CAPITAL IMPROVEMENT PLAN FISCAL YEARS 2015/16 TO 2019/2020 The 5 year Capital Improvement Plan (the CIP) is a plan for major public facility improvements that are programmed to be implemented over the next five years. The projects included in the Project Details Report, attached hereto, are consistent with both City Council’s direction and the Vision 2025 Plan. The CIP is prepared by the Engineering Department and includes the funding and expense for projects provided from the City Departments of Community Development, Public Works, Parks & Community Services, and Grants. The Project Details Report summarizes the capital projects into programs or categories that include the following: PUBLIC WORKS - AIRPORT: The projects in this program are for the reconstruction and rehabilitation of existing infrastructure and facilities and for the construction of new facilities. The primary funding sources for these projects is FAA Grants, California Aeronautical Grants and Airport Fund Balance. PUBLIC WORKS DRAINAGE SYSTEM: The projects in this program are for the construction and rehabilitation of storm drain pipelines and drainage basins. The primary funding sources for these projects is Development Impact Fees. PUBLIC WORKS SEWER SYSTEM: The projects in this program are for replacement of existing sewer main pipeline, installing larger pipelines to meet increased flow capacity and for manhole improvements. The primary funding source for these projects is the Sewer Utility Fund and Development Impact Fees. PUBLIC WORKS WATER SYSTEM: The projects in this program are for replacement of water main pipelines, installation of residential and commercial water meters, and the installation of water wells. The primary funding source for these projects is the Water Utility Fund and Development Impact Fees.
Transcript

C��� �� �����

CAPITAL IMPROVEMENT PLAN

FISCAL YEARS 2015/16 TO 2019/2020

The 5 year Capital Improvement Plan (the CIP) is a plan for major public facility

improvements that are programmed to be implemented over the next five years.

The projects included in the Project Details Report, attached hereto, are

consistent with both City Council’s direction and the Vision 2025 Plan.

The CIP is prepared by the Engineering Department and includes the funding and

expense for projects provided from the City Departments of Community

Development, Public Works, Parks & Community Services, and Grants. The Project

Details Report summarizes the capital projects into programs or categories that

include the following:

PUBLIC WORKS - AIRPORT: The projects in this program are for the

reconstruction and rehabilitation of existing infrastructure and facilities and for

the construction of new facilities. The primary funding sources for these projects

is FAA Grants, California Aeronautical Grants and Airport Fund Balance.

PUBLIC WORKS – DRAINAGE SYSTEM: The projects in this program are for

the construction and rehabilitation of storm drain pipelines and drainage basins.

The primary funding sources for these projects is Development Impact Fees.

PUBLIC WORKS – SEWER SYSTEM: The projects in this program are for

replacement of existing sewer main pipeline, installing larger pipelines to meet

increased flow capacity and for manhole improvements. The primary funding

source for these projects is the Sewer Utility Fund and Development Impact Fees.

PUBLIC WORKS – WATER SYSTEM: The projects in this program are for

replacement of water main pipelines, installation of residential and commercial

water meters, and the installation of water wells. The primary funding source for

these projects is the Water Utility Fund and Development Impact Fees.

G�� � – TRANSIT SYSTEM: The projects in this program are infrastructure

improvements and passenger enhancements for the Fixed Route Transit System

and the Intermodal Operation and for the new Transit Maintenance-

Administration Facility. The primary funding sources for these projects is Prop 1B

– PTMISEA, Prop 1B – CalOES, Measure T and Development Impact Fees.

ENGINEERING – BRIDGES: The projects in this program are for rehabilitation

and improvements to existing bridges. The primary funding sources for these

projects is State & Federal Grants, Measure T, and Bridge Preventative

Maintenance Program (BPMP).

ENGINEERING – STREETS: The projects in this program are for

reconstruction, widening and pavement overlays of Collector and Arterial Streets,

installing sidewalks and curb returns for ADA walkability and installing bike lanes

and safety improvements. The primary funding sources for these projects is

Measure A, Measure T, Local Transportation Fund (LTF), Regional Surface

Transportation Program (RSTP), Congestion Mitigation & Air Quality (CMAQ),

Bicycle Transportation Account (BTA), Highway Safety Improvement Program

(HSIP) and Development Impact Fees.

ENGINEERING – TRAFFIC SIGNALS: The projects in this program are for the

installation of new traffic signals and improvements to existing traffic signals. The

primary funding sources for these projects is CMAQ, LTF, HSIP, Section 130 and

Development Impact Fees.

PARKS AND COMMUNITY SERVICES – The projects in this program are for

constructing bike/pedestrian paths, the Fresno River trail, park improvements and

rehabilitation. The primary funding sources for these projects is Measure T,

CMAQ, LTF, BTA, CDBG, San Joaquin Valley Air Pollution Control District (SVAPCD),

grants and donations.

C I T Y O F MADERA

PROJECT DETAILS Airport

Description: R������������� �� ������������ ���������

P� !"#$ %&'("�) *+P ,-Apron Reconstruction Phase II

Project Cost: ./012/0333

Phase:

Justification: R������������� �� ������������ �������� ��� �������t management program.

Category: A������

Total4567458 4587459 459745: 45:745; 45;74<=Expenditures

������������������Construction

������������Environmental

��������������Construction Management/Inspection

��������������Contingency

��������� ���������Total

Total>?@B>?D >?DB>?E >?EB>?F >?FB>?H >?HB>IJFunding Sources

��������������Airport Fund Balance: 20500-355

������������������FAA Grant: 20500-355

��������� ���������Total

Wednesday, June 24, 20151

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Airport

Description: KLMNLOOQNLM SOTNML UVQ WXYTO ZZ [O\VLT]Q^\] _OLOQY` Aviation Apron and Apron and taxiway drainage.

abcdefg hijkebl mna opEngineering Design - Apron, Drainage

Project Cost: qrstuvvv

Phase:

Justification: WYwOxOL] NT yO]OQNVQY]Oy YLy x^T] zO QO\VLT]Q^\]Oy as specified in new pavement management program. Drainage between the apron and taxiway is insufficient and needs to be upgraded.

Category: {NQ|VQ]

Total>?@B>?D >?DB>?E >?EB>?F >?FB>?H >?HB>IJExpenditures

��������Design/Engineering

������ ������Total

Prior

}~~�~~~

Total

Total>?@B>?D >?DB>?E >?EB>?F >?FB>?H >?HB>IJFunding Sources

��������Airport Fund Balance: 20500-355

������ ������Total

Prior

}~~�~~~

Total

Wednesday, June 24, 20152

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Airport

Description: [OXYzN`N]Y]O O�NT]NLM [^L�Y� r���v |YwOxOL]u O�]OLy the runway and taxiway P.

abcdefg hijkebl mna o�Extend & Rehab Runway 12-30, Extend Taxiway P

Project Cost: q��vuvvv

Phase:

Justification: WYwOxOL] NT yO]OQNVQY]Oy YLy x^T] zO QO\VLT]Q^\]Oy as specified in new pavement management program. Extending the runway will allow the Airport to support larger aircraft and allow the airport to grow.

Category: {NQ|VQ]

Total>?@B>?D >?DB>?E >?EB>?F >?FB>?H >?HB>IJExpenditures

��������������Design/Engineering

������� �������Total

Total>?@B>?D >?DB>?E >?EB>?F >?FB>?H >?HB>IJFunding Sources

����������Airport Fund Balance: 20500-355

��������Caltrans Aeronautic Grant: 20500-355

����������FAA Grant: 20500-355

������� �������Total

Wednesday, June 24, 20153

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Airport

Description: �VLT]Q^\] |YwOxOL] YLy NLUQYT]Q^\]^QO Y||^Q]YL\OT ]o support future commercial hangars (201,000 sq.ft.)

abcdefg hijkebl mna o�Extend Commercial Hangar Development - Phase III

Project Cost: qru�s�utvv

Phase:

Justification: �VLT]Q^\]NVL VU YyyN]NVLY` ]Y�N�Y� YLy Y|QVL ]V UY\ilitate the development of additional commercial hangars to accommodate additional aircraft and Fixed Based Operators at the airport.

Category: {NQ|VQ]

Total>?@B>?D >?DB>?E >?EB>?F >?FB>?H >?HB>IJExpenditures

��������������Design/Engineering

����������������Construction

��������������Construction Management/Inspection

������� ��������� ���������Total

Total>?@B>?D >?DB>?E >?EB>?F >?FB>?H >?HB>IJFunding Sources

����������� ������Airport Fund Balance: 20500-355

����������� ������Caltrans Aeronautic Grant: 20500-355

�������������� �������FAA Grant: 20500-355

������� ��������� ���������Total

Wednesday, June 24, 20154

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Airport

Description: �VLT]Q^\] |YwOxOL] YLy NLUQYT]Q^\]^QO Y||^Q]YL\OT ]o support new tee hangars.

abcdefg hijkebl mna o�Reconstruct Apron Ph. II, Apron & Taxiway Drainage

Project Cost: qruv��u��s

Phase:

Justification: WYwOxOL] NT yO]OQNVQY]Oy YLy x^T] zO QO\VLT]Q^\]Oy as specified in new pavement management program. Drainage between the apron and taxiway is insufficient and needs to be upgraded.

Category: {NQ|VQ]

Total>?@B>?D >?DB>?E >?EB>?F >?FB>?H >?HB>IJExpenditures

��������������Construction

����������Construction Management/Inspection

��������� ���������Total

Total>?@B>?D >?DB>?E >?EB>?F >?FB>?H >?HB>IJFunding Sources

������������Airport Fund Balance: 20500-355

����������Caltrans Aeronautic Grant: 20500-355

��������������FAA Grant: 20500-355

��������� ���������Total

Wednesday, June 24, 20155

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Airport

Description: �OY`NLM VU L^xOQV^T \QY\�T VL ]XO Y|QVLu ]Y�N�Y�T Ynd runway.

abcdefg hijkebl mna ooRunway, Taxiway & Apron Crack Seal

Project Cost: q�tsuvvv

Phase:

Justification: �XO YT|XY`]N\ \VL\QO]O �{�� |YwOxOL]T VL ]XO Q^L�Y�, taxiways and aprons are old and have significant transverse and longitudinal cracks, some alligator cracking and some block and map cracking.

Category: {NQ|VQ]

Total>?@B>?D >?DB>?E >?EB>?F >?FB>?H >?HB>IJExpenditures

����������Construction

������������Construction Management/Inspection

������� �������Total

Total>?@B>?D >?DB>?E >?EB>?F >?FB>?H >?HB>IJFunding Sources

��������Airport Fund Balance: 20500-355

����������Caltrans Aeronautic Grant: 20500-355

������������FAA Grant: 20500-355

������� �������Total

Wednesday, June 24, 20156

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Airport

Description: SOTNML VU WXYTO Z �OO �YLMYQ SOwO`V|xOL]

abcdefg hijkebl mna ��Tee Hangar Design Phase I

Project Cost: qstuvvv

Phase: SK�Z_�

Justification: WYwOxOL] NT yO]OQNVQY]Oy YLy x^T] zO QO\VLT]Q^\]Oy as specified in new pavement management program.

Category: {NQ|VQ]

Total>?@B>?D >?DB>?E >?EB>?F >?FB>?H >?HB>IJExpenditures

����������Design/Engineering

����������Environmental

������ ������Total

Total>?@B>?D >?DB>?E >?EB>?F >?FB>?H >?HB>IJFunding Sources

������Airport Fund Balance: 20500-355

��������FAA Grant: 20500-355

������ ������Total

Wednesday, June 24, 20157

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Airport

Description: ��������� �������� ���  �¡����������� ����������� �o support new Tee hangars.

¢£¤¥¦§¨ ©ª«¬¦£­ ®¯¢ °±Tee Hangar Taxiway & Apron Construction Phase I

Project Cost: ²³´µ¶···

Phase: ¸¹º»¼½

Justification: ��������� �� �¡ ��� � ���¾ ��¿ À�Á ��� ����� �� ¡��ilitate the development of additional Tee hangars to accommodate additional aircraft at the airport.

Category:  �����

TotalÃÄÅÆÃÄÇ ÃÄÇÆÃÄÈ ÃÄÈÆÃÄÉ ÃÄÉÆÃÄÊ ÃÄÊÆÃËÌExpenditures

��Construction

��������������Environmental

����������Construction Management/Inspection

��������������Contingency

� ������ ������Total

TotalÃÄÅÆÃÄÇ ÃÄÇÆÃÄÈ ÃÄÈÆÃÄÉ ÃÄÉÆÃÄÊ ÃÄÊÆÃËÌFunding Sources

��������Airport Fund Balance: 20500-355

������Caltrans Aeronautic Grant: 20500-355

������������FAA Grant: 20500-355

������ ������Total

Wednesday, June 24, 20158

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Airport

Description: ��������� �������� ���  �¡����������� ����������� �o support new Tee hangars.

¢£¤¥¦§¨ ©ª«¬¦£­ ®¯¢ °ÍTee Hangar Taxiway & Apron Construction Phase II

Project Cost: ²ÎÏζ···

Phase:

Justification: ��������� �� �¡ ��� � ���¾ ��¿ À�Á ��� ����� �� ¡��ilitate the development of additional Tee hangars to accommodate additional aircraft at the airport.

Category:  �����

TotalÃÄÅÆÃÄÇ ÃÄÇÆÃÄÈ ÃÄÈÆÃÄÉ ÃÄÉÆÃÄÊ ÃÄÊÆÃËÌExpenditures

����������Design/Engineering

������������Construction

������������Construction Management/Inspection

������ ������� ������Total

TotalÃÄÅÆÃÄÇ ÃÄÇÆÃÄÈ ÃÄÈÆÃÄÉ ÃÄÉÆÃÄÊ ÃÄÊÆÃËÌFunding Sources

��������Airport Fund Balance: 20500-355

������������Caltrans Aeronautic Grant: 20500-355

��������� �������FAA Grant: 20500-355

������� ������ ������Total

Wednesday, June 24, 20159

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Community Development

Description: Ð�¾���� �� ��� �¿���� �� �¡ � �Á Ñ�¾¾ �� ����������e medium-to long term projected growth.

5.4 Acres of Land for Buildings and Parking53,000 Square Feet of Buidling AreaFixtures, Furniture & Equipment

The relocation and expansion of City Hall will occur in conjunction with community growth as demands for service exceed the capacity of existing facilities.

¢£¤¥¦§¨ ©ª«¬¦£­ ÒÓÔ§ÕÖCity Hall Relocation & Expansion

Project Cost: ²µ´¶Ï×ض···

Phase:

Justification: Â�� � ���¾ � �Á Ñ�¾¾ �����  � ��Ù� ��� �� ���������te medium to long-term projected growth.

Category: Ú� ¾� �Û�

TotalÃÄÅÆÃÄÇ ÃÄÇÆÃÄÈ ÃÄÈÆÃÄÉ ÃÄÉÆÃÄÊ ÃÄÊÆÃËÌExpenditures

��������������Other

������������������Land Acquisition/Right of Way

������������������Construction

������������������Construction Management/Inspection

�������� ��������Total

TotalÃÄÅÆÃÄÇ ÃÄÇÆÃÄÈ ÃÄÈÆÃÄÉ ÃÄÉÆÃÄÊ ÃÄÊÆÃËÌFunding Sources

��������������DIF:45259 General Government Impact Fee

��������������������UNDETERMINED

�������� ��������Total

Wednesday, June 24, 201510

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Community Development

Description: ��������� �� �¡ � Ü �� º��� ��  � �Ý� ����ÝÀ��� Ù��drant of the City to accmodate new growth.

1 Acre of Land5,000 Square Foot BuildingApararatus, Vehicles & Equipment

The construction of a new fire station in the northwest quadrant of the City will occur when sufficient funds are available.

¢£¤¥¦§¨ ©ª«¬¦£­ ÒÓÔ§Õ°Fire Station - Northwest

Project Cost: ²Ø¶Þßζ···

Phase:

Justification: àÝ� ��� � �� �¡ ��À Ü �� º��� ��  � ��Ù� ��� �� ���ommodate new growth.

Category: Ú� ¾� �Û�

TotalÃÄÅÆÃÄÇ ÃÄÇÆÃÄÈ ÃÄÈÆÃÄÉ ÃÄÉÆÃÄÊ ÃÄÊÆÃËÌExpenditures

������������������Other

������������Land Acquisition/Right of Way

����������������Construction

��������� ���������Total

TotalÃÄÅÆÃÄÇ ÃÄÇÆÃÄÈ ÃÄÈÆÃÄÉ ÃÄÉÆÃÄÊ ÃÄÊÆÃËÌFunding Sources

����������������DIF:45216 Fire Department Impact Fee

��������� ���������Total

Wednesday, June 24, 201511

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Community Development

Description: Ð����� ���á �Û ¾�� �¡ Ü �� º��� �� ½�â ³ �� º�Ý��� Avenue

¢£¤¥¦§¨ ©ª«¬¦£­ ÒÓÔ§ÕãFire Station 7 - Parking Lot Paving

Project Cost: ²×³¶···

Phase:

Justification:

Category: º����� Ð���������� ��

TotalÃÄÅÆÃÄÇ ÃÄÇÆÃÄÈ ÃÄÈÆÃÄÉ ÃÄÉÆÃÄÊ ÃÄÊÆÃËÌExpenditures

������������Construction

����������Construction Management/Inspection

������ ������Total

TotalÃÄÅÆÃÄÇ ÃÄÇÆÃÄÈ ÃÄÈÆÃÄÉ ÃÄÉÆÃÄÊ ÃÄÊÆÃËÌFunding Sources

����������DIF:45216 Fire Department Impact Fee

������ ������Total

Wednesday, June 24, 201512

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: ¸����� �� ��¡ � ���Á ��� ������ �� ������� �� ��� �n.

¢£¤¥¦§¨ ©ª«¬¦£­ äÕãGateway Bridge Repair

Project Cost: ²µß¶···

Phase:

Justification: àÝ � å� �Û�  � ¾ ���� �� ��¾����æ� »������ �� ç Â��ion report.

Category: º����� Ð���������� ��

TotalÃÄÅÆÃÄÇ ÃÄÇÆÃÄÈ ÃÄÈÆÃÄÉ ÃÄÉÆÃÄÊ ÃÄÊÆÃËÌExpenditures

������������Design/Engineering

������ ������Total

Prior

èéêêê

Total

Totalëìíîëìï ëìïîëìð ëìðîëìñ ëìñîëìò ëìòîëóôFunding Sources

����������BPMP: 41700-473

����������LTF - Streets: 42000-333

������ ������Total

Prior

èéêêê

Total

Wednesday, June 24, 201513

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: õö÷øùúûüù ýþøùÿþúúC �ú���þ ö�þú ù�þ �úþø÷ö ���þú

P��� ������� ���Westberry Bridge Construction

Project Cost: $���������

Phase: �F�F��

Justification: �EE�ü�þ÷ù ü�úüû��ù�ö÷ �÷� ���÷ùþ÷�÷üþ öE �üüþ�ù�ÿ�þ levels of service at various local intersections dictate the need for this bride with the next 5 to 10 years

Category: �ú���þø

Totalëìíîëìï ëìïîëìð ëìðîëìñ ëìñîëìò ëìòîëóôExpenditures

��������������� ������Planning/Design

������� ������� ���������Total

Future

�éêêêéêêê

Total

Totalëìíîëìï ëìïîëìð ëìðîëìñ ëìñîëìò ëìòîëóôFunding Sources

��������������� ������DIF:45260 Transportation Impact Fee

������� ������� ���������Total

Future

�éêêêéêêê

Total

Wednesday, June 24, 201514

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: S��úö÷ �öû�þ��ú� ÷Eú�øùúûüùûúþ !úö"þüù#Sùúþþù õö��onent - Sharon Boulevard Alignment, South of Avenue 17, East of SR99. Establish Master Planned and Development-Serving Infrastructure Configurations and Right of Way requirements for facilities including Streets, Water, Wastewater Disposal, Street, and Storm Drainage. The street component will establish the plan line.

P��� ������� %&&�'&�()Sharon Blvd. Plan, Ellis Street to Avenue 17

Project Cost: $*+��,-+

Phase: D�S ./

Justification: õö���þù�ö÷ öE ���÷ ��÷þ ���ö0ø Eöú �öúþ þEE�ü�þ÷ù üonstruction of necessary road and utility facilities.

Category: Sùúþþù �þüö÷øùúûüù�ö÷

Totalëìíîëìï ëìïîëìð ëìðîëìñ ëìñîëìò ëìòîëóôExpenditures

����������Construction Management/Inspection

������ ������Total

Prior

121é345

Total

Totalëìíîëìï ëìïîëìð ëìðîëìñ ëìñîëìò ëìòîëóôFunding Sources

����������DIF:45263 Arterial/Collector St. Impact Fee

������ ������Total

Prior

121é345

Total

Wednesday, June 24, 201515

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: ÷øù��� I÷� õö��úþøøöú Eöú ù�þ õ/. Eûþ��÷� øCøùþ� �t 1200 Gill Street.

P��� ������� %�6''�'CNG Compressor

Project Cost: $7I8�8��

Phase: D�S ./

Justification: �ö �þþù Eûþ� �þ��÷� öE þT��÷��÷� õ/. ��þþù9

Category: A�ùþú÷�ù��þ �÷þú�C

Totalëìíîëìï ëìïîëìð ëìðîëìñ ëìñîëìò ëìòîëóôExpenditures

����������Construction

������������Construction Management/Inspection

������ ������Total

Prior

è5éêêê

Total

Totalëìíîëìï ëìïîëìð ëìðîëìñ ëìñîëìò ëìòîëóôFunding Sources

��������CMAQ - Public Facility: 41700-302

��������������LTF - Streets: 42000-333

������ ������Total

Prior

è5éêêê

Total

Wednesday, June 24, 201516

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: H�úþ � üö÷øû�ù�÷ù ùö �þúEöú� ù�þ ���þ�þ÷ù ��øùúþøø of City streets.

P��� ������� :;<��=Micro-Paver Distress Survey

Project Cost: $������

Phase:

Justification: Dþ�þ�ö� � üö��úþ�þ÷ø��þ ��ù�ÿ�øþ öE �÷Eöú��ù�ö÷ úþ�ated to the pavement condition of City streets.

Category: Sùúþþù >�

Totalëìíîëìï ëìïîëìð ëìðîëìñ ëìñîëìò ëìòîëóôExpenditures

������������Design/Engineering

������ ������Total

Totalëìíîëìï ëìïîëìð ëìðîëìñ ëìñîëìò ëìòîëóôFunding Sources

������������LTF - Streets: 42000-333

������ ������Total

Wednesday, June 24, 201517

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: ?@BGJ@KL ?MNMKO Q@JMK @BR ?JUKV WK@GB X@YJMK Z[@B \pdates

]^_`abc defga^h i] jklmcaMaster Utility Plan Update

Project Cost: noOoppOqqq

Phase: Wr?stu

Justification: X@YJMK vJG[GJL w[@BY YxUv[R JLwGy@[[L zM vwR@JMR M{ery 5 years at a minimum to account for changes in assumed development patterns from previous updates.

Category: |RVGBGYJK@JG{M

Total}~��}~� }~��}~� }~��}~� }~��}~� }~��}��Expenditures

��������������Planning/Design

������� �������Total

Prior

���������

Total

Total}~��}~� }~��}~� }~��}~� }~��}~� }~��}��Funding Sources

��������������Master Plan Reserve: 1990-3047

������� �������Total

Prior

���������

Total

Wednesday, June 24, 201518

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: ZKU�MyJ @RRY VGYYGB� NxMM[ yx@GK K@VwY �GJL�NGRM @Bd miscellaneous pedestrian facilities.

]^_`abc defga^h ����ADA Walkability Sidewalks

Project Cost: n�qpOqqq

Phase: Wr?stu

Justification: �UBYJKvyJGUB U� |W| �@yG[GJGMY MBx@ByMY VUzG[GJL @Bd access within City and shows good faith effort toward that goal.

Category: ?JKMMJ �MyUBYJKvyJGUB

Total}~��}~� }~��}~� }~��}~� }~��}~� }~��}��Expenditures

����������� ����� ����� ����� �����Design/Engineering

����������� ����� ����� ������ ������Construction

���������� ���� ���� ���� ����Construction Management/Inspection

������� ����� ����� ������� ������ ������Total

Prior

������

Total

Total}~��}~� }~��}~� }~��}~� }~��}~� }~��}��Funding Sources

������������� ������ ������ ������ ������LTF - Streets: 42000-333

����������� � ������ ���� �����Measure T - Enviromental Enhancement: 41500-447

������������ ������ ������ ������ ������Measure T - LTP ADA: 41500-447

������� ����� ����� ������� ������ ������Total

Prior

������

Total

Wednesday, June 24, 201519

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: �MyUBYJKvyJ @BR NGRMB �KUV � [@BMY JU p [@BMY�

]^_`abc defga^h ����Cleveland Ave. Improvements - Schnoor Ave. to SR99

Project Cost: noOoqqOqqq

Phase:

Justification: �M�vGKMY p JK@{M[ [@BMY JU KMRvyM JK@��Gy yUB�MYJGUn. This project is included as a Tier 1 improvement in the Measure T program.

Category: ?JKMMJ �MyUBYJKvyJGUB

Total}~��}~� }~��}~� }~��}~� }~��}~� }~��}��Expenditures

����������Design/Engineering

��������������Construction

��������������Right of Way Costs

������������Environmental

��������������Construction Management/Inspection

������� ������� ������ ���������Total

Total}~��}~� }~��}~� }~��}~� }~��}~� }~��}��Funding Sources

���������������� ������ �����Measure T - RTP/3R: 41500-447

������� ������� ������� ���������Total

Wednesday, June 24, 201520

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: �UBYJKvyJ |W| yvKz KMJvKBY @BR YGRMN@[�Y �GJLNGRM� 50/50 City/property owner shared cost as requested by the property owner.

]^_`abc defga^h ����Concrete Projects - Share Program

Project Cost: no�pOqqq

Phase: ��u? �\� s�u

Justification: sVwKU{M wMRMYJKG@B @BR NxMM[yx@GK @yyMYY@zGU[GJL

Category: ?JKMMJ �MyUBYJKvyJGUB

Total}~��}~� }~��}~� }~��}~� }~��}~� }~��}��Expenditures

������������� ������ ������ ������ ������Construction

������ ������ ������ ������ ������ �������Total

Prior

������

Total

Total}~��}~� }~��}~� }~��}~� }~��}~� }~��}��Funding Sources

������������ ������ ������ ������ ������LTF - Streets: 42000-333

������ ������ ������ ������ ������ �������Total

Prior

������

Total

Wednesday, June 24, 201521

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: XGYyM[[@BMUvY �@wGJ@[ sVwKU{MVMBJ ZKU�MyJY

]^_`abc defga^h ��¡�Contingency / Project Administration

Project Cost: noO��¢Oqqq

Phase:

Justification:

Category: ?J@�� �UYJY

Total}~��}~� }~��}~� }~��}~� }~��}~� }~��}��Expenditures

������������ ������Design/Engineering

������������� ������� ������� ������� �������Construction

������������� ������ ������ ������ ������Construction Management/Inspection

������� ������� ������� ������� ������� �������Total

Prior

£¤£����

Total

Total}~��}~� }~��}~� }~��}~� }~��}~� }~��}��Funding Sources

������������� ������� ������� ������� �������LTF - Streets: 42000-333

������� ������� ������� ������� ������� �������Total

Prior

£¤£����

Total

Wednesday, June 24, 201522

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: sBYJ@[[ [@BRYy@wGB� @BR GKKG�@JGUB �@yG[GJGMY GB Jxe median and on owner's property as permitted along 4th Street from Sunset Avenue to Lake Street

]^_`abc defga^h ���¥Fourth St. Median Landscaping

Project Cost: no¢¦Oqqq

Phase: ��u? �\� s�u

Justification:  U yUVw[MJM JxM GBYJ@[[@JGUB U� VMRG@B [@BRYy@wGB� for the two 4th Street improvement projects.

Category: ?JKMMJ �MyUBYJKvyJGUB

Total}~��}~� }~��}~� }~��}~� }~��}~� }~��}��Expenditures

������������Median Landscape Construction

������� �������Total

Total}~��}~� }~��}~� }~��}~� }~��}~� }~��}��Funding Sources

������������RSTP Federal Exchange: 41300-332

������� �������Total

Wednesday, June 24, 201523

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description:  KMM w[@BJGB� �UK Z@K� ?JKMMJ @KM@Y @Y w@KJ U� wKU�ect R-25, Fourth St. Reconstruction - Pine to K.

§¨©ª«¬­ ®¯°±«¨² ³´µ¶ ·¸Fourth St. Reconstruction - Pine to K Landscaping

Project Cost: ¹º»¼½¾¾¾

Phase: ¿ÀÁÂÃÄÅ¿ÃÆÀÁ

Justification: ÇÈÉ ÊËÌ ÍÊÎÏÐÑÒÑ ÍÊ ÌÓÒ ÍÊÍÌÍÈÏ ÔÕËÖÒÎÌ×

Category: ÂÌÕÒÒÌ ØÄ

TotalÙÚÛÜÙÚÝ ÙÚÝÜÙÚÞ ÙÚÞÜÙÚß ÙÚßÜÙÚà ÙÚàÜÙáâExpenditures

������������Construction

������� �������Total

TotalÙÚÛÜÙÚÝ ÙÚÝÜÙÚÞ ÙÚÞÜÙÚß ÙÚßÜÙÚà ÙÚàÜÙáâFunding Sources

������������Measure T - RTP/3R: 41500-447

������� �������Total

Wednesday, June 24, 201524

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: ãäÈÏÐÈÌÒ ÍÊÌÒÕÉÒÎÌÍËÊ åËÕ ÒÍÌÓÒÕ ÃÕÈååÍÎ ÉÍæÊÈÏ ËÕ round-about. Install selected mehtod of traffic control.

§¨©ª«¬­ ®¯°±«¨² ³´¶çFourth/Lake/Central Intersection

Project Cost: ¹èé¾½¾¾¾

Phase:

Justification: ÄÒÏÍÒäÒ ÌÕÈååÍÎ ÎËÊÖÒÎÌÍËÊ ÈÊÑ ÕÒÑÐÎÒ ÑÒÏÈê

Category: ÅÊÈÉÉÍæÊÒÑ

TotalÙÚÛÜÙÚÝ ÙÚÝÜÙÚÞ ÙÚÞÜÙÚß ÙÚßÜÙÚà ÙÚàÜÙáâExpenditures

������� ������Land Acquisition

����������Design/Engineering

������������Construction

������������Environmental

������������Construction Management/Inspection

������ ������ �������Total

TotalÙÚÛÜÙÚÝ ÙÚÝÜÙÚÞ ÙÚÞÜÙÚß ÙÚßÜÙÚà ÙÚàÜÙáâFunding Sources

������������ �������CMAQ - Streets: 41700-306

������������ �������LTF - Streets: 42000-333

���� ������� �������Total

Wednesday, June 24, 201525

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: ÂÍÑÒëÈÏìÉ ËÊ ¿ÒÊÌÕÈÏ íäÒÊÐÒ½ îÈÌÒëÈê ÌË ïÈìÒ ÂÌÕÒÒÌ: E Street, Central Avenue to 3rd Street: 3rd Street, E Street to Central Avenue.

§¨©ª«¬­ ®¯°±«¨² ³´ðñGateway/Central/3rd/E St. Sidewalks

Project Cost: ¹Øº»½¾¾¾

Phase: òãÂÆîÁ

Justification: ÂÍÑÒëÈÏìÉ ÑËÊóÌ ÒôÍÉÌ ÍÊ õÈÊê ÏËÎÈÌÍËÊÉ ÈÏËÊæ ÌÓÍÉ residential neighborhood that are needed for access to the Rotary Park.

Category: ÂÌÕÒÒÌ ÄÒÎËÊÉÌÕÐÎÌÍËÊ

TotalÙÚÛÜÙÚÝ ÙÚÝÜÙÚÞ ÙÚÞÜÙÚß ÙÚßÜÙÚà ÙÚàÜÙáâExpenditures

������������Design/Engineering

������������Land Acquisition/Right of Way

������������Construction

��������Utility Relocation

������������Construction Management/Inspection

������� �������Total

Prior

ö÷øøø

Total

TotalÙÚÛÜÙÚÝ ÙÚÝÜÙÚÞ ÙÚÞÜÙÚß ÙÚßÜÙÚà ÙÚàÜÙáâFunding Sources

������������CMAQ - Streets: 41700-306

����������LTF - Streets: 42000-333

������� �������Total

Prior

ö÷øøø

Total

Wednesday, June 24, 201526

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: ÇÍÑÒÊ ïÈìÒ ÂÌÕÒÒÌ ÌË è ÏÈÊÒÉ ëÍÌÓ õÒÑÍÈÊ åËÕ íÕÌÒÕÍal Street Standards.

§¨©ª«¬­ ®¯°±«¨² ³´ùúLake St. Widening - Fourth St. to Cleveland

Project Cost: ¹Ø½ûûü½¾¾¾

Phase: òãÂÆîÁ

Justification: ýÕËäÍÑÍÊæ è ÌÕÈäÒÏ ÏÈÊÒÉ ëÍÏÏ þÒ ÊÒÒÑÒÑ ÌË ÓÈÊÑÏÒ Ìraffic volume. Complies with City approved traffic circulation element.

Category: ÂÌÕÒÒÌ ÄÒÎËÊÉÌÕÐÎÌÍËÊ

TotalÙÚÛÜÙÚÝ ÙÚÝÜÙÚÞ ÙÚÞÜÙÚß ÙÚßÜÙÚà ÙÚàÜÙáâExpenditures

������������Design/Engineering

��������������Land Acquisition/Right of Way

������������� ���������Construction

������������Environmental

������������ �������Construction Management/Inspection

������� �������� ��������Total

Prior

öÿ÷øøø

Total

TotalÙÚÛÜÙÚÝ ÙÚÝÜÙÚÞ ÙÚÞÜÙÚß ÙÚßÜÙÚà ÙÚàÜÙáâFunding Sources

�������������� �������LTF - Streets: 42000-333

����������������� �������Measure T - RTP/3R: 41500-447

����������������RSTP Federal Exchange: 41300-332

�������� ������� ��������Total

Prior

öÿ÷øøø

Total

Wednesday, June 24, 201527

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: ýÕÒÔÈÕÒ ÎËÊÎÒÔÌ ÔÏÈÊ åËÕ ÉÌÕÒÒÌ ÈÏÍæÊõÒÊÌ ÈÊÑ ÕÍæÓÌ-of-way on Olive Avenue between Tozer and 1,300' east of Tozer..

§¨©ª«¬­ ®¯°±«¨² ³´ùPOlive Ave. Concept Plan

Project Cost: ¹»è½¾¾¾

Phase: òãÂÆîÁ

Justification:

Category: ÅÊÈÉÉÍæÊÒÑ

TotalÙÚÛÜÙÚÝ ÙÚÝÜÙÚÞ ÙÚÞÜÙÚß ÙÚßÜÙÚà ÙÚàÜÙáâExpenditures

������������Design/Engineering

������ ������Total

Prior

��÷øøø

Total

TotalÙÚÛÜÙÚÝ ÙÚÝÜÙÚÞ ÙÚÞÜÙÚß ÙÚßÜÙÚà ÙÚàÜÙáâFunding Sources

������������DIF:45263 Arterial/Collector St. Impact Fee

������ ������Total

Prior

��÷øøø

Total

Wednesday, June 24, 201528

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: ÇÍÑÒÊ ÉÌÕÒÒÌ ÌË è ÏÈÊÒÉ åËÕ íÕÌÒÕÍÈÏ ÂÌÕÒÒÌ ÂÌÈÊÑÈÕds, acquire right-of-way and construct sidewalks. Widen UPRR crossing at SW corner of Olive Avenue and Knox Street

������� ���� ����Olive Ave. Widening - Gateway to e/o Roosevelt

Project Cost: $���������

Phase: D�����

Justification: ���� !" � #%! & "�'(()! # *'+& '" �'" ,'+ - .*)/ �ntersection by providing 4 travel lanes. Complies with City approved traffic circulaton element. Provide pedestrian access and safety by constructing a missing of a concrete sidewalk.

Category: �"� " S !�0&"�%!")�0

Total1234125 1254126 1264127 1274128 128419:Expenditures

��������������Land Acquisition

������������� �����Design/Engineering

��������������Construction

������������ �����Utility Relocation

����������Environmental

������������� �������Construction Management/Inspection

������������������UPRR

������� ��������� ��������� ��������Total

Total1234125 1254126 1264127 1274128 128419:Funding Sources

������������DIF:45263 Arterial/Collector St. Impact Fee

����������� ������LTF - Streets: 42000-333

������������Measure A City: 41500-347

������������������ �������Measure T - RTP/3R: 41500-447

�������������� ������ ������RSTP Federal Exchange: 41300-332

��������� ��������� ������� ��������Total

Wednesday, June 24, 201529

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: �0()** '0# I��/)# &)# ,'*; ('!)*)") & '0# 'II%�" 0ances. Areas to be determined to maximize pedestrian usage within funds available. To be implemented in phases.

������� ���� ��<=Pedestrian Facilities/Schools & Commercial Areas

Project Cost: $>??����

Phase:

Justification: W)** 0!�%�'@ I # &"�)'0 "�'/ * A I��/)# &'( "+ 't areas without sidewalks and ADA ramps with high concentration of pedestrians.

Category: U0'&&)@0 #

Total1234125 1254126 1264127 1274128 128419:Expenditures

������������Design/Engineering

������������Land Acquisition/Right of Way

��������������Construction

����������Environmental

������������Construction Management/Inspection

������ ������� �������Total

Total1234125 1254126 1264127 1274128 128419:Funding Sources

������������ �������CMAQ - Streets: 41700-306

������������LTF - Streets: 42000-333

��������� �����Measure T - Enviromental Enhancement: 41500-447

������ ������ �������Total

Wednesday, June 24, 201530

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: S !�0&"�%!")�0 '&IR'*" I'/)0@ �0 �)0 &"� " (��B Coward to Fourth Street and widen road way. Install missing street lights.

������� ���� ��E�Pine St. Reconstruction - Howard to Fourth St.

Project Cost: $�F�����

Phase: D�����

Justification: ���� !" )# 0")() # )0 �%G*)! W��;& �'/ B 0" H'0'@ Bent Plan as asphalt requiring replacement and improves traffic flow.

Category: �"� " S !�0&"�%!")�0

Total1234125 1254126 1264127 1274128 128419:Expenditures

������������Design/Engineering

������������Land Acquisition/Right of Way

��������������Construction

��������Environmental

����������Construction Management/Inspection

������ ������Total

Total1234125 1254126 1264127 1274128 128419:Funding Sources

������������Measure A City: 41500-347

������ ������Total

Wednesday, June 24, 201531

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: �"� " ,)# 0)0@ '*�0@ "R , &" &)# �( �)0 '0# '*�ng the north side of Pecan.

������� ���� ��<�Pine-Pecan Street Improvements

Project Cost: $J��������

Phase:

Justification: .((O&)" &"� " )BI��/ B 0"& (�� "R K�'0&)"O�%G*)! Works Facility.

Category: �"� " S !�0&"�%!")�0

Total1234125 1254126 1264127 1274128 128419:Expenditures

��������������Construction

������������Construction Management/Inspection

����� �����Total

Prior

LMNQTMVVV

Total

Total1234125 1254126 1264127 1274128 128419:Funding Sources

��������������DIF:45100 Storm Drain Existing Area Impact Fee

������������DIF:45219 Public Works Impact Fee

��������������DIF:45262 Median Island Impact Fee

������������LTF - Streets: 42000-333

����� �����Total

Prior

LMNQTMVVV

Total

Wednesday, June 24, 201532

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: X�0&"�%!" I'/ # &R�%*# �& ,)"R !%�G '0# @%"" � �0 Saymond Road north of Cleveland Avenue.

������� ���� ��YZRaymond Rd. Shoulder n/o Cleveland

Project Cost: $[�J����

Phase: D�����

Justification: �BI��/ "�'(()! '0# I # &"�)'0 !)�!%*'")�0 '0# &'( ty.

Category: �"� " X�0&"�%!")�0

Total1234125 1254126 1264127 1274128 128419:Expenditures

����������Design/Engineering

��������������Construction

������������Right of Way Costs

������������Construction Management/Inspection

������� �������Total

Prior

LMVVV

Total

Total1234125 1254126 1264127 1274128 128419:Funding Sources

��������������CMAQ - Streets: 41700-306

����������LTF - Streets: 42000-333

������� �������Total

Prior

LMVVV

Total

Wednesday, June 24, 201533

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: X�0&"�%!" 0 , ��'#,'+ )BI��/ B 0"& �0 S)/ �,'*; D�)ve between "A" Street and "C" Street.

������� ���� ��<YRiverwalk Drive Improvements

Project Cost: $F�[�[����

Phase:

Justification: � )@RG��R��# �BI��/ B 0"

Category: �"� " S !�0&"�%!")�0

Total1234125 1254126 1264127 1274128 128419:Expenditures

������������������Construction

������������Construction Management/Inspection

��������� ���������Total

Prior

\LMVVV

Total

Total1234125 1254126 1264127 1274128 128419:Funding Sources

������������������RDA Funds

��������� ���������Total

Prior

\LMVVV

Total

Wednesday, June 24, 201534

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: X�0&"�%!" I'/ # &R�%# �& '0# !%�G '0# @%"" �]

������� ���� ��E^Schnoor Ave. Sidewalks

Project Cost: $F������

Phase:

Justification: S #%! �HOF� #%&" '0# I��/)# I%G*)! &'( "+]

Category: �"� " X�0&"�%!")�0

Total1234125 1254126 1264127 1274128 128419:Expenditures

����������Land Acquisition

������������Design/Engineering

������������Construction

����������Environmental

������������Construction Management/Inspection

������ ������ �������Total

Total1234125 1254126 1264127 1274128 128419:Funding Sources

������������� �������CMAQ - Streets: 41700-306

����������� �����Measure T - Enviromental Enhancement: 41500-447

������ ������ �������Total

Wednesday, June 24, 201535

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: X�0&"�%!" I'/ # &R�%*# �&� !%�G '0# @%"" � '*�0@ (�ontage of Millview Sports Complex south side of Store Road.

������� ���� ��<�Storey Rd. Shoulder Paving

Project Cost: $[�F����

Phase:

Justification: S #%! �HOF� #%&" '0# I��/)# I%G*)! &'( "+]

Category: �"� " S !�0&"�%!")�0

Total1234125 1254126 1264127 1274128 128419:Expenditures

������������Design/Engineering

��������������Construction

����������Environmental

����������Construction Management/Inspection

������ ������� �������Total

Total1234125 1254126 1264127 1274128 128419:Funding Sources

������������ �������CMAQ - Streets: 41700-306

���������� ������Measure T - Enviromental Enhancement: 41500-447

������ ������� �������Total

Wednesday, June 24, 201536

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: �'/ B 0" � R'G)*)"'")�0 ,)"R /'�)�%& "+I & �( & '* coats and AC overlays on various arterial and collector streets.

������� ���� ��EESurface Seals and AC Overlays

Project Cost: $>��_�����

Phase:

Justification: ���� !" )& )# 0")() # )0 �%G*)! W��;& �'/ B 0" H'0'gement Plan as needing surface seals or overlays.

Category: �"� " [S

Total1234125 1254126 1264127 1274128 128419:Expenditures

������������ ������ ������ ������Design/Engineering

�������������� ������ ������Construction

������������ ������ ������Environmental

������������ ������ ������Construction Management/Inspection

������ ������� ������ ������� ������� ���������Total

Prior

TQ`MVVV

Total

Total1234125 1254126 1264127 1274128 128419:Funding Sources

��������������� ������� ������� ������� �������Measure T - RTP/3R: 41500-447

������� ������� ������� ������� ������� ���������Total

Prior

TQ`MVVV

Total

Wednesday, June 24, 201537

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: X�0&"�%!" &)# ,'*;& '0# !%�G �'BI&a )&"'** )0 I'/ Bent lighted crosswalk and acquisition of right of way. Safe Routes to School for Thomas Jefferson Middle School and John Adams Elementary School.

bcdefgh ijklfcm nopqThomas Jefferson/John Adams Sidewalks

Project Cost: rstuvwtt

Phase: xyz{|}

Justification: {~����� ������� ��� ���������� ����������� ��� ����ty.

Category: ����������

Total������� ������� ������� ������� �������Expenditures

������������Design/Engineering

��������������Construction

����������Construction Management/Inspection

������� �������Total

Prior

�����

Total

Total������� ������� ������� ������� �������Funding Sources

������������LTF - Streets: 42000-333

������������Safe Routes 2 School - State: 41300-342

������� �������Total

Prior

�����

Total

Wednesday, June 24, 201538

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: ��������� �� ����~��� �����  ����� ¡�¢ ��� �� �����us locations.

bcdefgh ijklfcm nop£Torres Wy. Alley Paving

Project Cost: r¤¥¦vttt

Phase:

Justification: §��������� ~������� �� ������ ¨§©¤tª

Category: z����� «�������������

Total������� ������� ������� ������� �������Expenditures

������������Design/Engineering

��������������Construction

����������Environmental

������������Construction Management/Inspection

������ ������� ������Total

Total������� ������� ������� ������� �������Funding Sources

������������CMAQ - Streets: 41700-306

���������� ������Measure T - Enviromental Enhancement: 41500-447

������ ������� ������ ������Total

Wednesday, June 24, 201539

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: «������� �������¬ ������

bcdefgh ijklfcm no­®UPPR Crossing - Street Approach

Project Cost: rus¯vttt

Phase: xyz{|}

Justification: {~����� �����¢ ��� ������ ��~����

Category: z����� s«

Total������� ������� ������� ������� �������Expenditures

�������������� ����� ����� ����� �����Construction

������ ������ ������ ������ ������ ������Total

Prior

�°±����

Total

Total������� ������� ������� ������� �������Funding Sources

�������������� ����� ����� ����� �����LTF - Streets: 42000-333

������ ������ ������ ������ ������ ������Total

Prior

�°±����

Total

Wednesday, June 24, 201540

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: «�¬�²������� �¬� z�¬���� ���ª  ���³ z�´�� z¢���~ ²�ginning at sewage pump station on Cleveland Avenue and going south, crossing the Fresno River, and ending at Industrial. Technical memo prepared October 2013 by Akel Engineering in conjunction with Master Plan Update presented as Appendix D contains detailed information and recommendations. NOTE: Segment across river has not been evaluated.

bcdefgh ijklfcm µoq® ¶µop·Schnoor Ave. Trunk Sewer System

Project Cost: r¤v¤¥¦vttt

Phase:

Justification: y¸���� ������ ���� �� ��´�� ����³ ~���ª

Category: z�´��

Total������� ������� ������� ������� �������Expenditures

����������Design/Engineering

�������������� ������Construction

������������ �����Construction Management/Inspection

������ ������� ������ ��������Total

Total������� ������� ������� ������� �������Funding Sources

�������������� �����Sewer Utility Fund: 20400-511

������� ������� ��������Total

Wednesday, June 24, 201541

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: «������ ~��¬��� ������v ����� ��� ���~�� �� ������� locations.

-Ongoing project.

bcdefgh ijklfcm µo¹ºSewer Main, Manhole Covers

Project Cost: r¤tuvttt

Phase:

Justification: z�´�� ~��¬��� ������v ����� ��� ���~�� ��� ��������ated or damaged. Replacement is needed.

Category: z�´��

Total������� ������� ������� ������� �������Expenditures

���������� �����Construction

������ ������ ������Total

Prior

»�����

Total

Total������� ������� ������� ������� �������Funding Sources

��������Sewer Utility Fund: 20400-511

������ ������Total

Prior

»�����

Total

Wednesday, June 24, 201542

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: {������¢ ��������v ��¼���� ���¬�©��©´�¢ ��� ������� preliminary estimates of costs in advance of engineering and construction.

This task will only proceed to the degree funding is available.

bcdefgh ijklfcm µ½oqpob¹ºEllis St./Krohn St. Retention Basin

Project Cost: r¤ttvttt

Phase:

Justification: ������� �������� ��� ����¬��� �� ���¬�©��©´�¢ �����es the potential for a series of temporary basins as part of individual development project.

Category: z���~ x����

Total������� ������� ������� ������� �������Expenditures

��������������Design/Engineering

������� �������Total

Total������� ������� ������� ������� �������Funding Sources

��������������DIF:45156 Storm Drain NE Quadrant Impact Fee

������� �������Total

Wednesday, June 24, 201543

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: {������¢ ��������v ��¼���� ���¬�©��©´�¢ ��� ������� preliminary estimates of costs in advance of engineering and construction.

This task will only proceed to the degree funding is available.

bcdefgh ijklfcm µ½oq¾obqqGranada Dr./Avenue 12 1/2 Retention Basin

Project Cost: ¿ÀÁÁÂÁÁÁ

Phase:

Justification: ÃÄÅÆÇÈÉ ÊËÆÇÇÌÇÍ ÆÇÄ ÊÎÏÈÐÆÑÉ ÒÓ ÏÌÍÐÔÕÒÓÕÖÆ× ÏÉÄÎÈes the potential for a series of temporary basins as part of individual development project.

Category: ØÔÒÏÙ ÚÏÆÌÇ

TotalÛÜÝÞÛÜß ÛÜßÞÛÜà ÛÜàÞÛÜá ÛÜáÞÛÜâ ÛÜâÞÛãäExpenditures

��������������Design/Engineering

������� �������Total

TotalÛÜÝÞÛÜß ÛÜßÞÛÜà ÛÜàÞÛÜá ÛÜáÞÛÜâ ÛÜâÞÛãäFunding Sources

��������������DIF:45157 Storm Drain SW Quadrant Impact Fee

������� �������Total

Wednesday, June 24, 201544

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: åÄÉÇÔÌÓ× ÊÏÌÒÏÌÔÌæÉ ÆÇÄ ÊÎÏÈÐÆÑÉ ÏÌÍÐÔÕÒÓÕÖÆ× ÆÔ Ëocations where development is anticipated to occur in the near term.

This task will only proceed to the degree funding is available.

çèéêëìí îïðñëèò óôõö÷õçøPine St/Avenue 12 1/2 Retention Basin

Project Cost: ¿ÀùÁÂÁÁÁ

Phase:

Justification: ÃÄÅÆÇÈÉ ÊËÆÇÇÌÇÍ ÆÇÄ ÊÎÏÈÐÆÑÉ ÒÓ ÏÌÍÐÔÕÒÓÕÖÆ× ÏÉÄÎÈes the potential for a series of temporary basins as part of individual development project.

Category: ØÔÒÏÙ ÚÏÆÌÇ

TotalÛÜÝÞÛÜß ÛÜßÞÛÜà ÛÜàÞÛÜá ÛÜáÞÛÜâ ÛÜâÞÛãäExpenditures

����������� ����� �����Design/Engineering

������ ������ ������ �������Total

TotalÛÜÝÞÛÜß ÛÜßÞÛÜà ÛÜàÞÛÜá ÛÜáÞÛÜâ ÛÜâÞÛãäFunding Sources

������������ ������ ������DIF:45100 Storm Drain Existing Area Impact Fee

������������ ������ ������DIF:45155 Storm Drain NW Quadrant Impact Fee

������������ ������ ������DIF:45156 Storm Drain NE Quadrant Impact Fee

������������ ������ ������DIF:45157 Storm Drain SW Quadrant Impact Fee

������������ ������ ������DIF:45158 Storm Drain SE Quadrant Impact Fee

������ ������ ������ �������Total

Wednesday, June 24, 201545

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: åÇÑÔÆËËÆÔÌÒÇ ÒÓ ÒÅÉÏ ÓËÒÖ ÊÌÊÉËÌÇÉ ÔÒ ÈÒÇÇÉÈÔ ÔÒ ÒÎtfall at San Sabastian & BilBao Street.

çèéêëìí îïðñëèò óôõöúSan Sabastian Basin Overflow Pipeline

Project Cost: ¿ùÁÂûüù

Phase:

Justification: ýÐÉ ØÆÇ ØÆþÆÑÔÌÆÇ þÆÑÌÇ ÇÉÉÄÑ ÔÒ þÉ ÄÏÆÌÇÉÄ ÏÉÍÎËÆÏly...

Category: ØÔÒÏÙ ÚÏÆÌÇ

TotalÛÜÝÞÛÜß ÛÜßÞÛÜà ÛÜàÞÛÜá ÛÜáÞÛÜâ ÛÜâÞÛãäExpenditures

������������Design/Engineering

������ ������Total

Prior

ÿ�����

Total

TotalÛÜÝÞÛÜß ÛÜßÞÛÜà ÛÜàÞÛÜá ÛÜáÞÛÜâ ÛÜâÞÛãäFunding Sources

������������DIF:45156 Storm Drain NE Quadrant Impact Fee

������ ������Total

Prior

ÿ�����

Total

Wednesday, June 24, 201546

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: åÇÑÔÆËË Æ ÅÆÏÌÆþËÉ ÓÏÉIÎÉÇÈ× ÄÏÌÅÉ ���Ú� ÔÒ ÌÇÈËÎÄÉ electrical work and appurtenance.

çèéêëìí îïðñëèò óóõPFairgrounds Liftstation

Project Cost: ¿$ùÁÂÁÁÁ

Phase:

Justification: ÌÙÊÏÒÅÉ ÔÐÉ ÊÉÏÓÒÏÙÆÇÈÉ ÒÓ ÔÐÉ ÊÎÙÊÑ ÆÔ ÔÐÉ ËÌÓÔ ÑÔation resulting to a more efficient and economical system.

Category: ØÉÖÉÏ

TotalÛÜÝÞÛÜß ÛÜßÞÛÜà ÛÜàÞÛÜá ÛÜáÞÛÜâ ÛÜâÞÛãäExpenditures

����������Design/Engineering

������������Construction

������������Construction Management/Inspection

������� �������Total

TotalÛÜÝÞÛÜß ÛÜßÞÛÜà ÛÜàÞÛÜá ÛÜáÞÛÜâ ÛÜâÞÛãäFunding Sources

��������������DIF:40949 Sewer Existing Area Impact Fee

��������������Sewer Utility Fund: 20400-511

������� �������Total

Wednesday, June 24, 201547

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: RÉÊËÆÈÉ ÀÂûÁÕÓÉÉÔ ÒÓ ÉÌÑÔÌÇÍ À�ÕÌÇÈÐ ÑÆÇÌÔÆÏ× ÑÉÖer main with new 15-inch main on Sherwood Wy. from Lake St. to 220-feet west of Nebraska Ave.

çèéêëìí îïðñëèò óóõúReplace Sewer Main - Sherwood Wy.

Project Cost: ¿$�ÂÁÁÁ

Phase:

Justification: EÌÑÔÌÇÍ ÑÉÖÉÏ ÙÆÌÇ ÌÑ ÎÇÄÉÏ ÑÌæÉ ÓÒÏ ÓÎËË þÎÌËÄÒÎÔ.

Category: ØÉÖÉÏ

TotalÛÜÝÞÛÜß ÛÜßÞÛÜà ÛÜàÞÛÜá ÛÜáÞÛÜâ ÛÜâÞÛãäExpenditures

������������Design/Engineering

��������������Construction

����������Construction Management/Inspection

������� �������Total

Total' ��' � ' ��' � ' ��' � ' ��' � ' ��'��Funding Sources

������������DIF:40949 Sewer Existing Area Impact Fee

��������������Sewer Utility Fund: 20400-511

������� �������Total

Wednesday, June 24, 201548

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: ������� ���� ��! " �#%&!%() ���%(�* &�(%!�+, &�-�+ main with new 15-inch main on Wessmith Wy. From 190-feet east of Lake St. to Lake St.

./01234 56782/9 ::;<Replace Sewer Main - Wessmith Wy.

Project Cost: =>?@���

Phase:

Justification: A#%&!%() &�-�+ B�%( %& C(D�+ &%F� "+ C�� GC%�D"C!.

Category: S�-�+

Total' ��' � ' ��' � ' ��' � ' ��' � ' ��'��Expenditures

����������Design/Engineering

������������Construction

����������Construction Management/Inspection

������ ������Total

Total' ��' � ' ��' � ' ��' � ' ��' � ' ��'��Funding Sources

������������DIF:40949 Sewer Existing Area Impact Fee

������������Sewer Utility Fund: 20400-511

������ ������Total

Wednesday, June 24, 201549

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: HDD � DC�� �� ! !C+( ��(� "+ JK L��M���(D HM�(C� !raffic turning south onto Schnoor Avenue.

./01234 56782/9 N:;<OCleveland Dual Left Turn Lanes at Schnoor

Project Cost: =Q�T@���

Phase: UASVWX

Justification: AB%&&%"( +�DC�!%"( "+ LYHZ �+"[��!

Category: \+� %� S%)(��

Total' ��' � ' ��' � ' ��' � ' ��' � ' ��'��Expenditures

����������Construction

������������Construction Management/Inspection

������ ������Total

Prior

]]^_```

Total

Total' ��' � ' ��' � ' ��' � ' ��' � ' ��'��Funding Sources

����������CMAQ - Streets: 41700-306

����������LTF - Streets: 42000-333

������ ������Total

Prior

]]^_```

Total

Wednesday, June 24, 201550

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: HDD%() ��D�&!+%�( �+"&&%() �! &"C!* &%D� " !*� %(!ersection, across GatewayAdjusting existing crossing on north side of Gateway/Cleveland intersection.

./01234 56782/9 N:;<aGateway & Cleveland Pedestrian Crossing

Project Cost: =bcd@���

Phase: UASVWX

Justification: e�D�&!+%�( &� �!, �(D HUHf

Category: \+� %� S%)(��

Total' ��' � ' ��' � ' ��' � ' ��' � ' ��'��Expenditures

��������������Construction

����������Construction Management/Inspection

������� �������Total

Prior

gh_```

Total

Total' ��' � ' ��' � ' ��' � ' ��' � ' ��'��Funding Sources

������������DIF:45264 Traffic Signal Impact Fee

������������Section 130: 41700-306

������� �������Total

Prior

gh_```

Total

Wednesday, June 24, 201551

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: HDD !+� %� &%)(�� �! W+�(�D� U+%M� �(D i"-�+D �"�D.

./01234 56782/9 N:;<jGranada & Howard Traffic Signal

Project Cost: =Q>�@���

Phase:

Justification: AB%&&%"( +�DC�!%"( "+ LYHZ �+"[��!f

Traffic safety.

Category: \+� %� S%)(��

Total' ��' � ' ��' � ' ��' � ' ��' � ' ��'��Expenditures

������������Design/Engineering

������������Land Acquisition/Right of Way

������������Construction

��������Environmental

����������Construction Management/Inspection

������ ������� �������Total

Total' ��' � ' ��' � ' ��' � ' ��' � ' ��'��Funding Sources

������������ �����DIF:45264 Traffic Signal Impact Fee

������ ������� �������Total

Wednesday, June 24, 201552

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: L"(&!+C�! (�- �+"&&-��k "( i"-�+D �"�D �! Y�%(G�++, Dr. intersection utilizing rapid flashing beacons to increase visibility and awareness of crossing locations when pedestrians are present.

./01234 56782/9 N:;l<Howard Rd. & Mainberry Dr. Pedestrian Crosswalk

Project Cost: =b�@���

Phase:

Justification: e+"M%D� &� � ��D�&!+%�( ����&&f

Category: \+� %� S%)(��

Total' ��' � ' ��' � ' ��' � ' ��' � ' ��'��Expenditures

����������Design/Engineering

����������Construction

����������Construction Management/Inspection

������ ������Total

Total' ��' � ' ��' � ' ��' � ' ��' � ' ��'��Funding Sources

������������LTF - Streets: 42000-333

������ ������Total

Wednesday, June 24, 201553

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: mnopqrr q psqttuv ouwnqr qp pxy unpysoyvpuzn zt {yotberry Blvd. and Howard Rd.

|}~���� �����}� �����Howard/Westberry Traffic Signal

Project Cost: ��������

Phase:

Justification: ��uoouzn sy��vpuzn tzs ���� �sz�yvp qn� psqttuv oqtety.

Category: �sqttuv �uwnqr

Total� ¡¢� £ � £¢� ¤ � ¤¢� ¥ � ¥¢� ¦ � ¦¢�§¨Expenditures

������������Design/Engineering

����������Construction

����Environmental

������������Construction Management/Inspection

������ ������Total

Total� ¡¢� £ � £¢� ¤ � ¤¢� ¥ � ¥¢� ¦ � ¦¢�§¨Funding Sources

������������CMAQ - Streets: 41700-306

������������LTF - Streets: 42000-333

������ ������Total

Wednesday, June 24, 201554

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: mnopqrr q psqttuv ouwnqr qp pxy unpysoyvpuzn zt ��nrise Avenue and Tozer Street.

|}~���� �����}� ���©ªSunrise Ave. & Tozer St. Traffic Signal

Project Cost: ��«����

Phase:

Justification: ���uouzn sy��vpuzn tzs ���� �sz�yvp¬

Category: �sqttuv �uwnqr

Total� ¡¢� £ � £¢� ¤ � ¤¢� ¥ � ¥¢� ¦ � ¦¢�§¨Expenditures

������������ ������Design/Engineering

������������Construction

��������Environmental

������ ������ ������Total

Total� ¡¢� £ � £¢� ¤ � ¤¢� ¥ � ¥¢� ¦ � ¦¢�§¨Funding Sources

����������CMAQ - Streets: 41700-306

������ ������Total

Wednesday, June 24, 201555

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: �znops�vpuzn zt un­�q®y�ynp ruwxpy� vszoo¯qr°o qn� advanced warning devices at various locations.

|}~���� �����}� ����±Traffic Safety Improvements-Various Locations

Project Cost: �²�«����

Phase: ³��m´µ

Justification: m��sz®y psqttuv qn� �y�yopsuqn oqtyp¶

Category: �sqttuv �uwnqr

Total� ¡¢� £ � £¢� ¤ � ¤¢� ¥ � ¥¢� ¦ � ¦¢�§¨Expenditures

��������������Construction

��������Construction Management/Inspection

������ ������Total

Total� ¡¢� £ � £¢� ¤ � ¤¢� ¥ � ¥¢� ¦ � ¦¢�§¨Funding Sources

��������������HSIP Grant: 417000-306

����������LTF - Streets: 42000-333

������ ������Total

Wednesday, June 24, 201556

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: mnopqrr psqttuv ouwnqr qp ·zoy�upy qn� �r�

|}~���� �����}� ���ª�Yosemite & Elm Traffic Signal

Project Cost: ��«�����

Phase: �¸µ��¹º��m¸µ

Justification:

Category: �sqttuv �uwnqr

Total� ¡¢� £ � £¢� ¤ � ¤¢� ¥ � ¥¢� ¦ � ¦¢�§¨Expenditures

��������������Construction

����������Construction Management/Inspection

������� �������Total

Prior

»¼½¾¾¾

Total

Total� ¡¢� £ � £¢� ¤ � ¤¢� ¥ � ¥¢� ¦ � ¦¢�§¨Funding Sources

������������RDA Funds

������� �������Total

Prior

»¼½¾¾¾

Total

Wednesday, June 24, 201557

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: mnopqrr ²����­tyyp zt ny¯ ¿²­unvx ¯qpys runy pz vznnect to an existing 12-inch water lines to the east and west

|}~���� �����}� À�|�À�ÁÂ12" Pipe - Almond Ave -Pine St to Stadium Rd

Project Cost: �¿�Ã����

Phase:

Justification: �xuo oyw�ynp uo �youwnqpy� qo �uoounw un pxy {qpys System Master Plan. Missing lines typically provide redundancy should one line need to be turned off. They also increase efficiency resulting in higher pressure.

Category: {qpys

Total� ¡¢� £ � £¢� ¤ � ¤¢� ¥ � ¥¢� ¦ � ¦¢�§¨Expenditures

������������Land Acquisition

������������Design/Engineering

������������Construction

������ ����� ������Total

Total� ¡¢� £ � £¢� ¤ � ¤¢� ¥ � ¥¢� ¦ � ¦¢�§¨Funding Sources

������������� ������DIF:40845 Water Pipes Impact Fee

�� �Water Utility Fund: 20300-712

������ ����� ������Total

Wednesday, June 24, 201558

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: ÄÅÆÇÈÉÉ ÊËÌÍÎÏÏÇ ÐÎ ÅÏÑ ÒÓÍÔÅÕÖ ÑÈÇÏ× ÉÔÅÏ ÇÐ ÕÐÅÅÏct to an existing 12-inch water lines to the east and west

ØÙÚÛÜÝÞ ßàáâÜÙã äåØæäåçè12" Pipe Pecan Av, 480 ft w/o Monterey to Monterey

Project Cost: éêëìêÌÌ

Phase:

Justification: íÖÔÆ ÆÏîïÏÅÇ ÔÆ ðÏÆÔîÅÈÇÏð ÈÆ ïÔÆÆÔÅî ÔÅ ÇÖÏ ñÈÇÏ× System Master Plan. Missing lines typically provide redundancy should one line need to be turned off. They also increase efficiency resulting in higher pressure.

Category: ñÈÇÏ×

Totalòóôõòóö òóöõòó÷ òó÷õòóø òóøõòóù òóùõòúûExpenditures

��������Design/Engineering

����� �����Total

Future

üýþÿ��

Total

Totalòóôõòóö òóöõòó÷ òó÷õòóø òóøõòóù òóùõòúûFunding Sources

��������Water Utility Fund: 20300-712

����� �����Total

Future

üýþÿ��

Total

Wednesday, June 24, 201559

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: ÄÅÆÇÈÉÉ IËÌÍÎÏÏÇ ÐÎ ÅÏÑ ÒÓÍÔÅÕÖ ÑÈÇÏ× ÉÔÅÏ ÇÐ ÕÐÅÅÏct to existing 12-inch water lines to the east and west

ØÙÚÛÜÝÞ ßàáâÜÙã äåØæPå�12" Pipe, Pecan Ave - Madera to 760 ft e/o Madera

Project Cost: éë$ìÌÌÌ

Phase:

Justification: íÖÔÆ ÆÏîïÏÅÇ ÔÆ ðÏÆÔîÅÈÇÏð ÈÆ ïÔÆÆÔÅî ÔÅ ÇÖÏ ñÈÇÏ× System Master Plan. Missing lines typically provide redundancy should one line need to be turned off. They also increase efficiency resulting in higher pressure.

Category: ñÈÇÏ×

Totalòóôõòóö òóöõòó÷ òó÷õòóø òóøõòóù òóùõòúûExpenditures

��������Design/Engineering

����������Construction

����� ������ ������Total

Totalòóôõòóö òóöõòó÷ òó÷õòóø òóøõòóù òóùõòúûFunding Sources

��������� �����Water Utility Fund: 20300-712

����� ������ ������Total

Wednesday, June 24, 201560

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: C�������� ���� ����� ���� �� ���� ������ ��������ion with a 6.75 million gallon tank at or near Avenue 17 and Road 27

������� ��� ��! "#��%#&24" Pipe, Lake Street - Ellis to Avenue 17

Project Cost: '())*)))

Phase: D+�,-.

Justification: .��� N��/ � 0N��� ��1 2�/2 �33��� �/2���� �3 1���4 � conditions when municipal wells exhibit reduced capacity during peak hours. Pipe is necessary to convey flow to and from tankLong Term - Provide storage on east side of city given majority of pumping is proposed to occur on the west side of the City per the Water System Master Plan.

Category: W����

Total5678569 569856: 56:856; 56;856< 56<85=>Expenditures

����������� �����Design/Engineering

������������Construction

������ ������ ������� �������Total

Total5678569 569856: 56:856; 56;856< 56<85=>Funding Sources

������� � ������ ����� ������Water Utility Fund: 20300-712

� � ������ ������ ������� �������Total

Wednesday, June 24, 201561

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: ?ÐÅÆÇ×@ÕÇ $AIë ïÔÉÉÔÐÅ îÈÉÉÐÅ ÇÈÅB ÈÇ Ð× ÅÏÈ× EFÏÅ@e 17 and Road 27

ØÙÚÛÜÝÞ ßàáâÜÙã äåGåHAbove Ground Storage Tank - 6.75 MG

Project Cost: éJì$$êìÌÌÌ

Phase: KLMÄOQ

Justification: QÏÈ× íÏ×ï Í ARÎÎÆÏÇ ÔïSÈÕÇÆ ÐÎ ð×Ð@îÖÇ ÕÐÅðÔÇÔÐÅÆ Ñhen municipal wells exhibit reduced capacity during peak hoursLong Term - Provide storage on east side of city given majority of pumping is proposed to occur on the west side of the City per the Water System Master Plan.

Category: ñÈÇÏ×

Totalòóôõòóö òóöõòó÷ òó÷õòóø òóøõòóù òóùõòúûExpenditures

������������Land Acquisition

������������ �������Design/Engineering

�������������� ��������Construction

������� ������ �������� ��������� ��������Total

Totalòóôõòóö òóöõòó÷ òó÷õòóø òóøõòóù òóùõòúûFunding Sources

���������� ����� ������� ������� ��������Water Utility Fund: 20300-712

� ������� ������ �������� ��������� ��������Total

Wednesday, June 24, 201562

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: ÄÅÆÇÈÉÉ JÌÍÎÏÏÇ ÐÎ ÅÏÑ ÒÓÍÔÅÕÖ ÑÈÇÏ× ÉÔÅÏ ÇÐ ÕÐÅÅÏÕt to an existing 12-inch water line

ØÙÚÛÜÝÞ ßàáâÜÙã äåØßäåTUAviation Dr Pipe - Cross Airport Dr to 12" line

Project Cost: VXYZ[[

Phase:

Justification: \]^_ _`ab`cd ^_ e`_^acfd`e f_ b^__^ca ^c d]` gfd`h System Master Plan. Missing lines typically provide redundancy should one line need to be turned off. They also increase efficiency resulting in higher pressure.

Category: gfd`h

Totalijklijm ijmlijn ijnlijo ijolijp ijpliqrExpenditures

������Design/Engineering

����������Construction

����� �����Total

Totalijklijm ijmlijn ijnlijo ijolijp ijpliqrFunding Sources

����������Water Utility Fund: 20300-712

������ ������Total

Wednesday, June 24, 201563

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: sc_dftt uZ[vw``d xw c`y uzv^c{] yfd`h t^c` dx {xcc`ct to an existing 12-inch water line

|}~���� �����}� ��|�����Aviation Pipe - Connect 12" in Aviation by Falcon

Project Cost: Vu�Y[[[

Phase:

Justification: \]^_ _`ab`cd ^_ e`_^acfd`e f_ b^__^ca ^c d]` gfd`h System Master Plan. Missing lines typically provide redundancy should one line need to be turned off. They also increase efficiency resulting in higher pressure.

Category: gfd`h

Totalijklijm ijmlijn ijnlijo ijolijp ijpliqrExpenditures

����������Design/Engineering

����������Construction

������ ������Total

Totalijklijm ijmlijn ijnlijo ijolijp ijpliqrFunding Sources

������������Water Utility Fund: 20300-712

������ ������Total

Wednesday, June 24, 201564

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: �`�tf{`b`cd fce ^c_dfttfd^xc xw yfd`h b`d`h_ fd {xbmercial institutions for the City's AMR reading system.

|}~���� �����}� ����Commercial Water Meters

Project Cost: V�Y�zZY[[[

Phase:

Justification: \]` b`d`h y^tt �` f�t` dx _`tw h`fe fce dhfc_b^d efta into the main office saving labor to read meters.

Category: gfd`h

Totalijklijm ijmlijn ijnlijo ijolijp ijpliqrExpenditures

������������������Construction

������������Construction Management/Inspection

��������� ���������Total

Prior

�������

Total

Totalijklijm ijmlijn ijnlijo ijolijp ijpliqrFunding Sources

����������������Water Utility Fund: 20300-712

��������� ���������Total

Prior

�������

Total

Wednesday, June 24, 201565

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: ������� ���� ��  ¡�¡¢�£¤¢�� ¡¥�¤��¡�� �� �£¡¦¤§���¨ drilled well. Design drawings are complete.

©ª«¬­®¯ °±²³­ª´ µ¶·µ¶¸Complete Water Well No. 37

Project Cost: ¹º»¼º½»¼¼¼

Phase:

Justification: ¾��¡£ �¨��¡� ����¨�¤� ¤� ¤¢��¡� �¿¡ À¤�¨ £¡¥�¤£¡� � ditional well capacity to meet peak hour demandand or redundancy.

Category: ¾��¡£

TotalÁÂÃÄÁÂÅ ÁÂÅÄÁÂÆ ÁÂÆÄÁÂÇ ÁÂÇÄÁÂÈ ÁÂÈÄÁÉÊExpenditures

������������������Construction

��������� ���������Total

TotalÁÂÃÄÁÂÅ ÁÂÅÄÁÂÆ ÁÂÆÄÁÂÇ ÁÂÇÄÁÂÈ ÁÂÈÄÁÉÊFunding Sources

������������������Water Utility Fund: 20300-712

��������� ���������Total

Wednesday, June 24, 201566

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: sc_dftt c`y Ëv^c{] yfd`h t^c` ^c �fhftt`t y^d] fc `xisting water line.

|}~���� �����}� ��ÌÌ�ÍMaple St Pipe - Pine St to Noble St

Project Cost: V�Y[[[

Phase:

Justification: \]^_ _`ab`cd ^_ e`_^acfd`e f_ e`w^{^`cd xc d]` �f_^s of fire flow in the Water System Master Plan.

Category: gfd`h

Totalijklijm ijmlijn ijnlijo ijolijp ijpliqrExpenditures

��������Design/Engineering

������������Construction

������ ������Total

Totalijklijm ijmlijn ijnlijo ijolijp ijpliqrFunding Sources

����������Water Utility Fund: 20300-712

������ ������Total

Wednesday, June 24, 201567

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: sc_dftt c`y uzv^c{] yfd`h t^c` ^c �fhftt`t y^d] fc existing water line.

|}~���� �����}� ��ÌÌ�ÏOlive Ave Pipe - Pine St to Noble St

Project Cost: V�Y[[[

Phase:

Justification: \]^_ _`ab`cd ^_ e`_^acfd`e f_ e`w^{^`cd xc d]` �f_^s of fire flow in the Water System Master Plan.

Category: gfd`h

Totalijklijm ijmlijn ijnlijo ijolijp ijpliqrExpenditures

��������Design/Engineering

������������Construction

������ ������Total

Totalijklijm ijmlijn ijnlijo ijolijp ijpliqrFunding Sources

����������Water Utility Fund: 20300-712

������ ������Total

Wednesday, June 24, 201568

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: sc_dfttfd^xc xw yfd`h bf^c_Y ÐftÐ`_ fce f��Ñhd`cfc{es on Pecan Avenue, Garnet Street to Golden State Blvd.

|}~���� �����}� ���ÒPecan Ave. Water Main

Project Cost: VzXÎY[[[

Phase: ÓÔÕsÖ×

Justification: ØeÙf{`cd �hx�`hd^`_ fh` {Ñhh`cdtÚ _`hÐ^{`e �Ú �h^{fte on-site wells.

Category: gfd`h

Totalijklijm ijmlijn ijnlijo ijolijp ijpliqrExpenditures

������������Design/Engineering

������������Construction

����������Environmental

������������Construction Management/Inspection

������������Contingency

������� �������Total

Totalijklijm ijmlijn ijnlijo ijolijp ijpliqrFunding Sources

������������DIF:40845 Water Pipes Impact Fee

������� �������Total

Wednesday, June 24, 201569

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: ÛÜÝÞßàà Üáâ ãäåÜæç âßÞáè àåÜá åÜ éßèßààáà âåÞç ßÜ áxisting water line.

êëìíîïð ñòóôîëõ ö÷øø÷ùPlumas St Pipe - Rotan Ave approx 330 ft west

Project Cost: úûãüýýý

Phase:

Justification: þçåÝ ÝáÿTáÜÞ åÝ �áÝåÿÜßÞá� ßÝ �á�åæåáÜÞ �Ü Þçá �ßÝås of fire flow in the Water System Master Plan.

Category: WßÞáè

Total'���'�� '���'�� '���'� '��'� '��'��Expenditures

����������Design/Engineering

������������Construction

����� �����Total

Total'���'�� '���'�� '���'� '��'� '��'��Funding Sources

������������Water Utility Fund: 20300-712

����� �����Total

Wednesday, June 24, 201570

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: C�ÜÝÞè æÞ �ü�ýý ��� é Té ÝÞßÞå�Ü åÜ æ�Ü� ÜæÞå�Ü âåÞh a 6.75 million gallon tank at or near Avenue 17 and Road 27

êëìíîïð ñòóôîëõ ö÷êP÷�Pump Station for Tank at Ave. 17 & Road 27

Project Cost: ú$ü���üýýý

Phase: D����

Justification: �áßè þáèT ä NþÜß� ßÜ� é Té ���ÝáÞÝ åTéßæÞÝ �� �è� ÿht conditions when municipal wells exhibit reduced capacity during peak hoursLong Term - Provide storage and pumping capacity on east side of city given majority of pumping is proposed to occur on the west side of the City per the Water System Master Plan.

Category: WßÞáè

Total'���'�� '���'�� '���'� '��'� '��'��Expenditures

������������� �������Design/Engineering

���������������� ���������Construction

������ ������� ��������� ��������� ���������Total

Total'���'�� '���'�� '���'� '��'� '��'��Funding Sources

�������������� ������� �������� ���������Water Utility Fund: 20300-712

������ ������� ��������� ��������� ���������Total

Wednesday, June 24, 201571

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: ÛÜÝÞßàà Üáâ ãäåÜæç âßÞáè àåÜá åÜ éßèßààáà âåÞç ßÜ áxisting water line.

êëìíîïð ñòóôîëõ ö÷øø÷�Rotan Ave Pipe - Howard Rd to Plumas St

Project Cost: ú�ýüýýý

Phase:

Justification: þçåÝ ÝáÿTáÜÞ åÝ �áÝåÿÜßÞá� ßÝ �á�åæåáÜÞ �Ü Þçá �ßÝås of fire flow in the Water System Master Plan.

Category: WßÞáè

Total'���'�� '���'�� '���'� '��'� '��'��Expenditures

����������Design/Engineering

������������Construction

������ ������Total

Total'���'�� '���'�� '���'� '��'� '��'��Funding Sources

������������Water Utility Fund: 20300-712

������ ������Total

Wednesday, June 24, 201572

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: ��� � ! "#%& ()*+ ,� ! -./0122�3 !4! 50#��0 1.3 ��06), east on 11th, under UPRR to east. North on "E" Street to 10th Street, east on 10th Street to "D" Street. Connect to existing 10".

Part of 2010 Water Improvements - Bid Package 2. 90% design. Shelved due to lack of funding.

Should be constructed in conjunction with W-06.

789:;<= >?@A;8B W-08Water Main Upgrades - 10th St.

Project Cost: EFG*H***

Phase:

Justification: I#%J�K0 -3�.0-"-�3 -. �LLF M1/0�# I21. 0% O#%Q-3� O-peline reinforcements between South and East Madera as "Improvements No. 1.2" that includes W-06 and W-08

Category: (10�#

TotalRSUVRSX RSXVRSY RSYVRSZ RSZVRS[ RS[VR\]Expenditures

������������Design/Engineering

������������Construction

����������Construction Management/Inspection

������ ������� ������Total

TotalRSUVRSX RSXVRSY RSYVRSZ RSZVRS[ RS[VR\]Funding Sources

������������ �����Water Utility Fund: 20300-712

������ ������� ������Total

Wednesday, June 24, 201573

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: WßÞáè éè��áæÞÝ Ý^ÝÞáT éÿèß�áÝ ßÞ _ �ÞèááÞ ä ûûÞç Þo Madera Avenue. Install new 12" main from existing 12" crossing SR99 at 10th Street alignment, southerly on "H" Street, across Madera Avenue to 11th Street. Bore under Madera Avenue (SR145).

Project is 90% design by CDM as part of 2010 Water System Improvements - Bid Pack 2 along with W-07 and W-08. Shelved due to lack of funding.

Should be constructed in conjunction with W-08.

êëìíîïð ñòóôîëõ ö÷`aWater Main Upgrades - H St.

Project Cost: ú�$büýýý

Phase:

Justification: �è��áæÞ å�áÜÞå�åá� åÜ ûcc� �ßÝÞáè �àßÜ Þ� éè�då�á éipeline reinforcements between South and East Madera as "Improvements No. 1.2" that includes W-06 and W-08

Category: WßÞáè

Total'���'�� '���'�� '���'� '��'� '��'��Expenditures

������������Design/Engineering

��������������Construction

����������Construction Management/Inspection

������ ������� �������Total

Total'���'�� '���'�� '���'� '��'� '��'��Funding Sources

������������ �����Water Utility Fund: 20300-712

������ ������� �������Total

Wednesday, June 24, 201574

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: eáéàßæá Ü�áèÝåfá éåéáÝ âåÞç àßèÿáè �gC Þ� åÜæà �á valves & appurtenances at the following locations:Oak Street - Pine to CypressOlive Ave. - P to Q StreetP Street - 4th to 5thO/P Alley - 6th to Olive10th - D to UPRR12th - E to D Alley14th - D to Olive5th - Gateway to G2nd - C to EB St.- Central to RiverA St. - Central to River6th - Lake St. to Vineyard

êëìíîïð ñòóôîëõ ö÷`ùWater Main Upgrades - Locations 1-12

Project Cost: úãbýüýýý

Phase:

Justification: hÜ�áèÝåfá éåéáÝ Üáá� Þ� �á éÿèß�á� Þ� éè�då�á Ý ��icient supply of potable water.

Category: WßÞáè

Total'���'�� '���'�� '���'� '��'� '��'��Expenditures

��������������Design/Engineering

��������������Construction

��������������Construction Management/Inspection

������ ������Total

Total'���'�� '���'�� '���'� '��'� '��'��Funding Sources

������������Water Utility Fund: 20300-712

������ ������Total

Wednesday, June 24, 201575

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: eáéàßæá Ü�áèÝåfá éåéáÝ âåÞç àßèÿáè �gC Þ� åÜæà �á valve & appurtenance at the following locations:

Fresno Street - Riverside to DaltonRiverside Alley @ DaltonMerced St. - Daltin to RiversideB Street - 10th to 13th11th Street - A to 200ft E/O A StreetNebraska - Cleveland to James WayWilson - Owens to SharonAdell - Lake to MercedHarding - Davis to Torres WayWallace - Sunrise to Sierra Vista SchoolLake - Wallace to HullLincoln - Tulare to 2 blks east

êëìíîïð ñòóôîëõ ö÷`iWater Main Upgrades - Locations 13-23

Project Cost: úûübýýüýýý

Phase:

Justification: hÜ�áèÝåfá éåéáÝ Üáá� Þ� �á éÿèß�á� Þ� éè�då�á Ý ��icient supply of potable water.

Category: WßÞáè

Total'���'�� '���'�� '���'� '��'� '��'��Expenditures

��������������Design/Engineering

������������������Construction

��������������Construction Management/Inspection

��������� ���������Total

Total'���'�� '���'�� '���'� '��'� '��'��Funding Sources

����������������Water Utility Fund: 20300-712

��������� ���������Total

Wednesday, June 24, 201576

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: WßÞáè éè��áæÞÝ Ý^ÝÞáT éÿèß�áÝ ßÞ eådáè Cè�ÝÝåÜÿj �ateway, Columbia to Water Well No. 18.

êëìíîïð ñòóôîëõ ö÷`kWater Main Upgrades - River Crossing at Gateway

Project Cost: lmnopqqq

Phase:

Justification: rstuv wxwtuy zw {utuvz|vstz}~ s}{ }uu{z}~ vu�szv� Major reconditioning or replacement is needed to restore capacity.

Category: rstuv

Total������� ������� ������� ������� �������Expenditures

������������Design/Engineering

������������Construction

����������Construction Management/Inspection

������ ������Total

Total������� ������� ������� ������� �������Funding Sources

������������Water Utility Fund: 20300-712

������ ������Total

Wednesday, June 24, 201577

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: �uy|�u u�zwtz}~ �stuv t|�uv �|�stu{ st t�u �vs}� �urgon Senior Center (238 S. "D" Street) and perform environmental remediation of the dismantled pieces for proper disposal.

������� ������  ¡¢£¤Water Tower Demolition

Project Cost: l¥nopqqq

Phase:

Justification: ¦�u u��u}wu |§ vuwt|vz}~ t�u �stuv t|�uv wtv¨�t¨vs�ly and environmentally has been estimated by the Public Works Department to be in a ballpark area of $1,000,000 - well over the estimated removal costs. These funds do not presently exist which would leave the current safety concerns in place until such fund could be secured, if ever.

Category: rstuv

Total������� ������� ������� ������� �������Expenditures

������������Design/Engineering

������������Construction

������������Construction Management/Inspection

������ ������� ������Total

Total������� ������� ������� ������� �������Funding Sources

������������ �����Water Utility Fund: 20300-712

������ ������� ������Total

Wednesday, June 24, 201578

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: ©|}wtv¨�t �stuv �u�� z} s��|v{s}�u �zt� t�u rstuv ªystem Master Plan. Design is complete. The site has been improved and the shaft has been drilled. Site is not currently owned by the City. This site will require water treatment for manganese.

������� ������  ¡¢«¡¢£Water Well No. 35, Ellis St 970 ft w/o Chapin St

Project Cost: l¥pqmmpqqq

Phase: ©¬­ª¦�®©¦¯¬­

Justification: �u�vuwu}tw s �u�� t�st �z�� °u }uu{u{ �uv s}s�xwzw contained in the Water System Master Plan to serve existing development.

Category: rstuv

Total������� ������� ������� ������� �������Expenditures

������������������Construction

��������� ���������Total

Total������� ������� ������� ������� �������Funding Sources

������������������Water Utility Fund: 20300-712

��������� ���������Total

Wednesday, June 24, 201579

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: ±²³´µ¶² ³·¸³¹ µº »²´´ ¼½¾ ¿À µº Áº½Â²Ã Ä Å½Æ²Â ±½µÇ

ÈÉÊËÌÍÎ ÏÐÑÒÌÉÓ W-20Well #28 Pumps Replacement

Project Cost: ÔÕÖÖ×ÖÖÖ

Phase:

Justification: ؽ´½ÙÚ²Ç ·¹² ½Û ³·¸³¹ ¶µ·¹²Ç ÜÙ²ÛÛܶܲٶà µÙÇ ¶½¹º´y energy use. PG&E will provide funds to replace units thereby saving electricity.

Category: ݵº²Â

TotalÞßàáÞßâ ÞßâáÞßã ÞßãáÞßä ÞßäáÞßå ÞßåáÞæçExpenditures

������������Design/Engineering

������������Construction

������������Construction Management/Inspection

������� �������Total

TotalÞßàáÞßâ ÞßâáÞßã ÞßãáÞßä ÞßäáÞßå ÞßåáÞæçFunding Sources

������������Water Utility Fund: 20300-712

������� �������Total

Wednesday, June 24, 201580

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Engineering

Description: èz�u�z}u |¨t§s�� u�tu}wz|} é ru�� ­|� ¥ê� ¯}wts�� a pipeline 200 feet down Almond to provide relief line.

������� ������  ¡¢ëìWell No. 27 Pipeline Outfall Extension

Project Cost: loêopqqq

Phase: íï­

Justification: ïvs}¨�stu{ ð�tz�stu{ ©sv°|} §z�tuv wxwtuy zw °s��§�ushed twice a year. Currently, the well water floods the street. System will install a pipeline 200 feet down Almond to provide for relief line.

Category: rstuv

Total������� ������� ������� ������� �������Expenditures

����������Design/Engineering

������������Construction

������������Construction Management/Inspection

������ ������� �������Total

Total������� ������� ������� ������� �������Funding Sources

��������� ������Water Utility Fund: 20300-712

������ ������� �������Total

Wednesday, June 24, 201581

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Parks & Community Services

Description: ñsz}tsz} °z�uò�u{uwtvzs} tvsz�w s}{ �|}wtv¨�t }u� °ike lanes and paths.

������� ������  �ó¢ôëBike Lane Projects - Various Locations

Project Cost: lõmõpöqq

Phase:

Justification: ÷øùúûüúøúýü øúþ ÿMü�øûùÿúø� �ø�üû� øúþ �øûý�ùú� ��úds for improvement projects.

Category: Pø��

Total'��' ' �'� '��'� '��'� '��'��Expenditures

������������ ������ ������ ������ �����Construction

����� ������ ������ ������ ������ �������Total

Prior

�������

Total

Total'��' ' �'� '��'� '��'� '��'��Funding Sources

������������ ������ ������ ������ �����LTF - Parks: 42000-341

����� ������ ������ ������ ������ �������Total

Prior

�������

Total

Wednesday, June 24, 201582

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Parks & Community Services

Description: Cÿú�û��ýû �ùü�Müþü�û�ùøú Møû� ùú ÷�� ø�ù�ú�üúû úÿ�th of Fresno River to Cleveland Avenue between Granada Dr. and Schnoor Ave.

����� ! "#$%��& �()*+Bike/Ped Path - FRT to Cleveland

Project Cost: ,-./0111

Phase:

Justification: P�ÿ2ùþü ���ûù3�ÿþø� Møû�4ø� ýÿúúüýûùú� 5�ü�úÿ 6ù2ü� and commercial areas to the northwest area of Madera.

Category: Pø��

Total'��' ' �'� '��'� '��'� '��'��Expenditures

������������Design/Engineering

��������������Construction

������������Construction Management/Inspection

������ ������ ������Total

Total'��' ' �'� '��'� '��'� '��'��Funding Sources

��������������CMAQ - Parks: 41700-303

����������� ������Measure T - Enviromental Enhancement: 41500-447

������ ������ ������Total

Wednesday, June 24, 201583

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Parks & Community Services

Description: E�ü�üúû� ÿ� û�ü M�ÿ7üýû ùúý��þü ùú�ûø��øûùÿú ÿ� �ø�dscape approaches, fall surfaces, landscaping, play equipment and other playground amenities (benches, trash cans, etc.)

����� ! "#$%��& �()+8Centennial Park Playground

Project Cost: ,-9.0111

Phase:

Justification: C�ù�þ�üú 4ùû� þù�ø��ùùûùü� ø�ü úÿû ø�4ø�� ø��ü ûÿ ünjoy playgrounds especially when they are cumbersome, or not fully accessable. This project will construct the City's first fully accessible playground and will be located in Lions Town and Country Park.

Category: Pø��

Total'��' ' �'� '��'� '��'� '��'��Expenditures

������������Design/Engineering

������������Construction

������������Construction Management/Inspection

������� �������Total

Total'��' ' �'� '��'� '��'� '��'��Funding Sources

����������Fansler Grant: 41000-635

��������������Housing Related Parks Program: 41000-635

������� �������Total

Wednesday, June 24, 201584

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Parks & Community Services

Description: T�ù� M�ü2ùÿ���� øMM�ÿ2üþ øúþ þü�ù�úüþ M�ÿ7üýû ùúý��des engineering, environmental and construction for a trail undercrossing at Gateway Drive and the Union Pacific Railroad tressel.

����� ! "#$%��& �():;FRT - Gateway & UPRR Undercrossing

Project Cost: ,9190<11

Phase: �ED�=>

Justification:

Category: Pø��

Total'��' ' �'� '��'� '��'� '��'��Expenditures

��������������Construction

����������Construction Management/Inspection

��������Design/Engineering/Administrative

����������UPRR

����� �����Total

Prior

�?�@��

Total

Total'��' ' �'� '��'� '��'� '��'��Funding Sources

������������BTA - State (Bicycle Transportation Acc: 41300-342

��������������CMAQ - Parks: 41700-303

����������LTF - Parks: 42000-341

����������SJVAPCD - Remove II Grant: 41300

����� �����Total

Prior

�?�@��

Total

Wednesday, June 24, 201585

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Parks & Community Services

Description: Cÿú�û��ýû Aü�ú ÷ýC���ÿ�� 6ù2ü� �ùü Møû� 3 úÿ�û� �ønk of Fresno River Trail from Granada Drive to MID alignment.

����� ! "#$%��& �()*;FRT - Granada to MID, North Bank

Project Cost: ,BF90111

Phase:

Justification: Cÿúûùú�øúýü ÿ� �üý�üøûùÿúø� øúþ ýÿ���ûü� ���ûù3�ÿþøl trail connecting northwest Madera to existing facilities.

Category: Pø��

Total'��' ' �'� '��'� '��'� '��'��Expenditures

������������Land Acquisition

����������Design/Engineering

��������������Construction

������������Construction Management/Inspection

������ ������� �������Total

Total'��' ' �'� '��'� '��'� '��'��Funding Sources

������������� ������CMAQ - Parks: 41700-303

���������� ������Measure T - Enviromental Enhancement: 41500-447

������ ������ �������Total

Wednesday, June 24, 201586

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Parks & Community Services

Description: Cÿú�û��ýû Aü�ú ÷ýC���ÿ�� 6ù2ü� �ùü Møû� 3 úÿ�û� �ønk of Fresno River Trail from MID alignment to Schnoor Avenue.

����� ! "#$%��& �()*GFRT - MID to Schnoor, North Bank

Project Cost: HIJKLKKK

Phase:

Justification: NOQRSQUVQWX OY ZXWZXVRSOQV[ WO\\URXZ \U[RS \O]V[ RZail cnenecting northwest Madera to existing facilities.

Category: ^VZ_`

Totalabcdabe abedabf abfdabg abgdabh abhdaijExpenditures

����������Design/Engineering

������������Construction

������������Utility Relocation

��������Environmental

������������Construction Management/Inspection

������ ������ �������Total

Totalabcdabe abedabf abfdabg abgdabh abhdaijFunding Sources

����������� �������CMAQ - Parks: 41700-303

����������� ������Measure T - Enviromental Enhancement: 41500-447

������ ������ �������Total

Wednesday, June 24, 201587

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Parks & Community Services

Description: NOQ`RZUWR kXZQ lWNU[[OUmn oSpXZ qZVS[ UQ]XZWZO``SQm at Schnoor undercrossing - North

rstuvwx yz{|vs} r~���FRT- Schnoor Bridge - North Undercrossing

Project Cost: H��ILIKK

Phase: ������

Justification: NOQRSQUVQWX OY RZVS[ RO X[S\SQVRX UQ`VYX ZOV] WZO``ing across Schnoor Avenue.

Category: ^VZ_`

Totalabcdabe abedabf abfdabg abgdabh abhdaijExpenditures

����������Design/Engineering

��������������Construction

��������Right of Way Costs

������������Construction Management/Inspection

������� �������Total

Prior

������

Total

Totalabcdabe abedabf abfdabg abgdabh abhdaijFunding Sources

��������������BTA - State (Bicycle Transportation Acc: 41300-342

������������LTF - Parks: 42000-341

������� �������Total

Prior

������

Total

Wednesday, June 24, 201588

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Parks & Community Services

Description: �[X\XQR` OY RnX ZXnV�S[SRVRSOQ �[VQ` SQW[U]X ZX\OpVl of hazardous debris, demolition of concrete pads and sidewalks that are in poor repair, removal of unattractive fencing that creates a barrier to park access, ADA improvements, installation of fencing tosegregate the public from seasonal pond water and stormwater infrastructure, re-grading of pond bottom, landscape rehabilitation and limited installatio of park amenities (soccer goalposts, picnic tables, trash and recycling cans for example).

rstuvwx yz{|vs} r~���Knox Park Rehabilitation

Project Cost: H��KLKKK

Phase:

Justification: �QO� ^VZ_ S` V YOZ\XZ QXSmn�OZnOO] �VZ_ �SRnSQ RnX confines of a water retention basin. The park which served the neighborhoods immediately surrounding it has fallen into disrepair and is permanently locked to prevent public access.

Category: ^VZ_`

Totalabcdabe abedabf abfdabg abgdabh abhdaijExpenditures

������������Design/Engineering

����������Construction

����������Construction Management/Inspection

������ ������Total

Totalabcdabe abedabf abfdabg abgdabh abhdaijFunding Sources

��������������Housing Related Parks Program: 41000-635

������ ������Total

Wednesday, June 24, 201589

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Parks & Community Services

Description: ^nV`X � OY RnS` �ZO�XWR �S[[ WOQ`RZUWR VQ V`�nV[R Woncrete path with concrete landing and install irrigation facilities and trees along an existing MID easement corridor (Laurel Street) that connects to the Fresno River Trail.

rstuvwx yz{|vs} r~���Laurel Bike Path - Sunset to FRT

Project Cost: H�K�L�KK

Phase: ������

Justification:

Category: ^VZ_`

Totalabcdabe abedabf abfdabg abgdabh abhdaijExpenditures

������������Construction

����������Construction Management/Inspection

������� �������Total

Prior

������

Total

Totalabcdabe abedabf abfdabg abgdabh abhdaijFunding Sources

��������������CMAQ - Parks: 41700-303

������������LTF - Parks: 42000-341

��������������Measure T - Enviromental Enhancement: 41500-447

����������SJVAPCD - Remove II Grant: 41300

������� �������Total

Prior

������

Total

Wednesday, June 24, 201590

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Parks & Community Services

Description: �X`SmQ VQ] WOQ`RZUWRSOQ OY WOQWZXRX WUZ� � mURRXZL chain link fence and re-grading to improve drainage. Part of this project is the booster pump that was completed in 2011.

��� ¡¢£ ¤¥¦§¡�¨ �©ª«¬Sunrise Rotary Sports Complex Improvements

Project Cost: ­®¯°±²²²

Phase: ³´µ¶·¸

Justification:

Category: ¹º»¼½

Total¾¿ÀÁ¾¿Â ¾¿ÂÁ¾¿Ã ¾¿ÃÁ¾¿Ä ¾¿ÄÁ¾¿Å ¾¿ÅÁ¾ÆÇExpenditures

������������Design/Engineering

������������Construction

������������Construction Management/Inspection

������� �������Total

Prior

ÈÉÊÊÊ

Total

Total¾¿ÀÁ¾¿Â ¾¿ÂÁ¾¿Ã ¾¿ÃÁ¾¿Ä ¾¿ÄÁ¾¿Å ¾¿ÅÁ¾ÆÇFunding Sources

����������CDBG - Parks: 10221-433

������������DIF:45218 Parks Impact Fee

������� �������Total

Prior

ÈÉÊÊÊ

Total

Wednesday, June 24, 201591

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Parks & Community Services

Description: Ë»ÌÍ ÎÏÐ ÑÒ»»ÐÓΠк½ÎÐ»Ó ÐÓÔ ÌÕ ÎÏРλºÖ× ÎÏÖ½ Ø»ÌÙect would create a Class II bike lane and street crossings to take trail to intersection of Raymond Road and Cleveland Avenue. A new Class I Bike Trail would be constructed running east between the River and Raymond Road to end at the eastern Madera City Limits.

��� ¡¢£ ¤¥¦§¡�¨ �©ªÚÛTulare/Cleveland/Raymond Bike Path

Project Cost: ­Ü¯Ý±²²²

Phase: ³´µ¶·¸

Justification: ÞÌӽλÒÑÎÖÌÓ ÌÕ Ë»Ð½ÓÌ ßÖàл ỺÖ× Íº½Îл Ø×ºÓ Øл Vision 2025.

Category: ¹º»¼½

Total¾¿ÀÁ¾¿Â ¾¿ÂÁ¾¿Ã ¾¿ÃÁ¾¿Ä ¾¿ÄÁ¾¿Å ¾¿ÅÁ¾ÆÇExpenditures

������������Design/Engineering

������������Construction

������������Construction Management/Inspection

������ ������� �������Total

Total¾¿ÀÁ¾¿Â ¾¿ÂÁ¾¿Ã ¾¿ÃÁ¾¿Ä ¾¿ÄÁ¾¿Å ¾¿ÅÁ¾ÆÇFunding Sources

����������CMAQ - Parks: 41700-303

����������Measure T - Enviromental Enhancement: 41500-447

������� �������Total

Wednesday, June 24, 201592

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Public Works

Description: ßÐØ׺ÑÐ ÍÖ½ÑÐ×׺ÓÐÌÒ½ ½Ðâл ͺÖÓ½ ºÎ ÎÏÐ ÕÌ××ÌâÖÓã locations:Mainberry - Sunset to CamdenKenny Crt - A Street to Cul De Sac - CDBG Activity IMisc Alleys Downtown - CDBG Activity G, HPark Dr - Orchard to ClairmontAlley - Yosemite to Pine - CDBG Activity EPaul to Schnoor Alley3rd Street - B Street to D Street - CDBG Activity B, C, D9th Street - CDBG Activity F

Install new main Almond Avenue east of SR145 and abandon lift station, raise manhole covers to grade on SR145/Madera Avenue and upgrade South Street lift station - CDBG Activity A.

��� ¡¢£ ¤¥¦§¡�¨ äªåæSewer Mains, Package 2

Project Cost: ­°±ççè±²²²

Phase: ³´µ¶·¸

Justification: µÐâл ØÖØÐ×ÖÓн º»Ð ÔÐÎлÖÌ»ºÎÐÔ ºÓÔ ÑºàÖÓã ÖÓé êºjor reconditioning or replacement is needed to restore capacity. Funding will be prioritized on infrastructure most in need.

Category: µÐâл

Total¾¿ÀÁ¾¿Â ¾¿ÂÁ¾¿Ã ¾¿ÃÁ¾¿Ä ¾¿ÄÁ¾¿Å ¾¿ÅÁ¾ÆÇExpenditures

������������������Construction

��������������Construction Management/Inspection

�������� ��������Total

Prior

ëÊÉÊÊÊ

Total

Total¾¿ÀÁ¾¿Â ¾¿ÂÁ¾¿Ã ¾¿ÃÁ¾¿Ä ¾¿ÄÁ¾¿Å ¾¿ÅÁ¾ÆÇFunding Sources

������������CDBG - Public Works: 10221-433

��������������Sewer Utility Fund: 20400-511

�������� ��������Total

Prior

ëÊÉÊÊÊ

Total

Wednesday, June 24, 201593

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Public Works

Description: ßÐÑ̺ÎÖÓã ÌÕ ÎÏÐ âºÎл ÎÌâл ÖÓÎлÖÌ» ×ÖÓÖÓã

��� ¡¢£ ¤¥¦§¡�¨ ìªææWater Tower Recoating

Project Cost: ­°±Ý²²±²²²

Phase:

Justification: ßÐÑ̺ÎÖÓã ÎÌ Ø»ÐàÐÓÎ »Ò½Î ºÓÔ ÔÐÎлÖÌ»ºÎÖÌÓ ÌÕ ÖÓÎÐrior lining of the water tower

Category: íºÎл

Total¾¿ÀÁ¾¿Â ¾¿ÂÁ¾¿Ã ¾¿ÃÁ¾¿Ä ¾¿ÄÁ¾¿Å ¾¿ÅÁ¾ÆÇExpenditures

����������������Construction

��������� ���������Total

Total¾¿ÀÁ¾¿Â ¾¿ÂÁ¾¿Ã ¾¿ÃÁ¾¿Ä ¾¿ÄÁ¾¿Å ¾¿ÅÁ¾ÆÇFunding Sources

����������������Water Utility Fund: 20300-712

��������� ���������Total

Wednesday, June 24, 201594

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Transit Program

Description: ¶Ó½Îº×׺ÎÖÌÓ ÌÕ ½ÐÑÒ»ÖÎî ï غ½½ÐÓãл ÖÍØ»ÌàÐÍÐÓνé

��� ¡¢£ ¤¥¦§¡�¨ ð�ñòóªôSecurity & Passenger Enhancements

Project Cost: ­®²®±²²²

Phase:

Justification: ÞÖÎî ÌÕ êºÔлº ỺӽÖÎ µî½ÎÐÍ ÐÓϺÓÑÐÍÐÓÎ ºÓÔ Øº½½Ðnger amenities consistent with Vision 2025 Strategy 121 and Measure T.

Category: ỺӽÖÎ

Total¾¿ÀÁ¾¿Â ¾¿ÂÁ¾¿Ã ¾¿ÃÁ¾¿Ä ¾¿ÄÁ¾¿Å ¾¿ÅÁ¾ÆÇExpenditures

������������Design/Engineering

������������Construction

������������Construction Management/Inspection

������� �������Total

Total¾¿ÀÁ¾¿Â ¾¿ÂÁ¾¿Ã ¾¿ÃÁ¾¿Ä ¾¿ÄÁ¾¿Å ¾¿ÅÁ¾ÆÇFunding Sources

������������Measure T - Transit Enhan. Sr.: 415000-447

������������Measure T - Transit Enhan.: 41500-447

������������Prop 1B CalOES: 41100-449

������� �������Total

Wednesday, June 24, 201595

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Transit Program

Description: ¶Ó½Îº×׺ÎÖÌÓ ÌÕ ½ÐÑÒ»ÖÎî ï غ½½ÐÓãл ÖÍØ»ÌàÐÍÐÓνé

��� ¡¢£ ¤¥¦§¡�¨ ð�ñòóªõSecurity & Passenger Enhancements, B

Project Cost: ­¯®è±²²²

Phase:

Justification: ÞÖÎî ÌÕ êºÔлº ỺӽÖÎ µî½ÎÐÍ ÐÓϺÓÑÐÍÐÓÎ ºÓÔ Øº½½Ðnger amenities consistent with Vision 2025 Strategy 121 and Measure T.

Category: ỺӽÖÎ

Total¾¿ÀÁ¾¿Â ¾¿ÂÁ¾¿Ã ¾¿ÃÁ¾¿Ä ¾¿ÄÁ¾¿Å ¾¿ÅÁ¾ÆÇExpenditures

����������Design/Engineering

��������������Construction

������������Construction Management/Inspection

������ ������Total

Total¾¿ÀÁ¾¿Â ¾¿ÂÁ¾¿Ã ¾¿ÃÁ¾¿Ä ¾¿ÄÁ¾¿Å ¾¿ÅÁ¾ÆÇFunding Sources

����������� �����Measure T - Transit Enhan. Sr.: 415000-447

������������ �����Measure T - Transit Enhan.: 41500-447

����������� �����Prop 1B CalOES: 41100-449

������� ������� ������Total

Wednesday, June 24, 201596

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Transit Program

Description: ö÷øùúûûúùüý÷ ýþ øÿI��üù� � �úøøÿ÷�ÿ� ü���ý�ÿ�ÿ÷ùø�

P�� � ������ ������Security & Passenger Enhancements, C

Project Cost: $�������

Phase:

Justification: Cüù� ýþ �ú�ÿ�ú �ú÷øüù !�øùÿ� ÿ÷"ú÷Iÿ�ÿ÷ù ú÷� �úøøÿnger amenities consistent with Vision 2025 Strategy 121 and Measure T.

Category: �ú÷øüù

Total'#%&'#( '#(&'#) '#)&'#* '#*&'#+ '#+&',-Expenditures

����������Design/Engineering

������������Construction

������������Construction Management/Inspection

������ ������Total

Total'#%&'#( '#(&'#) '#)&'#* '#*&'#+ '#+&',-Funding Sources

����������� �����Measure T - Transit Enhan. Sr.: 415000-447

����������� �����Measure T - Transit Enhan.: 41500-447

����������Prop 1B CalOES: 41100-449

������� ����� ������Total

Wednesday, June 24, 201597

City of Madera CIP FY2015/16 - FY2019/20 FINAL

C I T Y O F MADERA

PROJECT DETAILS Transit Program

Description: "üø ��ýTÿIù ü÷Iû��ÿø �ÿûýIúùüý÷ ú÷� ÿ.�ú÷øüý÷ ýþ ùhe Public Works Corporation yard to accommodate medium-to long term projected growth.

P�� � ������ �����/Transit & Public Works Maintenance/Admin Facility

Project Cost: $��0�1�2��

Phase: D3!ö45

Justification: ý ��ý�ü�ÿ þúIüûüùüÿø ùý úIIý��ý�úùÿ Cüù� ýþ �ú�ÿ�ú Transit System and Public Works Yard space to accommodate projected growth consistent with Vision 2025 Strategy 121

Category: �ú÷øüù

Total'#%&'#( '#(&'#) '#)&'#* '#*&'#+ '#+&',-Expenditures

��������������Design/Engineering

��������������Construction

��������������Construction Management/Inspection

��������� ������� ��������Total

Prior

6678777

Total

Total'#%&'#( '#(&'#) '#)&'#* '#*&'#+ '#+&',-Funding Sources

������������Prop 1B CalOES: 41100-449

������������������Prop 1B PTMISEA: 21229-449

�������� ��������Total

Prior

6678777

Total

Wednesday, June 24, 201598

City of Madera CIP FY2015/16 - FY2019/20 FINAL


Recommended