178
Exelon. Exelon Generation Company, LLC www.exeloncorp.com Nuclear Byron Station 4450 North German Church Road Byron, IL 61010-9794 January 20, 2009 LTR: BYRON 2009-0003 File: 1.10.0101 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Byron Nuclear Power Station, Unit 2 'Facility Operating License NPF-66 NRC Docket No. STN 50-455 Subject: Byron Station Unit 2 Steam Generator Inservice Inspection Summary Report for Refueling Outage 14 In accordance with Technical Specification 5.6.9, "Steam Generator (SG) Tube Inspection Report," Exelon Generation Company, LLC is reporting the results of the steam generator inspections that were completed during the Byron Station Unit 2, Refueling Outage 14. The attached report is also being submitted in accordance with the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, 2001 Edition through the 2003 Addenda, Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components," Article IWA-6000, "Record and Reports," and Paragraph 11-890.2.3, "Reporting" of ASME Section V ."Nondestructive Examination," Article 8 - Appendix II, "Eddy Current Examination of Nonferromagnetic Heat Exchanger Tubing," 2001 Edition through the 2003 Addenda. If there are any questions regarding this report, please contact Dave Gudger, Regulatory Assurance Manager, at (815) 406-2800. Respectfully, Site Vice President Byron Nuclear Generating Station Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im
Transcript
Page 1: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

Exelon.Exelon Generation Company, LLC www.exeloncorp.com NuclearByron Station4450 North German Church Road

Byron, IL 61010-9794

January 20, 2009

LTR: BYRON 2009-0003File: 1.10.0101

U. S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, DC 20555-0001

Byron Nuclear Power Station, Unit 2'Facility Operating License NPF-66NRC Docket No. STN 50-455

Subject: Byron Station Unit 2 Steam Generator Inservice Inspection Summary Report forRefueling Outage 14

In accordance with Technical Specification 5.6.9, "Steam Generator (SG) Tube InspectionReport," Exelon Generation Company, LLC is reporting the results of the steam generatorinspections that were completed during the Byron Station Unit 2, Refueling Outage 14. Theattached report is also being submitted in accordance with the requirements of the AmericanSociety of Mechanical Engineers Boiler and Pressure Vessel Code, 2001 Edition through the2003 Addenda, Section XI, "Rules for Inservice Inspection of Nuclear Power PlantComponents," Article IWA-6000, "Record and Reports," and Paragraph 11-890.2.3, "Reporting"of ASME Section V ."Nondestructive Examination," Article 8 - Appendix II, "Eddy CurrentExamination of Nonferromagnetic Heat Exchanger Tubing," 2001 Edition through the 2003Addenda.

If there are any questions regarding this report, please contact Dave Gudger, RegulatoryAssurance Manager, at (815) 406-2800.

Respectfully,

Site Vice PresidentByron Nuclear Generating Station

Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14Refueling Outage, October 2008

DMH/PC/TLH/Im

Page 2: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

Exelon Generation Company, LLC

BYRON STATION UNIT 24450 North German Church Road

Byron, Illinois 61010

COMMERCIAL OPERATION: August 21,1987

BYRON STATION UNIT 2

STEAM GENERATOR EDDY CURRENT INSPECTION REPORT

REFUELING OUTAGE 14

October 2008

Exelon Generation Company, LLC200 Exelon Way

Kennett Square, PA 19348

Mailing Address4300 Winfield Road

Warrenville, IL 60555

Documentation Completed Date: January 09, 2009

Page 1 of 44

Page 3: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

TABLE OF CONTENTS

1.0 INTRODUCTION ....................................................................... 3

2.0 SUMMARY ................................................................................ 4

3.0 CERTIFICATIONS ...................................................................... 5

3.1 Procedures/Examinations/Equipment .............................. 5

3.2 Personnel ......................................................................... 6

4.0 EXAMINATION TECHNIQUE AND EXAMINATION SCOPE ..... 7

4.1 SG Tube Examination Techniques .................................. 8

4.2 SG Tube Inspection Scope ............................................. 9

4.3 Recording of Examination Data ...................................... 11

4.4 Witness and Verification of Examination ........................... 11

5.0 EXAMINATION RESULTS ......................................................... 11

5.1 Indications Found ............................................................ 11

5.2 Other SG Inspection Results ........................................... 16

6.0 RESULTS OF CONDITION MONITORING ................................ 17

6.1 AVB Wear ....................................................................... 18

6.2 Pre-Heater Baffle/TSP Wear ........................................... 18

6.3 Foreign Object Wear ........................................................ 19

6.4 Tubesheet Region Indications ..................................... 19

6.5 Primary-to-Secondary Leakage Assessment .................... 19

7.0 REPAIR SUMMARY ................................................................... 20

8.0 DOCUMENTATION ................................................................... 21

9.0 FIGURES/TABLES/ATTACHMENTS ......................................... 22

Page 2 of 44

Page 4: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

1.0 INTRODUCTION

Byron Station, Unit 2 operates with four (4) Westinghouse Model D-5 recirculating steamgenerators (SGs) in the four loop pressurized water reactor system. The steamgenerators contain thermally treated Alloy-600 U-tubes that have a nominal outsidediameter of 0.750 inches and a nominal thickness of 0.043 inches. The tubes arehydraulically expanded into the full depth of the tubesheet. The tubes are supported bystainless steel quatrefoil support plates (TSP's) and chrome plated Alloy-600 anti-vibrationbars (AVB's). See Figure A.1 for a diagram of the D-5 steam generator configuration.

Technical Specification (TS) 5.5.9.d provides the requirements for steam generatorinspection frequencies. The TS states that 100% of the Unit 2 tubes are to be inspectedat sequential periods of 120, 90 and thereafter 60 effective full power months (EFPM).Additionally, inspect 50% of the tube by the outage nearest the mid-point of the period andthe remaining 50% by the refueling outage nearest the end of the period. No SG shalloperate for more that 48 EFPM or two refueling outages without being inspected. If acrack indication is found in any SG tube, then the next inspection for each SG for thedegradation mechanism that caused the crack indication shall not exceed 24 EFPM or onefuel cycle (which ever is less). A degradation assessment shall be performed to determinethe specific inspection scope and inspection methods with the objective of detecting flawsof any type that may be present along the length of the tube.

During the start of Unit 2, Refueling Outage 14 Byron was at 88.63 EFPM within the 90EFPM period. Therefore, Byron's Refueling Outage 14 was the end point outage of the90 EFPM period.

In accordance with Byron Station Technical Specification (TS) 3.4.19, "Steam Generator(SG) Tube Integrity", TS 5.5.9, "Steam Generator (SG) Program," and American Societyof Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code Section Xl2001 Edition through the 2003 Addenda, IWB 2500-1, Examination Category B-Q, ItemB1 6.20, SG eddy current examinations were performed during the Byron Station, Unit 2Refueling Outage 14. All inspections were completed in accordance with T.S. 5.5.9.d.

The inspections were performed consistent with the Electric Power Research Institute(EPRI) "PWR Steam Generator Examination Guidelines: Revision 7", applicable interimguidance and Nuclear Energy Institute (NEI) 97-06, "Steam Generator ProgramGuidelines, Revision 2." The field inspection activities were conducted from October 11through October 16, 2008, by Westinghouse Electric Company LLC. The following tubeinspections were performed during this outage (TS 5.6.9.a):

o 100% full-length bobbin coil eddy current examination of all SGs, excluding the row1 & row 2 U-bend region, which were inspected with the 25% +PointTM inspectionprogram.

o 20% hot leg top of tubesheet (+/- 3") +PointTM inspection in all SGso 20% hot leg bulges > 18 Volts and over expansions > 1.5 mils within the hot leg

tubesheet, +Point inspection in all SGso 20% of the hot leg tubing within the tubesheet for the full-length of tubesheet,

+PointTM inspection in all SGso 20% of the tack expansion region of the hot leg tubing within the tubesheet, +PointTM

inspection in all SGso Expanded to 100% Tube End (TE) +2" hot leg and 20% TE +2" cold leg in all

SG's.

Page 3 of 44

Page 5: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

o For the tubes identified as potentially having increased residual stress (40 tubes),100% hot leg tubesheet region (top of tubesheet +3" to TE), hot leg dents/dents>_2.0 volts, and wear indications within in-service tubes, +PointTM inspection in allSGs

o +PointTM inspection of all hot leg and cold leg tubesheet expansions transitionssignificantly outside the tubesheet

o 20% preheater baffle expansion +PointM inspection in all SG'so 100% +PointTM inspection of the "corner' preheater expansions for the TSP 02C

Plate in the three SGs not scheduled for visual inspection of the preheater region,(SG's 2A, 2C, & 2D)

o 25% hot leg dents/dings >3.0 volts +Point inspection in all SGso 25% row 1 and 2 U-bends +PointTM inspection in all SGso Visual inspection of 100% of the previously installed mechanical plugs and welded

tube plugs in all SGs

2.0 SUMMARY

The guidance in Revision 7 of the EPRI "PWR Steam Generator Examination Guidelines"(i.e., EPRI Guidelines and applicable interim guidance) was used during this inspection. Adegradation assessment was performed prior to each inspection to ensure the properEPRI Appendix H, "Performance Demonstration for Eddy Current Examination," qualifiedinspection techniques were used to detect any existing and potential modes ofdegradation. Each technique was evaluated to ensure that the detection and sizingcapabilities are applicable to the Byron Station, Unit 2 site-specific condition in accordancewith Section 6.3.2 of the EPRI Guidelines. All data analysts were qualified to Appendix G,"Qualification of Eddy Current Examination Personnel for Analysis of Eddy CurrentExamination Data," of the EPRI Guidelines (i.e., Qualified Data Analyst (QDA)). All dataanalyst and acquisition personnel satisfactorily completed site specific performancetraining and testing. An independent QDA process control review was employed torandomly sample the data to ensure that the analysis resolution process was properlyperformed and that the field calls were properly reported. An analysis feedback processwas implemented that required the data analysts to review their missed calls and overcallson a daily basis.

The modes of tube degradation found during the current inspection were anti-vibration bar(AVB) wear, pre-heater support plate wear, foreign object wear, and Axial Primary WaterStress Corrosion Cracking (PWSCC) in bottom 1 inch of Hot Leg tubesheet. Pursuant toEPRI Guideline Section 3.7, "Classification of Sample Plan Results", the results of theinspection were classified as inspection category C-1 for SG C and category C-2 for SG'sA/B/D. There were no scanning limitations during the examinations.

License Amendment 158 approved an Interim Alternate Repair Criteria (IARC) for crack-like indications within the tubesheet that is applicable to Unit 2, Refueling Outage 14 andthe subsequent operating cycle. License Amendment 158 implements a change to TS5.5.9. Refer to Section 5.1.4 for the repair criteria for axial and circumferential flaws foundwithin the tubesheet for Unit 2, Refueling Outage 14 and the subsequent operating cycle.

As a result of the current eddy current inspections and response to conditions found, atotal of thirteen (13) tubes were repaired by tube plugging. Table 2.1 provides the tube

Page 4 of 44

Page 6: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

plugging levels for each SG. Table 2.2 provides the total number of tubes plugged in thecurrent outage by degradation mode.

TABLE 2.1Pluaaina L evel (TS 5.6.9.f & TS 5.6.9.h•Eauivalent Tube

SG A SG B SIGC KSG D TOTALTubes Previously Plugged 146 127 68 25 366Tubes Plugged in 2 5 3 3 13Refueling Outage 14Total Tubes Plugged 148 132 71 28 379Total Tubes Sleeved 0 0 0 0 0Total Tubes Plugged (%)* 3.24% 2.89% 1.55% 0.61% 2.07%

* Each SG contains 4570 Tubes

TABLE 2.2Tubes Plugged During Unit 2, Refueling Outage 14 (TS 5.6.9.e)

Mode of Degradation SG A SG B SG C SG D TotalAnti-Vibration Bar Wear 1 0 0 0 1Pre-Heater Support Plate Wear 0 1 0 2 3Foreign Object Wear 0 2 0 1 3Preventively Plugged 1 2 3 0 6Axial PWSCC Bottom Hot Leg 0 0 0 0 0TubesheetCycle 14 Plugging Totals 2___ 5___ 3___ 3___ +__

3.0 CERTIFICATIONS

3.1 Procedures/Examinations/Equipment

3.1.1 The examination and evaluation procedures used during the eddy currentinspection were approved by personnel qualified to ECT Level III inaccordance with the 1984 Edition of the American Society forNondestructive Testing (ASNT) Recommended Practice SNT-TC-1 A,"Personnel Qualification and Certification in Nondestructive Testing" andthe 1991 and 1995 Editions of the American National Standards Institute(ANSI)/ASNT CP-189, "ASNT Standard for Qualification and Certification ofNondestructive Testing Personnel." Exelon Generation Company, LLC(EGC) procedure ER-AP-335-039, "Multifrequency Eddy Current DataAcquisition of Steam Generator Tubing," Revision 5 and EGC procedureER-AP-335-040, "Evaluation of Eddy Current Data for Steam GeneratorTubing," Revision 4, were used for data acquisition and analysis.

3.1.2 The examinations, equipment, procedures and personnel were incompliance with the following requirements: The EGC and WestinghouseQuality Assurance Programs for Inservice Inspection; Byron StationTechnical Specification 5.5.9; 2001 Edition through the 2003 Addenda ofthe ASME B&PV Code Section Xl, "Rules for Inservice Inspection ofNuclear Power Plant Components"; 2001 Edition through the 2003Addenda of the ASME B&PV Code Section V, "Nondestructive

Page 5 of 44

Page 7: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

Examination"; Revision 7 of the EPRI PWR SG Examination Guidelines;and NEI 97-06, "Steam Generator Program Guidelines," Revision 2.

3.1.3 Certification packages for examiners, data analysts, and equipment areavailable at Byron Station. Table A.1 and Table A.2 contained inAttachment "A", lists all personnel who performed, supervised, or evaluatedthe data during the current inspection.

3.1.4 CoreStar International Corporation OMNI-200 TM Remote Data AcquisitionUnits (RDAUs) with Westinghouse ANSER 8.4.3 Revision 332 computersoftware was used to acquire the eddy current data. Analysis wasperformed with Westinghouse ANSER 8.4.3 Revision 299 computersoftware.

3.1.5 The bobbin coil examinations were performed with a 0.610 inch diameterbobbin coil eddy current probe. For low row U-Bend tubing, 0.590 inchdiameter probes were utilized where there was difficulty using the 0.610inch diameter probe.

3.1.6 The top of tubesheet, tubesheet region, baffle plate expansion, and specialinterest rotating coil examinations were performed with a 0.610 inchdiameter three coil rotating +PointTM probe that contained a plus-point coil,a 0.115 inch diameter pancake coil and a 0.080 inch diameter pancakecoil.

3.1.7 The rotating coil examinations in the U-Bend region were performed with a0.580 inch diameter rotating +PointTM probe.

3.2 Personnel

3.2.1 The personnel who performed the SG eddy current inspection dataacquisition were qualified to ECT Level II in accordance with the 1984Edition of the ASNT Recommended Practice SNT-TC-1A, "PersonnelQualification and Certification in Nondestructive Testing" or the 1995Edition of ANSI/ASNT CP-1 89, "ASNT Standard for Qualification andCertification of Nondestructive Testing Personnel." A list of certified eddycurrent personnel who performed data acquisition for the examination arecontained in Table A.1 of Attachment A.

3.2.2 The personnel who performed the SG eddy current data analysis werequalified to a minimum of ECT Level II, with special analysis training (i.e.,Level IIA) in accordance with the 1984 Edition of the ASNTRecommended Practice SNT-TC-1A, "Personnel Qualification andCertification in Nondestructive Testing" or the 1995 Edition of ANSI/ASNTCP-189, "ASNT Standard for Qualification and Certification ofNondestructive Testing Personnel." A list of certified eddy currentpersonnel who performed data analysis for the examination are containedin Table A.2 of Attachment A

Page 6 of 44

Page 8: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

3.2.3 All SG eddy current data analysts were qualified in accordance with EPRIAppendix G for QDA's. In addition, all data analysts were trained andtested in accordance with a site specific performance demonstrationprogram in both the bobbin coil and +PointTM inspection data analysis.Resolution analysts were also trained and tested specifically for theperformance of data resolution. All analysts were required to achieve aminimum probability of detection of 80% with a 90% minimum confidencelevel on practical examinations and a minimum score of 80% on thewritten test prior to analyzing data.

3.2.4 All SG eddy current data acquisition personnel were trained and tested inaccordance with a site specific performance demonstration program.The data acquisition operators were required to achieve a written testscore of 80% or greater prior to acquiring data.

3.2.5 The SG eddy current analysis was subject to two independent analyses.Primary analysis of all data was performed by personnel from Master-Lee,HRID, MoreTech, Infineddy, NDE Technologies Incorporated,Westinghouse, and Wiltec. Secondary analysis was performed bypersonnel from Anatec, and Tecnatom. Discrepancies between the twoparties required ECT Level III concurrence between both parties for thefinal resolution.

3.2.6 Two independent SG eddy current ECT Level III ODA's who were notpart of the resolution team were employed to serve as process controlreviewers, in accordance with EPRI Guidelines, Section 6.3.3. TheIndependent Level III QDAs randomly sampled the data to ensure theresolution process was properly performed and that the field calls wereproperly reported. The Independent Level III QDAs also provided dataacquisition oversight to ensure that the data collection process was incompliance with appropriate procedures, that all essential variables wereset in accordance with the applicable Examination TechniqueSpecification Sheet (ETSS) and to provide a data quality check ofacquired data. The Independent Level III QDAs reported directly to theEGC Nondestructive Examination Level Ill.

3.2.7 Personnel from Westinghouse Electric Company, Master-Lee, System-One, Anatec, and Hudson performed data acquisition.

3.2.8 Real time data quality verifications were performed by personnel qualifiedas data analysts.

4.0 EXAMINATION TECHNIQUE AND EXAMINATION SCOPE

All eddy current examination techniques used are qualified in accordance with AppendixH of the EPRI PWR SG Examination Guidelines. Each examination technique wasevaluated to be applicable to the tubing and conditions of the Byron, Unit 2 SGs.

Page 7 of 44

Page 9: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

4.1 SG Tube Examination Techniques (TS 5.6.9.c)

4.1.1 The bobbin coil examinations were performed with a 0.610 inch diameterbobbin coil eddy current probe described in Section 3.1.5. For low row U-Bend regions where there was difficulty using the 0.610 inch diameterprobe, a 0.590 inch diameter bobbin probe was utilized where there wasdifficulty traversing the U-bend region. The nominal probe inspectionspeed was 40 inches per second for the 0.610 inch diameter probe and 24inches per second for the 0.590 inch diameter probe. Sufficient samplingrates were used to maintain a minimum of 33 samples per inch. Thebobbin coil probes were operated at frequencies of 550 kHz, 300 kHz, 130kHz, and 20 kHz operating in the differential and absolute test modes. Inaddition, suppression mixes were used to enhance the inspection. Thesemixes were as follows: 550/130 kHz differential mix, a 300/130 kHzabsolute mix, and a 550/300/130 kHz differential mix.

4.1.2 The +PointTM examinations at top of tubesheet and pre-heater baffle plateexpansion transition regions, and special interest locations were performedwith a 0.610 inch diameter three coil +PointTM eddy current probe describedin Section 3.1.6. The nominal probe speed was 0.8 inches per second and0.1 inches per second for dents and dings. A sampling rate was used tomaintain a minimum of 30 samples per inch in the circumferential directionand 25 samples per inch in the axial direction. For dents and dings, asampling rate was used to maintain a minimum of 30 samples per inch inthe circumferential direction and 30 samples per inch in the axial direction.The rotating probes were operated at frequencies of 300 kHz, 200 kHz,100 kHz and 20 kHz. In addition to the four base frequencies, threeprocess channels were used to display circumferential indications in thepositive trace.

4.1.3 The +PointTM examinations in the U-bend regions were performed with a0.580 inch diameter +PointTM probe described in Section 3.1.7. Thenominal probe speed was 0.4 inches per second. A sampling rate wasused to maintain a minimum of 30 samples per inch in the circumferentialdirection and 30 samples per inch in the axial direction. The +PointTMprobe was operated at frequencies of 400 kHz, 300 kHz, 150 kHz, and 20kHz for Rows 1 and 2. For U-bend rows greater than row 2, the +PointTM

probe was operated at frequencies at 400kHz, 300 kHz, 100 kHz and 20kHz. In addition to the four base frequencies, three process channels wereused to display circumferential indications in the positive trace.

4.1.4 The eddy current calibration standards used for the bobbin coil and+PointT inspections met the requirements of Section 6.2.3 of the EPRIPWR Steam Generator Examination Guidelines, Revision 7 and Sections Vand XI of the ASME B&PV Code, 2001 Edition through the 2003 Addenda.

4.1.5 The SG eddy current examination techniques used during this inspectionwere equivalent to the EPRI Appendix H techniques listed in Table 4.1.Each Examination Technique Specification Sheet (ETSS) was evaluatedand determined to be applicable to the site conditions.

Page 8 of 44

Page 10: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

Table 4.1nrfliv 14 Tghni

96005.2 9 Bobbin Free Span Pitting96007.1 11 Bobbin Tube Support Plate (TSP) Outer Diameter Stress Corrosion

Cracking (ODSCC)96043.2 1 Bobbin Single Land Pre-Heater Support Wear96511.1 16 +Point" Low Row U-bend Primary Water Stress Corrosion Cracking

(PWSCC)96703.1 17 +PointM Dent/Ding Axial PWSCC96910.1 10 +Point'M Tapered TSP Wear/Foreign Object Wear/Free Span

Volumetric Indications21409.1 5 +PointTm TTS Sludge Pile/Crevice/Expansion Transition Axial ODSCC21410.1 6 +PointTM Expansion Transition/Dent/Ding Circumferential ODSCC20510.1 7 +PointVM Expansion Transition/Tubesheet (TS) Bulge-Overexpansion

Dent/Ding Pre-heater Circumferential PWSCC20511.1 8 +PointTM Expansion Transition/TS Bulge-Overexpansion Pre-heater

Axial PWSCC21998.1 4 oint•r Foreign Object Wear/Free Span Volumetric Indications22401.1 4 +Point" Dent/Ding Axial ODSCC

4.2 SG Tube Inspection Scope (TS 5.6.9.a)

4.2.1 100% of the tubes in all four SGs were inspected full length, with abobbin coil probe as described in Section 4.1.1, with the exception of theRow 1 and 2 U-Bend region where a 25% sample was performed with a+PointTM probe as described in Section 4.1.3.

4.2.2 20% of the tubes in all four SGs were inspected full length in the hot legtubesheet region from 3 inches above the top of tubesheet expansiontransition region to the tube end with a +PointTM probe as described inSection 4.1.2. This population included 20% of the hot leg bulges > 18volts and over expansions > 1.5 mils above 1 inch from the hot legtubesheet tube end. These inspections were performed with a +PointTMprobe as described in Section 4.1.2.

4.2.3 Based on the initial 20% full length hot leg tubesheet inspection asdescribed in Section 4.2.2 identifying indications within the bottom 0.5inches of tubing, scope was expanded to 100% of the bottom 2 inches ofthe hot leg tubing in all SGs and 20% of the bottom 2 inches of the coldleg tubing. A +PointTM probe as described in Section 4.1.2 was used forthis inspection.

4.2.4 100% of the tubes identified in all four SGs as having increased residualstress (total of 40 tubes) were inspected full length in the hot legtubesheet region from 3 inches above the top of tubesheet expansiontransition region to the tube end with a +PointTM probe as described in

Page 9 of 44

Page 11: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

Section 4.1.2. Additionally, all hot leg dents/dings > 2.0 volts, (total of 4indications) and any wear indications (total of 18) identified in these tubeswere inspected with a +PointM probe as described in Section 4.1.2.

4.2.5 20% of the pre-heater baffle plate expansion transitions (+/- 2 inches) inall SG's were inspected with a +PointTM probe at baffle plates 02C and03C as described in Section 4.1.2. Additional pre-heater baffle plateexpansion transitions (+/- 2 inches) were inspected as diagnosticinspections in the 2A, 2C and 2D SGs with a +PointTM probe as describedin Section 4.1.2, at baffle plate 02C in the outer peripheral tubes near theflow blocking region of the pre-heater. This location has historically beenknown as an area where secondary side foreign objects may collect dueto the flow conditions in the region. Note: Since the 2B SG was visuallyinspected at the baffle plate 02C location diagnostic inspection was notperformed for the 2B SG.

4.2.6 25% of the hot leg dents/dings greater than 3.0 volts based on bobbininspection results were inspected (+/- 3 inches) in all four SGs with a+PointTM probe as described in Section 4.1.2.

4.2.7 25% of the Row 1 and Row 2 U-Bends in all four SGs were inspectedfrom the top support plate on the hot leg side to the top support plate onthe cold leg side with a +PointTM probe as described in Section 4.1.3.

4.2.8 100% +PointTM inspection (21 total) of hot leg and cold leg tubesheetexpansions transitions significantly outside the tubesheet as determinedby review of bobbin eddy current data.

4.2.9 Diagnostic examinations were conducted on the following types ofindications and conditions using a rotating probe described in Section4.1.2 and 4.1.3:

o Non-quantifiable indications that were detected by the bobbin coilexamination

o Hot leg dents and dings described in Section 4.2.6.o Tubes in the vicinity of potential foreign objects in order to

determine the extent of tubes potentially affected by the objects.o All expansion transitions and bulges that are significantly outside

the top of tubesheeto Diagnostic examinations were also performed in the 40 tubes that

were identified with potentially high residual stress in the areas ofhot leg dents and dings 3-volts or greater and areas of AVB tubewear.

A total of 1107 tubes were inspected as a result of these diagnosticexaminations.

4.2.10 Attachment B contains tube sheet maps indicating the tube inspections thatwere performed during Unit 2, Refueling Outage 14.

Page 10 of 44

Page 12: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

4.3 Recording of Examination Data

The raw eddy current data and analysis results were recorded on optical disks.The data was then loaded into the Westinghouse Eddy Current Data ManagementSystem, "ST Max," version 1.22.01. This system was used to track the properexamination of all tubes and it was also used to generate the final eddy currentreport summaries.

4.4 Witness and Verification of Examination

Eddy current inspections were witnessed and/or verified by the Authorized NuclearInservice Inspectors, Mr. Jeff Hendricks and Mr. Lee Malabanan, of the HartfordSteam Boiler of CT of Hartford Connecticut, Chicago Branch, 2443 WarrenvilleRoad, Suite 500, Lisle, Illinois 60532-9871.

The Unit 2, Refueling Outage 14 ASME Form NIS-1, "Owners Report for InserviceInspections," is contained in Attachment D.

The Unit 2, Refueling Outage 14 ASME Form NIS-2, "Owner's Report forRepair/Replacement Activity" for steam generator mechanical tube pluggingactivities is contained in Attachment E.

5.0 EXAMINATION RESULTS

5.1 Indications Found (TS 5.6.9.b)

5.1.1 Anti-Vibration Bar (AVB) Wear - Tube degradation was found during theUnit 2, Refueling Outage 14 bobbin coil examination in the U-bend regiondue to fretting of the Anti-Vibration Bars on the tube. A total of 891indications in 513 tubes were reported. The EPRI Appendix H bobbin coilexamination technique 96004.3, Rev. 11 was utilized in this inspection forthe depth sizing of AVB wear. The largest indication found was 40%Through Wall (TW) and was found in tube Row 45-Col 28 in SG 2A. Thisindication met the 40% TS plugging/repair limit and was subsequentlystabilized and plugged. Table 5.1.1 provides a summary of AVB Weardegradation. Attachment C provides a listing of all tube flaws containingmeasurable through wall depth and inservice indications, including AVBwear.

Page 11 of 44

Page 13: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

Table 5.1.1Unit 2, Refueling Outage 14 AVB Wear Summary

SG.. ASGB SGC_ SGDTube Id. Tub F Ind. Inbeld. Tu.es*: * d.

<20% TW 70 81 128 176 94 117 79 10520-39% TW 75 110 92 138 84 116 39 47>= 40% TW 1 1 0 0 0 0 0 0TOTAL * 146 192 220 314 178 233 118 152• Tubes may contain multiple indications and may be identified in multiple size

categories.

5.1.2 Foreign Obiect Wear - Tube degradation was found that was attributed toforeign object wear during the Unit 2, Refueling Outage 14 inspection.Six (6) indications of foreign object wear were found in five tubes. Theindications ranged from 15% TW to 38% TW as measured by the EPRIAppendix H +PointTM qualified examination technique 21998.1 Rev. 4.Table 5.1.2 provides a summary of the tubes that contained foreign objectwear during Unit 2, Refueling Outage 14.

Table 5.1.2a 14 Foreiai

2A 45 67 TSP 02C+2.88" 19% Object Removed-B2R1 1- No change in flaw size2A 45 67 TSP 02C+1.22" 23% Object Removed-B2R1 1- No change in flaw size2B 7 8 TSP 05H+0.72" 15% Location Not accessible-Tube Plugged/Stabilized2B 25 20 TSP 07H-0.63" 38% Location Not accessible-Tube Plugged/Stabilized2D 24 65 TSP 02C+1.14" 32% Object Removed-B2R11- No change in flaw size2D 24 69 TSP 05H-0.84" 27% Location Not accessible-Tube Plugged/Stabilized

Three of the indications were associated with loose parts that wereremoved during the B2R1 1 outage and the tubes remained inservice.The affected tubes were Row 45-Col 67 in SG 2A (2-indications) andRow 24-Col 65 in SG 2D.

As a result, of the Eddy Current inspection, evidence of three in-accessible foreign objects were found. The first foreign object was alegacy object previously identified at TSP 05H in the 2B steam generator.This object appears to have moved from its location from B2R13. As aresult, the three (3) affected tubes (28 SG Row 6 Col 8 & Row 6 Col 7,and Row 7 Col 8) were plugged and stabilized to maintain the "box"around this object. Tube Row 7 Col 8 contained a 15% TW flaw andtubes Row 6 Col 8 & Row 6 Col 7 contained PLP indications with noevidence of tube damage.

The second foreign object was also in the 2B steam generator butlocated on the bottom of TSP 07H in tube Row 25, Col 20 and caused a38% TW flaw with a PLP signal. In this case the foreign object wasidentified as being lodged in the bottom edge of one of the quatrefoil flowholes. As a result, the affected tube was plugged and stabilized.

Page 12 of 44

Page 14: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

The third foreign object caused a 27% TW wear indication at TSP 05H inthe 2D SG tube Row 24 Col 69 however, no PLP signal was identified. Inthis case, the wear scar is similar to the one on the 2B steam generatorat 07H location. Based on this similarity, it was assumed that a foreignobject was present in the bottom edge of one of the quatrefoil flow holes.Although no PLP was detected, it is assumed that one exists and it is

possible that it could migrate during the upcoming cycle. This tube wasalso plugged and stabilized.

A fourth foreign object was found at the TSP 08H of 2C steam generator byvisual and eddy current inspections. The foreign object was identified byeddy current during the B2R13 inspection but access was not gained tovisually verify the object. At that time, all affected tubes were plugged andstabilized. During B2R14, eddy current and visual inspections showed thatit moved slightly. However, no wear was detected on the affected tubesthat remained in-service over the cycle. To ensure this part does notadversely impact surrounding tubes during the upcoming cycle, tubes Row33 Col 63, Row 34 Col 63, and Row 34 Col 64 were plugged and stabilized.If the part does move, experience with this object indicates that potential

wear on in-service tubes would be well below the tube's structural limit.

5.1.3 Pre-Heater Wear/TSP Wear - Nineteen (19) tubes were found thatcontained indications of pre-heater baffle plate/TSP wear. The depth of thepre-heater wear ranged from 5% TW to 45% TW as measured by theEPRI Appendix H qualified bobbin coil examination technique 96043.2,Rev. 1, for single land quatrefoil wear, 96004.3, Rev. 11, for drilled holebaffle plate wear and 96910.1, Rev. 10, for tapered wear. Three (3) tubeswere plugged as a result of pre-heater baffle plate/TSP wear. Table 5.1.3below provides a summary of tubes that contain pre-heater baffleplate/TSP wear.

TABLE 5.1.3're-heater Ba'

2B 15-91 06C 5% Drill Hole '96004.3 / 112B 47-75 02C 8% Drill Hole 96004.3/11

2C 48-35 02C 7% Drill Hole 96004.3 / 112D 48-63 05C 5% Drill Hole 96004.3 / 11

2B 46-50 07C 22% Single Land 96043.2 / 1

2B 48-50 07C 39% Single Land 96043.2/12B 48-53 07C 30% Single Land 96043.2 / 12B 48-54 07C 31% Single Land 96043.2 / 1

2B* 48-55 07C 45% Single Land 96043.2/12B 48-59 07C 33% Single Land 96043.2 / 12B 49-52 07C 27% Single Land 96043.2/1

Page 13 of 44

Page 15: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

Zb 49-W3 UIU 1 33% bingie Lana 9bU43.2 / 12C 49-70 07C 38% Single Land 96043.2 / 1

2D* 49-67 08C 26% Single Land 96043.2/1

2D* 49-67 07C 41% Single Land 96043.2/12C 49-65 07C 18% Single Land 96043.2 / 1

2D* 49-69 07C 41% Single Land 96043.2/1

2C 49-73 07C 27% Tapered 96910.1 / 10

2D 48-63 07C 22% Tapered 96910.1 / 10*Stabilized and Plugged in Unit 2, Refueling Outage 14

5.1.4 Tubesheet Primary Water Stress Corrosion CrackinqLicense Amendment 158 approved an IARC for crack-like indicationswithin the tubesheet that is applicable to Unit 2, Refueling Outage 14 andthe subsequent operating cycle. License Amendment 158 implements achange to Tech Spec 5.5.9. The following provides the repair criteria foraxial and circumferential flaws found within the tubesheet for Unit 2,Refueling Outage 14 and the subsequent operating cycle.

o Tubes with flaws having a circumferential component less than or equalto 203 degrees found in the portion of the tube below 17 inches from thetop of the tubesheet and above 1 inch from the bottom of the tubesheetdo not require plugging. Tubes with flaws having a circumferentialcomponent greater than 203 degrees found in the portion of the tubebelow 17 inches from the top of the tubesheet and above 1 inch from thebottom of the tubesheet shall be removed from service.

o Tubes with service-induced flaws located within the region from the top ofthe tubesheet to 17 inches below the top of the tubesheet shall beremoved from service. Tubes with service-induced axial cracks found inthe portion of the tube below 17 inches from the top of the tubesheet donot require plugging.

o When more than one flaw with circumferential components is found in theportion of the tube below 17 inches from the top of the tubesheet andabove 1 inch from the bottom of the tubesheet with the total of thecircumferential components greater than 203 degrees and an axialseparation distance of less than 1 inch, then the tube shall be removedfrom service. When the circumferential components of each of the flawsare added, it is acceptable to count the overlapped portions only once inthe total of circumferential components.

o When one or more flaws with circumferential components are found inthe portion of the tube within 1 inch from the bottom of the tubesheet, andthe total of the circumferential components found in the tube exceeds 94

Page 14 of 44

Page 16: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

degrees, then the tube shall be removed from service. When one or moreflaws with circumferential components are found in the portion of the tubewithin 1 inch from the bottom of the tubesheet and within 1 inch axialseparation distance of a flaw above 1 inch from the bottom of thetubesheet, and the total of the circumferential components found in thetube exceeds 94 degrees, then the tube shall be removed from service.When the circumferential components of each of the flaws are added, itis acceptable to count the overlapped portions only once in the total ofcircumferential components.

The IARC contains additional requirements for Condition Monitoring andOperational Assessment evaluations. Details of the requirements are containedin the license amendment request documented in Exelon Letter RS-08-075 andWestinghouse Report LTR CDME-0-43 Revision 3 P-Attachment. Therequirements are summarized as:

o For integrity assessments, the ratio of 2.5 will be used in the completionof both the condition monitoring and operational assessments. Forexample, for the condition monitoring assessment, the component of theleakage from the lower 4 inches for the most limiting SG during the priorcycle will be multiplied by a factor of 2.5 and added to the total leakagefrom any other source and compared to the allowable accident analysisleakage assumption. For the operational assessment, the difference inleakage between the allowable limit during the limiting design basisaccident and the leakage from other sources will be divided by 2.5 andcompared to the observed leakage. An administrative limit will beestablished to not exceed the calculated value.

For axial and circumferential cracks found within the top 17-inches of the hot legtubesheet where a plug on detection strategy is applied per the previous 17-inchH*/B* criteria, tube burst is precluded by the constraint of the tubesheet. Forcircumferential cracks, the axial separation limit is a 270-degree circumferentialthrough wall flaw per the EPRI Circ Crack Evaluation Report. Axial indicationsdo not affect the load bearing capability of the tube. Condition monitoring fortube leakage will be based on actual operational leakage detected andassessment of the flaw population characteristics found. If flaws are found in thefirst 17 inches of the tubesheet, then this would be the first occurrence of flaws inthat region at Byron. Therefore, based on the plug on detection strategy, theend of the next cycle population would be similar to the current outage.

As a result of the initial 20% Hot Leg tubesheet full depth +PointTM inspection,axial indications were found within the bottom 0.5 inches of the tube. Based onfinding axial indications at the hot leg tube end within the initial 20% full-depthtubesheet +PointTM program, scope expansion was extended to 100% of the hotleg tube ends plus 2 inches in the hot leg of each SG and 20% of the cold legtube ends plus 2 inches in each SG. No indication of cracking was found in thecold leg. No indication of circumferential cracking was found in any of theinspections. No crack-like indication was found above 0.5" of the bottom of thetube. Based on the IARC that had been approved by the NRC for use during theUnit 2, Refueling Outage 14, none of the sixty-five (65) tubes with indications ofSCC required plugging. Refer to Table 5.1-4 for indications in each SG.

Page 15 of 44

Page 17: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

Table 5.1-4

2A 9 82B 26 262C 27 272D 3 3

Total 65 64

5.2 Other SG Inspection Results

5.2.1 Inspection of Tubes that Potentially Contain Higher Residual Stress:Forty (40) tubes were previously found in the Byron Unit 2 SGs as a resultof a special screening to identify tubes that potentially could contain higherresidual stress. This screening was performed in response to a fabricationanomaly that was found at another plant containing thermally treated Alloy600 tubing that resulted in higher residual stress in certain tubes. Severalof these tubes at the other plant developed stress corrosion cracking intubes that contained higher residual stress resulting from the fabricationanomaly. As a result, the following inspections were performed on the 40tubes in the Byron Station Unit 2 SGs that potentially could contain higherresidual stress:

o Full Length bobbin coil inspection as described in Section 4.1.1o Hot Leg Top of tubesheet (+3 inches to tube end) with +PointTM

probe as described in Section 4.1.2o All hot leg dents and dings 2.0 volts and greater with +PointTM

probe as described in Section 4.1.2 (total of 18 tubes thatpotentially contain higher residual stress)

o All areas of AVB wear (total of 4) with +PointTM probe as describedin Section 4.1.2

As a result of these inspections, no indication of stress corrosion crackingwas found in the forty (40) tubes that were previously determined tocontain higher residual stress.

Refer to Attachment B for detailed locations and sizing for all indicationsidentified within the tubes identified as having potentially higher residualstress.

5.2.2 Visual Inspection of Installed Tube Plugs:All previously installed welded plugs and previously installed mechanicalplugs were visually inspected for signs of degradation and leakage. A totalof 25 welded plugs and 771 mechanical plugs were visually inspected. Inaddition, all plugs installed during this outage (i.e., 26 mechanical plugs in13 tubes) were also visually inspected and the installation parameters werereviewed for acceptable installation. No anomalies were found.

Page 16 of 44

Page 18: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

5.2.3 Preventative Tube Plugging:Six (6) tubes were preventatively plugged that did not contain tube flaws orservice induced degradation.

One tube in the 2A SG; Row 34 Col 47:Tube preventatively plugged in anticipation of implementing a permanenttubesheet alternate repair criteria. This tube had an oversized tube borethat is larger than the assumptions contained in the permanent tubesheetARC analysis.

Two tubes in the 2B SG; Row 6 Col 7 & Row 6 Col 8:Tubes preventatively plugged and stabilized due to possible loose part(PLP) signals at TSP 05H tube support plate location.

Three tubes in the 2C SG; Row 33 Col 63, Row 34 Col 63, & Row 34 Col64:Tubes preventatively plugged and stabilized due to possible loose part(PLP) signals at the TSP 08H tube support plate location.

5.2.4 Attachment C contains tube lists with axial elevations of all tube flaws thatcontain measurable through wall depth and inservice indications thatwere found during the Unit 2, Refueling Outage 14 eddy currentinspection (TS 5.6.9.d).

5.2.5 During the previous Refueling Outage 13 visual inspection areas oferosion were found in the primary moisture separator components ineach of the four SG's inspected. The extent of the erosion was similar tothe previous Refueling Outage 12 inspection results. Additionalultrasonic thickness measurements were taken of the eroded areas ineach of the SG's. This was the second inspection of the SG 2B and thefirst inspection of the other three SG's. Continued erosion of thecomponents was identified in the SG 2B, while no indications of throughwall erosion were identified. Similar extent of erosion was found in theother three SG's. An analysis was performed that determined thatsignificant margin remained in the eroded areas prior to the erosionpenetrating through wall and affecting SG performance or possiblygenerating loose parts. The erosion in the affected areas was notprojected to penetrate through wall or produce loose parts over the nexttwo operating cycles after which the next inspection is currently planned.Note: During Unit 2, Refueling Outage 14 visual inspection of the primarymoisture separator components was not performed. Monitoring of thecondition is planned for Unit 2, Refueling Outage 15 in order to monitorthe degradation growth rate and take corrective actions if they becomenecessary.

6.0 RESULTS OF CONDITION MONITORING (TS 5.6.9.g)

A condition monitoring assessment was performed for each inservice degradationmechanism found during the Unit 2, Refueling Outage 14 inspection. The condition

Page 17 of 44

Page 19: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

monitoring assessment was performed in accordance with TS 5.5.9.a and NEI 97-06using the EPRI Steam Generator Integrity Assessment Guidelines, Revision 2. Foreach identified degradation mechanism, the as-found condition was compared to theappropriate performance criteria for tube structural integrity, accident induced leakageand operational leakage as defined in TS 5.5.9.b. For each damage mechanism a tubestructural limit was determined to ensure that SG tube integrity would be maintainedover the full range of normal operating conditions and design basis accidents. Thisincludes retaining a safety factor of 3.0 against burst under normal steady state fullpower operation primary to secondary pressure differential and a safety factor of 1.4against burst under the limiting design basis accident pressure differential.For Byron Station Unit 2, the limiting case is 3 times operating differential pressure,which is significantly higher than the most limiting accident condition (steam line break).In the case of uniform wall thinning, the remaining tube wall can still meet the applicablestress limit during normal and accident loading conditions. With only wear/frettingdamage mechanisms and application of the uniform wall thinning structural limit thatmeets ASME Code minimum tube wall requirements and Draft Regulatory Guide 1.121margins of safety, a tube will not leak at normal operating or accident conditions.Satisfying the structural limit ensures that the SG tube integrity performance criteria forstructural integrity, accident induced leakage and operational leakage will bemaintained.

The as-found condition of each degradation mechanism found during Refueling Outage14 was shown to meet the appropriate limiting structural integrity performanceparameter with a probability of 0.95 at 50% confidence, including consideration ofrelevant uncertainties.

No tube pulls or in-situ pressure testing was performed during Unit 2, Refueling Outage14.

Sections 6.1 through 6.4 provide a summary of the condition monitoring assessment foreach degradation mechanism. Section 6.5 provides a primary to secondary leakageassessment as required by TS 5.6.9.k and TS 5.6.9.1.

6.1 AVB Wear

The largest AVB wear indication found during the Unit 2, Refueling Outage 14inspection was 40% TW as measured by the EPRI Appendix H qualifiedtechnique 96004.3, Revision 11. Considering technique and analystuncertainties, the largest AVB wear indication found is corrected to 47.3% TWwith a 0.95 probability at 50% confidence. This is well below the AVB wearstructural limit of 71.4% TW.

6.2 Pre-Heater Baffle/TSP Wear

The largest pre-heater baffle plate drilled hole baffle wear indication found duringthe Unit 2, Refueling Outage 14 inspection was 8% TW as measured by theEPRI Appendix H qualified technique 96004.3, Revision 11. As described in theUnit 2, Refueling Outage 14 Appendix H Qualification document, the sitevalidation of EPRI Appendix H techniques indicates that for pre-heater wear, thesignal to noise ratio may impact the detection of pre-heater wear flaws that are

Page 18 of 44

Page 20: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

less than 16% TW. Therefore, even though a signal of 8% TW was detected fortube wear at a drilled hole TSP location, it will be conservatively assumed that a16% TW indication may not have been identified and will be evaluated forcondition monitoring purposes. Considering technique and analyst uncertainties,the largest baffle plate wear indication found is corrected to 24.3% TW with a0.95 probability at 50% confidence. This is well below the 0.75-inch baffle platewear structural limit of 65.6% TW.

The largest single land TSP quatrefoil wear indication found during the Unit 2,Refueling Outage 14 inspection was 45% TW as measured by the EPRIAppendix H qualified technique 96043.2, Revision 1. Considering technique andanalyst uncertainties, the largest single land TSP wear indication found iscorrected to 50% TW with a 0.95 probability at 50% confidence. This is belowthe 1.12 inch TSP wear structural limit of 60.7% TW.

The largest TSP tapered wear indication found during the Unit 2, RefuelingOutage 14 inspection was 27% TW as measured by the EPRI Appendix Hqualified technique 96910.1, Revision 10. Considering technique and analystuncertainties, the largest tapered TSP wear indication found is corrected to43.9% TW with a 0.95 probability at 50% confidence. This is below the 1.12 inchTSP wear structural limit of 60.7% TW.

6.3 Foreign Object Wear

The largest foreign object wear indication found during the Unit 2, RefuelingOutage 14 inspection was 38% TW as measured by the EPRI Appendix Hqualified technique 21998.1, Revision 4. Considering technique and analystuncertainties, the largest baffle plate wear indication found is corrected to 56.2%TW with a 0.95 probability at 50% confidence. This is below the 58.1% TWfreespan uniform wall thinning of unlimited length structural limit.

6.4 Tubesheet Region Indications (TS 5.6.9.J)

During Unit 2, Refueling Outage 14 (65) indications identified within thetubesheet were contained within the bottom 0.5 inch of the hot leg tubesheet. Asdiscussed in the IARC analysis, axial indications within this region are acceptablefor continued operation since they are constrained within the tubesheet and haveno safety significance. No circumferential indications were identified during Unit2, Refueling Outage 14 and all axial indications identified within the tubesheetduring Refueling Outage 14 met all condition monitoring requirements. Based onthe 65 axial indications being located >17 inches from the top of tubesheet,which met the IARC acceptance criteria as defined in License Amendment 158,therefore, none of the tubes required repair during Refueling Outage 14. All 65indications have originated from the primary side (inner surface of the tube).Additional information regarding the indications are in Attachment C.

6.5 Primary-to-Secondary Leakage Assessment (TS 5.6.9.k and TS 5.6.9.1)

Byron Unit 2 did not observe any operational primary to secondary leakagegreater than three (3) gallons per day over the cycle preceding the inspection.

Page 19 of 44

Page 21: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

Chemistry sampling of the Steam Jet Air Ejector and liquid SG blowdown samplelocations did not detect any SG operational leakage that was above the detectionthreshold. Therefore, it was determined that there was no quantifiable SGoperational leakage.

The IARC contains additional requirements for Condition Monitoring (CM)assessment and Operational Assessment (OA) evaluation.

For the CM assessment, the component of leakage from the lower 4 inches ofthe most limiting SG during the prior cycle of operation will be multiplied by afactor of 2.5 and added to the total leakage from any other source and comparedto the allowable accident analysis leakage assumption. Regarding the CMrequirement, since Byron Unit 2 did not observe any measurable SG primary tosecondary operational leakage, the calculated accident leakage rate from flawsin the lowermost 4-inches of the hot leg tubesheet would also not be quantifiable.

For the OA evaluation, the difference in leakage between the allowable limitduring the design basis accident and the leakage from other sources will bedivided by 2.5 and compared to the observed leakage and, if required, anadministrative limit will be established to not exceed the calculated value.No degradation that may lead to leakage was detected above the bottom 4inches of the tubesheet region during Unit 2, Refueling Outage 14. This isevidenced by all degradation modes identified during Refueling Outage 14 beingbelow the tube structural limits as described in Sections 6.1, 6.2, 6.3, and 6.4.Therefore, the entire allowable accident induced leakage (0.5 gallons per minuteRoom Temperature (gpmRT)) at Byron Unit 2 can be allocated to the tubesheetexpansion region over the next cycle of operation. Using the calculation basisabove, the allowable normal accident induced leakage from the tubesheetexpansion region is 0.2 gpmRT (0.5 gpmRT divided by 2.5), which is greaterthan the 150 gpdRT (0.104 gpmRT) TS 3.4.13 primary to secondary leakagelimit for Byron Unit 2. Therefore, no adjustment of the TS 3.4.13 limit for normaloperating leakage is required, and accident conditional leakage limits aremaintained by adherence to TS 3.4.13.

7.0 REPAIR SUMMARY (TS 5.6.9.i)

Repairs were conducted in accordance with ASME Section X1, 2001 Edition through the2003 Addenda. All tube plugging was performed by Westinghouse using Alloy 690mechanical tube plugging process in accordance with ASME Section XI IWA-4713, "HeatExchanger Tube Plugging by Expansion." All repairs were performed in accordance withapproved Westinghouse procedures. Table 7.1 depicts the repairs conducted during Unit2, Refueling Outage 14. Table 7.2 lists the tube locations that were repaired in RefuelingOutage 14.

Page 20 of 44

Page 22: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

TABLE 7.1Summary of Unit 2, Refueling Outage 14 Tube Plugging

REPAIRSPERFORMED SG SG B SG C SG D TOTALTubes Plugged* 2 5 3 3 13Tubes Stabilized 0 5 3 3 11* Includes number of tubes stabilized and plugged.

TABLE 7.2SG Tubes Plugged/ir

SG

2A

Row

45 281

Plug None 38%40%

AV4+U.UU"AV3-0.O0"

2 2A 34 47 Plug None Notel

3 2B 6 7 Plug Yes/HL PLP 05H+0.68"

4 2B 6 8 Plug Yes/HL PLP 05H+0.61"5 2B 7 8 Plug Yes/HL 15% 05H+0.78"6 2B 25 20 Plug Yes/HL 38% 07H-0.63"7 2B 48 55 Plug Yes/CL 45% 07H-0.03"8 2C 33 63 Plug Yes/HL PLP 08H+0.77"9 2C 34 63 Plug Yes/HL PLP 08H+0.69"

10 2C 34 64 Plug Yes/HL PLP 08H+0.00"26% 08C+0.05"

11 2D 49 67 Plug Yes/CL 41% 07C+0.05"12 2D 24 69 Plug Yes/HL 27% 05H-0.67"13 2D 49 69 Plug Yes/CL 41% 07C+0.41"

(PLP - Possible Loose Part signal)Note 1: Tube preventatively plugged in anticipation of implementing a permanenttubesheet alternate repair criteria. This tube had an oversized tube bore that is largerthan the assumptions contained in the analysis.

8.0 DOCUMENTATION

All original optical disks have been provided to Exelon Generation Company and aremaintained at Byron Station. The final data sheets and pertinent tube sheet plots arecontained in the Westinghouse Final Outage Reports for Byron Station, Unit 2, RefuelingOutage 14 Steam Generator Inspection. The report is also maintained at Byron Station.

Page 21 of 44

Page 23: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

9.0 FIG URES/TABLES/ATTACHMENTS

Attachment ATable A.1 Data Acquisition Personnel Certification ListTable A.2 Data Analysis Personnel Certification ListFigure A.1 Westinghouse Model D-5 Tube Support Configuration

Attachment BAttachment B.1 Hot Leg Bobbin Coil Inspection ScopeAttachment B.2 Cold Leg Bobbin Coil Inspection ScopeAttachment B.3 Hot Leg Top of Tubesheet +PointM Inspection ScopeAttachment B.4 Row 1 and Row 2 +PointTM Inspection ScopeAttachment B.5 Baffle Plate Expansion +Point Inspection ScopeAttachment B.6 Special Interest +PointTM Inspection Scope, Including Hot LegDents and Dings

Attachment CAttachment C.1 2A Steam Generator Inservice IndicationsAttachment C.2 2B Steam Generator Inservice IndicationsAttachment C.3 2C Steam Generator Inservice IndicationsAttachment C.4 2D Steam Generator Inservice IndicationsAttachment C.5 Tubes Repaired During Unit 2, Refueling Outage 14

Attachment DASME Form NIS-1, "Owners Report for Inservice Inspections"

Attachment EASME Form NIS-2, "Owners Report for Repair/Replacement Activity" for 2A SG TubePlugging

ASME Form NIS-2, "Owners Report for Repair/Replacement Activity" for 2B SG TubePlugging

ASME Form NIS-2, "Owners Report for Repair/Replacement Activity" for 2C SG TubePlugging

ASME Form NIS-2, "Owners Report for Repair/Replacement Activity" for 2D SG TubePlugging

Page 22 of 44

Page 24: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

ATTACHMENT A

PERSONNEL CERTIFICATIONS

WESTINGHOUSE MODEL D-5 TUBE SUPPORT CONFIGURATION

Page 23 of 44

Page 25: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

TABLE A.1DATA ACQUISITION PERSONNEL CERTIFICATIONS

No.j <Name %< Company : L Avel, ODA~1 Burriss, KT Anatec 11A QDA2 Foster, RJ Hudson I No3 Lopez, PA Hudson I No4 Agosti, S Master-Lee 11A No5 Jones, JT Master-Lee II No

6 Ribaric, JR Master-Lee II No7 Shaffer, ED Master-Lee 11A No8 Schmidt, JR Master-Lee 11A No9 Bland, MJ System One II No10 Kessler, JD System One I No11 Mantich, SM System One I No12 Prindible, SP System One II No13 Chiplaskey, GA Westinghouse II No14 Evering, DP Westinghouse II No15 Mains, PJ Westinghouse II No16 Mardell, DM Westinghouse II No17 Michalski, RA Westinghouse II No18 Miller GW Westinghouse II No19 Patton, BB Westinghouse II No20 Reif, DL Westinghouse II No21 Ripple, GB Westinghouse II No22 Scott, AW Westinghouse II No23 Shipley, EB Westinghouse II No24 Tedrick, JE Westinghouse II No25 Walsh, MP Westinghouse II No

Page 24 of 44

Page 26: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

TABLE A.2DATA ANALYSIS PERSONNEL CERTIFICATIONS

No Nowe Company Level ODA1 Chizmar, DA Anatec IIA QDA2 Davison, MJ Anatec III QDA3 DeLaPintiere, L Anatec III QDA4 Dykes, AR Anatec IIA QDA5 Hako, E Jr. Anatec IIA QDA6 Hover, GD Ana Anatec IIA QDA7 Hufford, CA Anatec IIA QDA8 Kellar, JL Anatec III QDA9 Kennedy, CW Anatec IIA QDA

10 Kotcher, WG Anatec IIA QDA11 Lancaster, ME Anatec IIA QDA12 Maben, DE Anatec III QDA13 Mau TM Anatec III QDA14 Melton, KL Anatec IIA QDA15 Miranda, EJ Anatec IIA QDA16 Morgan, BK Anatec III QDA17 Prentice, RV Anatec III QDA18 Raper, LU Anatec III QDA19 Ready, SD Anatec IIA QDA20 Rogers, GF Anatec III QDA21 Smith, Joshua T Anatec IIA QDA22 Spake, Jr. CD Anatec III QDA23 Steele, BG Anatec IIA QDA24 Tan, JM Anatec IIA QDA25 Wadaga, SM Anatec IIA QDA26 Wieber, JA Anatec IIA QDA

27 Cvitanovic, Nikola HIRID IIA QDA28 Fiser, J HRID IIA QDA29 Nadinic, B HRID lilA QDA30 Rengel, A HRID IIA QDA31 Zerovnik, V HRID IIA QDA32 Zunac, D HRID IIA QDA3334 Herold, MJ Infineddy IIA QDA35 Hill, J Infineddy III QDA36 Ingenthron, JP Infineddy IIA QDA37 Rush, S Infineddy III QDA

38 Dlabik, AJ Master-Lee lilA QDA39 Galmoff, T Master-Lee IIA QDA40 Kajari, I Master-Lee IIA QDA41 Lynn, VS Master-Lee lilA QDA42 Padgett, LT Master-Lee IIA QDA43 Rehak, RD Master-Lee IIA QDA

Page 25 of 44

Page 27: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

No. -Name Company >Level ODA44 Tarr, GM Master-Lee IIA QDA45 Tommarello, DJ Master-Lee IIA QDA46 Gortemiller, CL MoreTech III QDA47 Mui, AC MoreTech IIA QDA48 Webb, RJ MoreTech lilA QDA

49 Alspaugh, KS NDE Technology lilA QDA50 Anderson, DA NDE Technology IIA QDA51 Black, CR NDE Technology IliA QDA52 Brown, ME * NDE Technology lilA QDA53 Case, JM NDE Technology lilA QDA54 Drumm, RL NDE Technology lilA QDA55 Dye, JE NDE Technology IIA QDA56 Haynes, WR NDE Technology lilA QDA57 Lewis, DA NDE Technology lilA QDA58 Schmitz, KJ NDE Technology lilA QDA59 Shelden, JT NDE Technology lilA QDA60 Siegel, RA* NDE Technology lilA QDA61 Thompson, KA NDE Technology IIA ODA

62 Agun Diez, F Tecnatom IIA QDA63 Delgado Domingo, M Tecnatom IIA QDA64 Garcia Lopez, F Tecnatom III QDA65 Garcia-Caro Bullido, J Tecnatom IIA QDA66 Lopez Moreta, P Tecnatom IIA QDA67 Manzanares Fernandez, I Tecnatom IIA QDA68 Nieto Elices, J Tecnatom IIA QDA69 Novalvos Gutierrez, C Tecnatom IIA QDA

70 Popovich, RA Westinghouse III QDA71 Skirpan, JR Westinghouse III QDA72 Tobin, RJ Westinghouse III QDA

73 Callison, TP Wiltec IIA ODA74 Martin, AP Wiltec IIA QDA

* Independent Qualified Data Analyst

Page 26 of 44

Page 28: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

FIGURE A.1Westinghouse Model D-5 Tube Support Configuration

AVZ AV3

Anlid-vib ration

11t lic

10c

091H

go"H DeC

07H 07C

063C

05 H J5c

W~03C

FeedwalarmInmi

031-1

01HTSHTEH

O02c

MEcTSCTEC

Nuzzle Manway

Page 27 of 44

Page 29: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

ATTACHMENT B

INSPECTION SCOPE

Page 28 of 44

Page 30: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

ATTACHMENT B.1

Hot Leg Bobbin Coil Inspection Scope

Page 29 of 44

Page 31: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

CBE-A HOT LEG 610 BOBBIN INSPECTIONAS TESTEDByron B2R14 CBE D5

X 453 TESTED I1H THRU TEH

a 154 PLUGGED TUBE

116 105 leg 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 1l 5

alcoo

no..

Ia... a.. 0 0 -a aa

.100 00

AU....................U........... 0 0 ......... ................. n.a

an. *a..................... ..... .... 0ý 0 ..... .... .......... .... ............... .......01nO,,*~~_ G_ ,,, () -I, --- ---- _ ,- -•, , - , ' , , -, , - , • , ' - o •' O

an........... .... ...................... .... 0ý 0.................................... .... .......... nan:no.. .. ~0...............................0 0...........................00.- :0nn.0. 0................ .:::0"000.:.:. :. .0 ::0 ::1::... 00:::::::= :::: ::::...l .... .. 0

aa... .. 00................. ... 0 0 ... ..... ... 0 0......0 0..1... .... .... ........00 - .. ul

00 -........................... 000 -.-.. 0 0-......0 00........0..

0 00u

..........................()............... 01... .......... a a................................ 0... ................ 0

00 .............................................. ... 0. 0 0........ OO.)O...............O0.. .

no....................................... 0 0......................................... .......... ..00( 0 ... .......... ......................... ................ 0........ ......... .... .......... ........................... 0 0

00 00 -,, - oe o-..-. -•• u-u e- .-o -- -ee

0 .0f.................0 .................0 000"00 010000T0000............0 ............ n . o0 0 ... .0.... . . . . . . . ..... .................. 00. 00...... ... .. .. .. .... ....00 .. * 00

0 00

011.... ............. .......... .... .... .... ........ .. ...0 0 .... .n.n n... 0 0... . ......................... .... .... .... .... .... ..... 0. . . . .. . . . . . . . . . 0..... .... . .................................... . .... .... ... . ................. .... a=

0................................................................... . .................................. ...... ...00 O.. ............ ... ..... ...... ..... ..... "-, .0.. ........... ...... 0 ......... .... .... ..

0.. ................... 00 ...... ..................... . .... ..... ..0 0.. .... .... . ... ........ ..................... 0 0.... . . .

0 ,* 0,a , - - , , - , lO , e a , , , (O 0 (O 0 ( ) o o ) o 0 , , , a , , , lO , , , , , , lo , ,

00 o. 00o) , , • , , , o ) , ,• , , , , (, , , , , , , () , , , , , , ,) o , , 0

xxxxxxx xxx ~xxxx uxxxxxxxx *xxxx xxxx *xxxx ~ xxxxxxx *xxxx *xxxx xxxx *xxxxxxxxxx lxxxxx lxxxx xx xxxx * xxxx

110 165 18 95

I )xx xxxxxx xx xXXnX

90I xxxxx xx xxxxxxxxx

85

xxxxixxxxi*xxx x xxxx xxxx xxxx * xxxx xx*xx xxxx xx xxx xxxxxx *xxxx *xxxx *xxxx *xxxx xxxx *xxxx *xxxx *xxxx * xxxxx xx*xxxx *xxxx *xxxx *xxxxxxxx *xxxx *xxxx *xxxx *xxxx *xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxxxxxx *xxxx *xxxx *xxxx *xxxx *xxxx xxxx *xxxx *xxxx *xxxx xxxx *xxxxl*xxxxl*xxxxl~xxx

88 75 78 65 66 55 56 45 48 35 30 25 28 15 Ia

XXXXxxxx

5

Wesfnghowes Eledtfc Company LLC -ST Max 101171208 16:41:48

Page 32: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

CBE-B HOT LEG 610 BOBBIN INSPECTIONAS TESTEDByron B2R14 CBE D5

X 454 TESTED 11H THRU TEH

a 135 PLUGGED TUBE "

118 105 180 95 981 1 1 1

85 88 75 78 65 . 60 55 50 45 40 3510000y 0 00o0TocpOTo~QOOooopo0000

0 ,0 ... il .... 4 .... 4 .... 4 .... ý000f + u+ ::::ý:: I

0

O ..

0

30 25t000

ac jO

28 L5 5

0 . . t t * t.. ............................ 0 o .... . ........ 0 0

00........., o o....-- --.......... . . . .................................0.0onao-......................o..a............0 0 a,, ,* ****oao, -,0aa

ana a a...........1.......................a a.. ... .0

a.............. ......................... . 0 a ..........0

000: . ........................ o ....... 0 0 .. ... .... 00..... . ..... 0

=a04 a.O0 ....... --- .. . .....- 0 0 .... ............ . ........ ........ 0000 , :.00

a1 aa .. oo..........,..... .... 0 0a........ 0 0 . ....... 0 0.........a..............00......O0

-- ,00..,-- •- - -,,0 O 0 0 ,-.) - - E-O .- a ...... ...............- ... 0,00-.. .... 0 0 .... ..- 00'0... ... . . ...... .. --- 0.o

Dan ................. ....... ..... ..... ..... ..... . 0 0 .. ...................... ...° ,,,. :, • e...•,oo0......-. . ,. .... -........ .. ...... .. ... .... 0 0 ..... -...... -...... -- ,............ ----.. ,o

00o .... ... ......... ... ....... ... ... ..... ... 0 0 ... ....... ....... ..... . . ... . .. .. ......... 00

00 .00.......... .... 00..... ..... .......... . 0 0 0 0 .. ......... ... 0. ....O.. .. aO000 -• ..... .... ..... . .......00. . ... .00. .... ... .... ... ........... .00.. 01 .00) ý E X " "e ) - - - - e 9 00

0 - - . . . .................... . ..... ...... 0000 0000 0000100000 0000'.. .......... ..... . . .......... ...... .. 00................................................... .. ........... .... . .................. . ...1 0.- ..a 0

0 . . . ............... ............................................................ ........ .. a......................... ... . ........... 0

0......... ............ ... ...............................................................................................................

00

00-* - :::I00

0 , - 0)0 -- ,,,- . .- ,.. .000................... . •..-..............0000....................................000, -• , , , -0I, ,• 00000 . ... ........ .... ........... ........ .......00.." .. ,0()0 . . .. . .., - .- - 0 ' ...., .... , , ,- -.... ... ...- ' ' ' '' , . . , m - (0 0 1 ,: . 00 , . . ' ' ' " • ' * ' * " 0 ' ' ' • ' ' ' ' ' " " ' 0 0 0 0 " ' , , , • " ' ' - , 0 0 0 - , , , , , 0 0, • • ,

0 .e. ... 0 ) .o.. .... .... .°e ° , e0e 0e 0e . •.. . .... ...e ) . D l .

x xx xxxxxx xx xx x xxIxxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxxxxxxx *xxxx *xxxx *xxxx *xxxx *xxxx *xxxx *xxxx *xxxx *xxxx xxax xxxx *xxxx *xxxx xxxx* xxxx *xxxx xxx xx~x *XXX xxxxxxxxx xxxx xxxx xxxx xxxxi*xxxx xxxxixxxx *xxxx *XXXXIXXX xx xx xx xx l* xxxx *xxlxx *x xxX xx 1 XX x XXXXx XXX *xx xxxxx 1xxx XXXX *xxxx~x;xlxxxx

118 185 is@ 95 98 85 88 75 78 65 68 55 58 45 48 35 38 25 28 15 1@

x x xx xx,XXXIxxx:

:XXXX:Xxxxx-xxxx;XXaX

5

WeatnghooEbctricConpanyLLC-STMax 1017/200 17:50:34

Page 33: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

CBE-C HOT LEG 610 BOBBIN INSPECTIONAS TESTEDByron B2R14 CBE D5

X 456 TESTED I1H THRU TEH

a 76 PLUGGED TUBE

l10 105 100 95 90 85 80 75 70 651 0000000000000O0P00000OAA0

0000 0,, *: : : :: : : *

00 .. .. . . . I . . .. .

60S0040

00

55 50 45Oaaoopoaooqoooo

4090000.

35 30 25 20 15 10

0

5

000

0 ,,.,.--,- ,-,---, - 0 ---- ------ - O00 ...... .... ... ...................... 0 0A..... .... ........................ ... 00

0 ... . . 0 -.... ... a..0 ...... . ......... 0 0a . . .......... .. ...... .....

00.. . 0-........... ... ........ . ..00 00.. .................................00 ........................... 0*0.. * .00

.. .....OB............................ 000 ........... 0 0........... :0(): 00................O........0

Q0...... .. 00............. ..... ........ 0 0 ........... 0 0........ ...0 0............ ~. 00 ........ 0

00. . . . . . ..... .0o0o 01 .... a 0 . ... 00@0 ..... ..... 0000.............. ........................................... a a. . 0, .. .......0 .- , .. 000.................................... .. anul.... 0 0................................. ............ o.......... ... 0

00. -.. ............. ................................ .... .... 0ý 0............................o........ ..................... ... 00

- --,, - -- - ---- , , - -- - --- -- -0-0, , , E0 0E) - * , 010 , - ,- -- , e - •O0 , , ,

........ ..... ...... ,........... .... ..... 0 0................................,......., ..00 ........0,

00......................... .... .... .... ......... .... .... .... 0 0.......................................o

-a .,,O - -- , - - - , -- 0- ) - - - -- - - e - -E- E)- O-00 .OA................00................ .. 0000 0000 0000 0000..............B00 0.............. .O .o

0 00 ..................... .00. noIla ....... .... ..... 0~ .... . .0

(0 ... .......... .. ............................

0..................................0000 0000`0000T0000T0000............ .... ..... a...... .... ... ...... 0

.. . ................................................. ......... ................... .... .... ..... .... .. a..................

0.......................................................................... ......... .... .... .... ... ... .... ......... .... ........... .00

0................... .......................................................... .... .... .... ... .... .....I..... ......... .... .... ..... ........0

0........... ...... a ................................................. .... ....o......... ......... ....o......... ......... ......... ....... 0

0......... 0...............00............... .... .... ....- ..... 0000............... ..... .... ........... (000.............. .... o .. 0 0...... ....0

0... O 0............0o........... ........... ......... 0 0......... ........... .a0 . . .o0.... 0

00 - • . • 000 ,.o ................... ..... .. ... 0000 ...... .......... ... . .... .000............. .... . ....... .00.0

00o :000

xxxx xxxx xxxx xxxx *xxxxxxxx xxxx xxxx xxxx *xxxxxxxx xxxx xxxx xxx:x xxxx

110 105 100 95

Ixxx xx xx x xxx xx x

90

xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxxIxxxx xxxx *xxxx *xxxx *xxxx *xxxx *xxxx xxxx *xxxx xxxx *xxxx xxxx *xxxx *xxxx *xxxx xxxx *xxx xxx* xxx* xx *xxx xxx xxxx *xxxx Xxx * xxxx xxxx *xxxxl*xxxxl*xxxxl*xxxxx *xxxx *xxxx *xxxx xxxx *xxxx *xxxx lxxxx lxxxx *xxxx *xxxx xxxx *xxxx *xxxx xxxx x

85 s o 75 70 65 60 55 50 45 40 35 30 25 20 15 le

Kxx:Kxx:~xx Xxx X:

x xx x.xxxxx x xxx xx x

5

We.SnghoussEI~cftC cmpanyLLC -ST Ma 101O/l72D8 17:5325

Page 34: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

CBE-D HOT LEG 610 BOBBIN INSPECTIONAS TESTEDByron B2R14 CBE D5

X 455 TESTED 11H THRU TEH

a 33 PLUGGED TUBE

.16 105 1M 95 90 850000.

000

80 75pOO 00 9 00 0

70 65 60(DO

'0~0

0.

a00

5500)

50 45

10000

40000035TTTT030t0000

0 .00

25 20 15 1I 5

0.. ........ . .. ... ....... . .... ............ 0 .... I .... .... 0000. ... ............. . ..... ... .. ..... 0 0 ..... ..................... 0

0 . . ................................ 0........ 0 00 00.................... ............. 0pa

00:: ::.0 . . . .. . . . .. . ..:::: 0.::.. ......... .......... .......... ::::.::::.. ... ::0 no00

a.... . .. 00. ..... .. ....--. ... O...0 0 ... ..... 0 0.. .. .. 0 ., 0.... ......... . -...... 00. . ... .a().U10 a - -e E)- pp E .. e p

00.,................................ ::: .....::. . ::::0::00)0.::::0:::..... ......... :....... ... o00.............................................0 0 .... .................................... O

0O........................................ ....... 0 0.......................................

e-e ao - E) - -e p 0 - ae e~0 ,..-0. ......... ..... --. 00 ",-.......-. 0000 0000 0000)0000..................... A...00..... ...... . o 0

O00''" .00OO ............ "0)0 '' 0)0"......".....00'''°'000 00............................. .... .......... .... ..... 0 0 000 00 00 00.................................... o ..... 00

)0.... . ... ... - ........ .. ..... -O.....000)000.)O000.)O000.. O000. .-............ -................. . . ............ 0

. . .... , . . .. ,, .,, .. . . o. . . . . . . . . . . . . ..... ........ .... .....

0 - • -08, .E)- ---- - ---00 -. a -,, --- ----,- . • - 00 0 . , ,• •-- - - --- ---- ---00 - ., , ,-, -,0( - , 8 ,.000........................ .... .... ......... .... ..... ............................................................... oo ý: : * *00

0 .......................... 0 0........ ......00 () .... .... ............................................................... ..........

0 .. ... 0()0 0 ...................................................... 0 0 .... ...........-................... . 0 0. 0

0 ..... .. 0............ .. .. .. ......... .... .... ... . .............. 0... .. . .. .... . .. ..... ..... ..... .... ..... I .. .. .... 0 ..... ... 000.... . . . . .. . . . ................ .... 00 . ...... . . . . . . . . . . . . . .. . . . . 0 0 . . . . . . ...... .... ............. .... ... 000.... ................... I .... ...... I .... .... 0 00.........................................................................................................

xxxx xxxx *xxxx *xxxx xxx xxxxx xxxx *xxxx *xxxx xxxxxxxx xxxx xxxx *xxxx *xxxxxxxxl*xxxxlxxxxl*xxxx t xxxx

118 185 18 95

xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xx xx xxxx xxxx xxxx xxxx xxxx xxxx Ixxxx Ixxxxxxxx xxxx xxxx xxxx xxxx *xxxx xxxx xxxx *xxxx *xxxx *xxxx xxxx xxxx *xxxx xxxx xxxx *xxxx *xxxxxxxx * x *x xxxx *xxxx * xxx x*x xxxx *Xx~xx XX Xxxx xXXxx x*XXX I xxx xx~x~Xxxxxxxxx xxxx xxxxlxxxx ixxxx *xxxx ixxxx *xxxx *xxxx ixxxxixxxxixxxxxxxx * xxxx xxxx xxxxl~xxxx *xxxxlxxxx xxxx xxxx98 85 88 75 78 65 68 55 58 45 46 35 38 25 26 I5 1A 5

Wemtnghv Eo c /•iCormpany LLC - ST Max 10/17/2008 17:55:48

Page 35: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

Attachment B.2

Cold Leg Bobbin Coil Inspection Scope

Page 30 of 44

Page 36: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

CBE-A COLD LEG 610 BOBBIN INSPECTIONAS TESTEDByron B2R14 CBE D5

X 226 TESTED 11C THRU TEC

E 3971 TESTED TEH THRU TEC

a 154 PLUGGED TUBE

lie 105 1M0 95 90

DEEa EE E

85 as

~ EE 7 E E E E UEEEE'~EEEEýEE E EE E EE

75

SEE EDEEEEE EE E

70

.EEEE

.EEEAEEu EE

65 60aU Uan

E EE EEEEuE E EE

Ea

EE

55'0D00E E EEE

-EEEE

50

EEEEE EE EýEEEE

45DADA

SEEEEEEEEEEEE

40

E E EEE

EEEE

35OAUoE E Eu

jEEEEýEEEE

30t EEOEEEU

25 20 15 10 5

AD EEEEE EEEE EE EE -EE--EE EEEE EEEE EEEE EEEE EEEE EEEE E E EEEE EEEE7EEEE EEEE 'aEEE EEEE EEO

DEEE EEEE EEEE EEEE EEEE EEEE EEEE E E EEEE EEEE EEEE EEEE EEEE EEEE EEEDADEE EEAE EEEE EEEE EEEE EEEE EEEE E E EEEE EEEE7EEEE EEEE EEEE EEEE EEEE1. ELL. . . EEEE ----E-EEEE EEEE .... EL EEE... ...EE.... EL-- 1 -LL

DUE EEEE EEEE EEEEE E E EEEE EEEE EEEE EEEEEEEEEEýEEEE EEEEADA.EE E EEEEE EEEE EEEE EEEE EEEE EAEE EEEE E E rEEEE EEEE ýEEEE EEEE E EEEEIEEEE EEEE EEEEE EUEEEiE EEED EEEE EEEE EEEE EEEE EEEE EEEE E E EEEE EEEE EEEE EEEE 'EEEE EEEE UEEE EEEEcEEE EEEE EEEE EEEE EEEE EEEE EEE EEEE E E EEEE EEE EEEE EEEE EEEE EEEE EEEE EEAAý

-~ fE-&~+ ELL -E-- ELL-E-EE-EE EiEEEE -E-E ---- ýEtELLEEtEL~EEI EEEEIEEEE 'EEEE EEEE .EEEE EEEE EEEE EEEE E E EEEE :EEEE EEEE EEEE EEEE EEEE EEEE EEEE nEn

EEE'EEEE'EEEE EEEEIEEEE EEEEIEEEE EEEEUEEEE E E E.EEE'EEEE"EEEE EEEE EEEE EEEE'EEEE EEEE ADDEEEE EEEE EEEE EEEEIEEEE EEEE'EEEE EEEE EEEEE Ea EEEE7EEEE EEEE EEEE EEEE EEEE EEEEiEEEE EEE

EEEE EEEEIEEEE EEEE"EEEE EEEE EEEE:EEEE"EEEE a A" EEEEIEEEE EEEE EUEE EEEE EEEE EEEE EEEE EDEE

EEEEE EEEE EEEE IEEEE EEEE EEEE EEEE EEEE EEEE A AIEEEE EEEEIEEEE EEEE EEEE EEEE EEEE EEEE EEEEiEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE E E'EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE'E

EE EEEEIEEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE E E,'EEEE EEEE EEEE EEEEI EEEE EEEEwEEEE EEEE EEEE EEEE-EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE E E EEEEE EEEEE EEEEE EEEEE 1EEEE EEEEE IEEEE -EEEE 1EEEE EE

____~ ~~~~~~~~~~~~~~~~~~~~ E --- sfEEE~E- --- -+ EEEE Ef- EEEEE E- E--E EEEE -EE ~EE- E E& E-EE-E E--E -E E -EEE-EEE EEEU .EEEE EEEE EEEE EEEE'EDEEIEEEE EEEEI'EEEEI 1EEEEI EEEEIEEEE EAEEIEEEEIEEEE'EEEE EEEE DEEEiEEE

EEEEIEEEE EEEE EEEE'EEEE EEEE EEEEpEEEE: ýEEEE EEEEIEEEE EEEEwEEEE.EEEE' EEEE EEEEEEEE EE'EE EEEEEEE :EEEEEEEEE ,EEEEEEEE EEEE'EEEE* EEEE EEEEEEEE EEEE EEEEEEEEE EEEEIEEEE EEEE EEEE EEEE EEEA mmaUA EEE EEEE'EEEE EEEE .EEEE7EEEE EEEE EEEE.EEEE EEEEE-E-E- E EE E.... •... E. & ............... -..... -... E . E.... -E.E...E- ..... -E -...... EEEE E-EE-E EEEE-EEEE ... .... •r -EEEE EEEE EEEE EEEE"EEE EEEE EEEEE EEEE'EEEE EEEE E EEEEIEEE EEEEEE EEEEE EEEE EEEE EEEE EEEE EEEE7 EEEE LEED

E EEEE EEEE EEEE EEEE EEEE'EEEE EEEE EEEE EEEE EEEE EEEE'EEEE:EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEEwEEEE EEEE EEEE:EEEE EEEE EEEE EEEE EEEE EEEE EEEE EE EEEE EEEE'EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEEEEEEE EEEE EEEE EEEE EEEE EEEE E

EE EEEE EEEE EEEE EEEE EEEEEEEEE EEEE EEEE EEEUEEEE"EEEE EEEE EEEE EEEE EEEE:EEEE "EEEE EEEE7EEEE'EEEE EEEE EEEE EEEE EEEE EEEE'EEEE EEEE EEEE EEEE'EEEEE EEEHEEEE EEEE EEEE EEEE EEEE EEEEýEEEE EEEE EEEE EEEE EEEE EEEE EE

EEE EEEEIEEEE EEEEiEEEEEEE EE EEEEiEEEE EEEE EEEE EEE -EEEE EEEEiEEEE EEEE1EEEEi EEEEEEE EEEE EEEE EEEEIEEEEEEEE EEEE EEEEI EEEEI EEEEI EEEEI EEEE iEEEE EEEE1 EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE !EEEE 1EEEE iEEEE EEE

EEE EEEE EEEE EEEE EEEE'EE EEEE EEEEIEEEE'EEEEIEEEE'E E EEEEIEEEEIEEEE EEEE EEEE: EE EEEEIEEEE EEEE EEEE EEEEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE:EEEE.EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE'EEEE EEEE EEEE EEEE'EEEE'EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEE

EEEE EEEE EEEEI EEEE EEEE EEEE EEEE EEEE EEEE:EEEE EEEE EEEE EEEE'EE EEEEEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEEarrr rr- r r r r r r r r r 4 r r r rrc ,'zr r- r-r r- -- l-r--r r -rr ----- ---

XXXXIX XX XI

xxxx:xxxx:

:Xxxxx::XXXXI

:xxxx::x xxx:

:xxxx::xxxxI

x x x ::xxax:

:xx~xx:xxxx: -xxxx xxxx xxxx -xxxx- xxxx- xxxx xxxx xxxx xxxx xxxx xxxxxxxx xxxxxx xxxx~xx~xx

(XXXX)

xxx0

x 0;;;xX XX X

110 105 100 95 90 85 80 75 70 65 60 55 50 45 48 35 30 25 20 15 10 5

WesiinghousEletinc Company LLC - ST Max 10117r2008 16:53:48

Page 37: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

CBE-B COLD LEG 610 BOBBIN INSPECTIONAS TESTEDByron B2R14 CBE D5

X 226 TESTED 11C THRU TEC

E 3989 TESTED TEH THRU TEC

a 135 PLUGGED TUBE

.10 105 100 95 90 85E EEE

E EEEEDEE EEEE

EEEE EEEE

80tEEEEEEEEEEEOEEEE

75EEEEEEEEEEEEEEEE

78E EEEEEEEEEEEEEEEE

65E EEDEE EEEE EEEE EEE

60EEEE

55 50 45a 9EEEEEEEEa

EEE

EEEEEEEE

EEEEEEEEEEEE

EUEEEEEEEEEE

40E EEEEEEEEEEEEEEEE

35ýEEEE

30 25 20 15 10 5

EEEEEEEuEEEE

EE EEEaEE

-U EEE EELL LILLEEEEEEEEE EE E E EEEELEEEELEEEELEEEELEEEE EEEEEEEEE EEEE EEEE EEEE EEEE EEEE EEEE E E EEEE EEEE EEEE EEEE EEEE EOEEE EEEEE EEEE EEEE EEEE EEuE EEEE EEEE E E EEEE EEEE EEEE EEEE EEEE EaEE EEun

:anEa EEE EEEE EEEE EEUE EEEE EEEE E E EEEE EEEE EEEE EEEE EEEE EEEEDEEEEnn

nnE EE EEEE EEEE EEEE EEEE a EEEE EEEE EEEE EEEE EEEE EEEE EEEE Eaa

000E EEE E E-E EE-EE EEEE EEEEE EnE E EEEEE E E EEEE EEEE EEE E EE' EE EEEE EE-EE EEEE EEI Enaa EEEE EEEE EEEE EEEE EEEE EEEE EEEE E E EEEE EEEE EEEE EEEE EEEE EEEE EEEE:Earn

lannaaEEEE EAEE EEEE EEEE EEEE EEEE EEEE E E EEEE EEEE aEEE EEEE EEEE EEEE EEEE EEEEEa E EEEE AEEE EEEE EAEE EEEE EEDE EEEE E E EEEE EEEE EEEE EEEE EEEE EEEE nEEE EEEE E

WaOEE EEEE EEEE EEEE EEEE EEEE EEE EEEE E E EEEE EEE EEEE EEDE EEEE E EEEE ,EEEEEEEE E EEE EEEE EE EEEE EEEE E EE EEE E E E E EEEEE EEE EIEEE EIL EIEIEIE CCC IIIEn EEEE E EEEE'EEEEEEEE EEEE EEEE EEEE EEEE E E EEEEEEEE EEEE EEEE EEEE EEEE EEEE EEEE En

EaE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE E E EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEO

EEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE E E EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EDE

EEEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE E E EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEEE -E-EEEE -E-E-E-E -EEIE-E E EEEE EEEE E-EE EEE E EE E-E-E E E-E-EEE E-E E- EEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE E-E-E E-

EEEEHEEEE EEE EEEE EEEE7EEEE Eý EE-EEEE.E EEEEE E EEEEýEEEE EEEE EEEE EEEE.EEEE EEEE EEEE EEEE

E EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE E E EEEE EEEE EEEO EEEE EEEE EEEE EEEE EEEE EEEE E

EE EEEE EEEE EEEE EEEE EEEE EEEE'EEEE EEEE EEEE E E EEEEEEEEE EEEE EEEE EEAE EEEE EEEE EEEE EEEa EnEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE E E EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EE

-EEEE EEEE EEEE-EEEE E EEEEEE E E-E-EE E-E-EEE EEEEE EEEu -E--EE-

EEE EEEn EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEErEEEE EEErE EEEE EEEEEEEE EEEE EEEE UEEE EE

EEEEEEEEE EEEE EEEEEEEEEEEEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE

EEEEEEEEE EEEE EEEE EEEEEEEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE

!EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEEEE E E-EEEE EEE E-E-EE EE-E-E EEEE E-EE EEE EEEE EEEE EEEE EE EEEE EE E-E-EE EEE EEE E-EEE E.E E E EEEI

EEEE EEEE EEEE EEEE EEEE EE EEEEE EE E EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEEE EEE EEEE EEiEEEEEEEE EEEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEn EEEE E

EE:EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEn EEEE EEEE EEEE EEEE EEEE EEEE E

EEEEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE'EEEE E

CCCL EE EEE E HE CCCL E-E ..... ... E-E-EE -... ...... ... E EEEE-E .-E-E-E E-E-E-E &..... 'E... . . .. .UR.. .

EEEEEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEua EEEEEEEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEEIEEEE nE

EEEIEEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEEUEEEE EEEE EEEE EEEE nEE

EEEEEEEEEEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE E EEE EEEE EEEE EEEE EEEE EEEE EEEE.EEEE EEEE.EEEE EEE

EE EEEEEEE EE EE EEEEEEEE'EEEE'EEEE'EEEE E E EEEE EEEE EEEE'EEEE EEEEý EE'EEEE EEEEwEEEE EEEOmEEEEEE EEEEEEEEEE EEEE EEEE EEEE EEEE7EEEE EEEEwEEEE EEEE7EEEE EEEE:EEEE EEEE EEEE7EEEE EEEE EEEE'EEEE"EEEE EEEEEE EEEEEEEEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE'EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE.EEEE EEE

EEEE EEEEEEEEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE:EEEE EEEE EEEE:EEEE EEEE EEEE EEEE EEEE'EEnEEEEE EEEE

0...0 ...

xxxxxxxx I xxxx xxxx*x xxx xxxx *xxxxlie 105 lee

i xxxxxxxx

95

xxxxx~xxx

xxxxxxxx

xxaxxxxx

XXXX)xxxx)

... 4,,,4. .4.. .4. .. 4. .0

xxxxItxxxxIxxxxI*xxxxIxxxx *xxxx *xxxx *xxxxI xxxx xxxx *xxxx Zxxxx xxxx *xxxx Zxx xx.txxxx~x xxx xxxxxxxx *xxxx * xxxx *xxxx *xxxx *xxxx *xxxx *xxxx~xxxx * xxnx9g 85 8a 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5

WesfinghosEledic CoayLLC-STMa, 10/17/2008 17:51:08

Page 38: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

CBE-C COLD LEG 610 BOBBIN INSPECTIONAS TESTEDByron B2R14 CBE D5

X 227 TESTED 11C THRU TEC

X 1 TESTED 11H THRU TEC

E 4046 TESTED TEH THRU TEC

a 76 PLUGGED TUBE

18 105 1M8 95 98 85

E EEEIEEE EEEI

EEEEI EEEEI

88' EEEEE E EEE EE E

-EEEE

75E E EEEE EE EE E EEE EE E

78I EE E EEEE EýEEE EE E E E

65SECmEE EE EE E EEE E EE

60EEE

EEEE

56

77EEE:E EE EE E EEI

5sE E EEIEEEEI

IEEEEIEEEUt

45EEEEE

EEEEEEEEEEEE

48SEEEEI

EEEEEEEE

35uEEEE

EEEEI

30 25 20 15 18 5

EEE EEEED

EE__ - :EE-E- E-E-E-E- EI-E-EEI aE-E-EI-E- -E-E-EI EEEE - E E- EEE t EE EEEE- EEE± - EE t -EEE EEEE EEEE EEEE mEEE EEEE EEEE E E. EEEE EEEEI EEEE EEEE EEEE UEEEEIEE

EEE EEEE EEEE EEEEEEEE EEEE EEEE E E EEEE EEEE EEEE EEEE EEEE EEEEI OnoEEEE EEEE EEEmlEEEI EEEE EEEE EEEE E E EEEE EEEE EEEE EEEE EEEE EEEE EEEE

-AEEEE EEEE.EEE "EEE . EEEE EEEE.EEEE E a EEEE EEEE EEEE EBEE EEEE EEEE EEE.

EEE EEEE EEEE 8EEE aEEE EEEE EEEE EEEE. E a EEEE EEEE EEEE EEEE EEEE EEEE'EEEE EUEEEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE E m EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEEUEEE EEEa EEEE EEEE EEEE EEEE EEEE EEEE E E EEEE EEEE EEEE EEEE EEEE EEEE mEEE EEEEEEEEEEEEEEEEI E !EEEE EEEEE E EEEE EEE EEEE EEEE EEEa EEEE EEEE EEEE

E--EE- -11. EE & --&U I~ in EE-EiE- &EEEE-- &E~E.-& &&~E.- --EE &EE I EEEEEEEEEEEE EEEEEEEEEEEEEEE EEm"EEEE A E EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EE

EEE EEEE EEEE EEEE EEEEIEEEE EEEE EEumm EEE E E EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEEEE EEEE EEEE EEEE EEEE EEEE EEEE EEmm EEEE E E EEEE EEEE EEEE EEEE EEEE EEEEIEEEE EEEE EEE

EEEE EEEE EEEE EEEE EEEEIEEEE EEEE'EEEE EEEE E E EEEE EEEE EEEE EEEE EEEE EEEEIEEEE EEEE EEEEE E E E 7 E EEE&EiEL ELL~E-E-EELEE ,&E-& &ý, E-&-- E EE-EE EEriE-& EE&&~ --- &EE~iEE&fE&EE ELL "iELL'EEEE EEEE EEE E EEEE EEEE E EEE EEEE EEEEEEEEE E E EEEE EEEEE EEEE EEEE EEEE EEEE IEEEE EEEEE EEEE

E EEEE EEEE EEEE EEEE EEEE EEEEE EEEE EEEE EEEE E E EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEE EEEE EEEE EEEE EEEE EEEEtEEEE EEEE EEEE EEEE E E EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EmEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE E E EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EE

EEEE'-EE E E-EE EH E£E-E-& E E EEE- E EE EE &&& &E -& E & -EL EU- .&E .EEE .EL .ZE- EEL.EEC•CE LE•m EEEE ELEE ELEE EELEEL ECEEE ELEE ELEEF[ ELEE FELEE EEE E EEE EEE EEE ELEE EEEE EEE EEEEEE-EEEEu.EEEE EEEE EEEE EEEE EEEE EEEE EEEE'EEEE EEE,,EEEE EEEE EEEE EEEEEEEEE EEEE mEEEE EEEE EEEE EEEE EEEE EEEE |EEEE EEEE EEEa ,EEEEEEEE EEEE EEEE EEEE

EEEE EEEE aEEE EEEE EEEEE EEEE EE| EEEE E E EEEE EEEE EEEE mEEE EEEE EEEE EEEE EEEEtEEEE EEEEEEEE EEEE &&EEEE&•EEEEI&EEEE E E EE &EEEE& tLLE-rE E EEE&EEE&EE E EEEE EEEE EEEE

EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEEý EEEEE EEE EEEE EEEE EEEE EEEE EE EEEE EEEE EEEE EEEEI

E EEEE EEE EEEE E E E E E EEEE EEEE EE EEE EEEE EEEE EEEE EEEE EEEE. EEEE. EEEE. EE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEEEEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEEIEEEE EE EEEE EEEE EEmE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEE EEEE EEEE EEEE EEEEiEEEE EEEE EEEEIEEEHE

EE EEEE EEEE EEEE EEEE EEEE'EEEE EEEE EEEE EEEE'EEEE'EEEEEEEE E'EEE EEEE EEEE EEEE EEEEiEEEE EEEE EEEEEEEE7EE

EE EEEE EEEE EELE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEEIEEEE EEEE EEEEIEEEE.EEEEE EEEE EEEE EEEE EEEE EEEE EEEE; EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEEEE EEEE EEEE EEEE EEEE EEEE EEEE7EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE'EEEE EEE

EEE EEEE EEEE EEEE EEEE EE ELEEE EEEE EEEE EEEE EEEE E E EEEE EEEE EEEE DEEE EEEE EEI EEEE EEEEE EE EEEE EEE

EEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEEIEEEE EEE

EEEE EEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEE

0 ...0*;;x xx x (XXXX)

XXXX)XXXX XXXXIxxxx)

.... ... .... ----- -------- T ---- I ---- . T ... ....... 4 .... i .... .... j .... j ... 0

xxxx *xxxx *xxxx *xxxx *xxxx *xxxxixxxx txxxxtxxxxixxxxixxxxixxxxixxxx~xxxxtxxxx~xxxxixxxxixxxxixxxxxxxx xxxx xxxx xxxx xxxx xxxx xxxx * xxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx118 185 18e 95 90 85 88 75 78 65 68 55 50 45 40 35 38 25 28 15 1i 5

WesanghouseEiecbwc Company LLC -STMax MWOM/00 0935.49

Page 39: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

CBE-D COLD LEG 610 BOBBIN INSPECTIONAS TESTEDByron B2R14 CBE D5

X 227 TESTED lC THRU TEC

E 4090 TESTED TEH THRU TEC

a 33 PLUGGED TUBE

.1i 105 leO 95 90 85E

E EEEE EEEE E

80EEE EEEEEEE EEEEEEE EEEE

75E EEEEEEEEEEEE

7

1

7@EEEE

EEEEEEEEEEEE

65 60 55EEEE E EJEEOEEEEE E U EEEEEEEE E E EEEEEEEE E EEEE

50E EEEEEEEEEEEEEEEE

45EE EEE EE EEEE EEEE EE

40 35EEEE EEEEEEEE EEEEEEEE EEEEEEEE EEEEIC I I CIC I

30

EEEEEEEE

25 20 15 10 5

EEE EEEE EEEE

EE EEEE EEEE EEEE HEEE EEEE EEEE E EEEE EEEE EEEE EEEE'EEEE EEEE EEEEE EEEE EEEE UEEE EEEE EEEE EEEE E E EEEE EEEE EEEE EEEE BEEE EEEE EEE

EEEE EEEE EEEE EEEE EEEE EEEE EEEE E E EEEE EEEE EEEE EEEE EEEE EEEE EEEEEEE EEEE EEEE .EEE EEEE EEEE EEEE E E EEEE EEEE EEEE EEEE EEEE EEEE EEEEECE EiEEEEiEEEE-EEE E-EE -L LELEEE :EEE E i E E E ýE- -E EEEE : EEE

EEE EEEE EEEE EEEE EEEEI EEEE EEEE EEEE E E EEEEIEEEE EEEE EEEE EEEE EEEE EEEE EEUEEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE E E EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEEUEEE EEEU EEEE EEEE EEEE EEEE EEEE EEEE E E EEEE EEEE EEEa EEEE EEEE EEEE *EEE EEBE

EEE EEEE EEEEE EEEE EEEE EEEEEEEEEEEEE E E EEEE EEE EEEE EEEE EEEE EEEE EEEE EEE"

EE.EEEE .EEEE EEEE EEEE EEEEE EEEEEE EEEE EEEE EEEE EE EEEEEE EEEE EEE

EEEI EEEE !EEEE EEEE EEEE EEEE !EEEE EEEE EEEE E E !EEEE !EEEEI EEEE EEEE EEEE EEEE EEEE !EEEE EE"EEEI EEEE !EEEE EEEE EEEE EEEE !EEEE EEEE EEEE E E !EEEE EEEE !EEEE EEEE EEEE EEEE EEEE EEEE EEB

EEEE !EEEE !EEEE EEEE EEEE EEEE •EEEE EEEE EEEE E E EEEE EEEE !EEEE EEEE EEEE EEEE EEEE EEEE EEEE

:EEEE EEEE [EZEEE EEEE EEEE EEEE .EEEE EEE EEEE E E EEEE [EEEEEEEE EEEZE EEEE EEEE EEEZEEEEE EEEE,E EEEE iEEEE EEEE EEEE !EEEE EEEE !EEEE EEEE EEEE E E EEEE EEEE !EEEE EEEE EEEE EEEE EEEE EEEE EEEEE

EE EEEE IEEEE !EEEE !EEEE EEEE EEEE, EEEE EEEE EEEE [E E !EEEE, EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEEI EEEEiEEEEIEEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE E E EEEE EEEE EEEE EEEE EEE E EEEEEEE EEEE EEEEE EEEI EEEE EEEEE EEEE EEEE EEEE 'E EEE E EEE EE E E E E EEEE EEEE EEEEE EEEE EEEE EEEE EEEE EEEE EEEE EE

EEEEEEEE EEEE EEEE EEEEEE .. E. EEEE.....E E EEEE E[ :EEEE EEEE EEEE EEEE EEEEEEEEE1EEEE EEEEEEEE EEEE.EEEE EEEE EEEE EEEE EEEE EEE'E EEEEE EEE EEEE EEEE EEEE EEEE -EE EEE

EEEEi EEEEEEEEIEEEE EEEE EEEE EEEEE EEEE EEEEEEEEEEE E EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEEEEEE EEE EEEE'EEEE'EEEE EE EE EEEE EEEE EEEE EE EEEE EEEE EEEE EE E EE EEEE EEEE EEEE EEEEE

EEEEiEEEEIEEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEEEEEEEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEE E

EEEEEIEEEE E EEEEc EEEE EEEE EEEE EEEE !EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEEEEEEEEEEEEEEEEEE EE EEEEEE EEE EEEEEEEE EEEEEEE EEEEEE HEEEEEEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEEEE'EEE EIE EEEE EEEE7EEEE &EE -EEEHE EEE EEEE EEEE £E EE EEE:EE EEEE E-&EE EEEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEIEEEEEEE EIEEE EIEEEEI EEEEi EEEE EEEEEEEE EEEE EEEE EEEEIEEEE EEEEIEEEE EEEE EEEE EEEE EEEE EEEEE EEEE EEEE EE

EE EEEEE EEEE EEEEE EEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEEEE EEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEEEEEE E EEE E E EEi!E EEEE EEEE EEEE EEEE EEEE EEEEE EEEE ,EEEE EEEE :EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEE

EEEIEEEE EEEE EEEE7EEEEIEEE EEEE EEEE EEEE EEEE EEEE EEEEiEEEE'EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE'EEEEI EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEE

E EEEE iEEEE EEEE iEE-EEEEl " E .. . . .. ...E ..... ,-E E E - E E E E .E E~E,. "I IEE EE EE -EE i E E ......... . . . .EE ~ ~ ~ ~ . .7:[ E. EE E ý 7EE E E E EE E lE EE EE E E EE' 7 EEEE" . ... ..... .. E" .... E[E EEE[EE E E ... .............. E E E

EE EIEEEE EEEE EEEE EEEElEEEE EEEE EEEE EEEE EEEE EEEE EEEE7EEEEIEEEE'EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEEEEE EEEEIEEEE EEEE EEEE EEEEIEEEE EEEE EEEE EEEE EEEE EEEE EEEE EEEE:EEEEEE EEEEEEE EEEE EEEE EEEE EEEE EEEE

... .. ... 'E E E. . E. .E E ..... "E E. . " E.. " E ...ý "- .. " "EEE['" .... - E. . "E E. .E E. .E ..... E E. .E E. .E ... ... i .. . . . .. . . .

xxxx xxxx xxxx xxxx xxxxxxxx xxxx xxxx xxxxixxxx

le 105 is@ 95

xxxx

90

~xxxxX * *X,85

xxxxI* x,,X,:80

xxxx75

*xxxx70

xxxx6 5 , ,65

~xxxxZx*x*x*x60

xxxxxx*x*x*

55

xxxx

50

xxxx45

xxxx40

xxxxX* X* X*X*35

xxxx

30

xxxxXXXx

25

*xxxx20

ixxxx~xxxx~

is

xxxx:10xx

Iýxxxx

5

Wosbngho.s E~gdtic Campany LLC - ST Man IWIS/200 00:38'21

Page 40: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

CBE-A COLD LEG 590 BOBBIN INSPECTIONAS TESTEDByron B2R14 CBE D5

X 227 TESTED 11H THRU TEC

a 154 PLUGGED TUBE

118 105 108 95 90

f00

85ta nona10.. .

80 75

.1:0078noun l

65Dann

68

000

a0

55coca a

58 45 48nou

35 38

00oa

25 28 15 1e 5

III ,I , , -,-- - - - -- -- -- --- I---- - - , -0 -- -- -- -- .- .--- , -- e,-- - c laa.... ......... ............ .... . .0 0, ..... ......... ... I ..... .

ao.........................0 0............................ ..... a... .... .. 0no........................... 0......................... ......... .... ..... n

.na0 : 1:.a..................0 0 ............... .... .... .... ...................

aGo .......................... 0 0................ .... .......... .... .... ..... .... ......... .... on:go.. -. 00............... - -..... O. )O0....... O0 0' .... 0

0.0. .Oa...... .... 000........ .....::0 :::. .0. 0...... 0::::...........::::0000:: ,:0. ...(a.......00.............. : .. ...... ... 0 0 .. ......... 0 0 ....... ..... 0 0 ... .... .................. 0 .n

O0 ----- 0•) ------ - * -OO00..................................0()00.. ......... 0 0 ............ 000)O... .............. ....................... 0

000 - *.... .................................... 0 0 ............................................... aaaDE0.............................. ............. 0 0 ........................................ ::: : .::: :: ..::. 0

00 - ..... ..... ........ ..... ...... O000.)..........0....a a...........................0..... " 0...........000

00.. ::: : .... ....... 0 0..... .. 0

0o* .0.. . . . .• . . . . . . . .. . .. .. . . . . . . .•. . . .i . . . .I . . . .i . . . . 0 0 0 0 0 00 0 0 00.. . .•. . . .i. . . .i. . . .i. . . .i. . . .0 0 ... . .i. . . . . . . . . . . . .i . . . . . . a . . * . 0 i ?

o 00*: : °o o .. .. . . .. .........................00 : ::: :::00........................00 ; •:: :i: :: -:; ;:.. *. 00 ... .o

0 . 0

0................................ 0 ... . ........ 0000 000a aaaa a0o 0000.........................0.0... .... .... ...u..''..0

0 0• - .: • - 0 0 . . .- , •. , : :, 0 0 0 .::, ) 0 :

-0 0•-

, , - • , , , 0 0 , , o • , - ' e • " ' ' ' ) 0 " ' " • " ' ' ' • " ' '

0 . ............... ..... .... I.................................................................. ......

0................................................................. .... .... .....00 10 9 10 0 0 0 0.... .... .... ... ................ ..... ..... 0

.e eeo

.ee .el .~e .el . . . ...

0 . . . . . . . . . . . . . - .. .- -e. .- -. . .- -. . .- - e. .- -e o c - -e o c - -. e o - e e-. - o-e o - -. e e - -. . .- -e .e . ..o.e o . . . . . . .. o.e. . . . . . . . . . . . . . . . . . . . . . . .O.0..............................................................................................................................00" . . . . .. .. . .

0...................0(0 ... .... .. 0*00.......................0000........................... 000:: . . .0 . . .0

0 .. ..... 0

00 . 00

xxxx xxxx xxxxixxxx xxxx xxxxxxxxx xxxx xxxx XXXXXXXXX xxxxXxxxxiXXXXXXXXXXXXXX x xxx.XxxXXXX XX XX* XX*aX0000000 0000 0000 0000 00

l1e 185 188 95I xx98 85

I10000

88

I xx0000'

75I xx0000

78 65 60 55I xx0,000

5o

Ixx0000*

45

Xx x x

000*0

48 35

I xx30

Ixxxx0000

25 20

XXXX)XXXX

00,00

is

XXXXII

ocooc1000

xxxxXXXX

0000

565 15

WesWirhgwo Ekdric Company LLC - ST Max 101M7100 16:43:12

Page 41: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B COLD LEG .590 BOBBIN INSPECTION PROGRAM

Byron B2R14 CBE D5C 228 TEST (11H - TEC) WITH 590

BOBBIN

a 135 PLUGGED TUBE

118 105 100 95 90 85 8N0000 0000

0 0moo. ....... a

75)0000

700000l

65 60OOOOO

55000Oa0

0 0

50 4500070000•40 35 30 25 200000o00000I I I

15 10 5

)0

001i" '": I : : : : jI : : : ".3 10 0 0o.. a 000

45

35

30

25

20

15

10

5

a. .... . .......... 0 0...................... . .. . .00

00a.....0.0........a..... ... 0 . . ... O .. ........ .................... a.. .-

aaa ........ . -- -0. . ............. 0 0 .,........ I..... . . ..aa

o..o a a....... ... .......... ...... a a ................ ... ... ......... .... 0

ca a an . ..l.O ., . . .. . , ,-A . . .. . . . o -.- • . o. .• .- I : .• .i .. . . . . . ..

ago .! 00 .a ....... ... ......... .... 0 0. .......... ... ..... . .. .... 00 . 00

aao a • . a .0000 ..... I o .......... 0 0 ...... ...0000 ... ...... .

0a1:1:1:11a 0 .... .... .... .... 0 0....... . 0 0 ..... .....0 0 .

00 ... a........... .... ...... ....... .. 0 0. . . .0000.......... .aoDan .................... ........ ..... .... 0 0 ...... . . ... . . 00

0...............................................................0 0..................................... .. .

0 ...... . .................................... .... . .... 0 0 ............ a .... ........ .. . 0

0 ......................... .......................... o.0 .... 0 . .. a .0

0 ..C. ... .. ...... ... .6 0000 000 00 0. ... ... ... ..... 0. 0 - a o-* 0

0 0 • •0o0 ,.....................00 00.........•...-......00OO *00000 0

0......... .... 0 0 . .. .. .... •.... . .. . . .. .0 00 0 .. . .. ........ .................... .00

o. • ... .. ....... .... .. ............ .... ..... . ...... 0. 0 ....0.... 0 0 .. ...... . ....... ... a O0

O 0 on. . . .... • . . . .... . ... ... 0. ... ..... ..(0 0 ....( 00 0 0 0 0 .... . ... .0 0.... :.....I.... . ...no . . =0....... ......... ..... ..(o ..... ........ . .. .. :" ". .. . ..:. . ... . ... ." -o• ..... 0 •... .: .. .. .. ,. . . . . . . . . ... i . . . . ...... . . . . . .

00. ......... ..;.. .i.. .... .... .. . ... .... ....000 ) 0 0 )O ) 0 1 00 (0 0 ( .... ......... . o . ,. oO . . . . . . . . .. . . . . . . . . . . . . I .. .. . . . .. . .. .. . . . .. . . . .. . . . . . . . . . . . . . . . . . . . . .a . . )

0 :. . .. .. . . . . .. ... ...... .. ... *.. .. . . . . . .0

1

0:~~CC CCCC(o.00

45

40

35

30

25

15

5

coco coo co c ccoCCCC ~ {~ CCCC cc CC

0oT CICCI .

~CCCC~CCCC CCC0 CCCCCCC ( CCCC 4 0CCC0CC CCCC CCCC4 CCCC CCCC CCCC CCCC C CCCC

.... ( .... CCC CCC.( .. CCCC CCCCCC CC..CC(CC•CC .... ;icccc~cccc~ccccCCCC

0000]CCCC

0000

25

,CcccICCCC(ocCCC CCCC(

)000010000(

CCCC00CCCC00c .00

0000pO0000, OOOO oooO O118 105 100 95

000o 0000 850 880 750786o5 68 5005000005000050000300005 0000800000000000085 80 75 70 65 60 55 50 45 40 35 30

qooooqooo0

20 15 10 5

Westinghouse Electric Company LLC -ST Max 10/1712008 16:07:57

Page 42: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

CBE-C COLD LEG 590 BOBBIN INSPECTIONAS TESTEDByron B2R14 CBE D5

X 227 TESTED 11H THRU TEC

0 1 TESTED 10H THRU TEC

a 76 PLUGGED TUBE

11 105 100 95 90 85 , as 75 78 65 681 0000$000000~00000V000000a0000)0. . 0

0

0

0

0

55 5000000

45 40p0000

35 30

S0

000

. .Oa0

25 20 15 18

00001::.:I::::I::::I::::I::::l 00 .. 0

00...... 0 0''o. ...............................a ... ,oo

00......... ......... ...... 0 0.. ... . ...........- a-

oo. ..... . a . . ............... 0 0'....................................00

0....................U .................. a....... ....................... a

00.............. .(..... -. -............... 0........... ..-.. ................... OO

0 0 .... . : 00. 00 ..: ... .. .. .. . J.... ,))no .... ................................... 0 .00-..... ...00 .... ...- ..... .......... 000. . . .0 0..............00.0. ..... .. ... ... . ..... .. .. ..... O00oý..... 00........... ........... .... ... 0 0.............0 0........ .. 0 0 .................0........ ... 0 0

00................................................. - 0 0a ... 0 o......... .................. 0

00... ....................... •........... . . .. a .. .. 0 0........ .... . . . ..... . .................... 000 .............................. ......... .... ... .u .... 0 0...........................................

- - . . . . . . . . 0 0 .......C. .......... . . . 0 0 0 0 0 0 0 0 0 0 0 0 ........... . . .. .. .. :o : :. . ... ... ... .. ... . n: : :

00 - Ol 0 ............. 000(0O0000 O000(0O0000. 0 .- ................. 0 0

0.......... .0.0 ..a. ))( , , . . .. .......... . ....0 ...- . .... a: : . ... ... ..... ....... ............. ...- I..00 0000 .0a .. I.... ............. . ............0

0.............. .... .... ...................................................... . . . . . . .

.............. . 0............................................................. ........ . 0 ... ............ .. (

0. . . . ...... ........... .. .. ..... .... .... . . ...... .. . . .. ...... .. ....... .... .... ... a . . .... .... ... 00 ( . . . . . . . . . . . . . ... .o .e ~ .. o .° .o + .e .e e .~e .+ . . . . . ...° .e ~ .e e. .. .. e e ., e .e e . . . . . . . e. . . . . . .( )

° .:::::: : :: : :: : : :: : :: : : ::-:: : : :: : :: : :: : : :: : :: : : :: : :: : : :: : :: : : :::: I:0:0 0 ...... .............. ............ . ..... .... .... ............. 0 0

0.... ...... ...... .... ...... .000().. ... ... .. . . ....... .. .. .......... .... ....... 000 . ..-.... -............... 00...... 0 0..............0........................00............................00000................ 0 000.......0

0...... ... 0 ............. 0............................ I......0. 0..................................0. ..... .......I..............00......... 0O.,...................................000.........................................000.........................................000......................................

0.......................................................................................................................................................

XXXXxxxx

0000

~xxxx~ xxxx xxxx xxxx.I XXXX~XX XXXX

000000000000 0000(

lie 185 lee 95

Ixxxx0000

98

I xxxx0000

85

Ixxx xx x0000

so

Ixxx xxx0000(

75

xxxx0000

78

!xxxx~

0000(

65

0000

68

Ixxxx:xx x x0000(

55

x x x xxxxx

0000

58

xxxxxx0000(

45

!xxx xx x

0000

48

xxxx:~x x x

0000(

35

x xx xSxxxx:

0000(

38

)00001

:xxxx

)00001

:xxxx

)0000,

ýXxxxxxxox:Xxxxfxxxx

. .0o

)0000$~0000

25 20 15 18 5

Weslinghc.s Ekedt Cmipasy LLC - ST Max 10/1(280 08:38:53

Page 43: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

CBE-D COLD LEG 590 BOBBIN INSPECTIONAS TESTEDByron B2R14 CBE D5

X 228 TESTED 11H THRU TEC

a 33 PLUGGED TUBE

110 105 100 95 90 85 80 75 70000 oq0o 000Q000 01(000 0

00010 *

65 60T0000 000O

0

000

55 150000010000oo

450000O

40p 0 00

35T00ooo300000

.. 00

25 20 15 10 5

00..............A............... .0 0..........................00

.. ........ .... ........... ............ 0 0 ..... . .... .T .. . .. . .......... 0-

00 . .0.... .... ......... ........................... 0'..... ' ................. .......... 00. . .on...... 00. ...... ... ...: ..000.. ---.. 0 000--. .. ,,--, .--,.. .. ..

-00' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' 0 0.. . .' ":: : : : : 0 0: : : : : 0* ' 00 " *: :" : " ',' ":: : : ()0

.. 00. . .... .: . ..... ... 0 .. ... 0 0.......•. ..... 0 0 ..... ................ .. .. ..... ..00:, ..

00.. . ....... I.......... ........ 00()00..,..... 0 0 ........ 00()0. ................ . ... ...... ..... 0000 ..................................... ............... .... 0ý 0................................ o.......... .....I.... ...... On0 -...................... ............... ......... ......... 0ý 0.........................................................u

00........................ .... ......... .......... ...........0 0.......................................00

............................... .... .... .......... ........... 0 0......................................00*.... . ..... ...... . o. . ...........................o 0.......... ............. ...... o.. ............ e...o .

00............................... .... .... .... .... ..... .... ..... 0 0............................... .... .... .... .... ...... :: :000

o......................................... .... .... o (0 00 0............................ .... ....00 ................... n ..... 0

0-6 *o:: .0..............0 0...................0000 000 0000000..........00............D.. .. 0

00:ý0..00( 0 000 .0.....................00.0...............I.00.. .. .00

0..................................................000 000.000 .000.00........... ..... ..................... .............. .....0

o................................................................ .......... ............ .... .... ......... .... ..... .... .... ....... 0

0........0 0................000......................0*00*0........................000...............0 0*..*......0

0.......00..................0.................................0 0..................................0..................00.......

00. .. ... .. ............. ........ ........... o.0000..................................00........,.. . .. 0

oo = -.. o .... ..... :f: :~ o .... .. .. := .... .... ::: .... ....: :: .... ... .... ::::: : :::: .... O c o

00..........................................................................................................................................0

o.... .. . . . .-o00

I---- o •o , .. , , ... '° '''" ' I00 0 ) 0 0 ) 00 10 0 (00 0 ° ' ' ° e ' ' "•'' "•' ' •o ' ' 0

xxxx * xxxxx xxx~xx xxxxXXXX XX XX XXKX

00 0 000000 0000 0000 xocc oooo

10le 105 0 95

Ixxxxxxxx0 000

90

Ixxxxoooo'

851

xxxxx x xx

10 000

so

xxxx

0000*

75

ixxxxxxxx0ooo00

70

!xxxxxx

0000

65

*xxxx~x x x01000

60

Ixxxxx xx x

00 00

55

xxxx

soo

!xxxx0000

45

Ixxxx

40

xxxx

100,00

35

xxxxxxxx10* 10

30

xxxx0000

25

xxxxxxxx

0000q

20

Ix xx x

000*0,

15

x xXXX)

1000-c

10

xxxxxxxx

01000

5

Wesbnghouae Ekdwic Company LLC - ST Max 10/1/200 17:5627

Page 44: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

Attachment B.3

Hot Leg Top of Tubesheet +PointTM Inspection Scope

Page 31 of 44

Page 45: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

CBE-A HOT LEG TUBESHEET +POINT INSPECTIONAS TESTEDByron B2R14 CBE D5

S 981 TESTED TEH +0.0 THRU TSH +3.0"

a 154 PLUGGED TUBE

110 105 100 95 90 85 80 75 70 65 60nn.a Doa~n nonaa man anaua

55 50 45 46 35 36an I o o nn

25 20 15 16 5a

a a f a a f a a 0 0 0 - a 0 0 o+..5SSS...+..S5~....+SS.aSa

0oo1:.1SQS1....-i: ...

0

.. a .... 0 01 SS S I SSI Iss 0000 ass I S..: ass .:.. ss:: .. On~1~ -~

on S.......SS............. S . 0 o .SS ....... SS a. an anno. ;S........SS................S ..... 0 o0 .0.s;S ... ... .. uS..........on

no. S.......SS.............. S , . .... 0 0 • .SSS ....... SS a... S ........... oa,nS.. '.- S .as............. ... 0 o .SS ....... SS .... SS.., .... Oi

an ........ 0S ....... SS................ 0 0 o SSS ...... SS SS...............san

aSS. .0 ;...... SS ................ .S ..... 0 0, .- S........ SS . . . ......... .. o. .1 ao

oSa. .. on S ....... SS ......... D... S 0 00 ... 0. o o 5 -S *o SS 0.S. . SS:..........no.. -SSo

auSS. .. 00 .S ...... SS ........ o0.S .... 0 0 -. SS,; o o. SS .... SS .. . ... ,oo.. -Sun(

00 •........... ......... 00= :E.S *:•: = =0 .o 0 .. .S00. .S ............. .on00..SS. ........... ...... SS ......... OO. S: .....S . O 0 0 O .. S O.......S ... SS-.......... "..SS. nun

0o. .SS........S ...... SS .............. S ..... o.0 o -- S S ...... SS ..... SS...................00.. .. ....... S.......SS................ S ..... a a .SS S ..... S ... . ...........S..-...o

oo:.. .SSS . .... ;S. .. .SSý ..... ......... S, a. . -as . S ;S ... ... SS -0.- iSS .. ....... S.-a-SS. .noo

..... ................ .. . . . .. a a . s ... ....... ..... .. ............... .. S. I s...0.............SS.....;S....... SS...............S .s....0 0 .. SS;S........sS.S s....... S .......... S..SS......0,

ao•......S ............ S....... SS .................. S . ...... 5o5o.-.SS5;S.......SS......SS .............. SS......00=0o ........ SS........5.......SS................ S;:..... o o .. SSs:......SS .... SS .............. SS.......o0.. *.0~...S.......S..5....SS .S............0 00 ooSS SS ..... SS . SS 0.............. . no.. *..0.

o........ .... ..... .;S....aSS . . .. ..... .... SS ............. ......... 0

0 .. .So•- S. . . S. ot:o.s .u.. ... )ooos',oooo( ooss ;sooo .. SS -. -. ,SS~oo ... .. ... SS )O .. ,...

so: .. 0...oo SS: . . . S--o:)o-S S ..... . . .. S. . .SS o o. . . . .. S. oo . .. o

0 .................................... S..... n...... ss.......... .

......................", ..... S...•....SS..........................5 ;....s S5.......... ... S5.............

o~p...........S .............. S....... SS ......................... s S.......SSSS. ..SS55.......... SS........S.•... ..S -S............ S

0...................SS...... S....... SS................ S ...... S.......SS ;S....... SS .. ... SS.............. SS..............5So~t...........SS...... ;S..............SS................ S.......... S....s S.:S...... SS .. ... SS..................S ........... S

o ............. SS..............S.......sS................ S ....... S. . .S:......s.....S -- SS SS.................. S............ ss

o ............. SS..............S........ SS .............. S,......5.... .......SsS... ...... SS .. S. SS.............ss...SS. .......... SSSS .................... ;S.........SS...................5......... .SSS ......sS.........SS . ..... ............. S............S

SSS .... o.o 0....SS....... ;oo•-S...........so ... .... s . oS. . o .. S; ~..... . -. SS.. 000o .... S SSS~ .... o~.0-0.* S

SSS .... .odo....... sS......;So *-S ............ . .S 00* ...... o o • .SS.;0...... S.......S.•o ........ S.....0 0~ ... SSSSSS . .... S.-SS....... ....... s * 11 O*.SS..... SS S ... SS. .00o . ...S .S ............ SSS

SSS ........... SSS.......;S......SS ............. S ...... ss .. ... $'S...... SS *.S.- SS............S..;SSS ........... SSSSSS ..... . SS S ...... SS ............. S...... S ..... SSS ...... SS I.S. SS .......... SSS ........... s. S

- -ss ~-.-.- --- - -~ -----.-.- 9-- -ss -ss ~s.- - -.- s--- s- --sss--

E) ss - i e ssssse

SSSSSSSSS-SS

ass.

ass.*::: ":::,::Ss ::::S SS

ass ....

5:5:

.s..as...S. .

SS:ss:SS:

;S .. sssSass

Ss. 3SSsSSS.

S ..

25

,sss.,S S

0000(

le

SSSSSSSSSSSS

ssss5116 105 166 95 90 85 86 75 76 65 66 55 5s 45 40 35 30 26 15

Weadinchoue E19rcf Company LLC -ST Max 1011MAM0 16:53-06

Page 46: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

CBE-B HOT LEG TUBESHEET +POINT INSPECTIONAS TESTEDByron B2R14 CBE D5

S 935 TESTED TEH +0.0 THRU TSH +3.0"

a 135 PLUGGED TUBE

118 105 180 95 90 85 8a 75I osSSyooooyoooo

c00 *SSS :.I:,00 .. *,s . . . .

78moos S

f.SS

65 600000000~

55 -cac a o

588s000$S...

45 40

TOOOOTOOOO

35sso0S .0w

30 25 20

'C'C0

0 . s

15 18 5

.ý.sýýo,....S S.::;::::1::::1S1S.uoooS -- --noo

0a........S .. ............. S s ... C 0 ... s††††††††††††††SS......-oo .......... SSS.................... ,o o. .--. SS ............. ss-.......o

aa........ SSS ........ a. . SS .... 0 0 *5 .. .... 1 .... . ....... .ISS.a .a.. . on

a.a;a ..... SSS .... ....... .. SS .... a a .. SS . .............. .S .......... o(

s e e s -s . • u - . - ... . . . S M . . . .-.*. . . S , a * s 1- - --- -I-

can ... SS ..... SSSý......... ... ..... SS. .... 'o 0 ... .S S ....... ..... S ............. Som

Daa. 0.-S Sae. SSS ..... ... SS. .... 0 0 . - a... a... . .. o. * SSSO

aa, .. Cmo; a... S ..... o oos .... 0 0 .... SSoO .. On....:.: ....SSSS ... oao.. sssoaaaa0 * .05 S.." *,S .......... 0 SS .... 0 0 ... .S ............ a. SSS.... ..o. 555

CaS t ... t. . .........o05 ,o5 S0 C..............5.5...... t.....s...o°o ..SSS S Se. . SS .... I...oo ..... 'oo 1...0 ,-00. o.. ..... SS.S .......... SSSo

a.n SSS. . SSS ....... ...... S .o o .... S............ .SS........... .. SSS* .oo.. SSS ..... S:; . SSS ............ SS .. '.. o 0 .. .5 5.............. SS............SSSo .o

oo.. SSS~ ..... S;S ..... -............. SS. ..... 0 0 .... S S ............. SS........SSS.o.... SSS. ..... SS . SSS ............ SS.... o.. SS ....... a.... SS......m.... ......... (

00 .... SSS .. S •,...SSS ..... ....... S......0 0 ... S S ... .... ..... SSaS......... .SSS. . . .0 0o

o..4.... SSS.... SS .... SSS ............ S.......C 0 . S... . .......... .SS ........... SSs. ... a..o

o ..... o. SSS* ..... SS ... SS ..... ...... 0 ,0000000 ooos Soso............o ............ sss o .o

o ... SSS o S 0 0 O.. SS .... ....... S.oi o ........... SSS, o.. .00oo...........sss. . .. S. SS..oo*SSS ss...• ... .. S.o(o..........SSoo.........0 ......... SSS . s.eS ... SSS ...... ... 00 .......-..... SSS .......... S

)o ........ SSS.. es .... S ........... ooSs...ooo.. oo..oo.s s.ooo(. ....... SS .......... .SSS........ ............. "-.... SSS .. .35 55......5...........S ........ SS.......-S a...

........... ..... 5,5 . sees See. S. .... ........ SS..... S . ... .sss.......... SO. ................... sss . . S5,S .... SS........... SS ............. S 5............. .5........... .SSS.-...a ... S()O

C ...... ......... ....5S ..... SSS.-... .... .. SS .... ...... . .S S... . SS. SSS...... .... 00 SSS. .... 5... * SS............ SS ............. S S ............ SS ..-.... - SSS........... o

SO S.... .... • ........ .°5T......00.... s . . .. SO...*SSSt.... ......... ss .... CO.. .. .. S S ........ .... SS .. .... .... SSS . ... ..°'t5......t"sC.... sss- ... t . S0 . ... .... . C ... . ....... .. .... ..... sss. . .. . .a" " ' 0

S ... ......... ssS........ SSS..... ... .ss....... .... ... S S............ ss........... s0.S- ;- • ~ c ;:• SS... . •Sc -,,SS... .. ... SS ;c c• S• •: -: .... - .... SqS-- .. .... 00-- c-c = ;

S .... o .... SSS.S. . .5 .................. .. SS .... 0000 ... .S S ........ .... SS.. O .. ..... SSS ... o o.. . .o

ss.. .. sss ..... .SS ..... .. ss .... .... S. .... ..... ... SS.. .... ......... . . . . .. 0ss .. .......... SSS ..... s s... . ..SS .... .... .. s . ... S S... . ... s~ ..... SS ... ... . .... SSS0

S S,SS.

SS..

*Sss.sSs.-

S ..S ..5 ..SCoC'

SSSs-S SS S)S S, 0ooss

'S.0

ýC00

'S ..

's.~o0C0, Kg;; * SSoo0

SSSSSS:

5ss.osSS., S SSo '0000c1 0C O(

Coa

SSC0~poooCC4)o~oo~SSSoc~oooS 0000 0000~ S 0000

118 105 18s 95 90 85 80 75 70 65 60 55 58 45 40 35 30 25 20 15 18 5

WesWtintiua E~ic wConany LLC - ST Max 10117l2U3 17:50:11

Page 47: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

CBE-C HOT LEG TUBESHEET +POINT INSPECTIONAS TESTEDByron B2R14 CBE D5

S 929 TESTED TEH +0.0 THRU TSH +3.0"

a 76 PLUGGED TUBE

11l 105 186 95 90 85 86 75 70 65 66So~sSS~ooooq~ooooqPooSS~o~ua(q0

1o~Sss1 : : : : : Ss : 1000 .sss Ss

00.* sss . . . . . S . .

0000

5513aoS~

56

SA0

45 40I000035 36

ss.0 0

sS. ..So

25 26 15 16 5

oo. . .. S . .. . .. S ;....4. o 'o.... S, . . .. .... :SS.. n.SS gum000- ....... SS .... a.......... SS ..... o o... S0S ................ SS ... SS .0000o ......... SSS..... ........ SS . ..... o0 0 . .. S ............. . S. .. . . .SS .A.oo... ...... ... SS ... . .......... SS. ...... 0 0 . . . S S .... .. =.. .. .... . . S S ... Q -

0 ..... ...... ssA..A..........SS.....0 ... a s S.. ....

ss ............. SSS A........... SS, 0 A S S................. ..... SS... .. oSSS. .. oo(.......... SSS..............•• SS, .. ... 0 A . ..- SS............ S$.....SS SS, 00o .... 0oASS. • •o=(........SSS ......... 0 o(ooSS, o.. 0 l 0 S . S-oo0 0.........5:SS .... Sno ....... 0SSS-* .. oo(...... SSS ...... 0 ss ... 0 0 ... , S-0 0 ......... SS. .. SS 00 ....... 0 (

C~~~~8 -- - -~ -G -~ -C - --e -- ----- -

00'sss ............... 555.........0()OOA0 .... a 0 ... .S S-000 0..........5' S.......000ooSSS- .. SSS ............ a.. 0 0 ... S, S.............S.5.. * ............... o00oo. SSS- .............. SSS .............. A • • a~..,0 0 o. ... SS.... ...... ...... SSS..... SS•...............000. SSS. ......... SSS..............Sn 0 0 ..•. .S..............;SS ... S ...... So

So.....S ........... SSS ............... 5• • 0 0 , S........... .... S.S. ..SS. ............s....sss..sss........ ..... 0.... 0 Sss ......... 0 ............ sS. . ............. 0

SSS...............sss ........... SS• .....So. o0....S::S ............. ss s...................QOSS * S00 0...........0 SSS SS SS- SS............S. S .00

0 S . . .. ASS . ... ......... . .... • ASS .. . - ..................

0SS .. 5..... SS.....-..--.*..SSS.............CoSS! 00000 OSSO..... oo.... •S .... f........ • • ;S .....SS; ................ 0ooss . .. .533..........SSS. ............S.S................:S: 5................S . . AS..............

ooss....ossS ..... .. oSss .. S1 sS.... . ...... . ssa ......... . oo. .o0.SS .. . . .SS .............. SSS...................... SS.. .-SS..........S.........

0)o. SS ... 3f..... ......SSS.............. • •...S........... •oS;oo•oo•oS(S................ SS. . .IS: ..................... 0•• • o0 .SS ..... SSS...............SSS...............S.............S... 0.............. SS... ...... ..............

00. .SS -.. SSS...-........-..SSS.............. • •SS................S S...S............. SS* .5.......S.= ............... S..-5S

0**.SS 0.... SSS ......... 0.. SS ......... SS•: S .. 0 S ......... A.... SS- SS. ....... 0S0... o

o. ..... s.........000 . .......... SS ... ... 0..... S ............ ... SS. OSS...................So

0..ss .... SS...... ................ .... .SS................ S...............SS ..... ................. 0S

o0. .. ss-...............s. ..••SS.............•SS ............ :S.....S ........ ;S..... S ......... S ..... S.....55• •

o . . --. S ... .......... SS.... -. ; ... ..... . . 00

o .S:Ss o. • SSSS : .. . .. oo SSSSS ..... ... . S : . .... o o .... S ;S ..... ...... ;SS . •oossw .... ...... o() ..... S

o .. . ..So - . SSS . .... ... .o .SSS ..... .... .. • • SS• .... . .o .o .... S ;S ... .....•o.... SS.- - SS: .... .... ..•• o o ..... S

o0 ... --- .. .. SS . ....-... . ... .. .. -. -. - . SS! . .. . . . . :........... . ;SS .. .. SS . . . . . . . ..•••

oo. s SS .... s. S .. . ..... . .ss .... ... ... SS . . ..... s . . . . . . s . . s:

0 . . - s 0.. I s . ... ..... - .. 0 0.. . s .. .. .. .... SS. ... SS• .... ..... ... 0 ) .... SSS

45

40

35

30

25

26

15

5

0...

0.*" ooss!

sss. -sss)ssS(

ss!ssOM 00S!

SoS.. :SS.:s.oo

)ossý

.ssS

osss)oSss0000 OO00cOSSS0OOO000O0000c oOO0(oQooo( ;0000qp0000c )00 040 000ý oooo0oooo0'o0ooýoooo

11 165 1i6 95 90 85 8W 75 70 65 66 55 56 45 40 35 30 25 2 15 1A 5

Wesgnghouse Edrct Com~pany LLC - STrMax 1011712008 17:5306

Page 48: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

CBE-D HOT LEG TUBESHEET +POINT INSPECTIONAS TESTEDByron B2R14 CBE D5

S 963 TESTED TEH +0.0 THRU TSH +3.0"

a 33 PLUGGED TUBE

110 105 100 95 90

0000

00..

850SSS0SSS-SSS-SSS

80 75$00000

70,00SS

t.SS

65 160S0000 0

10''

5500000S.

0... 5. .S.

soS000

S.

45 40$00 000$00000 35$SS00

$5 S * 0$SS~SS.

30 25 20 15 10 5

'000... 00

00............sss................o o. .•. ... ......... o000.............. a................. S 0 * S......o.o........... : .......... 00

00............. .SSS ................. SS 0 .....oo ...SS ........... S...........000o......o.SSS .... 0 *.... ........ SS........

ME) S_ 8_ -. 5 - -e - S 8 - .-.- - - - - - - -- -- 6

SS... .......... SSSS .............. SS ..... 0 0 .-.. S S .............. ;SS ........ ....... SSSSS . ..00 .... nSSSS ............. SS ... .. 0 0 . -.. 5................ . SS -. ...... 00o. SSSOU.S. ..oa0 ... .. SSSS .......... 0 o00oSS .... 0 0 ... S S.oo o*..a .... s..... .. 0. , SSaoaSS. " .00)...... SSS 0 0SS ....... 0 0 S S.0 0 ........ .. . ....... . 00. • S S U

00 SSS.......................SS.........0 oooSS ..... 0 0 ..- .00o 0.............. ....... SSS. 000. SSS.................SSS.............3 S ..... 0 0o. .- SS................S................S- .oao..SSS ............. SSS............. SS 0 ..... o o..-sS..............SS...S..............SSS..a00. *SSS.,.... ...... SSS . ....... . . . 0 0 .. S ............. .. SS ......... SSS. ..0

... ............. SSS ............ 0 0 .-.. S S ....... 33............ .SSS.....0o ... SSS . .... .. SSS.... . 0 0. ... S;S ... .......... SS ........ SSS... 0 0

oS; ..... SSS...............s..SS............. SS.* .. 0 0 . .. 5; 5............. SS.....S ...... • • SSS........0oo0.......... SSS................. SSS.................SS5 .... 0 oo...S'S.................•S...............5SSS.........0o

- ~ SS S--~686.-. -~68-S -- - -- - E- -S -I.- -. ---- em-- *a-(). -69.-O-~ 0,,S-- 0 0 . . S88- 0:=• 0

oSS ..So SSS .......... ... SSS .......... ...ooSS 000 oooo0 000oo S .;... .......... 3. 0SS.o. .......... .SSS o .. . 00ooS .0 S. ss....... ......0.053. ) .......... SSS.o .... 00

0.35 SS SS .............. SSS ... .s.. SS .............. SS. ......... 0

0. ..... SSS ........ SSS ...... .. 003 0000 0000..... SOt ................... SS ......... ..... ........ 0

o.ssS• . ..... ....... sS................sSSS.............5SSS............. S;S ....... s......;SoS.......s...SS............ )0 ,-SSS . ...... S S ....... ... . ....................... S! .............. S•S................. *S .. . . . .. . 0... . . .

oSS .... SSS ............ ss........... SS............. sS..... ....... SS.............. SSS. ...........

0' * .SS .---. . : ........ ........ ... ............. .............................. .. ..... .. ...o...SS.... SSS............. SS............5.. .......... S,............ • • ss............ SSS............0o. S .SS . ...... ...... SSS .... ..................... .... . SS ..... ...

So. • .SS ..... SSS............SSS........... ss............ S .................. SS .............. SSS............ 000 ... SS. ;o. . SSS........ SSS.... S ..... . .. . S ... .. . .. . .s . .. SSS. . . .o . ..... .. .0

S..... SS . . . . SSS.... 000 .SSS'.. .... SS . ... . . . . . . . . o....... ... SSS.... .... S

oo o0 . . o . •-; • o -SS++

S.... SS. .... SSS .. . .. s . S...... ............ S :SS ............ SS ............ SSS.............SSS.. SS0 ... . SSS ............. SSS ....... ..... ............. S S. ...... SS ...... SSS............SoS

SS6.- -- ,.. -- . - -S ...... - 000 + ._ -.. -_-

Ss.0

Ss.

S oo

ss! .. . SSS-. ... . sss. . .

-sss.sss.sss

.s..

.5..

.s.S:

.s

S . .. ss:

SSSS. .sss.

. SSSS-SSSSS

(P05 S$0000ý5s50o~0000o~0000430oSS S(p0000cp0500p0S $o•ooo(o0*000s$Ss0$0000~p0000$s )oooopooo(

11 105 100 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25

)55504J0000~00004i555S

20 15 1i 5

Wes*InhWuso Elodic Compan~y LLC - ST Max 1Wl8I2M8 09:33:52

Page 49: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

Attachment B.4

Row 1 and Row 2 +PointTM Inspection Scope

Page 32 of 44

Page 50: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

CBE-A LOW ROW UBEND +POINT INSPECTIONAS TESTEDByron B2R14 CBE D5

X 57 TESTED 1IH THRU 11C

a 154 PLUGGED TUBE

116 196 .166 96 96 8 86 B 75 76 65 68

I aam~ama~maa~ amaipmanmoo::aý

00 .. ....I .. . .. .... a. . . .

55nounma

o ::01 ..

6o 45 46 36 36 26 26 is 16noun noun nounmmcanaa

::: a: : : : : ..... .... ... ... ..onl

5

45

40

35

3.

25

aa...... .... .............. a........0 ..................... ..... a... -ao ................. ......... ......... 0 0.......................am

ma ....................... 0 0 ................................

0.m. ..aa............ ...... aaa........a ...... aa ....................... ma0.. ......a........a............ .....:a a.........a a.0........a a............... ..... a0.. .. MOO

-- ----- ---- - - -- e-~ E0 -a E-)--- .-.-. -- --aa......................a ......... a a.....-0)00 .... ... aaa0..........................a

aa................................ a..... ............................... ma................................ a.......... .... ............................... 0 1.... : E : ...... .... a0

aa............................................. .. m...................................moo.0

.... ... ... ... ... ... ... m .... ......... ..........................0.......................... ......... .... .... .... .... ..... 0 0...................................... ......... .0

a..............0..0..00..........................a a.... .......................... o.. .. .a

00 :0. *.m........... 000. ::..................000000 0 000. ............. ... 00............ ...... ma::0.. -. 00

0 ....... 00.......................00. ..0 a. . . .. . . . .. : : ()o ooe 0 0oooO O o o o0 . . . . ... C) 0

0 .... .... . . .0 0 ....aa 00 00

a..... ..... . ............. .... .... ... .... ...... .... .... ... -0. .... ... . .0 0..................... . ..... . 00 ......... . .. ..... .... .... 0 0.... .... ..... . ..... . .0

0 ......... a --. . --. . -. - .... .... 0 0...-'". ,00 .0-...Q...... O ,...O

0 ... 0 .. .... 000 ::::'.. 0000E..........................000................. .....00 ... 1.00E) A 1. - , ,, O -,,,,,e, -0 ------ ---O 0 -°°,--,-----°,,,,-00-,-,. . a

0 .: ... 0- .. ... ... . 0 ....--: - ..... ... - ..-.O.: .... 0 1 1 0 0 0 : :-:•::::•: . . . . . .... 00 .. : .: ::

.0 ....- ,..-..,,.0,-....00, ...- 0000 -,...,-)0)-- ,, , - . , , . .. ,.. . O0

---.. .... -... . .... . ... ... ..... . .. .. .. ... . ... . ... . .. . . . . . . . ... . .. . .... . 00... - v v -- . . . . =: f = = O = #0 -.1 1 E E"""""""" 0° R° , 0O (•O0 00 0i """O """"""""" O15

16

5

.x -Xaa X 0000

: * , * I : : : :.;:: X..xX000 0OX0

X ..0000

X..X00x0

.Xaxox

Kx -ýaxaa )OXOO. )OXOX

.X.aXaa0-X-i1ix0;3 ;X;3 .... ..0 0 0 0 0 0 0 0 00001000;

axa aX00000(

X X.

OX 00)X X.0ox00:

0 0,,0,,0

0000

lie 166 lee 95 96 85 8e 75 76 65 60 55 56 45 46 35 30 25 20 15 10 5

Wastinghowzse Eledlic Company LLC - ST Man 10/17f2UM 16.48:38

Page 51: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

CBE-B LOW ROW UBEND +POINT INSPECTIONAS TESTEDByron B2R14 CBE D5

X 57 TESTED 11H THRU 11C

a 135 PLUGGED TUBE

110 105 10i 95 98 85 88 75 78 65 6810000 0 000$00000$0 00 00000a0$000

55 58 45 48 35 38 25 20 15 1800*300UM0000000$oo0000$00000I I I I

5

goo00. .

)0 I... 0 0~ .... ; ... 060

0 U000

ma.................................... 0 0 ........... I I....................0000 . . ..... . .................... 0 O l0.....i...... I...... . . .......... - .. O0

nman.. .. ...... ..... on.......................0 0....... 13........ 1.............. o.m .sonm()coa a................. 1 .... 1 ...............a a...................................0(

ag 0 0 . .....-.... oan... .... ............ . ... .... ... ...... 0 0. ..o ..... .... ..... .. .

amaol. mOo a...........................s 00 . ..... 0 0.........f........... :, 0........00: *.000

ama00011-00 .... .... .... ...........co.........0 0..........0 00...... a.............. )0... Oil......

o ........... .... ......... 00 .. ..... 0 0... ..... ... 000........... ........ . .

am................... .... ........................0ý 0 .... ......... ........ ....... Ono.............................0 0..... ......... ............................ .... 0.... .... -o

00 .. .... .... .... .... .... .......... .................. 0 0........... ........ ..... ..................... .... 00

0.......... .... ........................ .. .. .. ......... ...... 0 .. .. . . . . . . . . .O.....

00........................................0 0................................o00 ...... .... .............................. .0) 0 ..... ... ..... .... .... ......- ........ ..... .... ... 04a 0

0 ............ .. .0 0 ..... ...... ... . . .... 0 ..00 00000 0 000 00.000...... .... 0..... . . . . * * ..... n.. -. 0

6, e - - - - e - E) 0 0 • a --•l

0 0 aa, ... ......... .... 0 00...

ee. ... '.0 00. 0 0 00 .0.. .... .. 0. ,,e. .. 0. 0.,- -o

00... ....... ........... .................. .... .... 0 0 0 0 000 00 000........................ .... ....0)0.......... ..0. .00

o....................................... ..................................................... a....)0(), "((): ,. 0(

o................................................... I.... .... ........................ .... ..... ..... ...... .... ............... na.0...................................... ............... .... .................... I............... ..... ...... .... ..... .... 0 ......... n

00 ..... .... .... .... .......... .... .... I.... .... .... .... ................................................... A......000E e -- - - - - - - - -

O o- . = © = : = = f = O © : f = = = = f : : = = - - -= = = = = = = = = = = = = = = = = = = = = = - - -- -- s o --

00:0. X1 x

px000 OO0X(X ... ... ; X.C.: x .X X

0

X.0-X-Xi .... J..X.J.X.x ..X.

0oXo00o 60o00c ,Xoxoý0000ýoxoxoxoxo*ooooý0oxotoxoxýoxooooxoxooooxoxooooooX00oxoxýooxoooooooxoo00ox0ox0ooo118 105 le 95 98 85 88 75 78 65 68 55 50 45 40 35 30 25 28 15 18

We"bghous Eicbic Conpany UC - ST Mau IW1•W208 10:50:54

5

Page 52: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

CBE-C LOW ROW UBEND +POINT INSPECTIONAS TESTEDByron B2R14 CBE D5

X 57 TESTED 11H THRU 11C

a 76 PLUGGED TUBE

116 105 isO 95 90 85 86 75 70 65 661 0000$000000000000000000113100

55 56 45 46011100OGOO ooooToooo

35 36 25 26 15 l61201 1

5

)0-. 0

00001::..I::::I::::I::::I::::I'I 001 .... I ....

000

(00................. .B.........Aa .............. 0 0 ... ..... 1 0000............................0 0'.............................. ........... cana

00B.........B................ 1 1 .............. 0 0..............................00(0..........a *....IN.............. 0 aU.......... .......... .......................

Gc- -ye5 G-

00..........a . a................ 0 a............... .......... ............ .... n0 00.. .... .... ........................ 0 B........................... . .. ...... 00. *.00

a.....On.....................0 0.........0 0.:: :1"..... ........... 000................ o ~ .0......00............. ..... .... ... 0 0 ........... 0 0........ .... 0 0...... ......... ...B 00........0(

E) -. e-on E- E) - ~ - ~ ~- - 000............... ..... ..... .... .... .. o a *. 0..........:000......... ..... .... ............. 0

00............................a a. 0...-..... .... ........................... 00 ....... ................... ...... ............ 11a.... ý 0 0..... .......... ............................. 0

00 ....... .... .... .... .... .... .... ................... 0 0 ..... .... .... .... .......................... ..... 00

.................. .... ......... .... .... .... .... .... 0 0...................................................... ....0........................ .... .... ..... ..... ..... ...... .... 0 0......................... ............................. .... (0

00................ ....... ......... ..... ..... ..... ...... .... 0 0..................... ..... ..... ...........I..... ...... ...... On0................... .... ..... ..... ...... .... .... ........... 0 0........................... .................... ...... ...... 0

0 .. ~ .... ...).... ........ 0 0............ .... 0000 0000 00000 0000 .... .......... 0 0. .... ......... ...... ao. .. 000. * .00...................0(0 a. 0........... .... .... ..... (00* * .. 00

0............a .. . . . . .. . . . .: . . a....... .... ................. 00................ .......... .... .... ..... .... .... 00000()0000()0000 00000 0000 .... .... ..... a... ................. ............. 0(

). .................... .... .............. ...... ................................................0................................................................................................................0........... . ........................................................... .... .... ......... ......... .... o........ ......... ....o.... ....... 00............. ... a ....................................... .................... .... ......................... .... .... ..... .... 10

-E)0E)--- cc a8E0 .................................................................. .... ............... .... .... .................... 1....... 00....................................................................... .... .... .... .... ... ::E : ... : :::: 0

00 ....................................................... .................... ......... I........ ... ............. 000 ........ 00........ ...... .... .000............ .......... .... ..... 0000............. ..... .... .... ..... 000........... ........ 00........0

-8 -E A0 E- E) E) E) ee-0 ...... 00..... D ... ...... .... . 0....................... .... 0 0.......... ..... .... a......... ... ) 0......... ......... 0(0...... .0

.. 0.. . . . . .o . . 0 . . . . . . . . . 0)0 . . . . . . . . . . ) 0. . . . . . . .0)......................0 0.................. ....... ..... .... .. 0000.......... .... ........ ......... .. .... .. . . . ....00 -: :00

00. 4 . .. . ... . .. .. . . . .. . . . .. . . .o . . .. . . . . .. . .. .00G-----------------------------------------------------------------------------------

0...

0 ...00...OOOX•

:.X.x X-X- .x.OX 00;

X.X. X.. I .... ... X. 0x-x(

0

)X0x0j0x00 ooox000oO~xXOOX0oooo0$ooo0 '0XOO~ox004~0x00*0x004~00x04~xox4.x0x04.OO ~oxox~oooxc~oooo116 165 166 95 90 85 8s 75 70 65 60 55 56 45 40 35 36 25 26 15 16 5

Westinghouse Elodbit. Company LLC - ST Max l1l11=008 10:50.09

Page 53: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

CBE-D LOW ROW UBEND +POINT INSPECTIONAS TESTEDByron B2R14 CBE D5

X 57 TESTED I1H THRU 1IC

a 33 PLUGGED TUBE

11 105 1M8 95 9g 85 80 75 70 65 60I oooop~oooo~pooooqpoooocpo~ooo~o

55 5s 45 40 35 30 25 20 15 1i0$0o00000000000o00000000000o1 1 1 1 1

5

0.000

00..

)0.. 0

I:::: 1:::: 10..... .... .... ....

of .... i .... i .... .... 4 ... 0 0.00

00................. .............. 0 0. .......... Il..................0000............. I.... a....................0 0.. .... 1 . ..... ...... .'00o

00 ..- ................... ......................... O 0 .... .... ..... .......... ................. - o(0........................ ........... 0 0...................... .... 4 .... .....:: ý....01I

00 , -- , -0 1 - 8 a l 6 so s ,,,,o,•••o. o , •0 a , C G - w- * " -- - -• - , ----, --- --- ••• - ---- •,o00.......... . ......................... .. - - 0 0 . . .... .........-I).... --... . ...... ....... na

00)O .00. ... ...... .. ....................... 0 0 .......................... .. .00 .a........- ........ .........- -... 0()00... ..... 0 0..... ....... OO)O...-.-,.........--..... c * O0

au... .... 00.............. .... .... ... 0 0 ........... 0 0...........0 0 ................. 0.....

E0 g-s--------- - ---- e s- e -o O-e - --------- ---- ---- ------

00...................... . ......... 000... ......0 0o o .....000. .. ................... .......... 00

O00..............- ...... .. .... .. .......... I.. . ... .... 0 0 .. . .. .. . ... ........... O0

00........................................-0 0........................... .... ..... ..... .... ..... ..........00

C C E) ----

. . . . . . . . . . . . . . . . 0 0......... ...................................

0o......... ................ . . .......... ..... 0 0 ..... . . . .. . ............ . ......... ...... ........0

00.................. .. ..... ....... .... . .... .... . 0 0. ........ .. ..... ... .... .................... ........ 0

0............................................0..................................................0 - ..- O....................00..... . ... ,0000'0000 00000)000............. ---- -.. 00.......... O .. 0

00 .. 00........................0.0- . -.. 0,0..... ...... . 00. .. 00

0 .................. . ..................... ... ... 0 0 0000 0000 0000)0000 ... .... .... .... ...............................

0..................................................... .... ......... .............. .......... .................................

0()................................................................ ......... .... .... .... .............. .... .... .......... ......... 10

- (.•'**.--- *::: :: :: =: : :;== : ::::: • =; : : :: = =•:::: ::::E ::: :-• : = = = • :::::= =:::: : :::I00

0 . -. . - - --0 , - --, - , ,-- - - 0 0- - - , ,,- -, , ,,- - ---- - 0 0 0 0 - --- ---- - - -- - - - - - - - - ---,-0 0-. , - - . 0 0 ,-- - - -0 .............. ..................................... ........................... .. ........ .... ....... .......... ..... ........... .... . 000............................................................. ..................... .... .... ............... ........................ ........000 ....... .0 0.... .. ...... 000 ................. . .... .... 0000 .... ........... .O0

0 ...... 0 ........... ..... ..... 0 0. ........... ........... I0..................0....................00..................00000 . .. 0

011 0.. s

00............... ... .................................................... ........ .... .... .... ......... ......... .....o.... .... ..... .. . .. 00

0 ... I... : :

00:;: ;: : .,x ,X - .Xý0x 00

Is. x ... .X

X000.X

oxox

.X X

)OOXO.X...ý0000 0000

'OX(,0000(

.X.Xix.x.t ... 0

,XOXOJOXOOý00000000T0X0X(Px0x0cP00001P0X00 )ooootooxo*oooo 000 XC

118 105 188 95 90 85 80 75 70 65 60 55 50 45 48 35 38 25 20

Westmghouse Eledric Company LLC - ST Max 10118/200 09:33:27

15 1A 5

Page 54: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

Attachment B.5

Baffle Plate Expansion +PointTM Inspection Scope

Page 33 of 44

Page 55: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

CBE-A TUBES EXPANDED AT BAFFLE +POINT INSPECTIONAS TESTEDByron B2R14 CBE D5

2 6 TESTED 02C -/+ 2"

A 29 TESTED 03C AND 02C -/+ 2"

a 154 PLUGGED TUBE

118 105 1M8 95 90 85 8s 75S 1 1 1 0000111111192O AAAa

-27 A,:

78 65 60 55 50 45 48 35 30 25 28agoo A00010A A UAA

A .AAA A lat A*A* ý: - .j.... .. . C2.oF .1 .. 0 0 ..... ... .... o4.... t C.

15 18 5

-A.......... .. .A ... o .............. ..... n'A A. .....

....... o .. 0..o.... . ... .. ... .. .. 0 0..... .0 . . .

aC.. .0....... .... .... 0-

n o. . .. C A A .A A

... oo.. .. . . . -. . o.-. ---. . ........ ... . .. o........ ..... o o.......,oo -- .. A o

E) o) - , -- e E) - - ,e Go- -,-- - - - oO.0.. ..... . .. . . . . ..... ... . o - - 0 0.. ..- 0 0 . -... ..-0 0 ... ---.... .......,......CA

=.. ... ... ................... C C ...... . --... . .. .... . ........... ......0C ... ..... .... ... . ....... . ........ . . .... ..... .0 a . .... . ..... ..a............ ... .. ......

A o, oo ..... ..... ... . . . .C . . . . . . .

C .C .... .... C C 0- 00 e -9

0 , ,000(',-' "' " °, 010 -,0,:: -,U -," , 000(),0000( •0000 (00000 (0 ° ..... a ".°..0 110"'...... ....... ')g 0o. -,000 , ,,0 "''" " " -, 0 0' ' ' ' "' ", , , - - - 0 • . " " ' , 000--,°.00

C C . . . . . .. .... . . . .C C C.. . . . . .. . . . . . . . . . . . . . . . . . . . . . . C . . .. CC................................ ............ CA A -AC .............. ......... . . ............

()~~ .... .... . .. . 0

0. .... .o.. ... • .... ..................... .. ........... ............................................... ............. ......... ......... .... .... .... .... ..... ........... A

0. .... . .. ... .. .°.

o- . ,.. .0(0... .. , , , ° 0 (, , , . . , • . , ° ..... .... • , . •. ° °, • , .... .0) *0

C.. ........... . ... .... ........ . . .... ..... ..... . . . . . . . ........... - -.... . .. .......

0 .. .. .,o )0 . • , ,•, 0 ...... .°•, . . . ° , . - - o 0 o ,, • o•0, • ,e- ,, "e, ,, , ,• °0 0° 0O...................... . .000. ..... ,....... . . . . .00000 0.....................000. .°... ... .. 0.. .. ."....

C ......... .L .........................................................................................................

o -. . . .. .C....... C.................C..............................C C...............................C.................C .......

45

35

30

25

20

15

i0

5

... ... t .. ... .... ... . ... ...(100C0C

''0"'0"'00C . .... ............

0000 10 0 8 95 98 85 88 75 76 85 66lie 105 is@ 95 90 as Be 75 79 65 69

>00004C0000ý000C10CC0C41CCCC4pCCC10 CCCoCCC )0000 ,0000

55 so 45 40 35 38 25 20 15 10 5

Wesbi~housa EI.oft Companiy LLC -ST Max 10117I2Z6 16:5124

Page 56: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

CBE-B TUBES EXPANDED AT BAFFLE +POINT INSPECTIONAS TESTEDByron B2R14 CBE D5

A 29 TESTED 03C AND 02C -/+ 2"

a 135 PLUGGED TUBE

118 185 100 95 90 85 80 75 70 65 60I 0eo00o•A• OOA OAO 0OApA0 ... ...... . .1 - - A

55 50 45 40 35a On aOOAO0QAOOAQC00AOOOOO

30 25 20 15 18 5

0' o Aa: AA. * .a.. C0oo

'0'0

000:::::1:::0:-cOO00--t .. t .... t .... t .... I ... 0 . I I..

-00 -- 3 -- - 00 - = -~ -( -an...,.. . o. . .. .... •. ,-o-.•...........0 0', A .... ....... o... ..... ... . ......... 00

00- .... A All.................. ......... o0 0

Ba................B.......... 0.........................B U1,3*.fl

Ban .... .......... .........., ... .. . -... A A .... .. . .... .. .. . .. -e. OBMau. 0.00 o.... .. .. .. . 0 0.........B................0 ... 0 . ~: .001

Ba )a ..oa a...... .......... ...... =a..........A A............000........o :..:.aa ... . ..... . 0..............0. ... .. ........ 0 0.........B..................00.........0

lo - , - Oe - O-- - O , - ---- ---- --

Cn ... .... ..... . . . . . . ... . .... . .0..... .--..-....... .... 0 0..... ........ .......................Ba.... .. .. .. .. .. ...... ......... ... .... ... .... .. ....... 0 0. .. ..... . ..... ... .. ................... .. .. ............ . .............C

0............................ .. ...... .......... ......... 0 . .. ..... ..................... . . .. .. ..... .. ..... . ........... .........

0 .u............ 0............0000"CC 00000000 .... .... .... .... .... ... l.00.............C.~~

IeE)l l l l ~ l l ~ l l l l l l l -I I v(0)) E0 -! 1 I I I IGi t I i 1 1 1 1 1 1 1 1 1 1 i I

00. .* .0 ... 0000.0000 0000 0000............. 00..................00. • 0

00......................................... 0 0 0 0 0 0 0000 0000.. ......... ....................... .o C

S.. . .......... ............................................ .... .... .... ......... ......... .... ......... ................ .... ....a 0o

(00:: 4o : 0,00,....................... 0000......................00*0.............................0

0.. 0

C O.... . ........ .00. 1 ... 0ol

l~e. o,,. ,,. ,,. • ,,. eel .,.e e *0, • ,e , ,e ~ el ~ oe e~l• ,el e,, •ee, •,, o ,, , , -- ,le ll, eno

0..0...

0...

0000 000 0005 0000

11e 185 M8 95

0000 08

90 85 as 75

00

78 65 60 55 50 45 40 35 38 25 28 15 10 5

WesanghoýeEkpctnc~Copwaly aC-sr Ma. l0/17/2008 17:50:50

Page 57: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

CBE-C TUBES EXPANDED AT BAFFLE +POINT INSPECTIONAS TESTEDByron B2R14 CBE D5

2 18 TESTED 02C -/+ 2"

A 29 TESTED 03C AND 02C -/+ 2"

a 76 PLUGGED TUBE

1i 185 le 95 98 85 80 75 78 65 68 55 58 45 401 1 1 I2oo0#0o090A0Aq)A0A0TP0mu00 0900AOi#a00~0#A00c00A0A

350002f..35

2200*..

A*A.A*Af ... . to 0 'A..AýA ... ýA .. .P

38 25 20 15 18

2t 22 5

AOA. -A*A* A* :::: ý:::: 1::::A

o , ............ ....... ........... 0 ......... .... .... ....0 ....

. ........ ..... ....... . ..... A o.... . .... . .. ....... ......... ............

22B ::: ' ...- a -22_o ... .... 1... ..... 0 - u .... .... ...... o.o...... .... .... ...... .... .... .. a.

00. ).a . .0.................................................... ao....... ...... ..... ..... ... .. . .0.. . . 0n o

a...... ... 0,.......... -.. ,. 000... ........ A A ..... ... 0, 00..- ..- ..,, .,....O,..--,O0--... .. 00(. .. ... ,-... ......... 0 0... ..... 0 0.. ......- 0 0... -..... .... a .... 0.()o ... ... o

-) - ------ -..-- aa BC 8 ~- aes .m--00.....................O0O)000a .... a 0........000.................... .... .... ...... 00

00.................................. ....... . -a 0 0.. ..... .... .... ......... ............................00

0 . . . . . . . ... .... .. ,a ..... 0 0.... ................... ..................... 000........... .... ............. ......... 0 0......... .................................. .... ..... .....- 00

-* ------- -o o-me, oa oo0 G -0 -6P e * 6 -.................................. v0 .. .00.... .... ......... .... .... .... .............................

o~...0.............0 .................. 000000 000 0000.................. 0..... .......... .... ..00 1 oo.... ........ . .0 a..........,, .-.......... ,..,,oo . .0

0.......... al00000M000 )000().- ... -0

00. ..... , .. . 00..... .. ... .. ........... , * 0000, 0000 0000 0000 0000.-....-............. ..... 400 T,,7,00 ,00

o . .. .... .......... a.. . .. .. .. . . . . . . . . ..o.............................. ...... .a............

0 . . . . . .. ... . . . . . . . . . . . O.. ........... ...... ......................................................................................

... ... .. .... .... .... ........ .. . . . . . . . . .................................... .. . ...-a. .... .. .. .. .. .. ... . ... .. .. ..

0 ........ .......... .. ........ .. ...... .. ...a.0..................................................................................................................

.....oo. . o ......... ........ .... . ...... .. .. ..... ...... . .................. .o oo o ........... .@0 .

0.........0 0................. .000....................... . ......... 000..................... ..... a ... ..... 000....................0 0..o........0

0 ....... 0 ........................ ............T:... .... ..... ..... ... 0: 0 ............................. .... 000- ............. 0......0.....................00 .. ..... .... 000......I..... ......... .... ......... .... .... .... 00.... ......... ..................00

0.......................................................................................................................................................................

00................................................................................................................................................................0

45

48

35

38

25

20

15

18

5

000

1 0 0 0 00 0 0 00 00 0 0 0 00 0 00 5 0000 0000 0000 0000 300 00 00

118 185 188 95 98 85 88 75 78 65 68 55 58 45 48 35 38 25 28 15

0::::::ooe oooo

Westinghouse Eldcti Company LLC - ST Max lY17/2008 17:53:37

Page 58: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

CBE-D TUBES EXPANDED AT BAFFLE +POINT INSPECTIONAS TESTEDByron B2R14 CBE D5

2 20 TESTED 02C -/+ 2"

A 29 TESTED 03C AND 02C -/+ 2"

a 33 PLUGGED TUBE

11 105 16 95 90 85 86 75 7012000DOAOOAOOOOAOOA

2.-.220 -

00.. . .

'A A.

65pA OAO,

60AO

55 50 45 46 35 36cOOOa0Q00AOOAOOOOAOOOO0002I

25 20 15 1i 5

' A

aoOfA-Ai-A-ý .... f .... f ... 2ý2

0t::~ j:: :ý: ::ý: ::j: ::0220 .. 00

00..............A................0 0.......................0022 -.. ..-... ...... -... -......... .0 0 ... ......-...... 22

22 ........ ..... ..................... 0 0o o2...................... ........ 220 .................................... 0 0 ................ .................. ...

00.... ............. ........ ........ 0 0.............. ...... ............. O000 00.................................. 0 .... ..... ... .. .... . ... . 00....0 0 .00

a-.........(-oa............)oo000. ..... A A 00.........OO)O... -.. -.... ,... O .. no()a........00 .. --..... . .. .. 0) 0... .....'0 0 ....... 0 0....... .............. 0.......-

00o........................... .............000........0.()oo o .... 0 00.........o.o. . ..... 00

00........................................... 0 ..... ........ .... .........0 . ..0 ....................................... .... ..... .... ..... 0 0........................................ .... .... ....... a

00................ ........................... ..... .... ..... 0 0............................ ......... .... .... .... ....... 00

.............. ................. .......... o . . ......... 0 0. ....... ..... . .... ..... ........ .....

==0 == = == = == = == = ==,== = == = == = ==: 0 00= = = == = = •= : O =: • : =• , = ::: ¢,OO0....................................... .......... .... .... .....0ý 0.......................... ......... .... .... .... ............... 0

O o..--O0()..............00.................00000000( 00000000....................00................ -,-,o oO.O .. 00.(-...........---O0...00 -00........O.)O...)00... .0oO0 .. . . .00o.-..-. . ..........- 0000 0000 000000 000000.........................................

0..................................................... .... .... .... .......... ......... ......... .... .... .............................0

0.....4...........0....................0 0......... .... .... .... .... .... .... .... .... 0.... .... .... ... .... ... 00..... .... 0::ý

0 1 00..............................000..............................00............................

0 00

00. ... .... ............................................ .... ... 00

00 .. .. . .... ... ... .... . ... ... .... . .. .... ... ... .... . .. .. 0

G I -ee ~ ~ e e e e e ~ ~ ~ ~ e e e e e ee e e e ~ e e ~ e e e ~ e e e e e

45

40

35

30

25

20

15

5O...0 ...

0000

:::: 1:::: j:::: 1:::: j:::: 1:::: 1:::: j:::: 1:::: 1:::: j:::: 1:::: 1:::: j:::: 00

116 105 166 95 96 85 86 75 70 65 60 55 56 45 46 35 30 25

1000 010 000410 0 0410 0

20 15 16 5

Westnghos.Ec1ednc Company LLC - ST Ma 10/1712 17:55:59

Page 59: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

Attachment B.6

Special Interest +PointTM Inspection ScopeIncluding Hot Leg Dents and Dings

Page 34 of 44

Page 60: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - A SPECIAL INTEREST +POINT INSPECTIONS

Byron B2R14 CBE D5X 99 TUBE TESTED FOR SPECIAL

INTEREST WITH +POINT PROBESEE LIST FOR LOCATION(S)TESTED

a 154 PLUGGED TUBE

118 195 188 95 90 85 88 75 70 65 68I I I iaaasaaamaaaasaaagaaaag 55 50 45 48 35 30T a0 0 a01

25 20 15 1I 5

a00~:0

.. . . . .. . . ..

0on

3......... . .... I. .... a.

0 0 01.

DO0 0 ......... ~. ... ..laU.., *..o .......... . .. 0,* 0................... X**(..*.,.. .. o

a*...... .......... ......... .......... 0 0 ............ ..X ..-* ........... .......... maODoa. **o..... ........... . ...... . a .. .... 0 0 . . . . . .. 000X. .. ... . ... .... t. . o

00 * :.......o . ............... o ... 000. ....... 0 0 .......... .o OX - X.............. .. O ..... 0........... .... .............. 0...........0 0 ........... 0 OX.. X.... .............. OO .... aa

00-.......... ......... .... .... .... .... 0 00.... .... 0 0. ......... 00@ ... .. o.n... ....... a. . . ........................................... o ..................... .... ........... ..

O ..XX................. ...................-... 0 0...... ... .............. ... .... .... 0

oXX.. ... .. ...................... a.... o. o.....a.. . .. .. ooXX........................... .... .... ....... a a................................

XXa :XX . ..... .... .... ... X ...... .... .... ..... 0 0 .... .... .......... .... ................... .0XX XX...............................x....................0 0....................................................................0::: : : ::

~~- YGG 0 E)- -~--O -

oX. .. oo..............o.0 .- ... .-......0000)0000 00000000.)OOO ,,--,, , .0.OllO .............. m"" "*0

X0. * *.00 *. ....................... 00 00... 1 . .. * 0 .* (0). *.00 00 .00

` .o..., .... . . . ......... ....................... '. ` 0 1 00 0 T.bX.. ... o(

0.....................................00 o a mma oo 000.................... ........... ......0

................ . ................................................................................

o .. ........... ................................... ..... .. ... . ... .......... ........ .x

0....... 0 . . . *..... ..... X........ .... . ...* ....**. ........ .... -'..... ..... ...... .................... 0

O*.. *.**0O ()O......... . ... * .O O *** 0. -* *** * ..... .... 0O O 0 *. *. * ... -..** * * ***•**)O. .... •.... .... ... *0()0- ... * *.00.. ..... ..... . ................................ ......... .... .. oo .0............................... o

0o.. ..... . ......................... 0000...... .... . ... 000.......... ..... .............. o•0 ............................... ............... 0

0 *0 a...0

0000 0000 OOOX 000010000

118 105 188 95

~x

ý009o )0000 ý00;0' )0000

0

oooo0oooo0oooo 0;0000 ý0000 OoX0oo0$0000X$0oX 000x 0 0000~0000/~00OX00$0000

98 85 88 75 70 65 60 55 50 45 48 35 30 25 20 15 18 5

Wwtinghoýse/.di Cowpany LLC -ST Mw 1011712008 00:58:45

Page 61: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - A Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:35

+ ... ÷ .. . ÷ . ..... . + . .. + ... ÷.... .... ÷ ... ÷. ----------- --- -.-- - - - - ---. . ..- +----.. ...-- . ..- .+ ......- - .. ...- ...... ..

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL Ll----------------------------+--------+-----+-----+-----+-----+----+---+.- - + ----- +..---.-- -+- +--------

4 3 NHD TEH TSH .610 NPSNM 9 HN4 3 2.35 183 ONG P1 09C 19.22 11H TEC .590 SBUCC 60 Cl4 3 2.05 185 ONG P1 1MH 40.29 11H TEH .610 TBATC 85 HI4 3 6.01 177 ONG P1 1MH 40.97 11H TEH .610 TBATC 85 HI4 3 NDF 2 10H 40.97 iMN 11H .610 NPSNM 93 HII

1 8 3 3.04 185 ONG P1 1MH 17.18 TEH TEC .610 ZBAZC 6 CI8 3 NOD TEH TSH .610 NPSNM 11 HI8 3 NDF 2 10H 17.18 10H 11H .610 NPSNM 31 HI8 3 NDF 2 10H 17.18 10H 11H .610 NPSNM 81 HI

I5 5 5.83 178 ONG P1 10H 41.43 TEH TEC .610 ZBAZC 6 Cl5 5 17.86 183 DNT P1 11H -. 22 TEH TEC .610 ZBAZC 6 Cl5 5 5.21 180 ONG P1 11H 7.68 TEH TEC .610 ZBAZC 6 Cl5 5 5.83 180 ONG P1 11H 9.09 TEH TEC .610 ZBAZC 6 CI5 5 3.92 183 ONG P1 11H 10.98 TEH TEC .610 ZBAZC 6 Cl5 5 3.01 180 ONG PI 11H 12.57 TEH TEC .610 ZBAZC 6 CI5 5 4.32 182 ONG P1 11H 14.32 TEH TEC .610 ZBAZC 6 CI5 5 2.60 182 ONG P1 11H 15.53 TEH TEC .610 ZBAZC 6 Cl5 5 NDF 2 10H 41.43 1MH 11H .610 NPSNM 31 HI5 5 NOD TEH TEH .610 NPSNM 75 HI5 5 NDF 2 10H 41.43 1H 11H .610 NPSNM 81 HI

I5 6 3.71 176 ONG P1 1MH 30.35 TEH TEC .610 ZBAZC 8 CI5 6 2.91 177 ONG P1 11H 12.36 TEH TEC .610 ZBAZC 8 Cl5 6 4.63 178 ONG P1 11H 13.37 TEH TEC .610 ZBAZC 8 CI5 6 NDF 2 1MH 30.35 10H 11H .610 NPSNM 31 HI5 6 NDF 2 TEH .49 TEH TEH .610 NPSNM 77 HI5 6 NDF 2 10H 30.35 10H 11H .610 NPSNM 81 HI

I1 7 NOD 11C TEC .610 ZBAZC 18 CI1 7 NOD TEH TEH .610 NPSNM 77 HI1 7 3.44 176 DNT P1 11H .19 11H TEH .610 TBATC 87 HI1 7 NDF 2 11H .19 11H 11H .610 NPSNM 95 HII

12 8 3.00 176 ONG P1 1MH 34.44 TEH TEC .610 ZBAZC 8 CI12 8 8.30 178 ONG P1 10H 35.67 TEH TEC .610 ZBAZC 8 CI12 8 2.56 174 DNT Pt 11C .62 TEH TEC .610 ZBAZC 8 Cl12 8 NDF 2 1MH 34.44 1MH 11H .610 NPSNM 31 HI12 8 NDF 2 10H 35.67 1MH 11H .610 NPSNM 31 HI12 8 NHD TEH TEH .610 NPSNM 75 HI

I17 9 3.05 184 ONG P1 08H 10.90 TEH TEC .610 ZBAZC 6 CI17 9 NDF 2 08H 10.90 08H 09H .610 NPSNM 29 HI17 9 NDF 2 TEH .49 TEH TEH .610 NPSNM 77 HI17 9 NDF 2 08H 10.90 08H 09H .610 NPSNM 81 HI

I2 10 NOD 11C TEC .610 SBACC 12 CI2 10 NOF 2 TEH .49 TEH TEH .610 NPSNM 77 HI2 10 3.47 184 ONG P1 03H 4.82 11H TEH .610 TBATC 85 HI2 10 2.76 184 ONG P1 03H 22.49 11H TEH .610 TBATC 85 HI2 10 NDF 2 03H 4.82 03H 05H .610 NPSNM 95 HI

I22 11 3.70 183 ONG P1 01H 5.88 TEH TEC .610 ZBAZC 18 CI

1 22 11 3.17 105 INR 6 03H 15.90 TEH TEC .610 ZBAZC 18 CII 22 11 2.18 75 MBM 6 07H 17.34 TEH TEC .610 ZBAZC 10 CII 22 11 2.43 175 ONG P1 09H 14.50 TEH TEC .610 ZBAZC 10 CII 22 11 13.29 177 ONG P1 08C 22.78 TEH TEC .610 ZBAZC 10 CII 22 11 18.87 178 ONG P1 08C 41.08 TEH TEC .610 ZBAZC 10 CII 22 11 NDF 2 01H 5.88 01H 03H .610 NPSNM 29 HI

22 11 NOD TEH TEH .610 NPSNM 77 HI22 11 NDF 2 01H 5.88 01H 03H .610 NPSNM 81 HI

I2 12 NOD 11C TEC .610 SBACC 12 CI2 12 NHD TEH TEH .610 NPSNM 77 HI2 12 NHD lC 11H .580 ZPUMB 80 CI2 12 3.01 186 ONG P1 01H 18.85 11H TEH .610 TBATC 85 HI2 12 NDF 2 01H 18.85 01H 03H .610 NPSNM 95 HI

I21 13 4.48 177 ONG P1 08H 19.00 TEH TEC .610 ZBAZC 10 CI21 13 3.22 179 ONG P1 08H 29.85 TEH TEC .610 ZBAZC 10 CI21 13 .28 157 DFS 1 08C 11.50 TEH TEC .610 ZBAZC 10 C121 13 NDF 2 08H 18.90 08H 09H .610 NPSNM 29 HI21 13 NDF 2 08H 29.85 08H 09H .610 NPSNM 29 HI21 13 NOD TEH TEH .610 NPSNM 77 HI21 13 NOF 2 08H 29.85 08H 09H .610 NPSNM 81 HI

I20 20 2.32 185 ONG P1 05H 22.91 TEH TEC .610 ZBAZC 10 CI20 20 2.64 185 ONG P1 08H 1.88 TEH TEC .610 ZBAZC 10 CI20 20 2.15 184 ONG P1 08H 3.97 TEH TEC .610 ZBAZC 10 CI............. +...4-+.... +....+....+....+.........+..................+.......---- . . +....+....+....+......+......+......--.+.

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LIS.... .. .. ......... + ....--- .---... +...- ..+... + . . .+ . . . + . + -+--- -+-- +....... ....... ....-- -- ... + .... + .. +.....-----. -- +

1

Page 62: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - A Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:35

+ .... - .... - ... .- ---- + ---- + ---- + .--- + ---- + ..- -+ --- +- -- + -- + - +- - -+ .--- + ---- + .--- + - -+ - -+ - +. -+

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+.. . .... +.. . .. +-----------...-+----- ..--.. +...-------+..---. - -+-....+-.. .+.----+----+----+-- -- +

20 20 2.46 185 ONG P1 08H 5.75 TEH TEC .610 ZBAZC 18 CI20 20 3.52 186 ONG P1 08H 6.56 TEH TEC .610 ZBAZC 10 CI20 20 2.36 187 ONG P1 08H 10.89 TEH TEC .610 ZBAZC 10 CI20 20 NDF 2 08H 6.56 08H 09H .610 NPSNM 29 HI20 20 NOD TEH TEH .610 NPSNM 71 HI20 20 NDF 2 08H 6.56 08H 09H .610 NPSNM 81 HI

3333333333333333

1111

161616

16

36363636

111111

2020202020202020

21212121

22222222

22222222

272727

5.09 1752.19 81

.44 1422.57 1752.82 171

ONGMBMDFSDNTONGNDFNDDNDF

NODNOD

5.35 176 DNTNDF

3.37 184 ONGNDFNODNDF

3.47 182 DNGNDFNODNDF

3.19 184 DNGNOFNDF

3.35 179 ONGNDDNDF

3.45 185 DNG2.54 172 ONG

NODNDF

3.23 175 DNTNODNOD

3.03 183 DNG2.48 184 ONG

NDF

P1 08H6 08H1 09H

P1 iMNP1 iON

2 08H

2 08H

P1 11H2 11H

P1 09H2 09H

2 09H

P1 03H2 03H

2 03H

2.7610.485.36-. 29

36.582.76

2.76

.49

.49

TEH TECTEH TECTEH TECTEH TECTEH TEC08H 09HTEH TEH08H 09H

11C TECTEH TEH11H TEH11H 11H

TEH TEC09H 101TEH TEH09H 101

TEH TEC03H 051TEH TEH03H 05H

.610 ZBAZC

.610 ZBAZC

.610 ZBAZC

.610 ZBAZC.610 ZBAZC.610 NPSNM.610 NPSNM.610 NPSNM

.610 ZBAZC

.610 NPSNM

.610 TBATC

.610 NPSNM

.610 ZBAZC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 ZBAZC

.610 NPSNM

.610 NPSNM

.610 NPSNM

18 C18 C10 C18 C10 C29 H71 H81 H

10 C57 H87 H95 H

10 C29 H57 H81 H

10 C29 H71 H81 H

3.923.92

3.92

8.698.69

8.69

P1 08H 30.702 TEH .492 08H 30.70

P1 09H 5.13

2 09H 5.13

TEH TEC .610 ZBAZC 18 CTEH TEH .610 NPSNM 51 H08N 09H .610 NPSNM 81 H

P1 108P1 101-

2 101

P1 11C

40.5941.59

40.59

.43

P1 03H 15.09P1 07H 41.71

2 03H 15.09

4.518.552.25

.182.212.442.67

180181180148

67182180

NODONGONGDNTDFSMBMONGDNGNDFNDFNDF

NOD3.00 187 ONG3.59 181 ONG

NODNDF

NODNOD

3.30 182 DNTNDFNDF

NDFNDF

5.11 183 DNTNDF

P1 10iP1 10HP1 11H

1 10C6 09C

P1 09CP1 07C

2 10H2 10H2 11H

P1 03HP1 10H

2 03H

P1 11H2 11H2 11H

2 TEH2 TEH

P1 01H2 01H

40.9241.91

.2135.9211.5712.1138.5040.9241.91

.21

12.858.44

12.85

.48

.48

.48

10.1910.35

-. 25-. 25

TEH TEC .610 ZBAZC 14 CITEH TEH .610 NPSNM 53 HI09H 10N .610 NPSNM 81 HI

ITEH TEC .610 ZBAZC 14 CITEH TEC .610 ZBAZC 14 Cl

TEH TEH .610 NPSNM 53 HI10H 11H .610 NPSNN 81 HI

I11C TEC .610 ZBAZC 10 CITEH TEH .610 NPSNM 53 HI11C 11H .580 ZPUMB 78 CI11H TEH .610 TBATC 85 HI11H TEH .610 TBATC 85 NI03H 05H .610 NPSNM 95 HI

ITEH TSH .610 NPSNM 9 HITEH TEC .610 ZBAZC 14 CITEH TEC .610 ZBAZC 14 CITEH TEC .610 ZBAZC 14 CITEH TEC .610 ZBAZC 14 CITEH TEC .610 ZBAZC 14 CITEH TEC .610 ZBAZC 14 CITEH TEC .610 ZBAZC 14 CI10i 11H .610 NPSNM 81 HI10H 11H .610 NPSNM 81 HIiN 11H .610 NPSNM 81 NI

ITEH TSH .610 NPSNM 5 HITEH TEC .610 ZBAZC 18 CITEH TEC .610 ZBAZC 18 CITEC TEC .610 NPSNM 68 CI03H 05H .610 NPSNM 93 HI

I11C TEC .610 ZBAZC. 10 CITEH TEH .610 NPSNM 53 NI11H TEH .610 TBATC 85 HI11H 11H .610 NPSNM 93 HI11H 11H .610 NPSNM 95 HI

7777

37373737

TEH TSHTEH TSHTEH TEC01H 01H

.610 NPSNM

.610 NPSNM

.610 ZBAZC

.610 NPSNM

11 H11 H18 C81 H

+- - - - - ... .---- - + ---- + ---- + ---- + ---- + ---- + - - - +- -. .-- +- -+ -. -+- -- - + .... - ---- + ---- + - -+ - -+ --- -"

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL L+. . . . . . .+. . . .. +---------- - . .+ . .+ . . . . . . ..-----+-.+ . .. +. ..-- - -+ - -- + . . . ..----+- . . +.----..--- .+- ...... +.....-. ...

2

Page 63: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - A Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:35

+. . . .+. . . . . .. .+. .+ . .+-----------------..------- +.. .. .. . .. .. . +.. ...----- - - -+-. . .---- +----. .. +.. . . ..----- +-......+- ...... .

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL Lj---------------------- +--------+-----+-----+-----+-----+----+---+--+ - + - -----+----+-----+ - - +--------

I 40 38 3.54 177 MNG P1 05H 1.25 TEH TEC .610 ZBAZC 18 CI40 38 2.34 62 MBM 6 09C 38.50 TEH TEC .610 ZBAZC 18 CI40 38 NMD TEH TEH .610 NPSNM 53 HI40 38 NDF 2 05H 1.25 05H 07H .610 NPSNM 81 HI

I45 38 3.04 184 ONG P1 01H 26.54 TEH TEC .610 ZBAZC 18 CI45 38 NMD TEH TEH .610 NPSNM 71 HI45 38 NDF 2 01H 26.54 01H 03H .610 NPSNM 81 HI

I1 39 NOD 11C TEC .610 ZBAZC 10 Cl1 39 NDF 2 TEH .49 TEH TEH .610 NPSNM 47 HI1 39 5.24 184 DNT P1 11H -. 08 11H TEH .610 TBATC 85 HI1 39 NDF 2 11H -. 08 11H 11H .610 NPSNM 93 HI

I36 39 3.22 65 MBM 6 AV2 9.92 TEH TEC .610 SBACC 20 CI36 39 NOD TSH TSH .610 NPSNM 51 HI36 39 NOD TEH TEH .610 NPSNM 51 HI

I37 39 NOD TEH TEC .610 SBACC 20 CI37 39 NMD TEH TEH .610 NPSNM 51 HI37 39 NMD TSH TSH .610 NPSNM 51 HII38 39 NMD TEH TEC .610 SBACC 20 CI38 39 NMD TEH TEH .610 NPSNM 51 HI38 39 NMD TSH TSH .610 NPSNM 51 NI

I39 39 NOO TEH TEC .610 SBACC 20 CI39 39 NMD TEH TEH .610 NPSNM 51 HI39 39 NMD TSH TSH .610 NPSNM 51 HII40 39 NMD TEH TEC .610 SBACC 20 CI40 39 NMD TSH TSH .610 NPSNM 51 NI40 39 NDF 2 TEH .49 TEH TEH .610 NPSNM 51 HI

I41 39 NMD TEH TEC .610 SBACC 20 CI41 39 NMD TEH TEH .610 NPSNM 51 HI41 39 NMD TSH TSH .610 NPSNM 51 HII36 40 NMD TEH TEC .610 ZBAZC 22 CI36 40 NMD TEH TEH .610 NPSNM 53 HI36 40 NMD TSH TSH .610 NPSNM 53 HI

I37 40 NMD TEH TEC .610 ZBAZC 22 CI37 40 NOD TEH TEH .610 NPSNM 53 HI37 40 NMD TSH TSH .610 NPSNM 53 HII38 40 NMD TEH TEC .610 ZBAZC 22 CI38 40 NMD TEH TEH .610 NPSNM 53 HI38 40 NMD TSH TSH .610 NPSNM 53 HII39 40 2.58 183 ONG P1 AV1 20.75 TEH TEC .610 ZBAZC 22 CI39 40 NMD TSH TSH .610 NPSNM 53 HI39 40 NDF 2 TEH 2.72 TEH TEH .610 NPSNM 53 HI

I40 40 3.38 189 ONG P1 07C 4.50 TEH TEC .610 ZBAZC 22 CI40 40 NOD TEH TEH .610 NPSNM 53 HI40 40 NMD TSH TSH .610 NPSNM 53 HI

I41 40 3.78 80 MBM 6 09H 40.79 TEH TEC .610 ZBAZC 22 CI41 40 NMD TEH TEH .610 NPSNM 53 HI41 40 NOD TSH TSH .610 NPSNM 53 HII

1 41 NOD 11C TEC .610 ZBAZC 6 CI1 41 NMD TEH TSH .610 NPSNM 11 HI1 41 NDF 2 TEC .50 TEC TEC .610 NPSNM 68 CI1 41 NOD 11C 11H .580 ZPUMB 80 CI1 41 3.16 182 DNT P1 11H -. 11 I1H TEH .610 TBATC 85 HI1 41 NDF 2 11H -. 11 11H 11H .610 NPSNM 93 HI

I17 41 5.23 180 ONG P1 10i 33.17 TEH TEC .610 ZBAZC 4 CI17 41 4.34 178 0NG P1 10i 34.44 TEH TEC .610 ZBAZC 4 CI17 41 4.55 179 DNT P1 11C .45 TEH TEC .610 ZBAZC 4 CI17 41 2.93 175 DNG P1 10C 39.32 TEH TEC .610 ZBAZC 4 CI17 41 NDF 2 TEH 8.46 TEH TSH .610 NPSNM 7 HI17 41 NDF 2 TEH 12.75 TEH TSH .610 NPSNM 7 HI17 41 NDF 2 10i 33.17 10H 11H .610 NPSNM 31 HI17 41 NDF 2 10i 33.17 10H 11H .610 NPSNM 81 HI

I

36 43 NOD TEH TEC .610 SBACC 28 CI36 43 RBD TEH TEH .610 NPSNM 43 HI

... +...........+....-+.-...+ .... +.-...+ .... + ...... + ...... +_-+ .... + .... +.... +.... +.... +.... +.... ...+. -

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ . .+ . .+ . . .. .+.. .+.. .+.. .+.. .+.. .+.. . . .. +..----------..-- - - - . +--- . . .. + ....- ... +... . .... .... ..--.---- +. ...... ......-------

3

Page 64: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - A Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:35

+ .. .. +. .. +...+ .. --------- ...- +----.. + ....----+ - - -+.--- +--. - + .....-- + ... ..----.----- + .. + ...----- -+- -.... +- ... .-I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ .. +...+.... . .. - .. + .. +...+.. ---------......... +.....---.--- -- - +- -+- ....... +......... ......------.- +- ...... +.. •.- . _+

NDDNDD

NDDNDDNDD

NDDNDDNOD

NODNODNOD

NODNODNDD

2.14 47 MBMNODNOD

3.72 179 DNG2.46 73 MBM

NDFNODNDF

3.19 164 DNGNDFNDONOF

3.41 177 DNG2.18 181 DNT

NDFNDDNDF

NDDNOD

5.54 184 DNTNDF

.26 121 DFS6.67 178 ONG3.28 182 ONG2.57 174 ONG4.08 174 DNG2.24 174 ONG

NDFNDF

2.67 185 DNG3.16 186 DNT

NODNDF

.71 150 DFS

.30 163 DFSNDD

.09 108 VOL

.22 288 PCT

.16 278 PCT

.14 88 VOL

10.81 181 DNT12.09 181 DNT

NDFNDD

4.74 78 MBM2.57 79 MBM5.78 180 DNT

NDF

4.16 175 DNT2.98 172 DNT

NODNOD

6 AV3 23.78

P162

2

P12

2

P1P1

2

2

05H09C05H

05H

08H08H

08H

03HAV103H

03H

16 5216 52

6666

45454545454545

11111111

1111

59595959

67676767676767

7070707070707070

75757575

P1 11H2 11H

1 10HP1 MONP1 10HP1 1MHP1 10HP1 10C

2 TEH2 MON

P1 03HP1 11H

2 11H

1 02C1 02C

P4 02C23 2 02C19 2 02C

P4 02C

P1 07CP1 07C

2 TEH

6 08H6 09H

P1 11H2 11H

P1 07CP1 07C

19.77* 3.7819.77

19.77

3.663.66

3.66

17.13.49

17.13

17.13

.44

.44

27.1039.5540.0640.5241.2237.81

.5040.06

27.18.66

.66

1.223.04

1.181.222.882.99

-. 27.74.49

13.2731.62

.52

.52

-. 28.73

TEH TEHTSH TSH

TEH TECTEH TEHTSH TSH

TEH TECTEH TEHTSH TSH

TEH TECTEH TEHTSH TSH

TEH TECTEH TEHTSH TSH

TEH TECTEH TEHTSH TSH

TEH TECTEH TEC05H 07HTEH TEH05H 07H

TEH TEC08H 09HTEH TEH08H 09H

TEH TECTEH TEC03H 05HTEH TEH03H 05H

11C TECTEH TSH11H TEH11H 11H

TEH TECTEH TECTEH TECTEH TECTEH TECTEH TECTEH TSH10H 11H

TEH TECTEH TECTEH TEH11H 11H

TEH TECTEH TECTEH TEH02C 03C

.27 .36 55 02C 03C.18 .35 53 02C 03C

02C 03C

11C TEC11C TECTEH TEH11C 11H11H TEH11H TEH11H TEH11H 11H

11C TEC11C TECTEH TEH11C 11H

.610 NPSNM

.610 NPSNM

.610 SBACC

.610 NPSNM

.610 NPSNM

.610 SBACC

.610 NPSNM

.610 NPSNM

.610 SBACC

.610 NPSNM

.610 NPSNM

.610 SBACC

.610 NPSNM

.610 NPSNM

.610 SBACC

.610 NPSNM

.610 NPSNM

.610 ZBAZC

.610 ZBAZC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 ZBAZC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 ZBAZC

.610 ZBAZC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 SBACC

.610 NPSNM

.610 TBATC

.610 NPSNM

.610 ZBAZC

.610 ZBAZC

.610 ZBAZC

.610 ZBAZC

.610 ZBAZC

.610 ZBAZC

.610 NPSNM

.610 NPSNM

.610 ZBAZC

.610 ZBAZC

.610 NPSNM

.610 NPSNM

.610 SBACC

.610 SBACC.610 NPSNM.610 NPSNM.610 NPSNM.610 NPSNM.610 NPSNM

.610 ZBAZC

.610 ZBAZC

.610 NPSNM

.580 ZPUMB

.610 TBATC

.610 TBATC

.610 TBATC

.610 NPSNM

.610 SBACC

.610 SBACC

.610 NPSNM

.580 ZPUMB

57 HI57 HI

28 CI77 H77 HI

28 CI77 H77 HI

28 CI77 H77 HI

28 CI77 HI77 HI

28 CI77 HI77 HI

6 CI6 CI

31 HI45 HI49 HN

6 CI31 HI45 HI81 HI

2 CI2 CI

31 HI41 HI49 HI

12 CI13 HI87 HI95 HI

2 CI2 CI2 CI2 CI2 CI2 CI

15 HI31 HI

62 CI62 CI63 HI93 HI

40 CI40 Cl69 HI76 CI76 CI76 CI76 CI

62 CI62 CI65 HI78 CI91 HI91 HI91 HI97 HI

46 CI46 CI65 HI78 CI

-- - - - - .- - --- + - --- + - --- + ---- + ---- + --- +- - .. --- +- -+ - - + - - + ---- + .. -- + ---- + - - +- +- --,-

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ .. .. ...... ,-- .. +.. +..-------- +----. ----+ ----.... --- +, ,1. ,I--+-. .+-.... +.----+----+----+- - -- +

4

Page 65: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - A Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:35

+ . .+. . . +. . . .+. . . .--------- - --- +---- . + .+.. . .. .. . .. . .. . .------ + .. . . . . ...-----..+ ----+-... . .--- -.+ .. .. +- . .. . .-I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ . .+.. .+. .. . . . . .. . .---------....+-- .-------- ..-- - -- --......... +-.-+.-... .+ -.... +.... ...----. ..----.---- .+- .. . .+..- . .-

5.58 172 DNTNDF

5.55 182 ONGNODNDF

3.03 175 ONGNODNDF

3.06 185 ONG2.31 185 ONG

NODNDF

NDF2.17 180 ONG

NODNDF

NODRBD

3.10 173 ONGNODNDF

NOD3.28 178 ONG3.12 181 ONG3.99 178 ONG4.76 175 ONG5.07 180 ONG2.68 177 ONG

10.01 181 DNGNODNDFNDF

3.42 181 ONG2.33 185 ONG2.03 170 DNT2.11 184 ONG

NDFNDF

3.03 179 DNTNODNDF

2.61 178 ONG3.22 180 ONG5.66 181 ONG3.07 175 ONG5.25 180 ONG3.15 69 MBM

NODNDF

3.15 188 ONGNODNDF

NDFNODNOD

3.61 179 ONGNDF

NDFNDFNDFNODNDF

1.42 177 INR5.34 178 ONG7.47 178 DNT3.31 174 DNT

NDFNDF

P1 11H2 11H

P1 1ON

2 101

P1 101

2 1ON

P1 05HP1 07H

2 05H

P1 TEHP1 101

2 101

.17

.17

41.74

41.74

41.87

41.87

9.6620.03

9.66

1.6415.73

15.73

P1 10H 41.63

2 1OH 41.63

P1 MONP1 1OH

P1 10CP1 10CP1 10CP1 10CPl 10C

2 10H2 1OH

P1 07HP1 09HPl 11CP1 10C

2 TEH2 07H

P1 10H

2 1ON

P1 10HP1 11HP1 11HP1 10CP1 10C

6 09C

2 11H

P1 08H

2 08H

2 TEH

P1 05H2 05H

2 TEH2 TEH2 TEH

2 TECP1 101P1 101P1 11HP1 11H

2 10H2 11H

9.0814.959.59

12.0513.1214.3815.03

9.0814.95

1.6129.92

-. 3926.24

.481.61

.60

.60

25.67.93

2.0437.5138.5531.54

.93

23.17

23.17

9.93

20.1220.12

.4818.7320.05

.5040.7641.84

-. 50.30

41.84-. 50

11H TEH11H 11H

TEH TECTEH TEH101 11H

TEH TECTEH TEH101 11H

TEH TECTEH TECTEH TEH05H 07H

TEH TSHTEH TECTEC TEC101 11H

TEH TSHTEH TSHTEH TECTEC TEC101 11H

TEH TSHTEH TECTEH TECTEH TECTEH TECTEH TECTEH TECTEH TECTEC TEC101 11H1MH 11H

TEH TECTEH TECTEH TEC'TEH TECTEH TEH07H 08H

TEH TECTEH TEH101 101

TEH TECTEH TECTEH TECTEH TECTEH TECTEH TECTEH TEH11H 11H

TEH TECTEH TEH08H 09H

TEH TSH11H TECTEC TEC11H TEH05H 07H

TEH TSHTEH TSHTEH TSH11C TECTEC TEC11H TEH11H TEH11H TEH11H TEH101 11H101 11H

.610 TBATC

.610 NPSNM

.610 SBACC

.610 NPSNM

.610 NPSNM

.610 ZBAZC

.610 NPSNM

.610 NPSNM

.610 SBACC

.610 SBACC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 SBACC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 SBACC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 SBACC

.610 SBACC

.610 SBACC

.610 SBACC

.610 SBACC

.610 SBACC

.610 SBACC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 SBACC

.610 SBACC

.610 SBACC

.610 SBACC

.610 NPSNM

.610 NPSNM

.610 SBACC

.610 NPSNM

.610 NPSNM

.610 SBACC

.610 SBACC

.610 SBACC

.610 SBACC

.610 SBACC

.610 SBACC

.610 NPSNM

.610 NPSNM

.610 SBACC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.590 SBUCC

.610 NPSNM

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 SBACC

.610 NPSNM

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 NPSNM

.610 NPSNM

91 HI97 HI

142 CI65 HI95 HI

144 CI67 HI93 HI

I42 CI42 Cl

67 HI93 HI

117 HI46 CI70 Cl93 HI

17 HI19 HI40 CI70 CI95 HI

19 HI46 CI46 CI46 CI46 CI46 CI46 CI46 CI70 CI93 HI93 HI

54 C54 Cl54 Cl54 Cl

65 HI93 HI

38 CI69 HI93 HI

54 C~54 CI54 Cl54 Cl54 Cl54 Cl

67 NI93 NI

38 CI67 HI93 Hi

21 N60 CI

72 CI89 NI97 HI

21 HI21 N21 HI46 CI72 CI91 HI91 HI91 N91 HI97 HI97 HI

CAL LI

46.+..

+ .... - .... - ... .- --- - + ---- + ---- + ---- + .. --- + ---- + -- + -- +- - + -.---- +----+----+ - + - 4--- -- - -- - - - -- - - ....

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE+..+. .+ .. . .+ . . .----------. +---. .---- .----+----.+...............- +. ...----- -+ -+- . +----.+.----..+ ---- +-.....+-.... ..

5

Page 66: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - A Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:35

+.. .. +.....+.. .. +.. -----------.-....-------- ..-----+- --.--- +--... +--+. . . ---- ... + ...----+---...---.+-......+...- .

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+. . . .+. . . . . . .+. .+ . .+-----------..--....------- . .. . . . . .. . . ..------ - - - -.--- +- . . .+----- + . ..----+ -- --..--- + -.. ... +- ......

1 90 NDF 2 11H .30 10H 11H .610 NPSNM 97 HI

18 93 3.28 186 DNG P1 01H 1.29 TEH TEC .610 SBACC 54 CI18 93 .52 149 DFS 1 07H 2.46 TEH TEC .610 SBACC 54 CI18 93 2.58 171 DNT P1 09H -. 05 TEH TEC .610 SBACC 54 CI18 93 NOD TEH TEH .610 NPSNM 67 HI18 93 NDF 2 01H 1.29 01H 03H .610 NPSNM 97 HI

I26 95 8.03 182 ONG P1 10H 42.16 TEH TEC .610 SBACC 46 CI26 95 3.09 185 DNT P1 11H -. 34 TEH TEC .610 SBACC 46 CI26 95 .21 121 DSS P1 liC -. 52 TEH TEC .610 SBACC 46 CI26 95 2.66 173 DNT P1 liC .51 TEH TEC .610 SBACC 46 CI26 95 NOD TEH TEH .610 NPSNM 73 HI26 95 NDF 2 11H -. 34 11H 11H .610 NPSNM 93 HI

I1 181 NOD 11C TEC .610 SBACC 46 CI1 101 NOD TEH TEH .610 NPSNM 71 HI1 101 5.78 183 DNT P1 11H -. 21 11H TEH .610 TBATC 89 HI1 101 NDF 2 11H -. 21 11H 11H .610 NPSNM 97 HI

I18 101 5.12 179 DNG P1 10H 25.61 TEH TEC .610 SBACC 54 CI18 101 4.29 177 ONG P1 10H 26.20 TEH TEC .610 SBACC 54 CI18 101 4.00 177 ONG P1 1MH 26.95 TEH TEC .610 SBACC 54 CI18 101 5.51 179 ONG P1 101- 27.97 TEH TEC .610 SBACC 54 CI

18 101 6.04 181 DNT P1 liC -. 08 TEH TEC .610 SBACC 54 CI18 101 12.61 181 ONG P1 10C 23.34 TEH TEC .610 SBACC 54 CI18 101 NOD TEH TEH .610 NPSNM 73 HI18 101 NDF 2 10H 25.61 10H 11H .610 NPSNM 95 HI18 101 NDF 2 10H 27.97 10H 11H .610 NPSNM 95 HI

I

26 103 5.17 183 DNG P1 08C 5.62 TEH TEC .610 SBACC 46 CI26 103 .42 144 DFS 1 03C 9.51 TEH TEC .610 SBACC 46 CI26 103 NOD TEH TEH .610 NPSNM 73 HI26 103 NDD TSH TSH .610 NPSNM 83 HI

27 103 NDD TEH TEC .610 ZBAZC 48 CI27 103 NOD TEH TEH .610 NPSNM 73 HI27 103 NOD TSH TSH .610 NPSNM 83 HI

28 103 NOD TEH TEC .610 SBACC 46 CI28 103 NDD TEH TEH .610 NPSNM 73 HI28 103 NOD TSH TSH .610 NPSNM 83 HI

29 103 1.94 184 INR P1 liC .20 TEH TEC .610 ZBAZC 44 CI29 103 NOD TEH TEH .610 NPSNM 73 HI29 103 NOD TSH TSH .610 NPSNM 83 HI

30 103 1.95 0 PCT 24 P2 AV2 .14 TEH TEC .610 SBACC 42 CI30 103 NOD TEH TEH .610 NPSNM 73 HI30 103 NOD TSH TSH .610 NPSNM 83 HII31 183 1.65 8 PCT 24 P2 AV2 .8 TEH TEC .618 ZBAZC 44 CI31 103 1.79 0 PCT 25 P2 AV3 .00 TEH TEC .610 ZBAZC 44 CI31 103 NOD TEH TEH .610 NPSNM 73 HI31 103 NOD TSH TSH .610 NPSNM 83 HI

I17 104 9.50 181 ONG P1 1MH 14.30 TEH TEC .610 ZBAZC 56 CI17 104 NDF 2 TEH 2.74 TEH TEH .610 NPSNM 71 HI17 104 NDF 2 10H 14.30 10H 11H .610 NPSNM 95 HI

I26 104 NDD TEH TEC .610 SBACC 46 CI26 104 NOD TEH TEH .610 NPSNM 71 HI26 104 NOD TSH TSH .610 NPSNM 83 HI

I27 104 1.10 0 PCT 19 P2 AV2 .00 TEH TEC .610 ZBAZC 48 CI27 104 NOD TEH TEH .610 NPSNM 71 HI27 104 NOD TSH TSH .610 NPSNM 83 HI

I28 104 1.23 0 PCT 19 P2 AV4 .00 TEH TEC .610 SBACC 46 CI28 104 NOD TEH TEH .610 NPSNM 71 HI28 104 NOD TSH TSH .610 NPSNM 83 HI

I29 104 .61 0 PCT 13 P2 AV3 .00 TEH TEC .610 ZBAZC 44 CI29 104 NOD TEH TEH .610 NPSNM 71 HI29 104 NOD TSH TSH .610 NPSNM 83 HI

I30 104 .14 77 DFS 1 10H 38.99 TEH TEC .610 SBACC 42 CI30 104 1.30 0 PCT 19 P2 AV2 .14 TEH TEC .610 SBACC 42 CI30 104 NOD TEH TEH .610 NPSNM 71 HI30 104 NOD TSH TSH .610 NPSNM 83 HI

+ .... .... --"VOLT- +...----------+--- + .. +..+.... . .'----+.....-- ----- +- .... +.------+- .+ .. +----.-- -.. --- +-....+-...... +I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+.. ..-..... + .. +.. .. +---------........---+----. ..-------+..---.+--+-......+....-..+.----+----+---.+- +-+-

Page 67: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - A Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10117/2008 01:00:35

----- ----- ------------+--------+-----+-----+-----+-----+----+---+--+ - + - ---- + -----+ -----+ - -- ------- -

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ .. . +... + . ... ... ÷ . .. +... ÷ ... .. . +... - _-.+.- .... . +... ...----------+- L -------- --- -------------- +...-.+ -. .+ -. + -. . +

31 10431 10431 10431 10431 104

26 10526 10526 10526 105

27 10527 10527 10527 10527 10527 105

30 10530 10530 10530 105

25 10625 10625 10625 106

26 10626 10626 10626 10626 106

27 10627 10627 10627 10627 10627 10627 106

28 10628 10628 106

20 10720 10720 10720 107

24 10724 10724 10724 10724 10724 10724 10724 10724 107

25 10725 10725 107

26 10726 10726 10726 10726 10726 107

25 10825 10825 108

22 10922 10922 109

2.52 177 ONG2.52 177 DNT3.97 181 ONG

NDDNDD

NODNODNODNOD

.99 164 DFS

.49 151 DFS2.02 168 ONG

NODNODNOD

1.18 0 PCT.91 170 DFS

NODNOD

NODNODNODNOD

.91 0 PCT

.80 0 PCTNODNODNDD

2.07 0 PCT1.64 0 PCT2.70 0 PCT2.89 175 DNT

NODNDFNOD

2.27 173 DNTNODNOD

NOD2.32 186 ONG2.60 180 DNT

NDF

3.56 173 ONG2.92 176 ONG6.32 175 ONG

12.88 181 ONG3.94 184 DNG3.49 173 DNT

11.23 180 DNTNODNDF

NOD2.01 65 MBM

NOD

3.15 177 DNT1.25 0 PCT1.72 0 PCT

NODNODNDF

2.65 172 ONGNODNOD

NDFNDF

1.49 0 PCT

P1 AV3 16.88P1 AV4 .11P1 01C 3.02

1 10C 14.041 10C 22.67

P1 10C 23.74

18 P2 AV21 10C

.2626.71

19 P2 AV117 P2 AV3

272431

P2P2P2P1

2

AV1AV2AV307C

TEC

- .05.00.03

- .57

1.73

TEH TECTEH TECTEH TECTEH 'TEHTSH TSH

TEH TECTEC TECTEH 'TEHTSH TSH

TEH ITECTEH TECTEH TECTEC TECTEH TEHTSH TSH

TEH TECTEH TECTEH TEHTSH 'TSH

TEH TECTEH TEHTEC TECTSH TSH

TEH 'TECTEH TECTEH TEHTEC TECTSH TSH

TEH TECTEH TECTEH TECTEH TECTEH TEHTEC TECTSH TSH

TEH TECTEH TEHTSH TSH

TEH TSHTEH TECTEH TECiN 11H

TEH :TECTEH TECTEH TECTEH TECTEH TECTEH TECTEH TECTEH TEH10H 11H

TEH TSHTEH TECTSH TSH

TEH TECTEH TECTEH TECTEH TEHTSH TSH11H 11H

TEH TECTEH TEHTSH TSH

TEH TSHTEH :TSHTEH TEC

.610 ZBAZC

.610 ZBAZC

.610 ZBAZC

.610 NPSNM

.610 NPSNM

.610 SBACC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 ZBAZC

.610 ZBAZC

.610 ZBAZC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 SBACC

.610 SBACC

.610 NPSNM

.610 NPSNM

.610 ZBAZC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 SBACC

.610 SBACC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 ZBAZC

.610 ZBAZC

.610 ZBAZC

.610 ZBAZC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 SBACC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 SBACC

.610 SBACC

.610 NPSNM

.610 SBACC

.610 SBACC

.610 SBACC

.610 SBACC

.610 SBACC

.610 SBACC

.610 SBACC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 ZBAZC

.610 NPSNM

.610 SBACC

.610 SBACC

.610 SBACC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 ZBAZC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 SBACC

44 CI44 CI44 CI71 HI83 HI

46 C70 C73 H83 H

48 C48 C48 C70 C73 H83 H

42 C42 C71 H83 H

48 C71 H72 C83 H

46 C46 C71 H72 C83 H

48 C48 C48 C48 C71 H72 C83 H

46 CI71 HI83 HI

21 HI54 CI54 CI97 HI

54 CI54 CI54 CI54 CI54 CI54 Cl54 Cl73 HN93 HN

21 HN48 CI83 HN

46 C46 CI46 CI73 HI83 HI93 HI

48 Cl71 HI83 HI

21 HI21 HI54 CI

P1 07C -. 39

P1P1

2

P1P1P1P1P1P1P1

2

10H11C1011

10H

11C11C

MON

22.68.27

22.68

22.6530.9435.4536.5537.21

-. 70.29

22.65

6 04C 14.64

P1 11H22 P2 AV223 P2 AV3

2 11H

P1 10C

.58

.00

.00

.58

38.24

2 TEH 5.712 TEH 11.00

21 P2 AV4 .14S+- - -- + --- + ---- + ---- + ---- + ---- + ---- + --- + --- + -- + - +- ------------- - -- - - - - - --+ -.....- +. -+

ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI

7

Page 68: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - A Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:35

+ .... .- .- ----------- + .... - .. - -.. - - ---- + ------- + -- - - -+ - .- - ... + - +- -. -+ ....- +- -. .- -. - -. -- +-- - -

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ . .+. . . . . .. . . . .+. . .----------+---+ . + .... +. ....... ......----.. ..-+ ...--+ - +-+ . .-----+ . ..----+ -- -. ..---- +-.. ... +. . .--

22 109 2.89 183 DNG P1 06C 4.25 TEH TEC .610 SBACC 54 CI22 109 2.90 181 DNT P1 05C - .21 TEH TEC .610 SBACC 54 CI22 109 2.60 182 DNG P1 05C 2.78 TEH TEC .610 SBACC 54 CI22 109 2.51 183 ONG P1 05C 3.92 TEH TEC .610 SBACC 54 CI22 109 .28 81 VOL P4 AV4 .00 AV4 AV4 .580 ZPUN4 82 CI

23 109 NDF 2 TEH 4.97 TEH TSH .610 NPSNM 21 HI23 109 .63 0 PCT 13 P2 AV1 .00 TEH TEC .610 ZBAZC 56 CI23 109 1.20 0 PCT 20 P2 AV4 -. 08 TEH TEC .610 ZBAZC 56 CI23 109 2.77 184 DNT P1 AV4 .08 TEH TEC .610 ZBAZC 56 CI23 109 .40 92 VOL P4 AVi .00 AVi AV1 .580 ZPUN4 82 CI23 109 .31 108 VOL P4 AV4 .00 AV4 AV4 .580 ZPUN4 82 Cl.. .-.. ..- ..--. .. +-. . . .. +----------....+.....----.--- - - - . .. .. .. .... +.. ...-- - -- + - ---- ---- + ----. +-. . . .+- + ...... +- - +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+. . . . . . .+. . . . .+-----------..-+.+ .. . .. . .. + . .. ..-----.-. ....+- - - --- +- . .. .. +..----. + . .---- +- - . .--- + -.. ... +. .. ..- +

Tubes: 99 Records: 4748

Page 69: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B SPECIAL INTEREST +POINT INSPECTIONS

Byron B2R14 CBE D5X 304 TUBE TESTED FOR SPECIAL

INTEREST WITH +POINT PROBE -

SEE LIST FOR LOCATION(S)TESTED

a 135 PLUGGED TUBE

lie 105 18M 95 9g

0c

85 80 75 78 65I 0000(P0000q000xqT0000q0xa0

0(po ... 0 .............. 4--X-

68 55 58 45T) O a1) 0110000ooo 0000*

0 01 ....

40 35 30 25 20 15 1800000$000001 1 1 1 1

5

a 00 , x...... ooo

45

40

35

30

25

20

15

18

5

a.. ..... 0 0................................... xx00. .... 0.... .... 0 O ............. x. ........... ... :Xx

a go . .... .. .... U .... I ..... 0 0. .... .......... xx ...... .... U.o.o xx ao

( n a ..... ..... ..... .is........... a ... ....... .. .. ......... XX

ann. a.oo .a.. ..-.........................0.....0 0.............. n.,...-.,...,.00o. .. oo

,aa... .. oo .. ............t........0o o..........0 0.......... 000..o ......... .. ....... T...... oo........0I. .... . .. ............... I .... I .... .00...xx o .. ..... 0 0.......... 0 0.oo ....... a.................0.... x....0)~---.- 0- - - -0-- -0 - -)( -.-- - -*s - - -- _

o En .......... ........... .............. o............0 0 .. ..... . .......... .... . .. .. an

o................xxx' ' XX*: ........... 0 ................... , .....,................ ........ XX-. .*o

0 an................ .... ...... xx .... . o.... . . ... ........ • ............. 0.......... ... x -

00 un. .. . ........ x . ... .... . 0 0.... .............. . ... ...... .. ....

................................ X X..................0 0 O O..... ,.... ,............. *..................xxI, ..... XX

0..... ...................... . . .. .. ... .. ...... .. 0.... . o ..... ......... a . .............. a .XXX .... XXXX

00..................... ,.... ,.... , ...................... XXX: 0.... O O .... ,.... ,........... o....................x XX:'X .- .XXo xa0..... ..... .... . .... . ...... ..... .. .... XX .... O) 0. .......... .. ............................ •xx, - . xxo

X....o ........ .......... . 0 . ......... ooXX 000o0 0000o000 ..... ....... 0...... xx xx.. )XXX[XXo

0 0 * .00..... .. .o .... ........ oo... ......... .... o x

...... ............. ... . .... .......... . ... ........ 0.0. . .. ..... x. x. .. c xxx .

.... . ..... ......... ... ....... .... ... ...... 0 .0.0.. 0 .0.0. 0 0 .. . .. .... ...... .... ..... ........ .......... .............

.................................................................. . t..........t.... •.....•'.... .... ÷.....,;.............. $.....•, .... $ .... , .... ......

O............. ...... .................. ...... . .... ..-........ ... ... ........... a..... . ......... •-............. ..xxO 0. .... ....... ...... .... .. .... . .. ..... ............. ....... . ........... . .... . . . . . ............ .. ....... .... ...... ....... xXx x

0.........................." ' ........................................'.... '..........•.... '.....*.... '.... '...................................x a ' xxX

0........................................................ ................... . ...... ..... .... . .... . ..... ...... .XXaXn

O00................................................................xx........-.......'" •''".....•.....'.... *.....*.....*....x.x aXxxII

oX. .... oo 0............. oo.........000..............................XXXo,........................000...... -.....-........ 0-o(•xxx xxx

0. .- • -) .-. - GO- - X . X -X- X(- - .

0.........00........ .................................. X 0...o ........................ .... .0 . ...... .......... o)XX axxo

o 0,. .. . ...

..... .............. o000 ..................... • •XXXo .................. oo ................. xxxx xxo

0o. .................................................. XXX........................ .... ....... X xxxxxxo0 ............... . .................... .......... ........ .......... ....... . ......... .... ....... ..... ..... XXX Xx ,..o

0-..------- ------------- ---------------- -------------- -------------- eae --

45

48

38

25

28

15

10

5

O-o-X-. -

0o-,

X . . . .

01000

.... ..........

.... .... ....

0000010*- "'; ;0.0I

)(xxx

)OOO0 xOO0000. )0)000 )0000 0000 000010000(

xxxx . 0-- v0

00 0000 0000 00 0 ý 4ooo o ox o 0000 oo0O~Xooopoooc0000o

11e 105 le 95 90 85 80 75 70 65 60 55 50 45 48 35 30 25 20

Westinghouse Eiectnc Company LLC - ST Max 1017/28 00:58:40

15 1A 5

Page 70: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

+ .. ... +._ + .. .. ÷...----------...-------.+..----+----+----+.. +--+-.. .+-. .+.----- +...+..-------+...--- +-.....+.... - +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+.. .. +.....+.. .. +.. ---------... +-.------- .+..-------. +---......+--+-.. .+-.. +.-----+...+..-------+...--- +-.....+-......

18 2 NOD TEH TEC .610 TBATC 30 CI10 2 NDF 2 TEH 1.45 TEH TEH .610 NPSNM 67 HI10 2 NOD 05H 05H .610 NPSNM 87 HI10 2 NOD TEC TEC .610 NPSNN 98 ClI11 2 3.54 73 MBM 6 02C 13.96 TEH TEC .610 TBATC 16 CI11 2 NOD TEH TEH .610 NPSNP 69 HI11 2 NOD 05H 05H .610 NPSNM 87 HI11 2 NOD TEC TEC .610 NPSNM 98 Cl

I12 2 NOD TEH TEC .610 TBATC 30 CI12 2 NDF 2 TEH .51 TEH TEH .610 NPSNM 69 HI12 2 NOD 05H 05H .610 NPSNM 87 HI12 2 NOD TEC TEC .610 NPSNM 100 CII

7 3 NOD TEH TEC .610 TBATC 30 CI7 3 NOD TEH TEH .610 NPSNM 67 HI7 3 NOD 05H 05H .610 NPSNM 87 HII8 3 NOD TEH TEC .610 TBATC 30 CI8 3 NOD TEH TEH .610 NPSNM 67 HI8 3 NOD 05H 05H .610 NPSNM 87 HI

I9 3 2.15 183 ONG P1 05H 6.61 TEH TEC .610 TBATC 30 CI9 3 NDF 2 TEH 1.31 TEH TEH .610 NPSNM 67 HI9 3 NOD 05H 05H .610 NPSNM 87 HI

I10 3 NOD TEH TEC .610 TBATC 30 CI10 3 NOD TEH TEH .610 NPSNM 67 HI18 3 NOD 05H 05H .610 NPSNM 87 HI

I11 3 NOD TEH TEC .610 TBATC 16 CI11 3 NOD TEH TEH .610 NPSNM 67 HI11 3 NOD 05H 05H .610 NPSNM 87 HI

I12 3 8.54 76 MBM 6 07C 37.69 TEH TEC .610 TBATC 14 CI12 3 7.71 184 ONG P1 07C 37.97 TEH TEC .610 TBATC 14 CI12 3 NOD TEH TEH .610 NPSNM 67 HI12 3 NOD 05H 05H .610 NPSNM 87 HI

I13 3 3.16 177 ONG P1 04C 10.27 TEH TEC .610 TBATC 16 CI13 3 NOD TEH TEH .610 NPSNM 67 HI13 3 NOD 05H 05H .610 NPSNM 87 HII14 3 NOD TEH TEC .610 TBATC 16 CI14 3 NOD TEH TEH .610 NPSNM 69 HI14 3 NOD 05H 05H .610 NPSNM 87 HII15 3 NOD TEH TEC .610 TBATC 16 CI15 3 NOD TEH TEH .610 NPSNM 69 HI15 3 NOD 05H 05H .610 NPSNM 87 HI

I7 4 NOD TEH TEC .610 TBATC 32 CI7 4 NOD TEH TEH .610 NPSNM 65 HI7 4 NOD 05H 05H .610 NPSNM 87 HII8 4 NOD TEH TEC .610 TBATC 32 CI

I 8 4 NOD TEH TEH .610 NPSNM 65 HII 8 4 NOD 05H 05H .610 NPSNM 87 HI

I II 9 4 NOD TEH TEC .610 TBATC 32 CII 9 4 NOD TEH TEH .610 NPSNM 65 HII 9 4 NOD 05H 05H .610 NPSNM 87 HI

I II 10 4 NOD TEH TEC .610 TBATC 32 CII 10 4 NOD TEH TEH .610 NPSNM, 65 HII 10 4 NOD 05H 05H .610 NPSNM 87 HI

I II 11 4 NOD TEH TEC .610 TBATC 32 CII 11 4 NOD TEH TEH .610 NPSNM 65 HII 11 4 NOD 05H 05H .610 NPSNM 87 HI

I I14 4 NOD TEH TEC .610 TBATC 14 CI14 4 NOD TEH TEH .610 NPSNM 71 HI14 4 NOD 05H 05H .610 NPSNN 87 HII15 4 2.09 173 ONG P1 10C 12.83 TEH TEC .610 TBATC 14 CI15 4 .49. 160 DFS 1 10C 14.56 TEH TEC .610 TBATC 14 CI15 4 NOD TEH TEH .610 NPSNN 71 HI15 4 NOD 05H 05H .610 NPSNM 87 HI---------------------------+--------+-----+-----+-----+-----+----+---+--+ - + ----- +-...+ ---+ . - +-------

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ . .+. . +. . . . .+.. .+. . .. . .+.---------..+-- . . . ..----- - - +..-- - +-. -+- ... ... +....- .. + ...---. +.. ..----.--. ,.--- + --..... +. .. ..- +

1

Page 71: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

+ .. ... +. + .. .. +.----------+..-- ---- +----... ----+ ---.--..- +--.+-.+- --- +...---- + +.. ...----- +-......+-.......

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI--------------------- +--------+-----+-----+-----+-----+----+---+--+ ----- +----+ -----+ -----+ - - +--------

16 4 NDD TEH TEC .610 TBATC 16 CI16 4 NOD TEH TEH .610 NPSNM 71 HI16 4 NDD 05H 05H .610 NPSNM 87 HII17 4 NOD TEH TEC .610 TBATC 16 CI17 4 NOD TEH TEH .610 NPSNM 69 HI17 4 NOD 05H 05H .610 NPSNM 87 HI

I4 5 NOD TEH TEH .610 NPSNM 67 HI4 5 NOD 05H 05H .610 NPSNM 73 HI4 5 NOD 11H TEC .590 SBUCC 88 CI4 5 NOD 11H TEH .610 TBATC 93 HII5 5 NOD TEH TEC .610 TBATC 30 CI5 5 NOD TEH TEH .610 NPSNM 67 HI5 5 NOD 05H 05H .610 NPSNM 73 HI

I

6 5 NOD TEH TEC .610 TBATC 30 CI6 5 NOD TEH TEH .610 NPSNM 67 HI6 5 NOD 05H 05H .610 NPSNM 73 HI

I

7 5 NOD TEH TEC .610 TBATC 30 CI7 5 NOD TEH TEH .610 NPSNM 67 HI7 5 NOD 05H 05H .610 NPSNM 73 HII8 5 NOD TEH TEC .610 TBATC 30 CI8 5 NOD TEH TEH .610 NPSNM 67 HI8 5 NOD 05H 05H .610 NPSNM 73 HII

11 5 3.88 80 BM 6 08H 32.10 TEH TEC .610 TBATC 30 CI11 5 NOD TEH TEH .610 NPSNM 67 HI11 5 NOD 05H 05H .610 NPSNM 87 HII16 5 NOD TEH TEC .610 TBATC 14 CI16 5 NOD TEH TEH .610 NPSNM 67 HI16 5 NOD 05H 05H .610 NPSNM 87 HII17 5 NOD TEH TEC .610 TBATC 14 CI17 5 NOD TEH TEH .610 NPSNM 67 HI17 5 NOD 05H 05H .610 NPSNM 87 HI

I4 6 NOD TEH TEH .610 NPSNM 65 HI4 6 NOD 05H 05H .610 NPSNM 73 HI4 6 NOD 11H TEC .590 SBUCC 86 CI4 6 NOD 11H TEH .610 SBACC 95 HI

I I5 6 NOD TEH TEC .610 TBATC 32 CI5 6 NOD TEH TEH .610 NPSNM 65 HI5 6 NOD 05H 05H .610 NPSNM 73 NII6 6 NOD TEH TEC .610 TBATC 32 CI6 6 NOD TEH TEH .610 NPSNM 65 HI6 6 NOD 05H 05H .610 NPSNM 73 HI

I7 6 NOD TEH TEC .610 TBATC 32 CI7 6 NOD TEH TEH .610 NPSNM 65 HI7 6 NOD 05H 05H .610 NPSNM 73 HII8 6 2.00 184 ONG P1 02C 2.28 TEH TEC .610 TBATC 32 CI8 6 NOD TEH TEH .610 NPSNM 65 HI8 6 NOD 05H 05H .610 NPSNM 73 HI

I

11 6 2.68 75 MBM 6 03H 12.38 TEH TEC .610 TBATC 16 CI11 6 2.38 175 ONG P1 08C 38.95 TEH TEC .610 TBATC 16 CI11 6 NOD TEH TEH .610 NPSNM 65 HI11 6 NOD 05H 05H .610 NPSNM 87 HI

I12 6 NOD TEH TSH .610 NPSNM 1 HI12 6 NOD TEH TEC .610 TBATC 16 CI12 6 NOD 05H 05H .610 NPSNM 87 HI

I13 6 3.80 183 ONG P1 08H 31.16 TEH TEC .610 TBATC 16 CI13 6 NOD TEH TEH .610 NPSNM 65 HI13 6 NOD 05H 05H .610 NPSNM 87 HI

I

16 6 NOD TEH TEC .610 TBATC 16 CI16 6 NOD TEH TEH .610 NPSNM 65 HI16 6 NOD 05H 05H .610 NPSNM 87 HI

I------------------------ +--------+-----+-----+-----+-----+----+---+--+ - + ----- +.----+----. - - +--------

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENOT PDIA PTYPE CAL LI-----------------------------+-+-----++ - + -- +--+- -+- ----+----* ------ - +---

2

Page 72: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

+ .. ... ÷...... .. +...---------- -+----+----+----..---+..---- +---+......-. +... .....----.----.---- ....+--+-

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI-------- ~-+------------------+-----+-----+----+------+---+---+--+ - + - ----+-----+-----+ - - 4--------

I 17 6 NOD TEH TEC .610 TBATC 16 CI17 6 NOD TEH TEH .610 NPSNM 69 HI17 6 NOD 05H 05H .610 NPSNM 87 HI

I I4 7 NOD TEH TEH .610 NPSNM 67 HI4 7 NOD 05H 05H .610 NPSNM 73 HI4 7 NOD 11H TEC .590 SBUCC 86 CI4 7 NOD 11H TEH .610 SBACC 95 HI

I5 7 NOD TEH TEC .610 TBATC 30 CI5 7 NOD TEH TEH .610 NPSNM 67 HI5 7 NOD 05H 05H .610 NPSNM 73 HI

I6 7 NOD TEH TEC .610 TBATC 30 CI6 7 NOD TEH TEH .610 NPSNM 67 HI6 7 TBP 05H :5H .610 NPSNM 73 HI6 7 41.84 83 PLP 11 05H .68 05H 85H .610 NPSNM 73 HI

I7 7 2.11 181 ONG P1 AV4 3.93 TEH TEC .610 TBATC 30 CI7 7 NOD TEH TEH .610 NPSNM 67 HI7 7 NDD 05H 05H .610 NPSNM 73 HII8 7 NOD TEH TEC .610 TBATC 30 CI8 7 NOD TEH TEH .610 NPSNM 67 HI8 7 NOD 05H 05H .610 NPSNM 73 HI

I9 7 3.98 85 MBM 6 08H 1.52 TEH TEC .610 TBATC 30 CI9 7 NDF 2 TEH .96 TEH TEH .610 NPSNM 67 HI9 7 NOD 05H 05H .610 NPSNM 73 HII

i1 7 NOD TEH TEC .610 TBATC 30 CIi1 7 NOD TEH TEH .610 NPSNM 67 HIi1 7 NOD 05H 05H .610 NPSNM 87 HI

I11 7 NOD TEH TEC .610 TBATC 30 CI11 7 NDD TEH TEH .610 NPSNM 67 HI11 7 NOD 05H 05H .610 NPSNM 87 HI

I12 7 NOD TEH TEC .610 TBATC 14 CI12 7 NOD TEH TEH .610 NPSNM 67 HI12 7 NOD 05H 05H .610 NPSNM 87 HI

I13 7 4.59 174 ONG P1 09C 4.42 TEH TEC .610 TBATC 14 CI13 7 NOD TEH TEH .610 NPSNM 67 HI

.13 7 NOD 05H 05H .610 NPSNM 87 HII16 7 NOD TEH TEC .610 TBATC 14 CI16 7 NOD TEH TEH .610 NPSNM 67 HI16 7 NOD 05H 05H .610 NPSNM 87 HI

I17 7 4.83 73 MBM 6 07C 19.02 TEH TEC .610 TBATC 14 CI17 7 NOD TEH TEH .610 NPSNM 67 HI17 7 NDD 05H 05H .610 NPSNM 87 HI

I4 8 NOD TEH TEH .610 NPSNM 65 HI4 8 NOD 05H 05H .610 NPSNM 73 HI4 8 NOD 11H TEC .590 SBUCC 86 CI4 8 NOD 11H TEH .610 SBACC 95 HII5 8 NOD TEH TEC .610 TBATC 30 CI5 8 NOD TEH TEH .610 NPSNM 65 Hi5 8 NOD 05H 05H .610 NPSNM 73 HI

I6 8 NOD TEH TEC .610 TBATC 30 CI6 8 NOD TEH TEH .610 NPSNM 65 HI6 8 TBP 05H 05H .610 NPSNM 73 HI6 8 33.27 84 PLP 11 05H .61 05H 05H .610 NPSNM 73 HI

I7 8 .31 112 DSI P1 05H .93 TEH TEC .610 TBATC 30 CI7 8 NOD TEH TEH .610 NPSNM 65 HI7 8 .07 102 SVI P4 05H .72 05H 05H .610 NPSNM 73 HI7 8 .13 294 PCT 15 2 05H .78 .36 .36 55 05H 05H .610 NPSNM 73 HI7 8 TBP TEC TEH .610 TBATC 101 HI7 8 .26 52 DSI P1 05H .58 TEC TEH .610 TBATC 101 HI

I8 8 2.41 187 DNT P1 01C -. 11 TEH TEC .610 TBATC 30 CI8 8 NOD TEH TEH .610 NPSNM 65 HI8 8 NOD 05H 05H .610 NPSNM 73 HI

I9 8 NOD TEH TEC .610 TBATC 30 CI

+ .. .. -...... +...+...+...+ .. + ..-------..............----.--- +--- .+--+-.......+....-..+---.+----+---.+- +-+-

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDTA PTYPE CAL LII ---- I --------------------------------+----+----+ +-------------+------ -+--+--------- +---- - +.----+----+---.+---+-

3

Page 73: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10117/2008 01:00:34

+ . .+. .. +. . . .. . .+ . .+..-----------+....+--- .---- .----+ .- - -. .+. -- - +-- --- +- - .---- +---- +------..+ . .. +.. . . . ...+-+---

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ .. +... ...... + .. ... + .. +.----------- --+----.-. ----+--+--+- ..... + .... +... ----- .. +...+...+....----------- -+-. -- +

9 8 NOD TEH TEH .610 NPSNM 65 HI9 8 NOD 05H 05H .610 NPSNM 73 HI

I10 8 NOD TEH TEC .610 TBATC 30 C110 8 NOD TEH TEH .610 NPSNM 65 HI10 8 NOD 05H 05H .610 NPSNM 87 HI

I11 8 NOD TEH TEC .610 TBATC 16 CI11 8 NOD TEH TEH .610 NPSNM 65 HI11 8 NOD 05H 05H .610 NPSNN 87 HII12 8 NOD TEH TEC .610 TBATC 16 CI12 8 NOD TEH TEH .610 NPSNM 65 HI12 8 NOD 05H 05H .610 NPSNM 87 HI

I13 8 NOD TEH TEC .610 TBATC 16 CI13 8 NOD TEH TEH .610 NPSNN 65 HI13 8 NOD 05H 05H .610 NPSN4 87 HI

I14 8 NOD TEH TEC .610 TBATC 16 CI14 8 NOD TEH TEH .610 NPSNN 65 HI14 8 NOD 05H 05H .610 NPSNM 87 HI

I15 8 NOD TEH TEC .610 TBATC 16 CI15 8 NOD TEH TEH .610 NPSNM 65 HI15 8 NOD 05H 05H .610 NPSNM 87 HI

I

16 8 2.04 177 ONG P1 108 37.85 TEH TEC .610 TBATC 16 CI16 8 2.04 175 DNT P1 11H -. 69 TEH TEC .610 TBATC 16 CI16 8 2.40 176 DNT P1 11C .14 TEH TEC .610 TBATC 16 CI16 8 NOD TEH TEH .610 NPSNM 65 HI16 8 NOD 05H 05H .610 NPSNM 87 HII17 8 NOD TEH TEC .610 TBATC 16 CI17 8 NOD TEH TEH .610 NPSNN 65 HI17 8 NOD 05H 05H .610 NPSNM 87 HI

I24 8 NOD TEH TEC .610 TBATC 16 CI24 8 NOD TEH TEH .610 NPSNM 69 HI24 8 NOD 07H 07H .610 NPSNM 87 HI

I25 8 NOD TEH TEC .610 TBATC 16 CI25 8 NOD TEH TEH .610 NPSNM 69 NI25 8 NOD 07H 07H .610 NPSNM 87 HI

I26 8 .30 66 DFS 1 TSH 1.06 TEH TEC .610 TBATC 16 CI26 8 NOD TEH TEH .610 NPSNM 69 HI26 8 NOD 07H 07H .610 NPSNM 87 HII

4 9 NOD TEH TEH .610 NPSNM 67 HI4 9 NOD 05H 05H .610 NPSNM 73 NI4 9 2.62 177 ONG P1 04C 16.05 11H TEC .590 SBUCC 86 CI4 9 NOD 11H TEH .610 SBACC 95 HI

I5 9 NOD TEH TEC .610 TBATC 32 CI5 9 NOD TEH TEH .610 NPSNM 67 HI5 9 NOD 05H 05H .610 NPSNM 73 HI

I6 9 NOD TEH TEC .610 TBATC 32 Ci6 9 NOD TEH TEH .610 NPSNM 67 HI6 9 NOD 05H 05H .610 NPSNM 73 HI

7 9 NOD TEH TEC .610 TBATC 32 CI7 9 NOD TEH TEH .610 NPSNM 67 HI7 9 NOD 05H 05H .610 NPSNM 73 HI

8 9 NOD TEH TEC .610 TBATC 32 CI8 9 NOD TEH TEH .610 NPSNM 67 HI8 9 NOD 05H 05H .610 NPSNM 73 HI

9 9 NOD TEH TEC .610 TBATC 32 CI9 9 NOD TEH TEH .610 NPSNM 67 HI9 9 NOD 05H 05H .610 NPSNM 73 HI

12 9 NOD TEH TEC .610 TBATC 14 CI12 9 NDF 2 TEH .48 TEH TEH .610 NPSNM 67 HI12 9 NOD 05H 05H .610 NPSNM 87 HI

I13 9 NOD TEH TEC .610 TBATC 14 CI13 9 NOD TEH TEH .610 NPSNM 67 HI

+ . .+. . . . . .. - . .+. . . .----------....---- .---- -+ . . . . . . . . .+ ..------ -.-- -.--- +- . .+---- +----- + . .. ...----+ - -.+-. +- ...... .

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENOT POIA PTYPE CAL LI+ .. +... .......--.. +... ..---------- --.-+.. -------+..--- +--+-......+.....-..+.--..-+ .. +...----+-- -..--- +-.....+-......

4

Page 74: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B Special Interest +Point Inspection Results

Byron 2 82R14 CBE 20081001 10/17/2008 01:00:34

+ . .+. . . . . .. +. . . .+. .-----------...---.---.---- + . .. . .. +. .. ..----- - - + --+ - .. +-. . . +----- + . .+.----.-- - . .--- + -. ... +- ...... .

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI---------------------- +--------+-----+-----+-----+-----+----+---+--+ - + - ---- +-----+-----+ - - +--------

13 9 NDD 05H 05H .610 NPSNM 87 HII

14 9 NOD TEH TEC .610 TBATC 14 CI14 9 NDD TEH TEH .610 NPSNP 67 HI14 9 NOD 05H 05H .610 NPSNM 87 HI

I15 9 NOD TEH TEC .610 TBATC 14 CIi15 9 NOD TEH TEH .610 NPSNM 67 HI15 9 NDD 05H 05H .610 NPSNM 87 HI

I16 9 NDO TEH TEC .610 TBATC 14 CI16 9 NDF 2 TEH .49 TEH TEH .610 NPSNM 67 HI16 9 NDF 2 TEH 1.52 TEH TEH .610 NPSNM 67 HI16 9 NDF 2 TEH 2.92 TEH TEH .610 NPSNM 67 HI16 9 NDD 05H 05H .610 NPSNP 87 HI

I17 9 NOD TEH TEC .610 TBATC 14 CI17 9 NOD TEH TEH .610 NPSNM 67 HI17 9 NOD 05H 05H .610 NPSNM 87 HI

I23 9 NOD TEH TEC .610 TBATC 14 CI23 9 NDD TEH TEH .610 NPSNM 67 HI23 9 NDD 07H 07H .610 NPSNM 87 HI

I24 9 NDO TEH TEC .610 TBATC 14 CI24 9 NDF 2 TEH .48 TEH TEH .610 NPSNM 71 HI24 9 NDF 2 TEH 2.08 TEH TEH .610 NPSNM 71 HI24 9 NDD 07H 07H .610 NPSNM 87 HI

I25 9 NOD TEH TEC .610 TBATC 14 CI25 9 NDF 2 TEH .73 TEH TEH .610 NPSNM 71 HI25 9 NOD 07H 07H .610 NPSNM 87 HI

I26 9 3.32 57 MBM 6 AV1 8.72 TEH TEC .610 TBATC 14 CI26 9 2.01 68 INR 6 AVI 9.80 TEH TEC .610 TBATC 14 CI26 9 1.91 76 INR 6 AVI 10.59 TEH TEC .610 TBATC 14 CI26 9 4.34 177 DNT P1 03C -. 52 TEH TEC .618 TBATC 14 CI26 9 NDO TEH TEH .610 NPSNM 71 HI26 9 NDO 07H 07H .610 NPSNM 87 HI

I27 9 2.89 176 DNT P1 11H .27 TEH TEC .610 TBATC 14 CI27 9 NDD TEH TEH .610 NPSNM 71 HI27 9 NDD 07H 07H .610 NPSNM 87 HI

I28 9 .80 154 DFS 1 TSH 1.04 TEH TEC .610 TBATC 14 CI28 9 NDF 2 TEH .47 TEH TEH .618 NPSNM 71 HI28 9 NOD 07H 07H .610 NPSNM 87 HI

I4 18 NOD TEH TEH .610 NPSNM 65 Hj4 18 NDO 05H 05H .610 NPSNM 73 HI4 18 NDO 11H TEC .590 SBUCC 86 CI4 10 NDD 11H TEH .610 SBACC 95 HI

I5 18 2.99 63 MBM 6 09H 19.95 TEH TEC .610 TBATC 30 CI5 18 2.35 64 MBM 6 10i 27.95 TEH TEC .610 TBATC 30 CI5 10 2.95 174 ONG P1 10H 35.45 TEH TEC .618 TBATC 30 CI5 10 2.62 175 DNG P1 10C 36.13 TEH TEC .610 TBATC 30 CI5 18 NOD TEH TEH .610 NPSNM 65 HI5 10 NOD 05H 05H .610 NPSNM 73 HII6 18 2.37 185 DNG P1 05C 12.53 TEH TEC .610 TBATC 30 CI6 10 NOD TEH TEH .610 NPSNM 65 HI6 10 NDD 05H 05H .618 NPSNM 73 HI

I7 10 NOD TEH TEC .610 TBATC 30 CI7 10 NOD TEH TEH .610 NPSNM 65 HI7 10 NOD 05H 05H .610 NPSNM 73 HI

8 10 3.44 183 DNG P1 08H 27.79 TEH TEC .610 TBATC 30 CI8 18 NDO TEH TEH .610 NPSNM 65 HI8 10 NDD 05H 05H .610 NPSNM 73 HII9 18 2.39 177 ONG P1 05H 2.56 TEH TEC .610 TBATC 30 CI9 18 NOD TEH TEH .610 NPSNM 65 HI9 18 NDF 2 05H 2.56 05H 05H .610 NPSNM 73 HI

I23 10 NDO TEH TEC .610 TBATC 16 CI23 10 NDD TEH TEH .610 NPSNM 69 HI23 10 NDO 07H 07H .610 NPSNM 87 HI

---------------------- +--------+-----+-----+-----+-----+----+---+--+ - + - ----+-----+-----+ - - +--------

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ . .+. . +. . . . .+.. .+. . . . . .+---------....----+ + .. .. .. + ... .. . . ... . . .. ..-- - --+- - -+- ++ ----..+ ---- + -- -..--+ - .. + -...... +- ..

5

Page 75: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

---- ---- - - - -+ -- - -. -+ --. -+- -- +- - -+- - -+- --------- +---------+ - + - + --- - - - - - - - - -- - - - - -- --

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ .... + -- 4 --- . .+.. . + . .. +---------........+........--- --- +--+-.......+-.....+...--+----+---.+- -+--

242424

101010

1s101010

10101010

10101s

Is

101010

121212121212111211111111

11

1111

111111

111111

111111

11

111111

111111

121212

121212

121212

121212

121212

NODNODNOD

1.67 173 INR2.88 64 MBM

NODNOD

1.22 0 PCT12.14 181 DNT

NDDNOD.

2.17 185 ONGNDDNDD

1.95 173 INRNDDNDD

3.29 175 ONG3.10 181 ONG6.34 180 ONG2.S2 181 DNT2.42 178 ONG5.43 .179 ONG5.32 178 ONG

11.S2 181 ONGNODNDFNDFNDF

NODNODNOD

NODNDDNDD

1.18 0 PCT2.64 0 PCT1.42 0 PCT2.72 174 DNG3.27 173 DNT

NDDNDD

NDDNDDNDD

3.30 16 BLGNDDNDF

.35 150 DFSNODNDD

NDDNDDNDD

2.23 179 ONGNDDNDD

P1 .11H6 AV4

19 P2 AV2P1 03C

.178.87

.15-. 49

P1 10C 38.24

P1 03C -. 46

P1 10HP1 10HP1 10HP1 11HP1 10CP1 10CP1 10CP1 10C

2 1012 1MH2 10H

39.9440.9441.86

-. 5838.4939.6440.78.41.80

39.9439.9439.94

TEH TEC .610 TBATC 16 CITEH TEH .610 NPSNM 69 HI07H 07H .610 NPSNM 87 HI

ITEH TEC .610 TBATC 16 CITEH TEC .610 TBATC 16 Cl

TEH TEH .610 NPSNM 69 HI07H 07H .610 NPSNM 87 HI

ITEH TEC .610 TBATC 16 CITEH TEC .610 TBATC 16 Cl

TEH TEH .610 NPSNM 69 HI07H 07H .610 NPSNM 87 Hj

ITEH TEC .610 TBATC 16 CITEH TEH .610 NPSNM 69 HI07H 07H .610 NPSNM 87 HI

ITEH TEC .610 TBATC 16 CITEH TEH .610 NPSNM 69 HI07H 07H .610 NPSNM 87 HI

ITEH TEC .610 TBATC 30 CITEH TEC .610 TBATC 30 CITEH TEC .610 TBATC 30 CITEH TEC .610 TBATC 30 CITEH TEC .610 TBATC 30 CITEH TEC .610 TBATC 30 CITEH TEC .610 TBATC 30 CITEH TEC .610 TBATC 30 Cl

TEH TEH .610 NPSNM 67 HI101 11H .610 NPSNM 75 HI10H 11H .610 NPSNM 77 HI10H 11H .610 NPSNM 79 HI

ITEH TEC .610 TBATC 14 CITEH TEH .610 NPSNM 67 HI07H 07H .610 NPSNM 87 HIITEH TEC .610 TBATC 14 CITEH TEH .610 NPSNM 67 HI07H 07H .610 NPSNM 87 HI

ITEH TEC .610 TBATC 14 CITEH TEC .610 TBATC 14 CITEH TEC .610 TBATC 14 CITEH TEC .610 TBATC 14 CITEH TEC .610 TBATC 14 Cl

TEH TEH .610 NPSNM 71 HI07H 07H .610 NPSNM 87 HI

ITEH TEC .610 TBATC 14 CITEH TEH .610 NPSNM 71 HI07H 07H .610 NPSNM 87 HI

ITEH TEC .610 TBATC 14 CITEH TEH .610 NPSNM 71 HITSC TSC .610 NPSNM 112 CI

ITEH TEC .610 TBATC 16 CITEH TEH .610 NPSNM 65 HI07H 07H .610 NPSNM 87 HI

ITEH TEC .610 TBATC 16 CITEH TEH .610 NPSNM 65 HI07H 07H .610 NPSNM 87 HI

ITEH TEC .610 TBATC 16 CITEH TEH .610 NPSNM 65 HI07H 07H .610 NPSNM 87 HI

ITEH TEC .610 TBATC 16 CITEH TEH .610 NPSNM 69 HI07H 07H .610 NPSNM 87 HI

ITEH TEC .610 TBATC 16 CITEH TEH .610 NPSNM 69 HI07H 07H .610 NPSNM 87 HI

TEH TEC .610 TBATC 16 CI

172819

P2 AV2P2 AV3P2 AV4P1 09CP1 03C

.00

.00

.0020.87

-. 52

1 TSC 1.17

2 TSC 1.17

1 07C 16.10

P1 07H 6.32

NDDNDDNOD

NODNDDNDD

28 12 1.41 0 PCT 20 P2 AV2 .11+ .... - .... - ......... + .-.. + ..-. + .... + .... + .... +- - ... ...... +- - -+ .. +.- -+ - - ....- --+ ...- + ...... + .. + . +. --

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI................. +.-...+ ..-. +.-...-+ .... + .... +.........+. .. +.......+.... +.+..+-.- -+....+.--...+......+......+......--+

Page 76: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

+ .. +.. .+ .. .. . +.. .---------- ..---. .. . ... + ...------.-- - +- .. + ....... .-+-.-.---- +----. .+. .. +..----+ -- +-.. ... +-......

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+. . . .+. . . . .+. . . .+. .---------...- +---- . . . .. . . . .. . . _+--------.-- -..-- --- +- . .+.------ + +. ..----+ -- --..--- + -.. ... +- ......

28 12 9.56 181 DNT P1 03C -. 49 TEH TEC .610 TBATC 16 CI28 12 NDD TEH TEH .610 NPSNM 69 HI28 12 NDD 07H 07H .610 NPSNM 87 HI

I29 12 9.49 177 DNT P1 03C -. 46 TEH TEC .610 TBATC 16 CI29 12 NDD TEH TEH .610 NPSNM 69 HI29 12 NDD 07H 07H .610 NPSNM 87 HI

I23 13 NOD TEH TEC .610 TBATC 14 Cl23 13 NOD TEH TEH .610 NPSNN 43 NI23 13 NOD 07H 07H .610 NPSNN 87 HI

I24 13 NOD TEH TEC .610 TBATC 14 CI24 13 NOD TEH TEH .610 NPSNM 43 HI24 13 NOD 07H 07H .610 NPSNM 87 HI

I25 13 7.70 182 DNG P1 03H 10.32 TEH TEC .610 TBATC 14 CI25 13 3.19 183 DNG P1 03H 17.41 TEH TEC .610 TBATC 14 CI25 13 NOD TEH TEH .610 NPSNM 43 HI25 13 NDF 2 03H 17.41 03H 05H .610 NPSNM 79 HI25 13 NOD 07H 07H .610 NPSNM 87 HI

I

26 13 NOD TEH TEC .610 TBATC 14 CI26 13 NOD TEH TEH .610 NPSNM 43 HI26 13 NOD 07H 07H .610 NPSNM 87 HI

I27 13 2.08 77 INR 6 06C 6.97 TEH TEC .610 TBATC 14 CI27 13 2.83 176 DNT P1 03C -. 54 TEH TEC .610 TBATC 14 CI27 13 NOD TEH TEH .610 NPSNM 43 HI27 13 NOD 07H 07H .610 NPSNM 87 HI

I28 13 NOD TEH TEC .610 TBATC 14 CI28 13 NOD TEH TEH .610 NPSNM 71 HI28 13 NOD 07H 07H .610 NPSNM 87 HII29 13 3.10 176 DNT P1 11H .33 TEH TEC .610 TBATC 14 CI29 13 .97 0 PCT 15 P2 AV3 .00 TEH TEC .610 TBATC 14 CI29 13 12.83 179 DNT P1 03C -. 41 TEH TEC .610 TBATC 14 CI29 13 NOD TEH TEH .610 NPSNM 71 HI29 13 NOD 07H 07H .610 NPSNM 87 HII

1 14 8.98 183 DNT P1 11C .25 11C TEC .610 TBATC 30 CI1 14 3.15 185 INR P1 11C .33 11C TEC .610 TBATC 30 CI1 14 NOD TEH TEH .610 NPSNM 65 HI1 14 4.32 176 DNG P1 07H 32.37 11H TEH .610 TBATC 93 HI1 14 NDF 2 07H 32.37 07H 08H .610 NPSNM 103 HI1 14 NOD 11C 11H .580 ZPUMB 120 CI

I7 16 2.60 187 DNG P1 07H 6.91 TEH TEC .610 TBATC 28 CI7 16 3.91 178 DNG P1 10C 37.48 TEH TEC .610 TBATC 28 CI7 16 7.96 182 DNG P1 10C 38.50 TEH TEC .610 TBATC 28 CI7 16 2.80 179 DNG P1 10C 40.31 TEH TEC .610 TBATC 28 CI7 16 3.89 181 DNG P1 10C 41.30 TEH TEC .610 TBATC 28 CI7 16 52.30 11 BLG 1 TSC 1.17 TEH TEC .610 TBATC 28 CI7 16 NDD TEH TEH .610 NPSNM 65 HI7 16 NDF 2 07H 6.97 07H 08H .610 NPSNM 75 HI7 16 NDF 2 07H 6.97 07H 08H .610 NPSNM 77 HI7 16 NDF 2 07H 6.97 07H 08H .610 NPSNM 79 HI7 16 NDF 2 TSC .93 TSC TSC .610 NPSNM 112 CI7 16 NDF 2 TSC 1.17 TSC TSC .610 NPSNHM 112 CI

I23 18 NDD TEH TSH .610 NPSNM 1 HI23 18 NDD TEH TEC .610 TBATC 16 CI23 18 NDD 07H 07H .610 NPSNM 73 HI23 18 NDD TEC TEC .610 NPSNM 96 CI

I24 18 NDD TEH TSH .610 NPSNM 1 HI24 18 NOD TEH TEC .610 TBATC 12 CI24 18 NOD 07H 07H .610 NPSNM 73 HI24 18 NOD TEC TEC .610 NPSNM 96 CI

I25 18 NOD TEH TSH .610 NPSNM 1 HI25 18 NOD TEH TEC .610 TBATC 12 CI25 18 NOD 07H 07H .610 NPSNM 73 HI25 18 NOD TEC TEC .610 NPSNM 96 CI

I26 18 NDD TEH TSH .610 NPSNM 1 HI26 18 2.97 180 ONG P1 11H 3.99 TEH TEC .610 TBATC 12 CI26 18 6.73 178 ONG P1 11H 5.20 TEH TEC .610 TBATC 12 CI26 18 .23 64 DFS 1 05C 16.74 TEH TEC .610 TBATC 12 CI

+ . .+. . .. . . .+. . .. . .+. .---------.... +.......---- ..- +..- --. .+- .+..- .. .. +......-+.....----. .+.----.-- . .--- + -. ... +- ......

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ .. +...+-..-+.. .. .. +---------+----+----+•----+ - ----+---+ ---- +--+...+ ..... ......- +-......+..-..+.----+----+---.+- -+ - +

7

Page 77: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

+ . .+ . .+ . .+ . .+ . .+ . .+------------ --- --- +----+.... .. . .... ... ... ....------ - - - +.-+ -. + - +.---- + ---- -+ -. . --+-.....+ -... .+- .

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+. . . .+. . . . .+. . . .+. .---------... ....---+ ---- .---- + .. .. .. .. .. . .. .. .. ...----- -..-.. ---- + . .----+ -- . ..--- +-......+- .....

26 18 NOD 07H 07H .610 NPSNM 73 HI26 18 NOF 2 TEC .60 TEC TEC .610 NPSNM 96 CI

I27 18 NOD TEH TSH .610 NPSNM 1 HI27 18 NOD TEH TEC .610 TBATC 12 CI27 18 NOD 07H 07H .610 NPSNM 73 HI27 18 NOD TEC TEC .610 NPSNM 96 CI

I32 18 NOD TEH TSH .610 NPSNN 3 HI32 18 NOD TEH TEC .610 TBATC 12 CI32 18 NOD TEC TEC .610 NPSNM 94 CI32 18 NOD 02C 02C .610 NPSNM 128 CI

I33 18 NOD TEH TSH .610 NPSNM 3 HI33 18 NOD TEH TEC .610 TBATC 12 CI33 18 NOD TEC TEC .610 NPSNP 94 CI33 18 NOD 02C 02C .610 NPSNM 128 CI

I34 18 NDF 2 TEH .49 TEH TSH .610 NPSNM 3 HI34 18 NOD TEH TEC .610 TBATC 12 CI

I 34 18 NOD TEC TEC .610 NPSNM 94 CII 34 18 NOD 02C 02C .610 NPSNM 126 CI

I II 1 19 NOD TEH TSH .610 NPSNM 1 HII 1 19 NOD 11C TEC .610 TBATC 26 CII 1 19 3.09 183 DNT P1 11H .27 11H TEH .610 TBATC 93 HII 1 19 NOF 2 11H .27 11H 11H .610 NPSNM 103 HII II 23 19 NOD TEH TSH .610 NPSNM 3 HII 23 19 NWD TEH TEC .610 TBATC 14 CI

23 19 NOD 07H 07H .610 NPSNM 73 HII24 19 NOD TEH TSH .610 NPSNM 3 HI24 19 NOD TEH TEC .610 TBATC 14 CI24 19 NWD 07H 07H .610 NPSNM 73 HI24 19 NWD 02C 02C .610 NPSNM 128 CI

I25 19 NOD TEH TSH .610 NPSNM 3 HI25 19 NWD TEH TEC .610 TBATC 10 CI25 19 NOD 07H 07H .610 NPSNM 73 HI25 19 NOD 02C 02C .610 NPSNM 128 CI

I26 19 NOD TEH TSH .610 NPSNM 3 HI26 19 NOD TEH TEC .610 TBATC 10 CI26 19 NOD 07H 07H .610 NPSNM 73 HI26 19 NOD 02C 02C .610 NPSNM 128 CI

I27 19 NWD TEH TSH .610 NPSNM 3 HI27 19 NOD TEH TEC .610 TBATC 10 CI27 19 NWD 07H 07H .610 NPSNM 73 HI27 19 NWD 02C 02C .610 NPSNM 128 CI

I28 19 NDF 2 TEH 18.12 TEH TSH .610 NPSNM 3 HI28 19 NOD TEH TEC .610 TBATC 10 CI28 19 NOD 02C 02C .610 NPSNM 128 CI

I29 19 NOD TEH TSH .610 NPSNM 3 HI29 19 NOD TEH TEC .610 TBATC 10 CI29 19 NOD 02C 02C .610 NPSNM 128 CI

I32 19 NOD TEH TSH .610 NPSNM 7 HI32 19 7.25 176 DNT P1 11C .36 TEH TEC .610 TBATC 10 CI32 19 NWD 02C 02C .610 NPSNM 128 CI

I33 19 NOD TEH TSH .610 NPSNM 7 HI33 19 NWD TEH TEC .610 TBATC 10 CI33 19 NOD 02C 02C .610 NPSNM 128 CI

I34 19 NDD' TEH TSH .610 NPSNM 7 HI34 19 13.00 184 ONG P1 TSH 1.11 TEH TEC .610 TBATC 10 CI

I 34 19 2.41 183 ONG P1 03H 20.82 TEH TEC .610 TBATC 10 CII 34 19 .77 0 PCT 13 P2 AV3 .00 TEH TEC .610 TBATC 10 CII 34 19 NWD 02C 02C .610 NPSNM 126 CII EII 23 20 2.04 59 MBM 6 08C 4.77 TEH TEC .610 TBATC 16 CI23 20 2.81 74 MBM 6 08C 17.69 TEH TEC .610 TBATC 16 Cl

23 20 NWD TEH TEH .610 NPSNM 43 HI23 20 NWD 07H 07H .610 NPSNM 73 HII24 20 NOD TEH TEC .610 TBATC 12 CI

------------------------- +-----+-----+-----+-----+-----+----+---+---+ - ---- +-----+-----+ - - +--------

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+. . . . . . .+. . . . .+----------...----- .---- .----. + .. .. .. .. .. .. .. .. ...----- + - ++. .----+ .----+ -- . . .--- + -.. ... +- ......

8

Page 78: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

+.. ..--- ... + ... .---------- ..-----+----.----. + .... + ..... +- +CRL--N "-------- - - +----+----....+.----+ - +-......+....+- +I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRIEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI÷.. .. .----------.----.----.-----.. .-----.---- +.---+.-----. ..--- +--+-...----.----.----.. . +.......-- +- -- +

24 20 NOD TEH TEH .610 NPSNM 43 HI24 20 NOD 07H 07H .610 NPSNM 73 HI24 20 NDD 02C 02C .610 NPSNM 126 CI

I

25 20 .59 101 DSI P1 07H -. 47 TEH TEC .610 TBATC 12 CI25 20 3.82 79 MBM 6 iMN 18.26 TEH TEC .610 TBATC 12 CI25 20 NDF 2 TEH .93 TEH TEH .610 NPSNM 43 HI25 20 .54 229 PCT 38 2 07H -. 63 .30 .38 58 07H 07H .610 NPSNM 73 HI25 20 16.73 65 PLP 11 07H -. 62 07H 07H .610 NPSNM 73 HI25 20 .35 45 SVI P4 07H -. 60 07H 07H .610 NPSNM 73 HI25 20 TBP TEC TEH .610 TBATC 101 HI25 20 .61 105 DSI P1 07H .05 TEC TEH .610 TBATC 101 HI25 20 NDD 02C 02C .610 NPSNM 126 CI

I26 20 NOD TEH TEC .610 TBATC 12 CI26 20 NDD TEH TEH .610 NPSNM 43 HI26 20 NOD 07H 07H .610 NPSNM 73 HI26 20 NDD 02C 02C .610 NPSNM 126 CII27 20 NDD TEH TEC .610 TBATC 12 CI27 20 NOD TEH TEH .610 NPSNM 43 HI27 20 NDD 07H 07H .610 NPSNM 73 HI27 20 NOD 02C 02C .610 NPSNM 126 CII28 20 NDD TEH TEC .610 TBATC 12 CI28 20 NOD TEH TEHN .610 NPSNM 43 HI28 20 NOD 02C 02C .610 NPSNM 126 CII29 20 NOD TEH TEC .610 TBATC 12 CI29 20 NOD TEH TEH .610 NPSNM 43 HI29 20 NOD 02C 02C .610 NPSNM 126 CII32 20 NOD TEH TEC .610 TBATC 12 CI32 20 NDD TEH TEH .610 NPSNM 43 HI32 20 NDD 02C 02C .610 NPSNM 126 CI

34 20 NDD TEH TEC .610 TBATC 12 CI34 20 NOF 2 TEH .49 TEH TEH .610 NPSNM 43 HI34 20 NDD 02C 02C .610 NPSNM 126 CI

I36 20 .73 0 PCT 13 P2 AV1 .16 TEH TEC .610 TBATC 12 CI36 20 1.76 0 PCT 24 P2 AV2 .03 TEH TEC .610 TBATC 12 CI36 20 .90 0 PCT 15 P2 AV3 .03 TEH TEC .610 TBATC 12 Cl

36 20 NDD TEH TEH .610 NPSNM 43 HI36 20 PBC TEC TEH .610 TBATC 101 HI36 20 NDF 2 03C -. 35 03C 03C .610 NPSNM 112 CI

23 21 NDD TEH TEC .610 TBATC 14 CI23 21 NDD TEH TEH .610 NPSNM 41 HI23 21 NDD 07H 07H .610 NPSNM 73 HI

24 21 NOD TEH TEC .610 TBATC 14 CI24 21 NOD TEH TEH .610 NPSNM 41 HI24 21 NOD 07H 07H .610 NPSNM 73 HI24 21 NOD 02C 02C .610 NPSNM 128 CI

25 21 NDD TEH TEC .610 TBATC 10 CI25 21 NDD TEH TEH .610 NPSNM 41 HI25 21 NDD 07H 07H .610 NPSNM 73 HI25 21 NDO 02C 02C .610 NPSNM 128 CI

26 21 NDD TEH TEC .610 TBATC 10 CI26 21 NDD TEH TEH .610 NPSNM 41 HI26 21 NDD 07H 07H .610 NPSNM 73 HI26 21 NDD 02C 02C .610 NPSNM 128 CI

27 21 2.34 74 MBM 6 06C 15.07 TEH TEC .610 TBATC 10 CI27 21 NOD TEH TEH .610 NPSNM 41 HI27 21 NOD 07H 07H .610 NPSNM 73 HI27 21 NOD 02C 02C .610 NPSNM 128 CI

28 21 NDD TEH TEC .610 TBATC 10 CI28 21 NDD TEH TEH .610 NPSNM 41 HI28 21 NDD 02C 02C .610 NPSNM 128 CII29 21 2.19 173 DNG P1 07H 34.83 TEH TEC .610 TBATC 10 CI29 21 NDO TEH TEH .610 NPSNM 41 HI29 21 NDD 02C 02C .610 NPSNM 128 CII23 22 NDD TEH TEC .610 TBATC 20 CI

---------------------- +--------+-----+-----+-----+-----+----+---+--+ - + - ---- +-----+ -----+ - - +--------

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+.. . .... +.. . .. +----------.....+----+----...--------+---. . +--+-.......+......-.+.....---- .----+--...--- +-.....+-.....

9

Page 79: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

+ . . . . .. . . .- . . .. - .. ----------... ....+---+ ----- - - +- - - -+--... ..... +-.. ....... +. - ÷ .. . . . ..---- -. . ...--+ -- +-. . . . . .- +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+..._ _. . .. . ..---------------+ + ----+----+....---- ..- +..---+-+-.....+...-....+.----+----+----..+...+....----.+- ..... +..

23 22 NOD TEH TEH .610 NPSNM 43 HI23 22 NDD 07H 07H .610 NPSNM 73 HI

I24 22 NDD TEH TEC .610 TBATC 12 CI24 22 NDD TEH TEH .610 NPSNM 43 HI24 22 NOD 07H 07H .610 NPSNM 73 HI24 22 NDD 02C 02C .610 NPSNM 126 CII25 22 2.58 178 ONG P1 09C 19.09 TEH TEC .610 TBATC 12 CI25 22 NDF 2 TEH .82 TEH TEH .610 NPSNM 43 HI25 22 NOD 07H 07H .610 NPSNM 73 HI25 22 NOD 02C 02C .610 NPSNM 126 CI

I26 22 NOD TEH TEC .610 TBATC 12 CI26 22 NOD TEH TEH .610 NPSNM 43 HI26 22 NOD 07H 07H .610 NPSNM 73 HI26 22 NOD TEC TEH .610 TBATC 101 HI26 22 NDF 2 03C -. 60 03C 03C .610 NPSNM 112 CI26 22 NOD 02C 02C .610 NPSNM 126 CII27 22 NDO TEH TEC .610 TBATC 12 CI27 22 NOD TEH TEH .610 NPSNM 43 HI27 22 NOD 07H 07H .610 NPSNM 73 HI27 22 NDD 02C 02C .610 NPSNM 126 CII28 22 NOD TEH TEC .610 TBATC 12 CI28 22 NDF 2 TEH .49 TEH TEH .610 NPSNM 43 HI28 22 NOD 02C 02C .610 NPSNM 126 CI

I

29 22 NOD TEH TEC .610 TBATC 12 CI29 22 NOF 2 TEH .49 TEH TEH .610 NPSNM 43 HI29 22 NOD 02C 02C .610 NPSNM 126 CII41 23 1.87 183 INR P1 04C 11.62 TEH TEC .610 TBATC 10 CI41 23 NOD TEH TEH .610 NPSNM 41 HI41 23 NOD 02C 02C .610 NPSNM 128 CI

I42 23 NDD TEH TEC .610 TBATC 10 CI42 23 NDD TEH TEH .610 NPSNM 41 HI42 23 NDD 02C 02C .610 NPSNM 128 CII43 23 NOD TEH TEC .610 TBATC 10 CI43 23 NDD TEH TEH .610 NPSNM 41 HI43 23 NOD 02C 02C .610 NPSNM 128 CI

I44 23 .67 149 DFS 1 TSH 1.30 TEH TEC .610 TBATC 10 CI44 23 NOD TEH TEH .610 NPSNM 41 HI44 23 NOD 02C 02C .610 NPSNM 128 CI

I41 24 NDD TEH TEC .610 TBATC 12 CI41 24 NDD TEH TEH .610 NPSNM 43 HI41 24 NDO 02C 02C .610 NPSNM 126 CI

I

42 24 NDD TEH TEC .610 TBATC 12 CI42 24 NOD TEH TEH .610 NPSNM 43 HI42 24 NDD 02C 02C .610 NPSNM 126 CI

I

43 24 NDD TEH TEC .610 TBATC 12 CI43 24 NOD TEH TEH .610 NPSNM 43 HI43 24 NOD 02C 02C .610 NPSNM 126 CI

I44 24 NOD TEH TEC .610 TBATC 12 CI44 24 NDD TEH TEH .610 NPSNM 43 HI44 24 NDD 02C 02C .610 NPSNM 126 CI

I41 25 NDD TEH TEC .610 TBATC 10 CI41 25 NDD TEH TEH .610 NPSNM 41 HI41 25 NOD TEC TEC .610 NPSNM 96 CI41 25 NDD 02C 02C .610 NPSNM 126 CII42 25 1.79 77 INR 6 03H 33.23 TEH TEC .610 TBATC 10 CI42 25 NOD TEH TEH .610 NPSNM 41 HI42 25 NOD TEC TEC .610 NPSNM 96 CI42 25 NOD 02C 02C .610 NPSNM 126 CI

I43 25 1.99 0 PCT 24 P2 AV2 -. 05 TEH TEC .610 TBATC 10 CI43 25 1.33 0 PCT 19 P2 AV3 -. 14 TEH TEC .610 TBATC 10 CI43 25 1.13 0 PCT 17 P2 AV4 -. 11 TEH TEC .610 TBATC 41 CI43 25 NOD TEH TEH .610 NPSNM 41 HI43 25 NOD TEC TEC .610 NPSNM 96 Cl

------------------------------------------------------+------++---+---+-----+ +- - +-------

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+. . . .. . . . . .+. .+. .----------. .. ÷ .. +----.----.----+.-- -- + . .. .. . . .. .. .. .. ..-- -- + ----.+. .. ..----+ -- -. ..--- + -.. ... +-.....

Page 80: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

+. . . .+. . . . .+. . . .+. .---------... ....----.---- ..----- - - + - --....... .+ -+..- .. .. + -....... +....---- +---- +. . ...----- +-. .+. +- +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ .. .. +...... - .. +.---------..--+----.----.----+. +... --------.--- +-. +-.. .+ -- -+ ... + .. +.----.-- -...--.-- .+ ..... +.- +

43 25 NOD 02C 02C .610 NPSNM 126 CI

44 25 NOD TEH TEC .610 TBATC 18 CI44 25 NDD TEH TEH .610 NPSNM 41 HI44 25 NDD TEC TEC .610 NPSNM 96 CI44 25 NOD 02C 02C .610 NPSNM 126 CI

45 25 NDD TEH TEC .610 TBATC 18 CI45 25 NOD TEH TEH .610 NPSNM 41 HI45 25 NOD TEC TEC .610 NPSNM 96 CI45 25 NOD 02C 02C .610 NPSNM 126 CI

I25 26 .16 144 DFS 1 09C 35.63 TEH TEC .610 TBATC 12 CI25 26 NOD TEH TEH .610 NPSNHM 43 HI25 26 NOD TEC TEC .610 NPSNH 96 CI25 26 NDF 2 09C 35.63 09C 10C .610 NPSNHM 112 CII10 27 5.00 177 ONG P1 05H 1.87 TEH TEC .610 TBATC 26 CI10 27 NOD TEH TEH .610 NPSNM 67 HI10 27 NDF 2 05H 1.87 05H 07H .610 NPSNM 91 HI

I26 30 NOD TEH TEC .610 TBATC 12 CI26 30 NOD TEH TEH .610 NPSNM 43 HI26 30 NOD TEC TEH .610 TBATC 101 HI26 30 NDF 2 03C -. 63 03C 03C .610 NPSNM 112 CII

9 40 2.02 180 ONG P1 07H 26.02 TEH TEC .610 TBATC 24 CI9 40 4.98 181 ONG P1 07H 26.70 TEH TEC .610 TBATC 24 CI9 40 NOD TEH TEH .610 NPSNHM 35 HI9 40 NDF 2 07H 26.70 07H 08H .610 NPSNM 91 HII

41 40 2.08 176 ONG P1 08H 37.61 TEH TEC .610 TBATC 8 CI41 40 NOD TEH TEH .610 NPSNM 39 HI41 40 NOD 02C 02C .610 NPSNHM 128 CI

I42 40 NOD TEH TEC .610 TBATC 8 CI42 40 NOD TEH TEH .610 NPSNM 39 HI42 40 NOD 02C 02C .610 NPSNM 128 CII43 40 2.06 182 DNT P1 08C .44 TEH TEC .610 TBATC 8 CI43 40 7.43 182 ONG P1 08C 2.33 TEH TEC .610 TBATC 8 CI43 40 8.57 182 ONG P1 88C 3.46 TEH TEC .610 TBATC 8 CI43 40 1.77 76 INR 6 07C 18.74 TEH TEC .610 TBATC 8 CI43 40 NDF 2 TEH .48 TEH TEH .610 NPSNM 39 HI43 40 NOD 02C 02C .610 NPSNM 128 CII34 41 3.57 181 ONG P1 01H 2.66 TEH TEC .610 TBATC 6 CI34 41 NOD TEH TEH .610 NPSNM 33 HI34 41 NDF 2 01H 2.66 01H 03H .610 NPSNM 79 HI34 41 NDF 2 TEC .44 TEC TEC .610 NPSNM 94 CI

41 41 NOD TEH TEC .610 TBATC 6 CI41 41 NOD TEH TEH .610 NPSNM 37 HI41 41 NOD TEC TEC .610 NPSNM 96 CI41 41 NOD 02C 02C .610 NPSNM 126 CI

42 41 NOD TEH TEC .610 TBATC 6 CI42 41 NOD TEH TEH .610 NPSNM 37 HI42 41 NOD TEC TEC .610 NPSNM 96 CI42 41 NOD TEC TEC .610 NPSNM 126 CI42 41 NOD 02C 02C .610 NPSNM 126 CI

I43 41 NOD TEH TEC .610 TBATC 6 CI43 41 NOD TEH TEH .610 NPSNM 37 HI43 41 NDD TEC TEC .610 NPSNHM 96 CI43 41 NDD 02C 02C .610 NPSNHM 126 CII41 42 NOD TEH TEC .610 TBATC 30 CI41 42 NOD TEH TEH .610 NPSNHM 39 HI41 42 NOD TEC TEC .610 NPSNHM 94 CI41 42 NOD 02C 02C .610 NPSNHM 128 CI

I42 42 NOD TEH TEC .610 TBATC 30 CI42 42 NOD TEH TEH .610 NPSNM 39 HI42 42 NOD TEC TEC .610 NPSNM 94 CI42 42 NOD 02C 02C .610 NPSNM 128 CII43 42 NOD TEH TEC .610 TBATC 30 CI43 42 NOD TEH TEH .610 NPSNM 39 HI43 42 NOD TEC TEC .610 NPSNM 94 CI

... . . .. +. . . .. + .. +.. . . .. + ..------- - - ---- + . .. .. .. +.+ .. .. +.. .. . . ..-- - - - ---- - -+. .. + . .+---- .-- . .--- + -. ... +- ...... .

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+. . . . . . .+. . . . .+----------. . . .. +----.----.----.-- - ... ... .+ +. ... .+.... .. ..-- -- ---- +----....+. . ..----- +-......+- ...... +

11

Page 81: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

+ . .+.. .- ... . . .+.. .+. .. +. .-----------....-....-.---- +.----- - -. +.- --. .+---++-+.......+.. . .. ..----- ---+ - . . ..----- + - . +--+ - - +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRUID CEG BEGT ENDT PDIA PTYPE CAL LI+. . . .- .. . . .+. . . .+. . . .----------.. . .. .. .----.----..--..-- - +- -+- ....... +.....-..+.... .. .+----- -- . . ..------ +..- - .+- +

43 42 NOD 02C 02C .610 NPSNM

5.91 50 DTSNDDNDF

3.09 184 DNGNDDNDF

NDF2.04 0 RWS

NDF1.67 0 PCT

.41 110 VOL

NDD5.68 0 RWS

NDF3.72 0 PCT

.72 115 VOL

NDF2.43 176 DNT2.50 176 DNT3.03 0 RWS2.13 0 PCT

.60 117 VOL

.15 133 DFS2.93 0 RWS

NOD2.44 0 PCT

NDDNDD

.56 117 VOL

NDD.32 151 DFS

3.88 0 RWS.55 159 DFS

2.54 0 PCT.83 110 VOL

6.23 0 PIDNDD

4.70 0 PCT1.20 105 VOL

NODNODNODNOD

RBDNDDNDDNDDNDD

NDDNDD

1.85 185 INRNDD

P4 TSH

2 TSH

P1 05H

2 05H

2 TEHP2 07C

2 TEC22 P6 07C

P4 07C

P2 07C2 TEC

39 P6 07CP4 07C

2 TEHP1 AV2P1 AV3P2 07C

27 P6 07CP4 07C

1 09CP2 07C

30 P6 07C

P4 07C

1 1MHP2 07C

1 02C31 P6 07C

P4 07C

P2 07C

45 P6 07CP4 07C

.00

.00

25.82

25.82

.48-. 03

.45

.15-. 03

.06

.45

.13-. 31

.47

.00-. 05

.16

.28

.16

8.36.28

.41

.28

19.25.11

7.07.20.24

.33

-. 03.23

TEH TECTEH TEHTSH TSH

TEH TECTEH TEH05H 07H

TEH TSHTEH TECTEC TECTEC TEH07C 07C

TEH TSHTEH TECTEC TECTEC TEH07C 07C

TEH TEHTEH TEC

.TEH TECTEH TECTEC TEH07C 07C

TEH TECTEH TECTEH TEHTEC TEH02C 02C03C 03C07C 07C

TEH TEHTEH TECTEH TECTEH TECTEC TEH07C 07C

TEH TECTEH TEHTEC TEH07C 07C

11C TECTEH TEH11H TEH02C 02C

TEH TEHTEH TEH11H TEC11H TEH02C 02C

TEH TEH11H TEC11H TEH02C 02C

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 NPSNM

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 NPSNM

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 NPSNM

.610 TBATC

.610 TBATC

.610 NPSNM

.610 TBATC

.610 NPSNM.610 NPSNM.610 NPSNM

.610 NPSNM

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 NPSNM

.610 TBATC

.610 NPSNM

.610 TBATC

.610 NPSNM

.610 TBATC

.610 NPSNM

.610 SBACC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.590 SBUCC

.610 TBATC

.610 NPSNM

.610 NPSNM

.590 SBUCC

.610 SBACC

.610 NPSNM

128 CI

32 CI33 HI73 HI

22 CI25 HI81 HI

7 HI36 CI98 CI

101 HI110 CI

7 HI36 CI98 Cl

101 HI110 CI

33 HI36 CI36 CI36 CI

101 HI110 CI

34 CI34 CI35 HI

101 HI106 CI106 CI110 CI

33 HI36 C36 C36 C

101 H110 C

34 C35 H

101 H110 C

28 C51 H99 H

128 C

47 H49 H92 CI93 HI

126 CI

35 HI90 Cl95 HI

128 ClP1 03H -. 27

3 57 NOD TI:H TEH .610 NPSNM 49 HI3 57 NDD 11H TEC .590 SBUCC 92 CI3 57 NDD 11H TEH .610 TBATC 93 HI3 57 NDD 02C 02C .610 NPSNM 126 CII4 57 NDD TEH TEH .610 NPSNM 49 HI4 57 NDD 11H TEC .590 SBUCC 90 CI4 57 NDD 11H TEH .610 SBACC 95 HI4 57 NDD 02C 02C .610 NPSNM 128 CI

7 57 NDD TEH TEC .610 TBATC 24 CI7 57 NDD TEH TEH .610 NPSNM 33 HI7 57 NDD 02C 02C .610 NPSNM 128 CI

I8 57 NOD TEH TEC .610 TBATC 24 CI

----- ----- --------------+--------+-----+-----+-----+.--.+---+---+--+ - + - ----+ -----+ -----+ - - +--- -----

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI--. .- . .-- . . ...- . .--. .-...-. .-. .--------- + --. .----+ - ..- .. . ...- - . .. . +. .. . . .---+- --+ - + -- +. .. . . .---- + -- .--- + -.. ... +- ... ..

12

Page 82: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

+---- ...---------- ----- ----- ------+---- ------+-. +---- -----+- - - --------+ -+------------------- -------+ - ------- -----+-----+ -- +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI--------------------------------------------+----+----+----+----+----+---+-------------+----+---------

8 57 NOD TEH TEH .610 NPSNM 29 HI8 57 NDD 02C 02C .610 NPSNN 126 CII

11 57 NDD TEH TEC .610 TBATC 24 CI11 57 NDD TEH TEH .610 NPSNM 29 HN11 57 NDD 02C 02C .610 NPSNM 126 CI

I1 12 57 2.73 168 DNG P1 10C 35.76 TEH TEC .610 TBATC 24 CI

12 57 3.41 175 ONG P1 10C 36.98 TEH TEC .610 TBATC 24 CI12 57 NOD TEH TEH .610 NPSNM 29 HI12 57 NOD 02C 02C .610 NPSNN 126 CI

I2 58 NOD TEH TEH .610 NPSNM 51 HI2 58 NOD 11C TEC .610 ZBAZC 80 CI2 58 3.80 187 DNG P1 03H 4.65 11H TEH .610 SBACC 99 HI2 58 NDD 02C 02C .610 NPSNM 128 Cj

I3 58 NDD TEH TEH .610 NPSNM 51 Hj3 58 NDD 11H TEC .590 SBUCC 92 CI3 58 NDD 11H TEH .610 TBATC 93 HI3 58 NDD 02C 02C .610 NPSNM 126 CI

I4 58 NOD TEH TEH .610 NPSNM 51 HI4 58 NOD 11H TEC .590 SBUCC 90 Cj4 58 4.50 187 DNG P1 01H 23.79 11H TEH .610 SBACC 95 HI4 58 NDF 2 01H 23.79 01H 03H .610 NPSNM 103 HI4 58 NOD 02C 02C .610 NPSNM 128 Cj

II 7 58 NOD TEH TEH .610 NPSNM 51 Hj1 7 58 3.85 69 MBE 6 03H 6.90 TEH TEC .610 ZBAZC 80 C11 7 58 3.69 184 ONG P1 10H 6.74 TEH TEC .610 ZBAZC 80 CI1 7 58 NDD 02C 02C .610 NPSNM 128 CI

I I8 58 NDD TEH TEH .610 NPSNM 51 HI8 58 NDD TEH TEC .610 ZBAZC 80 Cj

1 8 58 NOD 02C 02C .610 NPSNM 126 CjI I

1 11 58 NOD TEH TEH .610 NPSNM 51 HI1 11 58 NOD TEH TEC .610 ZBAZC 80 CI1 11 58 NOD 02C 02C .610 NPSNM 128 CI

I I12 58 NDD TEH TEH .610 NPSNN 51 HI12 58 NDD TEH TEC .610 ZBAZC 80 Cj12 58 NOD 02C 02C .610 NPSNM 126 Cj

I2 59 NDD TEH TEH .610 NPSNM 49 HI2 59 NOD 11C TEC .610 ZBAZC 82 CI2 59 NDD 11H TEH .610 SBACC 99 HI2 59 NOD 11C 11H .580 ZPUMB 118 CI2 59 NOD 02C 02C .610 NPSNM 128 CI

I3 59 NOD TEH TEH .610 NPSNM 49 HI3 59 .30 147 DFS 1 07C 2.89 11H TEC .590 SBUCC 92 Cj3 59 NDD 11H TEH .610 TBATC 93 HN3 59 NDD 02C 02C .610 NPSNM 126 Cj

4 59 2.70 35 SAS 0 2 TEH .19 .12 .39 59 TEH TSH .610 NPSNM 45 HN4 59 NDD 11H TEC .590 SBUCC 90 Cj4 59 2.01 185 DNG P1 10i 15.94 11H TEH .610 SBACC 95 HN4 59 NOD 02C 02C .610 NPSNM 128 Cj

5 59 NOD TEH TEH .610 NPSNM 49 HN5 59 NOD TEH TEC .610 ZBAZC 82 Cj5 59 NDD 02C 02C .610 NPSNM 126 Cj

7 59 NDD TEH TEH .610 NPSNM 49 HI7 59 2.84 72 MBM 6 09C 18.71 TEH TEC .610 ZBAZC 82 CI7 59 4.66 77 MBM 6 09C 28.88 TEH TEC .610 ZBAZC 82 CI7 59 NOD 02C 02C .610 NPSNM 128 Cj

8 59 NDF 2 TEH .48 TEH TEH .610 NPSNM 49 HN8 59 NOD TEH TEC .610 ZBAZC 82 Cj8 59 NOD 02C 02C .610 NPSNM 126 Cj

9 59 NDD TEH TEH .610 NPSNM 49 HN9 59 NDD TEH TEC .610 ZBAZC 82 Cj9 59 NDD 02C 02C .610 NPSNM 126 Cj

I 10 59 NOD TEH TEH .610 NPSNM 49 HN1 10 59 NOD TEH TEC .610 ZBAZC 82 CI

------------------------------- +---+----+-----+-----+----+---+--+ - + - ----+ -----+ -----+ - - +--------

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+.. .. +.....+.. .. +.. ---------...+---+ .. +..... .... .----....--..----- +- ... +..----+-- .. +.----.-- -.. --- +-....+-.......

13

Page 83: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

.. .+.. .+--. .+-. .+ . .+ . .+---------.... ....---.----.----.. . .. ... +.. .. . ..----- -..- +-...-----. .. +.----+ -- -- .--- + -. ... +- ...... +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI... + ... + -...- +... + ..---------......--- +------------ --- +--+-......-+ -..... +-- -+ ... + .. +.----.-- -...--.-- .+ ..... +.- +

10 59 NDD 02C 02C .610 NPSNM 126 CI

11 59 NOD TEH TEH .610 NPSNM 49 HI11 59 NOD TEH TEC .610 ZBAZC 82 CI11 59 NOD 02C 02C .610 NPSNM 128 CII12 59 NOD TEH TEH .610 NPSNM 49 HI12 59 NOD TEH TEC .610 ZBAZC 82 CI12 59 NOD 02C 02C .610 NPSNM 126 CII48 59 1.99 182 INR P1 03H 32.98 TEH TEC .610 SBACC 52 CI48 59 3.86 0 RWS P2 07C .00 TEH TEC .610 SBACC 52 CI48 59 NOD TEH TEH .610 NPSNM 53 HI48 59 2.75 0 PCT 33 P6 07C .00 TEC TEH .610 TBATC 101 HI48 59 .78 108 VOL P4 07C -. 07 07C 07C .610 NPSNM 110 CII2 60 NOD TEH TEH .610 NPSNM 51 HI2 60 NOD 11C TEC .610 ZBAZC 80 CI2 60 NOD 11H TEH .610 SBACC 99 HI2 60 NOD 02C 02C .610 NPSNM 128 CI

I3 60 NOD TEH TEH .610 NPSNM 51 HI3 60 NOD 11H TEC .590 SBUCC 92 CI3 60 NOD 11H TEH .610 TBATC 93 HI3 60 NOD 02C 02C .610 NPSNM 126 CI

I4 60 NOD TEH TEH .610 NPSNM 51 HI4 60 NOD 11H TEC .590 SBUCC 90 CI4 60 NOD 11H TEH .610 SBACC 95 HI4 60 NOD 02C 02C .610 NPSNM 128 CI

I5 60 NOD TEH TEH .610 NPSNM 51 HI5 60 NOD TEH TEC .610 ZBAZC 80 CI5 60 NOD 02C 02C .610 NPSNM 126 CII7 60 NOD TEH TEH .610 NPSNM 51 HI7 60 NOD TEH TEC .610 ZBAZC 80 CI7 60 NOD 02C 02C .610 NPSNM 128 CI

I

8 60 NOD TEH TEH .610 NPSNM 51 HI8 60 NOD TEH TEC .610 ZBAZC 80 CI8 60 NOD 02C 02C .610 NPSNM 128 CII9 60 NOD TEH TEH .610 NPSNM 51 HI9 60 NOD TEH TEC .610 ZBAZC 80 CI9 60 NOD 02C 02C .610 NPSNM 128 CI

I37 60 NOD TEH TEH .610 NPSNM 43 HI37 60 2.73 186 ONG P1 08H 17.64 TEH TEC .610 ZBAZC 54 CI37 60 3.13 187 ONG Pl 08H 18.93 TEH TEC .610 ZBAZC 54 CI37 60 NOF 2 08H 18.93 08H 09H .610 NPSNM 81 HI

I2 61 NOD TEH TEH .610 NPSNM 49 HI2 61 NOD 11C TEC .610 ZBAZC 82 CI2 61 NOD 11H TEH .610 SBACC 99 HI2 61 NOD 11C 11H .580 ZPUMB 118 CI2 61 NOD 02C 02C .610 NPSNM 128 CI

3 61 NOD TEH TEH .610 NPSNM 49 HI3 61 NOD 11H TEC .590 SBUCC 92 CI3 61 NOD 11H TEH .610 TBATC 93 HI3 61 NOD 02C 02C .610 NPSNM 126 CI

4 61 NOD TEH TEH .610 NPSNM 49 HI4 61 .29 151 DFS 1 05C 8.75 11H TEC .590 SBUCC 90 CI4 61 NOD 11H TEH .610 SBACC 95 HI4 61 NOD 02C 02C .610 NPSNM 128 CI

5 61 NOD TEH TEH .610 NPSNM 49 HI5 61 NOD TEH TEC .610 .ZBAZC 82 CI5 61 NOD 02C 02C .610 NPSNM 126 CI

48 62 NOD TEH TEH .610 NPSNM 53 HI48 62 9.91 66 DSS Pl 02C -. 49 TEH TEC .610 ZBAZC 54 CI48 62 NOD TEC TEH .610 TBATC 101 HI48 62 NOD 02C 02C .610 NPSNM 106 CI48 62 NOD 03C 03C .610 NPSNM 106 CI48 62 NOF P1 02C -. 49 02C 02C .610 NPSNM 110 CII49 63 NOD TEH TEH .610 NPSNM 53 HI

------------------------ +--------+-----+-----+-----+-.--+----+---+--+ - + - ---- + -----+ -----+ - -- --------

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI--------------- ----------- +----+----+------- +----++ - + - + + ----+-- ----- - --

14

Page 84: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

+ . .+.. .÷. . .÷. . ÷. .---------- - --+ ---- +-----. + .. . -.. . -..+. _.÷.. ..----- -.. ++-. .+---- +---- +.. . . . . ..----- +-......+- ...... .

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI* 49 63.. .. .. .... .. .. ..----------...---... ... ..... ..----..........-- -.--- -. . . .. ..----.----. .. ...-----....- ...

49 63 2.72 180 DNT P1 AV2 .19 TEH TEC .610 ZBAZC 54 Cl49 63 3.97 0 RWS P2 07C .28 TEH TEC .610 ZBAZC 54 CI49 63 4.23 182 ONG P1 03C 13.55 TEH TEC .610 ZBAZC 54 CI49 63 2.45 172 ONG P1 TSC .85 TEH TEC .610 ZBAZC 54 CI49 63 2.79 0 PCT 33 P6 07C .13 TEC TEH .610 TBATC 101 HI49 63 .53 125 VOL P4 07C -. 01 07C 07C .610 NPSNM 110 CI

I24 65 5.86 173 DNT P1 03C -. 41 TEH TEC .610 TBATC 40 CI24 65 NOD TEH TEH .610 NPSNM 49 HI24 65 NDF 2 TEC .77 TEC TEC .610 NPSNM 102 CI24 65 NDD 02C 02C .610 NPSNM 126 CII25 65 2.62 175 ONT P1 03C -. 52 TEH TEC .610 SBACC 38 CI25 65 NOD TEH TEH .610 NPSNM 51 HI25 65 NOD TEC TEC .610 NPSNM 102 CI25 65 NOD 02C 02C .610 NPSNM 126 CI

I

26 65 NOD TEH TEC .610 TBATC 40 CI26 65 NOD TEH TEH .610 NPSNM 53 HI26 65 NOD TEC TEC .610 NPSNM 102 CI26 65 NOD 02C 02C .610 NPSNM 126 CII27 65 NOD TEH TEC .610 SBACC 38 CI27 65 NOD TEH TEH .610 NPSNM 55 HI27 65 NOD TEC TEC .610 NPSNM 102 CI27 65 NOD 02C 02C .610 NPSNM 126 CI

24 66 11.16 178 DNT P1 03C -. 41 TEH TEC .610 TBATC 40 CI24 66 NOD TEH TEH .610 NPSNM 49 HI24 66 NOF 2 TEC .45 TEC TEC .610 NPSNM 104 CI24 66 NOD 02C 02C .610 NPSNM 128 CI

25 66 6.01 176 DNT P1 03C -. 52 TEH TEC .610 SBACC 38 CI25 66 NOD TEH TEH .610 NPSNM 51 HI25 66 NOD TEC TEC .610 NPSNM 104 CI25 66 NOD 02C 02C .610 NPSNM 128 CI

26 66 3.72 169 DNT P1 03C -. 41 TEH TEC .610 TBATC 40 CI26 66 NOD TEH TEH .610 NPSNM 53 HI26 66 NDF 2 TEC .45 TEC TEC .610 NPSNM 104 CI26 66 NOD 02C 02C .610 NPSNM 128 CI

27 66 NOD TEH TEC .610 SBACC 38 CI27 66 NOD TEH TEH .610 NPSNM 55 HI27 66 NOD TEC TEC .610 NPSNM 104 CI27 66 NOD 02C 02C .610 NPSNM 128 CI

28 66 NOD TEH TSH .610 NPSNM 15 HI28 66 NOD TEH TEC .610 TBATC 40 CI28 66 NOD TEC TEC .610 NPSNM 104 CI28 66 NOD 02C 02C .610 NPSNM 128 CI

45 66 NOD TEH TSH .610 NPSNM 13 HI45 66 3.08 180 ONG P1 03H 13.85 TEH TEC .610 SBACC 46 CI45 66 NDF 2 03H 13.85 03H 05H .610 NPSNM 81 HI45 66 NOD TEC TEC .610 NPSNM 102 CII24 67 NOD TEH TSH .610 NPSNM 13 HI24 67 NOD TEH TEC .610 TBATC 40 CI24 67 NOD 02C 02C .610 NPSNM 126 CI

I25 67 NOD TEH TSH .610 NPSNM 13 HI25 67 NDD TEH TEC .610 SBACC 38 CI25 67 NOD 02C 02C .610 NPSNM 128 CI

I26 67 NOD TEH TSH .610 NPSNM 13 HI26 67 NOD TEH TEC .610 TBATC 40 CI26 67 NOD 02C 02C .610 NPSNM 128 CI

I27 67 NOD TEH TSH .610 NPSNM 13 HI27 67 2.38 168 DNT P1 03C -. 49 TEH TEC .610 SBACC 38 CI27 67 NOD 02C 02C .610 NPSNM 128 ClI28 67 NOD TEH TSH .610 NPSNM 13 HI28 67 NOD TEH TEC .610 TBATC 40 CI28 67 NOD 02C 02C .610 NPSNM 128 CI

I25 68 4.96 177 DNT P1 03C -. 52 TEH TEC .610 SBACC 38 CI25 68 NOD TEH TEH .610 NPSNM 51 HI25 68 NOD 02C 02C .610 NPSNM 126 CI

+ . .+. . . . .. .+. . . .+.---------- .. +...------------+..+. .... .. +.- --+- - -. --. + - -+ --- -+. .. + . . ..------ -+. ..--- + -.. ... +- ......I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ . .+. . . . . .. ÷. . . .+.---------- - .----+ ----....+.. .+....------ - + -. - -. +--.- -+ --- -+. .. + . . ..------ -+. ..--- + -.. ... +- ......

15

Page 85: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/20@8 01:00:34

÷ .. +-l_- l-. ..--.. -.. . . .. ÷ ..-----------....---+ - - -- 4.. .. + . .÷ .+ .... . _ .÷. .. ... . ..-- --+ -..... --+.....-.--- . .... +_

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI--------------------- +--------+------+-----+-----+-----+---+---+--+ - + - ----- +-----+----4- - + - 1--------

26 68 2.80 176 DNT P1 03C - .47 TEH TEC .610 TBATC 40 CI26 68 NDD TEH TEH .610 NPSNM 53 HI26 68 NOD 02C 02C .610 NPSNM 126 CII27 68 NDD TEH TEC .610 SBACC 38 CI27 68 NDD TEH TEH .610 NPSNM 55 HI27 68 NDD 02C 02C .610 NPSNM 126 CII28 68 NDD TEH TEC .610 TBATC 40 CI28 68 NDD TEH TEH .610 NPSNM 53 HI28 68 NDD 02C 02C .610 NPSNM 126 CII45 68 3.08 165 DNT P1 11H -. 61 TEH TEC .610 SBACC 46 CI45 68 2.39 170 DNT P1 11H .49 TEH TEC .610 SBACC 46 CI45 68 2.05 171 ONG P1 11H .93 TEH TEC .610 SBACC 46 CI45 68 NOD TEH TEH .610 NPSNM 53 HI45 68 NDF 2 11H -. 61 11H 11H .610 NPSNM 81 HII33 69 NOD TEH TEC .610 TBATC 48 CI33 69 NOD TEH TEH .610 NPSNM 55 HI33 69 NOD 02C 02C .610 NPSNM 128 CI

I34 69 NOD TEH TEC .610 TBATC 48 CI34 69 NOD TEH TEH .610 NPSNM 53 HI34 69 NOD 02C 02C .610 NPSNM 128 CI

I33 70 3.03 186 DNG P1 11H .94 TEH TEC .610 SBACC 46 CI33 70 NDD TEH TEH .610 NPSNM 55 HI33 70 NDF 2 11H .94 11H 11H .610 NPSNM 81 HI33 70 NDD 02C 02C .610 NPSNM 126 CII34 70 NDD TEH TEC .610 SBACC 46 CI34 70 NDD TEH TEH .610 NPSNM 53 HI34 70 NDD 02C 02C .610 NPSNM 126 CII33 71 NOD TEH TEC .610 TBATC 44 CI33 71 NDD TEH TEH .610 NPSNM 55 HI33 71 NOD 02C 02C .610 NPSNM 128 CI

I34 71 NOD TEH TEC .610 TBATC 44 CI34 71 NOD TEH TEH .610 NPSNM 53 HI34 71 NOD 02C 02C .610 NPSNM 128 CI

I35 71 NOD TEH TEC .610 TBATC 44 CI35 71 NOD TEH TEH .610 NPSNM 55 HI35 71 NOD 02C 02C .610 NPSNM 128 CI

I49 71 2.42 175 DNG P1 1MH 32.71 TEH TEC .610 TBATC 48 CI49 71 3.80 180 DNG P1 10H 33.76 TEH TEC .610 TBATC 48 CI49 71 2.04 176 DNG P1 1MH 34.70 TEH TEC .610 TBATC 48 CI49 71 2.45 180 DNG P1 10H 35.75 TEH TEC .610 TBATC 48 Cl

49 71 1.73 180 INR P1 AV4 27.88 TEH TEC .610 TBATC 48 CI49 71 NOD TEH TEH .610 NPSNM 53 HI49 71 NDF 2 10H 33.76 10H 11H .610 NPSNM 91 HI49 71 NDD 02C 02C .610 NPSNM 106 CI49 71 NDD 03C 03C .610 NPSNM 106 CI

I33 72 1.34 0 PCT 20 P2 AV3 .00 TEH TEC .610 SBACC 42 CI33 72 .93 0 PCT 15 P2 AV4 .03 TEH TEC .610 SBACC 42 Cl

33 72 NOD TEH TEH .610 NPSNM 55 HI33 72 NOD 02C 02C .610 NPSNM 126 CI

I34 72 NOD TEH TEC .610 SBACC 42 CI34 72 NOD TEH TEH .610 NPSNM 53 HI34 72 NOD 02C 02C .610 NPSNM 126 CII35 72 NDD TEH TEC .610 SBACC 42 CI35 72 NDD TEH TEH .610 NPSNM 55 HI35 72 NDD 02C 02C .610 NPSNM 126 CII

1 74 NDD TEH TEH .610 NPSNM 49 HI1 74 3.31 176 DNT P1 07C .75 11C TEC .610 ZBAZC 82 CI1 74 3.02 175 DNT P1 06C .54 11C TEC .610 ZBAZC 82 CI1 74 10.16 184 DNT P1 11H .16 11H TEH .610 TBATC 97 HI1 74 NDD TEC TEC .610 NPSNM 104 CI1 74 NDF 2 11H .16 11H 11H .610 NPSNM 109 HI1 74 NOD 11C 11H .580 ZPUMB 120 CI

I29 74 NOD TEH TEC .610 SBACC 38 CI

+ ... + .. + ...... + ... + .. + .. +... -------+ .... - --+ --- +---- +---+-+.. .+-. .+.----+----+---.+- -+ - +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ ... + ... +........+ ... + ... +....+ ... + ... .... ÷ ---------- + ..+.--.-...+-e-- I----+. ..----.---- . ......+--+-

16

Page 86: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

+ ... + ... +._ -+.... .. +.---------- -- +----..+...----.- -- +.---+ .+--+-.......+- --- + .. -.. - ..----.+ -- --+---....+-......+-.

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ . . + . ..---------- + +....+.... +....+....+.........+.........+..+... ... +...-----------4-- - - + + - + -+. . .----... +-......+..- ... + +

29 74 NDD TEH TEH .610 NPSNM 55 HI29. 74 NDD TEC TEC .610 NPSNM 104 CI29 74 NDD 02C 02C .610 NPSNM 126 CI

30 74 NDO TEH TEC .610 SBACC 42 CI30 74 NDF 2 TEH 1.03 TEH TEH .610 NPSNM 53 HI30 74 NDF 2 TEC .45 TEC TEC .610 NPSNM 104 CI30 74 NOD 02C 02C .610 NPSNM 128 CI

I31 74 NOD TEH TEC .610 SBACC 42 CI31 74 NOD TEH TEH .610 NPSNM 55 HI31 74 NDF 2 TEC .45 TEC TEC .610 NPSNM 104 CI31 74 NOD 02C 02C .610 NPSNM 126 CI

I32 74 NOD TEH TEC .610 SBACC 42 CI32 74 NOD TEH TEH .610 NPSNM 53 HI32 74 NDF 2 TEC .45 TEC TEC .610 NPSNM 104 CI32 74 NOD 02C 02C .610 NPSNM 126 CII29 75 NOD TEH TEC .610 SBACC 38 CI29 75 NOD TEH TEH .610 NPSNM 55 HI29 75 NOD 02C 02C .610 NPSNM 126 CI

I30 75 NOD TEH TEC .610 TBATC 44 CI30 75 NOD TEH TEH .610 NPSNM 53 HI30 75 NOD 02C 02C .610 NPSNM 128 CI

I31 75 NDD TEH TEC .610 TBATC 44 Cl31 75 NOD TEH TEH .610 NPSNM 55 HI31 75 NDD 02C 02C .610 NPSNM 128 Cl

I32 75 NOD TEH TEC .610 TBATC 44 Cl32 75 NDO TEH TEH .610 NPSNM 53 Hj32 75 NDD 02C 02C .610 NPSNM 128 Cl

I47 75 2.19 0 RWS P2 02C .11 TEH TEC .610 TBATC 44 CI47 75 NDD TEH TEH .610 NPSNM 53 HI47 75 .30 0 PCT 8 P5 02C .40 TEC TEH .610 TBATC 101 HI47 75 .11 115 VOL P4 02C .55 02C 02C .610 NPSNM 110 CI

I1 76 NDD TEH TEH .610 NPSNM 49 HI1 76 2.20 176 DNT P1 11C -. 43 11C TEC .610 ZBAZC 82 Cl1 76 4.38 176 DNT P1 11C .35 11C TEC .610 ZBAZC 82 CI1 76 3.83 177 DNT P1 11H .21 11H TEH .610 TBATC 97 HI1 76 NDF 2 11H .21 11H 11H .610 NPSNM 109 HI1 76 NOD 11C 11H .580 ZPUMB 120 CI

I

29 76 NOD TEH TEC .610 SBACC 38 CI29 76 NOD TEH TEH .610 NPSNM 55 HI29 76 NOD 02C 02C .610 NPSNM 126 CII30 76 NOD TEH TEC .610 SBACC 42 CI30 76 NOD TEH TEH .610 NPSNM 53 HI30 76 NOD 02C 02C .610 NPSNM 126 CI

I31 76 NDD TEH TEC .610 SBACC 42 CI31 76 NDF 2 TEH .48 TEH TEH .610 NPSNM 55 HI31 76 NDD 02C 02C .610 NPSNM 126 CII32 76 NOD TEH TEC .610 SBACC 42 CI32 76 NDD TEH TEH .610 NPSNM 53 HI32 76 NDD 02C 02C .610 NPSNM 128 Cl

I33 76 NOD TEH TEC .610 SBACC 42 CI33 76 NOD TEH TEH .610 NPSNM 55 HI33 76 NOD 02C 02C .610 NPSNM 128 CII31 77 NOD TEH TEC .610 TBATC 44 CI31 77 NOD TEH TEH .610 NPSNM 55 HI31 77 NDD 02C 02C .610 NPSNM 126 CI

I32 77 NDD TEH TEC .610 TBATC 44 CI32 77 NDD TEH TEH .610 NPSNM 53 HI32 77 NDD 02C 02C .610 NPSNM 128 CI

I33 77 NDD TEH TEC .610 TBATC 44 CI33 77 NDF 2 TEH .48 TEH TEH .610 NPSNM 55 NI33 77 NDD 02C 02C .610 NPSNM 128 CI

I31 78 NOD TEH TEC .610 SBACC 42 CI

---------------------- +--------+------+-----+----+------+---4---+--+ - + - -----+----t------- - +--------

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI-------------- ----------- +----+----+-------+-----++ - + - + + ----+-- ----- - --

17

Page 87: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

+ .. . . +. . .÷.. . .. . . +.---------...-÷--+ .. . . +.. .. ... + ..------ -...- +. - .+.... ....----.. . ..----+ -- - ...--- +- ... +...... -

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI.. .- . .-- . .. ..- . . . . ...--. .------------...- +-.. ......--.----+----....--. +----...----.----.----+.. . .- +-.. . . . . . . .+.......-

31 78 NOD TEH TEH .610 NPSNM 55 HI31 78 NOD . .,->:Ž;t;:.:%,.,.r•'• *;, 02C-.-02C .610 NPSNM 126 CI

I32 78 NOD TEH TEC .610 SBACC 42 CI32 78 NOD TEH TEH .610 NPSNM 53 HI32 78 NDD 02C 02C .610 NPSNM 126 CI

I33 78 6.05 77 MBM 6 TSC 3.78 TEH TEC .610 SBACC 42 CI33 78 NDD TEH TEH .610 NPSNM 55 HI33 78 NDD 02C 02C .610 NPSNM 126 CI

47 83 NDO TEH TSH .610 NPSNN 11 HI47 83 4.62 186 DNG P1 01H .89 TEH TEC .610 TBATC 44 CI47 83 6.94 178 ONG P1 13C 39.46 TEH TEC .610 TBATC 44 CI47 83 NDF 2 01H .89 01H 01H .610 NPSNt 91 Hj

33 90 NDD TEH TSH .610 NPSNM 13 HI33 90 NDD TEH TEC .610 ZBAZC 54 CI33 90 NDD TEC TEH .610 TBATC 101 HI33 90 NDF 2 TEC .46 TEC TEC .610 NPSNM 102 CI33 90 NDF 2 03C -. 52 03C 03C .610 NPSNM 110 CI

Ii15 91 NDD TEH TSH .610 NPSNM 19 HI15 91 .88 0 RWS P2 06C .05 TEH TEC .610 SBACC 58 CI15 91 .20 0 PCT 5 P5 06C -. 15 TEC TEH .610 TBATC 101 HI15 91 .12 117 VOL P4 06C .05 06C 06C .610 NPSNM 118 CI

I1 92 NOD TEH TEH .610 NPSNM 63 HI1 92 4.00 182 ONT P1 liC .32 11C TEC .610 ZBAZC 68 Ci1 92 1.89 182 INR P1 01H 6.92 11H TEH .610 TBATC 97 HI1 92 3.42 178 DNT P1 03H .69 11H TEH .610 TBATC 97 HI1 92 1.62 181 INR P1 05H 15.76 11H TEH .610 TBATC 97 HI1 92 2.29 182 DNG P1 05H 22.95 11H TEH .610 TBATC 97 HI1 92 NDF 2 03H .69 03H 03H .610 NPSNM 107 HI

I39 94 1.16 0 PCT 18 P2 AV2 .00 TEH TEC .610 ZBAZC 54 CI39 94 2.88 0 PCT 31 P2 AV3 .00 TEH TEC .610 ZBAZC 54 Cl

39 94 1.32 0 PCT 19 P2 AV4 .00 TEH TEC .610 ZBAZC 54 CI39 94 NOD TEH TEH .610 NPSNM 57 HI39 94 PBC TEC TEH .610 TBATC 101 HI39 94 NDF P1 03C -. 52 03C 03C .610 NPSNM 110 CI

I4 106 NDF 2 TEH .50 TEH TEH .610 NPSNM 63 HI4 106 NDF 2 TEH 1.22 TEH TEH .610 NPSNM 63 HI

4 106 NDD 11H TEC .590 SBUCC 92 CI4 106 8.14 184 DNG P1 11H .98 11H TEH .610 TBATC 97 HI4 106 NDD TEC TEC .610 NPSNM 104 CI4 106 NDF 2 11H .98 11H 11H .610 NPSNM 107 HI

I24 108 NDD TEH TEH .610 NPSNM 57 HI24 108 3.18 174 DNT P1 11H -. 44 TEH TEC .610 SBACC 58 CI24 108 1.85 0 PCT 24 P2 AV4 -. 26 TEH TEC .610 SBACC 58 CI24 108 NDF 2 11H -. 44 11H 11H .610 NPSNM 85 HI

I

11 110 NDF 2 TEH .85 TEH TEH .610 NPSNM 63 HI11 118 3.14 179 DNT P1 09H -. 48 TEH TEC .610 ZBAZC 76 CI11 110 5.08 176 DNT P1 09H .62 TEH TEC .610 ZBAZC 76 CI11 118 NDF 2 09H .62 09H 09H .610 NPSNN 91 HII12 110 NDF 2 TEH 1.14 TEH TEH .610 NPSNH 63 HI12 110 3.36 178 DNT P1 09H - .45 TEH TEC .610 ZBAZC 76 CI12 110 3.93 177 DNT P1 09H .62 TEH TEC .610 ZBAZC 76 CI12 110 5.21 176 DNG P1 MGH 38.47 TEH TEC .610 ZBAZC 76 CI12 110 2.23 174 DNG P1 10C 40.83 TEH TEC .610 ZBAZC 76 CI12 110 NDF 2 10H 38.47 10H 11H .610 NPSNM 91 HI

I21 110 NDF 2 TEH 1.29 TEH TEH .610 NPSNM 59 HI21 110 3.57 177 DNT P1 09H -. 35 TEH TEC .610 ZBAZC 80 CI21 110 5.31 177 DNT P1 09H .72 TEH TEC .610 ZBAZC 80 CI21 110 1.95 171 INR P1 10H 27.01, TEH TEC .610 ZBAZC 80 CI21 110 4.40 177 DNT P1 11H -. 35 TEH TEC .610 ZBAZC 80 CI21 110 2.59 176 DNT P1 11H .74 TEH TEC .610 ZBAZC 80 CI21 110 .75 0 PCT 13 P2 AV4 .00 TEH TEC .610 ZBAZC 80 CI21 110 NDF 2 09H .72 09H 09H .610 NPSNM 91 HI

I11 112 NOD TEH TEH .610 NPSNM 63 HI11 112 4.53 176 DNT P1 09H -. 35 TEH TEC .610 ZBAZC 70 CI11 112 3.11 178 DNT P1 09H .72 TEH TEC .610 ZBAZC 70 CI11 112 NDF 2 09H -. 35 09H 09H .610 NPSNM 91 HI

I---------------------- +--------+-----+-----+-----+-----+----+---+--+ - + - ---- +-----+-----+ - - +--------

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ . . .. . . . ...-- . .. +. .. +.. .+ . .----------+- - +-. .. +-- - - -- ,-+--+-.. .... +- .. --- +---.. .... .... +... . ...... .....--.- - +...... - -

18

Page 88: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

.... -.... - ... .- ---- + ---- + .--- + -. -- + ---- + .--- + ---.... ------ + - +- - -+ .--- + ---- + ---- + - - + - - + -- - --

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI---- ------------------- +--------+-----+-----+-----+-----+----+---+--+ - + - ----+ -----+-----+ - - +--- ----

3 114 NOD TEH TSH .610 NPSNM 21 HI3 114 2.64 175 ONG P1 10C 27.81 11H TEC .590 SBUCC 92 Cl3 114 4.87 179 DNG P1 10C 28.91 11H TEC .590 SBUCC 92 CI3 114 3.55 180 DNG P1 10C 36.69 11H TEC .590 SBUCC 92 CI3 114 9.12 178 DNG P1 10C 39.06 11H TEC .590 SBUCC 92 CI3 114 4.94 178 ONG P1 10H 27.49 11H TEH .610 TBATC 97 HI3 114 5.45 178 ONG P1 18H 35.49 11H TEH .610 TBATC 97 HI3 114 13.84 180 DNG P1 18H 36.72 11H TEH .610 TBATC 97 Hi3 114 NDD TEC TEC .610 NPSNM 104 CI3 114 NDF 2 10H 35.49 10H 11H .610 NPSNM 109 HI

.. .- . .. +.. .. ..- +. .. + .. --------- ....------- + ----. . - - -++.. .- ,-- - +- -+- ... ... +....- ... +..---- + .. + ..----+ -- -..--- - -. . . . ..- - +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT POIA PTYPE CAL Lj+ .... + ... + ......... ---------....+...+.---+----+. .----- - -- +- --.-- +-......+- . .+------+ - +..----+ -- --..--- -- .... +....- - +

Tubes: 304 Records: 114719

Page 89: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - C SPECIAL INTEREST +POINT INSPECTIONS

Byron B2R14 CBE D5X 241 TUBE TESTED FOR SPECIAL

INTEREST WITH +POINT PROBE -

SEE LIST FOR LOCATION(S)TESTED

a 76 PLUGGED TUBE

118 165 M8 95 96 85

00 .. X00 0

0

86 75 70 65 60 55 50 45 40 35 36 25 28 15 1iq00009pxx00;00Q0x~oBB(qo 00aB000pOU00c00000O000(000I I I I 5

0 of .... f .... f..X.f ... ut---0ý0

x 0 0ol:::Xý::::I::::ý::::I::::Iooooo45

48

35

30

25

20

.15

16

5

00...............B............. ... 0 0..................... ... . OX

00...................... .... .......... .... 0 0...........................a

-O.- ...... .... .... ...... . .... .... 0 0 ............... ............... -...... :00........ ..... B a .0................. 0 0a .-- ..-............. ........ O........0

fte) -- ----u- ý- - -m a--u. e-u a a X --.--- _-_-_-, -_E)

00 ... ... .. ... a .... "'. ." ." ... X. 0 a ..... ......... ....... ,....... . . ...... O0

00 ................o......... .... -. OX. xx 00 ..... 00..........000. - ..... ... 00.. .01....... O0............. .. ........ 0 XXX XX " 0 0 0. .-...... 0 0...... ...... XO..... X0

s *! o-_* - - -~ -*. -~ -C E)-e E). E) - -

00................. ... -.... -. OXXD XXX. . . 0 ...... ... 00)0. .. ...... "."........ ".......00

00o.... ....... ..-..... . ....- - ........ XX a XX o 0......................................... .

0....o.-.. .... . . . . . ...... . .. .... .... ....... .XX a IXXX. 0 0 ..... .. ........ .... ........... ..... . .. ... . ..... ............ .... 0

00.., .... . ..... ..... ... .... .... ..... XXXX XX. '0 0...... ............. .......... . .... ............ ... .. Xx

.. .. ................. ,.....,..... , .... + .... +.....[XXXX IX 0........................ ,.....+.... ,.... +.... + .... X ... ..... .....0.... ........ ... . . . ... .... ... ..... .... .XXXX X 0 .... ..... .... ... . ..... ... ..... ... .... ... ..... -... 0

oo .. . .. ... . . .. .. . ... .. .. . .. .. . .. .. .. . ..... [XXXX x 0 . . .. .. . . .+ .. X .. .. . . . .. . .. . . . ... . .. .. ..... . o0o .... ...... .... . . . . . . . . . XXXX .X 0........ .. ....... .... .... ..... .. .... . ... . ý.. .... . ...... .o

0. -X. . . ... . .... .0.... . .. .... . ...... . .. .0 . XXXXX 0 0 . .. . X... . ....... . ... . 0.. . •. . .... . ... ... B . .•..•

00, .. 0n .X.. .... . ., .0 0. ... . .... .... X.. OO O1XXXX 0000)XoX(.-,,, .. . .- l-0 . ... , . ,.. oX. -,oOe X., .- + .o . . +. , * . , . ,). . . . .. °, 0l ................. +..ooX . .O

0.............B. . . . . . . . . . . . .-..- .. + .--. .- O0 0 . . .0 0 of = = - : = . . . ..: . . . ... . . .. . . . . . .. . . . . .. .. . . . . U 1 1 0 . .. ...... . . .. . . ..... .0

0 .................... ... .. ... . .... ..... ... ... .... .... . ........ .I. ..................... 0

().. ... ......... .... .... ... .... .... ............ . . . .. .... ... .. a .. . .... ....... .....

0 . ... .. A . °. . , . . ... .. .. .°o .. , . , .. , . ,°.... .... . . .. . .... . .e .. .. ° ' X ' .'1 .,° "° .. .. ... 0

0...... ............. ... ....... .. .... ... . :..................................................................0

XX X X ........ ..... .... . ........................ .... .... .. .... . . . ............ . ... .. . . ........ .... ..... .. . .. ..... ........XX CXX..........................,.....,...... ........ ,.....,.....+.....+.... + ............. x..................... • .... .. ........ .. ...... •.....0

xxxIX x........................................t...... .... +.... +.....+.....+.....+.... +........ ,.....,.....,........ ,.... , .... , .... . ...... X.~ .0o

XXXI XX-O)O ..-. .... ..-.. .o000( ..-.. .... ..... *.... ..... 0000 .... •.... .... .... .... COOX . .... .... X... .... .... 0

xo x. 0...... ............. 0 ................. ........... 00............ o........ .... ... o 0........0 ....... ..... ...... .......... ............................ 0 .. ............ B.....I .... . oo.0....... ........... X X

0 .......... ........................ ........ ........................ 0. .. ..... ............ XX]XXX

..... .... .... ... . ... . ... . ... . ... . ... . ... . .... ....°" ' ' ' .... .... .. ... ,- .. .... ...•• X ZXXXX

45

40

35

36

25

15

1A

5

o.X-0..

0o-

0000 0000 Xooo.

1:::: u1000000 0.... ... ... m00c) 0 000 0000

I 0,:00

0 00ý000000$oo4ooooo oxoo4~ooxo )Ox OOXO~OOOO~OOOOOOoooo(DO000dboooo

11 105 166 95 90 85 86 75 70 65 60 55 50 45 40 35 30 25 20

Wesnghoums El Company UC - ST Max 101712W 00:59:30

15 1A 5

Page 90: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - C Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

+ . .÷. . . . .. .+. . . .÷.-----------..-+ . . . . . .. ..----+ -. ..-. ._- -. .-- - --+ - -. + . . ..---- + .- . .+.----.-- - . .-- ÷- - 4--.. . . .. . .

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ .. +...÷ ... +... ..--------------.---------+.----.. --.-- -+--+..-.....+.......-+..----+----+----+- +-+-

5 1 NOD TEH TSH .610 NPSNN 1 HI5 1 2.56 173 ONG P1 10H 31.59 TEH TEC .610 TBATC 26 CI5 1 NOD TEC TEC .610 NPSNM 86 CI5 1 NOD TSH TSH .610 NPSNM 99 HII6 1 NOD TEH TSH .610 NPSNM 1 HI6 1 NOD TEH TEC .610 TBATC 26 CI6 1 NOD TEC TEC .610 NPSNM 86 CI6 1 NOD TSH TSH .610 NPSNM 99 HI

5 2 NOD TEH TSH .610 NPSNM 3 HI5 2 NOD TEH TEC .610 TBATC 24 CI5 2 NOD TEC TEC .610 NPSNM 84 CI5 2 NOD TSH TSH .610 NPSNM 101 HI

6 2 NDF 2 TEH .47 TEH TSH .610 NPSNN 1 HI6 2 NOD TEH TEC .610 TBATC 26 CI6 2 NOD TEC TEC .610 NPSNN 86 CI6 2 NOD TSH TSH .610 NPSNM 99 HI

7 2 NDF 2 TEH .57 TEH TSH .610 NPSNM 1 HI7 2 .43 160 DFS 1 10H 30.54 TEH TEC .610 TBATC 26 CI7 2 NOD TEC TEC .610 NPSNM 86 Cj7 2 NOD TSH TSH .610 NPSNM 99 HI

I

8 2 NOD TEH TSH .610 NPSNM 1 HI8 2 2.37 182 ONG P1 03H 25.22 TEH TEC .610 TBATC 26 CI8 2 NOD TEC TEC .610 NPSNM 86 CI8 2 NOD TSH TSH .610 NPSNM 99 HI

I9 2 NOD TEH TSH .610 NPSNM 1 HI9 2 NOD TEH TEC .610 TBATC 26 CI9 2 NOD TEC TEC .610 NPSNM 86 CI9 2 NOD TSH TSH .610 NPSNM 99 HI

10 2 NOD TEH TSH .610 NPSNM 1 HIi10 2 4.47 178 ONG P1 10M 18.17 TEH TEC .610 TBATC 26 CIi10 2 1.77 186 INR P1 10M 20.22 TEH TEC .610 TBATC 26 CIi10 2 2.92 178 INR P1 10H 20.92 TEH TEC .610 TBATC 26 CI10 2 2.74 180 INR P1 10M 21.33 TEH TEC .610 TBATC 26 CI10 2 15.36 178 ONG P1 10M 22.40 TEH TEC .610 TBATC 26 CI10 2 .18 137 DFS 1 10C 5.19 TEH TEC .610 TBATC 26 CII10 2 2.41 65 MBM 6 04C 2.43 TEH TEC .610 TBATC 26 CI10 2 NDF 2 10H 17.23 10M 11H .610 NPSNM 75 HI10 2 NDF 2 10H 20.53 10M 11H .610 NPSNM 75 HIi10 2 NDF 2 1014 20.91 101 11H .610 NPSNM 75 HI10 2 NDF 2 TEC 1.01 TEC TEC .610 NPSNM 86 CI10 2 NOD TSH TSH .610 NPSNM 99 HI

5 3 NOD TEH TSH .610 NPSNM 3 HI5 3 NOD TEH TEC .610 TBATC 26 CI5 3 NOD TSH TSH .610 NPSNM 101 HI

6 3 NOD TEH TSH .610 NPSNM 3 HI6 3 3.44 177 ONG P1 10C 22.09 TEH TEC .610 TBATC 26 CI6 3 NOD TSH TSH .610 NPSNM 99 HI

7 3 NOD TEH TSH .610 NPSNM 3 HI7 3 .29 147 DFS 1 10C 17.00 TEH TEC .610 TBATC 26 CI7 3 NOD TSH TSH .610 NPSNM 99 HI

8 3 NOD TEH TSH .610 NPSNM 3 HI8 3 4.91 178 ONG P1 101 21.41 TEH TEC .610 TBATC 26 CI8 3 .52 64 DFS 1 10H 22.73 TEH TEC .610 TBATC 26 CI8 3 .33 43 INR 1 10H 34.75 TEH TEC .610 TBATC 26 CI8 3 6.45 178 ONG P1 10C 30.66 TEH TEC .610 TBATC 26 CI8 3 NOD TSH TSH .610 NPSNM 99 HI

9 3 NOD TEH TSH .610 NPSNM 3 HI9 3 NOD TEH TEC .610 TBATC 26 CI9 3 NOD TSH TSH .610 NPSNM 99 HI

i10 3 NOD TEH TSH .610 NPSNM 3 HIi10 3 4.22 176 ONG P1 10H 40.89 TEH TEC .610 TBATC 26 CI10 3 NOD TSH TSH .610 NPSNM 99 HI

5 4 .45 142 DFS 1 09H 40.43 TEH TEC .610 TBATC 24 CI5 4 NOD TEH TEH .610 NPSNM 31 HI5 4 NOD TSH TSH .610 NPSNM 101 HI

----------------------- +--------+-----+-----+-----+-----+----+---+--+ - + - ----+-----+-----+ - - +-------

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ . .+. . . . . . .+. . +. . . .+ . .+. .----------.. .. .. . .. ... .+... .. +---- - -.--- +--+. .+. .. +.-- - ... +.... . + ----.-..... + .- ..... + +

Page 91: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - C Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

-.... - .... - .. .-- ----- + -------- + .... - - ... - - ... - .----- --- + - --- -- -÷ - .-- + ---- - - - + .--- + -- .- + - -+ - -+ --. --

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+. . . .÷. . . . .÷. . . .÷. . ÷ ----------..-- + .. . ÷.. ... .. . ... ... ÷.----+-. ...- -. ...- +. .+ -.. ---- .---- .. . ..----- .. . -..÷ . . .÷.- +

666

444

NODNODNOD

3.77 170 ONG6.77 180 ONG

NODNDFNDFNOD

TEH TEC .610 TBATC 24TEH TEH .610 NPSNM 31TSH TSH .610 NPSNM 99

.122.781.955.274.237.173.164.324.048.142.582.12

.50

.32

.63

121177170177176180181175178182166172139159150

DFSONGINRONGONGONGDNGONGONGONGDNGONGDFSDFSDFSNDDNDFNDFNDFNDFNDFNOD

NODNODNOD

NODNODNOD

ONGONGONGONGONGDFSNODNDF

P1P1

22

1P1P1P1P1P1PiP1P1P1P1P1

11

1

22222

10H10OH

1OH1011

1OH1OH10HiON10OH10OH10OH10OH1OHiON09N

i0H1OH

1OH10OH10OH

1MOMO

23.2124.22

23.9924.22

3.605.716.206.787.227.888.249.16

10.5511.7213.1414.1620.672.44

41.68

6.736.787.189.17

10.62

TEHTEHTEH1OH1OH

TSH

TEHTEHTEHTEHTEHTEHTEHTEHTEHTEHTEHTEHTEHTEHTEHTEH10H1OH1OH1MH10HTSH

TECTECTEH11H11HTSH

TECTECTECTECTECTECTECTECTECTECTECTECTECTECTECTEH11H11H11H11H11HTSH

.610

.610

.610

.610

.610

.610

.610

.610

.610

.610

.610

.610

.610

.610

.610

.610

.610

.610

.610

.610

.610

.610

.610

.610

.610

.610

.610

.610

TBATCTBATCNPSNMNPSNMNPSNMNPSNM

TBATCTBATCTBATCTBATCTBATCTBATCTBATCTBATCTBATCTBATCTBATCTBATCTBATCTBATCTBATCNPSNMNPSNMNPSNMNPSNMNPSNMNPSNMNPSNM

2424317373

101

242424242424242424242424242424317373737373

101

ClHIHI

CICIHIHIHIHI

CIClClClCICIClClClClClClClClClHIHIHIHIHIHIHI

101010

1414141414141414

55555

666

7777

444

444

44444444

55555

TEH TEC .610 TBATC 24TEH TEH .610 NPSNM 31TSH TSH .610 NPSNM 101

TEH TEC .610 TBATC 24TEH TEH .610 NPSNM 31TSH TSH .610 NPSNM 101

IIIi

3.802.423.92.2.792.90

.32

183175182182172

56

P1P1P1PlP1

1

2

03H10H10H10C10C10C

03H

23.1233.8934.2227.0827.7228.73

23.12

TEHTEHTEHTEHTEHTEHTEH03H

TEHTEHTEHTEHTSH

TECTECTECTECTECTECTEH05H

TECTECTECTEHTSH

.610

.610

.610

.610

.610

.610

.610

.610

.610

.610

.610

.610

.610

TBATCTBATCTBATCTBATCTBATCTBATCNPSNMNPSNM

TBATCTBATCTBATCNPSNMNPSNM

2424242424243177

1.70 184 INR1.92 183 INR2.77 176 ONG

NODNOD

P1 TSH 6.63P1 01H 3.70P1 10H 9.71

26262629

101

555

NODNODNOD

TEH TEC .610 TBATC 26TEH TEH .610 NPSNM 29TSH TSH .610 NPSNM 99

888

999999

5555

555

555555

555

.13 144 DFS2.64 174 ONG

NODNDD

2.34 172 ONGNODNOD

5.35 175 ONG1.93 182 INR

.28 146 DFSNODNDFNOD

1 10C 11.59Pl 10C 40.19

P1 10H 1.98

TEH TECTEH TECTEH TEHTSH TSH

.610 TBATC

.610 TBATC

.610 NPSNM

.610 NPSNM

26262999

TEH TEC .610 TBATC 26TEH TEH .610 NPSNM 29TSH TSH .610 NPSNM 99

P1P1

1

2

10H11H10C

10H

29.7616.9229.06

29.76

TEHTEHTEHTEH10HTSH

TECTECTECTEH11HTSH

.610

.610

.610

.610

.610

.610

TBATCTBATCTBATCNPSNMNPSNMNPSNM

262626297799

101010

NODNODNOD

TEH TEC .610 TBATC 26TEH TEH .610 NPSNM 29TSH TSH .610 NPSNM 99

-.... - .... - .-------- + ---- + ---- + ---- + ---- + ---- + - - - +- - . .--- + -- + - +- - -+ ... - + ---- + ---- + - -+ --- - --- --

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL L'I+..+...+... .. +..+.. .+..+.---------. . .....----.--------. ...-- - -- - .+- -+- ...... +......-+.......--------+. ....----- +-.....+.- . .-

2

Page 92: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - C Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

÷ . .+. .. +-.-..- . .+ . .+..---------+-+ -- + ---- + . . . ..----.-- +. . . . . . . ..-- - --- +-. . . .---- +--- +. ..----+ -- --..--- + -.. ... +-......

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI---------------------- +--------+-----+-----+-----+-----+----+---+--+ - + - ----+-----+-----+ - - +--------

4 6 NDD TEH TEH .610 NPSNM 31 HI4 6 2.10 173 ONG P1 10C 16.39 11H TEC .590 SBUCC 82 CI4 6 3.40 176 ONG P1 10H 17.26 11H TEH .610 ZBAZC 85 HI4 6 3.08 174 DNG P1 10H 20.73 11H TEH .610 ZBAZC 85 HI4 6 NDF 2 1MH 17.26 10H 11H .610 NPSNM 107 HI4 6 NDF 2 1MH 20.73 10H 11H .610 NPSNM 107 HI

I5 6 .21 127 DFS 1 09H 36.04 TEH TEC .610 TBATC 24 CI5 6 5.30 176 ONG P1 11H 7.95 TEH TEC .610 TBATC 24 CI5 6 .34 151 DFS 1 09C 30.84 TEH TEC .610 TBATC 24 CI5 6 NDD TEH TEH .610 NPSNM 31 HI5 6 NDD TSH TSH .610 NPSNM 101 HI

I6 6 NDD TEH TEC .610 TBATC 24 CI6 6 NDD TEH TEH .610 NPSNM 31 HI6 6 NDD TSH TSH .610 NPSNM 101 HI

I7 6 3.75 181 DNG P1 09H 7.87 TEH TEC .610 TBATC 24 CI7 6 2.10 48 MBM 6 06C 16.71 TEH TEC .610 TBATC 24 CI7 6 NDD TEH TEH .610 NPSNM 31 HI7 6 NDF 2 09H 7.87 09H 1MH .610 NPSNM 77 HI7 6 NDD TSH TSH .610 NPSNM 101 HI

I8 6 2.03 178 DNG P1 10H 23.06 TEH TEC .610 TBATC 24 CI8 6 2.79 179 DNG P1 1MH 28.51 TEH TEC .610 TBATC 24 CI8 6 3.49 180 DNG P1 11H 18.37 TEH TEC .610 TBATC 24 CI8 6 NDD TEH TEH .610 NPSNM 31 HI

S 8 6 NDD TSH TSH .610 NPSNM 101 HII

9 6 NDD TEH TEC .610 TBATC 24 CI9 6 NOD TEH TEH .610 NPSNM 31 HI9 6 NOD TSH TSH .610 NPSNM 101 HI

I10 6 4.18 178 DNG P1 09H 40.04 TEH TEC .610 TBATC 24 CI10 6 3.07 177 DNG P1 10H 9.17 TEH TEC .610 TBATC 24 CI10 6 2.68 173 DNG P1 1MH 31.45 TEH TEC .610 TBATC 24 CI10 6 3.44 174 DNG P1 10H 35.23 TEH TEC .610 TBATC 24 CI10 6 1.89 177 INR P1 10C -. 45 TEH TEC .610 TBATC 24 CI10 6 2.42 171 DNG P1 10C 4.58 TEH TEC .610 TBATC 24 CI10 6 2.55 168 DNG P1 10C 4.99 TEH TEC .610 TBATC 24 CI10 6 4.03 180 DNG P1 10C 5.60 TEH TEC .610 TBATC 24 CI10 6 4.17 179 DNG P1 10C 6.26 TEH TEC .610 TBATC 24 CI10 6 .29 134 DFS 1 10C 32.11 TEH TEC .610 TBATC 24 CI10 6 3.25 171 DNG P1 10C 34.32 TEH TEC .610 TBATC 24 CI10 6 5.48 181 DNG P1 10C 35.39 TEH TEC .610 TBATC 24 CI10 6 1.97 174 INR P1 09C 37.41 TEH TEC .610 TBATC 24 CI10 6 NOD TEH TEH .610 NPSNW 31 HI10 6 NDF 2 10H 9.17 10H 11H .610 NPSNM 77 HI10 6 NDF 2 1OH 35.23 1OH 11H .610 NPSNM 77 HI10 6 NOD TSH TSH .610 NPSNM 99 HI

I7 7 3.28 176 DNG P1 10H 40.13 TEH TEC .610 TBATC 26 CI7 7 4.63 179 DNG P1 1011 40.97 TEH TEC .610 TBATC 26 Cl

7 7 3.55 179 DNT P1 11C -. 23 TEH TEC .610 TBATC 26 CI7 7 NOD TEH TEH .610 NPSNM 29 HI7 7 NDF 2 1MH 40.97 10H 11H .610 NPSNM 77 HI

I12 7 2.63 168 DNG P1 10H 38.84 TEH TEC .610 TBATC 26 CI

I 12 7 4.41 185 DNG P1 10H 39.39 TEH TEC .610 TBATC 26 CI12 7 11.69 178 DNG P1 10H 39.85 TEH TEC .610 TBATC 26 CI12 7 1.79 64 INR 6 10H 40.81 TEH TEC .610 TBATC 26 CI12 7 .09 142 DFS 1 10C 36.15 TEH TEC .610 TBATC 26 CI12 7 NDD TEH TEH .610 NPSNW 29 HI12 7 NDF 2 10H 39.85 10H 11H .610 NPSNM 77 HI

I17 10 NDD TEH TSH .610 NPSNM 1 HI17 10 2.80 179 ONG P1 05H 2.16 TEH TEC .610 TBATC 24 CI17 10 2.30 70 MBM 6 10H 9.35 TEH TEC .610 TBATC 24 CI17 10 2.35 87 INR 6 10C 34.62 TEH TEC .610 TBATC 24 CI17 10 5.16 176 ONG P1 10C 34.79 TEH TEC .610 TBATC 24 CI17 10 3.53 177 ONG P1 10C 37.21 TEH TEC .610 TBATC 24 CI17 10 NDF 2 05H 2.16 05H 07H .610 NPSNM 77 HI

I29 10 .76 161 DFS 1 05H 16.48 TEH TEC .610 TBATC 24 CI29 10 2.93 182 DNG P1 09H 20.98 TEH TEC .610 TBATC 24 CI29 10 2.10 166 DNG P1 10H 26.03 TEH TEC .610 TBATC 24 CI29 10 1.95 183 INR P1 10H 26.72 TEH TEC .610 TBATC 24 CI29 10 .35 133 DFS 1 10H 27.54 TEH TEC .610 TBATC 24 CI29 10 3.84 180 DNT P1 11H -. 59 TEH TEC .610 TBATC 24 CI

+ . . . . . .. . .+ . .+ . .+ . .+ . .+ . .--------. .. ...+. .. ...+------ -+ -.- --+-+ -. .+-. .. .. +. ...----+ .----+- -. . .--- + -.. ... +- ......

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ .. + .. +- .. +-..+...+...+.--------- -- ---- + ----+---+----.............+.-+-.....+....-...+----++..---- +-- .--+-..+-......+-..

3

Page 93: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - C Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

+. . . .- - - + .. + .. + .. + .. +... + l... ... +_ ----------.-.......- -.......-..-- -..-.-.-.-- .--- +..- .+ ..- .... +....-..+....-.

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ .. +...+ ... .. -- ''-----------------+-....-+.. --+... .. ...------ - - - - .. + . ..-- - +-+ .+---- +----. ---. .. 6--+- "'+ - ...... +''

29 10 3.10 181 DNT P1 11H -. 08 TEH TEC .610 TBATC 24 CI29 10 11.75 179 DNT P1 11H .46 TEH TEC .610 TBATC 24 Cl29 10 5.64 177 ONG P1 10C 11.18 TEH TEC .610 TBATC 24 Cl29 10 NDD TEH TEH .610 NPSNM 29 HI29 10 NDF 2 11H -. 08 11H 11H .610 NPSNM 79 HI

I31 11 5.33 178 DNT P1 11H -. 59 TEH TEC .610 TBATC 26 CI31 11 4.91 175 DNT P1 11H .46 TEH TEC .610 TBATC 26 Cl

31 11 .91 50 DSS P1 1iC - .79 TEH TEC .610 TBATC 26 CI31 11 2.18 176 DNG P1 10C 16.26 TEH TEC .610 TBATC 26 CI31 11 NOD TEH TEH .610 NPSNM 29 HI31 11 NDF 2 11H .46 11H 11H .610 NPSNM 79 HI

23 12 NDD TEH TSH .610 NPSNM 1 HI23 12 3.70 178 DNT P1 11H -. 64 TEH TEC .610 TBATC 24 CI23 12 4.75 178 DNT P1 11H -. 18 TEH TEC .610 TBATC 24 CI23 12 16.49 180 DNT P1 11H .41 TEH TEC .610 TBATC 24 CI23 12 18.20 179 DNG P1 11H .80 TEH TEC .610 TBATC 24 CI23 12 2.05 171 DNT P1 11C .36 TEH TEC .610 TBATC 24 CI23 12 6.75 178 DNG P1 10C 39.24 TEH TEC .610 TBATC 24 CI23 12 NDF 2 11H -. 64 11H 11H .610 NPSNM 79 HI23 12 NDF 2 11H -. 18 11H 11H .610 NPSNM 79 HI23 12 NDF 2 11H .41 11H 11H .610 NPSNM 79 HI23 12 NDF 2 11H .80 11H 11H .610 NPSNM 79 HI

24 12 NDF 2 TEH .65 TEH TSH .610 NPSNM 1 HI24 12 1.70 187 INR P1 09H 36.54 TEH TEC .610 TBATC 24 C124 12 4.17 178 DNT P1 11H .39 TEH TEC .610 TBATC 24 CI24 12 2.63 69 MBM 6 07C 3.37 TEH TEC .610 TBATC 24 CI24 12 3.26 74 MBM 6 06C 15.96 TEH TEC .610 TBATC 24 CI24 12 NDF 2 11H .39 11H 11H .610 NPSNM 79 HI

I31 12 NDF 2 TEH .48 TEH TSH .610 NPSNM 1 HI31 12 .17 117 DFS 1 10H 11.53 TEH TEC .610 TBATC 24 CI31 12 6.36 182 DNT P1 11H -. 57 TEH TEC .610 TBATC 24 CI31 12 3.11 179 DNT P1 11H -. 08 TEH TEC .610 TBATC 24 CI31 12 7.36 179 DNT P1 11H .46 TEH TEC .610 TBATC 24 CI31 12 .86 0 PCT 15 P2 AV3 .00 TEH TEC .610 TBATC 24 CI31 12 5.40 174 DNG P1 09C 41.75 TEH TEC .610 TBATC 24 CI31 12 NDF 2 11H -. 57 11H 11H .610 NPSNM 79 HI31 12 NDF 2 11H -. 08 11H 11H .610 NPSNM 79 HI31 12 NDF 2 11H .46 11H 11H .610 NPSNM 79 HI31 12 .49 79 VOL P4 AV3 .00 AV3 AV3 .580 ZPUN4 112 CI

12 13 3.47 181 DNG P1 10H 28.27 TEH TEC .610 TBATC 22 CI12 13 .95 31 DFS 1 10H 29.35 TEH TEC .610 TBATC 22 CI12 13 NDD TEH TEH .610 NPSNM 29 HI12 13 NDF 2 10H 28.27 10H 11H .610 NPSNM 77 HI29 13 4.35 173 DNT P1 11H -. 67 TEH TEC .618 TBATC 26 CI29 13 15.15 179 ONT P1 11H .39 TEH TEC .610 TBATC 26 CI

29 13 NDD TEH TEH .610 NPSNM 31 HI29 13 NDF 2 11H -. 67 11H 11H .610 NPSNM 79 HI

30 16 3.41 182 DNG P1 1MH 3.89 TEH TEC .610 TBATC 12 CI30 16 1.57 165 INR P1 11H -. 59 TEH TEC .610 TBATC 12 CI30 16 9.33 178 DNT P1 11H .54 TEH TEC .610 TBATC 12 CI30 16 .14 75 INR 1 10C 39.77 TEH TEC .610 TBATC 12 CI30 16 .39 27 INR 1 10C 40.32 TEH TEC .610 TBATC 12 CI30 16 NDD TEH TEH .610 NPSNM 29 HI30 16 NDF 2 1MH 3.89 1MH 11H .610 NPSNM 79 HI

11 17 3.49 180 ONG P1 10H 35.94 TEH TEC .610 TBATC 22 CI11 17 2.32 180 ONG P1 10H 38.32 TEH TEC .610 TBATC 22 CI11 17 4.23 175 ONG P1 10C 38.36 TEH TEC .610 TBATC 22 CI11 17 NOD TEH TEH .610 NPSNM 29 HI11 17 NDF 2 10H 35.94 10H 11H .610 NPSNM 77 HI11 17 NDF 2 TEC 1.93 TEC TEC .610 NPSNM 86 CI

I36 17 2.24 75 MBM 6 01H 17.24 TEH TEC .610 TBATC 14 CI36 17 4.39 83 MBM 6 1MH 33.09 TEH TEC .610 TBATC 14 CI36 17 4.32 178 DNT P1 11H -. 54 TEH TEC .610 TBATC 14 CI36 17 1.96 74 INR 6 02C 10.78 TEH TEC .610 TBATC 14 CI36 17 NDD TEH TEH .610 NPSNM 31 HI36 17 NDF 2 11H -. 54 11H 11H .610 NPSNM 79 HI36 17 NOD TEC TEC .610 NPSNM 84 CI

I6 18 1.14 162 INR P1 10H 28.29 TEH TEC .610 TBATC 20 CI6 18 4.36 176 DNG P1 10H 29.35 TEH TEC .610 TBATC 20 CI6 18 NDF P1 TEH .48 TEH TEH .610 NPSNM 31 HI

.... ...... ....+-+ .... + .... + .... + .... + .... + .-- +.......+.. +.+-.......- -+ .... +.... ....+.-..... + ............ +. -

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI................. +-....+....+.--...+.--...+.-...+.........+.........+.-+.......+-.......+.-...-+....+....+......+......+.. +-

4

Page 94: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - C Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

+ ... + .. +. + .. +... .----------..-- ---- +----.----.....+--- ---- +--+-....- + --- + .. -.. ..----.+ -- ..-- + -.... +-.. .+. .-

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI.... + . .. .. ... .. .. . +---------. .+.---+ ----. ---- - --.. .... . .. +................----+ -- - + . . . ..----+ -- -. ..--- +-......+- .....

6 18 NDF 2 10H+ 29.35 10H 11H .610 NPSNM 77 HI6 18 NOD TEC TEC .610 NPSNP 84 CI

I

27 18 NDF 2 TEH .48 TEH TSH .610 NPSNM 1 HI27 18 .14 125 DFS 1 10H 13.68 TEH TEC .610 TBATC 12 CI27 18 .39 167 DFS 1 10H 41.10 TEH TEC .610 TBATC 12 CI27 18 1.74 172 INR P1 11H -. 42 TEH TEC .610 TBATC 12 CI27 18 9.64 178 DNT P1 11H .59 TEH TEC .610 TBATC 12 CI27 18 12.41 176 DNG P1 11H .96 TEH TEC .610 TBATC 12 CI27 18 8.36 178 DNT P1 11C .59 TEH TEC .610 TBATC 12 CI27 18 2.54 174 DNG P1 10C 30.26 TEH TEC .610 TBATC 12 CI27 18 .41 38 DFS 1 10C 41.20 TEH TEC .610 TBATC 12 CI27 18 NDF 2 11H .59 11H 11H .610 NPSNM 79 HI27 18 NDF 2 11H .96 11H 11H .610 NPSNM 79 HI27 18 NDD TEC TEC .610 NPSNM 84 CII38 18 4.89 178 DNT P1 11H -. 48 TEH TEC .610 TBATC 12 CI38 18 .73 110 DFS 3 11H 1.25 TEH TEC .610 TBATC 12 CI38 18 .29 153 DFS 1 10C 31.47 TEH TEC .610 TBATC 12 CI38 18 NDD TEH TEH .610 NPSNM 31 HI38 18 NDF 2 11H -. 48 11H 11H .610 NPSNM 79 HI38 18 NDD TEC TEC .610 NPSNM 86 CI

I5 20 3.49 187 DNG P1 10H 39.33 TEH TEC .610 TBATC 20 CI5 20 NOD TEH TEH .610 NPSNM 31 HI5 20 NDF 2 10H 39.33 1MH 11H .610 NPSNM 77 HI

I6 20 4.73 177 DNG P1 1MH 25.22 TEH TEC .610 TBATC 20 CI6 20 3.70 185 DNG P1 10C 24.47 TEH TEC .610 TBATC 20 CI6 20 NDD TEH TEH .610 NPSNM 31 HI6 20 NDF 2 10H 25.22 10H 11H .610 NPSNM 77 HI

I7 20 4.73 177 DNG P1 1MH 7.64 TEH TEC .610 TBATC 20 CI7 20 .47 157 DFS 1 1@H 10.54 TEH TEC .610 TBATC 20 CI7 20 .24 152 DFS 1 10H 18.21 TEH TEC .610 TBATC 20 CI7 20 2.03 174 0NG P1 10H 20.97 TEH TEC .610 TBATC 20 CI7 20 .85 164 DFS 1 10H 29.07 TEH TEC .610 TBATC 20 CI7 20 .95 161 INR P1 10H 30.06 TEH TEC .610 TBATC 20 CI7 20 2.00 169 ONG P1 10C 17.58 TEH TEC .610 TBATC 20 CI7 20 3.70 174 DNG P1 10C 18.71 TEH TEC .610 TBATC 20 CI

1 7 20 12.84 178 DNG P1 10C 29.68 TEH TEC .610 TBATC 20 CI7 20 7.77 178 DNG P1 04C 6.14 TEH TEC .610 TBATC 20 CI7 20 NOD TEH TEH .610 NPSNM 31 HI7 20 NDF 2 1MH 7.64 10H 11H .610 NPSNM 77 HII

13 20 1.75 181 INR P1 TSH 2.34 TEH TEC .610 TBATC 20 CI13 20 3.66 179 DNG P1 TSH 3.36 TEH TEC .610 TBATC 20 CI13 20 2.36 358 INR 1 10C 32.33 TEH TEC .610 TBATC 20 CI13 20 7.62 174 DNG P1 10C 33.89 TEH TEC .610 TBATC 20 CI13 20 2.28 170 DNG P1 10C 35.16 TEH TEC .610 TBATC 20 CI13 20 5.81 174 DNG P1 10C 36.17 TEH TEC .610 TBATC 20 CI13 20 2.47 171 DNG P1 10C 39.19 TEH TEC .610 TBATC 20 CI13 20 9.05 175 DNG P1 10C 40.26 TEH TEC .610 TBATC 20 CI13 20 7.23 174 DNG P1 10C 41.05 TEH TEC .610 TBATC 20 CI13 20 NDD TEH TEH .610 NPSNM 31 HI13 20 NDF 2 TSH 3.36 TSH 01H .610 NPSNM 79 HI

I36 20 3.02 173 DNG P1 10H 35.16 TEH TEC .610 TBATC 12 CI36 20 .95 0 PCT 18 P2 AV2 .00 TEH TEC .610 TBATC 12 CI36 20 1.20 0 PCT 20 P2 AV3 .00 TEH TEC .610 TBATC 12 CI36 20 NDF 2 TEH .49 TEH TEH .610 NPSNM 29 HI36 20 NDF 2 10H 35.16 10H 11H .610 NPSNM 79 HI

I38 21 4.09 180 DNT P1 11H -. 46 TEH TEC .610 TBATC 14 CI38 21 2.73 178 DNT P1 11H .67 TEH TEC .610 TBATC 14 CI38 21 2.02 64 MBM 6 AV1 19.77 TEH TEC .610 TBATC 14 CI38 21 .23 155 DFS 1 08C 33.80 TEH TEC .610 TBATC 14 CI38 21 NDD TEH TEH .610 NPSNM 31 HI38 21 NDF 2 11H -. 46 11H 11H .610 NPSNM 79 HI

I

42 21 4.78 181 DNT P1 11H -. 56 TEH TEC .610 TBATC 14 CI42 21 NOD TEH TEH .610 NPSNM 29 HI42 21 NDF 2 11H -. 56 11H 11H .610 NPSNM 79 HI42 21 NOD 02C 02C .610 NPSNM 100 CII38 22 2.50 171 DNG P1 10H 26.11 TEH TEC .610 TBATC 12 CI38 22 4.77 178 DNG P1 10H 27.10 TEH TEC .610 TBATC 12 CI38 22 3.30 176 DNG P1 10H 35.41 TEH TEC .610 TBATC 12 CI38 22 1.98 0 PCT 27 P2 AV1 .22 TEH TEC .610 TBATC 12 Cl38 22 1.27 0 PCT 21 P2 AV2 .11 TEH TEC .610 TBATC 12 CI

+ ... ... ... .+ .. + ... + ... + ----------..---. +...---. +--- ... . +--+-+ .....-.. + .... .... .... ..--- ..--.. +-. + ...-....

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+. . . . . . .+. . . . .+-----------..-+.+ .. .. . .. . . .. ...----... ...+- - - --- +- . .. .. +..------+- .+ ..----+ -- -. ..---- +-.. ... +. . .. +-

5

Page 95: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - C Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

+ . .+ . .÷ . . . .. +. .. +. .. +..-------------. .-.. + -_+.----+. .. ..-.- -...-- -+ --+ - -.. +-. + .. ...----+. .----+ -- -. ..--- +-......+- .....

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI. . .. .+. . . . .+. . . .+. .----------. .. ...----.----.----+.. . .. . . . + . .. .+ . ..---- -- ++ . . ..----.+ . .+.----.-- - . .--- + -. ... +- ...... +

38 22 1.20 0 PCT 20 P2 AV3 -. 44 TEH TEC .610 TBATC 12 CI38 22 NDD TEH TEH .610 NPSNM 29 HI38 22 NDF 2 10H 35.41 10H 11H .610 NPSNM 79 HI

I29 23 2.08 172 ONG P1 10H 30.62 TEH TEC .610 TBATC 14 CI29 23 4.64 182 ONG P1 M0 31.67 TEH TEC .610 TBATC 14 Cl

29 23 .27 128 DFS 1 1OH 32.41 TEH TEC .610 TBATC 14 CI29 23 7.66 182 ONG P1 10H 38.62 TEH TEC .610 TBATC 14 Cl29 23 .15 35 INR 1 1MH 40.62 TEH TEC .610 TBATC 14 Cl29 23 .20 92 DFS 1 10H 41.03 TEH TEC .610 TBATC 14 CI29 23 3.22 176 DNT P1 11H -. 59 TEH TEC .610 TBATC 14 Cl29 23 7.58 189 DNT P1 11H .31 TEH TEC .610 TBATC 14 Cl29 23 3.98 190 DNT P1 11C .31 TEH TEC .610 TBATC 14 Cl29 23 3.18 181 DNT P1 10C -. 53 TEH TEC .610 TBATC 14 CI29 23 2.48 180 DNG P1 09C 29.42 TEH TEC .610 TBATC 14 CI29 23 .18 165 DFS 1 09C 37.90 TEH TEC .610 TBATC 14 CI29 23 NDD TEH TEH .610 NPSNM 31 HI29 23 NDF 2 10H 31.67 10H 11H .610 NPSNM 79 HI29 23 NDF 2 11H -. 59 10H 11H .610 NPSNM 79 HII32 23 3.26 180 DNG P1 10H 26.14 TEH TEC .610 TBATC 14 CI32 23 3.09 165 DNT P1 11C -. 68 TEH TEC .610 TBATC 14 CI32 23 9.12 182 DNT P1 11C .36 TEH TEC .610 TBATC 14 CI32 23 NDD TEH TEH .610 NPSNM 31 HI32 23 NDF 2 10H 26.14 10H 11H .610 NPSNM 79 HII44 23 4.59 178 DNT P1 11H -. 54 TEH TEC .610 TBATC 12 CI44 23 NDD TEH TEH .610 NPSNM 31 HI44 23 NDF 2 11H -. 54 11H 11H .610 NPSNM 79 HII17 24 3.17 182 DNG P1 10H 39.28 TEH TEC .610 TBATC 20 CI17 24 NDF 2 TEH 1.00 TEH TEH .610 NPSNM 27 HI17 24 NDF 2 10H 39.28 10H 11H .610 NPSNM 77 HI

I18 24 3.01 177 DNG P1 10H 25.44 TEH TEC .610 TBATC 20 CI18 24 NDD TEH TEH .610 NPSNM 27 HI18 24 NDF 2 10H 25.44 10H 11H .610 NPSNM 77 HI

I19 24 2.26 174 DNG P1 10H 21.27 TEH TEC .610 TBATC 20 CI19 24 2.76 171 DNG P1 1MH 27.39 TEH TEC .610 TBATC 20 CI19 24 4.89 177 DNG P1 101-1 28.37 TEH TEC .610 TBATC 20 Cl

19 24 NDD TEH TEH .610 NPSNM 27 HI19 24 NDF 2 10H 28.37 10H 11H .610 NPSNM 77 HII21 24 5.18 178 DNG P1 1MH 38.39 TEH TEC .610 TBATC 12 CI21 24 .70 169 INR 1 10H 40.71 TEH TEC .610 TBATC 12 CI21 24 .47 63 DSS P1 11C .18 TEH TEC .610 TBATC 12 CI21 24 2.40 169 ONG P1 10C 37.23 TEH TEC .610 TBATC 12 CI21 24 7.11 178 DNG P1 10C 38.35 TEH TEC .610 TBATC 12 CI21 24 .40 138 DFS 1 10C 38.96 TEH TEC .610 TBATC 12 CI21 24 2.69 173 DNG P1 10C 40.94 TEH TEC .610 TBATC 12 CI21 24 6.07 178 DNG P1 10C 42.01 TEH TEC .610 TBATC 12 CI21 24 NDD TEH TEH .610 NPSNM 29 HI21 24 NDF 2 10H 38.39 10H 11H .610 NPSNM 77 HI

I27 24 4.98 178 DNG P1 10H 3.56 TEH TEC .610 TBATC 12 CI27 24 .53 162 DFS 1 10H 8.53 TEH TEC .610 TBATC 12 CI27 24 9.26 181 ONG P1 11H 3.85 TEH TEC .610 TBATC 12 CI27 24 9.24 178 ONG P1 11H 5.13 TEH TEC .610 TBATC 12 Cl

27 24 NDD TEH TEH .610 NPSNM 29 HI27 24 NDF 2 10H 3.56 10H 11H .610 NPSNM 79 HII36 24 .23 120 DFS 1 10H 21.28 TEH TEC .610 TBATC 12 CI36 24 2.67 175 DNG P1 10H 29.93 TEH TEC .610 TBATC 12 CI36 24 5.22 179 DNG P1 10H 30.47 TEH TEC .610 TBATC 12 CI36 24 .96 0 PCT 18 P2 AV1 -. 38 TEH TEC .610 TBATC 12 CI36 24 2.39 0 PCT 29 P2 AV3 .00 TEH TEC .610 TBATC 12 CI36 24 NDD TEH TEH .610 NPSNM 29 HI36 24 NDF 2 10H 30.47 10H 11H .610 NPSNM 79 HII

7 25 NOD TEH TSH .610 NPSNM 3 HI7 25 6.81 181 DNG P1 1MH 37.02 TEH TEC .610 TBATC 22 CI7 25 7.93 179 DNG P1 10H 38.08 TEH TEC .610 TBATC 22 CI7 25 1.06 167 INR P1 10H 38.65 TEH TEC .610 TBATC 22 CI7 25 3.96 186 DNG P1 10H 39.06 TEH TEC .610 TBATC 22 CI7 25 2.93 177 DNG P1 10H 41.30 TEH TEC .610 TBATC 22 CI7 25 5.12 184 DNT P1 11C .27 TEH TEC .610 TBATC 22 CI7 25 3.33 182 INR P1 10C 39.20 TEH TEC .610 TBATC 22 CI7 25 2.68 178 ONG P1 10C 40.45 TEH TEC .610 TBATC 22 CI7 25 2.98 175 ONG P1 10C 41.85 TEH TEC .610 TBATC 22 CI

+ . . .. .. . .. . . +..----------+.---- .---- +----....+ .. .+....+... ... +.. .... +----- -. ....+----+ . .----+ -- . ..--- +-......+- .....

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ . .+ . .+.. . . .. +. . +.. +. . . . . .--------..--- . . ..-- -+.- --....... +-- +.-... .. +....-..+...---.+ . .------ . ..--- + -.. ... +-.....

6

Page 96: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - C Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:08:34

+ .. +.. .+l_ + .. . .. + .---------.+....+--- +---- .. .+ _ +_+l+ ... ..------ - - - -.--- - ... +.---- +----- +. .. +...---- .- +- ...... +l-+_ +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI.... + . .. .. ... .. .. . ..---------- - . .---..++.... .. .. +...--------......-- --- -+. . ..---- + .+.------ - .. +.--- - -... +.. ... +.- ÷

7 25 NDF 2 11H+ 39.06 10H 11H .610 NPSNM 77 HI7 25 NDF 2 TEC .47 TEC TEC .610 NPSNM 86 CI

I24 25 NOD TEH TSH .610 NPSNM 1 HI24 25 3.03 177 DNG P1 101 36.00 TEH TEC .610 TBATC 14 CI24 25 .21 124 DFS 1 10C 39.85 TEH TEC .610 TBATC 14 Cl24 25 2.44 171 ONG P1 10C 40.97 TEH TEC .610 TBATC 14 CI24 25 NDF 2 10H 36.00 iN 11H .610 NPSNM 79 HI24 25 NOD TEC TEC .610 NPSNM 86 CII16 26 NOD TEH TSH .610 NPSNM 1 HI16 26 4.95 174 ONG P1 iON 42.28 TEH TEC .610 TBATC 20 CI16 26 8.98 179 DNT P1 11H .36 TEH TEC .610 TBATC 20 CI16 26 8.65 176 DNT P1 11C -. 54 TEH TEC .610 TBATC 20 CI16 26 5.16 175 ONG P1 10C 36.86 TEH TEC .610 TBATC 20 CI16 26 27.38 175 ONG P1 10C 37.94 TEH TEC .610 TBATC 20 Cl16 26 4.10 174 ONG P1 10C 39.78 TEH TEC .610 TBATC 20 CI16 26 1.99 174 INR P1 10C 41.47 TEH TEC .610 TBATC 20 CI16 26 8.65 176 ONG P1 10C 42.26 TEH TEC .610 TBATC 20 CI16 26 NDF 2 11H -. 72 11H 11H .610 NPSNM 77 HI16 26 NOD TEC TEC .610 NPSNM 84 CI

I1 27 NOD TEH TSH .610 NPSNM 3 HI1 27 NOD 11C TEC .610 TBATC 32 CI1 27 9.85 182 ONG P1 11H .93 11H TEH .610 ZBAZC 91 HI1 27 NDF 2 11H .93 1NH 11H .610 NPSNM 107 HII

11 27 NDF 2 TEH .90 TEH TSH .610 NPSNM 3 HI11 27 4.13 180 ONG P1 10H 37.61 TEH TEC .610 TBATC 22 CI11 27 4.28 181 ONG P1 10H 38.61 TEH TEC .610 TBATC 22 CI11 27 4.85 188 ONG P1 11H 2.63 TEH TEC .610 TBATC 22 CI11 27 3.13 178 DNT P1 11C -. 51 TEH TEC .610 TBATC 22 CI11 27 NDF 2 10H 37.61 10H 11H .610 NPSNM 77 HI

I15 35 NOD TEH TSH .610 NPSNM 7 HI15 35 4.54 189 ONG P1 09H 14.05 TEH TEC .610 TBATC 22 CI15 35 3.24 81 MBM 6 09H 14.61 TEH TEC .610 TBATC 22 CI15 35 NDF P1 09H 14.05 09H 1MH .610 NPSNM 79 HI

I

48 35 NOF 2 TEH 16.99 TEH TSH .610 NPSNM 5 HI48 35 1.85 0 RWS P2 02C .28 TEH TEC .610 TBATC 10 CI48 35 .28 0 PCT 7 P5 02C .38 TEC TEH .610 ZBAZC 97 HI48 35 .27 88 VOL P4 02C .36 02C 02C .610 NPSNM 104 CI

I23 37 6.68 179 ONG P1 10H 37.96 TEH TEC .610 TBATC 4 CI23 37 6.68 179 ONG P1 10H 39.41 TEH TEC .610 TBATC 4 Cl

23 37 7.60 180 DNT P1 11H -. 53 TEH TEC .610 TBATC 4 CI23 37 2.90 178 DNT P1 11H .54 TEH TEC .610 TBATC 4 CI23 37 8.43 178 DNT P1 11C .47 TEH TEC .610 TBATC 4 CI23 37 4.58 177 ONG P1 10C 34.11 TEH TEC .610 TBATC 4 CI23 37 2.37 173 ONG P1 10C 38.37 TEH TEC .610 TBATC 4 CI23 37 2.61 174 ONG P1 10C 38.76 TEH TEC .610 TBATC 4 CI23 37 8.72 179 ONG P1 10C 39.57 TEH TEC .610 TBATC 4 CI23 37 15.08 179 ONG P1 10C 39.98 TEH TEC .610 TBATC 4 CI23 37 12.95 180 ONG P1 10C 41.04 TEH TEC .610 TBATC 4 CI23 37 NOD TEH TEH .610 NPSNM 39 HI23 37 NDF P1 10H 37.96 10H 11H .610 NPSNM 79 NI23 37 NOF P1 10H 39.41 10H 11H .610 NPSNM 79 HI23 37 NDF P1 11H -. 53 101 11H .610 NPSNM 79 HII10 38 29.31 24 PVN P1 TEH 20.28 TEH TEC .610 TBATC 20 CI10 38 4.37 81 MBM 6 01H 12.25 TEH TEC .610 TBATC 20 CI10 38 2.04 79 MBM 6 09C 22.64 TEH TEC .610 TBATC 20 CI10 38 NOD TEH TEH .610 NPSNM 25 HI10 38 14.13 45 PVN 2 TSH -1.13 TSH TSH .610 ZPSMB 111 HI10 38 1.11 18 PVN 2 TSH -. 99 TSH TSH .610 ZPSMB 111 HI

I13 42 2.26 172 ONG P1 iON 21.83 TEH TEC .610 TBATC 20 CI13 42 4.55 177 ONG P1 10H 22.97 TEH TEC .610 TBATC 20 CI13 42 5.77 177 ONG P1 10H 31.98 TEH TEC .610 TBATC 20 CI13 42 3.77 175 ONG P1 10H 33.60 TEH TEC .610 TBATC 20 CI13 42 .66 160 OFS 1 10H 37.77 TEH TEC .610 TBATC 20 CI13 42 .10 106 DFS 1 10H 40.96 TEH TEC .610 TBATC 20 CI13 42 5.26 179 ONG P1 10C 38.16 TEH TEC .610 TBATC 20 CI13 42 2.29 175 ONG P1 10C 40.44 TEH TEC .610 TBATC 20 CI13 42 2.75 176 ONG P1 10C 40.84 TEH TEC .610 TBATC 20 CI13 42 2.69 176 ONG P1 10C 41.55 TEH TEC .610 TBATC 20 CI13 42 NOD TEH TEH .610 NPSNM 21 HI13 42 NDF P1 10H 22.97 10i 11H .610 NPSNM 79 HI

I I----------------------- +--------+-----+-----+-----+-----+----+---+--+ - + - ----+-----+.----- - +--------

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+..+.. ----------.----.---- +----+----+-----...+...+- -- --- +---+-.----+----.----...+..+- +- +-,-----+

7

Page 97: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - C Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10117/2008 01:00:34

+ ... + .. . +. --- . .+. . . .+ .---------+----+----+ ---- --.. . . . + . . . - + ....... +.------+----...+. .. . . ..----- -+-.. ... +..---...-

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI.. ... +.....+.. .. ÷.. ---------....----.---- ......-------.. +---.. +--+-.......+.- . .+----+----+----..+....÷...----4--....-+

28 42 .88 169 DFS 1 MSH 39.39 TEH TEC .610 TBATC 16 CI28 42 .47 149 DFS 1 MSH 40.31 TEH TEC .610 TBATC 16 CI28 42 3.02 176 ONG P1 10H 41.44 TEH TEC .610 TBATC. 16 CI28 42 .11 134 DFS 1 81C 3.03 TEH TEC .610 TBATC 16 CI28 42 NOD TEH TEH .610 NPSNM 41 HI28 42 NDF P1 10H 41.44 1MH 11H .610 NPSNM 79 HI28 42 NOD TEC TEC .610 NPSNM 84 CI

I48 42 5.16 183 ONG P1 1MH 30.73 TEH TEC .610 TBATC 16 CI48 42 2.05 172 ONG P1 09C 25.81 TEH TEC .610 TBATC 16 CI48 42 NDF 2 TEH .49 TEH TEH .610 NPSNM 43 HI48 42 NDF 2 10H 30.73 10H 11H .610 NPSNM 81 HI48 42 NOD TEC TEC .610 NPSNM 86 CI

I44 43 2.96 176 ONG P1 10H 21.80 TEH TEC .610 TBATC 18 CI44 43 4.14 181 ONG P1 M0 22.88 TEH TEC .610 TBATC 18 CI

44 43 3.07 180 DNT P1 11H .73 TEH TEC .610 TBATC 18 CI44 43 NOD TEH TEH .610 NPSNM 39 HI44 43 NDF 2 1MH 22.88 1MH 11H .610 NPSNM 81 HI

I10 45 3.06 187 ONG P1 01H 15.09 TEH TEC .610 TBATC 18 CI10 45 2.16 186 ONG P1 10C 29.03 TEH TEC .610 TBATC 10 CI10 45 NOD TEH TEH .610 NPSNM 23 HI10 45 NDF 2 01H 15.09 01H 03H .610 NPSNM 113 HI

I24 46 1.99 174 INR P1 TSH 22.84 TEH TEC .610 TBATC 16 CI24 46 3.02 179 ONG P1 TSH 24.22 TEH TEC .610 TBATC 16 CI24 46 NOD TEH TEH .610 NPSNM 23 HI24 46 NDF 2 TSH 24.22 TSH 03H .610 NPSNM 81 HII40 46 NOD TEH TEC .610 TBATC 16 CI40 46 NOD TEH TEH .610 NPSNM 41 HI40 46 NOD TEC TEH .610 ZBAZC 97 HI40 46 NDF 2 01H -. 13 01H 01H .610 NPSNM 105 HI

I24 49 NOD TEH TSH .610 NPSNM 11 HI24 49 2.88 176 ONG P1 10H 33.22 TEH TEC .610 TBATC 16 CI24 49 7.30 178 ONG P1 10H 34.30 TEH TEC .610 TBATC 16 CI24 49 5.00 181 ONG P1 10H 37.30 TEH TEC .610 TBATC 16 CI24 49 9.20 179 ONG P1 10H 38.51 TEH TEC .610 TBATC 16 CI24 49 5.41 180 ONG P1 10H 40807 TEH TEC .610 TBATC 16 CI24 49 9.60 179 ONG P1 1MH 41.18 TEH TEC .610 TBATC 16 CI24 49 2.90 179 ONG P1 10C 36.16 TEH TEC .610 TBATC 16 CI24 49 2.56 181 ONG P1 10C 38.11 TEH TEC .610 TBATC 16 CI24 49 2.22 182 ONG P1 10C 38.52 TEH TEC .610 TBATC 16 CI24 49 NDF 2 1MH 37.30 10H 11H .610 NPSNM 81 HI

I21 50 2.98 9 BLG 1 TSH 2.12 TEH TEC .610 TBATC 10 CI21 50 NOD TEH TEH .610 NPSNM 21 HI21 50 NDF 2 TSH 2.23 TEH TSH .610 NPSNM 37 HI

I47 51 NOD TEH TSH .610 NPSNM 9 HI47 51 2.26 178 ONG P1 01H 10.40 TEH TEC .610 TBATC 18 CI47 51 3.99 180 ONG P1 01H 11.49 TEH TEC .610 TBATC 18 CI47 51 NDF 2 01H 11.49 01H 03H .610 NPSNM 81 HI

I21 52 4.10 185 ONG P1 05H 32.63 TEH TEC .610 TBATC 10 CI21 52 .54 168 DFS 1 09C 37.58 TEH TEC .610 TBATC 10 CI21 52 NOD TEH TEH .610 NPSNM 21 HI21 52 NDF 2 05H 32.63 05H 07H .610 NPSNM 113 HI

I40 52 3.35 185 ONG P1 05H 12.11 TEH TEC .610 TBATC 16 CI40 52 2.01 187 ONG P1 02C 3.34 TEH TEC .610 TBATC 16 CI40 52 NOD TEH TEH .610 NPSNM 43 HI40 52 NDF 2 05H 12.11 05H 07H .610 NPSNM 81 HI

I1 53 NOD TEH TEH .610 NPSNM 25 HI1 53 5.33 174 DNT P1 11C -. 12 11C TEC .610 TBATC 36 Cl1 53 10.27 175 DNT P1 11C .35 11C TEC .610 TBATC 36 Cl1 53 2.46 176 DNT P1 11H -. 31 11H TEH .610 ZBAZC 91 HI1 53 5.10 180 DNT P1 11H .39 11H TEH .610 ZBAZC 91 HI1 53 NOD 11C 11H .580 ZPUMB 106 CI1 53 NDF 2 11H .39 11H 11H .610 NPSNM 109 HI

I8 54 5.08 180 ONG P1 10H 39.65 TEH TEC .610 TBATC 14 CI8 54 NOD TEH TEH .610 NPSNM 21 HI8 54 NDF 2 10H 39.65 10H 11H .610 NPSNM 83 HII1 55 NOD TEH TEH .610 NPSNM 25 HI1 55 NOD 11C TEC .610 TBATC 36 CI

+ .... + .... - i- .. . . . . . .+ ..---------+- ----+ ........ + ......... ---- +-.......+- . .+.----+ .---- -+--+- --+-. .+ - +- .. --.

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ .. ... +...... .. +...÷... .. ----------....------ --- -4-- . . . . ..--.- +- .+ .. +.. ..---+----+- +-+-

8

Page 98: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - C Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

+---- .----...------------ --- + ---- - ------+ - ----.. +. .- --.- - -m - --.-- - +--------- ---------+ --------+ - ------ ------------+---

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ . .+ . .+ . . .. .+.. .+.. .+.--------- .. +.-------. ----+. - - -+.+.. ..-- - +- -+ -....... + -...... + .... ....----.. +..----.--. .--- + - . . . .- +

1 55 8.80 181 ONG P1 11H .88 11H TEH .610 ZBAZC 91 HI1 55 NDF 2 11H .88 11H 11H .610 NPSNM 109 HI

I20 59 3.16 175 ONG P1 TSH 16.43 TEH TEC .610 TBATC 48 CI20 59 NDF 2 TEH .48 TEH TEH .610 NPSNM 53 HI20 59 NDF 2 TSH 16.43 TSH 03H .610 NPSNM 83 HI

I25 59 2.84 64 MBM 6 10C 6.27 TEH TEC .610 TBATC 36 CI25 59 NMD TEH TEH .610 NPSNM 51 HI25 59 NMD TSH TSH .610 NPSNM 99 HI

26 59 NMD TEH TEC .610 TBATC 36 CI26 59 NMD TEH TEH .610 NPSNM 51 HI26 59 NOD TSH TSH .610 NPSNM 99 Hj

27 59 NMD TEH TEC .610 TBATC 36 CI27 59 NMD TEH TEH .610 NPSNM 51 HI27 59 NMD TSH TSH .610 NPSNM 99 HI

28 59 2.05 179 ONG P1 04C 15.17 TEH TEC .610 TBATC 36 CI28 59 NOD TEH TEH .610 NPSNM 51 HI28 59 NOD TSH TSH .610 NPSNM 99 HI

29 59 NMD TEH TEC .610 TBATC 36 CI29 59 NMD TEH TEH .610 NPSNM 51 HI29 59 NMD TSH TSH .610 NPSNM 99 HI

I24 60 NOD TEH TEC .610 TBATC 36 CI24 60 NOD TEH TEH .610 NPSNM 53 HI24 60 NMD TSH TSH .610 NPSNM 99 HI

I25 60 2.71 185 ONG P1 09H 34.94 TEH TEC .610 TBATC 36 CI25 60 5.73 77 MB8 6 09H 35.22 TEH TEC .610 TBATC 36 CI25 60 3.20 76 MB8 6 AV1 12.44 TEH TEC .610 TBATC 36 CI25 60 2.95 175 ONG P1 AV3 16.63 TEH TEC .610 TBATC 36 CI25 60 NMD TEH TEH .610 NPSNM 53 HI25 60 NMD TSH TSH .610 NPSNM 99 HI

I26 60 2.47 73 MBM 6 07C 16.44 TEH TEC .610 TBATC 34 CI26 60 NMO TEH TEH .610 NPSNM 53 HI26 60 NMD TSH TSH .610 NPSNM 101 HI

27 60 NOD TEH TEC .610 TBATC 34 Cl27 60 NOD TEH TEH .610 NPSNM 53 HI27 60 NOD TSH TSH .610 NPSNM 101 HI

28 60 NMD TEH TEC .610 TBATC 34 CI28 60 NMD TEH TEH .610 NPSNM 53 HI28 60 NMD TSH TSH .610 NPSNM 101 HI

29 60 NMD TEH TEC .610 TBATC 34 CI29 60 NOD TEH TEH .610 NPSNM 53 HI29 60 NOD TSH TSH .610 NPSNM 99 HI

31 60 5.72 186 ONG P1 08H 23.06 TEH TEC .610 TBATC 34 CI31 60 2.45 76 MBM 6 06C 10.86 TEH TEC .610 TBATC 34 CI31 60 2.22 72 MBM 6 04C 11.29 TEH TEC .610 TBATC 34 CI31 60 NOD TEH TEH .610 NPSNM 53 HI31 60 NDF 2 08H 23.06 08H 09H .610 NPSNM 81 HI

24 61 NOD TEH TEC .610 TBATC 36 CI24 61 NOD TEH TEH .610 NPSNM 51 HI24 61 NMD TSH TSH .610 NPSNM 99 HI

25 61 NOD TEH TSH .610 NPSNM 9 HI25 61 3.51 174 DNT P1 11H .50 TEH TEC .610 TBATC 34 CI25 61 NDF 2 11H .50 11H 11H .610 NPSNM 81 HI25 61 NMD TSH TSH .610 NPSNM 101 HI

26 61 2.01 85 MBM 6 10H 16.31 TEH TEC .610 TBATC 34 CI26 61 .20 141 DFS 1 10C 10.71 TEH TEC .610 TBATC 34 CI26 61 NMD TEH TEH .610 NPSNM 51 HI26 61 NMD TSH TSH .610 NPSNM 101 HI

27 61 NMD TEH TEC .610 TBATC 36 CI27 61 NMD TEH TEH .610 NPSNM 51 HI27 61 NOD TSH TSH .610 NPSNM 99 HI

28 61 NMD TEH TEC .610 TBATC 36 CI28 61 NMD TEH TEH .610 NPSNM 51 HI

S..•- - -- ... ... +.... .... ÷ ..-------+.-+- - -+- - -+--+-......+....-..+.----+----+---.+- -+ - +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI..---------- - --- .. .....----------- +-...------+ . .. ------- + ..----. +--+-......+......-.+.----+----+-----.+-. .+-+- - ----- +

Page 99: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - C Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

+ .... - .... - ... .----- + ---- + .. - - - - ------------- --- -- -- + -.. + . .4-+ -... +- ... +- ... - . . ... --- +-- - -

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI---------------------- +--------+-----+-----+-----+-----+----+---+--+ - + - ---- 4-----+ -----+ - - +--------

I 28 61 NOD TSH TSH .610 NPSNM 101 HII

29 61 NOD TEH TEC .610 TBATC 36 CI29 61 NDD TEH TEH .610 NPSNM 51 HI29 61 NOD TSH TSH .610 NPSNM 99 HI

I24 62 NOD TEH TEC .610 TBATC 36 Cl24 62 NOD TEH TEH .610 NPSNM 53 HI24 62 NOD TSH TSH .610 NPSNM 99 HII25 62 NOD TEH TEC .610 TBATC 34 CI25 62 NOD TEH TEH .610 NPSNM 53 HI25 62 NOD TSH TSH .610 NPSNM 101 HI

I26 62 NOD TEH TEC .610 TBATC 34 CI26 62 NOD TEH TEH .610 NPSNM 53 HI26 62 NOD TSH TSH .610 NPSNM 99 HI

I27 62 2.31 80 MBM 6 10H 30.85 TEH TEC .610 TBATC 34 CI27 62 NOD TEH TEH .610 NPSNM 53 HI27 62 NOD TSH TSH .610 NPSNM 99 HII28 62 NOD TEH TEC .610 TBATC 34 CI28 62 NOD TEH TEH .610 NPSNM 53 HI28 62 NOD TSH TSH .610 NPSNM 101 HI

I29 62 NOD TEH TEC .610 TBATC 4 CI29 62 NOD TEH TEH .610 NPSNM 53 HI29 62 NOD TSH TSH .610 NPSNM 99 HII32 62 .10 84 DFS 1 10C 18.07 TEH TEC .610 TBATC 4 CI32 62 NOD TEH TEH .610 NPSNM 53 HI32 62 NOD 08H 08H .610 NPSNM 99 HI

I33 62 NOD TEH TEC .610 TBATC 4 CI33 62 NOD TEH TEH .610 NPSNM 53 HI33 62 NOD 08H 08H .610 NPSNM 99 HI

I34 62 NOD TEH TEC .610 TBATC 4 CI34 62 NOD TEH TEH .610 NPSNM 53 HI34 62 NOD 08H 08H .610 NPSNM 99 HI

I35 62 NOD TEH TEC .610 TBATC 4 CI35 62 NOD TEH TEH .610 NPSNM 53 HI35 62 NOD 08H 08H .610 NPSNM 99 HI

39 62 4.30 176 ONG P1 09H 31.95 TEH TEC .610 TBATC 34 CI39 62 NOD TEH TEH .610 NPSNM 53 HI39 62 NDF 2 09H 31.95 09H 10H .610 NPSNM 81 HI

24 63 NOD TEH TEC .610 TBATC 36 CI24 63 NOD TEH TEH .610 NPSNM 51 HI24 63 NOD TSH TSH .610 NPSNM 99 HI

25 63 NOD TEH TEC .610 TBATC 34 CI25 63 NOD TEH TEH .610 NPSNM 51 HI25 63 NOD TSH TSH .610 NPSNM 101 HI

I26 63 NOD TEH TEC .610 TBATC 36 CI26 63 NOD TEH TEH .610 NPSNM 51 HI26 63 NOD TSH TSH .610 NPSNM 99 HII27 63 NOD TEH TEC .610 TBATC 36 CI27 63 NOD TEH TEH .610 NPSNM 51 HI27 63 NOD TSH TSH .610 NPSNM 99 HII28 63 NOD TEH TEC .610 TBATC 36 CI28 63 NOD TEH TEH .610 NPSNM 51 HI28 63 NOD TSH TSH .610 NPSNM 101 HI

I29 63 5.28 44 MBM 6 AV2 .25 TEH TEC .610 TBATC 4 CI29 63 .45 163 DFS 1 10C 5.24 TEH TEC .610 TBATC 4 CI29 63 NOD TEH TEH .610 NPSNM 51 HI29 63 NOD TSH TSH .610 NPSNM 99 HI

I31 63 NOD TEH TEC .610 TBATC 6 CI31 63 NOD TEH TEH .610 NPSNM 51 HI31 63 NOD 08H 08H .610 NPSNM 101 HII32 63 NOD TEH TEC .610 TBATC 6 CI

----------------------- +-------+-----+-----+-----+-----+--------+--+ - + - ----+-----+-----+ - - +-------

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+.. .. +.....÷.. .. +.. ---------......-------- ...----+ - -+-----.... .+.-+.....- ... +.......----+----+..+.....----- +- ... +....-

10

Page 100: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - C Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

--. - - .--. -- + - .-- + ---- + - .-- + - - -- - +- -. .--- + - - - + --+-- - ....... + .--- + ---- + .--- + - +- - -+ --- --

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL Lj+ .. +... ÷... ... + .. +---------...-----+----.. --- - - -+- -+ -....... +-.......+...+......+.----+-------.+- - -- +

32 6332 63

NODNOD

33333333

3434343434

35353535

36363636

37373737

383838

18181818

242424

252525

262626

272727

282828

292929

313131

323232

34343434

35353535

63636363

6363636363

63636363

63636363

63636363

636363

64646464

646464

646464

646464

646464

646464

646464

646464

646464

64646464

64646464

NDDNOD

47.30 84 PLP47.14 84 TBP

NDDNDDNOD

45.26 80 PLP46.58 80 TBP

NODNODNODNOD

NODNODNODNOD

4.32 175 ONGINFNODNOD

.16 65 DFSNODNOD

2.76 55 MBM3.33 190 ONG

NODNDF

NODNODNOD

NODNODNOD

NODNODNOD

NODNODNDD

NDDNODNOD

NDDNODNOD

.67 0 PCTNODNOD

3.64 180 ONGNODNOD

NODNODNOD

.34 208 TBP

NODNODNDFNOD

TEH TEH .610 NPSNM 53 HI08H 08H .610 NPSNM 101 HI

ITEH TEC .610 TBATC 6 CITEH TEH .610 NPSNM 53 HI08H 08H .610 NPSNM 101 HI08H 08H .610 NPSNM 101 HI

11 08H0 11 08N

11 08H11 08H

.77

.77

.69

.69

TEH TECTEH TEHTSH TSH08H 08H08H 08H

TEH TECTEH TEHTSH TSH08H 08H

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 NPSNM

6 C51 H51 H

101 H101 H

6 C51 H51 H99 H

P1 05C -. 99P1 04C 17.17

1 07C 3.70

TEH TEC .610 TBATC 6 ClTEH TEH .610 NPSNM 51 HITSH TSH .610 NPSNM 51 HI08H 08H .610 NPSNM 99 HI

ITEH TEC .610 TBATC 6 CjTEH TEC .610 TBATC 6 Cl

TEH TEH .610 NPSNM 51 HITSH TSH .610 NPSNM 51 HI

ITEH TEC .610 TBATC 36 CITSH TSH .610 NPSNM 51 HjTEH TEH .610 NPSNM 51 HI

ITEH TEC .610 TBATC 48 CITEH TEC .610 TBATC 48 Cl

TEH TEH .610 NPSNM 53 HI101 11H .610 NPSNM 83 HI

ITEH TEC .610 TBATC 34 CITEH TEH .610 NPSNM 53 HITSH TSH .610 NPSNM 99 HI

6 101P1 101

2 10H

26.4427.25

27.25

TEH TEC .610 TBATC 34 CTEH TEH .610 NPSNM 53 HTSH TSH .610 NPSNM 99 H

TEH TEC .610 TBATC 34 CTEH TEH .610 NPSNM 53 HTSH TSH .610 NPSNM 99 H

TEH TEC .610 TBATC 34 CTEH TEH .610 NPSNM 53 HTSH TSH .610 NPSNM 99 H

TEH TEC .610 TBATC 34 CTEH TEH .610 NPSNM 53 HTSH TSH .610 NPSNM 101 H

TEH TEC .610 TBATC 4 CTEH TEH .610 NPSNM 53 HTSH TSH .610 NPSNM 99 H

TEH TEC .610 TBATC 4 CTEH TEH .610 NPSNM 51 H08H 08H .610 NPSNM 101 H

TEH TEC .610 TBATC 4 CTEH TEH .610 NPSNM 51 H08H 08H .610 NPSNM 99 H

14 P2 AV2 .13

P1 10C 14.93

0 2 08H .00

TEH TECTEH TEHTSH TSH08H 08H

TEH TECTSH TSHTEH TEH08H 08H

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 NPSNM

4 C51 H51 H

101 H

4 C51 H51 H

101 H2 TEH 3.55

--. - - .-- .-- + ---- + ---- + ---- + ---- + ---- + --- + --- + -- + .-.- ------------- - - - -+ --. --

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+. . . .+. . . . .+. . . .+. . . .+----------... ........----.-- -+. - - --... +- --+-. .. .. +...- .. +.---- +----+ +. . . . ...----- +- ... +.- ..... .-

11

Page 101: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - C Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

... + .. ..... .. +...+.---------- .. +....+--.----.----+--- + --- +--+-......+....-..+...----+----+---. . ... +--+-

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT POIA PTYPE CAL LI. . .. . .. . . .+. . . . .+----------- --.+----+ - .. . .. .. .. + . .. ...----. .. ..- -. ..-.--- -+. . ..---- +----- + . ..----+ - 1.-- -. .+ . .. .-- +

36 64 .18 147 DFS 1 10C 2.38 TEH TEC .610 TBATC 4 CI36 64 NDD TEH TEH .610 NPSNM 51 HI36 64 NDD TSH TSH .610 NPSNM 51 HI36 64 NOD 08H 08H .610 NPSNM 99 HI

I37 64 NDD TEH TEC .610 TBATC 6 CI37 64 NDO TEH TEH .610 NPSNM 51 HI37 64 NDD TSH TSH .610 NPSNM 51 HI

I38 64 NDD TEH TEC .610 TBATC 34 CI38 64 NOD TEH TEH .610 NPSNM 51 HI38 64 NOD TSH TSH .610 NPSNM 51 HI

I

15 65 NOD TEH TSH .610 NPSNM 49 HI15 65 4.84 178 ONG P1 O1H 23.40 TEH TEC .610 ZBAZC 66 CI15 65 2.62 174 ONG P1 09C 31.27 TEH TEC .610 ZBAZC 66 CI15 65 NDF 2 01H 23.40 01H 03H .610 NPSNM 83 HI15 65 RBD TEC TEC .610 NPSNM 90 CI15 65 NOD TEC TEC .610 NPSNM 102 CI

I24 65 NOD TEH TSH .610 NPSNM 11 HI24 65 NOD TEH TEC .610 TBATC 36 CI24 65 NOD TEC TEC .610 NPSNM 90 CI24 65 NOD TSH TSH .610 NPSNM 99 HII25 65 NOD TEH TSH .610 NPSNM 9 HI25 65 NOD TEH TEC .610 TBATC 36 CI25 65 NOD TEC TEC .610 NPSNM 90 CI25 65 NOD TSH TSH .610 NPSNM 101 HI

I

26 65 NOD TEH TSH .610 NPSNM 9 HI26 65 2.27 69 MBM 6 05H 28.66 TEH TEC .610 TBATC 36 Cl26 65 NOD TEC TEC .610 NPSNM 90 CI26 65 NOD TSH TSH .610 NPSNM 101 HII27 65 NOD TEH TSH .610 NPSNM 9 HI27 65 NOD TEH TEC .610 TBATC 36 CI27 65 NOD TEC TEC .610 NPSNM 90 CI27 65 NOD TSH TSH .610 NPSNM 101 HI

I28 65 NOD TEH TSH .610 NPSNM 9 HI28 65 .24 155 INR P1 11C -. 06 TEH TEC .610 TBATC 36 CI28 65 NOD TEC TEC .610 NPSNM 90 CI28 65 NOD TSH TSH .610 NPSNM 101 HI

I29 65 NOD TEH TSH .610 NPSNM 9 HI29 65 NOD TEH TEC .610 TBATC 36 CI29 65 NOD TEC TEC .610 NPSNM 88 CI29 65 NOD TSH TSH .610 NPSNM 99 HI

I31 65 NOD TEH TEC .610 TBATC 6 CI31 65 NOD TEH TSH .610 NPSNM 9 HI31 65 NOD TEC TEC .610 NPSNM 88 CI31 65 NOD 08H 08H .610 NPSNM 101 HI

I36 65 .15 151 DFS 1 05C 12.09 TEH TEC .610 TBATC 4 CI36 65 49.75 84 PLP 11 TSH .14 TEH TSH .610 NPSNM 11 HI36 65 NDD TEC TEC .610 NPSNM 88 CI36 65 NOD 08H 08H .610 NPSNM 99 HII37 65 NOD TEH TEC .610 TBATC 6 CI37 65 NOD TEH TEH .610 NPSNM 51 HI37 65 NOD TSH TSH .610 NPSNM 51 HI37 65 NDD TEC TEC .610 NPSNM 88 CII49 65 NDF 2 TEH .94 TEH TSH .610 NPSNM 9 HI49 65 2.41 0 RWS P2 07C -. 47 TEH TEC .610 TBATC 42 CI49 65 NOD TEC TEC .610 NPSNM 88 CI49 65 1.39 0 PCT 18 P6 07C -. 41 TEC TEH .610 ZBAZC 97 HI49 65 .36 86 VOL P4 07C -. 54 07C 07C .610 NPSNM 104 CI49 65 .45 87 VOL P4 07C -. 49 07C 07C .610 NPSNM 104 CI

I1 66 NDD TEH TSH .610 NPSNM 49 HI1 66 3.71 186 INR P1 11C .00 11C TEC .610 ZBAZC 70 CI1 66 13.50 178 INR P1 11C .42 11C TEC .610 ZBAZC 70 CI1 66 13.50 178 INR P1 11C .50 11C TEC .610 ZBAZC 70 CI1 66 NOD TEC TEC .610 NPSNM 88 CI1 66 1.49 182 INR P1 1OH 42.48 11H TEH .610 ZBAZC 91 HI1 66 5.21 183 DNT P1 11H .69 11H TEH .610 ZBAZC 91 HI1 66 NDF 2 11H .67 11H 11H .610 NPSNM 107 HI

S. .+. . ---------- .---- +---- +----. ---- + ----.... + .... .... .... .... ------------- -....- +--- -- -- +. . . .+..----.--. ..--.-- +- .. .. -- +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI... .. .. ... ... ...----------...--.--------... +...... ......----------- -- - -

12

Page 102: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - C Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

-.... - .... -- - - -- t---- + ---- + - + -------- +- ... - -. . ---+ - - - +- -+ - -+ - + .--- + --- - + --.. - - . .-+- + ---. -+

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI÷. . .. .+. . . . . . .+. . .. .÷..----------....---- .----+. .-- - + .. .. ... + + .. ... + ... .. . ..-- -+-.-+---- ---- +. . . ..----- + -.. ... +- .. ... +-

NODNDDNDDNOD

NDD35.86 82 PLP

NDDNDD

1.45 33 SAS.29 127 DFS

4.86 178 DNG.43 135 DFS

NDF

NDDNDDNDO

.45 166 DFSNDDNOD

NDF5.64 73 MBM3.27 182 DNG2.66 175 DNG5.75 177 DNG3.12 174 DNG

NOF

NOD3.94 182 DNG2.69 178 DNT

NDF

NDDNDDNDD

NDDNDDNDO

NDDNDDNDO

NDDNDDNDDNDD

NDDNDDNDDNDD

NDONDD

2.22 29 MASNDFNDD

6.00 76 MBM.17 159 DFS

NDDNOD

2.12 173 ONGNDDNOD

NOD4.81 181 DNG3.32 76 MBM

NDF

11 TSH

0 2 TEH1 101

P1 1011 10C2 10i

.07

.1132.1633.4233.8133.42

1 07H 11.17

2 TEH6 09H

P1 09HP1 10CP1 10CP1 10C

2 09H

14.1615.6016.2912.3525.9637.3016.29

P1 03H 22.94P1 AV4 .15

2 03H 22.94

TEH TECTEH TSHTEC TEC08H 08H

TEH TECTEH TSHTEC TEC08H 08H

.13 .24 37 TEH TSHTEH TECTEH TECTEH TEC10i 11H

TEH TSHTEH TEC08H 08H

TEH TECTEH TSH08H 08H

TEH TSHTEH TECTEH TECTEH TECTEH TECTEH TEC09H iON

TEH TSHTEH TECTEH TEC03H 05H

TEH TECTEH TEH08H 08H

TEH TECTEH TEH08H 08H

TEH TECTEH TEH08H 08H

TEH TECTEH TEHTSH TSH08H 08H

TEH TECTEH TEHTSH TSH08H 08H

TEH TECTSH TSH

.18 .28 43 TEH TEHTEH TEH08H 08H

TEH TECTEH TECTEH TEHTSH TSH

TEH TECTEH TEHTSH TSH

TEH TEHTEH TECTEH TEC07H 08H

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 SBACC

.610 SBACC

.610 SBACC

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 NPSNM

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 TBATC

.610 NPSNM

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 NPSNM.610 SBACC.610 SBACC.610 NPSNM

14 Cl9 HI

90 CI181 HI

14 Cl

11 HI90 CI99 NI

149 HI68 CI68 CI68 CI83 HI1

9 HI42 CI

101 HI1

4 CI11 HI99 NI

I11 HI42 Cl42 CI42 Cl42 Cl42 Cl81 HI

19 HI

42 Cl42 Cl81 HI

140 CI51 HI

101 HI1

42 Cl51 HI99 HI

142 CI51 HI99 HI

142 CI51 HI51 HI99 HI

142 CI51 HI51 HI

101 HI1

40 CI51 HI51 HI51 HI99 HI

140 CI40 Cl51 HI51 HI

140 CI51 HI51 HI

53 HI68 CI68 Cl83 HI

I

8 2 TEH2 TEH

.06

.48

6 09C 2.871 07C 22.39

P1 iMN 13.40

P1 07H 15.246 10C 12.812 07H 15.24

--. - - .- . -- + ---- + ---- + ---- + - - ------- + - - - + - - - +- -+ - -+ - -+ ---. + ---- + ---- + - -+ - -+ --. --

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+.. .. +.... .. +.. ...---------- ---- +. ..----+ --+---. . .+..---......+--+-.......----- +----. ----.----.. +-- -+-

13

Page 103: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - C Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

+ .... - .... - ... .----- + ---- + ---- + ---- + ---- + ---- +. -. - + - .+. - + .------------ - - -+- ...... +- . +. -+

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ ... + ... + ...... ÷... +---------....+. .----+ --- -----, - -- + --- +--+-+.... ..-..... +........---- +---- ......----- +-....+- .....- +

31 69 NDD TEH TEC .610 TBATC 40 CI31 69 NDD TEH TEH .610 NPSNM 53 HI31 69 NDD 08H 08H .610 NPSNM 101 HI

I32 69 .42 153 DFS 1 10C 40.83 TEH TEC .610 TBATC 40 CI32 69 NDO TEH TEH .610 NPSNM 53 HI

1 32 69 NDD 08H 08H .610 NPSNM 101 HI

333333

343434

4040404040404040404040

44444444444444

4949494949494949494949

24242424

39393939

33333333

4545454545

4949494949494949

696969

696969

7070707070707070707070

70707070707070

7070707070707070707070

71717171

72727272

73737373

7373737373

7373737373737373

NDDNDDNDD

NDDNDDNDD

3.262.631.90

.30

.351.84

.744.482.80

2.373.401.702.641.89

174 ONG176 DNG175 INR152 DFS142 DFS170 INR151 DFS178 ONG180 ONG

NDFNDF

176 ONG176 ONG176 INR178 ONG175 INR

NODNDF

7.66 177 ONG1.57 174 INR2.06 173 ONG4.76 181 ONG2.24 179 DNT2.05 175 DNT5.78 0 RWS

NDDNDF

3.47 0 PCT1.27 82 VOL

5.17 180 DNG.23 146 DFS

NDDNDF

4.89 177 DNG8.27 178 DNG

NDDNDF

3.67 177 DNGNDFNDFNOD

4.62 172 DNT15.72 180 DNT

NDDNDFNDD

2.06 0 RWSNDFNDD

1.21 0 RWSNDDNDD

.54 92 VOL

.58 0 PCT

P1 O1HP1 O1HP1 O1H

1 1OH1 10C

P1 10C1 10C

P1 10CP1 10C

2 TEH2 01H

P1 01HP1 01HP1 01HP1 01HP1 1MH

2 01H

P1 01HP1 1MHP1 1MHP1 1MHP1 AV3P1 AV4P2 07C

2 1MH38 P6 07C

P4 07C

P1 10H1 1MH

2 1MH

P1 01HP1 01H

2 01H

10.0711.1411.5218.6118.1625.1227.0428.0728.40

.5910.07

10.6611.0611.7412.1426.65

11.06

13.0817.6927.7028.73

.07

.15

.05

28.73-. 08

.01

38.1939.28

38.19

10.7711.74

10.77

TEH TECTEH TECTEH TECTEH TECTEH TECTEH TEH01H 03H

TEH TECTEH TECTEH TECTEH TECTEH TECTEH TECTEH TECTEH TEH1MH 11HTEC TEH07C 07C

TEH TECTEH TECTEH TEH10H 11H

TEH TECTEH TECTEH TEH01H 03H

TEH TECTEH TEH05H 07HTEC TEC

TEH TECTEH TECTEH TEH11H 11HTEC TEC

TEH TECTEH TEHTEC TECTEC TEH02C 02C03C 03C07C 07C07C 07C

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 ZBAZC

.610 NPSNM

.610 TBATC

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 ZBAZC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 NPSNM

40 C40 C40 C40 C40 C53 H81 H

42 C42 C42 C42 C42 C42 C42 C53 H81 H97 H

104 C

48 C48 C53 H83 H

40 C40 C57 H81 H

42 C55 H81 H90 C

42 C42 C55 H81 H88 C

42 C55 H88 C97 H

100 C100 C104 C104 C

ITEH TEC .610 TBATC 40 CITEH TEH .610 NPSNM 51 HI08H 08H .610 NPSNM 101 HI

ITEH TEC .610 TBATC 40 CITEH TEH .610 NPSNM 51 HI08H 08H .610 NPSNM 101 HI

ITEH TEC .610 TBATC 40 CITEH TEC .610 TBATC 40 CITEH TEC .610 TBATC 40 CITEH TEC .610 TBATC 40 CITEH TEC .610 TBATC 40 CITEH TEC .610 TBATC 40 CITEH TEC .610 TBATC 40 ClTEH TEC .610 TBATC 40 CITEH TEC .610 TBATC 40 Cl

TEH TEH .610 NPSNM 53 HI01H 03H .610 NPSNM 81 HI

P1 05H 2.182 TEH .482 05H 2.18

P1 11HP1 11H

2 11H

P2 07C

2 TEH

P2 07C

- .34.75

- .34

- .52

.46

- .39

P4 07C -. 4827 P4 07C -. 43 .00 1.18 180

1 74 NOD 11C TEC .610 ZBAZC 58 CI1 74 NDD TEH TEH .610 NPSNM 59 HI

+. . . . .--. +-. .. +....+ ... + . .. +-------+-.----.. + ......... .+.. .......----- --- +---- +----..+.. . .----+ - +-......+..- .. .-

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+. . . .+. . . . . .+ . .+. . .----------. .. .--.----.----+.-- -- + . .. ...- - + .. . . . . .. . ..-- - ----- +. . ..-------+-......+-.... .+..- .+-

14

Page 104: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - C Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

+ ... - - - - -.. - -------------- - -- - ... - .... - .... -- . . -. - - -- -+-- - -- - -- - -- - - - --.. ..- - -- - -

I ROW COL VOLTS DEG IND PER CNN LOCN INCHI INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI4 - - - ---.- . . . . - . .+.---------......---+ - - - - - ----- + ....... ÷ ....... - - .... + .... 4----. . .-. . .+- ... .. --

1111

494949494949494949

35353535353535

55555

20202020

19191919191919

4747474747

494949494949

49494949494949494949

4141414141

1111

383838

74747474

747474747474747474

75757575757575

7676767676

76767676

80808080808080

8181818181

838383838383

84848484848484848484

8585858585

87878787

919191

NDF6.32 181 DNT

NODNDF

3.263.504.002.142.41

175 DNG179 ONG174 ONG182 ONG179 DNT

NODNDFNDFNOD

4.46 176 ONG3.50 175 DNT2.42 176 DNT5.54 179 DNT

NODNDFNDF

3.08 185 ONG2.38 184 ONG

.32 145 DFSNODNDF

3.27 177 ONG5.06 179 ONG

NODNDF

2 TECP1 11H

2 11H

P1 01HP1 01HP1 01HP1 09HP1 AV3

2 01H2 O1N

P1 IONP1 11HP1 11CP1 11C

2 iON2 11H

P1 09HP1 iMN

1 03C

2 09H

P1 iONP1 10H

2 iMN

P1 07H1 iON

P1 11H6 10C

P1 03C

2 07H

.49

.71

.71

7.658.81

12.3425.09

.03

7.6512.34

38.42.55

-. 63.44

38.42.55

39.5136.334.67

39.51

40.4741.44

41.44

12.5938.29

-. 3033.6312.05

12.59

TEC TEC11H TEN11C 11H11H 11H

TEN TECTEN TECTEH TECTEN TECTEN TECTEN TEN01H 03H01H 03HTEC TEC

TEN TECTEH TECTEN TECTEN TECTEN TENiN 11H10i 11H

TEN TECTEH TECTEN TECTEN TEN09H 10H

TEN TECTEN TECTEN TEN10H 11H

TEH TECTEN TECTEN TECTEN TECTEN TECTEN TEN07H 08H

TEN TSHTEN TECTEN TEC11H 11HTEC TEC

.610 NPSNM

.610 ZBAZC.580 ZPUMB.610 NPSNM

.610 TBATC

.610 TBATC.610 TBATC.610 TBATC.610 TBATC.610 NPSNM.610 NPSNM.610 NPSNM.610 NPSNM

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 ZBAZC

.610 ZBAZC

.610 ZBAZC

.610 NPSNM

.610 NPSNM

.610 ZBAZC

.610 ZBAZC

.610 NPSNM

.610 NPSNM

.610 ZBAZC

.610 ZBAZC

.610 ZBAZC

.610 ZBAZC

.610 ZBAZC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 TBATC

.610 NPSNM

.610 NPSNM

88 CI91 HI

106 CI107 HI1

42 CI42 CI42 Cl42 CI42 CI57 HI81 HI81 HI88 CI

I42 CI42 CI42 CI42 C1

55 HI81 HI81 HI

I58 Cl58 Cl58 CI

59 HI83 NI

54 CI54 CI57 HI83 HI

56 CI56 CI56 Cl56 CI56 CI

59 HI83 NI

5.20.24

3.271.937.32

18391

17648

184

ONGDFSDNTINRONGNODNDF

NDD3.19 179 DNT3.08 179 DNT

NDFNOD

P1 11H -. 41P1 11H .75

2 11H -. 41

13 H44 C44 C81 H92 C

3.07 1753.80 1803.58 181

.89 0

3.794.411.693.953.10

176175178178182

NDFONGDNTDNTPCTNDF

ONGONGINRONGONTNDFNDFNDFNDFNDD

2 TENP1 01HP1 AV1P1 AV3

16 P2 AV42 01H

P1 01HP1 O1HP1 03HP1 03HP1 AV3

2 TEN2 01H2 01H2 03H

.8812.16

-. 12.08

-. 0312.16

9.5712.242.343.41

.03

.809.57

12.243.41

13.53.28.11

13.53

TEN TSH .610 NPSNM 15 HITEN TEC .610 TBATC 44 CITEN TEC .610 TBATC 44 CITEN TEC .610 TBATC 44 CITEN TEC .610 TBATC 44 CI01H 03H .610 NPSNM 81 HI

ITEN TEC .610 TBATC 44 CITEN TEC .610 TBATC 44 CITEN TEC .610 TBATC 44 CITEN TEC .610 TBATC 44 ClTEN' TEC .610 TBATC 44 Cl

TEN TEN .610 NPSNM 57 HI01H 05H .610 NPSNM 81 HI01H 05H .610 NPSNM 81 HI01H 05H .610 NPSNM 81 HI02C 02C .610 NPSNM 100 CI

ITEN TEC .610 TBATC 44 CITEN TEC .610 TBATC 44 CITEH TEC .610 TBATC 44 CITEN TEN .610 NPSNM 55 HI01H 03H .610 NPSNM 83 HI

I11C TEC .610 ZBAZC 58 CITEN TEN .610 NPSNM 59 HI11H TEN .610 ZBAZC 91 HI11H 11H .610 NPSNM 107 HI

ITEN TEN .610 NPSNM 55 HITEN TEC .610 ZBAZC 58 CITEN TEC .610 ZBAZC 58 CI

3.14 176 ONG.88 0 PCT.84 0 PCT

NODNDF

NODNOD

3.05 180 DNTNDF

NDF4.73 170 DNT

13.31 177 DNT

P1 01H16 P2 AV115 P2 AV3

2 01H

P1 11H2 11H

2 TENP1 11HP1 11H

.36

.36

.79- .66

.27+ .... - ... -- - - - +- - .-- - -. .---------- .... -... - -- . .+ -.........-- -+ .-. . ----- -. - -. - - - -- --- -+- -.....-- -+-

I ROW COL VOLTS DEG IND PER CNN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+..+..+.. .. .. .. ..---------+ - -- -----.---- i . .------ --.. +..--- .4--i-- ....-- - +-. . ...----- +----..-----....+-... +.-.. .- .- 4---

15

Page 105: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - C Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

--. - - .--. -- + ---- + ---- + ---- + -.. -- + ---- + - - - +- - . .-- +- -+ - -+ - + ---- + ---- +-- - -- - - -- -- -

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+. . . .+. . . . .+. . . .+. . .---------+....+........- - -.+- - --.......- +.- ... .. +.....- .. +..---- +. . ..---- - .- .. +- ...... +.....-. .- +

38 9138 91

2.37 82 MBMNDF

6 08C 2.012 11H -. 66

1111111

292929292929

2323232323232323

93939393939393

969696969696

9898989898989898

2.82 1723.10 1722.77 173

2.27 1832.02 1822.16 1843.88 183

NODNODDNTDNTONGNDFNDD

DNGDNGDNGDNGNODNDF

TEH TEC .610 ZBAZC 58 CI11H 11H .610 NPSNM 83 HI

I11C TEC .610 ZBAZC 58 CITEH TEH .610 NPSNM 59 HI11H TEH .610 ZBAZC 91 HI11H TEH .610 ZBAZC 91 HI11H TEH .610 ZBAZC 91 HI05H 05H .610 NPSNM 107 HI11C 11H .580 ZPUMB 108 CI

P1 05HP1 05HP1 11H

2 05H

-. 46.61.86.61

NDD3.23 184 DNG2.69 186 ONG1.90 188 INR

NDFNDFNDFNDF

6.76 177 DNGNODNDF

P1P1P1P1

2

P1P1P1

2222

03H03H05H08H

08H

01H

01H10C01HTECTECTEC

19.3533.0925.44

9.70

9.70

19.2025.9439.2219.20

.672.903.83

TEHTEHTEHTEHTEH08H

TEHTEHTEHTEH01HTECTECTEC

TECTECTECTECTEH09H

TSHTECTECTEC03HTECTECTEC

.610

.610

.610.610.610.610

.610

.610

.610.610.610.610.610.610

TBATCTBATCTBATCTBATCNPSNMNPSNM

NPSNMTBATCTBATCTBATCNPSNMNPSNMNPSNMNPSNM

484848485783

1348484883989898

CCCCHH

HCCCHCCC

18 18818 18818 188

P1 03H 9.31

2 03H 9.31

TEH TEC .610 TBATC 52 CTEH TEH .610 NPSNM 59 H03H 05H .610 NPSNM 83 H

262626262626262626262626262626262626262626262626

105105105105105105105105105105105105105105105105105105105105105105105105

3.061.962.582.522.712.812.732.972.803.282.982.802.882.912.222.242.672.382.722.082.03

185186185185185185185185184184185185185178186185185185184185185

NDFDNGINRONGDNGDNGDNGDNGDNGDNGDNGDNGDNGONGDNTDNTDNGDNGDNGDNTDNGDNGNDFNDF

2P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1P1

22

TEH03H05H07H07H07H07H07H07H08H08H08H08H08H09H09H09H09H09H10H10H1MH03H08H

.4924.3130.57

1.648.69

15.7422.7129.7336.81

.927.99

15.0122.0536.09

-. 34.34

7.2821.4335.51

-. 2620.8327.8124.31

7.99

TEHTEHTEHTEHTEHTEHTEHTENTEHTEHTEHTEHTEHTEHTENTENTEHTEHTEHTEHTEHTEH03H08H

TSHTECTECTECTECTECTECTECTECTECTECTECTECTECTECTECTECTECTECTECTECTEC05H09H

.610.610.610.610.610.610.610.610.610.610.610.610.610.610.610.610.610.610.610.610.610.610.610.610

NPSNMZBAZCZBAZCZBAZCZBAZCZBAZCZBAZCZBAZCZBAZCZBAZCZBAZCZBAZCZBAZCZBAZCZBAZCZBAZCZBAZCZBAZCZBAZCZBAZCZBAZCZBAZCNPSNMNPSNM

156262626262626262626262626262626262626262628383

156283

19 10719 10719 107

18 10818 10810 108

11 10811 10811 108

12 10812 10812 108

13 10813 10813 108

14 10814 10814 108

NOD3.01 174 DNT

NDF

NDDNDDNDD

NODNODNOD

NDD.18 85 DFS

NDD

NOD2.43 183 DNG

NOD

P1 09H2 09H

.30

.30

TEN TSH .610 NPSNMTEH TEC .610 ZBAZC09H 09H .610 NPSNM

1 04C 15.49

TEH TEN .610 NPSNM 59TEN TEC .610 SBACC 68TSH TSH .610 NPSNM 99

TEH TEN .610 NPSNM 59TEH TEC .610 ZBAZC 66TSH TSH .610 NPSNM 99

TEN TEH .610 NPSNM 57TEH TEC .610 ZBAZC 62TSH TSH .610 NPSNM 99

TEN TEH .610 NPSNM 57TEH TEC .610 ZBAZC 62TSH TSH .610 NPSNM 99

TEH TEH .610 NPSNM 57TEH TEC .610 ZBAZC 62TSH TSH .610 NPSNM 99

P1 04C .84

NDDNDDNDD

+ .... - .... - ......... + -- .. + ...- + .... --- + .- -- - -INCH-. ..-..-- - - - - - - - + .-.. + .. -- + - ..-.-. + PDI--A-"+ .. +''-

I ROW COL VOLTS DEG IND PER CHN LOCN INCHi INCH2 I CRLEN CRWID CEG BEGT ENDT POIA PTYPE CAL LI--..- . .-- . .. . ..- ...-- . .- ..-- . ..-...--. .. . . .. . .. ----------- - - - . . + + ...... +-.......+-- ....- +.- ... + .... ...... ......-- - - +- ..

16

Page 106: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - C Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

+ .... - ... .- .- ------- + ---- + -------- + ---- + --- - - + .-- +..+ - +- - -+ ---- + ---- + ---- + - -+ - -+ - +. - +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI... +.. . -----------------------------------------------..... . -+.---------+.......+.......+....-- -.-- - ----- ------ ----- - -+-+ -+-

15 108 NDD TEH TEH .610 NPSNM 57 HI15 108 NDD TEH TEC .610 ZBAZC 62 CI15 108 NDD TSH TSH .610 NPSNM 99 HI

I18 109 NOD TEH TEH .610 NPSNM 61 HI1 109 1 7r 01 TNR r CP 19 1A TI- TEC 610 7RA7P R6 C'1

18 109

11 10911 10911 109

12 10912 10912 109

13 10913 10913 109

14 10914 10914 109

15 10915 10915 109

18 11018 11018 118

NOD

NDDNDDNDD

NDD3.14 177 DNG

NDD

NOD2.19 48 MBM

NDD

NDD2.55 186 ONG

NDD

P1 07C 16.21

6 AV4 4.77

P1 TSC 5.56

TSH TSH .610 NPSNN 99 HIITEH TEH .610 NPSNM 55 HITEH TEC .610 ZBAZC 66 CITSH TSH .610 NPSNM 101 HI

ITEH TEH .610 NPSNM 55 HITEH TEC .610 ZBAZC 62 CITSH TSH .610 NPSNM 101 HI

ITEH TEH .610 NPSNM 55 HITEH TEC .610 ZBAZC 62 CITSH TSH .610 NPSNM 101 HIITEH TEH .610 NPSNM 55 HITEH TEC .610 ZBAZC 62 CITSH TSH .610 NPSNM 101 HI

ITEH TEH .610 NPSNM 55 HITEH TEC .610 ZBAZC 62 CITSH TSH .610 NPSNM 101 HI

TEH TEH .610 NPSNM 59 HITEH TEC .610 SBACC 68 CITSH TSH .610 NPSNM 99 HI

NDDNODNOD

NODNDDNDD

11 118 NDD TEH TEH .610 NPSNM 59 HI11 118 NDD TEH TEC .610 SBACC 68 CI11 110 NDD TSH TSH .610 NPSNM 101 HI

12 110 NDD TEH TEH .610 NPSNM 57 HI12 110 NDD TEH TEC .610 ZBAZC 62 CI12 110 NOD TSH TSH .610 NPSNM 99 HI

I13 110 NDD TEH TEH .610 NPSNM 57 HI13 110 NDD TEH TEC .610 ZBAZC 62 CI13 110 NDD TSH TSH .610 NPSNM 99 HII14 110 NDD TEH TEH .610 NPSNM 57 HI14 110 NDD TEH TEC .610 ZBAZC 62 CI14 110 NDD TSH TSH .610 NPSNM 99 HI

I15 110 NOD TEH TEH .610 NPSNM 57 HI15 110 NOD TEH TEC .610 ZBAZC 62 CI15 110 NOD TSH TSH .610 NPSNM 99 HI

I10 111 NDD TEH TEH .610 NPSNM 61 HII10 111 NDD TEH TEC .610 ZBAZC 66 CI10 111 NDD TSH TSH .610 NPSNM 99 HII11 111 NOD TEH TEH .610 NPSNM 55 HI11 111 2.14 177 DNT P1 09H -. 39 TEH TEC .618 ZBAZC 66 CI11 111 2.02 175 DNT P1 09H .65 TEH TEC .610 ZBAZC 66 CI11 111 2.82 176 DNG P1 1MH 35.85 TEH TEC .610 ZBAZC 66 CI11 111 4.27 179 ONG P1 1MH 40.93 TEH TEC .610 ZBAZC 66 CI11 111 .51 145 DFS 1 l0C 39.36 TEH TEC .610 ZBAZC 66 CII 111 11 NDD TSH TSH .610 NPSNM 101 HI

I12 111 NOD TEH TEH .610 NPSNM 55 HI12 111 4.08 184 DNG P1 04C 16.69 TEH TEC .610 ZBAZC 62 CI12 111 NDD TSH TSH .610 NPSNM 101 HI

I13 111 NDD TEH TEH .610 NPSNM 55 HI13 111 NDD TEH TEC .610 ZBAZC 62 CI13 111 NDD TSH TSH .610 NPSNM 101 HI

. I

14 111 NDD TEH TEH .610 NPSNM 55 HI14 111 NDD TEH TEC .610 ZBAZC 62 CI14 111 NDD TSH TSH .610 NPSNM 101 HI

I15 111 NDD TEH TEH .610 NPSNM 55 HI15 111 2.28 174 DNT P1 09H -. 52 TEH TEC .610 ZBAZC 62 CI15 111 2.79 175 DNT P1 09H .55 TEH TEC .610 ZBAZC 62 CI15 111 NOD TSH TSH .610 NPSNM 99 HI

+.. .. + ... +.. .. +.. .. +...-----------------+.-...+.......-+.----...•-. . +....+.----.----+----....+-......+......+......--

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ .. .. +......+ .. .. .. +.---------- .. -+---- .... +. -- --- ... .... +.. .. +---+----+ -..- +....++....----+--+-....+-+

17

Page 107: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - C Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 01:00:34

÷ . .+ . .+ . . .. .+.. .+.. .+.--------- ..-..--- ----... + .... .+......... .+.----+-.......+. .+---- .---- + . .. +.----- +-......+- ...... +I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI

--------------------- +--------+-----+-----+-----+-----+----+---+--+ - + - ---- +-----+-----+-----+------

4 112 NDF P1 TEH .50 TEH TEH .610 NPSNM 59 HN4 112 NDF 2 TEH 2.85 TEH TEH .610 NPSNM 59 HI4 112 7.48 176 ONT P1 11C -. 22 11H TEC .590 SBUCC 74 Cj4 112 2.23 170 DNG P1 10C 41.90 11H TEC .590 SBUCC 74 Cj4 112 .70 161 INR P1 iMN 39.64 11H TEH .610 ZBAZC 95 HI4 112 3.70 173 DNG P1 10H 40.75 11H TEH .610 ZBAZC 95 HN4 112 NDF 2 1ON 40.75 1ON 11H .610 NPSNM 113 HN

10 112 NDF 2 TEH .50 TEH TEH .610 NPSNN 61 Nj10 112 NDF 2 TEH 3.63 TEH TEH .610 NPSNM 61 HN10 112 3.65 178 DNT P1 09H -. 31 TEH TEC .610 ZBAZC 66 Cj10 112 2.37 176 DNT P1 09H .63 TEH TEC .610 ZBAZC 66 Cj10 112 7.72 183 ONG P1 AV4 14.19 TEH TEC .610 ZBAZC 66 Cj10 112 NDF 2 09H -. 31 09H 09H .610 NPSNM 83 HN10 112 NDD TSH TSH .610 NPSNM 99 HN

11 112 NOD TEH TEH .610 NPSNM 55 HN11 112 2.27 175 DNT P1 09H -. 39 TEH TEC .610 ZBAZC 66 Cj11 112 NOD TSH TSH .610 NPSNM 99 HI

12 112 NDD TEH TEH .610 NPSNM 55 HI12 112 2.43 174 DNT P1 09H -. 50 TEH TEC .610 ZBAZC 62 Cj12 112 3.12 175 DNT P1 09H .59 TEH TEC .610 ZBAZC 62 Cj12 112 NDF 2 09H .59 09H 09H .610 NPSNN 83 HN12 112 NDD TSH TSH .610 NPSNN 99 HN

13 112 NOD TEH TEH .610 NPSNN 55 HN13 112 RBD TEH TEC .610 ZBAZC 64 Cj13 112 2.50 176 DNT P1 09H -. 31 TEH TEC .610 SBACC 72 Cj13 112 3.83 176 DNT P1 09H .73 TEH TEC .610 SBACC 72 Cj13 112 2.09 176 DNT P1 11H -. 34 TEH TEC .610 SBACC 72 Cj13 112 2.35 174 DNT P1 11H .74 TEH TEC .610 SBACC 72 Cj13 112 NDD TSH TSH .610 NPSNM 99 HN

14 112 NDD TEH TEH .610 NPSNN 55 Hj14 112 RBD TEH TEC .610 ZBAZC 64 Cj14 112 3.54 77 MBM 6 01H 4.15 TEH TEC .610 SBACC 72 Cj14 112 3.69 178 DNT P1 09H -. 34 TEH TEC .610 SBACC 72 Cj14 112 4.40 179 DNT P1 09H .73 TEH TEC .610 SBACC 72 Cj14 112 3.96 178 DNT P1 11H .72 TEH TEC .610 SBACC 72 Cj14 112 NOD TSH TSH .610 NPSNM 99 HN

15 112 NOD TEH TEH .610 NPSNM 55 HN15 112 RBD TEH TEC .610 ZBAZC 64 Cj15 112 2.23 176 DNT P1 09H -. 29 TEH TEC .610 SBACC 72 Cj15 112 2.41 177 DNT P1 09H .73 TEH TEC .610 SBACC 72 Cj15 112 3.42 178 DNT P1 11H -. 32 TEH TEC .610 SBACC 72 Cj15 112 2.41 174 DNT P1 11H .75 TEH TEC .610 SBACC 72 Cj15 112 NOD TSH TSH .610 NPSNM 99 HN

10 113 NOD TEH TEH .610 NPSNM 61 HI10 113 2.20 175 DNT P1 09H -. 37 TEH TEC .610 ZBAZC 66 Cj10 113 NOD TEC TEC .610 NPSNM 98 Cj10 113 NOD TSH TSH .610 NPSNM 101 HN

11 113 NDD TEH TEH .610 NPSNHM 55 HN11 113 2.67 176 DNT P1 09H -. 31 TEH TEC .610 SBACC 68 Cj11 113 2.01 177 DNT P1 09H .65 TEH TEC .610 SBACC 68 Cj11 113 2.94 181 ONG P1 09H 10.95 TEH TEC .610 SBACC 68 Cj11 113 NOD TEC TEC .610 NPSNN 98 Cj11 113 NOD TSH TSH .610 NPSNM 101 HN

12 113 NDF 2 TEH .48 TEH TEH .610 NPSNM 55 HI12 113 RBOD. TEH TSC .610 ZBAZC 64 Cj12 113 3.45 184 ONG P1 07H 41.96 TEH TEC .610 *SBACC 68 Cj12 113 .49 142 DFS 1 08H 32.71 TEH TEC .610 SBACC 68 Cj12 113 2.37 170 ONG P1 08H 33.72 TEH TEC .610 SBACC 68 Cj12 113 2.89 176 DNT P1 09H' -. 29 TEH TEC .610 SBACC 68 Cj12 113 3.63 177 DNT P1 09H .60 TEH TEC .610 SBACC 68 Cj12 113 5.29 179 DNG P1 10i 42.08 TEH TEC .610 SBACC 68 Cj12 113 2.36 179 DNT P1 11H -. 29 TEH TEC .610 SBACC 68 Cj12 113 .73 97 DFS 3 AV4 5.88 TEH TEC .610 SBACC 68 Cj12 113 PBC TEH TEC .610 SBACC 72 Cj12 113 .51 157 DFS 1 08H 32.72 TEH TEC .610 SBACC 72 Cj12 113 .74 105 DFS 3 AV4 5.52 TEH TEC .610 SBACC 72 Cj12 113 NDF 2 TEC 1.49 TEC TEC .610 NPSNM 98 Cj

1 12 113 NOD TSH TSH .610 NPSNHM 101 HN+ . .. . .. .. •+ .. + .. + ..--------- + + ----. ----... + .... +. .+. .+. .......---+- - -.-.- + ---- + .----+ -- -. ..--- +-......+- .....

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL Lj+ . .+. . . . . . . .+. . . .+..---------.....-+ ---- .---- + .. .. .. .. .. . .. .. .. ...----- - + + - + - + ----+.----... + --.--+-. .. + -...... +- .

Tubes: 241 Records: 119818

Page 108: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - D SPECIAL INTEREST +POINT INSPECTIONS

Byron B2R14 CBE D5X 129 TUBE TESTED FOR SPECIAL

INTEREST WITH +POINT PROBE -

SEE LIST FOR LOCATION(S)TESTED

a 33 PLUGGED TUBE

110 105 100 95 90 85 80 75 70 65 601000000000000000 XOXO sO000cpo

55 50 45 40 35 30 25 20xcp00a0Q0 0)000Q0000O000(0 I I

15 10 5

0'

000

00..

)0... .X. .f af .. f .. f.... f.x.-f. .40

XO. .... .... . ... . .... .... ..... 0 0.-. -. .... X.......... .... ...* ,o00

xc..................0 0..................a...........OX00-.. ............. . . . ... • . . .-.... 0 0. ..--. .... .... ... . ... o.. 00

.0 .............. ... . .. ... .... ....... 0 0 . ...... .... ....... . .

oo , . ,, ., ., . .. .... .,. . , . ,, . ,°... ,, ... 0 0" ' X .o .. . . .. . .. . ... . .. . . . A. o. . O0000.... 00 . ...-......... ........ 0 0 ..- -......X........................O0 . O0

00.,. .00(-.................0 0.......... 0()O........-.-..... . ))00- -00a -... -.. 00. -.... - ....... .000... ... 0 0.-- - aO......-. -- ... .- O .,. .aX

)a. ..... 00.. .. .... ............ . .. 0 0.. X " . 0 00 . ....... 0 0 ........ .... .. ............ (00 ...... .... a00-- e -,,E.-.,0 -0-- -) -- eO -- --------

00.......................... ... 000........0 0..........000............. .... . .. ... . ...........00 .................... .............. ..... ................. 0 0.................................... ..... .... ..... .... ... o

00 .............................. ......... .... ..... .... .... 0 0...................... .... .... ......... .... ..... .... .... 00

X o).. .... .. ... . .. ... . . ..... . .... .. ... . ... . .... .. ... ....... 0 0...................... ...... . .................... OK....... ...... . .. ..... . . ..X. ..... . .. .. .. .. .. X ...... 0...................... ... .............. ......... 0

X----0 .o............0 ............. X0XO0000 0000 0000............0 ........... ao ..,

-c.o............00.............. 0 0.............0 .00

S. .. ... . ...................... ................ ......... 0000 0000( 0000()0000()0000). .. ........................... . .. ..... A . ... . .. . . . . .~ . .0c

................... K............................... .... xI.... X... ......... .... .... ....0(........................................................................ .... .... .... .... .... .... .... 0

00 ... ... . .......... .... .. .. .. .. ..... .... .... ........ .... ... 00

-.-- 0---- - - X - - -* - -~ - -~ - E) E)

0...................................................................... K 0 ..

00 ..................................... ... .... .... .... .... ......... .... .... .... .... .................................... .. .. . 00

0..: ... X. .. .l x: .: .! l ... :: ! I: . :: .I ... ;::)0000

0

.... .... ... 0

oooo4)oooo4)oOX4)oooo0oooo4)oooooooo4oooo4)oooo4ooooooo4)o xx00ý XX XOOOO4OOOOOOOOpOooO4)Xoo0poooo )0000 )0 0 004.00 0040 00 0

110 105 100 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5

Wengho• eicCompany LLC - ST Ma 10/17/2008 01:0025

Page 109: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - D Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 09:10:09

+ .... - ... --. ------ -+ -- -- + .. -- + - .-- +- ... +- ... + -. .- -+ - +..+- -- + ---- + .--- + .--- + - -+ - -+ - +. -+

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+...+...+ ....... +...---------+...-. ----+----.+....+....----- -- ----- -- - -

33333

55555

121212121212

2727272727

555555

131313

1818181818

NDFNDF

3.20 172 DNT2.90 174 DNT

NDF

3.05 179 DNG2.67 179 DNG.25 157 DFS

NDFNDFNDF

3.29 175 DNT3.36 174 DNT3.57 172 DNT

NODNDF

2.61 171 DNG3.10 172 DNG2.81 173 DNT.16 134 DFS

NDDNDF

3.09 174 ONGNDDNDF

3.02 172 DNG2.70 91 MBM

.09 123 DFSNODNOF

2 TEH2 TEH

P1 11HP1 11H

2 11H

P1 101P1 10C

1 08C2 TEH2 TEH2 10H

P1 11HP1 llC

P1 11C

2 11H

P1 1MHP1 iMNP1 11C

1 10C

2 1MH

.49

.63- .51-. 48- .51

39.0336.184.08.47.66

39.03

.16-. 64

.44

.16

28.0730.81

.3825.80

30.81

TEH TEH .610 NPSNM 35 HITEH TEH .610 NPSNM 35 HI11H TEC .590 SBUCC 72 CI11H TEH .610 ZBAZC 77 HI11H 11H .610 NPSNM 91 HI

ITEH TEC .610 ZBAZC 10 CITEH TEC .610 ZBAZC 10 CITEH TEC .610 ZBAZC 10 CNTEH TEH .610 NPSNM 33 HITEH TEH .610 NPSNM 33 HI

10H 11H .610 NPSNM 91 HII

TEH TEC .610 TBATC 16 CITEH TEC .610 TBATC 16 CITEH TEC .610 TBATC 16 Cl

TEH TEH .610 NPSNM 33 HN11H 11H .610 NPSNM 91 HI

ITEH TEC .610 TBATC 12 CjTEH TEC .610 TBATC 12 CjTEH TEC .610 TBATC 12 CITEH TEC .610 TBATC 12 Cl

TEH TEH .610 NPSNM 33 HI10H 11H .610 NPSNM 67 HI

ITEH TEC .610 TBATC 12 CITEH TEH .610 NPSNM 33 HIiN 11H .610 NPSNM 69 HI

ITEH TEC .610 TBATC 12 CITEH TEC .610 TBATC 12 CITEH TEC .610 TBATC 12 CITEH TEH .610 NPSNM 35 HIiN 11H .610 NPSNM 69 HI

P1 iON 40.51

2 10H 40.51

P1 10H6 10H1 10C

2 i0N

32.0441.4417.29

32.04

21 9 5.33 176 DNG P1 10H 33.31 TEH TEC .610 TBATC 16 CI21 9 2.72 174 DNT P1 11C -. 53 TEH TEC .610 TBATC 16 CI21 9 8.40 178 DNT P1 11C .46 TEH TEC .610 TBATC 16 CI21 9 NDD TEH TEH .610 NPSNM 33 HI21 9 NDF 2 10H 33.31 iN 11H .610 NPSNM 91 HI

9 10 3.25 183 ONG P1 07H 27.35 TEN TEC .618 Z8AZC 18 CI9 10 3.07 183 ONG P1 08H 3.47 TEH TEC .610 ZBAZC 10 CI

I 9 10 2.99 179 ONG P1 04C 14.06 TEH TEC .610 ZBAZC 10 CII 9 10 NOD TEH TEH .610 NPSNM 33 HN1 9 10 NDF 2 08H 3.47 08H 09H .610 NPSNM 91 HN

1 25 10 3.04 180 DNT P1 11H .46 TEH TEC .610 ZBAZC 14 Cj1 25 10 2.90 176 DNT P1 11C -. 69 TEH TEC .610 ZBAZC 14 Cl

25 10 NDD TEH TEH .610 NPSNM 33 HI25 10 NDF 2 11H .46 11H 11H .610 NPSNM 91 HI

6 11 3.24 174 ONG P1 10H 28.52 TEH TEC .610 TBATC 12 CI6 11 6.47 178 DNG P1 10C 41.62 TEH TEC .610 TBATC 12 CI6 11 NOD TEH TEH .610 NPSNM 35 HI6 11 NDF 2 iON 28.52 10H 11H .610 NPSNM 67 HI

10 11 3.16 173 DNG P1 10H 38.56 TEH TEC .610 TBATC 12 CI10 11 .18 136 DFS 1 10C 38.17 TEH TEC .610 TBATC 12 CI10 11 3.10 172 DNG P1 10C 41.21 TEH TEC .610 TBATC 12 CI10 11 NDD TEH TEH .610 NPSNM 35 HI10 11 NDF 2 iON 38.56 iN 11H .610 NPSNM 69 HI

21 11 6.36 177 DNG P1 10H 30.14 TEH TEC .610 TBATC 16 CI21 11 3.61 176 DNG P1 iON 32.20 TEH TEC .610 TBATC 16 Cl21 11 2.75 173 DNT P1 11C -. 51 TEH TEC .610 TBATC 16 Cj21 11 5.64 176 DNT P1 11C .55 TEH TEC .610 TBATC 16 CI21 11 2.22 74 MBM 6 05C 7.56 TEH TEC .610 TBATC 16 CI21 11 NDD TEH TEH .610 NPSNM 33 HI21 11 NDF 2 10H 32.20 10H 11H .610 NPSNM 91 HI

I25 12 .23 143 DFS 1 10H 31.98 TEH TEC .610 ZBAZC 14 Cl25 12 3.27 182 DNT P1 11H -. 54 TEH TEC .610 ZBAZC 14 Cl25 12 2.06 179 DNT P1 11H -. 19 TEH TEC .610 ZBAZC 14 CI25 12 3.20 181 DNT P1 11H .49 TEH TEC .610 ZBAZC 14 CI25 12 .14 115 DFS 1 10C 27.26 TEH TEC .610 ZBAZC 14 CI25 12 NOD TEH TEH .610 NPSNM 33 HI25 12 NDF 2 11H .49 11H 11H .610 NPSNM 91 HI

I---------------------- +-------+-----+-----+-----+-----+----+---+--+ - + - ---- +-----+-----+ - + - +--------

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+.. . .... +.. . .. +----------. .....----+----+..+-------+ ..--- +.--+-......+......-+..-----+ ...----+-- ..--- +-.....+.....- +

1

Page 110: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - D Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 09:10:09

+. . . . . . .+. . . . .+----------.--. .---.----+----. ..----- - -- +- --. +.- - +... . .-- . . .+.......----+ ----- + . . ..----.- + -.-... . ...-

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+.. .. +.....+.. .. +...+--------------..--.------------ .....--- +--- +--+-.......+....-...+......---- .------...--- +-.....+....-

28 12 3.52 180 DNT P1 11H - .54 TEH TEC .610 ZBAZC 14 CI28 12 5.59 182 DNT P1 11H .52 TEH TEC .610 ZBAZC 14 CI28 12 NOD TEH TEH .610 NPSNM 35 HI28 12 NOF 2 11H .52 11H 11H .610 NPSNM 91 HI

I17 13 .37 65 DFS 1 18H 21.81 TEH TEC .610 TBATC 12 CI17 13 3.10 181 ONG P1 18N 22.49 TEH TEC .610 TBATC 12 CI17 13 5.51 178 ONG P1 101 22.92 TEH TEC .610 TBATC 12 CI17 13 3.06 177 ONG P1 10H 23.44 TEH TEC .610 TBATC 12 CI17 13 2.73 178 ONG P1 iON 24.04 TEH TEC .610 TBATC 12 CI17 13 NDF 2 TEH .50 TEH TEH .610 NPSNM 33 HI17 13 NOF 2 10H 22.92 1iH 11H .610 NPSNM 69 HI

I22 13 5.29 175 ONG P1 iON 35.58 TEH TEC .610 TBATC 16 CI22 13 2.86 177 ONG P1 iMN 36.23 TEH TEC .610 TBATC 16 CI22 13 2.18 177 ONG P1 101 37.29 TEH TEC .610 TBATC 16 CI22 13 NOD TEH TEH .610 NPSNM 35 HI22 13 NDF 2 10H 35.58 101 11H .610 NPSNM 91 HI

I32 13 2.22 173 ONT P1 11H -. 60 TEH TEC .610 TBATC 16 CI32 13 3.26 173 DNT P1 11C -. 48 TEH TEC .610 TBATC 16 Cl

32 13 NOD TEH TEH .610 NPSNM 35 HI32 13 2.60 175 DNT P1 11H -. 66 TEC TEH .610 ZBAZC 85 HI32 13 3.42 174 DNT P1 11C -. 50 TEC TEH .610 ZBAZC 85 HI32 13 NDF 2 03C .13 03C 03C .610 NPSNM 90 CI

34 14 5.04 182 DNT P1 11H -. 57 TEH TEC .610 ZBAZC 14 Cl34 14 3.19 176 DNT P1 11C -. 69 TEH TEC .610 ZBAZC 14 CI34 14 NOD TEH TEH .610 NPSNHM 35 HI34 14 NDF 2 11H -. 57 11H 11H .610 NPSNHM 91 HI

I6 15 3.32 174 ONG P1 10H 29.39 TEH TEC .610 TBATC 12 CI6 15 .41 85 DFS 1 iON 30.77 TEH TEC .610 TBATC 12 CI6 15 2.83 176 ONG P1 iON 39.35 TEH TEC .610 TBATC 12 CI6 15 3.16 171 ONG P1 10C 36.73 TEH TEC .610 TBATC 12 CI6 15 NOD TEH TEH .610 NPSNM 31 HI6 15 NDF 2 10H 29.39 1N 11H .610 NPSNH 67 HI

I24 16 3.70 183 ONG P1 10H 17.06 TEH TEC .610 ZBAZC 14 CI24 16 3.33 180 DNT P1 11H -. 49 TEH TEC .610 ZBAZC 14 CI24 16 3.71 179 DNT P1 11H .57 TEH TEC .610 ZBAZC 14 CI24 16 NDF 2 TEH .48 TEH TEH .610 NPSNHM 29 HI24 16 NDF 2 11H .57 11H 11H .610 NPSNHM 91 HII29 16 2.18 178 ONT P1 1N -. 51 TEN TEC .618 ZBAZC 14 CI29 16 3.14 179 DNT P1 11H .54 TEH TEC .610 ZBAZC 14 CI

29 16 3.32 178 ONG P1 10C 33.99 TEH TEC .610 ZBAZC 14 CI29 16 3.07 177 ONG P1 10C 35.98 TEH TEC .610 ZBAZC 14 CI29 16 2.87 77 MBM 6 08C 13.98 TEH TEC .610 ZBAZC 14 C129 16 NOD TEH TEH .610 NPSNM 33 HI29 16 NDF 2 11H .54 11H 11H .610 NPSNHM 91 HI

37 16 5.02 180 DNT P1 11H -. 59 TEH TEC .610 ZBAZC 14 CI37 16 2.49 174 DNT P1 11H .54 TEH TEC .610 ZBAZC 14 CI37 16 2.17 176 ONG P1 10C 36.27 TEH TEC .610 ZBAZC 14 CI37 16 NDF 2 TEN 1.37 TEH TEH .610 NPSNHM 33 HI37 16 NHF 2 11H -. 59 11H 11H .610 NPSNM 91 HI

8 19 NDF 2 TEH 16.82 TEH TSH .610 NPSNM 5 HI8 19 3.04 183 ONG P1 09H 29.91 TEH TEC .610 TBATC 16 CI8 19 27.90 178 DNT P1 11C .74 TEH TEC .610 TBATC 16 CI8 19 NDF 2 09H 29.91 09H 10H .610 NPSNM 91 HI

I43 22 5.88 182 ONT P1 11N - .51 TEN TEC .618 ZBAZC 14 CI43 22 5.17 181 DNT P1 11H .59 TEH TEC .610 ZBAZC 14 CI

43 22 1.35 0 PCT 18 P2 AVI .00 TEH TEC .610 ZBAZC 14 CI43 22 2.19 174 DNT P1 AV2 -. 26 TEH TEC .610 ZBAZC 14 CI43 22 1.08 0 PCT 16 P2 AV2 -. 13 TEH TEC .610 ZBAZC 14 Cl43 22 15.27 182 ONG P1 AV4 17.17 TEH TEC .610 ZBAZC 14 CI43 22 2.78 178 ONT P1 11C -. 67 TEH TEC .610 ZBAZC 14 CI43 22 5.06 184 ONT P1 11C .38 TEH TEC .610 ZBAZC 14 CI43 22 NOD TEH TEH .610 NPSNHM 33 HI43 22 NOD 02C 02C .610 NPSNH 88 CI43 22 NDF 2 11H .59 11H 11H .610 NPSNHM 91 HI

I41 24 5.06 183 DNT P1 11H -. 48 TEH TEC .610 ZBAZC 14 CI41 24 2.18 175 DNT P1 11H .54 TEH TEC .610 ZBAZC 14 CI41 24 NOD TEH TEH .610 NPSNHM 33 HI41 24 NDF 2 11H -. 48 11H 11H .610 NPSNHM 91 HI

I I---------------------- +--------+-----+-----+-----+-----+----+---+--+ - + - ---- +-----+-----+ - - 4--------

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ . .+. .. +. . . . . . .+.. .+. . . . . .--------.... .... ..--+ ----- - - + .-- - .+-- - +.. ... +- . . . .+... ...---- +...----.-- - . ..--..-. +.... ..- +

2

Page 111: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - D Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 09:10:09

+ .. .. ...... .. .. ----------- ...----..---- +.---+---. .+.---+.--+- +-+----+. ..---- +----.+- -+ - +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ . .+. . . . . .. . .+. . . .---------+. . . .+.----.-------- . .. +..-- - ..- - .-- - +-- - -- +....+....+..----.+.----.--.+..---..- +......- - +

9 25 3.25 175 ONG P1 10H 22.45 TEH TEC .610 TBATC 20 CI9 25 .56 153 DFS 1 10C 21.68 TEH TEC .610 TBATC 20 CI9 25 4.34 177 ONG P1 10C 22.77 TEH TEC .610 TBATC 20 CI9 25 NDF 2 TEH .49 TEH TEH .610 .NPSNM 31 HI9 25 NDF 2 TEH .78 TEH TEH .610 NPSNP 31 HI

I 9 25 NDF P1 TEC .45 TEC TEC .610 NPSNM 78 CI9 25 NDF 2 101 22.45 101 11H .610 NPSNM 91 HI

I13 26 3.39 186 DNG P1 088 40.16 TEH TEC .610 ZBAZC 18 CI13 26 NOD TEH TEH .610 NPSNM 29 NI13 26 NDF 2 088 40.16 088 09H .610 NPSNM 71 HI13 26 NDD TEC TEC .610 NPSNM 80 CI

II 34 26 3.02 176 DNT P1 11H -. 62 TEH TEC .610 ZBAZC 14 CII 34 26 11.59 184 DNT P1 11H .46 TEH TEC .610 ZBAZC 14 CII 34 26 NOD TEH TEH .610 NPSNM 35 HII 34 26 NDF P1 TEC .45 TEC TEC .610 NPSNM 80 CII 34 26 NDF 2 11H -. 62 11H 11H .610 NPSNM 91 HI

. II 30 28 .36 138 DFS 1 10C 18.65 TEH TEC .610 ZBAZC 14 CI

30 28 NOD TEH TEH .610 NPSNM 33 HI30 28 NDF P1 10C 18.65 10C 11C .610 NPSNM 90 CI

II 47 28 3.81 179 DNT P1 11H -. 57 TEH TEC .610 ZBAZC 14 CII 47 28 3.12 177 DNT P1 11H .51 TEH TEC .610 ZBAZC 14 CII 47 28 NDF 2 TEH .48 TEH TEH .610 NPSNM 39 HII 47 28 NOD 02C 02C .610 NPSNM 88 CII 47 28 NDF 2 11H .51 11H 11H .610 NPSNM 91 HII I

3 29 NOD TEH TEH .610 NPSNM 31 HI3 29 3.03 178 ONG P1 11H .96 11H TEC .590 SBUCC 72 CI3 29 NOD 11H TEH .610 SBACC 79 HI3 29 NDF 2 11H .96 11H 11H .610 NPSNM 91 HI

I 7 29 1.93 177 INR P1 10i 31.45 TEH TEC .610 TBATC 20 CII 7 29 6.04 176 ONG P1 10i 32.55 TEH TEC .610 TBATC 20 CI

7 29 2.22 179 ONG P1 10C 35.72 TEH TEC .610 TBATC 20 CI7 29 NOD TEH TEH .610 NPSNM 31 HI7 29 NDF 2 iMN 32.55 10 11H .610 NPSNM 91 HI

II 44 29 15.92 5 BLG 1 TSC .62 TEH TEC .610 TBATC 20 CII 44 29 NDF P1 TEH .48 TEH TEH .610 NPSNM 37 HI

44 29 NDF 2 TSC .62 TSC TSC .610 NPSNM 90 CIII 48 30 2.20 176 DNT P1 11H -. 65 TEH TEC .610 ZBAZC 18 CII 48 30 3.06 178 DNT PI 11H .43 TEH TEC .610 ZBAZC 18 CII 48 30 2.65 181 ONT P1 AVI .00 TEH TEC .610 ZBAZC 18 CII 48 30 2.29 183 DNT PI AV4 .74 TEH TEC .610 ZBAZC 18 CII 48 30 NOD TEH TEH .610 NPSNM 39 HII 48 30 NDF 2 11H .43 11H 11H .610 NPSNM 63 HII 48 30 NOD 02C 02C .610 NPSNM 88 CII II 1 33 NDF 2 TEH .47 TEH TSH .610 NPSNM 7 HII 1 33 NOD 11C TEC .610 TBATC 12 CII 14 33 3.09 171 DNT P1 11H -. 16 11H TEH .610 ZBAZC 77 HII 1 33 14.83 175 ONG P1 11H .82 11H TEH .610 ZBAZC 77 HII 1 33 NOD TEC TEC .610 NPSNM 78 CII 1 33 NDF 2 11H -. 16 11H 11H .610 NPSNM 91 HII I

8 33 NOF 2 TEH .49 TEH TSH .610 NPSNM 5 HI8 33 5.45 181 ONG P1 101 27.84 TEH TEC .610 ZBAZC 18 CI

I 8 33 2.72 177 ONG P1 10i 28.60 TEH TEC .610 ZBAZC 18 CII 8 33 4.13 180 ONG P1 10i 32.60 TEH TEC .610 ZBAZC 18 CII 8 33 NDF 2 101 27.84 10i 11H .610 NPSNM 73 HII 8 33 NOD TEC TEC .610 NPSNM 78 CI

I I13 35 NDF 2 TEH .50 TEH TSH .610 NPSNM 5 HI13 35 NDF 2 TEH 2.70 TEH TSH .610 NPSNM 5 HI

I 13 35 NDF 2 TEH 5.11 TEH TSH .610 NPSNM 5 HII 13 35 NDF 2 TEH 6.95 TEH TSH .610 NPSNM 5 HII 13 35 3.40 181 ONG P1 10H 38.75 TEH TEC .610 ZBAZC 22 CI

13 35 NDF 2 10H 38.75 10i 11H .610 NPSNM 91 HII

19 37 3.26 178 ONG P1 10H 41.76 TEH TEC .610 ZBAZC 22 CI19 37 2.02 64 1BM 6 08C 12.46 TEH TEC .610 ZBAZC 22 CI19 37 NOD TEH TEH .610 NPSNM 31 NI19 37 NDF 2 10H 41.76 10i 11H .610 NPSNM 93 HII48 38 4.52 188 DNG P1 03H 9.20 TEH TEC .610 ZBAZC 26 CI48 38 3.32 186 ONG P1 05H 10.26 TEH TEC .610 ZBAZC 26 CI

+. . . .. . .+-----------+-- - -...-+. . . .. +.. .-- . .. ..--.-----------...-- - - - ---+-. .+-. .+.---- --+-----+ - ------ ---+-------+- + -.

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+. . . . . . .+ . .+. .+..-----------+---+ . ..- .. . .. .. .+ .. ...----+.+.. ....-- - --- +- . .. .. +..----. + . .---- +- - . .----+-.. ... +-.....

3

Page 112: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - D Special Interest +Point Inspection Results

Byron 2 82R14 CBE 20081001 10/17/2008 09:10:09

÷ .. ÷...÷ ...- ÷ .. ... ÷ .---------.-...--......+----+.......---.---+--+- +-+ll÷..÷..+.----.----+ ...----- - + -- .... ÷.... ÷

I ROW COL VOLTS DEG INO PER CHN LOCN INCHI INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI-------------------- --+------+----.. -----+--------- - +-------------------+--------------.------+----+- ............

48 38 2.58 188 DNG P1 05H 17.22 TEH TEC .610 ZBAZC 26 CI48 38 NDF PI TEH .48 TEH TEH .610 NPSNM 37 HI48 38 NDF 2 05H 10.26 05H 07H .610 NPSNM 89 HI

I30 39 3.12 172 DNT P1 11H .44 TEH TEC .610 TBATC 28 CI30 39 NDO TEH TEH .610 NPSNM 31 HI30 39 NDF 2 11H .44 11H 11H .610 NPSNM 93 HII19 40 5.72 177 DNG P1 10H 36.72 TEH TEC .610 TBATC 8 CI19 40 4.49 176 DNG P1 10i 37.22 TEH TEC .610 TBATC 8 CI19 40 NDF 2 TEH .48 TEH TEH .610 NPSNM 29 HI19 40 NDF 2 10i 36.72 iN 11H .610 NPSNM 67 HI

17 44 5.06 71 MBM 6 07H 30.79 TEH TEC .610 ZBAZC 4 CI17 44 .28 118 DFS 1 10i 22.95 TEH TEC .610 ZBAZC 4 CI17 44 .19 94 INR 1 iON 26.92 TEH TEC .610 ZBAZC 4 CI17 44 5.11 176 ONG P1 10H 34.01 TEH TEC .610 ZBAZC 4 CI17 44 2.00 172 DNG P1 10H 36.16 TEH TEC .610 ZBAZC 4 CI17 44 3.00 176 DNG P1 10i 41.29 TEH TEC .610 ZBAZC 4 Ca17 44 .38 132 DFS 1 10C 24.98 TEH TEC .610 ZBAZC 4 Ca17 44 6.38 183 DNG P1 18C 36.06 TEH TEC .610 ZBAZC 4 Ca17 44 NOD TEH TEH .610 NPSNM 29 HI17 44 NDF 2 10i 34.01 10i 11H .610 NPSNM 53 HI17 44 NDF 2 iON 41.29 iN 11H .610 NPSNM 53 HI

I

43 44 3.22 184 ONG P1 03H 5.20 TEH TEC .610 ZBAZC 26 CI43 44 NDF P1 TEH .48 TEH TEH .610 NPSNM 37 HI43 44 NDF 2 03H 5.20 03H 05H .610 NPSNM 91 HI

I44 44 2.38 88 MBM 6 09H 30.24 TEH TEC .610 ZBAZC 26 CI44 44 3.27 182 DNG P1 10i 11.34 TEH TEC .610 ZBAZC 26 CI44 44 NDF P1 TEH .48 TEH TEH .610 NPSNM 37 HI44 44 NDF 2 10H 11.34 iOH 11H .610 NPSNM 91 HI

I45 45 NDF 2 TEH 8.52 TEH TSH .610 NPSNM 9 HI45 4S NDF 2 TEH 9.03 TEH TSH .610 NPSNM 9 HI45 46 NDF 2 TEH 9.45 TEH TSH .610 NPSNM 9 HI

I 45 46 3.94 4 BLG 1 TSC .45 TEH TEC .610 TBATC 28 CI45 46 NDF 2 TSC .45 TSC TSC .610 NPSNM 90 CII

1 10 46 2.74 178 DNG P1 10H 40.18 TEH TEC .610 ZBAZC 2 CI1 10 46 3.09 180 DNG P1 10H 40.99 TEH TEC .610 ZBAZC 2 CII 10 46 NDD TEH TEH .610 NPSNM 29 HII 10 46 NDF 2 10H 40.99 10H 11H .610 NPSNM 53 Hj

I I41 46 2.01 179 DNG P1 10H 21.93 TEH TEC .610 ZBAZC 30 CI41 46 3.09 180 ONG P1 10H 26.71 TEH TEC .610 ZBAZC 30 CI41 46 2.53 71 MBM 6 AV1 23.54 TEH TEC .610 ZBAZC 30 Ca41 46 NDF P1 TEH .48 TEH TEH .610 NPSNM 37 HI41 46 NDF 2 10i 26.71 10i 11H .610 NPSNM 91 HI

I38 47 2.11 85 MBM 6 10H 38.21 TEH TEC .610 ZBAZC 26 CI38 47 5.34 180 DNT P1 11H .38 TEH TEC .610 ZBAZC 26 CI38 47 3.31 178 DNT P1 11C .56 TEH TEC .610 ZBAZC 26 CI38 47 NOD TEH TEH .610 NPSNM 39 Hj38 47 NDF 2 11H .38 11H 11H .610 NPSNM 91 HI

I12 48 13.15 25 PVN P1 07H -. 25 TEH TEC .610 ZBAZC 2 CI12 48 2.01 16 PVN P1 07H 3.26 TEH TEC .610 ZBAZC 2 CI12 48 4.88 17 PVN P1 07H 6.60 TEH TEC .610 ZBAZC 2 CI12 48 10.25 19 PVN P1 07H 10.41 TEH TEC .610 ZBAZC 2 CI12 48 3.01 15 PVN P1 08H 24.95 TEH TEC .610 ZBAZC 2 CI12 48 NOD TEH TEH .610 NPSNM 25 HI12 48 5.57 47 PVN 2 07H -. 25 07H 08H .610 ZPSMB 55 HI12 48 1.78 30 PVN 2 07H 3.08 07H 08H .610 ZPSMB 55 HN12 48 1.90 33 PVN 2 07H 6.38 07H 08H .610 ZPSMB 55 HN12 48 5.49 33 PVN 2 07H 10.41 07H 08H .610 ZPSMB 55 HI

39 52 3.34 181 DNG P1 09H 23.38 TEH TEC .610 ZBAZC 30 CI39 52 4.09 182 DNG P1 09H 28.60 TEH TEC .610 ZBAZC 30 Cj39 52 3.38 181 DNG P1 iON 12.72 TEH TEC .610 ZBAZC 30 CI39 52 3.43 181 DNG P1 10H 25.18 TEH TEC .610 ZBAZC 30 Cj39 52 3.76 181 DNG P1 10H 33.91 TEH TEC .610 ZBAZC 30 Cl39 52 3.76 177 DNG P1 10i 37.94 TEH TEC .610 ZBAZC 30 CI39 52 10.86 184 DNG P1 10H 39.02 TEH TEC .610 ZBAZC 30 CI39 52 .74 0 PCT 12 P2 AV4 .18 TEH TEC .610 ZBAZC 30 CI39 52 2.55 54 MBM 6 10C 35.33 TEH TEC .610 ZBAZC 30 CI39 52 5.91 182 DNG P1 10C 35.55 TEH TEC .610 ZBAZC 30 CI39 52 4.41 179 DNG P1 10C 35.86 TEH TEC .610 ZBAZC 30 CI39 52 .29 39 DFS 1 03C 5.45 TEH TEC .610 ZBAZC 30 CI

÷ ... + .. . + -- - + .. ÷.. . . . +.. . . .. + .---------.- . .- -. +-- - +--+- ... ... + - -+.... ....---- +-- .- +. .. .. ..----- +-.....+- ...... ..

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL Lj+ . .÷. . . . . . . .+. . . .+.---------.. .... +--.---.----. .. .. .. . . . .. .. . ...----- -..-...---- ---. +-------------- ------+-.------+ -

4

Page 113: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - D Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 09:10:09

+.---.+ ...---- +.....----+ ..----.----+----+...+..-------+..--- .--.+ ..... ........----- + .+ .. .. +.....+.----++-......+-.-

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+.. .. +.....+.. .. +.. ---------.......-------.---- + ......------ •.--+-.......+....-...+....+.---- .------...--- +-......+-..

39 52 NDF P1 TEH .48 TEH TEH .610 NPSNM 37 HI39 52 NDF 2 03C 5.45 03C 04C .610 NPSNM 90 CI

I1 53 NOD 11C TEC .610 ZBAZC 6 Cl1 53 NDF 2 TEH .50 TEH TEH .610 NPSNM 27 HI1 53 NOD 11H TEH .610 ZBAZC 77 HI1 53 NOD 06C 06C .610 NPSNM 90 CI

I2 53 NOD 11C TEC .610 TBATC 8 CI2 53 NDF 2 TEH .50 TEH TEH .610 NPSNM 25 HI2 53 NOD 11H TEH .610 SBACC 79 NI2 53 NDD 06C 06C .610 NPSNM 90 Cl2 53 NDD 11C 11H .580 ZPUMB 92 CI

I3 53 NDF 2 TEH .48 TEH TEH .610 NPSNM 25 HI3 53 .41 109 DFS 1 03C 13.97 11H TEC .590 SBUCC 70 Cl3 53 NOD 11H TEH .610 ZBAZC 77 HI

3 53 NOD 06C 06C .610 NPSNM 90 CII1 54 NOD 11C TEC .610 ZBAZC 6 CI1 54 NDF 2 TEH .48 TEH TEH .610 NPSNM 27 HI1 54 NDF 2 TEH .72 TEH TEH .610 NPSNM 27 HI1 54 1.82 173 INR P1 03H -. 31 11H TEH .610 ZBAZC 77 HI1 54 3.58 174 DNT P1 03H .70 11H TEH .610 ZBAZC 77 HI1 54 3.23 174 DNT P1 05H -. 52 11H TEH .610 ZBAZC 77 HI1 54 5.41 175 DNT P1 05H .68 11H TEH .610 ZBAZC 77 HI1 54 NDD 06C 06C .610 NPSNM 90 CI1 54 NOD 11C 11H .580 ZPUMB 92 CI

I2 54 NOD 11C TEC .610 TBATC 8 CI2 54 NDF 2 TEH .48 TEH TEH .610 NPSNM 27 HI2 54 2.19 178 DNT P1 05H -. 41 11H TEH .610 SBACC 79 NI2 54 3.04 178 DNT P1 05H .48 11H TEH .610 SBACC 79 HI2 54 NOD 06C 06C .610 NPSNM 90 CI2 54 NDF 2 05H .48 05H 05H .610 NPSNM 91 HII3 54 2.04 26 SAS 0 2 TEH .09 .13 .22 34 TEH TEH .610 NPSNM 27 HI3 54 NDD 11H TEC .590 SBUCC 70 CI3 54 NDD 11H TEH .610 SBACC 79 HI3 54 NDD 06C 06C .610 NPSNM 90 CI

I2 55 NOD 11C TEC .610 TBATC 8 Ci2 55 NOD TEH TEH .610 NPSNM 25 HI2 55 1.96 175 INR P1 03H -. 36 11H TEH .610 ZBAZC 77 HI2 55 3.77 176 DNT P1 03H .58 11H TEH .610 ZBAZC 77 HI2 55 2.12 176 DNT P1 05H -. 52 11H TEH .610 ZBAZC 77 HI2 55 6.46 177 DNT P1 05H .57 11H TEH .610 ZBAZC 77 HI2 55 4.33 75 MBM 6 08H 32.93 11H TEH .610 ZBAZC 77 HI2 55 NOD 06C 06C .610 NPSNM 90 CI2 55 NOD 11C 11H .580 ZPUMB 92 CII3 55 NDF 2 TEH .48 TEH TEH .610 NPSNM 25 HI3 55 NOD 11H TEC .590 SBUCC 70 CI3 55 NOD 11H TEH .610 ZBAZC 77 HI3 55 NOD 06C 06C .610 NPSNM 90 CI

I1 56 NOD 11C TEC .610 ZBAZC 6 CI1 56 NDF 2 TEH .48 TEH TEH .610 NPSNM 27 HI1 56 8.08 178 DNT P1 03H -. 46 11H TEH .610 ZBAZC 81 HI1 56 13.01 177 DNT P1 03H .75 11H TEH .610 ZBAZC 81 NI1 56 9.54 178 DNT P1 05H -. 34 11H TEH .610 ZBAZC 81 HI1 56 15.32 177 DNT P1 05H .67 11H TEH .610 ZBAZC 81 Hj1 56 2.60 173 DNT P1 07H .62 11H TEH .610 ZBAZC 81 HI1 56 1.68 73 INR 6 08H 16.51 11H TEH .610 ZBAZC 81 HI1 56 NOD 06C 06C .610 NPSNM 90 CI1 56 RBD 11C 11H .580 ZPUMB 92 CI1 56 NDD 11C 11H .580 ZPUMB 94 CI

I2 56 NOD 11C TEC .610 TBATC 8 CI2 56 NDF 2 TEH .48 TEH TEH .610 NPSNM 27 HI2 56 4.12 180 DNT P1 03H -. 52 11H TEH .610 SBACC 83 HI2 56 7.59 180 DNT P1 03H .57 11H TEH .610 SBACC 83 HI2 56 6.68 181 DNT P1 05H -. 44 11H TEH .610 SBACC 83 HI2 56 6.85 182 DNT PI 05H .68 11H TEH .610 SBACC 83 HI2 56 NOD 06C 06C .610 NPSNM 90 CI

3 56 NDF 2 TEH .48 TEH TEH .610 NPSNM 27 HI3 56 NOD 11H TEC .590 SBUCC 72 CI3 56 1.95 174 INR P1 03H -. 33 11H TEH .610 ZBAZC 77 HI3 56 2.22 174 DNT P1 03H .57 11H TEH .610 ZBAZC 77 HI

+ .. . +... + ... ... + ... + . .. .. . +... + ... + . ... ... +.. .+.-----------++ .. ... _ - + ... .. . + ... + .-- - - -.... ++- ...... +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+. .+.. .÷. . . .+.. .+. .+..---------...---+----.---- . . . ..----..-- -.-- - +-- + . .. . . .. . . .-- - - -+..+ . .. +. ... ... ..----++-......+++ -

Page 114: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - D Special Interest +Point Inspection Results

Byron 2 82R14 CBE 20081001 10/17/2008 09:10:09

+ .... - . + .- ---- + ... - ---------- + ---- + --- -- +- -- +- -+ - -- - - + --------- + .- ---- + - ..- -+ - +. - +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+..+...+ .---------.---.----.-----.. +. . ---.- ---..---. .---------------.----.--..--- +- -

1 3 56 3.14 175 DNT P1 05H .57 11H TEH .610 ZBAZC 77 HI1 3 56 NOD 06C 06C .610 NPSNM 90 CII I1 49 56 2.21 19 DFS 1 TSH 1.20 TEH TEC .610 ZBAZC 26 CI1 49 56 3.24 184 ONG P1 TSH 2.24 TEH TEC .610 ZBAZC 26 CI1 49 56 3.15 183 DNT P1 AV3 .00 TEH TEC .610 ZBAZC 26 CI1 49 56 NDF 2 TEH .48 TEH TEH .610 NPSNM 39 HI1 49 56 NDF 2 TSH 2.24 TSH 01H .610 NPSNM 91 HI

I I1 1 57 NOD 11C TEC .610 ZBAZC 6 CI

1 57 NDF 2 TEH .48 TEH TEH .610 NPSNM 57 HI1 1 57 9.04 178 DNT P1 03H -. 43 11H TEH .610 ZBAZC 81 HI1 1 57 9.48 177 ONG P1 03H .78 11H TEH .610 ZBAZC 81 HN1 1 57 9.23 178 DNT P1 05H -. 41 11H TEH .610 ZBAZC 81 HI1 1 57 9.62 177 ONG P1 05H .78 11H TEH .610 ZBAZC 81 HI1 1 57 1.99 173 INR P1 07H -. 41 11H TEH .610 ZBAZC 81 HI

1 57 12.50 183 DNT P1 11H .38 11H TEH .610 ZBAZC 81 HI1 57 NOD 06C 06C .610 NPSNM 90 CI

3333333

22222222

5757575757575757575757

575757575757

58585858585858

58585858585858

5959595959595959

63636363636363636363

646464646464

6.85 1828.25 1807.78 1828.88 1813.61 1793.30 178

NDFNDFNOD

2.18 178 DNT2.00 178 DNT

NOD

NODNDFDNTDNTDNTDNTDNTDNTNODNDFNOD

3.30 1786.88 1785.79 1804.80 178

NODNDFDNTDNTDNTDNTNDF

2 TEHP1 03H.P1 03HP1 05HP1 05HP1 07HP1 07H

2 07H

2 TEH2 TEH

P1 03HP1 05H

2 TEHP1 03HP1 03HP1 05HP1 05H

2 03H

2 TEH2 TEH

P1 03HP1 05HP1 05H

2 03H

.48-. 44

.59- .41

.62- .52

.54

.54

.48

.75

.61- .40

.47-. 49

.57- .36

.57

.57

.48

.80

.58-. 47

.57

.58

- .49.54

- .52.52.54.52

.35

.25

.47

.10- .10

11C TECTEH TEH11H TEH11H TEH11H TEH11H TEH11H TEH11H TEH06C 06C07H 07H11C 11H

TEH TEHTEH TEH11H TEC11H TEH11H TEH06C 06C

11C TECTEH TEH11H TEH11H TEH11H TEH11H TEH03H 03H

.610 TBATC

.610 NPSNM

.610 SBACC

.610 SBACC

.610 SBACC.610 SBACC.610 SBACC.610 SBACC.610 NPSNM.610 NPSNM.580 ZPUMB

.610 NPSNM

.610 NPSNM

.590 SBUCC

.610 ZBAZC.610 ZBAZC.610 NPSNM

.610 TBATC.610 NPSNM.610 SBACC.610 SBACC.610 SBACC.610 SBACC.610 NPSNM

.610 NPSNM

.610 NPSNM

.590 SBUCC.610 ZBAZC.610 ZBAZC.610 ZBAZC.610 NPSNM

.610 ZBAZC

.610 NPSNM

.610 SBACC

.610 SBACC

.610 SBACC

.610 SBACC

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 TBATC

.610 NPSNM

.610 ZBAZC

.610 ZBAZC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 NPSNM

8 CI25 HI83 HI83 HI83 HN83 HI83 HI83 HI90 CI91 HI92 CI

25 HI25 HI72 CI77 HN77 HN90 Cl

8 CI59 H83 H83 H83 H83 H91 HI

NDFNDFNOD

3.18 178 DNT3.47 178 DNT4.10 178 DNT

NDF

48484848484848484848

363636363636

2.03 1805.04 1808.41 1815.83 180

2.39 01.48 0

.51 0

.20 0

.42 98

.49 0

.15 75

3.27 1852.62 1862.33 1863.45 187

NODNODDNTDNTDNTDNTNDFNDF

RWSRWSNDFPCTPCTNODNODVOLPCTVOL

ONGONGONGONGNDFNDF

P1 03HP1 03HP1 05HP1 05H

2 03H2 05H

P2 07CP2 05C

2 TEH22 P6 07C

5 P5 05C

P4 07C22 P4 07C

P4 05C

P1 03HP1 03HP1 05HP1 05H

2 TEHP1 03H

TEH TEHTEH TEH11H TEC11H TEH11H TEH11H TEH03H 03H

11C TECTEH TEH11H TEH11H TEH11H TEH11H TEH03H 03H05H 05H

TEH TECTEH TECTEH TEHTEC TEHTEC TEH02C 02C03C 03C07C 07C

1.25 .44 67 07C 07C05C 05C

57 H57 H72 C77 H77 H77 H91 H

38 C59 H83 H83 H83 H83 H91 H91 H

32 C32 C39 H85 H85 H88 C88 C90 C90 C90 C

.35

.43

.25

32.47 TEH TEC .610 ZBAZC 30 CI35.09 TEH TEC .610 ZBAZC 30 Cl7.50 TEH TEC .610 ZBAZC 30 CI

12.07 TEH TEC .610 ZBAZC 30 CI.49 TEH TEH .610 NPSNM 37 HI

32.47 03H 07H .610 NPSNM 89 HI- +........--- --------------------- +----+----+----......+........+-+-+-

INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI*-. + - -- +--+...- +l ..--+I .----+---------.+. ..----- +- ..... +.-.....

I ROW COL VOLTS DEG INO PER CHN LOCN+ . . . . . . . . + . . . . . . . . + . . . + . . .. + . . . . . . . . + . . . . + -

6'

Page 115: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - D Special Interest +Poant Inspection Results

Byron 2 82R14 CBE 20081001 10/17/2008 09:10:09

.. .+.. .+.. . . .. +. .. +. .. +. .. +. .. +. .. +.---------. . . .+-. . ..-- +-. ..-.---+- - - + --+ - +- . . . .------ + +. ..----+ -- --..--- -. .... +-.... . ..

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI... +.. - ....- +.. .. +.. ----------...----+ .. ÷..........÷.----....--..----- +- ... +..----+-- .. +.----.-- -.. --- +-....+-.......

36 64 NDF 2 05H 12.07 03H 07H .610 NPSNM 89 HII

24 65 .56 149 DFS 1 02C 1.00 TEH TEC .610 ZBAZC 10 CI24 65 NDF 2 TEH .50 TEH TSH .610 NPSNM 15 HI24 65 NDF 2 TEH .81 TEH TSH .610 NPSNM 15 HI24 65 NOD TEC TEC .610 NPSNM 74 CI24 65 .33 269 PCT 32 2 02C 1.14 .28 .40 61 02C 03C .610 NPSNM 90 CI24 65 .23 86 VOL P4 02C 1.20 02C 03C .610 NPSNM 90 CI

I38 65 NDF 2 TEH .50 TEH TSH .610 NPSNM 15 HI38 65 .10 125 DFS 1 02C 11.54 TEH TEC .610 TBATC 32 CI38 65 NOD TEC TEC .610 NPSNM 74 CI38 65 NDF 2 02C 11.54 02C 03C .610 NPSNM 90 CI

I24 67 NOD TEH TEC .610 ZBAZC 10 CI24 67 NDF 2 TEH .49 TEH TSH .610 NPSNM 15 HI24 67 NOD 05H 05H .610 NPSNM 87 HI

I25 67 NOD TEH TEC .610 TBATC 12 CI25 67 NOD TEH TSH .610 NPSNM 15 HI25 67 NOD 05H 05H .610 NPSNM 87 HI

I26 67 NDF 2 TEH .49 TEH TSH .610 NPSNM 15 HI26 67 NOD TEH TEC .610 ZBAZC 34 CI26 67 NOD 05H 05H .610 NPSNM 87 HI

I49 67 NOD TEH TSH .610 NPSNM 13 HI49 67 2.40 174 DNT P1 AV1 .06 TEH TEC .610 TBATC 32 CI49 67 2.65 177 DNT P1 AV2 .16 TEH TEC .610 TBATC 32 CI49 67 2.14 174 DNT P1 AV4 .10 TEH TEC .610 TBATC 32 CI49 67 2.02 72 MBM 6 10C 23.44 TEH TEC .610 TBATC 32 CI49 67 1.37 135 DSS P1 08C -.03 TEH TEC .610 TBATC 32 CI49 67 6.73 0 PID P2 07C .00 TEH TEC .610 TBATC 32 CI49 67 .72 215 PCT 26 P6 08C .05 TEC TEH .610 ZBAZC 85 HI49 67 1.97 0 PCT 41 P6 07C .05 TEC TEH .610 ZBAZC 85 HI49 67 .50 95 VOL P4 08C -. 03 08C 08C .610 NPSNM 90 CI49 67 .51 97 VOL P4 07C .00 07C 07C .610 NPSNM 90 CII24 68 NOD TEH TEC .610 ZBAZC 10 CI24 68 NOD TEH TEH .610 NPSNM 49 HI24 68 NOD 05H 05H .610 NPSNM 87 HI

I25 68 NOD TEH TEC .610 TBATC 12 CI25 68 NOD TEH TEH .610 NPSNM 49 HI25 68 NOD 05H 05H .610 NPSNM 87 HI

I26 68 NDD TEH TEC .610 TBATC 36 CI26 68 NOD TEH TEH .610 NPSNM 37 HI26 68 NOD 05H 05H .610 NPSNM 87 HI

I24 69 .52 154 DFI 1 05H -. 84 TEH TEC .610 ZBAZC 10 CI24 69 NOD TEH TEH .610 NPSNM 51 HI24 69 .25 263 PCT 27 2 05H -. 84 .31 .45 69 05H 05H .610 NPSNM 75 HI24 69 .17 80 SVI P4 05H -. 67 05H 05H .610 NPSNM 75 HI24 69 TBP 05H 05H .610 NPSNM 87 HI24 69 .25 79 PID P4 05H -. 84 05H 05H .610 NPSNM 87 HI

25 69 3.51 66 MBM 6 09C 38.93 TEH TEC .610 TBATC 12 CI25 69 NDF P1 TEH 4.75 TEH TEH .610 NPSNM 39 HI25 69 NOD 05H 05H .610 NPSNM 87 HI

26 69 NOD TEH TEC .610 ZBAZC 34 CI26 69 NOD TEH TEH .610 NPSNM 39 HI26 69 NOD 05H 05H .610 NPSNM 87 HI49 69 NO 2 TEH .47 TEH TEH .610 NPSNM 37 HI49 69 NDF 2 TEH .89 TEH TEH .610 NPSNM 37 HI

49 69 4.65 179 DNT P1 AV2 .12 TEH TEC .610 TBATC 48 CI49 69 2.49 177 DNT P1 AV3 .00 TEH TEC .610 TBATC 48 CI49 69 5.94 0 PID P2 07C .41 TEH TEC .610 TBATC 48 CI49 69 1.88 0 PCT 41 P6 07C .13 TEC TEH .610 ZBAZC 85 HI49 69 1.29 87 VOL P4 07C .41 07C 07C .610 NPSNM 90 CI

I22 70 NOD TEH TEC .610 TBATC 36 CI22 70 NOD TEH TEH .610 NPSNM 49 HI22 70 NOD 05H 05H .610 NPSNM 87 HI

I23 70 NOD TEH TEC .610 TBATC 36 CI23 70 NOD TEH TEH .610 NPSNM 49 HI23 70 NOD 05H 05H .610 NPSNM 87 HI

+ . .+. ..- . . . ..-- . .+- . .+. .. +. . . . . .----------+- - -. +-. .. .. ..-.--.. ..--.. ..---+- - -.- ++. .----+ .----+ -- . . .--- -...... +- ......

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI-- -- -- ----------------------------------------------------------------------------+++ -. + . .---- --+-----+. - ------+- -+--+-- -- +

7

Page 116: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - D Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 09:10:09

+ .. +.. .-------------.----.----.--------.. +- .---- - +.---- -------- +--------------+----------- -•- ------------

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 I CRLEN CRWID CEG BEGT ENOT POIA PTYPE CAL LI---------------------- +--------+-----+-----+-----+-----+----+---+--+ - + - ----+-----+-----+ - - +--------

I II 24 70 NDD TEH TEC .610 TBATC 36 CII 24 70 NDO TEH TEH .610 NPSNM 49 HI1 24 70 NOD 05H 05H .610 NPSNM 87 HI

I II 25 70 NOD TEH TEC .610 TBATC 12 CII 25 70 NDD TEH TEH .610 NPSNM 37 HI1 25 70 NDD 05H 05H .610 NPSNM 87 HII II 26 70 1.81 0 PCT 24 P2 AV2 .00 TEH TEC .610 TBATC 36 CII 26 70 .99 0 PCT 16 P2 AV3 .00 TEH TEC .610 TBATC 36 CII 26 70 NDF 2 TEH .48 TEH TEH .610 NPSNM 37 HII 26 70 NOD 05H 05H .610 NPSNM 87 HII II 21 71 5.06 181 DNG P1 10H 39.54 TEH TEC .610 ZBAZC 34 CO

21 71 2.09 188 DNT P1 11H -. 56 TEH TEC .610 ZBAZC 34 CI21 71 3.70 179 DNT P1 11C -. 46 TEH TEC .610 ZBAZC 34 CI21 71 2.15 174 ONG P1 10C 40.62 TEH TEC .610 ZBAZC 34 CI21 71 NDF 2 TEH .50 TEH TEH .610 NPSNM 51 HI21 71 NDF 2 10H 39.54 1MH 11H .610 NPSNM 89 HI

I22 71 NDD TEH TEC .610 ZBAZC 34 CI22 71 NOD TEH TEH .610 NPSNM 51 HI22 71 NDD 05H 05H .610 NPSNM 87 HI

I23 71 .34 69 DFS 3 11H 1.34 TEH TEC .610 ZBAZC 34 CI23 71 NDF 2 TEH .48 TEH TEH .610 NPSNM 51 HI23 71 NDD 05H 05H .610 NPSNM 87 HI

I24 71 NOD TEH TEC .610 ZBAZC. "34 CI24 71 NDF 2 TEH .48 TEH TEH .610 NPSNN 39 HI24 71 NOD 05H 05H .610 NPSNM 87 HI

I25 71 NDD TEH TEC .610 ZBAZC 34 CI25 71 NDD TEH TEH .610 NPSNM 39 HI25 71 NOD 05H 05H .610 NPSNN 87 HI

I26 71 2.39 184 DNG P1 03H 20.99 TEH TEC .610 ZBAZC 34 CI26 71 .29 115 DFS 1 02C 3.23 TEH TEC .610 ZBAZC 34 Cl26 71 3.28 173 DNG . P1 02C 5.14 TEH TEC .610 ZBAZC 34 CI26 71 NDD TEH TEH .610 NPSNM 39 HI26 71 NDD 05H 05H .610 NPSNM 87 HII15 72 .11 129 DFS 1 02C 13.93 TEH TEC .610 TBATC 32 CI15 72 NDD TEH TEH .610 NPSNM 57 HI15 72 NDF 2 02C 13.93 02C 03C .610 NPSNM 90 CII10 73 .16 146 DFS 1 03C 4.95 TEH TEC .610 TBATC 32 CI10 73 NDF 2 TEH .49 TEH TSH .610 NPSNM 51 HI10 73 NDF 2 TEH 1.72 TEH TSH .610 NPSNM 51 HI10 73 NDD TEC TEC .610 NPSNM 74 CI10 73 NDF 2 03C 4.95 03C 04C .610 NPSNM 90 CI

I1 85 NOD 11C TEC .610 TBATC 40 CI1 85 NDD TEH TEH .610 NPSNM 51 HI1 85 3.11 174 DNT P1 11H -. 27 11H TEH .610 ZBAZC 77 HI1 85 5.26 176 DNT P1 11H .32 11H TEH .610 ZBAZC 77 HI1 85 10.84 182 ONG P1 11H .89 11H TEH .610 ZBAZC 77 HI1 85 NDF 2 11H -. 27 11H 11H .610 NPSNM 89 HI1 85 NDF 2 11H .32 11H 11H .610 NPSNM 89 HI

I4 88 NDD TEH TEH .610 NPSNM 49 HI4 88 3.97 187 DNT P1 11H .12 11H TEC .590 SBUCC 72 CI4 88 5.41 174 DNT P1 11C -. 65 11H TEC .590 SBUCC 72 CI4 88 2.49 177 DNT P1 11C -. 57 11H TEC .590 SBUCC 72 CI4 88 2.95 181 INR P1 11C -. 48 11H TEC .590 SBUCC 72 CI4 88 16.06 176 INR P1 11C .08 11H TEC .590 SBUCC 72 CI4 88 2.12 167 DNG P1 10C 23.99 11H TEC .590 SBUCC 72 CI4 88 4.69 177 ONG P1 10C 24.94 11H TEC .590 SBUCC 72 CI4 88 3.30 183 ONG P1 10H 34.48 11H TEH .610 SBACC 79 HI4 88 6.01 186 DNT P1 11H .03 11H TEH .610 SBACC 79 HI4 88 NDF 2 1MH 34.48 10H 11H .610 NPSNM 89 HI4 88 NDF 2 11H .12 1MH 11H .610 NPSNM 89 HI

I7 88 4.70 175 DNG P1 11H -1.38 TEH TEC .610 TBATC 36 CI7 88 4.39 176 DNT P1 11C .36 TEH TEC .610 TBATC 36 CI7 88 NDD TEH TEH .610 NPSNM 49 HI7 88 NDF P1 11H -1.38 10H 11H .610 NPSNM 89 HI

I4 89 NOD TEH TEH .610 NPSNM 51 HI

----------------------- +-------+-----+-----+-----+-----+----+---+--+ - + - ---- +-----+-----+ - - +--------

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ . . .. . . .. . +. .. +.. .+--------- .... ....-------+.. . .. ... .. . .. .----- -....--- -.. •. .+----+ ---- ++ ----.+ -.- +-- • +

8

Page 117: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - D Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 09:10:09

------------------------ +----+-----+-----+-----+-----+----+---+--+ - + - ----+ -----+-----+ - - +-------

I ROW COL VOLTS DEG IND PER CHN LOCN INCHi INCN2 I CRIEN CRWID CEG BEGT ENOT POTA PTYPE CAL LI----------------------- +--------+-----+-----+-----+-----+----+---+--+ - + - ----+ -----+-----+ - - +-------

4 89 NDF6.94 176 DNT2.87 175 DNT

NDF1.41 90 INR3.43 178 ONG

NDFNDF

3.22 173 ONGNODNDDNDF

NDD5.21 177 ONG

NDF

NDF3.04 185 ONG

NDF

NDF5.15 15 BLG3.03 179 DNT

NDFNDF

NOD12.10 20 BLG

NDFNDFNOD

NDF3.28 186 ONG

NDF

5.90 179 DNG5.91 179 ONG

NODNDFNDF

NOD5.58 192 BLG

NDFNDF

NODNOD

2.99 182 DNT3.46 180 DNT

NDF

NDFNDF

4.85 10 BLG3.85 78 MBM2.50 180 DNT

NDFNDF

NDF2.47 178 ONG4.02 173 ONG

NOD1.15 155 DFS5.21 180 ONG

NDF

NOD2.87 175 ONG5.15 177 DNG2.10 173 ONG4.43 179 ONG7.21 178 ONG

NODNDF

2 11H -. 19P1 11H -. 49P1 11C .44P1 TEC 1.47

6 09H 28.41P1 1OH 41.62

2 iON 41.622 11H -. 19

P1 iON 41.11

2 1OH 41.11

11H 11H .610 NPSNM

P1 iON2 iON

P1 TENP1 01H

2 01H

P1 TEN1 TSH

P1 AV42 TSH2 TSH

36.9536.95

.4917.4417.44

.501.00-. 031.001.02

1 TSH 1.302 TSH 1.122 TSH 1.30

P1 TENP1 01H

2 01H

P1 iONP1 iON

2 ION2 10N

.4920.0720.07

32.7638.32

32.7638.32

11H TEC11H TECTEC TEC11H TEN11H TENiON 11HION IIN

TEN TECTEN TENTEC TEC10H 11H

TEN TENTEN TECiON 11H

TEN TENTEN TECO1N 03H

TEN TENTEN TECTEN TECTSH TSHTSH TSH

TEN TENTEN TECTSH 01HTSH 01H02C 02C

TEN TENTEN TEC01H 03H

TEN TECTEN TECTEN TENION tIH10N 11H

TEN TENTEN TECTSH TSHTSH TSH

11C TECTEN TEN11H TEN11H TEN05H 05H

TEN TENTEN TENTEN TECTEN TECTEN TECTSH TSHTSH TSH

TEN TSH11H TEC11H TECTEC TEC11H TEN11H TENiON 11H

TEN TSHTEN TECTEN TECTEN TECTEN TECTEN TECTEC TECiON 11H

.590 SBUCC

.590 SBUCC

.610 NPSNM

.610 SBACC

.610 SBACC

.610 NPSNM

.610 NPSNM

.610 ZBAZC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 NPSNM

.610 TBATC

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.610. NPSNM

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 TBATC.610 NPSNM.610 SBACC.610 SBACC.610 NPSNM

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 TBATC

.610 TBATC

.610 NPSNM

.610 NPSNM

.610 NPSNM

.590 SBUCC

.590 SBUCC

.610 NPSNM

.610 SBACC

.610 SBACC

.610 NPSNM

.610 NPSNM

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 NPSNM

.610 NPSNM

63 HI72 Cl72 Cl78 Cl79 HI79 HI89 HI89 HI

1

34 Ci51 HI78 Cl89 HI

1

47 HI60 CI89 HI

I.49 HI58 CI89 HI145 HI58 Cl58 Cj75 HI75 HI

147 HI60 CI75 HI75 HI88 Cl

145 HI62 CI89 HI

I44 CI44 Cl

51 HI89 HI89 Nj

145 HI60 Cl75 HI75 HI

144 CI49 HI79 HI79 HI89 HI

147 HI47 HI58 Cl58 Cl58 C175 HI75 HI

119 HI72 Cl72 Cl78 CI79 HI79 HI89 HI

19 HI44 CI44 CI44 CI44 CI44 CI78 CI89 HI

I

1 TSH 1.362 TSH 1.152 TSH 1.36

P1 05HP1 05H

2 05H

P1 TENP1 TEN

1 TSH6 07H

P1 AV42 TSH2 TSH

2 TENP1 11HP1 10C

1 10NP1 10N

2 iON

P1 01HP1 10HP1 10CP1 10CP1 10C

2 iON

-. 36.74.74

.502.191.09

34.33-. 061.061.09

.5010.436.94

4.465.625.62

13.3438.6038.3639.4341.62

38.60

.... -... - .- --- + ---- + .--- + ---- + ---- + ---- + - ---- - - +-- + - -+ - + ---- + ---- + ---- + - + -- + -- --- +

I ROW COL VOLTS DEG IND PER CNN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+.. .. +.....+.. .. +.. ---------..---- .----+ ...---- .--. .+---.......+--+ -..... +- .. .+----++ + . ..----+ --+-......+-.....+.-.. .-

9

Page 118: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - D Special Interest +Point Inspection Results

Byron 2 82R14 CBE 20081001 10/17/2008 09:10:09

+ .... - .... - ... .- --- - + --- -+ - - -- - - -------- + - --- + - ---- - -- + - +- --+ -. -- + .. -- + - -- - -- - -+- -+-

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ .. + .. + ..... .. .. --------- ...- +----..+----..+..---+.--- +--+- ...... +.....-..+.---- + .. +.---- ..-- .-+- ...... +....-..+- +

8888888

97979797979797

NOD5.85 184 DNT3.20 185 MNG2.22 73 MBM

NMDNDFNDF

1 1011 1011 1011 1011 1011 1011 1011 1011 1011 1011 1011 1011 1011 101

22 10522 10522 10522 10522 105

29 10529 10529 10529 10529 10529 105

12 10612 10612 10612 106

28 10628 10628 10628 10628 10628 10628 106

26 10726 10726 10726 10726 10726 10726 10726 107

27 10727 10727 10727 10727 10727 10727 10727 10727 10727 10727 107

18 10818 10818 108

.20

5.518.015.267.225.80

10.343.603.513.536.71

137 DFSNOD

179 ONG179 MNG179 DNT179 MNG177 ONG178 MNG

1 INR181 ONG173 DNT182 DNT

NDFNDF

P1 03HP1 03H

6 1MHP1 03H

2 03H

1 02C

P1 TSHP1 TSHP1 01HP1 01HP1 O1HP1 0iHP1 iONP1 1OHP1 11HP1 11H

2 10H2 02C

P1 11HP1 11HP1 11H

2 11H

P1 TEH1 TSH

P1 10CP1 08C

2 TSH2 TSH

.054.624.63

.05

4.62

1.75

3.344.42

.621.72

10.5311.6339.6440.83

-. 48-. 19

40.831.75

-. 32.71

-. 32.71

.49

.9639.95

.70

.961.06

NMD5.10 174 DNT3.60 185 DNT

NDFNDF

NDF2.53 29 BLG2.79 167 ONG2.06 171 DNT

NDFNDF

NMD

5.77 184 ONGNMDNDF

NDF5.49 16 BLG2.39 182 DNT2.60 180 DNT2.45 180 DNT

NDFNDF

NDF9.33 10 BLG2.38 171 DNT4.25 173 DNT1.44 0 PCT

1.02 0 PCTNDFNDF

NDF18.53 13 BLG3.20 181 DNT4.27 184 ONG

2.91 185 ONG4.27 184 DNT2.91 185 ONG2.43 178 DNT2.05 179 DNT

NDFNDF

NMD2.50 181 DNT

NDF

NDF2.80 189 BLG2.93 172 DNT3.71 173 DNT

NDFNDF

P1 08H 28.15

2 08H 28.15

TEH TSH .610 NPSNM 19 HITEH TEC .610 TBATC 44 CfTEH TEC .610 TBATC 44 CfTEH TEC .610 TBATC 44 CfTEC TEC .610 NPSNM 78 Cf03H 05H .610 NPSNM 89 HI03H 05H .610 NPSNM 89 HI

I11C TEC .610 ZBAZC 42 CITEH TEH .610 NPSNM 51 HI11H TEH .610 ZBAZC 77 Hf11H TEH .610 ZBAZC 77 HI11H TEH .610 ZBAZC 77 HI11H TEH .610 ZBAZC 77 H111H TEH .610 ZBAZC 77 HI11H TEH .610 ZBAZC 77 Hf11H TEH .610 ZBAZC 77 HI11H TEH .610 ZBAZC 77 HI11H TEH .610 ZBAZC 77 HI11H TEH .610 ZBAZC 77 HI10H 11H .610 NPSNM 89 HI02C 04C .610 NPSNM 90 CI

ITEH TSH .610 NPSNM 17 HITEH TEC .610 TBATC 64 CITEH TEC .610 TBATC 64 CIiiH 11H .610 NPSNM 89 HI11H 11H .610 NPSNM 89 HI

ITEH TEH .610 NPSNM 45 HITEH TEC .610 TBATC 64 CfTEH TEC .610 TBATC 64 CfTEH TEC .610 TBATC 64 CfTSH TSH .610 NPSNM 75 HITSH TSH .610 NPSNM 75 HIITEH TSH .610 NPSNM 17 HITEH TEC .610 ZBAZC 42 CfTEC TEC .610 NPSNM 80 Cf08H 09H .610 NPSNM 89 HI

ITEH TEH .610 NPSNM 47 HITEH TEC .610 TBATC 62 CfTEH TEC .610 TBATC 62 CfTEH TEC .610 TBATC 62 CITEH TEC .610 TBATC 62 CfTSH TSH .610 NPSNM 75 HITSH TSH .610 NPSNM 75 HI

ITEH TEH .610 NPSNM 45 HITEH TEC .610 TBATC 64 CITEH TEC .610 TBATC 64 CITEH TEC .610 TBATC 64 CITEH TEC .610 TBATC 64 CfTEH TEC .610 TBATC 64 CfTSH TSH .610 NPSNM 75 HITSH TSH .610 NPSNM 75 HI

ITEH TEH .610 NPSNM 47 HITEH TEC .610 TBATC 62 CfTEH TEC .610 TBATC 62 CfTEH TEC .610 TBATC 62 CfTEH TEC .610 TBATC 62 CfTEH TEC .610 TBATC 62 CfTEH TEC .610 TBATC 62 CITEH TEC .610 TBATC 62 CITEH TEC .610 TBATC 62 CITSH TSH .610 NPSNM 75 HITSH TSH .610 NPSNM 75 HI

ITEH TSH .610 NPSNM 19 HITEH TEC .610 TBATC 62 Cf11H 11H .610 NPSNM 73 HI

ITEH TEH .610 NPSNM 45 HITEH TEC .610 TBATC 64 CfTEH TEC .610 TBATC 64 CfTEH TEC .610 TBATC 64 CfTSH TSH .610 NPSNM 75 HITSH TSH .610 NPSNM 75 HI

P1 TEH1 TSH

P1 11HP1 08CP1 08C

2 TSH2 TSH

P1 TEH1 TSH

P1 11HP1 i1H

19 P2 AV315 P2 AV4

2 TSH2 TSH

P1 TEH1 TSH

P1 11HP1 11HP1 11HP1 AV1P1 AV1P1 08CP1 08C

2 TSH2 TSH

.471.30

.71- .39

.621.091.30

.661.26- .47

.63- .05

.001.071.26

.481.39

.6324.6525.15

.461.04-. 39

.621.111.39

P1 iiH -. 422 11H -. 42

242424242424

108108108108108108

P1 TEH1 TSH

P1 i1HP1 i1H

2 TSH2 TSH

.48

.82- .42

.68

.821.15

- - -- - - - + ---- + ---- + .--- + ---- + ---- + - - - +- - . .--- +- -- + - -+- --- - + .- -- + - --- + - + -- + -- -- -

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL Lf---- ---------------- +- -------+-----+-----+-----+-----+----+---+--+ - + - ---- +----+----.. .-.. -.. -- -----

+ . . . . .+ . . .. . . . . + . . .+ . . . . .+ . . . . . . I+ - -÷ . . . . .+ . . . . .+ . . . . .+ . . . . . . .+ - - . - . .1.+ - -

Page 119: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - D Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 09:10:09

-.. - .. +. ------- + -------- + .... - ---- + -- -- + --- + --- +_ -+ .. .---- +-----+----+---- -- - - - - + - +_ --

I ROW COL VOLTS DEG IND PER CNN LOCN INCHI INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI------------------------ +--------+-----+-----+-----+-----+----+---+--+ ----- + -----+----+ - - +--------

25 108 NOD TEN TEH .610 NPSNM 47 HI25 108 20.16 49 BLG I TSH 1.46 TEN TEC .610 TBATC 62 CI25 108 2.71 84 NBM 6 01H 14.91 TEN TEC .610 TBATC 62 CI25 108 .10 120 DFS 1 08H 16.94 TEH TEC .610 TBATC 62 CI25 108 6.02 180 DNT P1 11H - .39 TEH TEC .610 TBATC 62 CI25 108 10.34 182 DNT P1 11H .71 TEN TEC .610 TBATC 62 CI25 108 1.48 0 PCT 19 P2 AV1 -. 05 TEN TEC .610 TBATC 62 CI25 108 .92 0 PCT 13 P2 AV2 - .05 TEN TEC .610 TBATC 62 CI25 108 1.39 0 PCT 18 P2 AV4 .15 TEN TEC .610 TBATC 62 CI25 108 3.24 180 DNT P1 08C .62 TEN TEC .610 TBATC 62 CI25 108 NDF 2 11H -. 50 11H 11H .610 NPSNM 65 HI25 108 NDF 2 11H .56 11H 11H .610 NPSNM 65 HI25 108 NOF 2 TSH 1.13 TSH TSH .610 NPSNM 75 HI25 108 NOF 2 TSH 1.46 TSH TSH .610 NPSNM 75 HI

22 109 NDF 2 TEN .49 TEN TEN .610 NPSNM 47 HI22 109 1.77 26 BLG 1 TSH 1.07 TEN TEC .610 TBATC 64 Cl22 109 3.37 173 DNT P1 11H -. 44 TEN TEC .610 TBATC 64 CI22 109 3.49 172 DNT P1 11H .66 TEN TEC .610 TBATC 64 Cl22 109 4.01 173 DNT P1 liC -. 44 TEN TEC .610 TBATC 64 Cl22 109 5.83 175 DNT P1 liC .60 TEN TEC .610 TBATC 64 CI22 109 NDF 2 TSH 1.07 TSH TSH .610 NPSNM 75 HI22 109 NDF 2 TSH 1.15 TSH TSH .610 NPSNM 75 HII23 109 NOD TEN TEN .610 NPSNM 47 HI23 109 10.09 23 BLG 1 TSH 1.39 TEN TEC .610 TBATC 62 CI23 109 1.83 175 INR P1 10H 36.59 TEN TEC .610 TBATC 62 CI23 109 3.82 174 DNG P1 101 40.20 TEN TEC .610 TBATC 62 CI23 109 2.63 179 DNG P1 iMN 41.04 TEN TEC .610 TBATC 62 CI23 109 6.11 180 ONG P1 i0N 41.27 TEN TEC .610 TBATC 62 CI23 109 3.31 176 DNT P1 11H - .39 TEN TEC .610 TBATC 62 CI23 109 3.66 174 DNT P1 11H .71 TEN TEC .610 TBATC 62 CI23 109 NDF 2 iMN 40.30 101 11H .610 NPSNM 65 NI23 109 NDF 2 10H 41.36 iN 11H .610 NPSNM 65 HI23 109 NDF 2 11H .74 iN 11H .610 NPSNM 65 HI23 109 NDF 2 TSH 1.16 TSH 01H .610 NPSNM 75 HI23 109 NDF 2 TSH 1.39 TSH 01H .610 NPSNM 75 HI

20 110 NDF 2 TEN .50 TEN TEN .610 NPSNM 47 HI20 110 1.12 39 BLG 1 TSH 1.13 TEN TEC .610 TBATC 62 C'20 110 2.34 181 DNT P1 11H -. 39 TEN TEC .610 TBATC 62 CI20 110 2.21 180 DNT P1 11H .74 TEN TEC .610 TBATC 62 CI20 110 6.52 180 DNT P1 06C -. 32 TEN TEC .610 TBATC 62 CI20 110 6.93 181 DNT P1 06C .39 TEN TEC .610 TBATC 62 CI20 110 2.21 54 PBM 6 02C 5.77 TEN TEC .610 TBATC 62 CI20 110 2.70 55 MBM 6 02C 7.78 TEN TEC .610 TBATC 62 CI20 110 6.11 182 DNG P1 SiC 2.19 TEN TEC .610 TBATC 62 CI20 110 4.10 182 DNG P1 O1C 3.25 TEN TEC .610 TBATC 62 CI20 110 NDF 2 TSH 1.13 TSH TSH .610 NPSNM 75 HI

21 110 NDD TEN TEN .610 NPSNM 47 HI21 110 NOD TEN TEN .610 NPSNM 49 HI21 110 6.80 20 BLG 1 TSH 1.18 TEN TEC .610 TBATC 62 CI21 110 3.43 175 DNT P1 11H -. 58 TEN TEC .610 TBATC 62 CI21 110 9.26 186 DNT P1 11H .50 TEN TEC .610 TBATC 62 CI21 110 4.03 173 DNT P1 06C -. 32 TEN TEC .610 TBATC 62 CI21 110 5.45 176 DNT P1 06C .39 TEN TEC .610 TBATC 62 CI21 110 NDF 2 11H -. 47 11H 11H .610 NPSNM 67 HI21 110 NDF 2 TSH 1.18 TSH TSH .610 NPSNM 75 HI21 110 NDF 2 TSH 1.19 TSH TSH .610 NPSNM 75 HI

18 111 NDF P1 TEN .48 TEN TEN .610 NPSNM 49 HI18 111 1.61 22 BLG 1 TSH 1.06 TEN TEC .610 TBATC 62 CI18 111 2.21 179 DNT P1 10H -. 39 TEN TEC .610 TBATC 62 CI18 111 5.99 183 DNT P1 11H -. 39 TEN TEC .610 TBATC 62 CI18 111 3.61 183 DNT P1 11H .69 TEN TEC .610 TBATC 62 CI18 ill 2.36 179 DNT P1 10C -. 34 TEN TEC .610 TBATC 62 CI18 111 NDF 2 TSH 1.06 TSH TSH .610 NPSNM 75 HI

10 11310 11310 11310 11310 11310 11310 11310 11310 11310 113

3.238.873.382.793.783.842.933.90

171179176173177177174175

NDDONGDNGDNTDNGDNTDNTDNTDNTNDD

P1 10HP1 10HP1 11HP1 10CP1 08CP1 08CP1 05CP1 05C

40.3341.43

-. 3140.89

-. 49.57

-. 21.47

TEN TSHTEN TECTEN TECTEN TECTEN TECTEN TECTEN TECTEN TECTEN TECTEC TEC

.610 NPSNM

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 NPSNM

21 H44 C44 C44 C44 C44 C44 C44 C44 C80 C

.. .. . .... . .+---.----+----.----.----.----- +. . ......... +. - +. . . .. . ..----------+- .. - .. ---- ..--+- .+- ...... +....-...-

I ROW COL VOLTS DEG IND PER CNN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+. . . .÷. . . . .+ . .+. . .. .+. .----------+-...-+-.. .....- +-. ......- ++----.......- +..- ..... +..----+ .--+--- ..- +--+--

11

Page 120: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - D Special Interest +Point Inspection Results

Byron 2 B2R14 CBE 20081001 10/17/2008 09:10:09

+ .... - ... - .- ----- + .--- + ---- +- --- + - --- + - ----- - - . +- ... + .--- + .--- + ---- +- - + - + - +- -+

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI----- ----- ------------+--------+-----+-----+-----+-----+--------+--+ - + - ----+ -----+-----+ - - +-------

10 113 NDF P1 10H 40.33 10H 11H .610 NPSNM 89 HII 10 113 NDF 2 11H -. 31 18H 11H .610 NPSNM 89 HI

-- -- - -- - - - -- - - - -- - - - -- - - - - - - - - -----------++ + - - + + 4----+- --4--+ - + ------ +----+--+ - + - --- - - --

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+. . . .+. . . . .+. . . .+. .---------.. +.... .....---- .... +. - --... ... +--+..- ..... +......-.+...----+. .+.----+ + -.... +- .... .+..- . .-

Tubes: 129 Records: 75412

Page 121: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

ATTACHMENT C

Steam Generator Inservice Indications

Page 35 of 44

Page 122: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

Attachment C.1

2A Steam Generator Inservice Indications

Page 36 of 44

Page 123: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - A SG A - INDICATIONS WITH PERCENT THROUGHNWALL

Byron 2 B2RI4 CBE 20881001 1011812098 16:48:25

. . -- .-- - .- --- - ..-- -.. - -. .-- - - ---- - - + - - --- - - -- -- .... - .... - ...... --- .. .- .---. - -- --- --

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ . .÷ . .+.. . . .. ÷. . 4 . . . .+ . .÷ . .+.. . . .. 4 .-----------+. ... ... ÷.. .. ... +... ... ÷ . .. . .. .. . ... ..-- -.- ÷-......++- ......

5 .93 0 PCT 16 P2 AV4

88

18

1111

1212

1212

13

1414

1414

1515

1515

161616

16

1616

17

18

18

1818

18

18

1919

1919

2020

28

2.04.85

4.53

.951.23

1.011.41

1.271.10

1.57

1.29.98

1.891. 10

1.48.65

.901.32

2.131.881.07

1.27

2.111.72

2.21

1.38

.89

1.521.65

1.251.25

1.221,76

1.331.53

1.031.83

2.882.661.171.69

1.25.88

.99

1.361.11

2.831.11

1.711.03

PCTPCT

PCT

PCTPCT

PCTPCT

PCTPCT

PCT

PCTPCT

PCTPCT

PCTPCT

PCTPCT

PCTPCTPCT

PCT

PCTPCT

PCT

PCT

PCT

PCTPCT

PCTPCT

PCTPCT

PCTPCT

PCTPCT

PCTPCTPCTPCT

PCT

PCT

PCT

PCTPCT

PCTPCT

PCTPCT

P2P2

P2

P2P2

P2P2

P2P2

P2

P2P2

P2P2

P2P2

P2P2

P2P2P2

P2

P2P2

P2

P2

P2

P2P2

P2P2

P2P2

P2P2

P2P2

P2P2P2P2

P2P2

P2

P2P2

P2P2

P2P2

AV3AV4

AV3

AV2AV3

AV2AV3

AV3AV4

AV3

AV3AV4

AV2AV3

AV3AV4

AV3AV4

AV2AV3AV4

AV4

AV3AV4

AV3

AVI

AV3

AV2AV3

AV2AV4

AV1AV3

AV3AV4

AV2AV3

AV1AV2AV3AV4

AV3AV4

AV3

AVI1AV3

AV3AV4

AV2AV3

.27

-. 05.00

.80

.10

.08

.07- .07

.08

.15

.80

.10

.10

.1018

00.00

.00

.12

.00

.00

.00

.00

.00

.00

.00

- .03

.02

.00

.00

.00

.00

.08

.13

.10

.15

.00- .02

.00

.08

.00

.05

.15-. 05

.00

.1812

-. 05-. 05

.00

.00

.00

TEH TEC .618 SBACC 12 CI

TEN TEC .610 ZBAZC 1TEH TEC .610 ZBAZC 18

TEH TEC .610 ZBAZC 18 CITEN TEC .618 ZBAZC 18 CIITEH TEC .610 ZBAZC 10 CITEH TEC .610 ZBAZC 12 CI

ITEH TEC .618 SBACC 12 ClTEH TEC .610 SBACC 12 CI

ITEH TEC .610 SBACC 12 CjTEH TEC .610 SBACC 12 CI

ITEH TEC .610 ZBAZC 12 CI

TEN TEC .610 SBACC 12 ClTEH TEC .610 SBACC 12 Cl

TEN TEC .618 SBACC 12 CITEH TEC .618 SBACC 12 C)TEH TEC .610 SBACC 12 Cl

ITEH TEC .610 SBACC 12 CITEH TEC .610 SBACC 12 Cl

ITEH TEC .610 SBACC 12 ClTEH TEC .618 SBACC 12 Cl

TEH TEC .610 ZBAZC 18 CITEH TEC .610 ZBAZC 18 CITEH TEC .610 ZBAZC' 18 CI

ITEH TEC .610 ZBAZC 18 CI

ITEH TEC .610 ZBAZC 12 ClTEH TEC .610 ZBAZC 12 CI

TEH TEC .610 SBACC 12 CI

TEH TEC .610 ZBAZC 1i

TEH TEC .610 ZBAZC 18 Cl

TEH TEC .610 ZBAZC 18 CITEH TEC .610 ZBAZC 18 CI

TEH TEC .610 ZBAZC 18 ClTEH TEC .610 ZBAZC 18 CITEN TEC .618 SBACC 12 CITEH TEC .610 SBACC 12 CI

TEH TEC .610 SBACC 12 ClTEN TEC .618 SBACC 12 CI

TEH TEC .610 SBACC 12 CI

TEN TEC .618 SBACC 12 CI

TEH TEC .610 SBACC 12 CI

TEN TEC .618 ZBAZC 18 CI

TEH TEC .610 Z8AZC 18 ClTEH TEC .610 ZBAZC 14 Cl

ITEH TEC .610 SBACC i2 ClTEH TEC .610 ZBACC i2 Cl

TEH TEC .610 PBAPC CA ClI

TEH TEC .610 SBACC 12 ClTEH TEC .610 SBACC 12 Cl

ITEH TEC .610 $BACC 12 CI

TEH TEC .610 SBACC 12 CI

ITEH TEC .610 SBACC 12 ClJ

TEH TEC+ .610 ZBAZC 10

TEH TEC .610 ZBAZC 14

INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL Ll. . . . . . + - . . . . . . . .- . . . . . . .- . . . . + . . . ÷ . . . . . . . . . . + . . . . . . ÷ . . . . . + . .

38 2038 2038 20

36 2136 21

37 21

38 2138 21

39 2139 21

38 2238 22

41 22.

I ROW COLS. . .- - . ..- - .- -- -

4.62 0 PCT 38 P2 AV2

VOLTS DEG IND PER CHN LOCN INCHI-. ... .-- . . ..-- - .. .-- -. . .-- -. .. -÷ -.. .. ÷ ."-... .... + .

1

Page 124: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - A SG A - INDICATIONS WITH PERCENT THROUGHWALL

Byron 2 82R14 CBE 20081001 10/18/2008 16:48:25

---- -------------.- ---- - ------------------------------------------ + - ---------- ------ ------- +-- ----

I ROW COL VOLTS DEG IND PER CNN LOCN INCH1 .INCH2 I CRLEN CRUID CEG BEGT ENDT PDIA PTYPE CAL LI---- -------- ---------------+--------+.----+-----+-----+--.-+--------+-. - + ----- + -----+-----+ - - +-------

2.112.11

.85

1.30.77

2.402.04

1.412.00.86

2.221.52

.993.361.42

1.17

.99

1.41

1.12

.635.354.57

.93

.76

1.95

.77

.791.17

.95

1.091.60

.66

.69

.992.10

1.99.88

1.49

1.05

1.19

1.33

.88

.75

1.77

1.09

.903.094.63

1.621.06

0 PCT0 PCT0 PCT

0 PCT0 PCT0 PCT0 PCT

0 PCT0 PCT0 PCT

0 PCT0 PCT

0 PCT0 PCT0 PCT

0 PCT

0 PCT

0 PCT

0 PCT

0 PCT0 PCT0 PCT

0 PCT

0 PCT

0 PCT

0 PCT

0 PCT0 PCT

0 PCT

0 PCT0 PCT

0 PCT

0 PCT

0 PCT0 PCT

0 PCT0 PCT

0 PCT

0 PCT

0 PCT

0 PCT

0 PCT0 PCT

0 PCT

0 PCT

0 PCT0 PCT0 PCT

0 PCT0 PCT

P2 AV2P2 AV3P2 AV4

P2 AVIP2 AV2P2 AV3P2 AV4

P2 AV2P2 AV3P2 AV4

P2 AV2P2 AV3

P2 AV2P2 AV3P2 AV4

P2 AV3

P2 AV4

P2 AV2

P2 AV3

P2 AV2P2 AV3P2 AV4

P2 AV4

P2 AV3

P2 AV3

P2' AV2

P2 AV2P2 AV3

P2 AV3

P2 AV2P2 AV3

P2 AV3

P2 AV2

P2 AV1P2 AV3

P2 AV3

P2 AV4

P2 AV3

P2 AV1

P2 AV4

P2 AV1

P2 AV2P2 AV4

P2 AVI

P2 AVi

P2 AV2P2 AV3P2 AV4

P2 AV1P2 AV2

.12

.15

.07

.13

.11- .07

.03

,00.07.02

.00

.20

.00

.00

.14

.00

.00

.05

.15

.08

.00.00

.00

.07

.00

.00

.17•12

.00

.00

.00

.00

.00.

.00.00

.14

.00

.48

.05

.14

.05

.29

.08

.03

.00

.15

.03-. 10

.13

.00

TEN TECTEN TECTEN TEC

TEN TECTEN TECTEN TECTEN TEC

TEN TECTEN TECTEN TEC

TEN TECTEN TEC

TEN TECTEN TECTEN TEC

TEN TEC

TEN TEC

TEH TEC

TEN TEC

TEN TECTEN TECTEN TEC

TEN TEC

TEN TEC

TEN TEC

TEN TEC

TEH TECTEN TEC

TEN TEC

TEN TECTEN TEC

TEN TEC

TEN TEC

TEN TECTEN TEC

TEN TEC

TEN TEC

TEN TEC

TEN TEC

TEN TEC

TEN TEC

TEN TECTEN TEC

TEN TEC

TEN TEC

TEN TECTEN TECTEN TEC

TEN TECTEN TEC,

.610 SBACC

.610 SBACC

.610 SBACC

.610 SBACC

.610 SBACC

.610 SBACC

.610 SBACC

.610 SBACC.610 SBACC.610 SBACC

.610 ZBAZC

.610 ZBAZC

.610 SBACC

.610 SBACC.610 SBACC

.610 SBACC

.610 SBACC

.610C ZBAZC

.610 SBACC

.610 ZBAZC

.610 ZBAZC

.610 ZBAZC

.610 ZBAZC

.610 SBACC

.610 ZBAZC

.610 SBACC

.610 SBACC

.610 SBACC

.610 ZBAZC

.610 ZBAZC

.610 ZBAZC

.610 SBACC

.610 ZBAZC

.610 SBACC

.610 SBACC

.610 SBACC

.610 SBACC

,610 SBACC

.610 SBACC

.610 SBACC

.610 SBACC

.610 SBACC

.610 SBACC

.610 SBACC

.610 SBACC

.610 SBACC

.610 SBACC

.610 SBACC

.610 SBACC

.610 SBACC

121212

12121212

121212

1414

161616

16

16

14

16

141414

14

16

14

16

1616

18

1818

20

26

2828

3232

30

30

64

30

3232

34

30

383838

3030

CIClCI

CICIClCI

CIClCI

CICl

ClCICI

Cl

CI

C)

ClClCI

Cl

Cl

CI

cl

cI

Cj

CICI

CIC

C

C

CC

CC

C

C

C

C

C

C

C

C

CICC

CI

CI

------------------- , ----+-----+-----+-----+-----+----+ --- +--+ - + -------------- ------ -----------------

I ROW COL VOLTS DEG IND PER CNN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LIS. . .. .+. . . . .. .+ . .+. . ..--------- .... ---.----.---- . . . . .. .. . .. .. .. ...---+- - -.. +...+---- . ..----+-- . ..--+ - + -+•- . .+ . .

2

Page 125: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - A SG A - INDICATIONS WITH PERCENT THROUGHWALL

Byron 2 B2R14 CBE 20081001 10/18/2008 16:48:25

÷.. . ..... .. .. .. ..-------------.-.---- +. l÷ ......... ÷.- +... ... .------- ++- +----+.. .----+.--+-.....+-....-......

I ROW COL VOLTS DEG IND PER CNN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL Ll÷..÷.. ... ÷..÷.. ------------. ..---.----.----+---. ...--- +--....---÷ .... ÷.... .. ----- +----+----+.. .---- +-. - +--.÷...÷....+.

31 67 1.10 0 PCT 19 P2 AV4 .05 TEH TEC .610 SBACC 36 CI

45 67 .22 288 PCT 23 2 02C 1.22 .27 .36 55 02C 03C .610 NPSNM 7645 67 .16 278 PCT 19 2 62C 2.88 .18 .35 53 02C 03C .610 NPSNM 76

30 69 .94 0 PCT 17 P2 AV2 -. 13 TEN TEC .610 SBACC 36 CI30 69 .94 0 PCT 17 P2 AV3 -. 16 TEH TEC .610 SBACC 36 CI

30 70 .76 0 PCT 15 P2 AV2 .18 TEN TEC .616 SBACC 34 Cl

39I38 72 2.56 0 PCT 29 P2 AV3 .06 TEN TEC .610 SBACC 34 CII38 72 1.23 0 PCT 26 P2 AV4 .66 TEH TEC .616 SBACC 34 CI

S38 73 .92 6 PCT 17 P2 AV2 .12 TEN TEC .610 SBACC 36 CI38 73 2.39 0 PCT 29 P2 AV3 -. 12 TEN TEC .610 SBACC 36 Cl

32 76 1.54 0 PCT 23 P2 AV3 -.08 TEN TEC .610 SBACC 34 CI

32 79 2.04 0 PCT 26 P2 AV4 -. 03 TEN TEC .610 SBACC 42 CI

44 81 4.23 0 PCT 36 P2 AV2 .06 TEN TEC .610 SBACC 38 CI44 81 1.66 0 PCT 22 P2 AV3 .06 TEN TEC .610 SBACC 38 Cl

46 82 2.85 0 PCT 36 P2 AV2 -.05 TEN TEC .610 SBACC 38 Cl40 82 1.39 0 PCT 20 P2 AV3 -. 02 TEN TEC .610 SBACC 38 CI

39 84 .96 0 PCT 17 P2 AV2 -.10 TEN TEC .610 SBACC 40 CI

41 84 1.16 0 PCT 19 P2 AV2 .00 TEN TEC .610 SBACC 40 CI41 84 1.39 0 PCT 22 P2 AV3 .00 TEN TEC .610 SBACC 40 Cl

27 85 2.77 0 PCT 31 P2 AV2 -.05 TEN TEC .610 ZBAZC 48 Cl27 85 .67 0 PCT 14 P2 AV3 -.03 TEN TEC .610 ZBAZC 48 Cl

39 85 1.08 0 PCT 19 P2 AV2 .00 TEN TEC .610 SBACC 46 CI

34 85 1.54 0 PCT 21 P2 AV3 .00 TEN TEC .610 SBACC 38 CI

41 85 1.53 6 PCT 23 P2 AV2 .00 TEN TEC .610 SBACC 40 CII41 85 1.61 0 PCT 24 P2 AV3 -.05 TEN TEC .610 SBACC 4041 85 .61 0 PCT 18 P2 AV4 .00 TEN TEC .610 SBACC 40

41 88 1.68 0 PCT 19 P2 AV2 .06 TEN TEC .610 SBACC 40 CI

44 88 .83 0 PCT 14 P2 AV2 .02 TEN TEC .610 SBACC 38 CI

44 88 2.35 0 PCT 27 P2 AV3 .02 TEN TEC .610 SBACC 38 Cl44 88 2.11 0 PCT 26 P2 AV4 -.05 TEN TEC .610 SBACC 38 Cl

39 89 2.90 6 PCT 32 P2 AV2 .06 TEN TEC .610 SBACC 46 CI39 89 3.76 0 PCT 35 P2 AV3 .00 TEN TEC .610 SBACC 46 CIS39 89 1.37 6 PCT 22 P2 AV4 .66 TEN TEC .616 SBACC 40 CI

45 89 1.17 0 PCT 20 P2 AV4 .00 TEN TEC .610 SBACC 40 CI

I34 96 1.62 6 PCT 24 P2 AV3 - .15 TEN TEC ý.616 SBACC 42 Cl

I40 96 2.28 0 PCT 27 P2 AV2 .00 TEN TEC .610 SBACC 38 Cl40 90 2.40 0 PCT 27 P2 AV3 .07 TEN TEC .610 SBACC 38 ClI4 96 1.11 0 PCT 17 P2 AV4 -. 03 TEN TEC .610 SBACC 38 CJ

44 96 2.19 0 PCT 26 P2 AV2 -.02 TEH TEC .610 SBACC 38 CII 4 96 4.26 0 PCT 36 P2 ýAV3 .66 TEN TEC .610 SBACC 38 Cl

I4 91 1.14 0 PCT 18 P2 AV2 -.07 TEN TEC .610 SBACC 38 ClI46 91 3.76 0 PCT 34 P2 AV3 -.02 TEN TEC .610 SBACC 38 CI

41 91 2.96 0 PCT 32 P2 AV2 .00 TEN TEC .616 SBACC 46 Cl41 91 1.15 0 PCT 19 P2 AV3 .15 TEN TEC .610 SBACC 46 CI

40 92 1.61 0 PCT 16 P2 AVZ -. 05 TEN TEC .610 SBACC 38 Cl

46 92 1.07 6 PCT 17 P2 AV3 -. 02 TEN TEC .610 SBACC 38 Cl

41 92 1.62 0 PCT 24 P2 AV2 .60 TEN TEC .610 SBACC 40 CI41 92 1.02 0 PCT 18 P2 AV3 .46 TEN TEC .610 SBACC 40 CI41 92 1.73 0 PCT 25 P2 AV4 .06 TEN TEC .610 SBACC 46 Cl

39 94 1.10 0 PCT 19 P2 AVI .00 TE TEC .610 SBACC 40 CI39 94 1.14 0 PCT 19 P2 AV2 .05 TEN TEC .610 SBACC 40 C

39 94 3.65 0 PCT 35 P2 AV3 -. 03 TEN TEC .610 SBACC 46

------------------------------ +-----+----+------+-----+----+----+---+--+ - + - ---- +-----+ -----+ - ----------

I ROW COL , VOLTS DEG IND PER CNN LOCN INCHi INCH2 I CRIEN CRWIO CEG BEGT ENOT POIA PTYPE CAL LI------------------------ +---------+-----+-----+-----+-----+----+---+--+ - + - ---- + -----+ -----+ - - +--------

Page 126: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - A SG A - INDICATIONS WITH PERCENT THROUGHWALL

Byron 2 B2R14 CBE 20081001 1011812008 16:48:25

.............-----------------------------------------....... -------------.......---.......- +..----- ------- -------.--+-. ----

I ROW COL VOLTS DEG IND PER CNN LOCH INCHI INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL Li+ .. . . ÷.. . .. .÷ .. . . ÷. .. + . . .. ÷. .. . .. ÷-------------,.........+÷.-÷+.- -.----. .- -.---- + ÷ ..---+.- --+ . .- +- +--÷. . . . . .

34 95 .78 6 PCT 15 P2 AV2 .00 TEN TEC .610 SBACC 42 Ci

36 95 .85 0 PCT 16 P2 AV3 -. 05 TEN. TEC .610 SBACC 42 Ci36 95 .78 0 PCT 15 P2 AV4 .60 TEN TEC .610 SBACC 42 C)

40 95 2.40 0 PCT 27 P2 AVI .03 TEN TEC .610 SBACC 38 CI40 95 3.61 0 PCT 34 P2 AV2 -. 02 TEN TEC .610 SBACC 38 Ci40 95 3.70 0 PCT 34 P2 AV3 -. 10 TEN TEC .610 SBACC 38 Ci46 95 3.19 0 PCT 32 P2 AV4 -. 03 TEN TEC .610 SBACC 38 CI

36 96 1.79 0 PCT 25 P2 AV2 .13 TEN TEC .610 SBACC 42 CI

39 96 1.03 0 PCT 18 P2 AV3 .03 TEN TEC .610 SBACC 40 Ci39 96 .85 6 PCT 16 P2 AV4 .15 TEN TEC .610 SBACC 40 Ci

37 98 2.61 6 PCT 30 P2 AV2 .60 TEN TEC .610 SBACC 46 Ci37 98 2.76 0 PCT 31 P2 AV3 .00 TEN TEC .610 SBACC 40 Cl

38 98 1.78 0 PCT 23 P2 AVI -.05 TEN TEC .610 SBACC 38 Ci38 98 3.43 0 PCT 33 P2 AV2 .06 TEN TEC .610 SBACC 38 Ci38 98 2.02 0 PCT 25 P2 AV3 .00 TEN TEC .610 SBACC 38 Cl

28 99 1.20 0 PCT 22 P2 AV3 .00 TEN TEC .610 SBACC 46 Ci

37 99 1.44 0 PCT 22 P2 AV3 .05 TEN TEC .610 SBACC 40 Ci

35 100 1.22 0 PCT 20 P2 AV3 .05 TEN TEC .610 ZBAZC 44 Ci

31 101 1.77 6 PCT 25 P2 AV2 .00 TEN TEC .616 ZAZC 44CI31 101 2.29 0 PCT 29 P2 AV3 .00 TEN TEC .610 ZBAZC 44 Ci

S30 163 1.95 6 PCT 24 P2 AV2 .14 TEN TEC .610 SBACC 42 Ci

31 103 1.65 0 PCT 24 P2 AV2 .00 TEN TEC .610 ZBAZC 44 Ci31 103 1.79 0 PCT 25 P2 AV3 .00 TEN TEC .610 ZBAZC 44 Ci

27 104 1.16 0 PCT 19 P2 AV2 .60 TEN TEC .616 ZBAZC 4.8 Ci

I28 104 1.23 6 PCT 19 P2 AV4 .66 TEN TEC .610 SBACC 46 Ci

ij 29 104 .61 0 PCT 13 P2 AV3 .66 TEN TEC .616 ZBAZC 44 Ci

30 104 1.36 0 PCT 19 P2 AV2 .14 TEN TEC .610 SBACC 42 CI

28 105 1.59 0 PCT 25 P2 AV3 .00 TEN TEC .610 SBACC 46 CI28 105 1.72 0 PCT 26 P2 AV4 .00 TEN TEC .610 SBACC 46 Ci

36 105 1.18 0 PCT 18 P2 AV2 .26 TEN TEC .610 SBACC 42 Ci

26 106 .91 0 PCT 19 P2 AVI .00 TEN TEC .610 SBACC 46 Ci26 106 .80 0 PCT 17 P2 AV3 .66 TEN TEC .610 SBACC 46 Ci

I27 166 2.07 6 PCT 27 P2 AVi -.65 TEN TEC .610 ZBAZC 48 Ci27 106 1.64 0 PCT 24 P2 AV2 .00 TEN TEC .610 ZBAZC 48 Cl

127 166 2.70 0 PCT 31 P2 AV3 .03 TEN TEC .610 ZBAZC 48 Cl

26 107 1.25 0 PCT 22 P2 AV2 .00 TEN TEC .610 SBACC 46 Ci26 107 1.72 0 PCT 23 P2 AV3 .06 TEN TEC .610 SBACC 46 Ci

22 109 1.49 0 PCT 21 P2 AV4 .14 TEN TEC .610 SBACC 54 Ci

23 109 .63 0 PCT 13 P2 AVI .00 TEH TEC .610 ZBAZC 56 Ci23 109 1.26 0 PCT 26 P2 AV4 -.08 TEN TEC .610 ZBAZC 56 Ci----------------------------+--------+.----+-----+.----+----+----+---+--+ + - + ---+----.+ ------ - +--------

I ROW COL VOLTS DEG IND PER C 3N LOCH INCHI INCH2 I CRLEN CRWID CEG BEGT ENCT PIA PTYPE CAL Li-----------------------------+-------+----+-----+-----+----+---+--+ - + - ---- + -----+ -----+ - - +--------

Tubes: 110 Records: 194

4

Page 127: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - A SG A - INDICATIONS WITH I-CODES

Byron 2 B2R14 CBE 20081001 10/18/2008 16:59:53

4. ... ÷ . .. - --. . .----- +--- ---.-. . + . .. + .. .. . . . .. .. .4 -.. .. .. ------- - - - - -.-- - .-. ---..- ---.----. - . -----. . .+- . . ..--- 4.

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI------------------------------ +-------+----+-----+-----+----+---+--+ - + - ----+ -----+-----+ - + ------ ---

--------------------------- +----+-----+-----+-----+------+---+--+ - + - ---- + -----+ -----+ - - +--------

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT POIA PTYPE CAL L--------------------------------- +---------------------+---+-------------------- ------ -------------

Tubes: 0 Records: S1

Page 128: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - A SG A - TUBESHEET AXIAL INDICATIONS

Byron 2 B2R14 CBE 20081001 10/18/2008 17:06:36

-- -.. --. .. --.. .. ..-- -. ..-- .. . " -. .. --.. . --. .. --.. .. .. .. .. ..- ÷--- . .. ..- - .. .. . - ... + . ..+- .. . -.. .... +- . . . - .. .. 4-- 4"

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI, INCH2 I CRLEN CRWID CEG BEGT ENDT POIA PTYPE CAL LI4"- - -....- ....-...... ..-. .. .. .. .. . . . .... +'' -4- ....... ....... .... .... .... ...... ....-- -..-- + + - + -..... - - -+---

6 73 3.53 23 WAS 0 2 TEH .06 .15 .37 56 TEH TEH .610 NPSNM 63 HI

2 2 77 2.48 29 SAS 0 2 TEH .05 .15 .42 64 TEH TEH .610 NPSNM 63

3 79 2.78 25 SAS a 2 TEH .08 .18 .46 71 TEH TEH .610 NPSNM 63 HII

4 91 2.62 30 SAS a 2 TEH .02 .22 .24 37 TEH TEH .610 NPSNM 67 HII

5 98 2.31 28 SAS 0 2 TEH .10 .15 .19 29 TEH TSH .610 NPSNM 23 HI5 98 1.32 40 SAS 0 2 TEH .11 .12 .17 26 TEH TSH .610 NPSNM 23 Hi

I2 99 1.96 32 SAS 0 2 TEH .10 .16 .37 56 TEH TEH .610 NPSNN 71 HI

I5 104 4.53 28 SAS 0 2 TEH .09 .19 .36 55 TEH TEH .610 NPSNM 73 HI

I4 106 1.52 27 SAS 0 2 TEH .15 .16 .36 55 TEH TEH .610 NPSNM 73 HI

... 4 ... " ...... +---- .---- .----.. 4 ..---- .. . ...------- .--- +--+.-..... " ..... - +.... 4- ---+- ° €+----+....-.-- - +-4"

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT POIA PTYPE CAL LI---------------------- --+--------------+-----+----+----+----+---+--+ -+-----+----+ ----- +---+--

4, . . " . . ". . . . .4 . .4 . .4 . .4 . .4 . .4 . . . . ". . . .. -- " . . . .4 . . . - . . , . . - . . - . . . -. . . " . . . " 4

Tubes: 8 Records: 9I

Page 129: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

Attachment C.2

2B Steam Generator Inservice Indications

Page 37 of 44

Page 130: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B SG B - INDICATIONS WITH PERCENT THROUGHWALL

Byron 2 82R14 CBE 20081001 10/18/2698 16:55:33

÷ . .+. . . . . . . .+. . . .+----------.... -- +--- . ... +. ... .. + ... ... + ...------ - - - -. ...- +..---- +..---- + -- . .--- + -...... +- .....

ROW COL VOLTS DEG IND PER CNN LOCN INCHI INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI---------------------------------+----+----+-----+-----+----+---+--+ - + - ---- +-----+-----+ - - +--------

7 8 .13 294 PCT 15 2 05H .78 .36 .36 55 65H 05H .610 NPSNM 73 HI

I 27 10 1.22 6 PCT 19 P2 AV2 .15 TEN TEC .610 TBATC 16 Q(

28 11 1.18 6 PCT 17 P2 AV2 .00 TEN TEC .610 TBATC 14 Cl28 11 2.64 0 PCT 28 P2 AV3 .06 TEH TEC .616 TBATC 14 CI28 11 1.42 0 PCT 19 P2 AV4 .00 TEN TEC .610 TBATC 14 Cl

I28 12 1.41 0 PCT 20 P2 AV2 .11 TEN TEC .610 TBATC 16 CI

I30 12 .56 0 PCT 11 P2 AV2 .06 TEN TEC .610 TBATC 16 CI

I31 12 1.95 0 PCT 25 P2 AVI -. 03 TEN TEC .610 TBATC 16 CI31 12 3.11 0 PCT 32 P2 AV2 -. 09 TEN TEC .616 TBATC 16 Cl31 12 3.06 0 PCT 31 P2 AV3 -.03 TEN TEC .616 TBATC 16 CI31 12 1.83 0 PCT 24 P2 AV4 .08 TEN TEC .616 TBATC 16 CI

32 12 2.18 0 PCT 26 P2 AV2 .09 TEN TEC .610 TBATC 16 CI32 12 .88 6 PCT 14 P2 AV4 .03 TEN TEC .610 TBATC 16 CI

S29 13 .97 0 PCT 15 P2 AV3 .06 TEN TEC .616 TBATC 14 Cl

36 13 .91 0 PCT 14 P2 AV3 .06 TEN TEC .610 TBATC 14 CI

I31 13 .79 6 PCT 13 P2 AVI -.03 TEN TEC .616 T8ATC 14 Cl31 13 .86 0 PCT 13 P2 AV2 .00 TEN TEC .610 TBATC 14 CI31 13 1.16 0 PCT 16 P2 AV4 .60 TEN TEC .610 TBATC 14 CI

33 13 1.28 0 PCT 18 P2 AVi .00 TEN TEC .616 TBATC 14 CI

36 14 .86 0 PCT 15 P2 AV3 .22 TEN TEC .610 TBATC 16 CI

33 14 2.65 0 PCT 29 P2 AVI -.03 TEN TEC .616 TBATC 16 CI33 14 2.17 0 PCT 26 P2 AV2 .14 TEN TEC .610 TBATC 16 CI33 14 .82 0 PCT 14 P2 AV3 .03 TEN TEC .610 TBATC 16 CI33 14 .96 0 PCT 15 P2 AV4 .06 TEN TEC .610 TBATC 16 CI

34 14 3.79 0 PCT 35 P2 AV3 .03 TEN TEC .610 TBATC 16 CI34 14 .89 0 PCT 15 P2 AV4 .65 TEN TEC .610 TBATC 16 CI

35 14 1.26 6 PCT 19 P2 AVI .00 TEN TEC .610 TBATC 1635 14 1.52 0 PCT 21 P2 AV2 -.17 TEN TEC .610 TBATC 1635 14 .81 0 PCT 14 P2 AV3 .03 TEN TEC .610 TBATC 16 CI

31 15 1.77 0 PCT 22 P2 AV2 .66 TEN TEC .610 TBATC 14 C6

35 15 2.34 0 PCT 27 P2 AV2 .03 TEN TEC .610 TBATC 14 CI

31 16 .98 0 PCT 16 P2 AV3 -.05 TEN TEC .610 TBATC 16 CI

35 16 1.62 0 PCT 17 P2 AVi .00 TEN TEC .610 TBATC 16 CI35 16 1.95 0 PCT 21 P2 AV3 -. 08 TEN TEC .610 TBATC 16 CI

36 16 1.29 0 PCT 19 P2 AV2 -. 06 TEN TEC .610 TBATC 16 CI36 16 2.60 0 PCT 25 P2 AV3 -.14 TEN TEC .610 T§ATC 16 CI36 16 1.23 0 PCT 19 P2 AV4 .03 TEN TEC .610 TBATC 16 Cl

31 17 .83 0 PCT 13 P2 AV2 .04 TEN TEC .610 TBATC 14 CI31 17 .81 0 PCT 13 P2 AV3 .03 TEN TEC .610 TBATC 14 CI

34 17 1.61 0 PCT 15 P2 AV3 .00 TEN TEC .610 TBATC 14 CI

36 17 1.22 0 PCT 17 P2 AV2 .60 TEN TEC .610 TBATC 14 CI36 17 .69 0 PCT 11 P2 AV3 .00 TEN TEC .610 TBATC 14 CI

37 17 .86 0 PCT 13 P2 AV3 .06 TEN TEC .610 TBATC 14 CI

36 18 1.09 0 PCT 17 P2 AV2 .08 TEN TEC .610 TBATC 12 CII36 18 .66 6 PCT 12 P2 AV3 -.16 TEN TEC .616 TBATC 12 CI

34 19 .77 0 PCT 13 P2 AV3 .00 TEN TEC .610 TBATC 16 CI

37 19 .90 0 PCT 14 P2 AV2 .06 TEN TEC .610 TBATC 16 CI

39 19 2.67 0 PCT 29 P2 AV2 .06 TEN TEC .610 TBATC 10 CI39 19 2.69 0 PCT 25 P2 AV3 -.03 TEN TEC .610 TBATC 16 CI39 19 .83 0 PCT 13 P2 AV4 .14 TEN TEC .610 TBATC 16 CI

25 26 .54 229 PCT 38 2 07H -. 63 .30 .38 58 07H 07H .610 NPSNM 73

+..÷..+.....+..÷..+..+----------...--------+----.+---.. +..---. --..... ----- +.-.. .--.---- + ..-- ----...... +-......+....-- +

I ROW COL VOLTS DEG IND PER CNN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT POIA PTYPE CAL LI+ . .÷. . .. . . .+. . .. . .+. .--------.... .........-- -- - - +.- - --.-.-.. -+.... --------------------------- ------- --------------++

/ 1

Page 131: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B SG B - INDICATIONS WITH PERCENT THROUGHWALL

Byron 2 B2R14 CBE 20081081 10/18/2008 16:55:33

... •...- ..... .-- - .---- .---- +.---. ----.---- + -.. •.. ...... ..-- -.. . ..--.-.-. •----+----------------------- ------- --

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 I CRLEN CRWID CEG BEGT ENDT POIA PTYPE CAL LI.... ... ... • . .... .. •.... ....----------•--- -• ...... ....... .... ..-- - --+- - -•--.... ......+----+ - ÷ - -... .....

363636

39

404040

3939

36

40

434343

34

3939

40

4444

454545

2828

39

40

474747

323232

27

. 731.76

.90

1.00

1.652.001.03

.83

.70

1.73

1.42

1.991.331.13

1.34

1.88.75

1.22

2.68.86

2.513.691.71

.871.03

.79

1.63

4.092.332.02

2.241.111.03

.82

0 PCT 130 PCT 240 PCT 15

0 PCT 16

0 PCT 230 PCT 260 PCT 17

0 PCT 130 PCT 12

0 PCT 22

0 PCT 21

0 PCT 240 PCT 190 PCT 17

0 PCT 20

0 PCT 250 PCT 13

0 PCT 19

0 PCT 300 PCT 15

0 PCT 290 PCT 350 PCT 23

0 PCT 140 PCT 16

0 PCT 13

0 PCT 21

0 PCT 360 PCT 270 PCT 25

0 PCT 270 PCT 180 PCT 17

0 PCT 13

P2 AV1P2 AV2P2 AV3

P2 AV2

P2 AV2P2 AV3P2 AV4

P2 AV2P2 AV3

P2 AV2

P2 AV2

P2 AV2P2 AV3P2 AV4

P2 AV3

P2 AV2P2 AV3

P2 AV2

P2 AV2P2 AV3

P2 AV2P2 AV3P2 AV4

P2 AV2P2 AV3

P2 AV3

P2 AV3

P2 AV2P2 AV3P2 AV4

P2 AV2P2 AV3P2 AV4

P2 AV3

.16

.03

.03

.08

. 06-. 03- .03

.06-. 14

-. 17

-. 08

- .05- .14- .11

-. 13

.26-. 11

.12

.08

.16

.08

.00

.00

.13-. 16

-. 08

.03

.03- .03-. 03

.08

.08

.00

.00

TEH TECTEH TECTEH TEC

TEH TEC

TEH TECTEH TECTEH TEC

TEH TEC

TEH TEC

TEH TEC

TEH TEC

TEH TECTEH TECTEH TEC

TEH TEC

TEH TECTEH TEC

TEH TEC

TEH TECTEH TEC

TEH TECTEH TECTEH TEC

TEH TEC

TEN TEC

TEH TEC

TEH TEC

TEH TECTEH TECTEH TEC

TEH TECTEH TECTEH TEC

TEH TEC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.618 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC

.610 TBATC.610 TBATC

.610 TBATC

12 CI12 CI12 Cf

12 Cl1

12 CI12 CI12 Cl

I

10 Cl10 CI

I8 cI

12 CI

I12 CI

12 CI

I

12 Cf12 CI

Is I

12 Cl

12 CI12 CI

12 ClI

12 Cl12 Cl

18C

12 CI10 CI12 Cl

12 CI12 Cl

10 Cis CI

10 CI

i0 CII@ I

12 Cl

12 CI

is Cl

28 29 .84 0 PCT 13 P2 AV2 -. 08 LEH TIL; .19 ITAIT is Il28 29 1.14 0 PCT 17 P2 AV3 .05 TEH TEC .610 TBATC 10 Cf

36 29 .70 0 PCT 12 P2 AV2 .00 TEH TEC .610 TBATC 10 Cf

36 29 .91 0 PCT 14 P2 AV3 -. 10 TEH TEC .610 TBATC 18 Cf

43 29 1.26 0 PCT 18 P2 AV .00 TEN TEC .610 TBATC 10 CI43 29 4.81 0 PCT 36 P2 AV2 .11 TEH TEC .610 TBATC 10 Cf43 29 .67 0 PCT 11 P2 AV3 -. 08 TEN TEC .610 TBATC 18 Cf

45 29 .79 0 PCT 13 P2 AV4 -. 08 TEH TEC .610 TBATC 10 CI

34 30 .81 0 PCT 14 P2 AVi .09 TEH TEC .610 TBATC 12 CI34 30 1.82 0 PCT 24 P2 AV3 .17 TEH TEC .610 TBATC 12 Cf

42 30 1.94 0 PCT 25 P2 AVi .08 TEH TEC .618 TBATC 12 Cl42 30 2.10 0 PCT 26 P2 AV2 -. 03 TEH TEC .610 TBATC 12 CI42 30 3.93 0 PCT 36 P2 AV3 .00 TEH TEC .610 TBATC 12 Cf

27 31 .53 0 PCT 9 P2 AV3 -. 17 TEN TEC .610 TBATC 10 CI27 31 1.46 0 PCT 20 P2 AV4 .06 TEH TEC .610 TBATC 10 Cf

28 32 1.24 0 PCT 19 P2 AV2 .00 TEH TEC .610 TBATC 8 Cf

31 32 .92 0 PCT 15 P2 AV2 .18 TEH TEC .610 TBATC 8 Cf

32 32 1.48 0 PCT 21 P2 AV2 .00 TEH TEC .610 TBATC 8 Cf

32 32 2.49 0 PCT 28 P2 AV3 .00 TEH TEC .610 TBATC 8 Cf..... -- - - -.... --- -.. . .- -- - ---- - --- ---- - --- -- ....- -- - - - -.. .------ -- -- ------ -------- - - -- -- . .- + .. .+ . .+. .+- . .+- . . + -. .- - " -

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LISl""I+. . .. . . . .. .+. . .. .+. . .---------... ...---.---- . - .. . . . +.. . . . .. . . .-- -- ---+--+ - ++----..---- + -- -..--+-. -• . .+- . . .

2

Page 132: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B SG B - INDICATIONS WITH PERCENT THROUGHNALL

Byron 2 82R14 CBE 20081001 10/18/2008 16:55:33

+.. .+ .÷ ...... +-- ... . -- .......-- - +....-.-----. .-- .---- +- . . .------- +- .. ÷ .- ÷

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+----- . . . . . . . ÷ . . . . .-----.. . .-.. .. -. .-+...--. .- -. . ..-...-.- ÷ ....-.-+ - - ÷

32 32 1.04 0 PCT 16 P2 AV4 .00 TEN TEC .610 TBATC 8 CI

: 45 32 1.22 0 PCT 19 P2 AV2 .00 TEN TEC .610 TBATC 845 32 2.02 0 PCT 25 P2 AV3 -. 03 TEN TEC .610 TBATC 8

34 33 1.47 0 PCT 20 P2 AV2 .23 TEN TEC .610 TBATC 6 CI

39 33 .52 0 PCT 10 P2 AV3 -. 11 TEH TEC .610 TBATC 6 Cl39 33 1.06 0 PCT 16 P2 AV4 .22 TEN TEC .610 TBATC 6 CI

31 34 .92 0 PCT 15 P2 AV3 .00 TEN TEC .610 TBATC 8 Cl

40 34 1.97 0 PCT 25 P2 AVZ -. 03 TEN TEC .610 TBATC 8 CI

42 34 1.18 0 PCT 17 P2 AV2 .05 TEN TEC .610 TBATC 8 CI

32 36 1.24 0 PCT 18 P2 AV3 .00 TEN TEC .610 TBATC 8 CI

34 36 1.23 0 PCT 18 P2 AV2 .05 TEN TEC .610 TBATC 8 Cl

42 36 1.62 0 PCT 22 P2 AV2 .24 TEN TEC .610 TBATC 8 CI

45 36 2.26 0 PCT 26 P2 AV3 .00 TEN TEC .610 TBATC 8 Ct45 36 2.77 0 PCT 30 P2 AV4 .00 TEN TEC .610 TBATC 8 CI

28 37 .97 0 PCT 16 P2 AV3 .08 TEN TEC .610 TBATC 6 CI

I 42 37 .61 0 PCT 11 P2 AV1 -. 08 TEN TEC .610 TBATC 6 CI42 37 2.01 0 PCT 25 P2 AV2 .21 TEN TEC .610 TBATC 6 Cl42 37 2.28 0 PCT 27 P2 AV3 .13 TEN TEC .610 TBATC 6 Cl

39 38 1.24 0 PCT 19 P2 AV2 -. 03 TEN TEC .610 TBATC 8 CI39 38 .83 0 PCT 15 P2 AV3 -. 05 TEN TEC .610 TBATC 8 CI

10 39 .77 0 PCT 13 P2 AV4 .33 TEN TEC .610 TBATC 22 CI

32 39 1.00 0 PCT 16 P2 AV3 .13 TEN TEC .610 TBATC 6 CI32 39 .92 0 PCT 15 P2 AV4 .13 TEN TEC .610 TBATC 6 Ci

34 39 1.21 0 PCT I8 P2 AV2 .37 TEN TEC .610 TBATC 6

39 39 1.48 0 PCT 21 P2 AV2 .21 TEN TEC .610 TBATC 6

42 39 .85 0 PCT 14 P2 AV3 .16 TEN TEC .610 TBATC 6 CI

32 40 1.13 0 PCT 18 P2 AV2 .05 TEN TEC .610 TBATC 8 CI32 40 1.26 0 PCT 19 P2 AV3 .08 TEN TEC .610 TBATC 8 CI32 40 1.07 0 PCT 16 P2 AV4 .00 TEN TEC .610 TBATC 8 CI

40 41 .91 0 PCT 15 P2 AV2 .03 TEN TEC .610 TBATC 6 CI

41 43 2.01 0 PCT 26 P2 AV1 .00 TEN TEC .610 TBATC 32 CI41 43 2.62 0 PCT 30 P2 AV2 .24 TEN TEC .610 TBATC 32 CI41 43 3.87 0 PCT 36 P2 AV3 .00 TEN TEC .610 TBATC 32 CI

42 44 .90 0 PCT 15 P2 AV2 .00 TEN TEC .610 TBATC 30 CI42 44 3.24 0 PCT 33 P2 AV3 .00 TEN TEC .610 TBATC 30 CI42 44 1.47 0 PCT 21 P2 AV4 .00 TEN TEC .610 TBATC 30 CI

40 45 .90 0 PCT 16 P2 AV2 .19 TEN TEC .610 TBATC 32 Cl

44 45 1.00 0 PCT 17 P2 AV2 .16 TEN TEC .610 TBATC 34 CI44 45 1.74 0 PCT 24 P2 AV3 .21 TEN TEC .610 TBATC 34 CI

46 50 1.67 0 PCT 22 P6 07C .15 TEC TEN .610 TBATC 101 HI

48 50 3.72 0 PCT 39 P6 07C .13 TEC TEN .610 TBATC 101 HII

49 52 2.13 0 PCT 27 P6 07C .28 TEC TEN .610 TBATC 101 HII

48 53 2.44 0 PCT 30 P6 07C .41 TEC TEN .610 TBATC 101 HII

40 54 1.38 0 PCT 19 P2 AV2 .00 TEN TEC .610 TBATC 36 CI40 54 1.04 0 PCT 16 P2 AV3 .00 TEN TEC .610 TBATC 36 Cl

I48 54 2.54 0 PCT 31 P6 07C .20 TEC TEN .610 TBATC 101 HI

48 55 4.70 0 PCT 45 P6 07C -. 03 TEC TEN .610 TBATC 101

47 56 1.06 0 PCT 16 P2 AVi -. 08 TEH TEC .610 TBATC 6

I ROW COL VOLTS DEG INO PER CNN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ .... ++ .... ÷_ ÷----.---- +------- ---+ . . -..+. . -.. . . . . . .----.......- -.--.-.- . . . ..---- . ..----+ -- -. ..--- + -.. ... +. .. ..- ÷

3

Page 133: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B SG B - INDICATIONS WITH PERCENT THROUGHWALL

Byron 2 B2R14 CBE 20081001 10/18/2008 16:55:33

- ---------------- - ------- --------- - -- .-- -- ------ ---.--- ---- - - - -- - -- - ----------- - + -- ------- --------------

I ROW COL VOLTS DEG IND PER CNN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENOT POIA PTYPE CAL LI---------------------- --+-----------+-----+-----+-----+------+---+--+-------+------+ - ------

lei

47 56 2.78 0 PCT 30 P2 AV2

5959

59

63

686868

69

71717171

72

72

75

767676

77

7878

7979

79

83

83

83

838383

8484

85

858585

86

8686

87

87878787

88

88

89

898989

1.14. 92

2.75

2.79

.681.531.46

.66

.751.412.93.76

1.34

.93

,30

1.85.93.81

1.31

1.44.82

.461.14

1.18

.91

.93

.90

1.731.691.46

1.121.04

1.08

1.863.701.76

1.39

2.481.58

.65

1,672.711.58

.96

1.39

1.23

.60

3.083.441.68

0 PCT0 PCT

0 PCT

0 PCT

0 PCT6 PCT6 PCT

* PCT

* PCT0 PCT0 PCT0 PCT

0 PCT0 PCT

6 PCT

0 PCT0 PCT0 PCT

0 PCT

0 PCT0 PCT

0 PCT0 PCT

0 PCT

0 PCT

0 PCT

0 PCT

0 PCT0 PCT0 PCT

0 PCT0 PCT

0 PCT

0 PCT0 PCT0 PCT

0 PCT

0 PCT0 PCT

0 PCT

0 PCT0 PCT0 PCT0 PCT

0 PCT

0 PCT

0 PCT

0 PCT0 PCT0 PCT

1715

33

33

112120

10

15223215

2015

8

241513

21

2114

917

20

17

17

17

252423

1816

17

243523

20

2823

12

23302215

20

19

11

313322

P2 AV3P2 AV4

P6 07C

P6 07C

P2 AVIP2 AV2P2 AV3

P2 AV3

P2 AV2P2 AV2

P2 AV3P2 AV4

P2 AV3

P2 AV4

P5 02C

P2 AV2P2 AV3P2 AV4

P2 AV3

P2 AV3P2 AV4

P2 AV2P2 AV3

P2 AV3

P2 AV4

P2 AV2

P2 AV2

P2 AV2P2 AV3P2 AV4

P2 AV2P2 AV3

P2 AV2

P2 AV2P2 AV3P2 AV4

P2 AV2

P2 AV2P2 AV3

P2 AV2

P2 AViP2 AV2P2 AV3P2 AV4

P2 AV3

P2 AV2

P2 AV2

P2 AVIP2 AV2P2 AV3

• 00

-. 08.00

• 00

.13

.00

.05•16

.00

.60

.00.806.00

.00

.03

.40

.03-. 05-. '03

.00

.00-. 08

.06

.00

.20

-. 10

.13

.00

.00

.00

.00

-,.11

.08

.14

.05-. 08

.00

.00

.18

.00

.00

- .03.05

-. 05

.00

-. 08

• 00

.05

.03- .03-. 08

TEN TEC .616 TBATC 36 CII

TEN TEC .616 SBACC 52 ClTEN TEC .610 SBACC 52 CI

ITEC TEC .610 TBATC 101 HI

ITEC TEC .610 TBATC 101 "I

TEN TEC .610 TBATC 44 CITEN TEC .610 SBACC 46 Cl

TEN TEC .610 SBACC 46 CI

TEN TEC .610 SBACC 42 CI

TEC TEC .610 TBATC 48 CH

TEN TEC .610 T8ACC 42 CITEN TEC .610 TBATC 44 CITEN TEC .610 TBATC 44 CI

TEN TEC .610 TBATC 44 CI

TEN TEC .610 SBACC 42 CI

TEN TEC .610 TBATC 40 CITEN TEC .610 SBACC 42 CfTEN TEC .610 SBACC 42 CJ

I

TEN TEC .610 TBATC 44 CI

I

TEN TEC .610 SBACC 42 CI

TEN TEC .610 SBACC 42 CJ

TEN TEC .610 TBATC 42 CI

I

TEN TEC .610 TBATC 44 ClI

TEN TEC .610 S8ACC 42 CI

TEN TEC .610 SBACC 42 C)I

TEN TEC .610 TBATC 40 CI

TEN TEC .616 TBATC 40 CI

I

TEN TEC .610 TBATC 44 CI

I

TEN TEC .610 TBATC 44 CITEN TEC .616 TBATC 46 CITEN TEC .610 TBATC 44 CI

ITEN TEC .610 TBATC 46 CI

TEN TEC .618 SBACC 52 CI

I

TEN TEC .610 TBATC 45 ClTEH TEC .610 TBATC 44 ClTEN TEC .610 TBATC' 44 Cl

TEN TEC .610 SBACC 52 CI

TEN TEC .610 SBACC 42 CI

TEN TEC .610 SBACC 42 Cl

TEH TEC .610 TBATC 40 Cl

TEN TEC .619 TBATC 40 ClTEH TEC .610 TBATC 49 ClTEH TEC .619 TBATC 49 Cl

ITEN TEC .610 SBACC 38 CI

ITEH TEC .610 SBACC * 38 CJ

ITEN TEC .610 SBACC 42 CJ

ITEH TEC .610 SBACC 42 ClTEH TEC .610 SBACC 42 Cl

TEN TEC .610 SBACC 38 Cl

I

---- -------- --- ------- --+----------+----+-----+..--+---+---+--+ - + ------ ,. ---+-----+ - - +-------

I ROW COL VOLTS DEG IND PER CNN LOCN INCHI INCH2 I CRLEN CRWID CEG BEGT ENDT POIA PTYPE CAL LIS+----------------------------+- - --- +--- +-+ ---- -. --- - - +--

4

Page 134: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B SG B - INDICATIONS WITH PERCENT THROUGHWALL

Byron 2 82R14 CBE 20081001 10/18/2008 16:55:33

-- - - - - - - - --- --------------------------------------------- -.......-- -.......-- -- +--------+ ---- --------- ---+- - ------- --

f ROW COL VOLTS DEG INO PER CNN LOCN INCHI INCH2 I CRLEN CRWIO CEG BEGT ENOT POIA PTYPE CAL LI÷ . .÷. . . . . . ÷. . . .÷. . . . . .÷. . . . .÷..---------------.....-."-- .......-....... ..-- - -.----.. .. ÷ ..-- - -" --------- -- "-

I 45 89 .76 0 PCT 13 P2 AVI .11 TEN TEC .619 SBACC 52 CII 45 89 2.96 0 PCT 31 P2 AV2 .00 TEN TEC .610 SBACC 52 CI_I 45 89 1.56 0 PCT 21 P2 AV3 .05 TEN TEC .610 SBACC 52

36 90 .89 0 PCT 15 P2 AV2 .00 TEH TEC .610 ZBAZC 54 CI36 90 .87 0 PCT 15 P2 AV3 -. 21 TEN TEC .610 ZBAZC 54 CI

37 90 .66 0 PCT 17 P2 AV2 .27 TEH TEC .610 ZBAZC 54 Cl

44 90 2.88 0 PCT 30 P2 AV3 .00 TEN TEC .610 ZBAZC 54 Cl44 90 1.15 0 PCT 18 P2 AV4 -. 03 TEN TEC .610 ZBAZC 54 Cl

15 91 .20 0 PCT 5 P5 06C -. 15 TEC TEN .610 TBATC 101 HI

25 91 .87 0 PCT 14 P2 AV3 .07 TEN TEC .610 SBACC 52 CI

40 91 1.50 0 PCT 21 P2 AV2 .00 TEN TEC .610 SBACC 52 CI

42 91 .61 0 PCT 11 P2 AV2 -. 13 TEN TEC .610 SBACC 52 CI42 91 .54 0 PCT 10 P2 AV3 -. 05 TEN TEC .610 SBACC 52 CI42 91 .83 0 PCT 14 P2 AV4 .14 TEN TEC .610 SBACC 52 CI

43 91 1.66 0 PCT 22 P2 AV3 .00 TEN TEC .610 SBACC 52 CI

I37 92 3.48 0 PCT 33 P2 AV2 .00 TEN TEC .610 ZBAZC 54 CI

I38 92 1.03 0 PCT 17 P2 AV2 -. 11 TEN TEC .610 ZBAZC 54 C~1 38 92 .91 0 PCT 15 P2 AV3 .11 TEN TEC .610 ZBAZC 54 Cl

39 92 1.45 0 PCT 21 P2 AV4 .00 TEN TEC .610 ZBAZC 54 CI

1 40 92 2.37 0 PCT 28 P2 AV3 .05 TEN TEC .610 ZBAZC 54 Cl

I40 92 .87 0 PCT 15 P2 AV4 .03 TEN TEC .610 ZBAZC 54 C~

1 43 92 1.43 0 PCT 21 P2 AV3 .03 TEN TEC .610 ZBAZC 54 Cl

37 93 .89 0 PCT 14 P2 AV2 .10 TEN TEC .610 SBACC 52 CI

I37 93 2.57 0 PCT 28 P2 AV3 - .05 TEN TEC .610 SBACC 52 CI

I38 93 .46 .0 PCT 9 P2 AV1 .03 TEN TEC .610 SBACC 52I38 93 .94 0 PCT 15 P2 AV2 .08 TEN TEC .610 SBACC 52

38 93 1.06 0 PCT 16 P2 AV3 .03 TEN TEC .610 SBACC 52

I38 93 .84 0 PCT 14 P2 AV4 -. 08 TEN TEC .610 SBACC 52 CI

I

39 93 1.38 0 PCT 18 P2 AV3 .03' TEN TEC .610 SBACC 52 CI39 93 .94 0 PCT 15 P2 AV4 .08 TEN TEC .610 SBACC 52 CI

I

41 93 1.45 0 PCT 20 P2 AV2 -. 08 TEN TEC .610 SBACC 52 CIS41 93 2.16 0 PCT 26 P2 AV3 .00 TEN TEC .610 S8ACC 52 CI41 93 1.66 0 PCT 22 P2 AV4 .03 TEN TEC .610 SBACC 52 Cl

I

1 43 93 .74 0 PCT 12 P2 AV4 -. 27 TEN TEC .610 SBACC 52 CI

I36 94 1.32 0 PCT 20 P2 AV2 .00 TEN TEC .610 ZBAZC 54 CI

37 94 1.92 0 PCT 17 P2 AV2 .00 TEN TEC .610 ZBAZC 54 C

0 39 94 1.16 0 PCT 18 P2 AV2 .00 TEN TEC .610 ZBAZC 54 C39 94 2.88 0 PCT 31 P2 AV3 .00 TEN TEC .610 ZBAZC 54 CI39 94 1.32 0 PCT 19 P2 AV4 .00 TEN TEC .610 ZBAZC 54 Cl

I40 94 3.06 0 PCT 32 P2 AV2 .00 TEN TEC .610 ZBAZC 54 CI

38 95 3.48 0 PCT 34 P2 AVi .00 TEN TEC 610 SBACC 58 CI138 95 1.46 0 PCT 21 P2 AV2 .24 TEN TEC .610 SBACC 58 CI38 95 1.43 0 PCT 21 P2 AV3 .03 TEN TEC .610 SBACC 58 Cl38 95 1.69 0 PCT 23 P2 AV4 .00 TEN TEC .610 SBACC 58 CI

I

39 95 1.60 0 PCT 22 P2 AV2 -. 27 TEN TEC .610 SBACC 58 CI39 95 1.54 0 PCT 22 P2 AV3 .05 TEN TEC .610 SBACC 58 Cl39 95 1.31 0 PCT 20 P2 AV4 .06 TEN TEC .610 SBACC 58 CI

I

40 95 .69 0 PCT 13 P2 AV3 .00 TEN TEC .610 SBACC 58 CI40 95 .82 0 PCT 14 P2 AV4 -. 08 TEN TEC .610 SBACC 58 Cl

I

41 95 3.01 0 PCT 32 P2 AV2 .00 TEN TEC .610 SBACC 58 CI

41 95 2.42 0 PCT 28 P2 AV3 -. 09 TEN TEC .610 SBACC 58

35 96 1.74 0 PCT 23 P2 AV3 .03 TEN TEC .610 ZBAZC 569VOLTS DEG IND PER CNN LOCN INCHC INCH2 CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI

4- 95. . . .. . . . . . . . . . ..-. ........ ÷ .... 13 .... .... TE- ...... ......1- - ...... --

5

Page 135: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B SG B - INDICATIONS WITH PERCENT THROUGHWALL

Byron 2 B2R14 CBE 20081001 10/18/2008 16:55:33

4 ..... ... . . .- .... ..----- -.. ......+---.---.--- + .--- + ....- ..... ... ...----+ - ..- .---- -- .-... + ......- +- • ....

I ROW COL VOLTS DEG IND PER CNN LOCH INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL Li+...- ..- .... ...-.. ..---- - -.-..----.----.---- .-- .- +... ...---- -- +-- +- ..- .... •.. .. ..-----....--.----- ....- +.....---.+ "

* I

.1

- I

38 9638 9638 9638 96

33 97

35 9735 9735 97

29 98

32 98

33 9833 98

35 9835 9835 98

28 99

30 99

32 99

33 9933 9933 9933 99

34 9934 99

35 9935 99

34 10034 100

35 10035 10035 10.

30 101

35 10135 101

28 102

30 10230 102

31 102

34 102

25 103

28 10328 103

25 104

28 10428 104

26 105

27 10527 10527 10527 105

29 10529 105

2.401. 791.062.43

2.54

.813.36

.47

.92

1.29

.871.47

1.60,66

1,63

.94

1.22

.74

1.161.821.54

.67

.78

.60

1.071.19

1.24.76

1.95.95

1.76

1.24

3.552.26

1.51

2.18.86

1.00

.93

1.43

.911.38

1.01

1.751.42

1.98

.951.871.09

.73

1.181.48

0 PCT0 PCT0 PCT0 PCT

0 PCT

0 PCT0 PCT0 PCT

6 PCT

0 PCT

6 PCT0 PCT

0 PCT6 PCT0 PCT

0 PCT

0 PCT

0 PCT

0 PCT0 PCT0 PCT6 PCT

0 PCT0 PCT

0 PCT0 PCT

0 PCT0 PCT

0 PCT0 PCT0 PCT

0 PCT

0 PCT0 PCT

0 PCT

0 PCT0 PCT

0 PCT

0 PCT

0 PCT

0 PCT0 PCT

0 PCT

0 PCT0 PCT

0 PCT

0 PCT0 PCT0 PCT0 PCT

0 PCT

27231628

28

1333

9

15

19

1521

221723

15

18

12

17232112

1311

1618

1916

251624

19

3427

22

2715

16

16

20

1520

17

2421

25

15241712

18

P2 AVIP2 AV2P2 AV3P2 AV4

P2 AV3

P2 AV2P2 AV3P2 AV4

P2 AV2

P2 AV3

P2 AV2P2 AV3

P2 AVIP2 AV3P2 AV4

P2 AV2

P2 AV3

P2 AV3

P2 AVlP2 AV2P2 AV3P2 AV4

P2 AV3P2 AV4

P2 AV3P2 AV4

P2 AV3P2 AV4

P2 AV2P2 AV3P2 AV4

P2 AVI

P2 AV3P2 AV4

P2 AV3

P2 AV2P2 AV3

P2 AV3

P2 AV4

P2 AV2

P2 AVIP2 AV3

P2 AV2

P2 AV2P2 AV3

P2 AV3

P2 AVIP2 AV2P2 AV3P2 AV4

P2 AV2

-. 06- .03.05

-. 08

.00

- .11.00

-. 14

.00

- .03

.00

.00

.00

.08-. 08

.03

.05

-. 08

.08- .11.08

- .08

- .03.03

.03

.00

.03

.00

-. 17.06.00

.00

.00-. 14

- .03

-. 08- .11

- .16

.30

.05

.00-. 05

.11

,35- .11

.05

.09-. 14

.06

.00

.28- .08

ITEN TEC .610 ZBAZC 56 CiTEH TEC .610 ZBAZC 56 CiTEN TEC .610 ZBAZC 56 CiTEN TEC .610 ZBAZC 56 Ci

ITEH TEC .610 SBACC 52 CI

ITEH TEC .610 SBACC 52 ClTEN TEC .610 SBACC 52 CiTEN TEC .610 SBACC 52 Cl

ITEN TEC .610 ZBAZC 54 CI

TEN TEC .610 ZBAZC 54 ClI

TEN TEC .610 ZBAZC 54 ClTEH TEC .610 ZBAZC 54 Ci

ITEH TEC .610 ZBAZC 54 CITEN TEC .610 ZBAZC 54 CiTEN TEC .610 ZBAZC 54 Ci

TEN TEC .616 S8ACC 52 Ci

TEN TEC .610 SBACC 52 Ci

TEN TEC .610 SBACC 52 Ci

TEN TEC .610 SBACC 52 CiTEN TEC .610 SBACC 52 CITEN TEC .610 SBACC 52 Ci

TEN TEC .616 SBACC 52 Ci

I

TEN TEC .610 SBACC 52 CITEN TEC .610 SBACC 52 CI

TEN TEC .618 ZBAZC 54 CITEN TEC .616 SBACC 54 CITEN TEC .610 SBACC 52 CITEN TEC .610 SBACC 52 Ci

ITEN TEC .610 SBACC 58 CiTEN TEC .610 SBACC 58 Ci

I

TEN TEC .610 ZBAZC 54 Ci

TEN TEC .618 SBACC 58 Ci

TEN TEC 610 ZBAZC 54 CiI

TEN TEC 610 ZBAZC 56 CI

TEN TEC 610 SBACC 58 CiTEN TEC .610 SBACC 58 Ci

I

TEN TEC .610 SBACC 58 Ci

I

TEN TEC .616 SBACC 58 CiTEN TEC .610 SBACC 58 Ci

I

TEN TEC .610 SBACC 58 Ci

I

TEN TEC .610 SBACC 58 CI

I

TEN TEC .610 ZBAZC 56 CI

I

TEN TEC .610 ZBAZC 56 CiTEN TEC .610 ZBAZC 56 Ci

TEN TEC .610 SBACC 58 Cl

TEN TEC .610 SBACC 58 ClTEH TEC .610 SBACC 58 Cl

TEH TEC .610 ZBAZC 56 Cl

TEH TEC .610 ZBAZC 56 ClTEH TEC .610 ZBAZC 56 Cl

TEH TEC .610 ZBAZC 56 ClTEH TEC .610 ZBAZC 56 Cl

0 PCT 21 P2 AV4.... .... ......... + .... .... + .... + .... + 4....- .. .. .. + ... .. . . .. .. . .. .. . . ..---+ --- + -- .-- - + . --- ......- +.- .. .. +......--- -

I ROW COL VOLTS DEG IND PER CNN LOCH INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL Lj--. .- . .-- . . ..--. .-...-. .- . .-. .-. . . ..-. . . ..-. l-. . ..-.--------------------++ -- ....... - -....- + +...- 4 . + 4 . +-... . .. .+ -. .+- .

6

Page 136: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B SG B - INDICATIONS WITH PERCENT THROUGHWALL

Byron 2 B2R14 CBE 20081001 10/18/2008 16:55:33

÷. . ÷. . " . ..-- - -... + ... . .. ÷... . .. .. . .... ... 4" . .... ..----+-.. ..-- -. ..-- -..-- -.. + -.----. --+ .".----+ - +-+.. .". . .- +

ROW COL VOLTS DEG IND PER CNN LOCN INCHI INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL Ll--------------------------------------+---------+.----+-.--+----+-----+-.----+---++ - + - +++"-+- 4.- + -

30 105 2.31 0 PCT 27 P2 AV4 -. 03 TEN TEC .610 ZBAZC 56 C1

3 6T1 23 106 .68 0 PCT 12 P2 AV2 .06 TEN TEC .610 ZBAZC 56

S24 106 .73 0 PCT 12 P2 AV2 .82 TEN TEC .610 ZBAZC 56 CI

25 106 .51 0 PCT 10 P2 AV2 -. 05 TEN TEC .610 SBACC 58 C125 106 .92 0 PCT 16 P2 AV4 .06 TEN TEC .610 SBACC 58 Cf

23 107 .56 0 PCT 11 P2 AV3 .06 TEN TEC .610 SBACC 58 Cf

24 107 .99 0 PCT 16 P2 AV2 .37 TEN TEC .610 ZBAZC 56 C124 107 .63 0 PCT 11 P2 AV3 -. 02 TEN TEC .610 ZBAZC 56 Cf

25 107 1.10 0 PCT 17 P2 AV2 .50 TEN TEC .610 ZBAZC 56 Cf25 107 1.49 0 PCT 21 P2 AV3 - .03 TEN TEC .610 ZBAZC 56 Cf

.1 26 107 .90 0 PCT 15 P2 AV2 .36 TEN TEC .610 ZBAZC 56 Cf

23 108 2.76 0 PCT 30 P2 AV2 -. 02 TEN TEC .610 SBACC 58 C1

23 108 .74 0 PCT 13 P2 AV3 .00 TEN TEC .610 SBACC 58 Cf

24 108 1.85 0 PCT 24 P2, AV4 -. 26 TEN TEC .610 SBACC 58 Cl

25 108 .67 0 PCT 12 P2 AV2 -. 06 TEN TEC .610 ZBAZC 56 Cf25 108 .55 0 PCT 10 P2 AV3 .19 TEN TEC .610 ZBAZC 56 Cf25 108 2.07 0 PCT 25 P2 AV4 -. 11 TEN TEC .610 ZBAZC 56 C)

21 110 .75 0' PCT 13 P2 AV4 .00 TEN TEC .610 ZBAZC 80 Cf..--- . . 4.. . . ... . . . . .4..----------- ..-.--- -÷. .. ÷.. . .. .÷ ... . ..---- ". ...-- -.. ..- -..- .+- + ---- .----+ . " ..----- 4.-.....4...... -

I ROW COL VOLTS DEG IND PER CNN LOCN INCHI INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL Lf

-- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -4-- - - +-+-- - -- +-- - - --------- +-- . .. . .. . .. . ......... 4

Tubes: 185 Records: 3267

Page 137: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B SG B - INDICATIONS WITH I-CODES

Byron 2 B2R14 CBE 20081001 10/18/2008 17:01:08

..... - .... - ... .- ---- + .-------- + ..... .-------- + ...... .- ------ --- +--- - +------RLE-- . + . --- + -÷ . + -. + -- - "-

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ . .÷. . ÷. . . . .÷ . .+. . +. . . . . .÷.-----------+....... ÷ ......... ----+ - - -...- +-.. ... +- ---. ----.. +. .----- +-.. . . . . . .- - ÷

I 7 8 .31 112 DSI P1 05H .93 TEH TEC .610 TBATC 30 CII 7 .07 102 SVI P4 05H .72 05H 05H .610 NPSNM 73 HI

7 8 .26 52 DSI P1 05H .58 TEC TEH .610 TBATC 101 HI

25 20 .59 101 DSI P1 07H -. 47 TEH TEC .610 TBATC 12 CI25 28 .35 45 SVI P4 07H -. 60 07H 07H .610 NPSNH 73 HI25 20 .61 105 DSI P1 07H .05 TEC TEH .610 TBATC 101 HI--------------------------------------+-------,-----+----+----+----+---+--+ - + ------ + - - +-- ----

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI------------------------- +-------+-----+-----+-----+-----t----+---+--+ - + - ---- + -----+ ------ - +---------

Tubes: 2 Records: 61

Page 138: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B SG B - AXIAL INDICATIONS WITHIN THE TUBESHEET

Byron 2 B2R14 CBE 20081001 10/18/2008 17:07:36

-- .. ÷ .... - ......... - .... --- .... - .... - .... - .... --- .. - -- - - -- - --- -- --- - - - - -+ .... ÷ .... ÷ ...... ÷ .. .-.-- -- -- --

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL Lj+..--- . . . . .÷-----. .. -.---.----.--- ...--- + . .... ÷........ .- ÷ ... ÷.... .. + .. ÷...÷.-------....--...--..-.+ - ...... --

2 51 2.62 33 SAS 0 2 TEN .03 .15 .33 50 TEN TSH

59

69

70

70

70

72

73

75

78

78

82

84

86

86

89

89

90

90

93

95

97

98

100

le1

2.70

3.14

2.99

2.70

5.14

3.79

3.60

1.77

2.85

2.98

3.06

3.88

1.63

2.08

1.71

4.06

4.74

.97

3.39

1.48

1.07

1.65

2.88

.92

35 SAS

28 SAS

21 SAS

35 SAS

34 HAS

33 SAS

31 SAS

26 SAS

23 SAS

31 SAS

30 SAS

30 SAS

28 SAS

12 WAS

23 SAS

30 SAS

28 SAS

31 SAS

32 SAS

25 SAS

43 SAS

21 SAS

26 SAS

33 SAS

2 TEN

2 TEH

2 TEH

2 TEN

2 TEN

2 TEN

2 TEN

2 TEN

2 TEN

2 TEN

2 TEN

2 TEN

2 TEH

2 TEN

2 TEN

2 TEN

2 TEN

2 TEN

2 TEN

2 TEN

2 TEN

2 TEN

2 TEN

2 TEN

.19

.12

.12

.08

.15

.14

.10

.06

.13

.13

.09

.09

.13

.07

.10

.15

.11

.06

.16

.12

.15

.05

.10

.13

.09

.12

.16

.16

.14

.16

.12

.09

.09

.13

.16

.22

.19

.12

.12

.15

.19

.15

16

.19

.15

.12

.12

.16

.12

.39

.25

.57

.32

.33

.37

.26

.18

.31

.35

.23

.39

.32

31

.20

.18

.21

.21

.29

.33

.19

.18

.44

.34

59 TEN TSH

39 TEN TEN

87 TEN TEN

48 TEN TEN

50 TEN TEN

56 TEN TEN

40 TEN TSH

27 TEN TEN

47 TEN TEN

53 TEN TEN

35 TEN TSH

59 TEH TEN

48 TEN TEN

47 TEN TEN

31 TEN TSH

27 TEN TSH

32 TEN TSH

32 TEN TSH

45 TEN TEN

50 TEN TEN

29 TEN TSH

27 TEN TSH

67 TEN TEN

51 TEN TEN

.610 NPSNM 9 HN

.610 NPSNN 45 HI

.610 NPSNM 51 NI

.610 NPSNM 51 HI

.610 NPSNM 89 NI

.610 NPSNM 51 HN

.610 NPSNM 53 NH

.610 NPSNM 49 NH

.610 NPSNM 49 HN

.610 NPSNM 51 NH

.610 NPSNM 51 HN

.610 NPSNM 13 Nj

.610 NPSNM 57 HN

.610 NPSNM 61 Nj

.610 NPSNM 61 Nj

.610 NPSNM 19 NH

.610 NPSNM 13 Nj

.610 NPSNM 19 HN

.610 NPSNM 17 Nj

.610 NPSNM 59 HI

.610 NPSNM 61 HN

I

.616 NPSNM 19 Nj

.610 NPSNM 19 HI

.610 NPSNM 63 HI

1

.610 NPSNM 57 HI

1

•.610 NPSNM 61 HI

9 105 2.28 32 SAS 0 2 TEN .12 .46 71 TEN TEN--- - - - ------ --- -- - -- - - --- -- - - -- -+ ----- -- - --- - -+ --- --- ---- - -+ --- + ---- +-- -- .- -- --- +------- --------- - + - +- ---

ROW COL VOLTS DEG INO PER CNN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENOT POIA PTYPE CAL L(---- -------------------- +---------+----+-----+------+----+----+---+--+ - + - ----+ ------+----+ - - +-------

Tubes: 26 Records: 261

Page 139: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

Attachment C.3

2C Steam Generator Inservice Indications

Page 38 of 44

Page 140: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - C SG C - INDICATIONS WITH PERCENT THROUGHWALL

Byron 2 B2R14 CBE 20081001 10/18/2008 16:56:29

- -... - -... -- .... ... -" . . .----- .. - " .- - .--. - ---- ---- -- - -- --- -- -- -- ....... -" .... -- .... -+ .... -" ..... -" ..... -" .. .- - - --- - --

I ROW COL VOLTS DEG IND PER CNN LOCN INCHI INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI" . .. -- ...- .... ...----. ----. ----4 - --- .----- - . .-- - +..... 4" ......... + - - ....... 4-------.. . . ..----+ - . .- -+.". . .-. . . .4-- "

_bI

21

2222

23

2626

262626

27

29

31

3232

3131

33

3838

37

37

26

35

3535

3636

39

3636

39

36

4040

3535

3636

383838

3737

42

3636

353535

36

6 .80 8 PCT 14 P2 AVI

1.331.14

1.66

1.28.77

1.441.852.22

.86

1.85

.86

1.462.00

.99

1.37

1.28

1.721.48

1.27

1.48

1.09

1.07

1.12.88

.882.38

3.28

.951.20

1.26

2.83

3.45.78

1 .121.86

1.391.80

1.981.271.20

1.341.08

1.12

.962.39

.932.191.72

1.37

0 PCT0 PCT

0 PCT

0 PCT0 PCT

0 PCT0 PCT0 PCT

0 PCT

0 PCT

0 PCT

0 PCT0 PCT

0 PCT0 PCT

0 PCT

0 PCT0 PCT

0 PCT0 PCT

0 PCT

0 PCT

8 PCT0 PCT

0 PCT0 PCT

0 PCT

0 PCT0 PCT

0 PCT

0 PCT

0 PCT0 PCT

0 PCT0 PCT

0 PCT0 PCT

0 PCT0 PCT0 PCT

0 PCT0 PCT

0 PCT

0 PCT0 PCT

0 PCT0 PCT8 PCT

0 PCT

P2 AVI

P2 AV4

P2 AV4

P2 AV2P2 AV3

P2 AV2P2 AV3P2 AV4

P2 AV3

P2 AVI

P2 AV3

P2 AV2P2 AV3

P2 AV1P2 AV3

P2 AV3

P2 AV1P2 AV2

P2 AV1P2 AV3

P2 AV3

P2 AV2

P2 AV2P2 AV3

P2 AV2P2 AV3

P2 AV3

P2 AV2P2 AV3

P2 AV2

P2 AV3

P2 AV2P2 AV3

PZ AVIP2 AV3

P2 AV2P2 AV3

P2 AVIP2 AV2P2 AV3

P2 AV2P2 AV3

P2 AV3

P2 AV1P2 AV3

P2 AVIP2 AV2P2 AV3

P2 AV2

-. 04

.04

.00

.00

• 00

.00

.03

.06

.00

.11

.24

.00

.11.05

.00

.00

.00

- .32- .18

.00

.16

.00

-. 13

.05

.18

- .05.08

- .03

.00.00

.00

.05

- .34.00

.00-. 13

.00-. 13

.22

.11-.44

.18

.18

.08

-. 38.00

.18800

.13

.00

TEN TEC .610 TBATC 26 C1

ITEN TEC .610 TBATC 26 C0TEN TEC .610 TBATC 26 CI

ITEN TEC .610 TBATC 24 CI

ITEN TEC .610 TBATC 24 C0TEN TEC 610 TBATC 24 CI

ITEN TEC .610 TBATC 26 C0TEN TEC 610 TBATC 26 CITEN TEC .610 TBATC 26 CI

ITEN TEC .610 TBATC 26 CI

ITEN TEC .610 TBATC 26 CI

ITEN TEC .610 TBATC 24 CI

ITEN TEC .610 TBATC 26 CITEN TEC .610 TBATC 26 CI

ITEN TEC .610 TBATC 24 CITEN TEC .610 TBATC 24 CI

TEN TEC .610 TBATC 12 CII

TEN TEC .610 TBATC 12 ClTEN TEC .610 TBATC 12 CI

ITEN TEC .610 TBATC 14 ClTEN TEC .618 TBATC 14 Cl

ITEN TEC .610 TBATC 12 CI

ITEN TEC .610 TBATC 12 CI

TEN TEC .610 TBATC 12 CITEN TEC .610 TBATC 14 CI

ITEN TEC .610 TBATC 14 CITEN TEC .610 TBATC 14 Cl

ITEN TEC .610 TBATC 14 C0

ITEN TEC .610 TBATC 12 CITEN TEC .610 TBATC 12 Cl

ITEN TEC .610 TBATC 12 Cl

ITEH TEC .610 TBATC 14 CII

TEH TEC .619 TBATC 14 CITEH TEC .619 TBATC 14 Cl

.TEH TEC .610 TBATC 12 OfTEH TEC .610 TBATC 12 Cl

ITEH TEC .610 TBATC 12 ClTEH TEC .610 TBATC 12 Cl

ITEH TEC .610 TBATC 14 CITEH TEC .619 TBATC 14 Cl

TEN TEC .610 TBATC 14 CII

TEH TEC .610 TBATC 12 ClTEH TEC .619 TBATC 12 Cl

ITEN TEC .610 TBATC 14 Ci

TEH TEC .610 TBATC 14 ClTEH TEC .610 TBATC 14 Cl

I

TEH TEC .610 TBATC 14 Cl

---- --- ------------- +--------+-----+-----+-----+-----+----+---+--+ - + - ----+ ------+----+ - -- -------

I ROW COL VOLTS DEG IND PER CNN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI.. .. . . .. .. .+.... ...----.---- +---- +---- +---- .... + . .. .. . . .. .. . .. .. .. .. . . .----- --- +----....+. .. .. ..----+ - +- .. + - ......

I

Page 141: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - C SG C - INDICATIONS WITH PERCENT THROUGHWALL

Byron 2 B2R14 CBE 20081001 10/18/2008 16:56:29

... ÷.......÷ .. ÷.. .. ÷ .. ÷.. ..---------------- -...--...--- --- .-- ÷. .. ÷ ...-+---.÷..÷.----------+-- ÷ ... ÷----- -..--.....-- +

I ROW COL VOLTS DEG IND PER CNN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT POIA PTYPE CAL LI÷---÷ ÷... .÷.. .--------------+----+-----+-----..÷..÷....----........--.---+-.-..........----.---+...----+ - +- +- . ..... ÷...

38 25 1.30 0 PCT 19 P2 AV1 .05 TEN TEC .610 TBATC 14 C38 25 1.90 0 PCT 24 P2 AV2 .30 TEH TEC .610 TBATC 1438 25 1.34 0 PCT 20 P2 AV3 .20 TEN TEC .610 TBATC 14

39 25 1.37 0 PCT 20 P2 AV3 .13 TEH TEC .610 TATC 14 I39 25 1.37 0 PCT 20 P2 AV2 .13 TEH TEC .610 TBATC 14 CI39 25 1.06 0 PCT 17 P2 AV2 .18 TEH TEC .610 TBATC 14 CI

42 25 2.12 0 PCT 25 P2 AV3 .10 TEH TEC .610 TBATC 14 CI

39 26 .85 0 PCT 16 P2 AV3 -. 22 TEN TEC .610 TBATC 12 CI

*41 26 1.00 0 PCT 18 P2 AV2 .00 TEN TEC .610 TBATC 12 CI41 26 1.23 0 PCT 20 P2 AV3 .05 TEN TEC .610 TBATC 12 CI

I34 27 2.21 0 PCT 27 P2 AV2 .00 TEN TEC .610 TBATC 8 CI

36 27 1.10 0 PCT 18 P2 AV3 .00 TEH TEC .610 TBATC 8 Cl

S39 27 1.07 S PCT 17 P2 AVI. .08 TEH TEC .610 T8ATC 14 CI

41 27 1.37 0 PCT 21 P2 AV2 .00 TEN TEC .610 TBATC 14 Cl

32 28 1.15 0 PCT 17 P2 AV2 .00 TEN TEC .610 TBATC 10 CII32 28 1.44 0 PCT 19 P2 AV3 .00 TEN TEC .610 T8ATC 10 CI

36 28 1.47 0 PCT 20 P2 AV3 .00 TEN TEC .610 TBATC 10 CI

29 29 1.44 0 PCT 20 P2 AV2 - .08 TEN TEC .610 TBATC 8 Cl29 29 1.27 0 PCT 20 P2 AV3 .00 TEN TEC .610 TBATC 8 Cl

34 29 1.10 0 PCT 18 P2 AV2 -.03 TEN TEC .610 TBATC 8 CI34 29 1.29 0 PCT 19 P2 AV3 -. 05 TEN TEC .610 TBATC 8 Cl

I42 29 1.00 0 PCT 17 P2 AVI -.30 TEN TEC .610 TBATC 14 CI42 29. 1.41 0 PCT 20 P2 AV2 .17 TEN TEC .610 TBATC 14 CI42 29 2.47 0 PCT 27 P2 AV3 .10 TEN TEC .610 TBATC 14 Cl

I35 30 2.13 0 PCT 24 P2 AV2 .00 TEN TEC .610 TBATC 10 Cl

I43 30 .89 0 PCT 17 P2 AV3 -.12 TEN TEC .610 TBATC 12

48 31 1.30 0 PCT 20 P2 AVI .21 TEN TEC .610 TBATC 14 CI7 3I

37 34 1.91 0 PCT 15 P2 AV3 -. 03 TEN TEC .610 TBATC 10 CI

83 34 1.41 0 PCT 19 P2 AV3 -. 05 TEN TEC .610 TBATC 8 Cl

428 35 1.170 PCT 19 P2 AV3 -. 305 TEN TEC .610 TBATC 84 CI

428 35 1.11 0 PCT 17 P2 AV4 -.16 TEN TEC .610 TBATC 8 CI

30 35 1.50 0 PCT 21 P2 AV3 .06 TEN TEC .610 TBATC 8 Cl

39 35 3.18 0 PCT 33 P2 AV2 .02 TEN TEC .610 TBATC 8 CI39 35 3.41 0 PCT 34 P2 AV3 .00 TEN TEC .610 TBATC 8 CI

I48 35 .28 0 PCT 7 P5 02C .38 TEC TEN .618 ZBAC 97 NI

I

31 36 1.09 0 PCT 16 P2 AV2 .32 TEN TEC .610 TBATC 6 CII

43 36 1.91 0 PCT 18 P2 AV3 .00 TEN TEC .610 TBATC 8 CI43 39 1.07 0 PCT 19 P2 AV2 .00 TEN TEC .610 TBATC 4 CI

I

23 39 1.17 0 PCT 17 P2 AV3 .05 TEN TEC .610 TBATC 4 CI

I29 40 1.09 0 PCT 17 P2 AV2 -.27 TEN TEC .610 TBATC 6 CI

I

I 31 42 1.04 0 PCT 18 P2 AV2 .00 TEN TEC .610 TBATC 1 CI33 36 .75 0 PCT 15 P2 AV3 .00 TEN TEC .610 TBATC 1 C7

I2948 35 .28 0 PCT 17 P2 V2C .27 TEC TEC .619 ZBATC 96 HI

I31 42 1.04 0 PCT IS P2 AV2 .32 TEH TEC .619 TBATC 16 CI

436 42 .75 0 PCT 15 P2 AV3 -15 TEH TEC .610 TBATC 16 C

29 43 1.52 0 PCT 21 P2 AV4 .00 TEN TEC .610 TBATC 18

------------------------------ +----+-----+-----+-----+-----+----+---+--+ - + - ---- + -----+ -----+ - - +--------

IROW COL VOLTS DEG IND PER CNN LOCN INCHI INCN2 I CRIEN CRWIO CEG BEGT ENDT POXA PTYPE CAL LI------------------------------ +-----+----+-----+-----+-----+----+---+--+ - + - ---- + -----+ -----+ - - +--------

2

Page 142: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - C SG C - INDICATIONS WITH PERCENT THROUGHWALL

Byron 2 BZR14 CBE 20081001 1011812008 16:56:29

÷ - -- -. . .÷ . . .÷ . . . ..-. ..-. .- ÷ . . ..-. . . . . . . . ..- . . ..-. . .+ . . . ..- --- --------- - . . . . ..-- -. . ....-- -. . ..-- - - - --

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENOT POIA PTYPE CAL LI, . .÷.. .÷. . .. . .. . .÷ . .÷.. .÷. . ÷. . ..----------+--.-- . .. .. . . ÷-.. ..- ÷.. .. . . ..--.. -... +- - ----. ... ----- --.. ... +.... ..- ÷

29 44 1.03 9 PCT 18 P2 AV1 .13 TEN TEC .610 TBATC 16 CI29 44 1.19 0 PCT 20 P2 AV2 615 TEN TEC .610 TBATC 16 CI

31 48 .84 0 PCT 16 P2 AV2 .00 TEN TEC .616 TBATC 16. Cl

39 49 1.27 0 PCT 18 P2 AV2 .09 TEN TEC .610 TBATC 18 Cl

33 50 1.14 0 PCT 19 P2 AV3 -. 07 TEN TEC .610 TBATC 16 Ct

37 50 1.55 0 PCT 23 P2 AV2 .00 TEN TEC .616 TBATC 16 CI

48 56 .81 0 PCT 17 P2 AVI 31.23 TEN TEC .610 TBATC 16 CI

38 62 2.25 0 PCT 29 P2 AV2 .13 TEN TEC .610 TBATC 34 Ct38 62 1.30 6 PCT 20 P2 AV3 -. 27 TEN TEC .610 TBATC 34 CI

41 63 1.59 0 PCT 14 P2 AVI .09 TEN TEC .610 TBATC 36 CI41 63 4.43 0 PCT 33 P2 AV2 .13 TEN TEC .610 TBATC 36 CI41 63 2.10 6 PCT 18 P2 AV3 .05 TEN TEC .610 TBATC 36 CI

31 64 .67 0 PCT 14 P2 AV2 .13 TEN TEC .610 TBATC 4 C)

49 65 1.39 0 PCT 18 P6 07C -. 41 TEC TEN .616 ZBAZC 97 HII

49 70 3.47 0 PCT 38 P6 07C -. 08 TEC TEN .616 ZBAZC 97 HII

32 73 1.07 0 PCT 15 P2 AV3 .21 TEN TEC .616 TBATC 40 CI

49 73 .58 0 PCT 27 P4 07C -. 43 .06 1.18 180 07C 07C .610 NPSNM 104 CI32 74 1.46 0 PCT 18 P2 AV3 .16 TEN TEC .610 TBATC 46 CI

32 79 .88 0 PCT 16 P2 AV3 -. 11 TEN TEC .610 TBATC 44 Cl

41 79 1.12 0 PCT 19 P2 AV3 .13 TEN TEC .610 TBATC 44 CII36 86 .92 0 PCT 16 P2 AVi -. 19 TEN TEC .610 ZBAZC 66 CI36 80 1.24 0 PCT 26 P2 AV3 -. 08 TEN TEC .610 ZBAZC 66 CI33 81 1.61 0 PCT 17 P2 AV3 .08 TEN TEC .610 TBATC 44 CI

I36 81 1.30 0 PCT 26 P2 AV3 .16 TEN TEC .610 TBATC 44 CI

39 81 .83 6 PCT 15 P2 AV2 .13 TEN TEC .610 TBATC 44 CI39 81 .74 0 PCT 14 P2 AV3 -. 05 TEN TEC .610 TBATC 44 Cl

31 82 1.06 6 PCT 18 P2 AV3 .08 TEN TEC .610 ZBAZC 66 CI

32 82 1.65 6 PCT 23 P2 AV2 .00 TEN TEC .610 ZBAZC 66 Cj

35 82 1.18 0 PCT 19 P2 AV2 .06 TEN TEC .610 ZBAZC 66 Cj35 82 1.51 0 PCT 22 P2 AV3 -. 10 TEN TEC .610 ZBAZC 66 CI

S32 83 .74 6 PCT 14 P2 AVI .66 TEN TEC .610 TBATC 44 CI32 83 1.76 0 PCT 24 P2 AV3 .18 TEN TEC .610 TBATC 44 Cl

35 83 1.76 0 PCT 17 P2 AV3 .03 TEN TEC .610 TBATC 44 Cl

39 83 1.8 0 PCT 25 P2 AV2 .29 TEN TEC .610 TBATC 44 CI39 83 .97 0 PCT 17 P2 AV3 .08 TEN TEC .610 TBATC 44 Cl39 83 .97 6 PCT 17 P2 AV4 .25 TEN TEC .610 TBATC 44 Cl

I46 83 2.56 6) PCT 36 *P2 AV2 -.05 TEN TEC .610 TBATC 44 Cl34 83 1.62 6 PCT 23 P2 AV3 -.26 TEN TEC .610 TBATC 44 CI

49 83 .89 6 PCT 16 P2 AV4 -. 03 TEN TEC .616 TBATC 44 Cl

28 84 1.61 0 PCT 23 P2 AV3 .05 TEN TEC .610 ZBAZC 66 CI

36 84 1.34 0 PCT 21 P2 AV2 .03 TEN TEC .610 ZBAZC 66 CI

37 84 .89 6 PCT 16 P2 AV2 .07 TEN TEC .610 ZBAZC 66 CI37 84 1.48 6 PCT 22 P2 AV3 -.40 TEN TEC .610 ZBAZC 66 Cj

41 84 .88 6 PCT 16 P2 AV2 .00 TEN TEC .610 ZBAZC 66 Cj41 84 1.27 0 PCT 26 P2 AV3 .00 TEN TEC .610 ZBAZC 66 CI

26 85 1-.49 0 PCT 22 P2 AV2 .06 TEN TEC .610 TBATC 44 CI

36 85 1.30 0 PCT 20 P2 AV2 .16 TEN TEC .610 T1ATC 44 CI--------------------------------------------- ++ + + + +-----+---+--+ - + +-.-- ----+--- - ----+---+--

I ROW COL VOLTS DEG IND PER CNN LOCN INCHI INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LIS....÷ ... .. ..... .. . . .. ... +.... ÷.... .... .... .... .... .. ÷. ..... ÷-. - ---------.... ....- -......-- ......-...-..--

Page 143: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - C SG C - INDICATIONS WITH PERCENT THROUGHUALL

Byron 2 B2R14 CBE 20081001 10/18/2008 16:56:29

S. .. ÷ .. ÷... .. .. + .. ÷- .- - ÷...-- - - - . .... +-.... + ......... ..- --.. .. .+-- - - +----+---- -+... ... ÷. ... . ... ... ÷..--- + - + ---

I ROW COL VOLTS DEG IND PER CNN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+. . .. .÷. . . . .÷. . . .÷. . . .---------.. ÷-- - .... ÷ .. ..... . ..... .----....... +. . ..- + ...---- + . ..---- -- + -...... +.- ... .- ... .---

01 30

3434

353535

41

41

42

353535

424242

35

35

4141

4242

41414141

1.24 0 PCT 20 P2 AV3

42 8942 8942 8942 89

22 90

40 9040 9040 90

42 9042 9042 90

34 9234 92

41 9241 9241 9241 92

35 93

36 93

39 93

40 9340 9340 93

42 9342 9342 9342 93

43 9343 9343 93

34 94

I ROW COL-- - +- -. - -.-

1.201.16

.721.802.85

.88

.84

.89

.772.861.05

1.241.972.50

1.20

1.28

1.322.85

1.711.90

2.531.522.912.17

.871.973.46

.68

1.15

1.391.37

.99

.882.161.28

1.69.95

1.151.083.501.62

.91

1.33

.88

1.231.022.25

2.631.183.231.12

1.171.991.24

0 PCT0 PCT

0 PCT0 PCT0 PCT

0 PCT0 PCT

0 PCT

0 PCT0 PCT0 PCT

0 PCT0 PCT0 PCT

0 PCT

0 PCT

0 PCT0 PCT

0 PCT0 PCT

0 PCT0 PCT0 PCT0 PCT

0 PCT0 PCT0 PCT0 PCT

0 PCT

0 PCT0, PCT0 PCT

0 PCT0 PCT0 PCT

0 PCT0 PCT

0 PCT0 PCT0 PCT0 PCT

* PCT

0 PCT

* PCT

0 PCT0 PCT0 PCT

0 PCT* PCT0 PCT0 PCT

0 PCT0 PCT0 PCT

1919

142531

1615

16

143118

202629

19

20

2126

2425

29223127

16263413

19

212117

162720

2417

18173222

16

20

16

191727

30193318

192619

P2 AV2P2 AV3

P2 AV1P2 AV2P2 AV3

P2 AVIP2 AV3

P2 AV3

P2 AViP2 AV2P2 AV3

P2 AV1P2 AV2P2 AV3

P2 AV3

P2 AV3

P2 AV2P2 AV3

P2 AV2P2 AV3

P2 AVIP2 AV2P2 AV3P2 AV4

PZ AVIP2 AV2P2 AV3P2 AV4

P2 AV1

P2 AV2P2 AV3P2 AV4

P2 AV2P2 AV3P2 AV4

P2 AV2P2 AV3

P2 AVIP2 AV2P2 AV3P2 AV4

P2 AV2

P2 AV2

P2 AV4

P2 AV1P2 AV2P2 AV3

P2 AV1P2 AV2P2 AV3P2 AV4

P2 AVIP2 AV2P2 AV3

.00

- .24- .03

-. 09.14

-. 03

.28

.11

.05

.00- .04.00

'09-. 03-. 04

.05

- .03

.00

-. 05-. 08

.00- .21.00.06

.00

.22

.03

.00

- .03

.00

.00

.00

- .16- .03- .02

.00

.00

.08

.06

.00

.08

.00

.00

.03

.00

.00- .26

.00

.00- .23.08

.00

.25

.00

TEN TEC .610 TBATC 44 Cg

TEN TEC .610 TBATC 44TEN TEC .610 TBATC 44

TEN TEC .610 TBATC 44 CITEN TEC .610 TBATC 44 CITEH TEC .610 TBATC 44 CI

TEH TEC .610 TBATC 44 CITEN TEC .610 TBATC 44 C

TEH TEC .610 TBATC 44 CII

TEN TEC .610 ZBAZC 66 CITEN TEC .610 ZBAZC 66 CITEN TEC .610 ZBAZC 66 ClTEN TEC .610 ZBAZC 66 CITEN TEC .610 ZBAZC 66 CITEN TEC .610 TBATC 44 CITEN TEC .610 ZBAZC 66 CI

TEN TEC .610 ZBAZC 66 Cj

TEN TEC .610 ZBAZC 66 CI

TEN TEC .610 ZBAZC 66 CITEN TEC .610 ZBAZC 66 CITEN TEC .610 TBATC 44 CTEN TEC .610 ZBAZC 66 Cl

TEN TEC .610 TBATC 44 CITEN TEC .610 TBATC 44 CITEN TEC .610 TBATC 44 ClTEN TEC .610 TBATC 44 CI

TEN TEC .610 TBATC 44 CTEN TEC .610 TBATC 44CTEN TEC .610 TBATC 48 CITEN TEC .610 TBATC 44 CI

TEN TEC .610 TBATC 6 CI

TEN TEC .610 ZBAZC 66 ClTEN TEC .610 ZBAZC 66 ClTEN TEC .610 ZBAZC 66 Cl

TEN TEC .610 ZBAZC 66 CITEN TEC .610 ZBAZC 66 CITEN TEC .610 ZBAZC 66 CI

TEN TEC .610 ZBAZC 60 CITEN TEC .610 ZBAZC 60 CI

TEN TEC .610 ZBAZC 60 CITEN TEC .610 ZBAZC 66 CITEN TEC .610 ZBAZC 65 CITEN TEC .610 ZBAZC 58 CI

TEN TEC .610 ZBAZC 58 CI

TEN TEC .610 ZBAZC 58 CI

TEN TEC .610 ZBAZC 58 CI

TEN TEC .610 ZBAZC 58 CITEN TEC .610 ZBAZC 58 CITEN TEC .610 ZBAZC 58 CI

TEN TEC .610 ZBAZC 58 CITEN TEC .610 ZBAZC 58 CITEN TEC .610 ZBAZC 58 CITEN TEC .610 ZBAZC 58 CLTEN TEC .610 ZBAZC 58CTEN TEC .610 ZBAZC 58 CI

TEN TEC .610 ZBAZC 58 Cl,

TEH TEC .610 ZBAZC 58 C

TEH TEIC .610 TBATC 58 C

1.21 0 PCT 20 P2 AV2 -.08-----------------------+---+----+-----+-----+----+---+--+ - + - ----+ -----+-----+ - - +-- -----

VOLTS DEG IND PER CNN LOCN INCN1 INCN2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI------------------+-------+-----+-----+-----+----.-+---+---+--+ - + - ----+ -----+-----+ - - +-- -----

4

Page 144: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - C SG C - INDICATIONS WITH PERCENT THROUGHWALL

Byron 2 B2R14 CBE 26081001 10/18/2008 16:56:29

+--------------------------- .. + .... .... ..----..-- .---.. ---. +--÷. ... +..--+- .. + ........----.---.. ..----+ - +- +- ÷. ....- ÷

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 I CRLEN CRWIO CEG BEGT ENOT PDIA PTYPE CAL Li- - - - - - - -. - - -.- - --+ ... - --+ ....- + ' -+ - - - + - -.....7+- - - + -..... - . .----- + ---- + .... - ---- + -. .. - -. .- -. .- - ---

34 94 .99 0 PCT 18 P2 AV3 .06 TEH TEC .610 TBATC 48 CI

36 94 1.31 6 PCT 20 P2 AV2 .08 TEH TEC .610 ZBAZC 60 CI

I39 94 1.22 6 PCT 19 P2 AV2 .11 TEN TEC .610 ZBAZC 60 CI39 94 1.62 6 PCT 17 P2 AV3 .18 TEH TEC .610 ZBAZC 66 CI

42 94 1.46 0 PCT 21 P2 AV2 .08 TEH TEC .616 ZBAZC 60 CII42 94 2.96 6 PCT 30 P2 AV3 .13 TEN TEC .616 ZBZC 60 CI42 94 1.22 0 PCT 19 P2 AV4 .08 TEH TEC .610 ZBAZC 60 CI

I34 95 1.00 6 PCT 18 P2 AV2 .68 TEN TEC .610 TBATC 48 CI

I35 95 1.58 0 PCT 22 P2 AV2 .03 TEN TEC .616 ZBAZC 58 CI

I40 95 1.48 6 PCT 22 P2 AVI .60 TEN TEC .610 ZBAZC 58 Cl46 95 2.18 6 PCT 27 P2 AV3 .08 TEH TEC .610 ZBAZC 58 CI

35 96 1.67 0 PCT 17 P2 AV4 .08 TEH TEC .610 ZBAZC 60 CII35 96 .98 6 PCT 16 P2 AV4 .05 TEN TEC .616 ZBAZC 66 CI

I36 96 1.81 6 PCT 24 P2 AV2 .00 TEN TEC .616, ZBAZC 66 CI36 96 1.13 0 PCT 18 P2 AV3 .085 TEH TEC .610 ZBAZC 66 CI

I30 99 .96 0 PCT 16 P2 AV2 -.25 TEN TEC .616 ZBAZC 62 CI

38 99 1.67 0 PCT 19 P2 AV2 .11 TEH TEC .610 ZBAZC 62 CI

30 510 1.12 0 PCT 16 P2 AV2 .18 TEH TEC .610 ZBAZC 64 CI

I32 160 1.69 0 PCT 16 P2 AV2 - .03 TEN TEC .616 ZBAZC 64 CI32 109 .88 6 PCT 15 P2 AV3 .05 TEH TEC 616 ZBAZC 64 CI

27 161 .87 0 PCT 17 P2 AV3 .06 TEH TEC .610 ZBAZC 62 CI

28 101 .81 0 PCT 16 P2 AV2 .05 TEH TEC .610 ZBAZC 62 CI28 161 .73 0 PCT 15 P2 AV3 .08 TEH TEC .610 ZBAZC 62 CI

30 101 1,22 0 PCT 21 P2 AV2 .66 TEH TEC .610 ZBAZC 62 Cl36 161 .63 0 PCT 14 P2 AV3 .60 TEH TEC .610 ZBAZC 62 Cl

32 161 .90 0 PCT 17 P2 AV3 .63 TEH TEC .610 ZBAZC 62 CI

28 103 2.27 0 PCT 29 P2 AV3 .60 TEH TEC .616 ZBAZC 62 CI

30 104 1.38 0 PCT 19 P2 AV2 .13 TEN TEC .610 ZBAZC 64 CI36 104 1.21 0 PCT 17 P2 AV3 -.25 TEH TEC .610 ZBAZC 64 CI

25 105 1.65 0 PCT 19 P2 AV2 .03 TEH TEC .610 ZBAZC 62 CI

25 106 1.55 0 PCT 21 P2 AVI .00 TEH TEC .610 SBACC 72 CI

27 106 1.42 0 PCT 19 P2 AV2 -.20 TEH TEC .610 ZBAZC 64 C)27 106 3.15 0 PCT 30 P2 AV3 -.29 TEH TEC .610 ZBAZC 64 C2

, 25 107 1.35 0 PCT 22 P2 AV4 .00 TEH TEC .610 ZBAZC 62 CI

25 108 1.45 0 PCT 26 P2 AVI .00 TEH TEC .610 SBACC 72 CI25 108 2.05 0 PCT 24 P2 AV2 .03 TEH TEC .610 SBACC 72 CI25 1068 2.3 0 PCT 24 P2 AV3 .09 TEH TEC .610 SBACC 72 CI----------------- +-------------+----+-.--+-----+-----+----+---+--+ - + ----. + -----+----+ - - +--- -----

I ROW COL VOLTS DEG IND PER CNN LOCN INCN1 INCH2 I CRLEN CRWIO CEG BEGT ENOT POTA PTYPE CAL LI+ + -- +----------------------+----+-----+-----+-----+------+---+--+ - + - ---- + -----+ -----+ - - +--------

Tubes: 144 Records: 2375

Page 145: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - C SG C - INDICATIONS WITH I-CODES

Byron 2 B2R14 CBE 28881681 1i/18/2008 17:82:85

--- --- -... -" .... - --- + ---------- -- - - - -- -- -- +- -... -, .... -- -- - ---- , .. -. -. --. - .-.- - - - - -- --

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI---- -------- ---- -------- -----------------------------+----+---+----+----------------+----+---------

----------------------------- +----+-----+-----+-----+-----------+ ----- + ----+ -----+ - - +--------

ROW COL VOLTS DES IND PER CNN LOCN INCHI INCH2 I CRLEN CRWXD CEG BEST ENDT PDIA PTYPE CAL L.---- ------------------------ --- --------------------------------+------------ ------ -------- - +-- ---

Tubes: S Records: 01

Page 146: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - C SG C - AXIAL INDICATIONS WITH THE TUBESHEET

Byron 2 B2R14 CBE 20881001 10/18/2008 17:10:16

S.... -.. . .. .. .. ÷. .. + .. . .. ÷ . . . .. ÷.. .. .. . .. ...-- -- +--÷ . . .-. .--- +- . . .+----- ----- -------------------.... +- + I.--+

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT POIA PTYPE CAL Ll.. . - . .-- .. . . .÷- . .-.. .÷. .. +. . ÷. .------------.........-- ÷-...---- .. .-. --. - +-+---- ÷-+ ----.. .. + ----....+ -...... +.- -...

5 10 4.51 32 SAS a 2 TEN .14 .25 .39 59 TEH TEH .610 NPSNN 31 HI

2 12 3.54 33 MAS a 2 TEH .03 .22 .42 64 TEN TEH .610 NPSNM 31

3 13 1.80 36 SAS 6 2 TEN .10 .16 .35 53 TEN TEN .610 NPSNM 29 HII

4 13 2.63 34 SAS 0 2 TEN .11 .19 .33 50 TEH TEN .610 NPSNM 29 HII

7 16 1.98 25 SAS S 2 TEH .12 .16 .29 45 TEN TEH .610 NPSNM 31 HI

1 11 25 1.86 35 SAS 6 2 TEN .06 .06 .23 35 TEH TSH .610 NPSNM 3 HI

6 29 1.83 35 SAS 6 2 TEH .07 .11 .28 43 TEN TEH .610 NPSNM 25 HI

8 35 4.28 30 MAS 0 2 TEN .08 .12 .36 55 TEH TSH .610 NPSNM 5 HI

21 37 2.67 30 SAS a 2 TEN .08 .15 .37 56 TEN TEN .610 NPSNM 27 HI

13 40 3.37 36 SAS 6 2 TEN .12 .14 .39 59 TEN TEN .610 NPSNM 25 HI

4 41 4.15 33 SAS 6 2 TEN .12 .17 .41 63 TEN TEN .610 NPSNM 25 HI

1 49 3.51 23 SAS 6 2 TEN .09 .15 .31 47 TEN TSH .610 NPSNM 5 HI

1 2 52 1.60 36 SAS 0 2 TEN .11 .14 .34 51 TEN TEN .610 NPSNM 25 HI

25 56 2.91 22 SAS a 2 TEN .14 .15 .44- 67 TEN TEN .610 NPSNM 45 HI

4 58 1.59 45 SAS a 2 TEN .05 .15 .36 55 TEN TEN .610 NPSNM 51 HI

9 61 2.31 39 SAS 0 2 TEN .07 .15 .43 66 TEN TEN .610 NPSNM 53 HI

7 65 3.01 36 SAS a 2 TEN .10 .16 .23 35 TEN TSH .610 NPSNM 49 HI

8 65 1.25 43 SAS 6 2 TEN .16 .13 .24 37 TEN TSH .610 NPSNM 49 HI

11 66 2.10 32 SAS 0 2 TEN .10 .13 .26 31 TEN TSH .610 NPSNM 47 HI

9 67 1.45 33 SAS 0 2 TEN 11 .13 .24 37 TEN TSH .610 NPSNM 49 N

I 3 68 2.77 33 SAS 6 2 TEN .02 .18 .36 55 TEN TEN .610 NPSNM 51

36 68 2.22 29 MAS 6 2 TEN .06 .18 .28' 43 TEN TEN .610 NPSNM 51 HII

30 71 2.40 25 SAS 0 2 TEN .11 .15 .31 47 TEN TEN .610 NPSNM 53 HII

16 76 1.36 31 SAS 6 2 TEN .12 .19 .33 50 TEN TEN .610 NPSNM 59 HII

30 81 4.87 26 SAS 6 2 TEN .66 .15 .32 48 TEN TSH .610 NPSNM 13 HII

30 82 4.03 32 SAS 6 2 TEN .06 .19 .36 55 TEN TSH .610 NPSNM 15 HII

5 87 5.15 34 SAS 0 2 TEN .10 .15 .34 51 TEN TEN .610 NPSNM 61 HI------------------------ +--------+------+----+-----+-----+----+---+--+ - + - ---- +-----+-----+ - - +--------

I ROW COL VOLTS DEG IND PER CNN LOCN INCHi INCH2 I CRLEN CRUID CEG BEST ENDT PDIA PTYPE CAL LI-------------------------------+------------+-----+------+---+---+--+ - + - ---- +-----+-----+ - - +--------

Tubes: 27 Records: 27

Page 147: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

Attachment C.4

2D Steam Generator Inservice Indications

Page 39 of 44

Page 148: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - D SG D - INDICATIONS WITH PERCENT THROUGHWALL

Byron 2 B2R14 CBE 20081001 10/18/2008 16:57:42

4--....-4- -....- t- .........- 4- .... 4- .... - - .... - .- .... - .- ....-- . - ........- ÷ ......... - -- -4-- ....... - ....... - -I....-4- .... - --....- 4- ...... -- -......-- "- ......- 4-- -"-- - -I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 I CRLEN CRWID CEG BEGT ENOT PDIA PTYPE CAL LI4.. .. 4-..- --. . .-- --- ..-- . .-- . .---..- ".. . .. .4-. . .. . .---.. . . ". .. . ÷. . 4 .. " . .---------4" ......-- "-..-4-+.. " .. .. 4-- - +

I20 5 .90 0 PCT 15 P2 AV4 .19 TEN TEC 610 TBATC 12 Cj

I 23 7 1.14 0 PCT 18 P2 AV3 -. 28 TEH TEC .610 TBATC 16

25 7 .87 0 PCT 15 P2 AVI .02 TEH TEC .610 TBATC 16 CI

28 11 .83 0 PCT 15 P2 AV3 .00 TEH TEC .610 TBATC 16 CI

1 31 13 1.05 0 PCT 17 P2 AVI. .19 TEN TEC .610 TBATC 16 CI31 13 .86 0 PCT 15 P2 AV2 .09 TEH TEC .610 TBATC 16 CI31 13 1.83 0 PCT 25 P2 AV3 .00 TEN TEC .610 TBATC 16 CI

31 14 .81 0 PCT 12 P2 AV4 -.15 TEH TEC .610 ZBAZC 14 CI

35 14 .98 0 PCT 15 P2 AV4 -. 15 TEH TEC .610 ZBAZC 14 CI

35 17 2.35 0 PCT 28 P2 AV2 .00 TEH TEC .610 TBATC 16 CI35 17 1.16 0 PCT 19 P2 AV3 .12 TEH TEC .610 TBATC 16 CI

36 17 1.58 0 PCT 23 P2 AV2 .16 TEH TEC .610 TBATC 16 CI36 17 .88 0 PCT 15 P2 AV3 .21 TEH TEC .610 TBATC 16 CI

36 19 1.22 0 PCT 19 P2 AV3 .08 TEH TEC .610 TBATC 16 CI

39 19 .99 0 PCT 17 P2 AV3 -. 08 TEH TEC .610 TBATC 16 CI

35 20 1.75 0 PCT 23 P2 AV2 -. 19 TEN TEC .610 ZBAZC 14 Cl

41 20 1.30 0 PCT 18 P2 AV1 .00 TEH TEC .610 ZBAZC 14 CI41 20 1.88 0 PCT 24 P2 AV2 .00 TEH TEC .610 ZBAZC 14 CI

36 21 1.67 0 PCT 23 P2 AV2 .26 TEH TEC .610 TBATC 16 CI

41 21 .94 0 PCT 16 P2 AV2 .21 TEH TEC .610 TBATC 16 CI

41 21 1.06 0 PCT 18 P2 AV3 .10 TEH TEC .610 TBATC 16 CI

40 22 .87 0 PCT 13 P2 AV4 .00 TEN TEC .610 ZBAZC 14 CI

43 22 1.35 0 PCT 18 P2 AVI .00 TEH TEC .610 ZBAZC 14 CJ43 22 1.08 0 PCT 16 P2 AV2 -.13 TEH TEC .610 ZBAZC 14

I 38 25 97 0 PCT 16 P2 AV2 .18 TEH TEC .610 TBATC 1638 25 1.50 0 PCT 22 P2 AV3 .13 TEH TEC .610 TBATC 16 CI

40 25 .99 0 PCT 17 P2 AV3 -.31 TEH TEC .610 TBATC 16 CI

I40 26 1.06 0 PCT 15 P2 AV3 .00 TEN TEC .610 Z8AZC 14 CI

438 27 .93 0 PCT 16 P2 AV2 .23 TEH TEC .610 TBATC 16 CI

I39 27 .82 0 PCT 15 P2 AV2 .05 TEN TEC :610 TBATC 16 CIS39 27 1.25 0 PCT 20 P2 AV3 .18 TEN TEC .610 T8ATC 16 CI

47 27 1.04 0 PCT 15 P2 AV4 .00 TEH TEC .610 ZBAZC 14 CI

I28 28 1.68 0 PCT 22 P2 AV4 .00 TEN TEC .610 ZBAZC 14 CI

40 28 .87 0 PCT 14 P2 AV3 .15 TEN TEC .610 ZBAZC 14 CI

40 29 2.81 0 PCT 30 P2 AV2 .00 TEN TEC .610 TBATC 20 CI40 29 2.11 0 PCT 25 P2 AV3 .00 TEH TEC .610 TBATC 20 Ct

42 29 1.20 0 PCT 17 P2 AV2 .00 TEH TEC .610 TBATC 20 CI

25 30 1.36 0 PCT 18 P2 AV3 -. 05 TEH TEC .610 ZBAZC 18 CI

I41. 32 1.19 0 PCT 16 *P2 AV2 .15 TEN TEC .610 ZBAZC 22 CI41 32 .83 0 PCT 12 P2 AV3 .05 TEH TEC .610 ZBAZC 22 CI

I37 33 .96 0 PCT 15 P2 AVI .00 TEN TEC .610 TBATC 24 CI37 33 2.81 0 PCT 30 P2 AV2 .00 TEH TEC .610 TBATC 24 CI37 33 2.65 0 PCT 29 P2 AV3 .00 TEH TEC .610 TBATC 24 CI

40 33 1.71 0 PCT 22 P2 AV2 .00 TEH TEC .610 TBATC 24 CII4 33 2.32 0 PCT 27 P2 AV3 .00 TEH TEC .610 TBATC 24 CI40 33 .96 0 PCT 15 P2 AV4 .00 TEH TEC .610 TBATC 24 Cl

2441 33 1.35 0 PCT 19 P2 AV3 .00 TEH TEC .610 TBATC 24

41 33 1.35 0 PCT 19 P2 AV3 .00 TEH TEC .610 TBATC 24 C

------------------------------- +----+-------.---+-.--4.--*-4---4---+ ------- 4----+-----+-----. - - 4-- ------

I ROW COL VOLTS DEG IND PER CNN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEST ENOT PDIA PTYPE CAL LI---------------------------------- 4.------4.-----+-----+-----4.-----+----4---'--- -----------

1

Page 149: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - D SG 0 - INDICATIONS WITH PERCENT THROUGHWALL

Byron 2 82RI4 CBE 20081001 10/18/2008 16:57:42

. + . . . . + ..------------------------------------+----+----...........+........----- + - +-. --.-. ----... +-....+..-..+..-...----- +--ROW COL VOLTS DEG IND PER CNN LOCN INCHI INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI

..... + ... +. ....... + .... .. . . .. +.... ...- +.-- -- . .. ..- -..-- - - - -- -- +-.- ...... +.. ...- +----- ------------------ ------------+-- 4 - --

28 36 3.14 0 PCT 31 P2 AV2 -. 07 TEN TEC .610 ZBAZC 22 CJ

46 36 .97 0 PCT 13 P2 AV2 .15 TEN TEC .610 ZBAZC 22 CI40 36 1.05 0 PCT 14 P2 AV3 .00 TEN. TEC .610 ZBAZC 22 CI

42 36 3.35 0 PCT 33 P2 AV2 .00 TEN TEC .610 ZBAZC 22 Cj42 36 1.49 0 PCT 20 P2 AV3 .00 TEN TEC .610 ZBAZC 22 CI

36 37 3.60 0 PCT 34 P2 AV2 .00 TEN TEC .610 TBATC 28 Cl36. 37 2.86 5 PCT 30 P2 AV3 .08 TEN TEC .610 TBATC 28 CI

37 42 3.16 0 PCT 32 P2 AV2 -. 14 TEN TEC .610 ZBAZC 26 CI37 42 .84 0 PCT 13 P2 AV3 -. 15 TEN TEC .610 ZBAZC 26 CI

31 44 3.75 0 PCT 35 P2 AV2 .09 TEN TEC .610 TBATC 8 CI31 44 2.01 0 PCT 25 P2 AV3 .00 TEN TEC .610 TBATC 8 CI

41 44 .56 0 PCT 10 P2 AV3 .00 TEN TEC .610 ZBAZC 26 Cl41 44 .58 5 PCT 10 P2 AV4 .00 TEN TEC .610 ZBAZC 26 CI

25 50 2.31 0 PCT 27 P2 AV2 .00 TEN TEC .610 TBATC 8 CI

31 50 .77 0 PCT 13 P2 AVI -. 19 TEN TEC .610 TBATC 8 CI31 50 1.38 0 PCT 19 P2 AV2 -. 15 TEN TEC .610 TBATC 8 CI31 50 3.12 0 PCT 32 P2 AV3 -. 08 TEN TEC- .610 TBATC 8 CI31 50 1.02 0 PCT 16 P2 AV4 -. 06 TEN TEC .610 TBATC 8 Cj

39 52 .74 0 PCT 12 P2 AV4 .18 TEN TEC .610 ZBAZC 30 Cl

47 56 .96 0 PCT 15 P2 AV3 .00 TEN TEC .610 ZBAZC 26 Cj

47 56 2.10 0 PCT 25 P2 AV4 .09 TEN TEC .610 ZBAZC 26 CI

21 57 1.04 0 PCT 15 P2 AVI .17 TEN TEC .610 ZBAZC 6 CI21 57 .86 0 PCT 13 P2 AV4 -. 31 TEN TEC .610 ZBAZC 6 Cj

48 59 1.98 0 PCT 24 P2 AV3 .00 TEN TEC .610 TBATC 32 CI48 59 1.10 0 PCT 15 P2 AV4 -. 16 TEN TEC .610 TBATC 32 CI

4 41 60 1.20 0 PCT 17 P2 AVi .31 TEN TEC .610 ZBAZC 30 CI41 60 1.39 0 PCT 19 P2 AV2 .60 TEN TEC .610 ZBAZC 30 CI

129 63 1.18 0 PCT 17 P2 AV2 .09 TEN TEC .610 ZBAZC 34 Cl

48 63 .51 0 PCT 22 P6 07C .10 TEC TEN .610 ZBAZC 85 HI

48 63 .20 5 PCT 5 P5 05C -. 10 TEC TEN .610 ZBAZC 85 HI48 63 .49 0 PCT 22 P4 07C .43 1.25 .44 67 07C 07C .610 NPSNM 90 Cj

I.I24 65 .33 269 PCT 32 2 02C 1.14 .28 .40 61 02C 03C .610 NPSNM 90 Cj

49 67 .72 215 PCT 26 P6 08C .05 TEC TEN .610 ZBAZC 85 HN49 67 1.97 5 PCT 41 P6 07C .05 TEC TEN .610 ZBAZC 85 HN

24 69 .25 263 PCT 27 2 05H -. 84 .31 .45 69 05H 05H .610 NPSNM 75 HN

49 69 1.88 0 PCT 41 P6 07C 13 TEC TEN .610 ZBAZC 85 HN

26 70 1.81 0 PCT 24 P2 AV2 .00 TEN TEC .610 TBATC 36 Cj

26 70 .99 0 PCT 16 P2 AV3 .00 TEN TEC .610 TBATC 36 Ci

33 70 1.25 0 PCT 19 P2 AV3 -.05 TEN TEC .610 TBATC 36 CjI

48 71 .55 0 PCT 8 P2 AVI .10 TEN TEC .610 TBATC 48 Cj

S36 72 .91 5 PCT 13 P2 AV2 .00 TEN TEC .610 TBATC 46 Cj36 72 .88 0 PCT 13 P2 AV3 .15 TEN TEC .610 TBATC 40 Cj

39 72 1.18 0 PCT 16 P2 AV2 -.28 TEN TEC .610 ZBAZC 46 Cl39 72 1.80 0 PCT, 22 P2 AV3 .13 TEN TEC .610 ZBAZC 46 Cl

40 73 1.22 0 PCT 15 P2 AV2 .22 TEN TEC .610 TBATC 48 CI

40 76 .49 0 PCT 8 P2 AV1 -. 20 TEN TEC .610 ZBAZC 46 C)

40 76 1.92 0 PCT 23 P2 AV2 .22 TEN TEC .610 ZBAZC 46 Cl

II28 78 1.00 5 PCT 15 P2 AV3 .00 TEN TEC .610 ZBAZC 46 Cj

32 79 .98 0 PCT 13 P2 AV3 .00 TEN TEC .610 TBATC 48 Cj

39 80 1.27 0 PCT 17 P2 AV2 .15 TEN TEC .610 ZBAZC 46 Cj39 85 2.49 5 PCT 28 P2 AV3 .12 TEN TEC .610 ZBAZC 46 Cl-- -- - - - - - --- - - - -- - - -- - - -- - - - -- +- - - -- - - -- - - - - - -------+- - + +----+- --4+ - 4 - +---4-+--+- + - + -

I ROW COL VOLTS DEG IND PER CNN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL Ll+- . . . .+ . . . -- +.---. ---- +-------.--.... .... . .. .... .... .... ...... .. .. .... .. .... .... ... .......-- -.... ......--- +--

2

Page 150: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - D SG 0 - INDICATIONS WITH PERCENT THROUGHWALL

Byron 2 B2R14 CBE 20081601 10/18/2008 16:57:42

..- - - +... . ... .. .. ..-- - - - - -.--... .... + .... ......... .........+ - - -+---+. .+....... .... .... .... ...... .......--.....-4 - +-- ÷

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI-----------------------------+--..+.-----+-----+-----+-----+----+----+- + - ---- +-----+-----+ - - +--------

41 86 1.52 6 PCT 20 P2 AVI .12 TEH TEC .610 ZBAZC 46

19 82 .91 0 PCT 14 P2 AV4 .66 TEH TEC .610 ZBAZC 56

36 82 2.53 6 PCT 28 P2 AV2 .60 TEH TEC .610 ZBAZC 50 CI36 82 1.48 S PCT 19 P2 AV3 .00 TEH TEC .610 ZBAZC 50 CI36 82 1.33 6 PCT 18 P2 AV4 .66 TEN TEC .616 ZBAZC 56 CI

36 83 .98 0 PCT 14 P2 AVI .00 TEH TEC .616 TBATC 56 CI36 83 1.82 6 PCT 22 P2 AV2 .06 TEH TEC .616 TBATC 56 CI36 83 .82 0 PCT 12 P2 AV3 .06 TEH TEC .610 TBATC 56 CI

31 84 1.66 0 PCT 21 P2 AV2 .06 TEH TEC .616 ZBAZC 50 CI31 84 1.17 6 PCT 16 P2 AV3 .06 TEH TEC .610 ZBAZC 50 CI31 84 .91 6 PCT 13 P2 AV4 .00 TEH TEC .610 ZBAZC 56 CI

36 84 1.18 0 PCT 16 P2 AV2 .06 TEH TEC .610 ZBAZC 56 CI

43 85 1.11 0 PCT 15 P2 AV3 .06 TEH TEC .616 TBATC 56 CI

41 86 1.25 0 PCT 15 P2 AV2 .05 TEH TEC .616 TBATC 54 Cl41 86 3.96 0 PCT 36 P2 AV3 .06 TEH TEC .610 TBATC 54 CI41 86 .92 6 PCT 15 P2 AV4 -. 14 TEH TEC .610 TBATC 54 CI

34 87 1.33 0 PCT 18 P2 AV2 .66 TEH TEC .610 TBATC 56 CI34 87 1.63 0 PCT 21 P2 AV3 .06 TEH TEC .616 TBATC 56 CI

37 87 1.065 0 PCT 15 P2 AV3 .00 TEH TEC .610 TBATC 56- CI

46 89 1.08 0 PCT 16 P2 AV4 .66 TEH TEC .610 TBATC 60 CI

40 96 1.47 0 PCT 21 P2 AV3 .00 TEH TEC .610 TBATC 58 CI

35 91 .86 0 PCT 13 P2 AV2 -. 15 TEH TEC .610 TBATC 66 CI

43 91 1.14 0 PCT 16 P2 AV4 .66 TEH TEC .610 TBATC 60 CI

35 92 .80 6 PCT 14 P2 AV2 .68 TEH TEC .610 TBATC 58 C35 92 .68 6 PCT 12 P2 AV3 -. 07 TEH TEC .610 TBATC 58

40 92 1.14 0 PCT 18 P2 AV3 .66 TEH 'TEC .610 TBATC 58

41 92 .88 0 PCT 16 P2 AV3 .05 TEN TEC .610 TBATC 58 CI

36 94 .54 0 PCT 10 P2 AV1 .17 TEH TEC .616 TBATC 58 CI

36 94 .76 0 PCT 13 P2 AV3 .03 TEH TEC .616 TBATC 58 CI

I 34 95 1.18 0 PCT 17 P2 AV3 .15 TEH TEC .610 TBATC 66 CI

I 35 95 2.65 6 PCT 28 P2 AV2 -. 23 TEH TEC .610 TBATC 60 CII 35 95 1.42 0 PCT 19 P2 AV3 .86 TEH TEC .610 TBATC 66 Cj

36 95 1.35 0 PCT 19 P2 AV3 .06 TEH TEC .610 TBATC 66 CI

34 97 1.53 0 PCT 26 P2 AV1 .06 TEH TEC .610 TBATC 60 CI34 97 2.72 6 PCT 29 P2 AV2 .66 TEH TEC .610 TBATC 60 Cj34 97 1.24 0 PCT 17 P2 AV3 .06 TEH TEC .616 TBATC 60 CI

34 98 .96 0 PCT 16 P2 AV2 .02 TEH TEC .610 TBATC 58 CI34 98 1.33 0 PCT 20 P2 AV3 .12 TEH TEC .610 TBATC 58 CI34 98 .87 0 PCT 15 P2 AV4 -. 12 TEH TEC .610 TBATC 58 CI

34 99 .87 0 PCT 13 P2 AV1 .05 TEN TEC .610 TBATC 60 CI34 99 .74 0 PCT 12 P2 AV2 .15 TEH TEC .610 TBATC 60 Cl34 99 1.33 0 PCT 18 P2 AV3 .60 TEH TEC .610 TBATC 60 CI34 99 4.32 0 PCT 37 P2 AV4 .09 TEH TEC .610 TBATC 66 CI

34 166 .65 0 PCT 12 P2 AV1 .06 TEH TEC .610 TBATC 58 CI

34 106 1.20 6 PCT 18 P2 AV3 .12 TEH TEC .610 TBATC 58 Cl

36 166 .84 0 PCT 14 P2 AV4 .17 TEH TEC .610 TBATC 58 CI

28 102 .90 0 PCT 15 P2 AV3 .17 TEH TEC .610 TBATC 58 CI

29 102 1.10 6 PCT 17 P2 AV3 .29 TEH TEC .610 TBATC 58 CI

I 30 103 1.73 0 PCT 22 P2 AV2 -. 05 TEH TEC .610 TBATC 64

31 103 1.65 6 PCT 21 P2 AV2 .02 TEH TEC .610 TBATC 64 CI.. ..- .. .÷- . .. ..-- . .- + . ..- .. .÷-. . . . + . .. . .. . ...----------.+--+ .. .... ÷ . .... - +. ..--... ÷-. ..- -.. +- - -..4 -.....- ++ ....-.. ..

I ROW COL VOLTS DEG INO PER CHN LOCN INCHI INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL Lj÷ .. ÷. .. + . .. .. . ..------- w - ------------------------------------------------- - - - -- +--------------- -.- -------- - +-----------

3

Page 151: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - D SG 0 - INDICATIONS WITH PERCENT THROUGHWALL

Byron 2 B2R14 CBE 20081001 10/18/2008 16:57:42

... +.. .... .+.---.----.---- + + .. _----+---+-----. ......---+- -- +-- -+ .... +.... .. + .. a ..-----+ + ---- + ...----- + - +-.. --. -+

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 I CRLEN CRWID CEG 5EGT ENDT PDIA PTYPE CAL Lt.. . ...-----------.+- -+...----+----....+..---+ -- - - +- - -+ - +----++_ • ----+ + -.. .+-.. .+---,.

31 1013 1.73 0 PCT 22 P2 AV3 .12 TEH TEC .610 TBATC 64 CI31 103 1.09 0 PCT 16 P2 AV4 -. 09 TEH TEC .610 TBATC 64 CI

30 104 1.08 0 PCT 15 P2 AV2 .10 TEN TEC .619 TBATC 62 CI30 104 .83 0 PCT 12 P2 AV4 .12 TEH TEC .610 TBATC 62 CI

31 104 .94 0 PCT 13 P2 AV4 .05 TEN TEC .610 TBATC 62 CI31 104 1.35 0 PCT 18 P2 AV3 .05 TEH TEC .610 TBATC 62 CI

26 107 1.44 0 PCT 19 P2 AV3 -. 05 TEH TEC .610 TBATC 64 CI26 107 1.02 0 PCT 15 P2 AV4 .00 TEH TEC .610 TBATC 64 CI

25 108 1.48 0 PCT 19 P2 AVI -. 05 TEH TEC .610 TBATC 62 CI25 108 .92 0 PCT 13 P2 AV2 -. 05 TEH TEC .610 TBATC 62 CI25 108 1.39 0 PCT 18 P2 AV4 .15 TEH TEC .610 TBATC 62 CI------------------------- ,---------+----+------+----+-----+----+---4--, - + - ---- + ------+----+ - - +--- -----

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI+ INCH2 I CRLEN CRWID CEG BEGT ENDT POIA PTYPE CAL LI---- ---------------- ----------------------+-------+----+------+-----+---4--, - + ---- 4----,- + - + - -- ,--

Tubes: 96 Records: 160

4

Page 152: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - 0 SG 0 - INDICATIONS WITH I-CODES

Byron 2 B2R14 CBE 20081001 1011812008 17:03:41

---- --- --------------------+- --------,-----+-----+-----+-----+----+---+--+ - + ----- +-----+-----+- + - + - 1---+-

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 I CRLEN CRWID CEG BEGT ENDT POIA PTYPE CAL LI---- --- -------- --- ---------------+---------+-----+-----+----+---+---+--+ - + ----- +-----+-----+- + - + - -- +--

I 24 69 .52 154 OFl 1 05H -. 84 TEN TEC .610 ZBAZC 16 CI24 69 .17 80 SVI P4 05H -. 67 05H 05H .616 NPSNM 75 HI

4".. . -. .. ÷-.. .. .. ÷ .. ----------....+ ...----. + .. . -. . . .. . . .. . ..----.......-- -.---.-. . ..----. ...----+ -- - . ..--- +- +. . . . .- 4"

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT POIA PTYPE CAL LI÷. . .. . . . . .4. . . . .. . . .-----------+--..+-.. .. .------.........--.+----+-. ..-+ -. ..- -. .-. .-+- - - -- ---+. .----+ -. - +--. . 4 . . - ÷

Tubes: I Records: 2

Page 153: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - D SG D - AXIAL INDICATIONS WITH THE TUBESHEET

Byron 2 B2R14 CBE 20681601 101/18/2008 17:11:29

------------------------ +--------+-----+------+----+-----+----+---+--+ - + - ---- + -----+-----+ - - +-- ------

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+ .... -.... + l - " -------------- 1-- +---+... ..-------- - - -+ ... ..---+ --+ -.... +- ...... + -----+ ---- ---+-- .--+ - + -...... +- ....

I 3 54 2.04 26 SAS 6 2 TEH .09 .13 .22 34 TEN TEN .616 NPSNM 27 HI

I 2 101 3.04 33 SAS a 2 TEH .21 .25 .41 63 TEN TEN .616 NPSNM 51 HII I

I 2 106 1.93 26 SAS 6 2 TEH .08 .18 .34 51 TEN TSH .610 NPSNM 17 HII RO-CO- VOT--E-ND ER HN --------- OCH-----------+NC I CREN C ID CEGBE---GT-ENT PD-----A PY------A--- - +-

I ROW COL VOLTS DES IND PER CNN LOCN INCHI INCH2 I CRLEN CRWID CEG BEST ENDT POXA PTYPE CAL Lj---- ------------------------ +----+-----+-----+-----+-----+----+---+--+ - + - ---- + -----+ -----+ - - +--- -----

Tubes: 3- Records: 3

Page 154: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

Attachment C.5

Tubes Repaired During UNIT 2, REFUELING OUTAGE 14

Page 40 of 44

Page 155: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - A TUBES TO BE PLUGGEDHOT LEGByron B2R14 CBE D5

2 TUBE TO BE PLUGGED IN THE HOTLEG

a 154 EXISTING PLUGGED TUBE

is 105 188 95 98 85 88 75 78 65 60:OO : OaOQOOO l : ~llaO01155 5e2a01:1:u0 1a:aa

45 40 35 30.•aaannaa anaiat a, q , , ••.~

25 20 15 i8 5

a0

Do..

0

.. a. 0 :t t on.. On

a ".. ........ .. .. ........ . . ......... 0 0 ............ On................ .... .00n ......... .. . . . . .......... 0 04......... .. .... .. ........ o.

n0o...... ..... .......................... 0 0 ............ .. Onlin .... ................................ 0...... ............................... ....0

0n..•.......................•° •.0-...-....00.......................•....•........ ...°° .... (O .... aoon.o. ..O. .... ..-.......- T ...O(O .-. -.. . 0 .".O ...... .. ......... -. ..... .. 00. l .nn0

0... -.On.....000..... .0 0 ............. 000 ....... ..:...0( 0................ ......... 0 ........... 0 0 ...... ... .:::0 .................... ... 0 0 .... ::.a

00 ... ............. ..... .... ... 0()00... .. . 0 1O. o .00. .. - . O00..............................-........-..-. .........-.. 0 0¢...........................-.--......... ....- ..- ..... a0..... ......... ..... .... °...... . ......... .. o 0.................°° ° ° ........ ......

0 ............. ............................... .. ......... ... . ... . .......... ......... 0......... ¢

...... .. ......... ........................ ........ a ou. .................. . ..................... ........... o

0..................... f.... .................. *.... t ............... 0 0....................... *.... ÷.... ,...................t..............

00 0

0 -'". .......... . .............. ............... .... 0 o 000............................... . ..... 0'... ................... ............. ...........

0 -o....... .................. .. 0... ................... .o00 o0 o.00(o.... u.. . ....... . ... .... ......... 0O..... o

.. . o0( ... ... -. .............. ... . -. . ...-....-.... .... 0.. .....-.... .... (O...... .oo

.... .................. .............. ... °. ... °.•* ..... ...:::: .. ...... ... . .... 0•

0 ... .... ...... .... .... .000. a. ................. .......... 0•. .°° .°°...°°...

0 0

O . ........... 00. ... 69...°... ,..0 .... O0 . .... • , ,• ,° ,°°° .o o° °° -. $ , , ,, , ,o '•° ,• ,... .... * :::: :::: - * *:::: :::: :::: ::: :

0000 ... . ... . ............. .................. 00 .. .... .... ................... 000 0

o . . • .. o( .... . ... ; .. ; . ........ . .. . . ...... .. .0 ... 0: .... )0 :: : .. . . . . .:.. . . . . . .i. . oO

0 .. .. .. .. ... . .... ..: : 0 : . . .... ... ... ..... .... .....:.. .: : :0o .. ... o o......... ...... .. 0 ..... . . .................... 0 ............. . ............... 0o .............. 00 0

0== ==0 :0= =:= =: :== =0 • === === ==: : = ,=: === O•= ==; === === === == =• O == = = ==; ==0 0== •= 0

00: : : ....0 ... 1-*Lý0000( )000 0, 10000( 10000( 10000( )0000( 100 00, ooo,, 1)000, )0000, )0000

o:00

P0000

5

0000,0000 *0000cp000~oooq~o0on~qo0o0000( )0oooo00ooo0oo0o0oooo118 185 188 95 98 85 8s 75 78 65 68 55 58 45 48 35 38 25 28 15 18

Weoingwhoue Electhc Company LLC - ST Max 1017/208 09:4526

Page 156: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - A TUBES TO BE PLUGGEDCOLD LEGByron B2R14 CBE D5

2 TUBE TO BE PLUGGED IN THE COLDLEG

a 154 EXISTING PLUGGED TUBE

.10 105 188 95 99 85 80a1a1:1112 nnanao

noa,.,+.,

75 70 65 60 55 50 45 40,aaaa~laaaa iaaalaa a~aaaaooaaamaaaaaaaa

. ... .... ........

35 30 25 29*Onoa I I I

15 1i

.. a t in

5

a0:?? *.- :. : 0001

n................. . a........0 0.......................-.a1o...4........................ .........-. 0 .O...*... a........ Oa

no. a..... .... . ................... ......... 0 0 ............. .. .........

ma . .................-. *............*..o0 0o ..... .................... ..... *... *..... .... nanao.. .. 00. .... *.. ............................... 0 0 ... .. . . . ... ................ o0..... . .. .. 0.... ano

o.0.* .o. .0 00... ..... 0 0......... ...00 0... .... *.- . --. ( ....... 0

)a.... ... 00.... :*........... . 0.. . ....... 0 0. .......... 0....: ::........ .... : . .... ..... ... 00 -- *

O0 .. . .... ... . . . .... ... 000.0 .. -... 0 0. .*. . .. "..l. OO. .... . . ........ .. ... . *.... .. . -........ On

00... ... .....! ............. .... .............. 0 0 ....... ..... . .................. .................... amS........ ......... . ............. .... .......... 0 ..... ....... ......... .. ................. ....... 0

00 ......... .............. .... .. . o.. .. a................ .o......... .... . .......... ..... . ... a a ............. ........ ......................

.. . . . . . . . . . . . . .0 . . . . . . .. . 1 - -G e-0-0o........................................... ............ o o...... +.... <...... . o........................ .. oo.........00o01.... ........... .. ... ... .... . .................0 0 0...0. 0 o..... ...... .... ........ .. ..o 0 0 .0. 0..... . .. ... 13.. ...... o

0... .. a.............. 0..........0000000000000000............0... :":: . .. ..... ..... .... .... 000.. . ..... 0...... 0 . 0 0.... .............

0( .......... .... 1.• •. (.. , * ).. ,•°° ° ** .* • * .

° -- 1 .. ..I. : :. :: :::: :::: ::: ::: 11 ;i 11 i .. ;i ;; .... ; ; ..... .. . .. . .. .o. .

............................................................... .... ................... .... ......................... .... 0

• o. ..... *

O.. . .......... ............... ..... ... ...... 0 00oa a a a0 o* 000.... . . ..-. . ............. ......... o

o.. ... ............... .. ... i . .. ...... .............. . . .. . . ...................... ............. ".... .

0 -* ° * • * .... ** .*.., ()* 0 0.** *' * * ' .... ... .-..( O ' -- * * , 0()0,, .. .. 0(0.- ,° , * - ,000D * - , . . ** * * ,- * 0000# ** ** ' * * ** "* "(D00 *: '* ' * ° *' ' °' * " 0...................... ......... . ... ..............O. . ... .... . ..... . .. ..... .... .. .... ... .... . ..... .... ..... .... ..... .... .... ............ 0

00• --- ---- -s - -° C C,-*- 488E-

45

4.

35

30

25

29

15

Is

5

0*- .. .. . *. .. . *

....................................................................................................................

0000 1000(V0 000 ,000 0000

30 25 20 15 18 5

0000 0000 00 00 9 880OO 75 79 65O 068 5500 000 5O9004000(5OO O 000•lie 10•5 lee 95 90 85 so 75 70) 65 60 55 5so 45

)00001)0000<

48 35

Weslinghouss Ekidnc Company LLC - ST Max 10172008 09845.41

Page 157: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B TUBES TO BE REPAIREDHOT LEGByron B2R14 CBE D5

A 4 TUBE TO BE STABILIZED (190"CABLE STABILIZER) THEN

PLUGGED IN THE HOT LEG

B 1 TUBE TO BE PLUGGED IN THE HOTLEG

a 135 EXISTING PLUGGED TUBE

is 15 20 25 38 35 40 45 58 55 68 65 78 75 88 8500000000000000 0o0O1100o n m an*oc 0m00000ooo 0000 000001)000

00.............. .B......... .......... 0 0 od.. . .. . . .o..: : : 1

000 ..... ... . ... . ......** ... 0 0 .... .... }..*. . .. ..

95 188 185 11l

on-00

45

48

35

38

25

28

15

Is

5

-U - = - -- - --- -- - --- -- - g-I

00. ............................. I .......... ............... ........... . . ....a

no. .. a . . . . .**o.... ......... 0 * .m............... .......... * O0

na. -. a*. . a........... .... . . . . . . . . . . . . . .: n

a. .. 0.........i.............. .. ...- ... ..... . ............... ............. a.s )O * • 0O e *O * ° * e e o e O 0 ) * 4 * 6 a a •J ••De m a-- - - _Q_ - , *0 aw n

0......o .............. .... .... .... 00.... .......... 0ý 0 .... .... ....aoo ..........a ............. ao . 0aa .00 4 00.............. .... ......0 0.. ......0 0......... 0 0................0*

mo........................ .... ..... .:010*0...........0 0.........: .0-00.....................a. aoO...... O...............a............ ....... 0 0 ...... 00..O., . .. ....... 0........000

00......................I............ ......... 0 0..........0.......... .............. ...... .......0

0 o. .... ............... =...... .......... . . .. ... .... .... 0 0 ..... .... . .... ........ ......... ........ gn0.on .......................... . . ......... ..... 0 0 .0....0 ......... *........ .. .. ......... . ......

0 0 ( .. ., . ............a..... .... 0 0 ...... ... .. 0 0 ..... . ......... ........ ...- .0 .. . . .. . .00 . 0

. .. ................. ... .... ............ ..... ..... . .... .. 0 0 .... . ..... .......... .... . ............ ................ 0

0 .. .. a... ...... .... .. . ......... .. . ..0 .... 0 0 0 0000............. ..00.... .... ..... .... a .. ...

00..,,0.... ............... t .... .00.... t ........... t.... t.. . .. .t. . .. . . . . .. . . . .. . . . .. . . . .. . . o

0. 0 s .. .... I ............ .... .00

. .... . ....... .... ... ............. . .... . . . . .... .... .S...... ..... ........ ........................ ......... ......... ......... .... ..... .... ...... 00............................. . ............. ...................0000 0000 000 0000 0000 .. ..... . ..... .......... . ..... ................... ..........

0 0 ... " . ................................ .. .. .... ............... 0

0. .. ...........-- .. . . . . . .... ... ....................................................................0...................................................... .......... ................... .... .... I.... ......... .... ......... ............

0.) a............................. ....... ................... .... .... .........................................................

op.......................................... .... ..........a......... .... ..... ................... .... .... ......... ........... ......... 00

0.....0 ............. 00......................00...... .... .... .... .... .... ......... .... .... .00.... .... I.... .... .... ......0 ..... 0

0. nom..oo ........... 0....................... .............. 0 0................................... .... ...........0 .........

00 000......... . .. . ....... ........ ..... ...... .... 000.... ................ ........ 00.................0

0. 0- .-........... .. ........ . ........... ........... ............ .... .... .. 0

000 00- - -

0..

o.-

00...

0000(

.a.

0

• 0

0 0 10 000

18 185 11e5( 0 18)15 28 25 38 35 48 45 58 55 68 65 78 O078 5 8000 955 is is 20 25 30 35 40 45 50 55 60 65 70 75 so 85 90 95

Westrighouse Eectrc C~ipany LLC - ST Mu 1OI17/208 12:04:15

Page 158: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B TUBES TO BE REPAIREDCOLD LEGByron B2R14 CBE D5

A 4 TUBE TO BE PLUGGED IN THECOLD LEG

B 1 TUBE TO BE STABILIZED (190"CABLE STABILIZER) THENPLUGGED IN THE COLD LEG

a 135 EXISTING PLUGGED TUBE

18 105 18 95 90 85 as 75 78 65 60I 0000OOOOOOOOOOOOOO S0ua0$0

55 50 45 40 35 30nsaogon 00000000000000OOOOI

25 28 15 le 5

OýO ... 4 .... .... I .... .... jo 0I )0

00os 00 001::::1::::1::::.... f ... otooo

0 of .... f .... -900- -- - - - - - - - - - -

0 ...... .~.... ........ 0 0.A..... *. . . *,. .. *.. 6. . .O0aa ............... ~...... .... 0 Oi....... ..... .a .a. I* ::::::I. aa a............................ ...... ........ .......................A. . . ....... .

....................................... 0 0.... ............ .. ......

non ................... 0 . . ...... 0 O . ....... 000 ....... .. o...ODun i 0-000. . il .iI .i~ .I . . . 0 OiIa . . .I .i .I .I :DODOoI

-noun..Q . . . . 0 0.. .. 0 0 ...... 0 0o....a. ... 00...0oO- , --O O- -- , - -- - - --- - - - - - - - - - - --- - - -0-

o n .a ....... .................. 00.()o ........ 0 0......... ,o()00... .. . .. .... ).., .... On

anuý.. .. .. ............... ...... .... ....... 0 0 ... .. .. . .. . . .... Is .00

0 no

00.. .. . . . .. . . . . 0 0.. . .. . .. . .. . . .00

........ ............. ... 0 0..............

Oi 0 0

0.. . . . . . . . . . . 0 00 .... .... ..............a............o.....00....... .... .. .eeem ... . .. . ... o0 0000 0 0..... .... .. ........ . oe UO

00. .. 0.......... .... .... 0(0.......0000 00000 . .... o.00..... .. o 00 -600

0 0. o .0.... ...... ........ o .0. . .....0 0 ..... . o......00 .. 00

0 , 0,, . , , • , , - - ,, , - , - - 0 0 , , , - , - - , , • , I - - - - , , i

0 ........ . -.....-. 0110......... . ...... ......... 0000 )0000 0 000000 .0000.... ,.. ........- ,-0.............- 000.,- .00(, -,--, .--.-- )--.•----',-- ,, , • , , • 0 ) , - , ,-o a )00 81-100

........ o.11.. ... ......... . . . . . . . . . . . . . . .

0.........-0 0........ -... .. 0 .............. ..... ......... .. . -. ............. .. o . . ............... .... '0"I.... o.... I .... ................... ... ........ . ...... o .... . ..... ...... .... ..... . . .. .... .... ........ .. .

0............................................................ ......o o.... .... .... o ... o ........................ .. an -0

0. ... o ,o ............... .... .... . ...... .... .... o . .... .... .. gQ n

0...0 0... ................. ............. .. ..0 0.. .. . ... 0.0.. ... .. 0 0. .. o

0O . 0 • 1 .. *.. 0 •.o. .• 00 . .. .. . .o .° .. . . . .. . .* . . .* •0 . .- . ..°. . ..-o . .- - . -. ° . . •. -.- . . . 000 0 . .a .AA. . .o0el E e- - -- - - -- ---- C E)U C)----- 0 E

0 ....... 0 ...... 0~o....o....... ..0 0 .. . . .. . . 0.'.......o..a .. 0

0.. .. OO)o ..... ....00...... .. ... 0000.. oo.... .... ...00.. .. . .... -0

00........ ............. oo......... .. . o. ........ ... o. . . . ...... .... ...... 00

00..........................................................................................................................a. .hp s 90

00: :::: 1:::: 1:::: 1:::: 1:::: 1:::: 1:::: 1:::: j:::: j:::: j:::: I0

*'00.° °o° . # f . f ....

118 186 188 95 98 85 88 76 65 68 000056 58 4 48 35038 26 28

lie 105 Me 95 90 85 as 75 70 65 60 55 50 45 40 35 39 25 20

0000

15

PoooP00o

le 5

Wese~ngthouse Elach, Com.pany LC - ST Max 10/17r200 12:04:07

Page 159: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - C TUBES TO BE REPAIREDHOT LEGByron B2R14 CBE D5

* 3 TUBE TO BE STABILIZED (302'CABLE STABILIZER) THENPLUGGED IN THE HOT LEG

* 76 EXISTING PLUGGED TUBE

5 1i 15 20 25 30 35 40 45 50 55 69 65 79 75 8 85 90 95 le9 1050000apoooo~poooocpoomo~ooou~o oqpo00oq~ooooqpooooq~ooooqooooj I I I I

is

0 0 . j a + + +0 04 4 o(bo

Co..0001 .. :1: ... .... 100 001... ! .. I... ! .. .. : 0000

4500.f.............................. 0 0................... .............. 00

DAD..-T .... .... ....... . 0 0. ................ ,.................. ---... 0

0 0................., .............. .... , .. .0 0................. -......

B.................................a o....... .......... ......... 1.......a..........00

on. . ...... ...................................... 0........0a .04 ........... 00

oooo:eo e e o eo e e e oe o o , 0 o e e l l o o oo o ~ o o o e eoo:: : 0

0 0 : .00...................................a 0.......................0. 0*0 *000o00.... ..... .. ....... .. ........ .. .0 00.. .... ..... 0 0. .. ......... 0 00.. .. .. ..... ................... ......

0 0....... 0 ........ .............. 0 0........... 0.......... ........... 0.....

00... 1 ..... .... ........... .... .... . .: . : : 00..............0 " : m%' ` aaoo 0. . . . ..... " . . .......................... 0000... ........ ............ 0... .. 00 a.. . ... ... ..... .... ..... ... 0

00....................... .......... .... ..... .......... ..... 0 0 .... A..................... .... ..... .... ..... .......... 0

00................................................. 0................... .............. .... .......... ....... 0

00...........................................0 0................................ .... ..... .... ........... 00

ao0................................... 0........................... ......... .... ......... ... : :....000........................................... ..... .0 0...................... .... ......... .... .... .... .......... 0

0 ,.. .............. ... 0o a..........oooo.... ... oo00ooo 0 .... . . .... .... 00 .... . ..... .... n00O .00............... O........OO..O ......0 00..... .... .....e00 .00

0................ ..... .... ... a al . . .. . . ... . . . . .. . .. . . . .. ....... 0

(0............. ......... .... ....a.......... .... .....(0000 0000 000 00 000................................00....................................... o..o.....o.... ......... ).......... .......

OO ' ''' ''' ''' ''' '*' ''' ''O )O0 ''' ''' 0 ,II I 0 0(). -... .... ....-- ... .... ... .... ....O

0 ............................................................................ .... .... .......... .......... ......... .... .... .... .... ..... ........ 00................ ................. ................................................... .... ......... ......... ......... .... .... .... ...... .... ..... 0

0 0"- - - - - - - -,- -,* • - , * - , , , , , , • - - , , , - - -, Im l , - - - - - - - - - - - -, - - - - --, G O• , , , 0

0.A... . . . . . . ................. ..... ................ O.......................O..... ........... 00.. ........ ............... T................ .... ................. .... T .......... .... .. .... ................... .- ...... 0

0 .... . .. .• ..... ::: 00I•e e m .•, . e e•., ,•• . , ~ e • • • e • e ' , •. , . ,•, , , ••

00......................................................................................................................00.........0 . ....... ............0.......... .....a. ....... ............. 0 ....... T......T......T.......-- ..-- ... 0----- ...... ....... .. 0 .....T--..

O, , , O(, , , -, • - O lO*, , ,, , , O 00 ) 0 0 )0 0000 00-0 ..-- ... .... 0 0 , 0, , 0 ,•0 ... .0

0.........-..... .... ...... .0.... ............00 0000000.. . . . .,.. ......- • 000......-....--.-........ .. 0. ..

0.................................... ............. .............. ......

00.00000,

• 0

0

00*0*010*0*000000

lee 105 1195 1i 15 29 25 39 35 40 45 5s 55 69 65 70 75 89 85 90 95

Weaongh..eEIact.c Conmpany I - ST Ma 1011712008 13:0327

Page 160: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - C TUBES TO BE PLUGGEDCOLD LEGByron B2R14 CBE D5

a 3 TUBE TO BE PLUGGED IN THE COLDLEG

a 76 EXISTING PLUGGED TUBE

11l 105 188 95 90 85 88 75 70 65 60S0O000(00009O0000p0OO0(poflflOp

55 50 45 40 35 30 25 20fmlo0Q0o0o(p0 0000 u0$a O I I

15 18 50

000.00 . . . . . .. . . . .

0+ i i a ; 060

001 .... t o0o

i - - 00

00.................. ...... a..... .......... 0 0 .............. .................. a .... 00

00...................................0 0 .. .. ..... .. ... . ...... ... . ......... . ... .. . . . ........

00, ,00 (-. , ................a. ....................., . -.. . 0 0............................ ......-..00

(0........... .. a.. .. ................ .......0 a ,.. ........ ...... ....... I ..................................

00...... . a........ ...-... ....O..O ....- 0 a..... ...0 ....-.. .... . .... ...... ....... O

(0 0-, .-00()....-.-.... .......... 0 0 .. ....... ,0 a .... ----..-....... O0......00 .

a..... ... T .... ..... . ...... .. 0j00.--i. 0..... 0 oT ..... . . 0 0 . . . .- V i -- T........ .... ao... ... :::00.... -.. 00 .... ............. ., ... .... 0 0 ..-..... . 0 0.............0 0. . ......... ... a . .. 00 ....... O0

00 ...... .... .... . ..... .... .... . .o .. uNo.. a 0. .......... 00 .... ........ ......... .............. 00

0oo ............... ........................ ..... .a D 0 0...... .. . . ............ ........... ..... ..... .... 0

00.. ..... ............ .... ....... ... ....... .0 0 ... .... 0........

.. ......................... ............... ......... . . 0 ... : :::: :: o

0 .. . . . . . . .. . ........... ..- T.... ...... .... . .... -.... . 00 00

0 ( . . . . . . . . . . . . . . . . . . . . . . . . . . . 0 0 0

0...* 0........ ..... ... l... .. ............. 0000 0000 0000 000 ......... ...... a 0 .......... . . ... . : T o

0 -0....0 -... .. -... .. ... 0. 0........... .. .... .-. 0......0

)0 .. , .. 00 )... ...."' ' ' '" . . . ' ... ,01 : :0000 0000 0 0) -0-0 0000 000000-.. ., ... " . U. ..." ...- .' ..-. -.-)a 0 ,.,0 (

0... ..... a .. ............................. 0

0- ... .. .............. .. 000..,....--... ... .... .0000 0000- 0000 . •00 •0000 0 . .... go:::000. .... .a..............0 .. 00- ------- -

-- ----- 0

0..,,,,0()0--,*~... .... ..... u ' "*" '"'" ' '' ' ' " 0 0 . ..,, . .. D - , ..-. O . ... -,.... 0 •0 ,, ,

0 ... ... ..... ..... ......... ...... ......... .. .... .... .... ...... 00 .......................................................................... ......... ......... I.... ......... ......... I..... .........II.....: : :0

0 ....................................................a.......... ......... ............ ......... ........-...... o .. ...... ....................

0.......00..................00...............................00...............................00..................00.......

00......0 ............. 0...............................0 0.................a..... ...................... 0.....00

0....................0 ........ :000.......................00,00...........................000............. ........... 0

0...........................................................0 0.............. 0 0.............. a ... .... ( ........................

000 00:::

0. .

:0..)0000I 0000 )0000( 000 0 00 0 0;0000 ... .... . -ý0*0*ý01*41;*4;;1o;ý;;;*0000 0000 0000 0 0 0 0 0 )0000,)0000(p0000 )000000000~0000000000 ý0000I )0000

11 105 18 95 90 85 88 75 78 65 60 55 50 45 40 35 30 25 20 15 18

Wengho.eEkwlricConrpanyLLC-STMax 1W17/2rAM 1303:08

5

Page 161: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - D TUBES TO BE REPAIREDHOT LEGByron B2R14 CBE D5

A 1 TUBE TO BE STABILIZED (190"CABLE STABILIZER) THENPLUGGED IN THE HOT LEG

B 2 TUBE TO BE PLUGGED IN THE HOTLEG

.10 106 lee 95 90

0000

00 .

85 80 75 70 65 60joooo0oooq00000000BoBo~ooo0po

55 50 45 40(DO0 GO (0 00 (D000o(D 00 0

a 33 EXISTING PLUGGED TUBE35 30 25 20 15 10(P000 1I I I I I I

5

0 ... 00

a

0

0

0

.... .... .... .... ....

0ý000

00................a.............ý.....,.0 0.................. V 00

0.............a.................0 0............................ .... ":..00

00 .0...... .... ..... .......... ................. ... 0 0.... -............................. 0.. .. 00

a....C................0000........0 0........o.a...........a. 0 a0a........ 00 .... .... .... ............ 0 0...........0 0............0 0 ................ .......... 00..........a

S.900 e e e Ce--

00A.. ....... .. ....... . .................... . ...... 0(00 .. .. ...... 0 0 .. .......... 00(0 .. .. ................................... 000............. .......................... . ................. 0 0 .. ........... . ........ ........................... .. . ....... .....0 . .. ........ .. ..... . ......... . ..... .......... ..... . .... .... .......... 0 0. .. ..... .......... .... .......... ................. .......... .......

00......................... ..... ......... .... .......... .... 0 0 .... ......... .... .... .... .... ........................... 001

.............................. .... .... .... .... .... .... 0 0... .... .....................................

00... 0.00.... .. . . . ...... . .... . . .. ...... 0 . .... ........................... .... ... .... .... .... 0 0 = = =

0.. ........ .. ... .... ..... ...... ... ...... 0 0. ....... 0.. . .... . .... ............. . ....- ......... 0

)e-, ,, 0 o o , , ,- , -- ------ --- -- 0 .. o , O O . ~ . ,~ e tj - ý0000 ' "' D

OO................... 00 ... . ........ AOOo 00000 0000 0000...... .................. 0 .. . . a0

O .'.OOe o.... .:o :::. 0e *~o .. ~ .... eoo .. o! ::oe o ()::::o :::: :::00(11)00::: uooeo::" :

0 ~ e ~ e e e e e e ~ e e e ~ ~ e e~ e e 0 ° o o ° , , ° e e e e o e e ° ° • e e ° 0

0 O... .................................. .0 0 0 0 0 0 0 0 .. .. ...... n.... ............ . .............. 0

0......... .O.... ......... ....... .. ..... 00 ,O0000.... )0000)0000.. . . O......................... ...... . .......... 0

0........................................................................ .... .... .... .... ýo... .... .... .... ... .... .... .... .......... 0

- 0 0 , - 0 . , , , , , , •0 , * - - - , , , , , , , 0) , . , , , , , 0 , , 00 -

0.... .................... . .... ... . ...... . .... .......... ............... . ... .. . .. . ....... ........... 0O

0 '.... -.................................................................... .... .... .... ......... ..................... ..... .... ..... ................. 0

0.....0 0.............0 0................................ ... 0000.....o... .... .... ........ ......... ........ . 00.........o... ..... .......... 0 ......... 0

C 0 - E-.)--, 0 0 0 0 0-, -, , -- e ,-- E

0......0 ............. 0............................... ...... 0.......................... .0.... .... .... .... *.....0 ...... 0

00 . . . .. .. . .. 00

0° 0 ,, . o,,.. ° 0e ...,. , ,, ., .. ... 0()0.°,e e, ee ,. , ,, , , . e , e ° e e , . , e e e e .O

00.. , . , .e ..... .. . .... ....ee le ee , ... 0.°.e..ee , e e , , , ., , ,, ° °, °°.. .... O0

oo .. .... .................... ....... ...

0.°.

0 ...0.**

0000 110 1005(100 95 90lie 105 is@ 95 90 85 80

000 POOOO POOOO !0000 ý0000- 0-0.0-0. -0 0.'0.0.,(,0000 ,0000 ,0000bO0000b0000d)0000(D0OO

75 70 65 60 55 50 45 40 35 30 25 20 15 10 5

WmblnghousoE~cic Coipany LLC -ST Ma 1O/11M290 1425:2fi

Page 162: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - D TUBES TO BE REPAIREDCOLD LEGByron B2R14 CBE D5

A 1 TUBE TO BE PLUGGED IN THECOLD LEG

B 1 TUBE TO BE STABILIZED (302"CABLE STABILIZER) THENPLUGGED IN THE COLD LEG

C 1 TUBE TO BE STABILIZED (190"CABLE STABILIZER) THENPLUGGED IN THE COLD LEG

a 33 EXISTING PLUGGED TUBE

110 105 100 95 9g 85 80 75 70 65 60J0000(D0000QO00Op0q8O$O000c00

55 50 45 40 35 30 25 20QP0OU0QO000Q0000c0000000000I I I

15 10 5

)0.. 0 4 4 060

V0 0i .... I .... .... I .... I ... :10000000............. Aa..........0 0.......................0

00.6 . . a............ 0........... .................... a...........'.0000... ... .... ..................... ........ . .... .. .... ........ ...... ............ 000 ............... . U .. . . . .....,,..... O ,.-.-. . . ............. :, ,":, .000. . . . . . . . . . . . . . . . . .0t'' '''' 0................................................0

00 0.. ........... 0 0 .......................... '..... .00 00a . . .........O0.0.............0 0....... 0 o .. ... ooo..m. 0 0 ............. .. .noo. . o

....... 00(.....................o0 0.... .... 0 0 . .....-..0 0...- .......... .... 0-()O.......aEMIG. .--. O - - - 0 -, . - O---Eaae --- -- O0 ----- -

00-.... . .- ...-.- ..-.-. .-..- 0()00-.. ...... 0 0 ......... 00()0-..-........ --... .... -....... 00

00....................... .............. ..... .......... .... 0 0..........................................: * ,.OnC0 ................................... .... .... .... .... ..... 0 0...................... .... ......... .... ..... .... ..........a

00....................................... 0 0 . .. .............. .... . . .... ..... ..... . ........ 00

Ce - o-, e e0--......................................... 0 0... ........................................ .0

00.............................................. 0 0................... ....................... 00

0 ........................................... : :1)0 ....... 0a 0.............. ..................... .... ............... 00 . .. .......... ........ 00........................ 00000..... 0 . .......... 0...... ............o.. O

00- .00........0............... . ..00.. .. .... . .. . .. 00............ . 00 00

0().... .... .... .... .... .... .... .... .... .... ......... .... .... .... ........................... "*.. . . . . . . . . . . . 0

O e,,,,,,,,,,, ,,,,.e,,.... ........... .......ee ,, ,, .ee , ,. 0,,, , ,

00............................................................. .... .................... .......... .... .......... ............... ..... ..... .00

0........0 0 ... .... ........ .... 000().......... .......... ................ 0000 .... .... ........................ 0 0............. 0...,....0~ -& e - - ~ e ( - -_)-- C C--- --- - e E)- -- C-

0..... .... 00.... 0. .. .0. ..................... ..... 40 .. ... ...... 0 -....... ......... 0 o0..., , .. 0

eeee *eo ..e ... ~ e . .... e . ..ee . .. ee. e , o e ,, e o , o e e e e o . .. ''.• 0

0 ........................................ 01: . .... .... ............................................................... 000.. .. ...... ..... .. ............................... .............. ............ ,..... ,.............................,.......00

0 ..f. t * t t . t. ..

"'0

)0000

5

0000

11 105 100 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10

Westinghouse Electdic Company LLC - ST Max 101I7/208 14:25:13

Page 163: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - A DATA FOR TUBES TO BE PLUGGED

Byron 2 B2R14 CBE 20881681 10/15/2888 20:67:20

.. .. .. ... --- - - - - ---- ---- ----- + ............... ......................................................-- ---.- -

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI+. .+ . +... .+. .+ . +..+.----------------.-+ --- .----+----. ..... +.....---- - + ..--- .. +-.........---- . .,----+-- ... --- --.... +..... - -

45 28 .63 8 PCT 11 P2 AV2 .88 TEH TEC .610 ZBAZC 14 CI45 28 5.35 0 PCT 40 P2 AV3 .80 TEH TEC .610 ZBAZC 14 Cj45 ý28 4.57 8 PCT 38 P2 AV4 .80 TEN TEC .610 ZBAZC 14 CI45 28 NDD TEH TEH .610 NPSNM 71 HI45 28 4.07 8 PID P2 AV3 .06 TEH TEC .610 ZBAZC 88 CI

I34 47 NOD TEN TEC .610 ZBAZC 26 CI34 47 TBP TEH TEC .618 ZBAZC 26 CI34 47 NDD TEH TEH .618 NPSNM 77 HI

--------------------- +--------+-----,-----+-----+-----,----+---+--+ -+- ---- +-----+-----+------+------

I ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI4-.. .. .. .. + . +.. ....--------------- + --------,...+.......---- --.-- . . + --. . +- ....... 4----. ---- + ----. +-+.......- --... ...- - °4-

Tubes: 2 Records: 81

Page 164: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - B DATA FOR TUBES TO BE PLUGGED

Byron 2 B2R14 CBE 28881861 18/16/1208 87:31:22

+ . . +- - - - - --.... 4- .... 4- .... 4- .... - .... - .. .. .. - - - -- .........--.- - - ÷ .......- ++- . + .-+ .-+ -. . .-- - - -- -- - +

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI..... --.- ....-......---------- - .+..-.....------ +-...........-+ - -..... 4------.-..---- .---- ....-......---- ....

1 6 7 NDO TEH TEC .610 TBATC 38 CI6 7 NDD TEH TEH .618 NPSNM 67 HI6 7 TBP 85H 4 5H .616 NPSNM 73 HI6 7 41.84 83 PLP 11 85H .68 B5H 05H .616 NPSNM 73 HI

I6 B NOD TEH TEC .610 TBATC 38 CI6 8 NOD TEH TEH .618 NPSNM 65 HI6 B TBP 05H 05" .618 NPSNM 73 HN6 8 33.27 84 PLP 11 85H .61 85H B5H .610 NPSNM 73 HI

7 8 .31 112 DSI P1 05H .93 TEH TEC .610 TBATC 38 CI7 8 NOD TEH TEH .610 NPSNM 65 HI7 8 .87 182 SVI P4 05H .72 05H 05H .618 NPSNN 73 HI7 8 .13 294 PCT 15 2 814H .78 .36 .36 55 85H 85H .618 NPSNM 73 HN7 8 TBP TEC TEH .610 TBATC 101 HI7 8 .26 52 DSI P1 85H .58 TEC TEH .618 TBATC 181 HII

25 28 .59 101 DOI PI 87H -. 47 TEH TEC .618 TBATC 12 CI25 28 3.82 79 MBM 6 181 18.26 TEH TEC .618 TBATC 12 CI25 28 NDF 2 TEH .93 TEH TEH .618 NPSNM 43 HI25 20 .54 229 PCT 38 2 87H -. 63 .38 .38 58 87H 87H .618 NPSNM 73 HI25 28 16.73 65 PLP 11 87H -. 62 87H 87H .610 NPSNM 73 HI25 28 .35 45 SVI P4 87H -. 66 87H 87H .610 NPSNM 73 HI25 20 TBP TEC TEH .618 TBATC 181 HI25 20 .61 185 OS1 P1 87H .85 TEC TEH .618 TBATC 181 HI25 20 NOD 82C B2C .618 NPSNM 126 CI

I48 55 6.23 0 PID P2 07C .33 TEH TEC .610 TBATC 34 CI48 55 NOD TEH TEH .610 NPSNM 35 HI48 55 4.70 8 PCT 45 P6 87C - .03 TEC TEN .618 TBATC 181 HI48 55 1.20 105 VOL P4 87C .23 87C 87C .618 NPSNM 118 CI

+-... . ......-....-........ . ..--....- +....+-.........-+.........--.-----.......+.......+........-...........-- --- ---......- +--

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI.. .- .-... -. .......... ...-. +--+.. .- - -.... .. ..4- -.... +........ . +.........-- 4 -- . .. . . . .. . . . ..-- --+ . -. .. ........-+----

Tubes: 5 Records: 271

Page 165: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - C DATA FOR TUBES TO BE PLUGGED

Byron 2 B2R14 CBE 20881881 11/15/2888 22:20:22

SR- - OL -VOLT -E -N - - -O -NH -NC 2 - CR-E C- - B-- -- EGT ENT- P A- PT-- ------- -P-- - -- --- -- AL-----

I ROW COL _VOLTS DEG INO PER CHN LOCH INCHi INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI----------------------------- +--------+-----+-----+-----,------+---+--+-----+----+-----+-+------

33 63 NOD TEH TEC .618 TBATC 6 CI33 63 NDD TEH TEH .610 NPSNM 53 HI33 63 47.30 84 PLP 11 88H .77 0814 88H .610 NPSNM 101 HI33 63 47.14 84 TBP 8 11 081 .77 881H 08H .618 NPSNM 101 HI

I34 63 NOD TEH TEC .610 TBATC 6 CI34 63 NOD TEH TEH .618 NPSNN 51 HI34 63 NOD TSH TSH .618 NPSNM 51 HI34 63 46.58 88 TBP 11 88H .69 88H 88H .618 NPSNM 181 HI34 63 45.26 88 PLP 11 f8H .69 881H 8814 .618 NPSNM 181 HII34 64 NOD TEH TEC .618 TBATC 4 CI34 64 NOD TEH TEH .610 NPSNM 51 HI34 64 NOD TSH TSH .618 NPSNM 51 HI34 64 .34 288 TBP 8 2 88H .88 08H 88H .618 NPSNM 181 HI

----------------------- +--------+-----+-----+-----+-----+----+---+--+-------+ ----+ -----+ - - +--- -----

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENOT PDIA PTYPE CAL LI÷. .+ ..- ....... - ... ... ---------........--.----.---- ..-- -+---.....+--- +.... ... ...-- -- .---.--- -+ --- +. ..-----..+ .... - - +

Tubes: 3 Records: 131

Page 166: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

SG - D DATA FOR TUBES TO BE PLUGGED

Byron 2 B2R14 CBE 28681881 18/16/2888 81:24:46

.... -.... - ... .- -- - - + .... - .... - .... - -. .- -. .- .-.. - - ---- --- ----- - - - -- -- - -- - - - - - - -- - - - --

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENOT PDIA PTYPE CAL LI......---......- +-..----------..--..--------...----- --..-----.....----- ------------ .. ..-----.... -- ÷

49 67 NDD TEH TSH .610 NPSNN 13 HI49 67 2.48 174 DNT P1 AVI .06 TEH TEC .618 TBATC 32 Cj49 67 2.65 177 DNT P1 AV2 .16 TEH TEC .618 TBATC 32 CI49 67 2.14 174 DNT P1 AV4 .18 TEH TEC .610 TBATC 32 CI49 67 2.02 72 MBM 6 19C 23.44 TEH TEC .610 TBATC 32 CI49 67 1.37 135 DSS P1 98C - .03 TEH TEC .610 TBATC+ 32 Cj49 67 6.73 8 PIO P2 S7C .8e TEH TEC .610 TBATC 32 Cj49 67 .72 215 PCT 26 P6 88C .05 TEC TEH .618 ZBAZC 85 HI49 67 1.97 8 PCT 41 P6 87C .05 TEC TEH .618 ZBAZC 85 HI49 67 .58 95 VOL P4 08C -. 03 88C 08C .610 NPSNM 98 CI49 67 .51 97 VOL P4 87C .08 87C 07C .616 NPSNM 98 CII24 69 .52 154 DFI 1 85H -. 84 TEH TEC .618 ZBAZC 18 CI24 69 NDD TEH TEH .618 NPSNM 51 HI24 69 .25 263 PCT 27 2 85H -. 84 .31 .45 69 85H 85H .618 NPSNM 75 HI24 69 .17 88 VOL P4 85H -. 67 85H 85H .618 NPSNM 75 HN24 69 TBP 85H 85H .616 NPSNM 87 HI24 69 .25 79 PID P4 05H -. 84 05H 05H .618 NPSNM 87 HII49 69 NDF 2 TEH .47 TEH TEH .618 NPSNM 37 HN49 69 NOF 2 TEH .89 TEH TEH .618 NPSNM 37 HI49 69 4.65 179 DNT Pl AV2 .12 TEH TEC .618 TBATC 48 Cj49 69 2.49 177 DNT P1 AV3 .88 TEH TEC .618 TBATC 48 CI49 69 5.94 8 PIO P2 S7C .41 TEH TEC .618 TBATC 48 CI49 69 1.88 8 PCT 41 P6 87C .13 TEC TEH .618 ZBAZC 85 HI49 69 1.29 87 VOL P4 87C .41 87C 87C .618 NPSNM 98 Cl

+ .. +.. .... .. +.. ..-----------..---..------------ +...---+--- .+--+.............----- + .... +...+... ...----+----+----- - -

I ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 I CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL Lj+.. .. .... .. +..+.---------...--.----+----.----+..--- +...--- +--+ ..... +.....+.. ----- .----.----+ +..----+ -. .----.. +-....--+

Tubes: 3 Records: 241

Page 167: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

ATTACHMENT D

ASME FORM NIS-1OWNERS REPORT FOR INSERVICE INSPECTION

Page 41 of 44

Page 168: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

ATTACHMENT DFORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONS

As Required by the Provisions of the ASME Code Rules

1. Owner: Exelon Generation Company, LLC, 200 Exelon Way, Kennett Square, PA, 19348(Name and Address of Owner)

2. Plant: Byron Station, 4450 North German Church Road, Byron, Illinois, 61010(Name and Address of Plant)

3. Plant Unit: Two (2) 4. Owner Certificate of Authorization (if required): N/A

5. Commercial Service Date: 08/21/87 6. National Board Number for Unit: N-200

7. Components Inspected: Steam Generator Eddy Current Inspection - Unit 2, Refueling Outage 14

Component or Manufacturer or Manufacturer or State or Province National Board No.Appurtenance Installer Installer Serial No. No.

2RCOIBA Westinghouse 2095 U-201435 15

2RCO0BB Westinghouse 2096 U-201436 16

2RCO0BC Westinghouse 2097 U-201437 17

2RCO1BD Westinghouse 2098 U-201438 18

t 4 4 4.

4 4 4.

4 4

* * 4 +

t t 4.

4 4 +

4 4 4 1.

NOTE: Supplemental sheets in the form of lists, sketches, or drawings may be used, provided (1) size is 8 /2 in. x 11 in.,(2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and thenumber of sheets is recorded at the top of this form.

Page 42 of 44

Page 169: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

FORM NIS-1 (Back)

8. Examination Dates: 10/11/08 to 10/16/08

9. Inspection Period Identification: 1/16/06 to 1/15/09

10. Inspection Interval Identification: Third Inservice Inspection Interval

11. Applicable Edition of Section XI: 2001 Edition through the 2003 Addenda

12. Date/Revision of Inspection Plan: February 1, 2008 / Revision 2

13. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for currentinterval.

See Attached Report

14. Abstract of Results of Examinations and Tests.

See Attached Report

15. Abstract of Corrective Measures.

See Attached Report

We certify that the statements made in this report are correct, b) the examinations and tests meet the Inspection Plan asrequired by the ASME Code, Section XI, and c) corrective measures taken to conform to the rules of the ASME Code, Section XI.

Certificate of Authorization No. (if applicable) Not Applicable E

Date / 0 Signed For Exelon Generating Company, LLCOwner

•xpiration Date Not Apvvlicab/eBy i'q Jý1 jk-J

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of oil r essure Vessel Inspectors and the Stateor Province of • _ 1j and employed by d•.., L .7 pf 6,'#'t 17'_, . have inspected thecomponents described in this Owner's Report during the period /e ,, to 1 9 , and state that to the best of myknowledge and belief, the Owner has performed examinations and tiken'corrective measures described in this Owner's Report inaccordance with the requirements of the ASME Code, Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning theexaminations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shallbe liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with thisinspection.

,,Z/-id sV/Commissionsiffspector's Signature

Datea€w"V'/

National Board, State, Province, and Endorsements

Page 43 of 44

Page 170: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

ATTACHMENT E

ASME FORM NIS-2OWNERS REPORT FOR REPAIR/REPLACEMENT ACTIVITY

Page 44 of 44

Page 171: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

DOCUMENT NO.: 4.2 REV. NO.: 0

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITYAs Required by the Provisions of the ASME Code Section Xl

1. Owner Exelon Nuclear Date 10-17-08Name

4300 Wlnfleld Road, WarrenvIlle. IL Sheet 1 of 1Address

2. Plant Byron Nuclear Power Station Unit 02Name

4450 N. German Church Road. Byron, IL Work Order No. 01020110-2Address Repair Organization, P.O. No., Job No.. eo.

3. Work Performed by Wetinghouse Electric Co. Type Code Symbol Stamp Not ApplicableName Authorization No. Not Applicable

PO Box 158, Madlson, PA 15663 Expiration Date Not ApplicableAddress

4. Identification of System REACTOR COOLANT (RC)

5. (a) Applicable Construction Code ASME Section III 19 71 Edition, Addenda Code Case(b) Applicable Edition of Section Xi Used for Repair/Replacement Activity 2001 Edition / 2003 Addenda(c) Section Xi Code Case(s) NONE

6. Identification of Components

Name ofComnornt

Name ofManufacturm

ManufacturerNational

BoardNo.

Corrected,Removed, or

Installed

ASMECode

Stamped(Yes or No)Other Year

Mechanical Tube 2RC01BA

Plugs Westinghouse Ht No: Now S/N 2095 2008 Installed NOHo e/odLgNX4418HK NA Row: 46 / Col.: 28Hot Leg/Cold Leg CAT IDO 46093

2RC01BA ..Mechanical Tube Ht No: S/N 2096Plugs Westinghouse NX4418HK N/A SIN 20C6 2008 Installed NOHot Leg/Cold Leg NX441_HK_ Row: 34C Col.: 47CAT ID# 4,5093

7. Description of Work INSTALL MECHANICAL TUBE PLUGS IN THE 2A SG.

8. Test Conducted: Hydrostatic C0 Pn

Other 0 Pressure

eumatic [] Nominal Operating Pressure [I Exempt 0n/a psi Test Temp. n/a OF

Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8½ in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the numberof sheets is recorded at the top of this form.

Page 172: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

FORM NIS-2 (Back)

9. Remarks 01029110-02Applicable Manufacturer's Data Reports to be attached

S72 / W74 for NB-2331(D). NB2332(A)(2). NB-4334. 4334.1& 4334.2. NB-4335.1. NB-4335.2. & NB-4335.3

** 1355, 1493-1, 1484, 1528

Mechanical tube plugs fabricated to ASME Section 1111989 Edition No Addenda with Code Case N-474-1.

CERTIFICATE OF COMPUANCEI certify that the statements made in the report are correct and this conforms to the requirements of the ASME

Code, Section Xl.Type Code Symbol Stamp Not ApplicableCertificate of Authorization No. Not ApplicableSigned .f"C.. . Date /- ,20 09

c )or OwrWr'e Desglnee, Tfi

CERTIFICATE OF INSERVICE INSPECTIONI, the undersigned, holding a valid commission issued by the National Board of Boiler and PressureVessel Inspectors and the State or Province of Illinois and employed by HSB CTof , •ord, CT have isgted the components described In this Owner's Report during the period

oand state that to the best of my knowledge and belief,•fhOwner has perform~•'examinations and taken corrective measures described in this Owner'sReport in accordance with the requirements of the ASME Code, Section Xl.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed orimplied, concerning the examinations and corrective measures described in this Owner's Report.Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personalinjury or property-damage or a loss of any kind arising from or connected with this inspection.

Commissions0De- - n2pe0s0Date. QAM" • 20 09

Na*xW Bowd, Slate Provinx, wW Endorewwft

(Final)

Page 173: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

DOCUMENT NO.: 4.2 REV. NO.: 0

FORM NIS-2 OWNER'S REPORT FOR REPAIRIREPLACEMENT ACTIVITYAs Required by the Provisions of the ASME Code Section XI

1. Owner Exelon Nuclear Date 10-17-08Name

4300 Winfleld Road, Warrnvllle, IL Sheet 1 of 1Address

2. Plant Byron Nuclear Power Station Unit 02Name

4450 N. German Church Road, Byron, IL Work Order No. 01029111-02Address Repair Oganization, P.O. No., Job No.. et.

3. Work Performed by Westinghouse Electric Co. Type Code Symbol Stamp Not ApplicableName Authorization No. Not Applicable

PO Box 158, Madison, PA 15663 Expiration Date Not ApplicableAddress

4. Identification of System REACTOR COOLANT (RC)

5. (a) Applicable Construction Code ASME Section III 19 71 Edition, Addenda, _ __Code Case(b) Applicable Edition of Section XI Used for Repair/Replacement Activity 2001 Edition / 2003 Addenda(c) Section XI Code Case(s) NONE

6. Identification of Components

ASMEConacted, Code

National Removed, or StampedName of Name of Manufacturer Board Other Year Installed (Yes or No)

Component Manufacturer Serial No. No. Identification BuiltMechanical Tube 2RC01B8elag a Tub e Ht No: N/A S/N 2096 2008 Installed NOPlugs Westinghouse NX4418HK Row: 6/ Col: 7Hot Log/Cold Log CAT ID# 45093

Mechanical Tube Ht NO: BSN 2BPlugs Westinghouse NX4418HK N/A SIN 6 2008 Installed NOHot Leg/Gold Log NX48KRow: 6 / Col: 8a 08 IsaldN

Ho_______od Log CAT ID# 45093

Mechanical Tube 2RC01 BNPlugs Westinghouse NX4418HK N/A N2008 Installed NOHot LegtCold Log NX4418HK Row: 7 / Col: 8

Ho__L___Cold L g CAT ID# 48093

Mechanical Tube 2RC01 BBPlugs Westinghouse NX4418HK N/A 2008 Installed NOHot Leg/Cold Log Row: 25 / Col: 20

CAT ID# 450932RC01 58

Mechanical Tube H-it NO:Plugs Westinghouse NX4418HK N/A 2008 Installed NOHot Leg/Cold Log Row: 48 / Col: 5 2

CAT ID# 45093 ] I

7. Description of Work INSTALL MECHANICAL TUBE PLUGS IN THE 2B SG.

8. Test Conducted: Hydrostatic 0 Pneumatic 0 NorrOther 0 Pressure n/a psi

tinal Operating Pressure [I Exempt 0Test Temp. n/a OF

Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8½ in. x 11in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numberedand the number of sheets is recorded at the top of this form.

Page 174: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

FORM NIS-2 (Back)

9. Remarks 01029111-02Applicable Manufacturers Data Reports to be attached

S72 / W74 for NB-2331(D), NB2332(A)(2). NB-4334, 4334.1& 4334.2, NB-4335.1. NB-4335.2, & NB-4335.3

** 1355, 1493-1, 1484, 1528

Mechanical tube plugs fabricated to ASME Section 1111989 Edition No Addenda with Code Case N-474-1.

CERTIFICATE OF COMPLIANCEI certify that the statements made In the report are correct and this conforms to the requirements of the ASME

Code, Section XI.Type Code Symbol Stamp Not ApplicableCertificate of Authorization No. Not AppIIcableSigned e" , .- y.d Date / , 20 09

O-"-b mwee's Desgigee, Tft

CERTIFICATE OF INSERVICE INSPECTIONI, the undersigned, holding a valid commission issued by the National Board of Boiler and PressureVessel Inspectors and the State or Province of IllInois and employed by HSB CTOf .Hrtford, CT have in pected the components described in this Owner's Report during the periodIto -A, and state that to the best of my knowledge and belief,

e- examinations and taken corrective measures described In this Owner'sReport in accordance with the requirements of the ASME Code, Section Xl.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed orimplied, concerning the examinations and corrective measures described in this Owner's Report.Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personalinjury or prope aage or a loss of any kind arising from or connected with this inspection.

Commissions /14t 54VInspector Signature National Board, State Provine, and Endorsementa

Date: !3,dWf- ,20 09IF- /

(Final)

Page 175: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

DOCUMENT NO.: 4.2 REV. NO.: 0

FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITYAs Required by the Provisions of the ASME Code Section XI

1. Owner Exelon Nuclear Date 10-16-08Name

4300 Wlnfield Road, Warrenville, IL Sheet 1 of IAddress

2. Plant Byron Nuclear Power Station Unit 02Name

4450 N. German Church Road, Byron, IL Work Order No. 01029112-02Address Repair Orgmanzation, P.O. No., Job No., etc.

3. Work Performed by Westinghouse Electric Co. Type Code Symbol Stamp Not ApplicableName Authorization No. Not Applicable

PO Box 158, Madison, PA 15663 Expiration Date Not ApplicableAddress

4. Identification of System REACTOR COOLANT (RC)

5. (a) Applicable Construction Code ASME Section iI 1971 Edition, ' Addenda, e' Code Case(b) Applicable Edition of Section Xi Used for Repair/Replacement Activity 2001 Edition / 2003 Addenda(c) Section XI Code Case(s) NONE

6. Identification of Components

ASMECorrected, Code

National Removed, or StampedName of Name of Manufacturer Board 0ther Year Installed (Yes or No)

Component Manufacturer Serial No. No. Identrication Built2RC01BC

Mechanical Tube t o S/N 2097

Plugs Westinghouse NX441oH- N/A Row 2 2008 Installed NOHot Leg/Cold Log CATKRow. 33 / Col.: 63CAT 1ID# 45093

2RC01BCMechanical Tube Ht No: S/N 2097

Plugs Westinghouse NX4418HK N/A Sow 34 2008 Installed NOHot Leg/Cold Log NX4418HK Row: 34 / Col.: 63CAT 1ID# 45093

2RC01 BCMechanical Tube t No: S/N 2097 2

Plugs Westinghouse NX4418HK N/A 2008 Installed NOHot Leg/Cold Log CAT iD 4609Row: 34 / Col.: 64CAT ID# 4509

7. Description of Work INSTALL MECHANICAL TUBE PLUGS IN THE 2C SG.

8. Test Conducted: Hydrostatic C] Pn

Other C0 Pressure

eumatic [] Nominal Operating Pressure Eln/a psi Test Temp. n/s

Exempt 0I OF

Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8½ in. x 11 in., (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the numberof sheets is recorded at the top of this form.

Page 176: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

FORM NIS-2 (Back)

9. Remarks 01029112-02Applicable Manufacturers Data Reports to be attached

S72 /W74 for NB-2331(D), NB2332(A)(2), NB-4334, 4334.1& 4334.2, NB-4335.1, NB-4335.2, & NB-4335.3

'- 1355, 1493-1, 1484. 1528

Mechanical tube plugs fabricated to ASME Section III 1969 Edition No Addenda with Code Case N-474-1.

CERTIFICATE OF COMPUANCEI certify that the statements made in the report are correct and this conforms to the requirements of the ASME

Code, Section XI.Type Code Symbol Stamp Not ApplicableCertificate of Authorization No. Not ApplicableSigned go- art Date .20 09

Co-wr_ Ownees ovowmne, f

CERTIFICATE OF INSERVICE INSPECTIONI, the undersigned, holding a valid commission issued by the National Board of Boiler and PressureVessel Inspectors and the State or Province of Illinois and employed by HSB CTof Cfiord T have igspcted the components described In this Owner's Report during the period

to ,, and state that to the best of my knowledge and belief,t~e 6ner has perorm eaminations and taken corrective measures described in this Owner'sReport in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed orimplied, concerning the examinations and corrective measures described in this Owner's Report.Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personalinjury or property damgo or a loss -of any kind arising from or connected with this inspection.

________________M Commissions /Z//,14$y/Inspectoef'sSinature Natlons Board, State Province, and Endorsements

Date: p • 20 09

(Final)

Page 177: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

DOCUMENT NO.: 4.2 REV. NO.: 0

FORM NIS-2 OWNER'S REPORT FOR REPARIREPLACEMENT ACTIVITYAs Required by the Provisions of the ASME Code Section Xl

1. Owner Exelon Nuclear Date 10-16-08Name

4300 Wlnfleld Road, Warrenville IL Sheet 1 of 1Address

2. Plant Byron Nuclear Power Station Unit 02Name

4450 N. German Church Road, Byron, IL Work Order No. 01029113-02Address Repair Organiton, P.O. No., Job No., etk.

3. Work Performed by Westinghoum Electric Co. Type Code Symbol Stamp Not ApplicableName Authorization No. Not Applicable

PO Box 158, Madlion, PA 15663 Expiration Date Not ApplicableAddress

4. Identification of System REACTOR COOLANT (RC)

5. (a) Applicable Construction Code ASME Section I11 1971 Edition, Addenda, Code Case(b) Applicable Edition of Section XI Used for Repair/Replacement Activity 2001 Edition / 2003 Addenda(c) Section XI Code Case(s) NONE

6. Identification of Components

ASMECorrected. Code

National Removed, or StampedName of Name of Manufacturer Board Other Year Installed (Yes or No)

cponent Manufacturer Serial No. No. Ideicaton sul_2RC01BO

Mechanical Tube Ht No: _20

Plugs Westinghouse HNX : N/A 2008 Installed NOHot Leg/Cold Log NX4418HK Row. 24/ Col: 69

CAT ID# 45093

Mechanical Tube 2RCtoSDPlugs Westinghouse Ht No: NoA:S4N 2098 2006 Installed NOHot Leg/Cold Log NX4418HK NA Row, 491/ Col.: 67 208 IsledN

CAT IDO 450932RCO1 0

Mechanical Tube Ht No:2Plugs Westinghouse HX4No:KN/A S/N 2098NOHot Leg/Cold Log NX4418HK Row. 49 / Col.: 69 2008 Installed

-CAT ID# 45093

7. Description of Work INSTALL MECHANICAL TUBE PLUGS IN THE 2D SG.

8. Test Conducted: Hydrostatic 0] Pneumatic [] Nominal Operating Pressure 0 Exempt@ruhgw r-I Oa... I~rf ,.e I.ea T ~ ~ ~ -I 0C.. -I.

L.J 5 1.1I l Igu IUF0II.F. 1I1I -Note: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8% in. x 11 in., (2)information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the numberof sheets is recorded at the top of this form.

Page 178: Byron, Unit 2 - Steam Generator Inservice Inspection ...Attachment: Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 14 Refueling Outage, October 2008 DMH/PC/TLH/Im

FORM NIS-2 (Back)

9. Remarks 01029113-029Applicable Manufacturer's Data Reports to be attachedS72/ W74 for NB-2331 (D), NB2332(A)(2), NB-4334, 4334.1 & 4334.2, NB-4335. 1, NB-4335.2, & NB-4335.3

1355, 1493-1, 1484, 1528

Mechanical tube plugs fabricated to ASME Section 1111989 Edition No Addenda with Code Case N-474-1.

CERTIFICATE OF COMPUANCEI certify that the statements made in the report are correct and this conforms to the requirements of the ASME

Code, Section XI.Type Code Symbol Stamp Not ApplicableCertificate of Authorization No. Not ApplicableSigned t C. C rn-:d, Date Z 20 09

- (• ~Ownrw's Meowgee Tft

CERTIFICATE OF INSERVICE INSPECTIONI, the undersigned, holding a valid commission issued by the National Board of Boiler and PressureVessel Inspectors and the State or Province of Illinois and employed by HSB CTof CT have injcted the components described In this Owner's Report during the period

,and state that to the best of my knowledge and belief,

has performf6ddxaminations and taken corrective measures described In this Owner'sReport in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed orimplied, concerning the examinations and corrective measures described in this Owner's Report.Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personalinjury or propertyrdp•page or a loss of any kind arising from or connected with this inspection.

Commissions /Aa -110',.Ipentors Signatum Natona Board, Stats Provirn, and Endorsements

Date: ()4ftA! 5' .20 09

Dae:QdAM-f 2 0

(Final)


Recommended