BUYER SUPPLIER
RELATIONSHIPAIRBUS
International School of Business & Media; KolkataAbhijit Samanta
.
Major Challenges for Aircraft Manufacturing Industry:High Cost of doing R&DHigh Risk Involved in doing R&D, US$10
billion.Complexity of Production Cycle.Application of extremely diverse technology.A large no. of enterprises must be involved.
SWOT Analysis of A380 ProjectStrength: Airbus A380 is a triple-decker aircraft with a
passenger sitting capacity of 550. The project will through a big competition to
Boeing B747 which is a 400 sitter aircraft. The success of the project will bring a
revolution to the entire airlines industry which in long run generate more order for A380.
SOWT Analysis contd…Weakness: Involvement of high cost. Complexity of the entire project is very high. Involves too many stakeholders. Every dimension of the project is very much
diversified form one another.
Opportunity: It is required to develop a very level of
integration among various stakeholders. Huge opportunity of outsourcing a lot of
critical task which will reduce the company’s effort, time and energy.
High opportunity of engaging technically sound and advanced systems to enhance effective operation.
SOWT Analysis contd…
Threats: Assembling various parts of the aircraft at
the assembly point in a timely manner. Establishing network in more than 30
countries covering almost the entire world. A very high concern with quality. Maintaining high level of negotiation with
various stakeholders. Structuring all the procurement departments
in most effective way.
SOWT Analysis contd…
General Overview of Aircraft Manufacturing
An aircraft has mainly five distinct area in its structure.
1. Airframe / Fuselage.2. Engine / Power Plant.3. Aircraft Radio and Navigation System.4. Aircraft Electrical System.5. Aircraft Instrumentation System.
Radio and Navigation
System
Aircraft Instrumentati
on System
Aircraft Electrical System
Engine
Airframe / Structure
Main Assembly
Point
Final Product = Aircraft
In each of the areas high level of integrity is required
Critical Points that has to be achieved by Airbus:1. An integrated network among 1500 contractors in
more than 30 countries all over the world has to be established.
2. All the suppliers must have the ability to deliver the demanded quality within specific time frame.
3. Bringing all inputs like components and services from the worldwide was the biggest logistics challenge for the company.
4. The production schedule must be designed most effectively keeping all the constraints in mind.
5. The most critical task was to integrate various procurement departments.
A high level of integration is required to be established among various procurement departments.
Airframe
Procurement Dept.
Capital Goods Procurement
Integrated
Centralized
control.
Services
procurement
General
Procurement
Equipment and
Propulsion
system.
Inte
gratio
n
Integratio
n
Integratio
n
Inte
gra
tion
Integration
Outsourcing Overview
0
5
10
15
20
25
30
23
2
5
2
5
25
2
6
2
7
No. of companies
No. of equipment de-tails
Buyer – Supplier Critical Points
AIRBUS SUPPLIERS
Information flow
Material flow
Tasks performed by AIRBUS:1. Performance
Control.2. Drive Correction.3. Improve Action.
Let to better relationship with
suppliers
‘AIRBUS SOURCING’ the online system:
Allowed buyers and suppliers to:1. Exchange requirements.2. Proposals.3. Technical innovations.
ConclusionThe success of the entire project lied in some critical
aspects like:1) Developing a very sound information system between
AIRBUS and its suppliers. 2) A very high level of integration among various
purchasing departments that allowed AIRBUS to do a better and effective negotiation.
3) To co-ordinate with various issues like Time, Quality and Cost.
4) Establishing the entire supply chain network in such a way so that smooth flow of materials occurs.
5) Continuous monitoring and evaluation of the entire system so that probability of failure becomes minimum.