BUSINESS AND SCIENCE FORUM NEP changes, challenges, results. Annual review. NEP Chief Engineer Antanas Jankauskas
Transcript
Page 1: BUSINESS AND SCIENCE FORUM - lsta.lt NEO forumas/02_Antanas... · •Production parameters according EN standard’s requirements •EN ISO 3834 ... •ISO 9001-2000 ... Pre-insulated

BUSINESS AND SCIENCE FORUM

NEP changes, challenges, results. Annual review.

NEP Chief Engineer Antanas Jankauskas

Page 2: BUSINESS AND SCIENCE FORUM - lsta.lt NEO forumas/02_Antanas... · •Production parameters according EN standard’s requirements •EN ISO 3834 ... •ISO 9001-2000 ... Pre-insulated

*****************************************

Naujoviškas

Energijos

Perdavimas ®

Izoliuotų vamzdžių sistemos(IVS): Pre-insulated pipe systems (P-PS):

• Šiluminės energijos tiekimui Thermal energy supply

• Šalčio energijos perdavimui Cold energy transfer

• Produktotiekiui Product Pipeline

• Garotiekiui Steam supply

Page 3: BUSINESS AND SCIENCE FORUM - lsta.lt NEO forumas/02_Antanas... · •Production parameters according EN standard’s requirements •EN ISO 3834 ... •ISO 9001-2000 ... Pre-insulated

NEP in brief :

F&F

•Employees number – 58 (42)

•17 years of experience as manufacturer

•Industrial capacity – 220 km/year

•Production cycle – 8 min

• Turnover – 16mil Lt (4,54 mil €)

Achievements

•In 1999 and 2001 company was awarded the prize “The best Lithuania product of a year”

•Production parameters according EN standard’s requirements

•EN ISO 3834-2: 2007 certificate

•2x in production volume compared with 2013 year

• 30% export

Methods

•Integrated management in accordance with ISO

•Resource Management program OPEN ERP

•L e a n method in production process, The Kaizen process

•5S rating (sorting, Setting in Order to flow, Shining, Standardize, Sustain)

•PMBOK (project management body of knowledge)

Participation

•Company-owned private; belongs to Turnaround Baltic I

•NEP - member of LDHA

Page 4: BUSINESS AND SCIENCE FORUM - lsta.lt NEO forumas/02_Antanas... · •Production parameters according EN standard’s requirements •EN ISO 3834 ... •ISO 9001-2000 ... Pre-insulated

NEP management team

Chief engineer

Antanas Jankauskas

Administration manager

Lina Špakauskienė

Production manager

Artūras Kostiuchinas

Director / CEO/

Karolis Samušis

Export manager Artūras

Adomaitis

Sales manager

Justinas Meškauskas

Head of installation department

Vaidas Rimavičius

Commercial director

Vytautas Šapalas

Export development manager

Medardas Minkevičius

Economist

Evelina Kavaliauskaitė

Purchasing manager

Eglė Ivanauskienė

Page 5: BUSINESS AND SCIENCE FORUM - lsta.lt NEO forumas/02_Antanas... · •Production parameters according EN standard’s requirements •EN ISO 3834 ... •ISO 9001-2000 ... Pre-insulated

The production options of pre-insulated pipe systems

IVS

***********

P-PS

Pre-insulated single pipes

Pre-insulated double pipes

Pre-insulated single and double pipes for overground systems

Page 6: BUSINESS AND SCIENCE FORUM - lsta.lt NEO forumas/02_Antanas... · •Production parameters according EN standard’s requirements •EN ISO 3834 ... •ISO 9001-2000 ... Pre-insulated

Production potential

Product and service

Competence

Production –technological

base

•Pre-insulated single pipes (DN 20 ÷ DN 600/800) mm

•Pre-insulated double pipes (DN 20 ÷ DN 80) mm

•Pre-insulated single and double fittings

•Assembling of muffs

•Thermal tracks repair and installation

•ISO 9001-2000,

•ISO 14001,

•BS-OHSAS 18001:2007,

•SPSC (National Certification Centre)

• EH&P,

•EN ISO 3834-2

• production facilities 3120 sq. m

• Outdoor storage, 3450 sq.m

•Foaming machines – Puromat 150 QS; RIM Star 155/155; Σ output 5kg/s

•2 plastic welding machines, diameter range of PE 90 – 800

•Metal-processing and welding equipment

Page 7: BUSINESS AND SCIENCE FORUM - lsta.lt NEO forumas/02_Antanas... · •Production parameters according EN standard’s requirements •EN ISO 3834 ... •ISO 9001-2000 ... Pre-insulated

Production operations and processes

Page 8: BUSINESS AND SCIENCE FORUM - lsta.lt NEO forumas/02_Antanas... · •Production parameters according EN standard’s requirements •EN ISO 3834 ... •ISO 9001-2000 ... Pre-insulated

Production operations and processes Hight preassure PU foaming with 12% c-p blowing agent

New system for fittings with 6% c-p blowing agent

Assembling process by conveyor line with distance control

Semi-automatic welding of metal

Mechanical process - cutting, grinding, drilling, cleaning, trimming, bending, etc

Plastic cutting and welding(butt welding and by extruder)

Page 9: BUSINESS AND SCIENCE FORUM - lsta.lt NEO forumas/02_Antanas... · •Production parameters according EN standard’s requirements •EN ISO 3834 ... •ISO 9001-2000 ... Pre-insulated

Other processes

NEP

Control of raw material

Internal logistics process

Products and materials storage

Page 10: BUSINESS AND SCIENCE FORUM - lsta.lt NEO forumas/02_Antanas... · •Production parameters according EN standard’s requirements •EN ISO 3834 ... •ISO 9001-2000 ... Pre-insulated

Critical success factors for quality

• The production base.

• Raw materials, blanks.

• Work tools

• Staff (equivalent qualification, high turnover rate)

• Measures base for parameter verification .

• Production process organization and execution. (Is it carried by

technological profiles, projects, materials limitedness cards, accounts-

permits, other normative documents?)

• ISO Management.

• Legal activities, qualification, regulatory and technological base.

• Business Partners. (suppliers, subcontractors, designers, auditors,

material testing laboratory, etc.).

• Membership of business associations,

• Business philosophy, the company's policy and objectives.

Page 11: BUSINESS AND SCIENCE FORUM - lsta.lt NEO forumas/02_Antanas... · •Production parameters according EN standard’s requirements •EN ISO 3834 ... •ISO 9001-2000 ... Pre-insulated

Technology, quality and environment

Page 12: BUSINESS AND SCIENCE FORUM - lsta.lt NEO forumas/02_Antanas... · •Production parameters according EN standard’s requirements •EN ISO 3834 ... •ISO 9001-2000 ... Pre-insulated

Lab. quality control results

Pre-insulated steel pipe 60,3/125

• PUR: λ50 - 0,028 W/(mxK)

• PUR density: 69 kg/m3

• PUR compression strength: 340 kPa

• Voids and bubbles: 1,54%

• Centre line deviation: max 1,0 mm

• Axial shear strength: 0,36 Mpa (+230C)

• Axial shear strength: 0,24 Mpa (+1400C)

• Impact resistance: 48 shots, no cracks

• C-pentane: 29%

Page 13: BUSINESS AND SCIENCE FORUM - lsta.lt NEO forumas/02_Antanas... · •Production parameters according EN standard’s requirements •EN ISO 3834 ... •ISO 9001-2000 ... Pre-insulated

New activities, challenges

Boiler manufacturing

Page 14: BUSINESS AND SCIENCE FORUM - lsta.lt NEO forumas/02_Antanas... · •Production parameters according EN standard’s requirements •EN ISO 3834 ... •ISO 9001-2000 ... Pre-insulated

Boiler manufacturing

Page 15: BUSINESS AND SCIENCE FORUM - lsta.lt NEO forumas/02_Antanas... · •Production parameters according EN standard’s requirements •EN ISO 3834 ... •ISO 9001-2000 ... Pre-insulated
Page 16: BUSINESS AND SCIENCE FORUM - lsta.lt NEO forumas/02_Antanas... · •Production parameters according EN standard’s requirements •EN ISO 3834 ... •ISO 9001-2000 ... Pre-insulated

DN 600/800!!!

Page 17: BUSINESS AND SCIENCE FORUM - lsta.lt NEO forumas/02_Antanas... · •Production parameters according EN standard’s requirements •EN ISO 3834 ... •ISO 9001-2000 ... Pre-insulated
Page 18: BUSINESS AND SCIENCE FORUM - lsta.lt NEO forumas/02_Antanas... · •Production parameters according EN standard’s requirements •EN ISO 3834 ... •ISO 9001-2000 ... Pre-insulated

Problems and Solutions

Page 19: BUSINESS AND SCIENCE FORUM - lsta.lt NEO forumas/02_Antanas... · •Production parameters according EN standard’s requirements •EN ISO 3834 ... •ISO 9001-2000 ... Pre-insulated

Problems and Solutions

Page 20: BUSINESS AND SCIENCE FORUM - lsta.lt NEO forumas/02_Antanas... · •Production parameters according EN standard’s requirements •EN ISO 3834 ... •ISO 9001-2000 ... Pre-insulated

Problems and Solutions

Page 21: BUSINESS AND SCIENCE FORUM - lsta.lt NEO forumas/02_Antanas... · •Production parameters according EN standard’s requirements •EN ISO 3834 ... •ISO 9001-2000 ... Pre-insulated
Page 22: BUSINESS AND SCIENCE FORUM - lsta.lt NEO forumas/02_Antanas... · •Production parameters according EN standard’s requirements •EN ISO 3834 ... •ISO 9001-2000 ... Pre-insulated

22 0

Page 23: BUSINESS AND SCIENCE FORUM - lsta.lt NEO forumas/02_Antanas... · •Production parameters according EN standard’s requirements •EN ISO 3834 ... •ISO 9001-2000 ... Pre-insulated
Page 24: BUSINESS AND SCIENCE FORUM - lsta.lt NEO forumas/02_Antanas... · •Production parameters according EN standard’s requirements •EN ISO 3834 ... •ISO 9001-2000 ... Pre-insulated
Page 25: BUSINESS AND SCIENCE FORUM - lsta.lt NEO forumas/02_Antanas... · •Production parameters according EN standard’s requirements •EN ISO 3834 ... •ISO 9001-2000 ... Pre-insulated
Page 26: BUSINESS AND SCIENCE FORUM - lsta.lt NEO forumas/02_Antanas... · •Production parameters according EN standard’s requirements •EN ISO 3834 ... •ISO 9001-2000 ... Pre-insulated

Warehousing

Page 27: BUSINESS AND SCIENCE FORUM - lsta.lt NEO forumas/02_Antanas... · •Production parameters according EN standard’s requirements •EN ISO 3834 ... •ISO 9001-2000 ... Pre-insulated

NEP offers: Pre-insulated pipe systems for transportation of hot water, steam or other

fluids at high and cold temperatures

All the necessary fitting such as bends, T-pieces, valves, etc.

The double pipe and fitting consists of two parallel steel service pipes

housed in one jacket pipe

A complete range of field joints to suit different installation conditions and

customer demands

Installation and repairing of heat supply network

Installation and repairing of heating units

Steel constructions and installation

Page 28: BUSINESS AND SCIENCE FORUM - lsta.lt NEO forumas/02_Antanas... · •Production parameters according EN standard’s requirements •EN ISO 3834 ... •ISO 9001-2000 ... Pre-insulated

Expected changes in efficiency

Production cycle of straight pipes - 7 min

Production cycle of fittings - 18 min

Reduce the amount of welded parts by 40%

Accelerate and improved product loading and storage – 25%

Stabilize preheating process , reduce energy losses -40%

Expand the nomenclature of products

Increase productivity by 157% with the same number of employees

Achieve EBITDA 425 740 EUR