The BungalowAssembly Manual
© Suncast Corporation
Toll Free: 866.768.8465
Hours: 9-5 Monday-Friday EST
2x4 Rafters24” on center
2x4 Double
Wall Plate
Factory Primed Trim
Screened Wood Vents
Boxed in12” G
ables
Assembled
Peak Height - 10’4”
2 Large Wrought
Iron Flower H
ooks
Extra Strong7’ H
igh Front Walls
6’ High Back W
alls
Shingles(Supplied B
y Custom
er)
1/2” OSB Sheathing
Black A
ntique Hinges
Sidewalls 2x4’s 16” O
.C.
Factory Primed Siding
(ready for customer supplied paint)
5/8” Exterior 5-Ply Decking (w
ith optional floor)2x4 Sill Plate
Real Lock-Set
Find the assembly m
anual for this product atw
ww
.Hom
ePlaceStructures.com/m
anuals
BUN
GALO
W
11’ 8”deep
16’ or 20’
Optional Vented Cupola w
ith Copper Roof
“Offset” A-Fram
e Roof
(back roof is longer than the front roof)
specifica
tions
Double Plyw
oodG
ussets
Treated Bottom Plate (if purchased w
ithout floor)
Treated 2x4 Wood Ram
p(w
ith floor option)Insulated Raised Panel D
ouble House D
oors
Three Large24”x36” A
luminum
Slider W
indows
(with screens)
Four on the 20’ Model
Three Sets of V
inyl ShuttersFour on the 20’ M
odel
Three Vinyl
Flower B
oxesFour on the 20’ M
odel
18” Wide
Front Overhang
The Bungalow is not your typical shed; it is an upscale garden building. G
reat for a studio, guesthouse, garden building, outdoor storage, gift shop, office, den, playhouse, w
orkshop, pool house, or find your ow
n creative use. This unit includes 2x4 construction, steep A-frame roof
style, with 2x4 rafters, insulated raised-panel steel house doors, 3 slider w
indows w
ith screens and shutters, 3 flow
er boxes, and beautiful screened wood vents.
wide
Unit show
n is 12’x16’; 12’x20’also available
Please read through the entire manual before starting!
Note: It is very important that you have a level site for the garden building. If you have pur-
chased the optional floor, a level crushed-stone pad is recommended.
When using tools and ladders always follow manufacturers recommended safety guidelines!
Tools Needed:
Level
Screw Gun
Hammer
Tape Measure
Skill Saw
Speed Square
Chalk Line
Pencil
5/16” Drill Bit
Tin Snips
Caulking Gun
Other Items Needed:
Approximately 5 gallons of paint
Approximately 12 Bundles of shingles
Heavy duty Silicone Caulk/Sealer
Bungalow AssemblyManual
revised 11/12/06
© Suncast Corporation
When your kit arrives, it should look like this.
Inspect the package for any damage that may
have occurred during shipping, dented cor-
ners, punctured plastic, etc. If the package is
damaged, alert HomePlace Structures imme-
diately at 866.768.8465.
Hardware & Fasteners
3”16 Penny Nails
Color Code: Fluorescent
Green
Page 3
2-1/2” 7 Penny Nails
Color Code: Pink2” 6 Penny Nails
Color Code: Orange
2” Trim Nails
Color Code: Fluorescent Yellow
1-1/2” Red Shutter Screws
Color Code: Dark Blue2” Black Hinge Screw
Color Code: Black
This pack also includes two
door bumpers and one square
drive bit.
1” Pan Head Window Screws
Color Code: Light Blue
1” Roofing Nails
Color Code: Purple
1-1/2” White Washer Head
Flower Box Screw
Color Code: Dark Green
The following fasteners are included with your kit. However, you will find the assembly process to pro-
ceed much faster when using air powered tools and fasteners. When replacing hand fasteners with air
powered fasteners, always use a fastener equivalent.
© Suncast Corporation
Optional Floor Assembly
Step 1: Cut open floor kit, cut metal bands, and remove top plywood sheet as shown.
Your floor kit should include all of the following parts:
Page 6
© HomePlace Structures
See drawings on previous page for measurements.
If you did not purchase the optional floor, please proceed to page 8.
Pressure Treated 2”x4”:
17 - 8'
13 - 41”
OSB pieces:
24 - 3-1/2" x 23-1/2"
5/8” Plywood Flooring
3 - 4’x8’ sheets, 2 - 4'x4' sheets
2 - 44"x8'
Note: The unit assembled for this manual was 12’x16’. This manual is
designed to help assemble a 12’x16’ or 12’x20’ Bungalow. If you have
purchased a 12’x20’ unit, please not that the pictures for some steps
will appear different from. Please refer to the included drawings for your
specific unit.
Tip: It is important to level
floor before proceeding to
next step.
Step 2: Layout four 8’ pressure treated 2”x4” floor plates, mark off for floor joists at 16” on center and
square as shown.
Step 3: Layout floor as shown.
Note: See attached drawing for
measurements.
Step 4: Attach short floor joists to
long floor joists using using 6p 2”
nails and OSB pcs, keeping all
pieces flush at top.
Step 5: Attach floor joists
together at appropriate meas-
urements using 2-16 p. 3” nails
per joist
Step 9: Fasten plywood sections to floor joists using penny 7 p. 2-1/4” galvanized nails spaced
8” apart. Note: It is important to align plywood properly at edges.
Step 6: Attach outside band-
board joists together as shown.
Step 7: Make sure floor is square.
Floor is square when diagonal meas-
urements are equal.
Step 8: Layout plywood floor
sections as shown.
page 7
Bottom Wall Plate Layout for Units without floor
Step 10: Cut open large package and remove packing materials repeating step 1.
Step 11: Remove top layer of
4’x8’ OSB roof sheeting and
set aside.
Step 13: Remove screws from
4’-2”x4” double wall plates
and set aside.
Note: If you purchased the optional floor, please proceed to back wall layout and assembly page.
Step 12: Remove next layer of
kit and set aside.
Step 14: Remove all remaining
pieces (excluding pressure
treat 2”x4” bottom wall plates)
and.
Step 15: Measure a square
pad at 140”x192” and snap
lines as shown. Make sure
layout is square, see step 19.
Note: The measurement for
a 12’x20’ unit is 140”x240”.
Wall Plate 2”x4”Material List*:
10 - 8’ 6 - 25”
4 - 4’ 6 - 7’
*For a 12’ x 16’ size
page 8 © Suncast Corporation
Step 17: Mark and cut bottom plates to fit. Step 18: It is recommended
put a layer of clear silicone
sealer under bottom plates.
Step 20: Fasten bottom plates
to surface using concrete
screws, tapcons, or fastener
equivalent.
Bottom plate layout is com-
plete.
Step 16: Layout 6’ pressure treated bottom plates as shown. See next step
Step 19: Make sure bottom
plate layout is square. It is
square when diagonal meas-
urements are equal.
page 9© Suncast Corporation
Back Wall Layout & Assembly
Step 21: Layout top (top plate is a double wall plate) and bottom wall plates, measure and mark at 16”
on center as shown.
Step 22: Layout 68”-2”x4” wall studs and fasten to top and bottom plates at marks using 2 16p 3” nails
per stud as shown.
Note: It is very important align top of studs flush with top of wall plate.
See drawings on previous page for measurements.
page 12© Suncast Corporation
Step 23: Remove four 4’x85” sheets siding and layout on wall as shown.
Step 24: Start siding with over-
lap at corner with 1” overhang
at end of wall.
Step 25: Siding edge should
center on wall stud as shown.Step 26: Fasten siding to
walls using 7p 2-1/4” galva-
nized penny nails every 8”.
Step 28: Mark and cut off
excess siding as shown.
Step 27: Install next siding piece as shown, keeping groove reveal
consistent with other openings on sheet. Repeat to end of wall.
page 13
Step 29: Lift and set wall as
shown.
Step 30: Fasten wall to floor
using 16p 3” nails every 8”.
Step 31: Fasten siding to floor
using 7p 2-1/4” galvanized
penny nails every 8”.© HomePlace Structures
Front Wall Layout & Assembly
Step 34: Use square to mark
top and bottom plates at onceStep 35: Layout wall studs
aligning studs with marks on
wall plates.
Step 36: Leave out one 13”
block at top of door, this will
be installed when applying sid-
ing.
See drawings on previous page for measurements.
Step 32: Layout top and bot-
tom wall plates as shown.
Note: Reference drawings for
proper wall layout.
Step 33: Mark off wall using
measurements shown in draw-
ing.
page 16© Suncast Corporation
Step 38: Window Layout
should look like this.
Step 39: The wall is now ready
for siding installation.
Step 40: Layout front siding
pieces as shown.
Siding Measurements:
2 - 1’x90”, 2 - 4’x90”
2 - 16-3/4”x4’ (for top of door)
Step 37: Nail wall together using 12p 3” nails as shown.
Step 41: Begin with 4’x90” sid-
ing pieces on either side of
door, keeping 1/2” away from
edge of 2x4. Nail 4’x90” across
top only and only one nail at
bottom doorway corner of
siding piece.
Note: Left side of door
should have siding underlap.
Note: Right side of door
should have siding overlap.
Step 43: Before nailing rest of
siding, make sure that door
opening is square. Door is
square when corner to corner
diagonal measurements are
equal.
1/2”
Reveal
3/4”
Reveal
Step 42: Install 16-3/4”x4’ sid-
ing piece at top of door way -
nail across top only.
page 17© Suncast Corporation
One Nail
Here
1’x90”
4’x90”
4’x16-3/4”
Step 44: Install remaining door
header stud to center on siding
piece splice.
Step 46: Cut siding piece to fit using mark and install as shown.
Step 48: Lift and set wall
repeating steps from back wall.
Step 51: Use nails to snap 4
lines to mark window outline.
Step 45: Take remaining 16-3/4”x4’ door header siding and mark
piece as shown.
Step 49: Fasten wall bottom
plate to floor and siding to floor
repeating previous steps.
Step 50: Put a nail in each
corner of window (4 total) and
out through siding.
Step 52: Use a skill saw to cut
out window opening.
Front wall is complete.
Note: Remove nails prior to
cutting
Step 47: Install remaining sid-
ing pieces.
page 18
Side Wall Layout & Assembly
Note: This wall can be used for
either the right or left side wall.
Step 53: Layout wall repeating steps on front and back walls, using drawings on previous page.
See drawings on previous page for measurements.
Step 54: Set wall, align with front and back wall, and fasten as shown.
© Suncast Corporation page 20
© Suncast Corporation
Opposite Wall Layout & Assembly
Step 55: Layout wall repeating steps on front and back walls, using the measurements shown on previ-
ous page
Step 56: Set wall, align with front and back wall, and fasten as shown.
page 22
Page 23© Suncast Corporation
Sidewall Siding Installation
Step 57: Make a mark at both ends of wall even with bottom of sid-
ing and snap a line. Hammer 4 nails spaced approximately 2 apart
on line.
Step 58: Layout 2 full siding
sheets and 1 sheet as shown.
Step 58: Install first full sheet of siding by resting it on nails along bottom. Align siding piece at top and
end of wall, siding splice should fall on the center of wall stud. Nail off siding every 8” using 2-1/2” 7p
penny nails.
Step 59: Install remaining siding pieces repeating previous step.
Last siding piece should be flush with end of wall.Step 60: Repeat on opposite
wall.
Front & Back Soffit Installation
Step 61: Measure down 9” from top of wall and snap a line as
shown.
Step 62: Install soffit strip pieces
aligning bottom of piece with top
of line as shown.
Step 64: Fasten soffit pieces to soffit strip piece and to bottom of
rafter as shown.
Step 63: Overhang first 18”x48” soffit piece 1/2” as shown (do this
for both ends of garden building).
Step 65: Repeat steps on back
wall, measuring down 2-3/4”
from top of wall
Page 24 © Suncast Corporation
page 25© Suncast Corporation
Rafter Assembly & Installation
Step 67: Layout rafters and align
as shown.
Note: Make sure longer side of
rafter gusset is on longer rafter.
Step 66: Each rafter consists of
1-2x4x96” long, 1-2x4x86-1/4”
long, and two rafter gussets (end
rafters have only one gusset.
Note: End rafters have a left
and right, make sure to assem-
ble with gusset of opposite
side as shown.
Step 68: First assemble 2 end
rafters by fastening one rafter
gusset to rafters using 2” 6p nails
as shown.
Step 69: Assemble remaining 7
rafters by fastening a rafter gus-
set to each side of rafter.
Step 70: Install first end rafter
making sure gusset is facing
inside. Rafter should overhang
wall 1/2”.
Step 71: Fasten rafter to top of wall and into bottom of rafter as
shown.
Note: End of rafter should be flush with end of soffit, if needed adjust
rafter by pushing back and forth.
Step 72: Install remaining rafters
keeping them spaced exactly 2 ft.
apart.
page 26© Suncast Corporation
Gable Siding Installation
Step 73: Mark siding at both
ends 3” rom top of wall and snap
a line.
Step 74: Layout gable siding
pieces as shown.
Step 75: Install first gable siding piece, keeping piece aligned at ends
and with chalk lines as shown.
Note: Siding grooves should also align with grooves on wall.
Step 76: Install pre-cut gable sid-
ing brace at siding splice as
shown.
Step 78: Install remaining gable siding pieces as shown. Repeat on
opposite gable wall.
Step 77: Install corner overhang
brace on both front corners as
shown.
OSB Roof Sheeting Installation
Step 79: Layout two 4’x8’ and two
30-1/4”x8 OSB roof sheeting
pieces as shown.
Step 80: Install first full sheet of OSB keeping sheet centered on
middle rafter and flush with bottom of rafter.
Step 81: Fasten roof sheet to rafter using 7p 2-1/2” nail every 8” as
shown.
Step 82: Before fastening top of
OSB sheeting mark off every 2’.
Step 83: Fasten OSB to rafters
making sure rafters are spaced
evenly at 2 ft. on center.
Step 84: Install remaining OSB
pieces and repeat on back side.
Step 85: Paint building desired
color (paint sold separately).
Note: Trim pieces included are
painted white, you can paint
the trim a different color to
suite your taste. It is easiest to
paint trim prior to installing.
38”’x8’
4’x8’
page 27© Suncast Corporation
Gable Overhang Assembly & Installation
Step 87: Layout gable overhang
pieces as shown.
White plywood goes on bottom,
OSB goes on top.
See step 88... Use 7p 2-1/4”
nails for this application.
© Suncast Corporation
Step 88: Assemble gable end box as shown.
Note: There are two long gable end boxes, one left and one
right, and two short gable end boxes, one left and one right.
Make sure to assemble properly.
Step 89: Align gable end box at
center of roof and with edge of
end rafter.
page 28
Align flush with
end rafter.
Step 86: Install gable end rafters as shown using 16p 3” nails.
Note: Align flush with top of gable rafter, leaving space for additional OSB sheeting.
© Suncast Corporation
Gable Overhang Assembly & Installation p 2
Step 90: Fasten gable end box to end rafter as shown using 7p 2-1/4” galvanized nails.
Step 92: Repeat on opposite
side.
Step 91: Fasten gable end boxes together using 16p 3” nails as
shown.
page 29
Fascia Installation
Step 93: Layout gable fascia
pieces as shown.
Step 94: Install gable fascia aligning properly at peak and end of
rafter using 2” trim nails as shown.
Step 95: Install back gable fascia as shown. Repeat steps on oppo-
site gable wall.
Step 96: Layout front fascia
pieces as shown.
Step 97: Install 8’ fascia section
by centering it on two rafters as
shown.
Step 98: Fascia end pieces need to cut to fit. Repeat steps on back
wall.
page 30© Suncast Corporation
Window & Window Trim Installation
Step 99: Install windows as shown using 1” pan head screws. It is strongly recommended to seal behind
windows with clear silicone caulk.
Step 102: Install top and bottom window trim keeping short points
flush with side trim.
Step 103: Repeat previous steps
on all windows.
Note: Top trim piece for side
window will fall on top of gable
siding piece as shown,
Step 100: Layout window trim
pieces as shown.
Material List:
2 - 37-5/8” 1x3 side pieces
1 - 30-7/8 short point 1x3 bottom
1 - 30-7/8” short point 1x4 top
Step 101: First install side window trim keeping flush with window at
top and bottom. Fasten trim with 2” trim nails.
page 31 © Suncast Corporation
Door Trim Installation
Step 104: Layout door trim
pieces as shown.
Door Trim Material List:
2 - 3-1/2”x73-1/2” 5/8 plywood
1 - 3-1/2”x78-3/4” 5/8 plywood
2 - 1”x4”x73-1/2” painted trim
1 - 1”x4”x78-3/4” painted trim
1 - 1”x3”x81” painted trim
Step 105: Make a mark 3/4”
above door header at both ends
of door opening.
Step 106: Fasten unpainted door
trim strip aligning with edge of
siding and with mark.
Step 107: Install painted trim piece on top of strip keeping all edges
flush as shown.
Step 108: Repeat previous steps
making sure door trim is spaced
71-3/4” apart.
Step 109: Attach painted 1x4 to
5/8” plywood piece using 2” trim
nails as shown (keep all edges
flush).
Step 110: Attach 1x3x81” flat on
top of 1x4 trim piece as shown.
Step 111: Install top door trim
and properly align as shown.
page 32© Suncast Corporation
Installation of Window Shutters
Gable Vent Installation
Step 114: Paint corner overhang trim piece and install as shown.
Corner Trim Piece Installation
Step 112: Install window shutters using 1-1/2” red screws as shown.
Note: Shutters can be painted to suit your taste.
Step 113: Install wooden gable vents using trim nails as shown.
Note: Vents should be slanted towards ground.
page 33© Suncast Corporation
Step 119: Insert bottom piece as shown and fasten with two screws
at front and back of flower box.
Step 115: Layout flower box
pieces as shown.
Flower Box Assembly & InstallationFasteners used for flower box assembly are included in each flower box package.
Step 120: Fasten flower box
beneath window using 1-1/2”
white screws as shown.
Screw Pattern
Step 116: Attach back of flower box to side using 2 screws as
shown. Note: Make sure to keep edges flush.
Step 117: Repeat step 111 for
opposite side
Step 118: Attach front of flower box to sides using two screws per
side making sure to keep bottom and outside edges flush as shown.
© Suncast Corporation page 34
Corner Trim Installation
Door Installation
Step 121: Layout corner trim
pieces as shown.Step 122: Install corner trim pieces using 2” trim nails as shown.
Step 123: Layout doors putting
door with latch hole cutout on the
right.
Step 124: Starting with left door install doors keeping door tight
against side and 1/4” reveal at top using 2” black hinge screws as
shown.
© Suncast Corporation
Step 125: Install opposite door repeating previous steps as shown.
Note: It is important to keep the reveal at top of door consistent the
whole way across top of door.
Step 126: Mark location of interi-
or door latch by tapping latch
into top and bottom header as
shown.page 35
Continued...
Ramp Assembly & Installation
Step 127: Drill out 5/16” hole for top and bottom latch as shown. Step 128: Install door latch fol-
lowing directions included with
latch.
Step 129: Layout 6’ treated ramp
pieces as shown
Note: If you did not purchase
the optional floor, the ramp is
not included.
Step 130: Find center of only one
2x4 treated ramp piece and cut
in half for ramp bottom brace.
Step 131: Layout ramp pieces
and make sure edges are pre-
cisely straight as shown.
Step 132: Measure in 12” from
each end as shown.
Step 133: Fasten cut bottom braces to bottom of ramp using 16p 3”
nails as shown.
page 36© Suncast Corporation
Continued...
Step 134: Fasten bottom door kick strip beneath door using 7p 2-1/4” galvanized nails as shown.
Drip Edge Installation
135: Cut out a 1-1/2”x1-1/2” notch in both ends of ramp as shown. 136: Install ramp as shown.
See steps on next page.
page 37© Suncast Corporation
Continued...
Rafter Tie Installation
Step 138: Use remaining wall studs as rafter ties. Install rafter ties with 16p 3-1/2” nails as shown.
Note: Space rafter ties evenly throughout building
Step 137: Install drip edge using 1” roofing nails as shown.
page 38© Suncast Corporation
Hurricane Clip Installation
Step 139: Install hurricane clips on each rafter as shown.
page 39
Flower Hook Installation
Flower Box Trim InstallationStep 140: Install flower pot hooks where desired.
Step 141: Install flower box trim pieces as shown using 2” trim nails (you will need to
bend or cut nails).
Note: This step is necessary only if you want the flower box to be a different color.
Door Stop Installation
Step 142: Install door stop as shown.
Optional Cupola Installation
Step 7: Position cupola on center of
roof and fasten to roof using 3 inch
screws.
Note: To utilize venting for cupola,
cut out an 8”x8” hole in center of
roof. Attach a screen piece over hole
to keep bugs out.
Step 1: Take 2 scrap wood pieces
approximately 24” long and fasten tightly
together with one screw, so boards pivot
when applying pressure.
Step 9: Attach roof to base using screws
attached to roof.
Step 3: Straddle the roof with each
board, making sure each board is flat
against the roof. Mark boards with pen-
cil for cutting template.
Note: Mark front and back board.
Step 4: Find center of cupola and mark
lightly with pencil.
Step 5: Align marks on bottom board
with edges of top board and make a cut
line from each corner to center line.
Step 2: Measure from end of building,
find center of roof and mark.
Step 6: Cut out roof line by starting at
corners and cutting to center. Repeat
steps 4-6 on opposite side of cupola.
Note: When marking opposite side of
cupola base, make sure that front
and back board match with previous
side.
Step 8: Place cupola roof on top of
base.
Note: Remove shrink wrap from cop-
per after step 9 to protect copper
from oils on skin.
Fro
nt
Toll Free: 866.768.8465
Hours: 9-5 Monday-Friday EST
Amish Handcrafted Gazebos, Garden Buildings, Playhouses, & Playsets