Transcript
Page 1: C2C{Network project. 2 C2CN selected as Fast Track Network  What’s a Fast Track Network and why C2CN was selected?

C2C{Network project

Page 2: C2C{Network project. 2 C2CN selected as Fast Track Network  What’s a Fast Track Network and why C2CN was selected?

2

C2CN selected as Fast Track Network

What’s a Fast Track Network and why C2CN was selected?

Page 3: C2C{Network project. 2 C2CN selected as Fast Track Network  What’s a Fast Track Network and why C2CN was selected?

3

C2CN selected as Fast Track Network

European Commission as 11th partner bringing in expertise and assistance from

European CommissionDG Regional Policy

European CommissionDG Enterprise and Industry

European CommissionDG Environment

involving and mobilising Management Authorities of mainstream EU Operational Funds programmes

Page 4: C2C{Network project. 2 C2CN selected as Fast Track Network  What’s a Fast Track Network and why C2CN was selected?

4

C2CN general goals

Create European platform for gathering and disseminating knowledge on C2C

(…) how C2C can be formulated and implementedDraw up 'action plans' in which we demonstrate

regionally to produce sustainable solutions

Establish links with regional policy objectives (...)

Promote regional stakeholder involvement

Page 5: C2C{Network project. 2 C2CN selected as Fast Track Network  What’s a Fast Track Network and why C2CN was selected?

5

C2CN target areas

Product (…) design

Built environment design/development

Area specific design/development

Governance for C2C

Page 6: C2C{Network project. 2 C2CN selected as Fast Track Network  What’s a Fast Track Network and why C2CN was selected?

6

C2CN target areas

Product (…) design

Built environment design/development

Area specific design/development

Governance for C2C

Governance for C2C

Framew

ork for C2C

Page 7: C2C{Network project. 2 C2CN selected as Fast Track Network  What’s a Fast Track Network and why C2CN was selected?

7

C2CN expected outputs

1 long term European Partnership / C2C Network 14 good practices succesfully transfered (minimal) 4 general perspective studies (1 for each target area) 10 regional Action Plans 1 Good Practice Handbook (describing good practices) 1 Guide on Waste Management and C2C 1 set of policy recommendations 10 regional waste management policies addressed / improved 10 functional regional networks on C2C and waste management 6 mio EUR of mainstream funds dedicated to the

implementation of good practices (from this project)

Regional Action Plans

Guide on Waste Management and C2C

Good Practices Handbook

Perspectivestudies

Page 8: C2C{Network project. 2 C2CN selected as Fast Track Network  What’s a Fast Track Network and why C2CN was selected?

8

C2CN expected outputs

1 long term European Partnership / C2C Network 14 good practices succesfully transfered (minimal) 4 general perspective studies (1 for each target area) 10 regional Action Plans 1 Good Practice Handbook (describing good practices) 1 Guide on Waste Management and C2C 1 set of policy recommendations 10 regional waste management policies addressed / improved 10 functional regional networks on C2C and waste management 6 mio EUR of mainstream funds dedicated to the

implementation of good practices (from this project)

Regional Action plans

Guide on Waste Management and C2CGood Practices

Handbook

6 mio EUR of EU mainstream funds dedicated

to action

Policy recommendations

Policy recommendations

Page 9: C2C{Network project. 2 C2CN selected as Fast Track Network  What’s a Fast Track Network and why C2CN was selected?

9

C2CN expected outputs

1 long term European Partnership / C2C Network 14 good practices succesfully transfered (minimal) 4 general perspective studies (1 for each target area) 10 regional Action Plans 1 Good Practice Handbook (describing good practices) 1 Guide on Waste Management and C2C 1 set of policy recommendations 10 regional waste management policies addressed / improved 10 functional regional networks on C2C and waste management 6 mio EUR of mainstream funds dedicated to the

implementation of good practices (from this project)

Regional Action plans

Guide on Waste Management and C2CGood Practices

Handbook

Long term European C2C partnership / network

6 mio EUR EU of mainstream

funds dedicated to action

Policy recommendationsLong term Regional C2C

partnership / network

Page 10: C2C{Network project. 2 C2CN selected as Fast Track Network  What’s a Fast Track Network and why C2CN was selected?

10

C2CN partner regions

Page 11: C2C{Network project. 2 C2CN selected as Fast Track Network  What’s a Fast Track Network and why C2CN was selected?

11

Regional stakeholder involvement

Based on functional networks

Other networks invited ...

Page 12: C2C{Network project. 2 C2CN selected as Fast Track Network  What’s a Fast Track Network and why C2CN was selected?

12

C2CN links to Flemish policy / initiatives

Page 13: C2C{Network project. 2 C2CN selected as Fast Track Network  What’s a Fast Track Network and why C2CN was selected?

13

Work in progress > collecting cases

Cases / good practices not necessarily 100 % C2C not necessarily implemented potential for learning, transfer

and implementation Collecting, sending

and receiving

Page 14: C2C{Network project. 2 C2CN selected as Fast Track Network  What’s a Fast Track Network and why C2CN was selected?

14

Communicatie en contact

www.ovam.be/C2CNetwork

www.ovam.be/C2Cases

[email protected]

[C2CN website > June 2010]

Page 15: C2C{Network project. 2 C2CN selected as Fast Track Network  What’s a Fast Track Network and why C2CN was selected?

15

What’s INTERREG IVC ?

Homepage > Breng een case in Bekijk de cases Geef uw feedback

www.ovam.be/[email protected]

C2CN Stakeholder projectsite

Page 16: C2C{Network project. 2 C2CN selected as Fast Track Network  What’s a Fast Track Network and why C2CN was selected?

16

What’s INTERREG IVC ?C2CN Breng een case in

Page 17: C2C{Network project. 2 C2CN selected as Fast Track Network  What’s a Fast Track Network and why C2CN was selected?

17

What’s INTERREG IVC ?C2CN Bekijk de cases

Page 18: C2C{Network project. 2 C2CN selected as Fast Track Network  What’s a Fast Track Network and why C2CN was selected?

18

What’s INTERREG IVC ?C2CN Geef uw feedback

Page 19: C2C{Network project. 2 C2CN selected as Fast Track Network  What’s a Fast Track Network and why C2CN was selected?

19

What’s INTERREG IVC ?

Area specific development - Launch event (Maastricht NL, July 8-9th 2010)

Governance for C2C (Leuven BE, July 12-13th 2010)

>> Samenstelling delegatie(s) Vlaams Gewest

Expert seminars in het C2CNetwork

Page 20: C2C{Network project. 2 C2CN selected as Fast Track Network  What’s a Fast Track Network and why C2CN was selected?

20

Expert seminars in het C2CNetwork

Product / process design (Milan IT, Sep 9-10th 2010)

Building design / built environment (Ipswich UK, Sep 15-16th 2010)

Page 21: C2C{Network project. 2 C2CN selected as Fast Track Network  What’s a Fast Track Network and why C2CN was selected?

21

What’s INTERREG IVC ?

Aansluiten bij bestaande events, seminars, ... Transitie Arena DuWoBo 3 juni 2010 … OESO Global Forum on SMM oktober 2010 Plan C Netwerkdag eind oktober2010 Transitie Arena DuWoBo 25 november 2010 ...

Doe ook een voorstel!

Stakeholder meetings in Vlaams Gewest