Local Pensions Partnership Group (LPP)
Business Continuity Plan (BCP)
NOTE:
If an emergency occurs which threatens life, property or the environment, your first
action should always be to contact the emergency services by dialing 999.
ANNEX 2
Private
Reference: ISMS 17.2
Version Number: 2.0
Issue Date:
Page: 2 of22
Table of Contents
SECTION 1 – ABOUT THE PLAN ________________________________________________ 3
1. Introduction ________________________________________________________________ 3
2. Purpose of the BCP plan _______________________________________________________ 3
3. What is a disaster? ___________________________________________________________ 4
4. Why the need for a plan? ______________________________________________________ 4
5. Scope of the BCP Plan ________________________________________________________ 5
6. Maintenance and changes to the plan __________________________________________ 5
7. Plan Testing and Proceedures __________________________________________________ 6
8. The Buisness Continuity Team is made up of ______________________________________ 6
9. Invocation _________________________________________________________________ 6
10. Who can invoke the BCP plan __________________________________________________ 6
11. Activating the plan ___________________________________________________________ 7
12. Business Continuity Organisation Structure _______________________________________ 8
13. About the Disaster Recovery (DR) Centres & the Contract ____________________________ 9
14. Business Impact Analysis Summary ____________________________________________ 10
15. Accommodation Plan – Union Street ____________________________________________ 11
16. Accommodation Plan – Hertfordshire ____________________________________________ 11
17. Accommodation Plan – Lancashire ______________________________________________ 12
18. Communication Plan ________________________________________________________ 12
19. Scenario assumptions for Union Street Herts and Lancashire _________________________ 12
SECTION 2 – MANAGING THE BUSINESS CONTINUITY PLAN/PROCESS ________________ 12
1. Process for plan activation ____________________________________________________ 12
2. Incident/disaster assessment and action plan _____________________________________ 12
3. Management/BCP meeting ____________________________________________________ 13
4. The first 24 hours ___________________________________________________________ 15
5. The second 24 hours ________________________________________________________ 16
6. After the first 48 hours ______________________________________________________ 17
7. Restoration of systems ______________________________________________________ 17
SECTION 3 - RESUMPTION of NORMAL SERVICE RETURNING to BUSINESS AS USUAL ____ 19
SECTION 4 - Appendices ____________________________________________________ 20
1. Appendix A – BCP Job roles ____________________________________________________ 21
2. Appendix B – Team plans _______________________________________________________ 22
3. Appendix C - Key External Contacts list ___________________________________________ 22
Private
Reference: ISMS 17.2
Version Number: 2.0
Issue Date:
Page: 3 of22
SECTION 1 - ABOUT THE PLAN
1. Introduction
This is the Business Continuity Plan (BCP) documentation for the Local Pensions Partnership
Group, consisting of the following:
Local Pensions Partnership Investments Ltd (LPPI) the regulated entity,
Local Pensions Partnership Administration Ltd (LPPA) for Pensions Administrations and
Risk services.
In the event of a disaster which interferes with the LPP’s ability to conduct business from any of
its offices, this plan (Business Continuity Plan) will be implemented and followed by Departments,
Funcitions, Teams and individuals responsible to coordinate the business recovery of their
respective areas and/or departments. The plan is designed to contain, or provide reference to,
all of the information that might be needed at the time of a business recovery.
LPP is comprised of a number of companies and office locations. This plan covers all of the
offices, although responsibilities may differ depending on the office location.
There is a framework in place to manage the business continuity process, to assist in this there
are a set of documents which support the BCP:
• Crisis Communication Plan – providing a procedure to deal with any crisis which may
affect LPP.
• ICT (Information & Communications Technology) Disaster Recover Plan –detailed
procedures to recover the ICT systems.
• LPPI Team Business Continuity Plans : Individual plans detailing procedures to deal with
possible scenarios and on how teams will prioritise
o Investment Team BC Plan
o Compliance Team BC Plan
o Investment Operations Team BC Plan
• LPPA Team business continuity plans
These documents are available on the intranet and copies are held off-site at the Disaster
Recovery DR site and on the Business Continuity website.
2. Purpose of the BCP plan
The purpose of this plan and its complementary policies is to ensure that the organisation has a
documented and fully functional set of procedures which incorporate both business and ICT
services and which is written in sufficient detail to enable the re-instatement of those services
within 24-48 hours of a “disaster”.
The objective of the Business Continuity Plan is to coordinate recovery of critical business
functions in managing and supporting the business recovery in the event of a disruption or
disaster. This can include short, medium or more long-term disasters or other disruptions, such
as fires, floods, earthquakes, explosions, terrorism, extended power interruptions, and other
natural or man-made disasters.
Private
Reference: ISMS 17.2
Version Number: 2.0
Issue Date:
Page: 4 of22
The BCP plan will enable the Company to meet its statutory,
regulatory, and commercial obligations and initiate
“Business As Usual” in the event of a disaster affecting its normal level of service.
Information security is a key consideration in the plan to ensure that the confidentiality,
integrity and availability of information is maintained in any eventuality.
3. What is a disaster?
For the purposes of Business Continuity and this manual the term disaster is any situation that
the Executive Committee deem to be of a serious enough nature to implement the BC plan and
examples are covered in more detail within the crisis communication plan prepared and updated
by the Marketing and Communications Manager.
It should be noted that the length of time of the disruption should be taken into account when
deciding to invoke the disaster recovery plan. The time involved in bringing services back and
the data loss will need to be considered and will be a key decision point.
A disaster is defined as any event that renders a business facility inoperable or unusable, so that
it interferes with the organisation’s ability to deliver essential business services.
4. Why the need for the plan?.
4.1 LPP Group provides Investment Management (Regulated Business) and Pension
Administration services to London Pensions Fund Authority (LPP) and Lancashire
County Council (LCC), as well as pensions administration services to a number of
local government organisations (see table below) as part of corporate governance
requirements and contractual obligations is to ensure that we provide a working
business and IT disaster recovery plan within 24 hours of initiation.
4.2 Investment services are carried out by LPP Investments Ltd (LPP I) which is regulated
and an FCA registered subsidiary of LPP. Pension Administration Services are carried
out by the LPP Administration Ltd (LPP A).
4.3 With a move to greater reliance on the Internet to enable employers, agencies and
members to provide information electronically it becomes more and more critical that
service can be provided as quickly as possible.
4.4 A key requirement of our contractual agreements is that the business continuity plan
is reviewed on a regular basis and that IT Disaster Recovery plans are tested
regularly.
Private
Reference: ISMS 17.2
Version Number: 2.0
Issue Date:
Page: 5 of22
5. Scope of the BCP Plan
The BCP Plan is written to allow for:-
The BCP and DRP plans can be implemented within the 24
hour timescale required given that LPP is comprised of a
number of companies and office locations.
• As priority, The LPPI must be capable of resuming its BAU functions.
• The Business Continuity Plan is specific in scope to the recovery of core business functions
for the continuation from a serious disruptionional incident in any of LPP’s facilities to
ensure a fully restored operational business perspective at a new site.
• The Business Continuity Plan includes procedures for all phases of recovery as defined in
the Business Continuity Strategy of this document. This plan is separate from LPP’s
Disaster Recovery Plan, which focuses on the recovery of technology facilities and
platforms such as critical applications, databases and servers or other required technology
infrastructure. Unless otherwise modified, this plan does not address temporary
interruptions of duration less than the time frames determined to be critical to business
operations.
• The scope of the Business Continuity Plan will ensure staff / employees have the nessesary
training, documentation and understanding of what is expected and to ensure a seemless
approarch during execution of the plan.
6. Maintenance and Changes to the Plan
• Maintenance and review of the Business Continuity Plan is the responsibility of the Business
Continuity Manager.
• Maintenance and review of the Disaster Recovery Plan is the responsibility of the Head of
ICT and Facilities.
• Maintenance and review of the Crisis Comms Plan is the responsibility of the Marketing
manager.
• Maintenance and review of the Team Business Continuity Plans is the responsibility of each
department head/ Team Manager.
• Maintaining and/or monitoring of offsite office space sufficient for critical functions to meet
recovery time frames is the responsibility of the Head of ICT and Facilities.
7. Plan Testing and Procedures
Testing of the Business continuity plan as a functional document is the responsibility of the SMT
(Senior Management team) made of select department heads. The test will include scenario
testing, desktop walkthrough, simulations and etc. these will be coordinated by the Business
continuity Manager
• Team plans, each team manager is responsible for ensuring the workability of their
Business Continuity Plan. This should be periodically verified by active or passive testing.
• All plans are to be reviewed annually (November) or if there is a material change
warranting an off schedule review.
8. The Business Continuity Team is made up of
• Senior Management
• Senior Managers Team (SMT)
• Business Continuity Manager
• Facilities Manager
• Site representatives (and their deputies)
Private
Reference: ISMS 17.2
Version Number: 2.0
Issue Date:
Page: 6 of22
9. Invocation
To invoke the plan means to
the plan following a disaster.
9.1 When can we invoke the BC plan
Depending on the location and the type of disaster, the plan may be invoked in isolation of
functions, departments, teams, locations or in full.
There will be a designated business continuity site coordinator at each of the sites outside of
the main office.
9.2 Business Continuity Coordinators
The business continuity coordinators will be made up of members of staff that have been
identified as site representatives and have the responsibility for managing the
implementation of the business continuity plan during an emergency or a disruptive event.
These may be the managers at each site or anyone of senior authority (primary contact).
They would also have a deputy to ensure reliance isn’t on a single resource should the
primary contact be unavailable (secondary contact):
Location Primary contact details Secondary contact
Preston
Herts
Havering
Their responsibilities include coordinating the steps in the business continuity plan at their
respective sites.
10. Who can invoke the BCP plan
• The responsible officer (s), normally the chief executive or the Chief Risk Officer, will
authorise the BCP plan to be initiated.
• In the absence of the Chief Executive or the Chief Risk Officer any member of Senior
Management Team (SMT) can authorise the initiation.
• In the absence of any Senior Management a member of the BCP team (Appendix A) can
seek approval from the Board Chairman and initiate the plan.
• For instance where disaster recovery will be reverted to, there are invocation cards issued
to specific members of staff that can invoke DR regarding access to our alternative site in
Romford. This list is reviewed annually in line with the access control policy.
11. Activating the plan
The Chief Executive or Chief Risk Officer will delegate to the BCP managers responsibility for the
activation of the Business Continuity Plan. At the point the plan is activated the Senior
Management Team (SMT) will be informed. All staff members will be contacted and advised of
the current situation and what their role will be in the recovery phase.
The Chief Risk Officer is expected to have the personal contact numbers for the members of SMT
and the Business Continuity Manager.
Private
Reference: ISMS 17.2
Version Number: 2.0
Issue Date:
Page: 7 of22
Notification of a business interruption may originate from any
source. It is envisaged however that it will come from site
staff during occupation of premises, or from the landlord
security out of hours and possibly one of the emergency
services.
The following activation sequence will normally be used when informing personnel of the activation
of this plan, staff will be advised of the process via a number of available methods, text messaging
service, email comunications, with updates on the site and or phone calls from managers.
There are three phases which follow in the below sequence using
flags as easy identification:
phase will be used as an early warning of a situation which might
at some later stage escalate and thus require implementation of the Plan. A
allows key personnel/officers time to think, brief staff, start an incident log and prepare
for the deployment of resources should an message be received.
This is particularly important if an interruption occurs towards the end of office hours and staff
may need to be asked to stay at work until the situation becomes clear. Resources are not
normally deployed at this stage (although this will largely depend upon circumstances) and a
may follow this type of alert.
The major activities that can take place during this phase includes:
• Emergency Response Measures
• Notification of Management
• Damage Assessment Activities
• Declaration of the Disaster
phase will be used to request the immediate utilisation of staff
and resources and activation of the Business Continuity Plan.
In this phase, the Business Continuity Plans are put into effect. This phase continues until the
alternate facility is occupied, critical business functions have been re-established, and computer
system services restored to LPP’s Departments.
The major activities in this phase include:
• Notification and Assembly of the Recovery Teams
• Implementation of Interim Procedures
• Relocation to the Secondary Facility/Backup site
• Re-establishment of Data Ccommunications
phase will be used to signify the phased
withdrawal of any services or functions provided due to activation of the plan with a transition
back to the primary facility locations. The stand down order will be given by the manager who
will brief staff, stakeholders and customers as appropriate.
Private
Reference: ISMS 17.2
Version Number: 2.0
Issue Date:
Page: 8 of22
12. Business Continuity Organisation Structure
Responsibility for the BCP Plan is managed by three specific
levels of management within the company.
Senior Management
As directors and principle officers this group approves the
implementation of the BCP plan and for its overall success and accountability.
In the event of any disaster, early warning or downgrade situation the most senior director
available will advise the BCP Manager to begin to initiate the phase level process:
•
Business Continuity Planning Team
This is made up of the members of SMT (Senir Management Team) and the Business Continuity
Coorodinators. The Business Continuity Team has the delegated responsibility to
the plan. The group comprising key managers will oversee the detailed
implementation plans, ensure communication with all interested parties is maintained and
ensure any emergency purchasing is authorised and controlled.
The names and contact details of the BCP team members can be found in Appendix A.
Team Managers
Once the plan has begun phase then the nominated manager
from each of the Service Teams will take responsibility for contacting and organising their staff
into the appropriate working patterns at the relevant Disaster Recovery Centre.
The team managers will report back to the BCP team with progress, updates and any issues for
resolution.
After the initial first 48 hour period when staff are accommodated and we begin to deliver the
service, team managers will control their staff teams in the normal manner.
13. About the Disaster Recovery (DR) Centres & the Contract
London/Hertfordshire
LPP has a Disaster Recovery contract with Daisy Group (formerly Phoenix) that in the event of a
disaster then staff from either the London office or LPP Herts can be relocated to one of their
disaster recovery centres; the primary location being the Romford Office. The contract also
cover the provision of a number of servers, desktops, desks and other office equipment.
Fuller details regarding the Daisy Group contract can be found in the Disaster Recovery Plan
manual, including a breakdown of the ICT equipment. Provided is a summary of the centres and
the contract.
• The LPP contracts with Daisy Group, a specialist provider of business continuity services; the
contract covers the provision of computer servers, PC’s, printers, Internet access,
telephones and fax machines for staff.
• In the event of a disaster where there is free space within the Disaster Recovery centre we
may have the option to extend the number of seats above forty but this would be with
agreement with Daisy Group and does not form part of our contract.
• The main Disaster Recovery Centre is at Sovereign House, 16-22 Western Road, Romford,
RM1 3JT.
Private
Reference: ISMS 17.2
Version Number: 2.0
Issue Date:
Page: 9 of22
• The contract number with Daisy Group for invocation is
DR3772; contact with the site can be made at any time
but is limitedto authorized staff listed on the invocation
list.
• In the event that the Romford site is not available then our alternate sites would be at
Uxbridge in Middlesex or Wapping.
• The DR Centre is open for staff on a 24 hour basis and is subject to entry via front desk
security.
• The existing contract allows for fourteen weeks of occupation and may extend by the
agreement with Daisy and with the payment of additional fees.
Preston
The Preston office is located in Norwest court, Guildhall Street, Preston, PR1 3NU. The services
provided for the various government agencies are pension administration and Investment
management services. In the event of a disaster there is a co-located data centre in Manchester
which can be used to host backup infrastructure and data. In the event of a disaster this data
centre would be used until the main data centre in Preston was available again.
• The main Disaster Recovery Centre is at Daisy House, 1 Brindley Road, Manchester, M16
9TR.
In the event of the main office at Preston being unavailable users would be able to log in and
work from home where appropriate. However these arrangements will need to be confirmed so
we ensure the resources such as connectivity arrangements for all staff is available.
Havering
The Havening office is located in London Borough of Havering, Town Hall, Main Road, Romford,
Essex RM1 3BB.
In the event of a disaster (depending on the scenario – unavailability of office) the Havering
Business continuity plan will be reverted to.
14. Business Impact Analysis Summary
The purpose of this section is to provide the priority, recovery time objectives and recovery
point objectives for each team to be brought on-line at the recovery Centre.
Name of team RTO RPO
Investment Operations 24 hours Previous business day back up or last good backup
Compliance 24 hours Previous business day back up or last good backup
Risk 24 hours Previous business day back up or last good backup
Pensions Payroll 24 hours Previous business day back up or last good backup
Agency contracts 24 hours Previous business day back up or last good backup
Pension Services 24 hours Previous business day back up or last good backup
Employer Services 24 hours Previous business day back up or last good backup
Facilities (scanning) 24 hours Previous business day back up or last good backup
Investments 24 hours Previous business day back up or last good backup
Finance 24 hours Previous business day back up or last good backup
HR & Training 24 hours Previous business day back up or last good backup
Commercial Business 24 hours Previous business day back up or last good backup
Corporate Development 24 hours Previous business day back up or last good backup
Technical 24 hours Previous business day back up or last good backup
Business Change 24 hours Previous business day back up or last good backup
Private
Reference: ISMS 17.2
Version Number: 2.0
Issue Date:
Page: 10 of22
15. Accommodation Plan – London
We have more people than we can accommodate at the Disaster Recovery Centre so we will be
operating a split two shift system. Note. If the Disaster Recovery Centre has available space
then it will be possible to negotiate for additional seats which incur an additional charge to
standard contract fees.
The hours of working have been agreed as 8.00hrs to 15.00hrs GMT and 15.00hrs to 22.00hrs
GMT although it’s possible for the early shift to start before 8.00hrs and the late shift to extend
beyond 22.00hrs as required.
Responsibility for ensuring that the correct numbers of seats allocated to each team are filled is
the responsibility of each team manager.
The accommodation plan will need to be fluid as some staff can work from home and some for
cultural and family reasons may not be able to meet the shift times.
Team Number Day Evening Remote Access
Senior Executives
Pension services, including lfepa
Employer Services
Client services
Corporate Development
Facilities
Finance
HR/Training
ICT
Investments
Marketing
Specialist services
Business Change
Investment Operations
Compliance
Risk
16. Accommodation Plan – Hertfordshire
Seats have been provided for LPP Herts staff at the disaster recovery Centre.
The hours of working have been agreed as 8.00hrs to 15.00hrs GMT and 15.00hrs to 22.00hrs
GMT although it’s possible for the early shift to start before 8.00hrs and the late shift to extend
past 22.00hrs as required.
Responsibility for ensuring that the correct numbers of seats allocated to each team are filled is
the responsibility of the Herts team manager.
The accommodation plan will need to be fluid as some staff can work from home and some for
cultural and family reasons may not be able to meet the shift times.
Private
Reference: ISMS 17.2
Version Number: 2.0
Issue Date:
Page: 11 of22
17. Accommodation Plan – Lancashire
Should the main office for Lancashire be out of commission, the staff would relocate to the DR
site .
Where possible staff could work from home and connect to the services remotely.
18. Communication Plan
A number of ways have been identified to keep staff up to date with information about the
disaster scenario.
• The Business continuity website (please insert link) website has been created for staff to be
able view news/information. Staff are provided with logon/password access.
• Each night we do a data file transfer of HR records including name and address detail to the
site.
• We will use the corporate site once restored to broadcast information.
• We will use email to home address where we have details
• We will use SMS where we have phone details.
Staff have been provided with a business card which is re-issued on a periodic basis; this card
contains the three contact names and numbers. The card also contains the details of the website
address to the BCP site.
19. Scenario assumptions
A number of potential scenarios have been evaluated those which would require a full
implementation of the ICT disaster recovery plan and movement of staff to the disaster recovery
Centre and a number of partial incidents which could be managed on site. The scenarios are
covered in detail within the individual team BCP plans.
Private
Reference: ISMS 17.2
Version Number: 2.0
Issue Date:
Page: 12 of22
SECTION 2 – MANAGING THE BUSINESS CONTINUITY
PLAN/PROCESS
1. Process for plan activation
Depending on the site of disaster, the below can be tweaked to suit location. Other than London,
The Site Coordinators will be responsible for ensuring that the process below is followed;
As soon as an incident/disaster is reported the BCP process will commence and we move into
“standby mode”. The following actions will then be undertaken:-
2. Incident/disaster assessment and action plan
If an incident occurs during normal working hours we may not be able to hold any risk
assessments as it may be necessary to undertake an immediate evacuation of the office and
the following procedure must be followed.
ACTION FUTHER INFO/DETAILS Applicable
to all sites?
1 Evacuate the building
if necessary Evacuate the building in accordance with your
building’s emergency evacuation procedures. Use
the nearest stairwells. Do not use elevators.
Yes
2 Ensure all staff report
to the Assembly Point.
Staff should gather at the designated Assembly
point. The designated fire officers are responsible
for completing this action.
Yes
3 Call emergency
services (as
appropriate)
TEL: 999
The fire officers or representatives from the
Landlord is responsible for completing this action
Yes
4 Check that all staff,
contractors and any
visitors has been
evacuated from the
building and are
present. Consider
safety of all staff,
contactors and visitors
as a priority
Fire officers to manage the process.
Quickly assess whether any personnel in your
surrounding area are injured and need medical
attention. If you are able to assist them without
causing further injury to them or without putting
yourself in further danger, then provide what
assistance you can and also call for help.
Roll Call: department managers are responsible
for their team’s roll call. This is important to ensure
that all employees are accounted for.
Yes
5 Ensure log of incident
is started and
maintained
throughout the
incident phase
Use a decision and action log to do this.
The log template can be found in the appendix of
this manual and all Business continuity
coordinators must have an electronic template of
this form saved on their mobile devices
Yes
6 Record names and
details of any staff,
The designated fire officer and HR department are
responsible for completing this action
Private
Reference: ISMS 17.2
Version Number: 2.0
Issue Date:
Page: 13 of22
contractors or visitors
who may have been
injured or distressed
in the incident.
7 Forward details of any
fatalities or injuries in
the incident to HR
(depending on scale
of incident) and agree
action that will be
taken.
The HR contact to forward this information to is
the HR Manager
Yes
8 Assess impact of the
incident to agree
response / next steps
The BCP Manager and SMT are responsible for
completing this action
Yes
9 Log details of all items
lost by staff, visitors
etc. as a result of the
incident
Facilities officer is responsible for documenting
this information
Yes
10 Consider whether the
involvement of other
teams, services or
organizations are
required to support
the management of
the incident
Depending on the incident the following may be
approached to assist with incident management:
• Personnel
• Health and Safety
• Legal
• Occupational Health
Yes
11 Advise Managers to
contact their staff
with next steps
Reliance on Team BC plans at this point. All
managers must have the contact details for their
staff.
Depending upon the time of the disaster, people
are instructed what to do (i.e. stay at home and
wait to be notified again, etc).
Yes
12 Communication Ensure that staff are updated as often as possible,
ensure all staff have business continuity cards and
log on details.
Yes
3. Management/BCP meeting
If possible, it will be necessary to for management and the BCP team to meet to determine the
cause, effects and plans. If this meeting cannot be held in suitable location then a conference
call inviting all parties can be arranged.
The business continuity manager is responsible for ensuring that this meeting is managed.
The following actions should be considered. Note that all items may not be relevant.
Following this meeting all the actions decided upon will be divided between first 24 hours and
the next 24 hours
Private
Reference: ISMS 17.2
Version Number: 2.0
Issue Date:
Page: 14 of22
NO Description Action Date
1. Arrange meeting of managment and BCP team. This could
be a physical meeting or a virtual conference
2. Confirm all available all team members are present and
have access to the Business Continuity Plan and the crises
communication plan.
3. Overall situation report including nature and extent of the
emergency. Summarize any immediate actions taken.
4. Assess effect / impact of the situation, take into account:
4.1. Accommodation
- What premises have been affected? Anything key
stored in those building(s)? Alternative premises?
Mutual aid arrangements?
4.2. Staff
Are staff affected? Consider requirements and needs of
vulnerable staff. Agree which staff are required immediately
or their capacity to be available. Plan what to do with staff
not immediately required. Ensure all staff are contactable
and verify contact details.
4.3. Suppliers/Contractors/Key Customers
Are key suppliers, contractors, partners, customers affected
by the emergency? What alternatives are available?
4.4. What internal support activities been affected?
4.5. Legal and contractual obligations.
4.6. Telephony
- Has this been affected? Any impact?
4.7. Work
- What is the current status? What are we able to do?
What are the current priorities? What key activities
are affected?
4.8. Resources
- What resources do we require immediately? To what
do we have access? Alternatives? Mutual aid
arrangements to borrow equipment?
4.9. Information Technology
Is IT available? How long might the loss be of IT? What are
the plans should there be short and long term IT failure.
The outage would need to be in excess of 48 hours to
consider the move to the DR Centre worthwhile.
4.10. Transportation issues
Are there any problems with staff/customer/ supplier
transportation; E.g. Fuel, weather or change of premises
problems?
Private
Reference: ISMS 17.2
Version Number: 2.0
Issue Date:
Page: 15 of22
4.11. Health / Welfare issues
4.12. Utility issues
Has the emergency meant that facilities are affected;
i.e. water, electricity, etc.? What contingency plans are
in place for utilities/facilities failures?
5. Decide future actions/priorities
6. Communication to employees
Agree message to convey to staff
Agree which staff required immediately or their
capacity to be available and what to advise them.
Agree communication method to be used; i.e.
cascade tree and/or separate line with
answerphone or separate staff line/mobile into
which they can call.
7. Media/Public information
agree media message, see crisis communication plan
8. Any other business.
9. Chairperson to:
Summarize key points
Re-affirm priorities/actions
Decide if and when next meeting/tele conference call
is required.
10. Authorise the implementation of the BCP plan as per agreed
scenario or stand down and return to BAU.
4. The first 24 hours
After the initial BCP meeting and risk assessment is completed and it has been agreed to begin
the BCP process:-
ACTION FUTHER DETAILS/ACTION
1. Begin plan implementation
2. Where possible if access can still be made to the relevant
office, recover vital assets/equipment to enable delivery
of critical activities
3. Dependent upon the disaster situation we may need to
invoke the disaster recovery plan and instigate
recovery of systems alongside the BCP plans. ICT will
be authorised to begin the ICT disaster recovery plan
and DR company may need to be informed
Private
Reference: ISMS 17.2
Version Number: 2.0
Issue Date:
Page: 16 of22
4. The Company Secretary or designate to email the
Board outlining the situation and to keep them up to
date with developments
5. Hold Managers’ meeting if possible or begin chain of
communication with Managers whereby each is notified
with the facts.
6. Update the BCP website and intranet with information
and notify staff whether the office is operating under
normal working conditions or not.
7. Contact staff via bulk text, emails to company accounts,
emails to personal accounts.
8. Managers to determine level of staff availability in their
team and begin the process of keeping staff updated
with the disaster status and begin planning for staff to
resume work at their main office or DR location.
9. Ensure a contact numbers are available and the address
details of the DR site, if necessary, are published on the
BCP website
10. Agree policy for extraordinary additional leave where
necessary.
11. Ensure that the crisis communication plan is updated
and all interested parties kept up to date.
12. At the end of the first day assess next steps:-
Can staff return to office or do we continue with the DR
implementation and staff planning
5. The second 24 hours
ACTION FUTHER DETAILS/ACTION
1. Communicating with staff. As the scale of the incident
becomes clearer and the BCP team formulates its
plans it will be the responsibility of the BCP team to
provide a clear message to managers and staff and
this will be coordinated by the Communications
manager. The message will be delivered by:-
a. Updates to Business Continuity website
b. Text messages
c. Phone calls from managers
d. Emails to home address
Private
Reference: ISMS 17.2
Version Number: 2.0
Issue Date:
Page: 17 of22
2. Resource plans for the first day of resumption to be
confirmed by managers to the BCP team.
3. The ICT will finish the restoration of key systems by
the end of the 48 hour period.
6. After the first 48 hours
If the outage is confirmed as of a longer term nature then the BCP team will need to move the
organisation to as “business as usual” as possible. A number of issues will need to be
addressed:-
The BCP and wider HR team will work with Managers to ensure that the shift rotas (where
necessary) are managed effectively and do not cause un-necessary hardship for any staff
member.
Clients are kept up to date with regular communications to measure how well we are managing
against the SLA’s (Service Level Agreement).
Management will need to work with the board to determine the longer plans, we will we return
to the relevant office or will accommodation plans need to be considered.
If the disaster means that the organisation will be out of its offices for a longer period but will
return to the original office then a number of requirements will need to be considered.
• Not all systems are being re-instated in the first 48 hours and we will need to consider how
and when these can be bought on-line and the cost of this additional work valued against
agents contract commitments.
• The seats provided at the DR Centre are for skeleton staff coverage but we cannot sustain
this for any length time as the shift pattern would affect operational efficiency. Consideration
would need to be given to purchasing additional seats at the DR Centre which can be
obtained subject to room availability.
• In London, if the organisation does not get its first choice Centre at Romford and has to
locate to Uxbridge this will add burden of travel and costs for staff and again would reduce
operational efficiency.
7. Restoration of systems
The BCP manual does not detail the process of restoring systems each scenario will have
different requirements and details of system restore procedures can be found in the DR manual.
In the event of a full invocation at the DR centre the following priority of applications and
systems would be required.
Note, The BCP plan does not take into account restoration of desktops or the re-build of
the physical servers, these are covered in the ICT DR plan but the applications needed by
priority.
Private
Reference: ISMS 17.2
Version Number: 2.0
Issue Date:
Page: 18 of22
London/Hertfordshire
Priority System
Bloomberg
1 Email
2 Altair
3 Team Drives
4 Telephony
5 OpenHR
6 Intranet
7 Dimensions
8 BACS
9 CMS
10 FiSH
11 Employer Site
Preston
Priority System
1 Email
2 Altair/Image
3 Team Drives
4 Telephony
5 Intranet
6 BACS
7 CMS
8 Employer Site
Private
Reference: ISMS 17.2
Version Number: 2.0
Issue Date:
Page: 19 of22
SECTION 3 – RESUMPTION OF NORMAL SERVICE RETURNING TO BUSINESS AS USUAL
As the full extent of the incident is known we can determine and manage the process of
returning to business as usual the following actions should be completed.
ACTION FUTHER INFO/DETAILS
1. Agree and plan the actions required to
enable recovery and resumption of
normal working practises
Agreed actions will be detailed in an action plan
and set against timescales with responsibility
for completion clearly indicated.
2. Return all operations and services to
their original form
Implementation of agreed plan.
3. Continue to log all expenditure incurred
as a result of the incident
Use a financial expenditure log to do this
4. Respond to any long terms support
needs of staff
Depending on the nature of the incident, the
Business Continuity Team may need to consider
the use of Counseling Services e.g. internal
Occupational Health involvement or appropriate
External Agencies
5. Carry out a ‘debrief’ of the incident
and complete an Incident Report to
document opportunities for
improvement and any lessons
identified
Use an Incident Report Form to do this. This
should be reviewed by all members of the
Business Continuity Team to ensure key actions
resulting from the incident are implemented
within designated timescales
6. Review this Continuity Plan in light of
lessons learned from incident and the
response to it
Implement recommendations for improvement
and update this Plan. Ensure a revised version
of the Plan is read by all members of the
Business Continuity Team
7. Review the Crisis Communication Plan
and lessons learned
Update the Crisis Communication Plan with
lessons learned. Add them to the Concerto log.
8. Review the ICT disaster recovery
plan.
Review the recovery plans and amend to learn
lessons.
9. Publicise that there is now ‘business as
usual’
A number of tasks will need to be completed
and will include:-
Update of website
Publish new telephone numbers
Consider who needs to know that normal
working practices have been resumed e.g.
customers, suppliers etc.
10. Thank everyone involved preferably by personal phone call or email
Private
Reference: ISMS 17.2
Version Number: 2.0
Issue Date:
Page: 20 of22
SECTION 4 - APPENDICES
Appendix A – BCP Job roles
Included is the job roles required to manage the business processes within the BCP process
(some of the names listed may not be members of the BCP team), the name of the staff
member expected to manage this process is added but noted that they may not be available
and a substitute may be required.
a) Responsible Officer
• In normal circumstance the responsible officer will be the chief executive officer. In their
absence, the Chief risk officer assumes the role.
• Responsible for the overall success of the Business Continuity Plan and to provide direction
and guidance to the BCP Manager and BCP team.
b) Finance
• Responsible for ensuring that the company can meet its financial obligations.
• Responsible for authorising payments for ad-hoc requirements at the DR Centre
c) Board Support
• Responsible for providing updates to the Chairman and other board members of progress
with the “incident” and our recovery process.
• Provide updates to Executive Committee members of progress with the “incident” and our
recovery process.
d) Compliance Officer
• Responsible to ensure LPP I can meet its obligations.
• Provide updates to the Responsible Officer and Executive Committee.
e) HR Manager & staff payroll
• Responsible to ensure that all staffing issues are dealt with efficiently and effectively and
escalated to the responsible officer and BCP Manager as required.
• Work with all team managers to ensure a smooth transition of service to the DR Centre.
• Ensure that all staff needs including counseling are provided.
Private
Reference: ISMS 17.2
Version Number: 2.0
Issue Date:
Page: 21 of22
f) Communications Manager
• The marketing and communications manager is
responsible for the development and maintenance of the
crisis communication plan.
• Work with responsible officer and Executive Committee to provide a full communication
facility keeping staff and stakeholders updated on our progress.
g) Disaster Recovery Manager
• The Disaster Recover Manager will take responsibility for the planned restoration of the ICT
systems in line with the published DRP plan.
• The DR Manager will work in conjunction with ICT staff and PHOENIX technical staff to
complete restorations in agreed time scales.
• Report progress and problems with the restoration to the BCP manager.
h) Business Continuity Manager
• Delegated authority to implement and manage the BCP plan.
• Manage the BCP team members.
• Provide updates to the Responsible Officer and Executive Committee.
Appendix B– Team plans
Team plans are held on the intranet
Appendix C - Key External Contacts list
The key contact list is held on the intranet , on the business continuity website and at the battle
box in Romford.
Private
Reference: ISMS 17.2
Version Number: 2.0
Issue Date:
Page: 22 of22
Change History Record
Document Title: Business Continuity Plan
Version
No
Description of
change
Owner Approval Date of
Approval
Date of
Issue
1.0 First version Head of ICT LPP Executive
Committee
2.0 Revised Draft Senior Operational
Risk Officer
Chief Risk
Officer