BAND CLAMP TOOL
C2
Jack-type ToolFor applying ⅜" and ⅝" width clamps
1Pull strapping from carton and cut off. Slide clampon strap and bend end under at ear side of clamp.Bring opposite end of strap around object twice,each time passing under clamp bridge.
2Raise ball handle to forward position and insertstrapping. Slide tool forward.
3Slide cutter handle forward for alignment. Jack ballhandle to reach desired tension.
Operating Instructions for the C2 Installation Tool
4Retract cutter handle and raise to 90-110°. To cutstrapping, rotate cutter handle. Increase lockingbend by rotating tool forward. Apply thumb pressureon tab as you remove tool. Bend ears with hammer.
Dixon800 High StreetChestertown, MD 21620877.963.4966Fax: 800.283.4966dixonvalve.com
© 2015 DVCC C2 - INHOUSE1115
Part Identification for the C2 Installation Tool
Sliding Jack Replacement Kit
Part #
FY205K
Feature:• fits the F100, F175 and C2 tools
Qty Per Tool Part Description Part #
1 Holding dog C2072 Puller links FXA2112 Puller links FXB2111 Puller link pin C2121 Pulling dog FX2141 Pulling dog spring FY2171 Pulling dog pin F2331 Ball handle assembly FA2201 Pusher puller assembly CA2313 Retaining rings F2421 Cutter EXP2011 Crescent ring F2321 Cutter handle C2001 Holding dog pin F2332 3/16" x 5/8" roll pin C236
Illustrations are not in correct proportion to one another.
FX214 FY217 FA211 FB211
C207 FA211 FB211 C212
FX214 FY217 F233 FA220
CA231 F242 EXP201 F232
C200 F233
C236
For applying ⅜" and ⅝" band clamps