  • 5/20/2018 Busway Handling Maintenance

    1/25

    1

    Technical Seminar on Busduct Handling,

    Installation, Testing and Maintenance

  • 5/20/2018 Busway Handling Maintenance

    2/25

    2

    Material Storage & Protection

    - Water / Dust Precaution

    Water/ dust will provide alternative path /heating point

    Damage insulation

    Latent hazard of short circuit

    Solution

    Double packing (plastic bag+carton box)

    Apply rain coat after installation each day

    Proper storage management

  • 5/20/2018 Busway Handling Maintenance

    3/25

    3

    Factory Precaution

    Double packing (plastic bag+carton box)

  • 5/20/2018 Busway Handling Maintenance

    4/25

    4

    Factory Precaution

    Double packing (plastic bag+carton box)

  • 5/20/2018 Busway Handling Maintenance

    5/25

    5

    Site Recommendation

    Apply rain coat after installation each day

    Protect ing the end Using pro per Plast ic Shield

  • 5/20/2018 Busway Handling Maintenance

    6/25

    6

    Proper Storage

    Storage in Dry and Clean Warehou seStorage in Dirty and Open Area

  • 5/20/2018 Busway Handling Maintenance

    7/25

    7

    Site Storage

    Wetted Floor

  • 5/20/2018 Busway Handling Maintenance

    8/25

    8

    Good Example of Busduct Storage

    Stored in Dry & Clean Place,

    Raise Crate wi th w ooden Blocks

    Provide Curb to Protect

    Vert ical Bus duc t

  • 5/20/2018 Busway Handling Maintenance

    9/25

    9

    6. Installation Procedure

    Video of Installation (about 8 minutes)

  • 5/20/2018 Busway Handling Maintenance

    10/25

    10

    Quality Project Management Services

    Provided by Schneider Product Training

    Site Measurement

    Optimum busduct routing design

    Detail shop drawing preparation

    On site technical support

    Training on installation procedure

    Missing Link and Remedial Units

    Joint inspection (not contractual service)

  • 5/20/2018 Busway Handling Maintenance

    11/25

    11

    Missing Links / Remedial Units

    Missing linkreserve 1 pc of busduct for final measurement

    Increase accuracy of busudct dimension Save time for rectifying installation mistake

    Streamline the installation

    Miss ing Link

  • 5/20/2018 Busway Handling Maintenance

    12/25

    12

    Missing Link

  • 5/20/2018 Busway Handling Maintenance

    13/25

    13

    Contractor-Supplier Interaction

    Project Start Technical support

    and routing deisgn

    AutoCad Drawing

    BRASS and

    manufacturing

    instruction

    Project

    Management

    Support

    Installation support

    After sales services

    and missing links

    Fabrication

    We are not only a

    busduct supplier

  • 5/20/2018 Busway Handling Maintenance

    14/25

    14

    Vertical Spring Hanger

    Release of Loc knu t

  • 5/20/2018 Busway Handling Maintenance

    15/25

    15

    Installation Arrangement Horizontal Hanger

  • 5/20/2018 Busway Handling Maintenance

    16/25

    16

    Installation Arrangement Horizontal Hanger

  • 5/20/2018 Busway Handling Maintenance

    17/25

    17

    Testing & Commissioning

    A.Factory Test

    Factory Test7500V dc Hi-potTest

    100% test before delivery

    Insulation = 10M/ ft

    (IEC require 1M/ ft )

    Check weak point of insulation

  • 5/20/2018 Busway Handling Maintenance

    18/25

    18

    Testing & Commissioning

    B. On Site Test

    Mega test before any energizing NEMA:

    M=100/ Length of Busduct in Ft (1000V)

    Reading of individual busduct normally

    > 10 M

  • 5/20/2018 Busway Handling Maintenance

    19/25

    19

    System coordination with other trades

    Try to design the systems to move water

    services for busduct system Eliminate the water hazard from burst or leaked

    pipes / drains

  • 5/20/2018 Busway Handling Maintenance

    20/25

    20

    System coordination with other trades

    Water Drip from

    Cei l ing

  • 5/20/2018 Busway Handling Maintenance

    21/25

    21

    System coordination with other trades

    Large Drain Pipe

    Overhead

  • 5/20/2018 Busway Handling Maintenance

    22/25

    22

    11. Maintenance Issues

    Routine inspection Vertical spring hanger adjustment & Bowing

    Symptom

    Thermal checking/ scanning

    Spare part provision

  • 5/20/2018 Busway Handling Maintenance

    23/25

    23

    Routine Inspection

    Insulation test recommended by NEMA

    Check at least 1 per year

    Check after electrical short circuit or ground

    fault

    Visual inspection on joints and terminals

    Remove damp or clean dust when necessary

    Check tighten torque of joint bolt if necessary

    Check any cracks, loosen/ broken parts

  • 5/20/2018 Busway Handling Maintenance

    24/25

    24

    Trouble Shooting

    Recommend spare parts 1 pair of flanged ends for each busduct

    rating used

    A number of plug-in units

    24-hours services hotline provided by

    Schneider Busway

    Contact local Schneider office

  • 5/20/2018 Busway Handling Maintenance

    25/25

    25

    End of Presentation!