GROUP MEMBERS: Calpito, Mary Joanne Segaya, Nikki Diane Gapasin, Cristian Ico, Mark Kennedy Verzo, Alexis Grich 1:00-2:00 MWF H402 ON-SITE MONITORING REPORT 2-STOREY RESIDENTIAL HOUSE WITH BASEMENT OWNER: SPS MICHAEL & SHIRLEY NAVAL PROGRESS WORK FROM FEBERUARY 21- 28, 2015 FEBRUARY 21, 2015 1. Pouring of concrete for revision part (tie beam). 2. 2. Arriving of steel bars 100 pcs D16mm rebar and 75 pcs D20mm rebar FEBRUARY 22, 2015 1. Pouring of concrete for revision part (column). FEBRUARY 23, 2015 1. Installation of slab forms, bracings of slab and fabrication of rebar for beams. FEBRUARY 24, 2015 1. Continue on installation of slab forms, bracings of slab and fabrication of rebar for beams. 2. Continue fabrication of RSB and forms for the slab connection.
Transcript

GROUP MEMBERS:Calpito, Mary JoanneSegaya, Nikki DianeGapasin, CristianIco, Mark KennedyVerzo, Alexis Grich1:00-2:00 MWF H402

ON-SITE MONITORING REPORT2-STOREY RESIDENTIAL HOUSE WITH BASEMENTOWNER: SPS MICHAEL & SHIRLEY NAVAL

PROGRESS WORK FROM FEBERUARY 21- 28, 2015FEBRUARY 21, 20151. Pouring of concrete for revision part (tie beam).2. 2. Arriving of steel bars 100 pcs D16mm rebar and 75 pcs D20mm rebarFEBRUARY 22, 20151. Pouring of concrete for revision part (column).FEBRUARY 23, 20151. Installation of slab forms, bracings of slab and fabrication of rebar for beams.

FEBRUARY 24, 20151. Continue on installation of slab forms, bracings of slab and fabrication of rebar for beams.2. Continue fabrication of RSB and forms for the slab connection.

FEBRUARY 25, 20151. Arriving of Materials 1 truck of sand and 1 truck of gravel.2. Continue on installation of slab forms, bracings of slab and fabrication of rebar for beams.

FEBRUARY 26, 20151. Electrical fittings installation.2. Pipe fittings installation.3. Continue on installation of slab forms, bracings of slab and fabrication of rebar for beams.

FEBRUARY 27, 20151. Installation of dowel bar lay outing for walls.2. Continue on installation of slab forms, bracings of slab and fabrication of rebar for beams.3. Arriving of Materials 100 pcs Portland cement.

FEBRUARY 28, 20151. Finalizing the slab forms.2. Finalizing beam column connection for the slab forms.

Number of workers from February 21 to March 1, 2015 is 10.

Installation of slab formsInstallation of reinforcing steel bars form for the beams

Installation of dowel bars

Installation of slab forms, bracings of slab and fabrication of rebar for beams

Mr. Ico Interviewing Kuya ReyBackhoe, Drums with water, sand and gravel behind of me1 truck of cement and gravelArriving of Materials 100 pcs Portland cement100 pcs D16mm and 75 pcs D20mm reinforcing bars