By: Ernawati Mustafa Kamal School of Housing, Building & Planning Universiti Sains Malaysia
Transcript
Page 1: By: Ernawati Mustafa Kamal School of Housing, Building & Planning Universiti Sains Malaysia.

By: Ernawati Mustafa Kamal School of Housing, Building & Planning

Universiti Sains Malaysia

Page 2: By: Ernawati Mustafa Kamal School of Housing, Building & Planning Universiti Sains Malaysia.

A project is a collection of tasks that must be completed within certain time frame, with specific cost & quality.

Page 3: By: Ernawati Mustafa Kamal School of Housing, Building & Planning Universiti Sains Malaysia.

Estimating time of project by determining the earliest start and finish of each activity.

Finding the minimum cost schedule needed to complete the project by a certain date.

Investigating the results of possible delays in activity’s completion time.

Page 4: By: Ernawati Mustafa Kamal School of Housing, Building & Planning Universiti Sains Malaysia.

Progress control.

Smoothing out resource allocation over the duration of the project.

Page 5: By: Ernawati Mustafa Kamal School of Housing, Building & Planning Universiti Sains Malaysia.

Tasks are called “activities.” - Estimated completion time (and sometimes costs) are associated with each activity.

- Activity completion time is related to the amount of resources committed to it.

- The degree of activity details depends on the application and how specific is the data.

Page 6: By: Ernawati Mustafa Kamal School of Housing, Building & Planning Universiti Sains Malaysia.

To determine optimal schedules we need to◦ Identify all the project’s activities.

◦ Determine the precedence relations among activities.

Page 7: By: Ernawati Mustafa Kamal School of Housing, Building & Planning Universiti Sains Malaysia.

Example:

- Company A is a contractor & they need to

construct a house.

Page 8: By: Ernawati Mustafa Kamal School of Housing, Building & Planning Universiti Sains Malaysia.

Major task they need to perform &

complete:

- Sub-structure

- Superstructure

- Internal Finishes

- Services and finishing

- External Works

Page 9: By: Ernawati Mustafa Kamal School of Housing, Building & Planning Universiti Sains Malaysia.

Company A needs to develop a precedence relations chart.

The chart gives a concise set of tasks and their immediate predecessors.

Page 10: By: Ernawati Mustafa Kamal School of Housing, Building & Planning Universiti Sains Malaysia.

Activity DescriptionA Piling

Sub-Structure B Pile caps and ground beams

Activity DescriptionA Piling

Sub-Structure B Pile caps and ground beams

C FrameD Upper Floors E RoofF Stairs and Ramps

Superstructure G External Walls H Windows and External DoorsI Internal Walls and Partitions J Internal Doors

C FrameD Upper Floors E RoofF Stairs and Ramps

Superstructure G External Walls H Windows and External DoorsI Internal Walls and Partitions J Internal Doors

Internal Finishes K Wall finishesL Floor FinishesM Ceiling Finishes

Internal Finishes K Wall finishesL Floor FinishesM Ceiling Finishes

Page 11: By: Ernawati Mustafa Kamal School of Housing, Building & Planning Universiti Sains Malaysia.

Activity DescriptionN Sanitary installation

Services & Finishing O Water installationP Electrical installation

Activity DescriptionN Sanitary installation

Services & Finishing O Water installationP Electrical installation

Q Road, Paths, Pavings & SurfacingExternal Works R Landscaping and Irrigation Systems

S FencingT External drainageU External services

Q Road, Paths, Pavings & SurfacingExternal Works R Landscaping and Irrigation Systems

S FencingT External drainageU External services

From the activity description chart, we can determine immediate predecessors for each activity.

Page 12: By: Ernawati Mustafa Kamal School of Housing, Building & Planning Universiti Sains Malaysia.

Mathematical Analysis- calculating theoretical early and late start and finish dates for all projects activities without regard for any resource limitations.

- The resulting dates are not schedule, but it indicate the time period within which activity should be schedule.

Page 13: By: Ernawati Mustafa Kamal School of Housing, Building & Planning Universiti Sains Malaysia.

Critical Path Method (CPM)

Graphical Evaluation and Review Techniques (GERT)

Program Evaluation and Review Technique (PERT)

Page 14: By: Ernawati Mustafa Kamal School of Housing, Building & Planning Universiti Sains Malaysia.

Bar Charts- Milestone charts- Gantt charts

Horizontal time scale is used, often divided into weeks.

Various operations comprising the project are listed vertically down the left-hand side.

Page 15: By: Ernawati Mustafa Kamal School of Housing, Building & Planning Universiti Sains Malaysia.

The timing and duration of each operation indicated by a horizontal bar spanning the relevant period of weeks and shown on the same line as the operation it refers to.

Page 16: By: Ernawati Mustafa Kamal School of Housing, Building & Planning Universiti Sains Malaysia.
Page 17: By: Ernawati Mustafa Kamal School of Housing, Building & Planning Universiti Sains Malaysia.
Page 18: By: Ernawati Mustafa Kamal School of Housing, Building & Planning Universiti Sains Malaysia.
Page 19: By: Ernawati Mustafa Kamal School of Housing, Building & Planning Universiti Sains Malaysia.