+ All Categories
Home > Sales > Business profile 2016

Business profile 2016

Date post: 15-Apr-2017
Category:
Upload: rana-imran
View: 56 times
Download: 0 times
Share this document with a friend
4
315, Street No.12, G-15/1, JKCHS, Islamabad, Mobiles: 0092-300-5080094, 0092-322-5064818, [email protected], [email protected]
Transcript
Page 1: Business profile  2016

315, Street No.12, G-15/1, JKCHS, Islamabad, Mobiles: 0092-300-5080094, 0092-322-5064818, [email protected], [email protected]

Page 2: Business profile  2016

ABOUT THE COMPANY

IDEAL SOLUTIONS, was established in 2007 by a group of Construction Chemical professionals. The objective of the company is to provide its customers best possible services based on the latest construction techniques for saving time, money and misery. The well qualified teams behind the company posses rich experience of carrying out numerous application projects. The marketing & sales division is involved in sales of construction chemicals with services to end users.

Rana Imran Ahmad Khan Managing Partner

Rana Imran has a vast experience in the field of construction chemicals. He has represented different international companies in North Region Of Pakistan.

At IDEAL SOLUTIONS, we strive to deliver results, perform to highest standards, develop our people, provide quality customer service and actively pursue consistent durability improvements. The corporate philosophy of the company is based on quality services for quality jobs with a clear understanding of the variations in the clients’ requirements; IDEAL SOLUTIONS tends to approach every project with an utmost flexibility. The client is assisted at every stage with tailor made solutions using wherever possible, readily available products.

“WATERPROOFING”

All structures require waterproofing – weather to keep water out (Basements), or to keep water in (reservoirs)

Waterproofing of a structure is a critical element of its design and construction. Water infiltration and leakage damage a building’s structure and its contents. Because of the damaging effect of water, one must pay particular attention in selecting a quality waterproofing system and contractors to provide proper in place performance. “Our Specializations”

1. WATERPROOFING

2. EPOXY FLOORING

3. JOINT SEALING

4. CONCRETE REPAIR & PROTECTION

“JOINT SEALING”

Joints are essential features of modern buildings and structures. They allow for shrinkage, contraction, expansion and other movements which cause tensile or compressive stress. Shear movements, design tolerances and breaks between phases of construction are also accommodated by joints.

After a building has been completed, joints are a small, usually unnoticed part of the whole. But if joints are not properly designed and sealed against wind and weather, the result can lead to total failure of the structure- larger the project, the greater the disaster.

CONCRETE REPAIR EPOXY FLOORING WATERPROOFING JOINT SEALING

Page 3: Business profile  2016

CONCRETE REPAIR EPOXY FLOORING WATERPROOFING JOINT SEALING

“REPAIR & PROTECTION OF REINFORCED CONCRETE”

The decay of reinforced concrete is now a common sight around the world , Symptoms can include: Cracking, Sapling, Rusting of exposed steel reinforcement, Staining of concrete surfaces etc.

Attacks on concrete can be physical or chemical. Physical Attack includes -Water erosion, Wind-borne sand erosion, abrasion by wheels, or machinery, impact damage, Overload, Fire, Freezing and thawing cycles in colder climates etc. Chemical Attack includes -industrial spillage of aggressive chemicals, action of sulphates in ground water, internal crystal growth (in hot climates), alkali-silica reaction (ASR),

Corrosion of reinforcing steel is the most common reason for concrete distress. While many factors accelerate the process, there are two fundamental mechanisms which cause the problem: Carbonation – the effect of carbon dioxide (and/ or other acidic gases) present in the atmosphere, Chloride attack – the contaminating effect of chloride ions which may be present from one or more of the following sources -marine or costal locations, -use of road de-icing salts, -within the concrete matrix as a result of the use of contaminated raw materials during construction etc.

The original construction process can be the source of many problems. The most common reasons include Poor Concrete Mix Design, Poor Placement of steel reinforcement and shuttering, Inadequate Site Supervision during concrete placement, Inadequate Concrete Vibration – failure to ensure proper compaction, Poor Curing Techniques – failure to ensure full strength gain Decay Aggravated By Ambient Conditions Each of the following will accelerate the mechanisms of deterioration described above Elevated temperatures, High humidity/rain, Wet/dry cycling

“INDUSTRIAL FLOORING”

Floors in industry and commerce are not just parts of a structure. Industrial floors are heavily exposed to stress. Many production processes and procedures take place on these floors. They are also exposed to industrial chemicals. On top of this, industrial floors also have to meet a variety of operational requirements. Slip Resistance, Crack Bridging, Non-flammability, Conductivity, Aesthetics, Ease Of Maintenance, and, last but not least, Long Life these are just a few examples of the expectations for functional industrial floors.

Every industrial floor consist of two elements; Element 1, the base course, which always consists of the structural reinforced concrete slab. The purpose of this “load-bearing” course is to absorb or distribute static and dynamic loads. Element 2, the wearing course is the dominant part. The wearing course protects the floor from physical and/or chemical attack. The wearing course also has to meet the individual operational demands. Each element has its function, which is precisely defined. An industrial Floor can not be high – quality unless both the base course and the wearing course meet all of the requirements.

Page 4: Business profile  2016

• ZARKOON HEIGHTS (ISLAMABAD)

• KOHISTAN TOWER (RAWALPINDI)

• AKSON PHARMACUITECLAS (MIRPUR AJ&K)

• CANADIAN HIGH COMMISSION (ISLAMABAD)

• UAE EMBASSY (ISLAMABAD)

• UAE EMBASSY VILLAS (ISLAMABAD)

• CADET COLLEGE MUZZAFFARABAD (AJK)

• PEARL CONTINENTAL HOTEL MUZZAFFARABAD (AJK)

• STILLMAN’S INDUSTRIES (ISLAMABAD)

• REDCO TEXTILES LTD RAWAT (ISLAMABAD)

• HAIDRI BEVERAGES (ISLAMABAD)

• BEVERAGES PLUS (ISLAMABAD)

• NORTHERN BOTTLING (PVT) LTD (KPK)

• UCH POWER PLANT (BALUCHISTAN)

• PAKISTAN TOBACCO COMPANY AKORA KHATTAK (KPK)

• WAPDA STAFF COLONY (MUZZAFFARABAD, AJK)

• DISTT HQS HOSPITAL (ATHMUQAM, AJK)

• OLD MESS BUILDING PAF RISALPUR (KPK)

• RESIDENTIAL BLOCK 115 PAF RISALPUR (KPK)

• FDL HATTAR (KPK)

• DG OFFICE WAPDA (MUZZAFFARABAD AJK)

• SECRETARY DEFENSE’S HOUSE CHAKLALA CANTONMENT (RAWALPINDI)

• TEHSIL HEADQUARTERS HOSPITAL (HATTIAN BALA AJK)

• TEHSIL HEADQUARTERS HOSPITAL (HAJIRA AJK)

• OFFICE OF THE XEN BARQIAYAT (GARI DOPATA AJK)

• KSB PUMPS FACTORY (HASSANABADAL, PUNJAB)

• MALAKAND HYDRO POWER PROJECT III (DARGAI, KPK)

• CLASSIFIED PROJECTS (PUNJAB)

• MUREED AIR BASE (PUNJAB)

• MIANWALI AIR BASE (PUNJAB)

• NISHAT POWER LTD (PUNJAB)

• PRIVATE HOUSES (ISLAMABAD)

“OUR MAJOR PROJECTS”

315, Street No.12, G-15/1, JKCHS, Islamabad, Mobiles: 0092-300-5080094, 0092-322-5064818, [email protected], [email protected]


Recommended