MARKET ST
RIVER RD
S COLLEGE RD
N 23RD ST
S 17TH ST
S 16TH ST
OLEAN DER DR
N US HWY 421
S KERR AVE
N KERR AVE
N LUMIN A AVE
PIN E GROVE DR
MASON BORO LOOP RD
MARTIN LUTHER KIN G JR PKY
MILITARY CUTOFF RD
WRIGHTSVILLE AVE
N 3RD ST
AIRLIE RD
PIN ER RD
DAWSON ST
CASTLE HAYNE RD
IN DEPENDEN CE BLV
E I-40
WAYNICK BLV
BRIDGE RD
CAUSEWAY DR
CAROLINA BEACH RD
US HWY 74/76
BLUE CLAY RD
MYRTLE GROVE RD
SAN DERS RD
S 3RD ST
W SALISBURY ST
EASTWOOD RD
SHIPYARD BLV
S LUMIN A AVE
LONG LEAF HILLS DR
GORDON RDMARTIN LUTHER KIN G JR PKY
SHIPYARD BLV
S 17TH STS 17TH ST
MARKET ST
OLEAN DER DR
INDEPEN DENCE BLV
CAROLIN A BEACH RD
WRIGHTSVILLE AVE
CAROLIN A BEACH RD
S COLLEGE RD
Greenville/White Ave. 10DC30Status: DesignTotal Project Cost: $1,213,500
Brookshire/BeasleyStatus: Design & PermittingTotal Project Cost: $3,855,000
Clear Run Branch DrainageStatus: DesignTotal Project Cost: $9,600,000
Whispering PinesStatus: Proposed 17/18Total Project Cost: $3,300,000
New MacCumbers Outfall ImprovementStatus: DesignTotal Project Cost: $7,230,0001999
▪ Long Le af Cre e k Stab ilization 7DC125 - $1,822,0002000▪ Love Grove Tid e Gate Re p air 7F6100 - $106,000▪ Pine Valle y Drainage Im p rove m e nts 7DC175 - $2,249,000▪ Pine Valle y CC Stre am Re storation - $140,000 b y N C Cle an Wate r Manage m e ntTrust Fund2001▪ Ke rr Ave . Constructe d We tland - $40,000 b y N C Ecosyte m Enhanc e m e nt Program2002▪ Anne xation Are as 1995 & 1998 Maste r Plan & Map p ing 0DC101 - $925,000▪ Gille tte Dr. Phase II 7DC150 - $1,684,0002003▪ Marke t St. Re lie f 0DC100 - $636,0002004▪ Gre e nville Loop Brid ge 2DC120 - $1,246,8002005▪ Marsd e n Branch 9DC101 - $310,000▪ Burnt Mill Cre e k Outre ach & De m onstration Proje ct $120,000 b y Fe d e ral 319 Grant2006▪ Se agate Drainage 2DC110 - $532,000▪ Ship yard Pip e Re p air 06DC50 - $55,0002007▪ Plaza East Drainage Im p rove m e nts 2DC130 - $1,191,348▪ He id i Dr Re lie f 3DC105 - $343,971▪ Be the l Rd We tland 4DC300 - $3,473,103▪ Wrightsville Culve rt Re p lac e m e nt 05DC10 - $122,200▪ Longstre e t Drainage Im p rove m e nts 01DC100 - $3,355,5422008▪ Marke t St/N orthwood s 2DC140 - $1,230,087▪ Gre e nfie ld Sp illway 08DC30 - $372,1772009▪ Rile ys Branch 1DC101 - $1,979,730▪ CSX Culve rt Xing 08DC50 - $130,241▪ Mrkt St/Inland Grns 2DC150 - $1,529,387▪ Swe e p e r Storage Fac ility 07DC30 - $1,278,040▪ Dup re e Dr. Drainage 06DC40 - $705,965▪ Storm Drain Re hab . 07DC20 - $381,3182010▪ Burnt Mill Tid e gate 09DC20 - $390,000▪ Doctors Branch 08DC20 - $1,064,0002011▪ Hunte rs Trail Culve rt 10DC20 - $246,000▪ Shinn Point Rd - Re hab . 07DC20 - $130,000▪ We llington Ave . Culve rt 07DC20 - $320,0002012▪ Mine ral Sp rings Branch 3DC100 - $560,000▪ Cavalie r Drive Drainage 08DC40 - $1,417,500▪ Ce d ar Ave nue 07DC10 - $2,130,0002013▪ Card inal Dr & Ge orge Trask 10DC10 - $885,5002014▪ Ante lop e Trail Drainage - $326,5002015▪ Linc oln Outfall 06DC20 - $352,000▪ Roge rsville Rd . Culve rt Re p l. 13DC12 - $412,000▪ Gille tte Dr. Pip e Re p air 07DC20 - $116,000▪ Brad le y Cre e k/Miche lle Dr. 08DC10 -$4,941,2102016▪ Wiste ria/Cle arb rook Stage 1 - 09DC10 - $3,047,856▪ Bre nd a Drive 4DC200 - $460,000▪ Re hab - Shinwood Culve rt 07DC20 -$77,419
Com p le te d Cap ital Proje cts Stormwater Capital Improvement ProjectsSince Utility Implementation in 1998
R:\GIS\MXDs\SWutilityCapitalProjectMap9-2015.mxd
Com p le te $42,834,894Construction $0De sign/Pe rm tting $24,352,324Map p ing Proje ct $885,755Future to 19/20 $7,300,000
!!!!!
Total Value $75,372,973
Date : 8/19/2016
Project Type/Status
Color Key
Total Com p le te d $42,834,894* - to be funded from Storm Drain Rehabilitation Project
Wisteria Clearbrook 09DC10Status: Design Stage 2Total Project Cost: $2,453,824
Stormwater Drain Rehabilitation 07DC20Status: Proposed Through 19/20Total Project Cost: $4,000,000
Map p ing Proje ct 06DC10 Up d ate d Infrastructure Map p ing for the City & Anne xe d Are as Total Proje ct Cost: $885,755
Com p le te d Map p ing - 42.51 sqm iFuture Map p ing - 8.32 sqm i
Infrastructure Map p ing Progre ssLEGEN D