+ All Categories
Home > Documents > By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in...

By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in...

Date post: 28-Jun-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
72
By K.P.SINGH
Transcript
Page 1: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

By

K.P.SINGH

Page 2: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage
Page 3: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

LATEST GUIDELINES & DIRECTIVES OF POLLUTION BOARDS FOR

DISTILLERS VIDE THEIR CIRCULAR DATED 2nd JUNE 2017

1. Distilleries to install Online Mass Flow Measurement with online data

transfer facility to CPCB & SPCB servers for:

a. Weak Spent Wash as a feed to Evaporator.

b. Strong (Concentrate) Spent Wash as output of Evaporator.

2. Distilleries to install Online Peizometers for Measurement of Ground

Water Level of factory premises and near by area with online data

transfer facility to CPCB & SPCB servers through username and

password.

4. Distilleries to install Online PTZ Cameras for remote display of bio-

composting facilities with online data transfer facility to CPCB &

SPCB servers through username and password.

3. Distilleries to install Online Stack Monitoring Analyser at all the stacks

of plant for measurement of Particulates with online data transfer

facility to CPCB & SPCB servers.

Page 4: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

RADICO KHAITAN IMPLEMENTED ALL THE DIRECTIVES & GUIDELINES

OF POLLUTION BOARDS

1. Radico Khaitan installed Online Mass Flow Measurement with online

data transfer facility to CPCB & SPCB servers for following

applications: These flow meters are operative since 25th Sept. 2017.

a. Molasses based distillation plant’s Weak Spent Wash as a feed to

Evaporator.

b. Molasses based distillation plant’s Strong (Concentrate) Spent

Wash as output of Evaporator.

c. Grain based distillation plant’s Weak Spent Wash as a feed to

Evaporator.

d. Grain based distillation plant’s Strong (Concentrate) Spent Wash

as output of Evaporator.

Page 5: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Radico Khaitan installed Online Mass Flow Measurement in distillation

plants with online data transfer facility to CPCB & SPCB Servers

Page 6: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

As advised by CPCB , following parameters were studied and validated for our industry by VSI Pune .

Assessment of manufacturing technology for spent wash generation and adequacy assessment of ZLD system comprising of Bio-methanation , RO,MEE, Composting / Incineration and steam availability etc.

Water Audit and mass balance reports to establish spent wash generation rate.

Action plans to achieve Zero Liquid Discharge.

To restrict lined effluent storage capacity to 30 days.

Assessment of availability of press mud , compost yard, composting process , compost quality and sale of compost.

Page 7: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

WEAK SPENT WASH MASS FLOW METER DISPLAY AVAILABLE WITH

CPCB & SPCB SERVERS

Page 8: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

STRONG SPENT WASH MASS FLOW METER DISPLAY AVAILABLE WITH

CPCB & SPCB SERVERS

Page 9: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

ONLINE GROUND WATER LEVEL MONITORING DATA AVAILABLE WITH

CPCB & SPCB SERVERS

Page 10: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

STACK MONITORING DATA AVAILABLE WITH CPCB & SPCB SERVERS

Page 11: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

ONLINE MONITORING OF BIOCOMPOST FACILITIES WITH PTZ CAMERA

AND ONLINE CONNECTIVITY FACILITY WITH CPCB & SPCB SERVERS

Page 12: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage
Page 13: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage
Page 14: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage
Page 15: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

In 2005 we installed our First RO Plant of 1000 m3/ day.

In 2007 we installed another RO plant of 1250 M3 /day .

Modified both the RO plants in 2013 to take load ofhigher TDS , After installation of MEE on distillationplants.

In the year 2002 , we started Bio-Composting andat present we have about 52 Acres of Bio-composting.

At present we have 14 Acres of covered Bio-Composting for composting in rainy season.

Page 16: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Distillery have adopted the process of reduce and recycle

process to manage effluent.

Volume reduction is achieved through re-boilers,

integrated multi-effect evaporators ( MEE) before Bio-

Digesters.

We have installed Sophisticated TSS removal system ( To

bring down Digester outlet TSS 20,000 PPM to 2000 PPM at

RO Inlet ) comprising of Lamella Clarifiers , Series of

Clariflocculators , filter press . Clarifier and Dissolved air

floatation for further volume reduction through R.O.

plants

Page 17: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage
Page 18: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage
Page 19: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

1) Reduced Effluent Generation through Multi Effect

Evaporators and High Pressure RO Plants of 1000 m3

and 1250 m3/ day followed by permeate polishing unit.

2) Improved efficiency of RO Plant by increasing RO

pressure from 60 Bar to 75 Bar and improved TSS

reduction system through following additional

equipments in 2015-16. Now added one more stage of

90 Bar to improve recovery.

3) Installed 2nd stage RO as RO III plant for ultra filtration of First stage

Permeate in order to recycle it in fermentation and cooling tower.

4) Degasser to de-gasify the effluent for better settling of

suspended solids.

Page 20: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

(4) Settlers (3 nos.) for better sludge separation.

(5) Lamella Clarifier for better sludge separation.

(6) Filter Press- for thickening of separated sludge.

(7) Dissolved Air Floatation (DAF) Mechanism with

the help of Special Polyelectrolyte for settling of

fine sludge particles .

Page 21: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage
Page 22: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage
Page 23: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Lamella Degasser

Filter

Press

Page 24: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage
Page 25: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Radico is one of the Pioneer to accept and introduce

the new Technologies.

For the First Time in India we have installed the DAF

System on Distillery Effluent.

TSS Reduction thru DAF is from 3200 PPM to 2000

PPM i.e. about 38%.

Page 26: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage
Page 27: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Note : Till Now we have achieved 70% reduction in overall effluent

volume and targeted to have 80% reduction after stabilization of

currently installed systems.

Page 28: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

In order to reduce effluent volume to less than1: 2 ratio ,Radico has planned and ordered to M/s Excel Engineersand Consultants to install evaporator for it’s effluent fromRO reject.

Radico is installing five falling film and 0ne force flowevaporator along with one stand by ( FF) for all the fiveevaporators.

It will be having auto CIP / change over through DCScontrol system.

Concentration of effluent shall be increased up to 28-30%from 19-20 % of RO reject.

Page 29: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage
Page 30: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

RO-I

Page 31: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

RO-II

Page 32: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage
Page 33: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

After volume reduction through MEE & R.O.

remaining effluent is sent for Bio-Composting

using sugar mill press mud and manufacturing

highly valuable and micro-nutrient rich organic

manure Bio-compost.

The Bio-compost manufactured in the Distillery

is being packed in sealed bags and no Bio-

Compost sale is done through tractor trolleys

now.

Page 34: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Installed Permeate polishing unit in RO plantfor recycling of Permeate in Process.

Recycling of lees, process condensate andPermeate in fermentation for Molassesdilution.

Radico has been able to cut their fresh waterconsumption by about 60% through recyclingof steam Condensate to Boilers , Using MEEcondensate for dilution of Molasses andrecycling R O. permeate to cooling towers andfor gardening .

Page 35: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Stream recycle TO

1. Rectification, Pre-rectifier

column Lees Recycle

Fermentation Recycled

2. Vacuum Pump water recycle Fermentation 95% recovery

3. Steam Condensate Recycle Boiler 98% recovery

4. Process Condensate recycle Fermentation 95% recovery

5. CO2 Scrubber Water recycle Fermentation 98% recovery

6. RO Permeate recycle Cooling tower ,

Fermenters and

Gardening

100% recovery

Water Consumption / BL of

Alcohol Before adopting

recycling Systems

12 Liter / BL

Water Consumption / BL of

Alcohol after adopting

recycling system

8 Liter / BL

Page 36: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

S.No Stream recycled Year -2013-14 Year -2014-15 Year -2015-16 Implementation

1 Pre-rectifier & Rectification column Lees

Recycled to fermentation house

2 Vacuum Pump water Recycled to fermentation house

3 Steam Condensate Recycled to boiler section

Recycled to boiler section

4 CO2 Scrubber Water Recycled to fermentation house

5 Process Condensate Recycle to cooling tower

6 RO Permeate Recycle to cooling tower

Water Consumption / BL of Alcohol

18.0 12.0 8.0

Page 37: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Radico has adopted very innovative andeffective way of Bio-composting in Rainy seasonby covering Bio-composting yards.

These poly sheds are very useful in the rainyseason and protect the press mud from rainwater in order to continue the process of Sp.Wash consumption in the press mud in the rainyseason as well.

By adopting covered Bio-composting , Radico isable to achieve ZSD in the rainy season andthereby facilitate operation of distillerythroughout the year including rainy season.

Page 38: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Radico Khaitan Ltd has achievedremarkable landmarks in the field ofeffluent management, achieving ZeroSpent Wash Discharge through variousmeans and reduction in fresh waterconsumption per litre of alcoholproduction.

Page 39: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage
Page 40: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage
Page 41: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage
Page 42: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage
Page 43: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage
Page 44: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

• Radico had made 80 Nos bore wells at Rampur Village’s

pond with an objective to Tap the Natural water

resource available which ultimately raises the water

level in Rampur District….

• Further 20 Nos recharging bore well installation is in

pipeline in the ponds of nearby villages …..

CSR INITIATIVES ON WATER RECHARGING

Page 45: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Water Conservation through Water Recharging

Page 46: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Water Conservation through Water Recharging

Page 47: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Water Conservation through Water Recharging

Page 48: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Water Conservation through Water Recharging

Page 49: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

After Rain

Artificial Recharge …. At Village Ponds

Page 50: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Artificial Recharge …. At Various Rampur Village Ponds

Page 51: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

CSR – Other Activities

Radico Khaitan understands its responsibility towardssociety. Various activities are being arranged for societyfrom last more than 15 years under CSR.

1. Skill Development & Job Opportunities

2. Infrastructure & Educational Support

3. Academic Excellence Recognition

4. Health Care & Medical Facilities

5. Safe, Clean & Green Environment

6. Sports & Fitness Events

Page 52: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Skill Development & Job Opportunities

CSR Activities

Page 53: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage
Page 54: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Radico Khaitan understands its responsibility towardsSociety. Various activities are being arranged forSociety from last more than 15 years under CSR.

1. Skill Development & Job Opportunities

2. Infrastructure & Educational Support

3. Academic Excellence Recognition

4. Health Care & Medical Facilities

5. Safe, Clean & Green Environment

6. Sports & Fitness Events

Company’s Social Responsibility (CSR) Activities

Page 55: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Company’s Social Responsibility (CSR) Activities

Skill Development & Job Opportunities

Radico Khaitan is conducting Skill Development activities for employment

of Villagers and Women Empowerment .

Free professional classes for Girls & Boys to support them for self-

employment

Boys Courses: 1. Computer Courses

2. Motor Mechanic

3. Security, Fire & Safety

Guard

4. Retails Management

Girls Courses: 1. Nursing

2. Sewing

3. Stitching

4. Beautician

• Free Sewing Machines & Beautician Kits to all the girl participants.

• Free Dress, Shoes & Literature kit to all the boy participants.

• More than 500 Boys & Girls got employment.

• More than 150 girls proceeded for self employment through equipments

distributed to them.

Page 56: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Company’s Social Responsibility (CSR) Activities

Skill Development & Job OpportunitiesSnaps & Media Coverage:

Page 57: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Infrastructure & Educational Support

Practical knowledge of students studying in 10th & 12th classes is

lagging due to insufficient infrastructure of Practical Laboratories

in some schools of Rampur rural area.

Radico Khaitan decided to support the Inter Colleges for improving their

Laboratories:

• Donated one Hall for Science Laboratory to Shri Hari Inter College, Rampur.

• Donated Physics, Chemistry & Bio Laboratory Apparatus to Shri Hari Inter College,

Rampur.

• Donated Physics, Chemistry & Bio Laboratory Apparatus to R. S. M. Inter College,

Village Chandupura, Tehsil Swar, Rampur.

• Donated Physics, Chemistry & Bio Laboratory Apparatus to Bal Vidya Mandir Inter

College, Vill. Mahmoodpur, Rampur.

Company’s Social Responsibility (CSR) Activities

Page 58: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Infrastructure & Educational SupportSnaps & Media Coverage

Company’s Social Responsibility (CSR) Activities

Page 59: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Academic Excellence Recognition

From last more than 15 years Radico Khaitan is

celebrating “Academic Excellence Award” for recognition

of top scholars of Rampur

• Recognition with Cash Award to Top Three students of class

10th from all the Schools of Rampur.

• Recognition with Laptop to District Toppers (Top Three) of class

12th from all the educational boards running in Rampur.

• Full year educational fee support to needy scholars of Rampur.

Company’s Social Responsibility (CSR) Activities

Page 60: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Academic Excellence RecognitionMedia Coverage:

Company’s Social Responsibility (CSR) Activities

Page 61: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Health Care & Medical Facilities

Rampur is lacking from latest medical test & treatment technology.

For some eye inspection purpose patients were to visit other

districts.

Radico Khaitan Donated latest world class technique “Fundus

Camera” and “Retinal Green Laser” machines to District Eye Relief

Society, running under District Administration of Rampur

Now all the eye patients are being inspected and treated within

Rampur.

Radico has arranged all the running expenses of machines in order

to provide free inspection.

Radico Khaitan is conducting Free Medical Camps & Eye Checkup

Camps for needy people of villages.

Company’s Social Responsibility (CSR) Activities

Page 62: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Health Care & Medical FacilitiesSnaps:

Company’s Social Responsibility (CSR) Activities

Page 63: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Health Care & Medical FacilitiesSnaps & Media Coverage:

Company’s Social Responsibility (CSR) Activities

Page 64: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Safe, Clean & Green Environment

• Radico Khaitan is taking care of Environment very seriously.

• Radico Khaitan arranged more than 500 Deep Hand Pumps in

villages in order to provide good quality drinking water to villagers.

• Radico Khaitan installed “Drinking Water Turf - Piyau” in various

places of Rampur in order to provide filtered & chilled water.

• Tree Plantation Activities are being conducted throughout the year.

• Energy Conservation with optimum utilization is major focus point

of Radico.

• Radico has been recognized for one of the best water saving

distillery of India.

Company’s Social Responsibility (CSR) Activities

Page 65: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Safe, Clean & Green EnvironmentMedia Coverage:

Company’s Social Responsibility (CSR) Activities

Page 66: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Safe, Clean & Green Environment

Some of the part of Rampur District is facing “Dark Zone”

category from last some years. Radico Khaitan has adopted

Artificial Water Recharging Technique through Bore Wells to

improve the water level of Rampur.

More than 20 villages are benefited for Artificial Water

Recharging of Rain Water.

Radico also arranged Tree Plantation around the ponds in

villages for greenery.

Radico is also conducting “Swachh Bharat” drive in near by

villages of Rampur city.

Company’s Social Responsibility (CSR) Activities

Page 67: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Safe, Clean & Green Environment

Company’s Social Responsibility (CSR) Activities

Page 68: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Sports & Fitness Events

Radico Khaitan is organizing district level sports events

Half Marathon for Girls & Boys:

Radico Khaitan is regularly organizing “Half Marathon” in Rampur

where more than 1500 people participates. Radico recognizing the

winners with precious awards.

In same event Radico Khaitan is conducting a race of disable children

to encourage them about sport activities.

Radico Premier League Cricket Tournament:

Radico Khaitan is regularly organizing “Radico Premier League” an

inter school cricket tournament in Rampur to encourage the

students towards sport activities.

Company’s Social Responsibility (CSR) Activities

Page 69: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Sports & Fitness Events

Company’s Social Responsibility (CSR) Activities

Page 70: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Other Social Activities:

• Antim Yatra Vahan

donated to society

• Blanket Distribution

to needy people

during severe winters

Company’s Social Responsibility (CSR) Activities

Page 71: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Other Social Activities:

• Encouraging farmers

to use Bio-compost in

place of chemical

fertilizers

Company’s Social Responsibility (CSR) Activities

Page 72: By K.P - AIDA India. KP.SINGH.pdfreduction system through following additional equipments in 2015-16. Now added one more stage of 90 Bar to improve recovery. 3) Installed 2nd stage

Recommended