+ All Categories
Home > Documents > BUTLER & BUTLER - QUANTITY · PDF filePreparing documentation for both principal and...

BUTLER & BUTLER - QUANTITY · PDF filePreparing documentation for both principal and...

Date post: 11-Mar-2018
Category:
Upload: doananh
View: 224 times
Download: 1 times
Share this document with a friend
11
Paul Butler, PrQS, MAQS, DIP. QS Andrew Butler, PrQS, MAQS, BSc. QS BUTLER & BUTLER - QUANTITY SURVEYORS Tel: (031)566 3942 Fax: (031)566 3943 Paul Butler Cell: 082 324 9449 Andrew Butler Cell: 084 656 3678 e-mail: [email protected] Shop 103 Aldrovande Palace , 6 Jubilee Grove Umhlanga New Town Centre, 4319 P.O. Box 25188, Umhlanga 4321 Vat no: 4500102456 26 July 2012 PRACTICE CV Introduction: Our practice has been in existence since 1972 and is now located at Umhlanga New Town Centre adjacent to the Gateway shopping centre. The two partners in the practice are: Paul Butler (PrQS M.A.Q.S) - Qualified at Natal University in 1970 with a diploma in quantity surveying. Andrew Butler (PrQS M.A.Q.S) - Qualified at Natal University in 1999 with a BSc. in Quantity Surveying. We provide conventional Quantity surveying services briefly outlined as follows; Stages 1,2,3 Inception, concept and viability, design development, Attending project initiation meetings, Advising on procurement policy for the project, tender or negotiation, Advising on appropriate financial design criteria, Agreeing the documentation program with the principal consultant and other professionals, Attending design and consultant’s meetings, Reviewing and evaluating design concepts and advising on viability, Preparing preliminary and elemental or equivalent estimates of construction cost, Assisting the client in preparing a project viability report, Preparing detailed estimates, Stag 4 Documentation and procurement , Attending design and consultant’s meetings, Reviewing working drawings for compliance with approved budgets, Preparing documentation for both principal and subcontract procurement, Calling of tenders based on bills of quantities, Assisting with financial evaluation of tenders, Assisting with preparation of contract documentation for signature, Stage 5 Construction stage , Preparation of cash flow schedules, Estimates of variations, Attendance at technical and progress meetings, Adjudicating and resolving financial claims by the contractor(s) Assisting in the resolution of contractual claims by the contractor(s) Establishing and maintaining a financial control and detailed cost reporting, Preparing valuations for payment certificates, Preparing final account for the works on a progressive basis Stage 6 Close-out Valuation of variations and involvement in negotiation of final account with the contractor
Transcript
Page 1: BUTLER & BUTLER - QUANTITY  · PDF filePreparing documentation for both principal and subcontract procurement, ... completed in 2006, ... Durban North for Pam Golding

Paul Butler, PrQS, MAQS, DIP. QS Andrew Butler, PrQS, MAQS, BSc. QS

BUTLER & BUTLER - QUANTITY SURVEYORS Tel: (031)566 3942 Fax: (031)566 3943 Paul Butler Cell: 082 324 9449 Andrew Butler Cell: 084 656 3678 e-mail: [email protected]

Shop 103 Aldrovande Palace , 6 Jubilee Grove Umhlanga New Town Centre, 4319

P.O. Box 25188, Umhlanga 4321 Vat no: 4500102456

26 July 2012

PRACTICE CV

Introduction:

Our practice has been in existence since 1972 and is now located at Umhlanga New Town Centre

adjacent to the Gateway shopping centre. The two partners in the practice are:

Paul Butler (PrQS M.A.Q.S) - Qualified at Natal University in 1970 with a diploma in quantity

surveying.

Andrew Butler (PrQS M.A.Q.S) - Qualified at Natal University in 1999 with a BSc. in Quantity

Surveying.

We provide conventional Quantity surveying services briefly outlined as follows;

Stages 1,2,3 Inception, concept and viability, design development,

Attending project initiation meetings,

Advising on procurement policy for the project, tender or negotiation,

Advising on appropriate financial design criteria,

Agreeing the documentation program with the principal consultant and other professionals,

Attending design and consultant’s meetings,

Reviewing and evaluating design concepts and advising on viability,

Preparing preliminary and elemental or equivalent estimates of construction cost,

Assisting the client in preparing a project viability report,

Preparing detailed estimates,

Stag 4 Documentation and procurement,

Attending design and consultant’s meetings,

Reviewing working drawings for compliance with approved budgets,

Preparing documentation for both principal and subcontract procurement,

Calling of tenders based on bills of quantities,

Assisting with financial evaluation of tenders,

Assisting with preparation of contract documentation for signature,

Stage 5 Construction stage,

Preparation of cash flow schedules,

Estimates of variations,

Attendance at technical and progress meetings,

Adjudicating and resolving financial claims by the contractor(s)

Assisting in the resolution of contractual claims by the contractor(s)

Establishing and maintaining a financial control and detailed cost reporting,

Preparing valuations for payment certificates,

Preparing final account for the works on a progressive basis

Stage 6 Close-out

Valuation of variations and involvement in negotiation of final account with the contractor

Page 2: BUTLER & BUTLER - QUANTITY  · PDF filePreparing documentation for both principal and subcontract procurement, ... completed in 2006, ... Durban North for Pam Golding

Paul Butler, PrQS, MAQS, DIP. QS Andrew Butler, PrQS, MAQS, BSc. QS

Our more recent experience includes work on the following projects;

Commercial & Hospitality;

Proposed new +/-7000m2 Office Park at Simbithi Eco Estate for WBHO, due to commence

October 2012.

New 1400m2 Cashbuild store at The Ridge Shopping Centre, Shallcross, Durban. Due to

commence August 2012.

New 1300m2 office building with 6 parking levels, at Essex Gardens, Westville, due to be

completed in August 2012.

New Office Park at 5,7,9, Abrey Road, Kloof +/-4000m2, completed February 2012.

New 300m2 Nandos stand alone store at The Ridge Shopping Centre, Shallcross, Durban. Due to

be completed October 2011.

Page 3: BUTLER & BUTLER - QUANTITY  · PDF filePreparing documentation for both principal and subcontract procurement, ... completed in 2006, ... Durban North for Pam Golding

Paul Butler, PrQS, MAQS, DIP. QS Andrew Butler, PrQS, MAQS, BSc. QS

New Pick n Pay store at Nqgualeni, Easter Cape, due to be completed July 2011,

New Boxer Superstore, at Matatielle, Easter Cape, Due to be completed March 2011,

Alterations and renovations in conversion of industrial building to A grade offices and electronics

assembly factory at Valley View Rd New Germany for Reutech Communications, +/-R12M

completed December 2010

New lift and lift shaft at Glenwood Village Shopping Centre, Durban, Completed July 2010,

Alterations and renovations to the Pinedene Hotel in Pinetown, +/-R6M, completed January 2010,

Simbithi Golf Club House including +/-400m2 of offices, function rooms and restaurant and bar

etc, Completed end of 2009

Sizani Executive Office Park, 36 office units, completed in 2008

Page 4: BUTLER & BUTLER - QUANTITY  · PDF filePreparing documentation for both principal and subcontract procurement, ... completed in 2006, ... Durban North for Pam Golding

Paul Butler, PrQS, MAQS, DIP. QS Andrew Butler, PrQS, MAQS, BSc. QS

Addition of Drama Hall, Classroom Block and Exam Rooms, as well as alterations and additions

to Kindergarten at The Roseway Waldorf School, Alverstone, completed in July 2008

64 Room Frail Care Centre & Le Domain, Hillcrest, completed in 2008,

Extension of auditorium at the Victory Faith Centre Church, Marrianhill, completed in July 2008

Le Domain Lodge – 32 Room Boutique Lodge, completed in 2000

Umlazi Mega City – 35 000m2 regional shopping centre completed in 2007,

Page 5: BUTLER & BUTLER - QUANTITY  · PDF filePreparing documentation for both principal and subcontract procurement, ... completed in 2006, ... Durban North for Pam Golding

Paul Butler, PrQS, MAQS, DIP. QS Andrew Butler, PrQS, MAQS, BSc. QS

2000m2 Le Domain Club House, completed in 2006,

Riverside hotel Durban - 160 room hotel and conference facilities and restaurants etc – our

services also included the procurement and placing of the furniture, fittings and equipment

Isandlwana Lodge - 14 room hotel including conference and dining facilities all under thatch,

completed in 2000

Zululand Tree Lodge - reconstruction of hotel facilities for an existing bush lodge including

revamp of accommodation units, 2000,

Umngazi River Bungalows - reconstruction of hotel facilities for an existing cluster under thatch,

completed prior to 2000,

Page 6: BUTLER & BUTLER - QUANTITY  · PDF filePreparing documentation for both principal and subcontract procurement, ... completed in 2006, ... Durban North for Pam Golding

Paul Butler, PrQS, MAQS, DIP. QS Andrew Butler, PrQS, MAQS, BSc. QS

Estuary - hotel and residential resort at Port Edward – includes infrastructure, houses and rooms,

completed in 2005,

Work on 20 Sasol / Exel and 3 Engen service station convenience shops from 2000-2007

Page 7: BUTLER & BUTLER - QUANTITY  · PDF filePreparing documentation for both principal and subcontract procurement, ... completed in 2006, ... Durban North for Pam Golding

Paul Butler, PrQS, MAQS, DIP. QS Andrew Butler, PrQS, MAQS, BSc. QS

RESIDENTIAL WORK:

25 New Apartments in Old Main Road Hillcrest, due to commence shortly,

Apartments at 554 Essenwood Road, Durban, due to be completed July 2011,

694 Medium cost residential development at Tongaat, due to commence in January 2011,

Completion of 18 Residential units at Le Domain, completed December 2010,

Silverton Apartments, Berea Durban, 20 residential units, completed January 2010,

Shortens Country Estate, 155 Simplex units, Phase 1 completed end of 2009,

Page 8: BUTLER & BUTLER - QUANTITY  · PDF filePreparing documentation for both principal and subcontract procurement, ... completed in 2006, ... Durban North for Pam Golding

Paul Butler, PrQS, MAQS, DIP. QS Andrew Butler, PrQS, MAQS, BSc. QS

Simbithi Eco Estate – residential estate at Ballito providing infrastructure for about 2 000

individual houses and cluster units including golf course and estate buildings – developed in five

phases now substantially complete

La Palma Terraces – residential development in La Lucia completed early in 2008

Equinox, 34 Apartments, Umhlanga Ridge, completed in 2006,

Page 9: BUTLER & BUTLER - QUANTITY  · PDF filePreparing documentation for both principal and subcontract procurement, ... completed in 2006, ... Durban North for Pam Golding

Paul Butler, PrQS, MAQS, DIP. QS Andrew Butler, PrQS, MAQS, BSc. QS

Clifton Hill – residential estate at Hillcrest providing infrastructure for 270 houses plus three

cluster developments – developed in three phases substantially completed in mid 2007. Services

also included work to houses

Kirtlington - residential estate at Hillcrest providing infrastructure for 115 individual houses –

developed in three phases completed in about 2004

INDIVIDUAL HOUSES

No 5 Alsace, Completion of partially completed penthouse at Le Domain estate, completed March

2011,

House Taylor, 700m2, Simbithi Eco Estate, due to be completed middle of 2011,

House Blake, 950m2, Simbithi Eco Estate, completed December 2010,

House Tostee 930m

2, Burnham Drive, Umhlanga, completed July 2010

Houses Gatherer and Mann +/-400m2 each , Hawaan Forest Estate, Umhlanga, due for completion

January 2010

House Olivier, Simbithi Eco Estate, completed 2008,

House Taylor, Simbithi Eco Estate, completed 2008,

Page 10: BUTLER & BUTLER - QUANTITY  · PDF filePreparing documentation for both principal and subcontract procurement, ... completed in 2006, ... Durban North for Pam Golding

Paul Butler, PrQS, MAQS, DIP. QS Andrew Butler, PrQS, MAQS, BSc. QS

INDUSTRIAL WORK:

Repairs to settling floors to warehouse at Mallaca Road, Durban for Old Mutual, completed end of

2011.

Repairs to settling floors to warehouse at Columbine Place Glen Anil for Old Mutual, completed

early in 2011.

New 2000m2 warehouse for Sika, Westmead, completed end of 2009.

Bearing Man head offices, Gateway, completed in 2005.

PUBLIC SECTOR WORK:

3 New schools for the KZN Education Department in the Ilembe District, due to be completed

early in 2013,

11 New Early Childhood Development Classrooms, scattered over KZN, completed July 2012,

Alterations, renovations and additions to Mooi River Magistrates Court, completed 2007,

Alterations, renovations and additions to Kings House, Morningside Durban, completed 2001,

ALTERATIONS AND RENOVATIONS:

Alterations and renovations to existing semi- industrial and commercial premises for Outdoor

Network, Acutts Road, Briardene, Durban, due to commence shortly.

Alterations renovations to existing 1800m2 office building at Essex Gardens, Westville, Due to

commence in September 2012.

Alterations and additions to Yellowood Park Spar, due to be completed shortly.

Alterations and renovations to 250m2 shop at the Ridge Shopping Centre, Shallcross, Due to be

completed in August 2012.

Repairs to face brick facades at St Aidens Hospital Durban, completed September 2011,

Page 11: BUTLER & BUTLER - QUANTITY  · PDF filePreparing documentation for both principal and subcontract procurement, ... completed in 2006, ... Durban North for Pam Golding

Paul Butler, PrQS, MAQS, DIP. QS Andrew Butler, PrQS, MAQS, BSc. QS

Replacement of +/-4000m2 of asbestos roofing with structural steelwork and sheeted solution to

the Glenwood Village Shopping Centre, Glenwood, Durban, completed in February 2012.

Alterations and additions to no 2 Swapo/Broadway Road, Durban North for Pam Golding

Properties completed May 2011,

Repairs and renovations to historic building at Walnut Rd Durban, completed in 2010,

Alterations and additions to Bluff Superspar, completed February 2010,


Recommended