CA NO CE (P) BMK / /2015-2016
TENDER No. : CE (P) BRAHMANK-22 of 2015-16
HANDLING AND / OR CONVEYANCE OF TWO NOS HYDRAULIC EXCAVATORS BEML BE 300 BEARING EM No.11Q-31608 AND EM No.11Q-31609 FROM SIKKU BRIDGE SITE KM 560.200 (ARUNACHAL PRADESH) TO EBW AT
TEZPUR (ASSAM) UNDER 1443 BCC UNDER 44 BRTF OF PROJECT BRAHMANK IN ARUNACHAL PRADESH STATE. DATE OF SALE : 18 Jan 2016 ONWARDS
TENDER DOCUMENTS
DATE OF RECEIPT : 20 Feb 2016 UPTO 1000 Hrs
DATE OF OPENING : 20 Feb 2016 UPTO 1100 Hrs
UN-PRICED BID AND PRICED BID PLACE OF OPENING : HQ CE (P) BRAHMANK, PASIGHAT.
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 1
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
BORDER ROADS ORGANISATION
PART – I (UN-PRICED BID)
NAME OF WORK: “HANDLING AND / OR CONVEYANCE OF TWO NOS
HYDRAULIC EXCAVATORS BEML BE 300 BEARING EM No.11Q-31608 AND EM No.11Q-31609 FROM SIKKU BRIDGE SITE KM 560.200
(ARUNACHAL PRADESH) TO EBW AT TEZPUR (ASSAM) UNDER 1443 BCC
UNDER 44 BRTF OF PROJECT BRAHMANK IN ARUNACHAL PRADESH STATE.”
(A) PART-I (UNPRICED /TECHNICAL BID)
1. Content Sheet 01 to 01
2.
Tender Forwarding letter including eligibility criteria,
list & format of qualification documents and
instruction of tenders
02 to 09
3. Notice of tender 10 to 13
4. General condition of contracts, IAFW-2320 (1964
Print) including errata and amendments ** 14 to 46
5. Special conditions 47 to 56
6. Schedule „B‟, „C‟ & „D‟ 57 to 57
7. Tender condition acceptance letter, Tender page and
acceptance letter 58 to 61
(B) PART-II (PRICED BID)
8. Total number of pages for ( Q- Bid), available
separately including Schedule A notes, Schedule A 62 to 65
(C) OTHER DOCUMENTS FORMING PART OF CONTRACT AGREEMENT
9. Amendment / errata to tender documents
10. Relevant correspondence
11. Tender Conditions Acceptance letter
12. Total No of Page
13. Total No of Drawings Nil
**Not attached: - These documents can be referred in the office of the Chief Engineer
Project Brahmank during working hours.
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 2
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
Registered / AD
Tele: 0368-2222124/062 Headquarters Fax : 0368-2222342 Chief Engineer
Email: [email protected] Project Brahmank PIN: 931 722
C/O 99 APO 80182/BMK/ /E8 18 Jan 2016
M/s…………………………………..
……………………………………….
……………………………………….
PART – I (UN-PRICED BID)
HANDLING AND / OR CONVEYANCE OF TWO NOS HYDRAULIC
EXCAVATORS BEML BE 300 BEARING EM No.11Q-31608 AND EM No.11Q-
31609 FROM SIKKU BRIDGE SITE KM 560.200 (ARUNACHAL PRADESH)
TO EBW AT TEZPUR (ASSAM) UNDER 1443 BCC UNDER 44 BRTF OF
PROJECT BRAHMANK IN ARUNACHAL PRADESH STATE.
Dear Sir (s),
1. A set of tender documents containing T-Bid (Technical bid) and Q-Bid (Priced Bid) for the
above work is forwarded herewith. Please note that tender will be received through offline
only by the Chief Engineer (P) Brahmank, C/O 99 APO upto 1000 Hrs on 20 Feb 2016.
„T‟ & „Q‟ bid will be opened on 20 Feb 2016 at 1100 Hrs.
2. Tenderers or their duly authorized representative who have submitted their tenders and
who wish to be present at the time of opening of tenders may visit the office of Chief Engineer
(P) Brahmank C/O 99 APO at the above mentioned time. However they can view online
tender opening process at their premises.
3. Tender documents may also be downloaded from BRO website www.bro.gov.in
(for reference only) and Central Public Procurement Portal (CPPP) website
https://eprocure.gov.in/epublish/app. Cost of tender is to be attached/submit along
with downloaded tender. If cost of tender is already submitted in the office of
Accepting officer, it is not required to be attached again with downloaded tender,
however photocopy/scan copy of Bank draft shall be attached/submit. If cost of
tender is not attached/not already submitted in the office of Accepting officer, tender
shall be rejected by the Accepting officer.
4. Tendering procedure shall be single stage - single bid system.
5. Hard copy of DD for cost of tender document and EMD deposit instrument and
that of tender document duly signed on each page and Schedule „A‟ duly quoted the
price with pages serially numbered and provided with an index page be submitted by
post/through representative by the bid opening date/time as mentioned above.
6. Bid evaluation
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 3
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
6.1 The Bids of Bidders shall be evaluated considering the following:-
(a) Bidder should have submitted the cost of tender document.
(b) If the Contractor is not enlisted with BRO, he should have submitted EMD.
(c) Price Bids shall only be furnished in Schedule „A‟ forming part of the Tender
documents.
(d) All payment Terms as forming part of Clause of General Condition of Contract
have been accepted.
(e) Completion Period as indicated in Schedule „A‟ have been accepted.
(f) All General Conditions of Contract have been accepted.
(g) All Special Conditions of Contract have been accepted.
6.2 Determination of L1 : L1 shall be arrived at by taking into account the rates quoted in
Sch ‟A‟ which shall be inclusive of all taxes and duties levied.
6.3 „Conditional bids‟ shall be treated as being „Non Responsive‟. No „Conditional‟ bids
shall be accepted.
6.4 Blank.
7. Blank.
8. Tender shall be opened as per date/time as mentioned in the tender critical data sheet.
9. The Chief Engineer, Project Brahmank, C/O 99 APO will be Accepting Officer here-in-
after referred to as such for the purpose of this contract.
10. Tenderers are requested to quote rates in figures & words at page No.59 above/below
the the rates entered in schedule A i.e. page No.64.
12. If tenderers desire that any condition or stipulation given in the tender documents is to
be modified or deleted, they may submit their comments/suggestion well before 27 Jan 2016
for consideration by the Deptt for issue of corrigendum/amendments to tender documents. If
deptt considers comments/suggestion suitable, corrigendum/amendments to tender documents
shall be issued and also uploaded on BRO web site. If deptt does not consider
comments/suggestion suitable, corrigendum/amendments to tender documents would not be
issued / uploaded on BRO web site/ Central Public Procurement Portal (CPPP) website
https://eprocure.gov.in/eprocure/app and tenderers shall quote strictly complying with the
various provisions given in the tender documents. Any tender which stipulates, any
alterations to any of the conditions/provisions laid down in tender documents
(including corrigendum/amendments) or which proposes any other conditions of any
description whatsoever is liable to be rejected.
13. The tenderers are advised to visit the work site to acquaint themselves of working and
site conditions, before submitting their tender. The submission of tender by a person implies
that he has read this tender forwarding letter, the conditions of contract and has made himself
aware of the scope and specifications of the work to be done and of the conditions and other
factors, site conditions, taxes & levies prevailing etc. which may affect the quotation and
execution of the work.
14. Tenderers are required to quote for complete scope of work as per Schedule „A‟, particular
specification, special conditions and other provisions of the tender documents, failing which the
tender will be considered as “non bonafide” and shall be liable for rejection. Tenderers rate shall
be inclusive of all statutory levies, duties, surcharges, taxes, Octroi service tax etc and including
VAT/State sale tax, on works contract tax payable under the respective statutory pursuant to the
Constitution 46th Amendment Act 1982. Any other conditions stipulated by the tenderer
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 4
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
regarding Sales Tax on works contract will not be considered and such tender will be liable for
rejection.
15. Tenderer must be very careful to deliver a bonafide tender; failing which the tenders are
liable to be rejected. Tenderers are, therefore, advised to ensure that their tender must satisfy
each and every condition laid down in the tender documents.
16. Tenderers must ensure that their tender is unambiguous and is completed in all respects.
Their particular attention is drawn to the following requirements, which must be complied with:-
(a) Tender documents are to be signed, dated and witnessed as provided for the
purpose.
(b) Blank.
(c) Blank.
(d) In case they are submitting a BLANK TENDER, word „BLANK‟ must be prominently
endorsed on the envelope and in schedule „A‟ inside the tender documents and general
summary duly signed by the tenderer.
(e) If a tender is submitted on behalf of a firm, it may be signed either by all partners
or a person holding a valid power of attorney from all the partners constituting the firm.
The person signing the tender on behalf of another or on behalf of a firm shall attach with
tender a proper power of attorney duly executed in his favour by such other person or by
all the partners stating specifically that he has authority to bind such other person(s) or
the firm as the case may be in all matters pertaining to the contract including the
arbitration clause. The power of attorney shall be executed as indicated below:-
(i) In case of proprietorship concern if tender is signed by other than
proprietor, person signing tender documents should hold power of attorney from
proprietor.
(ii) In case of partnership concern, power of attorney shall be executed by all
partners.
(iii) In case of company, power of attorney shall be executed in accordance
with the constitution of company.
(f) The undertaking is to be signed and attached by tenderer as per format given at
appendix „C‟.
17. Tenderer who has downloaded the tender from BRO website www.bro.gov.in and Central
Public Procurement Portal (CPPP) website https://eprocure.gov.in/epublish/app,
https://eprocure.gov.in/epublish/app, shall not temper/modify the tender form in any manner.
In case, if the same is found to be tempered/modified in any manner, tender will be completely
rejected and tenderer is liable to be banned from doing business with BRO.
18. Your attention is drawn to the Indian Official Secret Act – 1923 (XIX of 1923) as amended
up to date particularly Section 5 thereof.
19. Earnest Money:-
(a) Earnest money is not required to be attached with tender by the enlisted
contractor with BRO (term “enlisted contractor” used in tender documents means
“enlisted contractor with BRO”) who have submitted standing security but same is
required from un-enlisted contractor/enlisted contractors with BRO, who have not
submitted standing security deposit.
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 5
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
(b) Un-enlisted contractors with BRO / enlisted contractors with BRO, who have not
submitted standing security deposit will submit the tender accompanied with Earnest
Money amounting to Rs. 3,000.00 (Rupees three thousand only) in the form of
Deposit at call Receipt/Term Deposit Receipt/Special Term Deposit Receipt issued in
favour of Chief Engineer (P) Brahmank C/o 99 APO by nationalized/scheduled Bank.
Tender not accompanied with earnest money will not be considered for acceptance. The
amount of this receipt should be basic amount and not their maturity value. Any deposit
lying with the department in any form against any other tender and/or contract shall not
be considered for adjustment as the earnest money against the tender. Any tender not
accompanied with the earnest money in the form as indicated here-in-before or
accompanied with any letter/communication containing any request for adjustment of any
other deposit as earnest money shall be treated as non bonafide tender.
(c) Earnest money shall be returned to unsuccessful bidders (other than
L-1) after opening of price bids and to successful (L-1) bidder after receipt of security
deposit.
20. Security Deposit:-
(a) In case of an enlisted contractor, who has submitted the standing security deposit,
but the tendered cost of the work exceeds the upper tendering limit of the contractor and
the Accepting Officer decides to accept this tender, the contractor has to lodge Additional
Security Deposit (difference of security of work and standing security deposit) as notified
by the Accepting Officer in the prescribed form within 30 days of the receipt by him of
notification of acceptance of the tender, failing which this sum shall be recovered from
the first RAR payment, and if the date of first RAR is prior to the period mentioned above,
the same shall be recovered from such payment.
(b) In case of un-enlisted contractor/enlisted contractor who has not deposited the
Standing Security deposit, and the Accepting Officer decides to accept his tender, then
contractor has to lodge Security Deposit as notified by the Accepting Officer in the
prescribed form within 30 days of the receipt by him of notification of acceptance of the
tender, failing which this sum shall be recovered from the first RAR payment, and if the
date of first RAR is prior to the period mentioned above, the same shall be recovered
from such payment. The security deposit amount will be communicated as per
departmental norms but in no case the same shall be more than Rs 11,25,000.00
(Rupees Eleven Lac Twenty Five Thousand only).
(c) The contractor may at his discretion furnish in lieu of Additional Security Deposit
or Security Deposit a Bank Guarantee Bond executed by any nationalized/Schedule Bank
for the said amount. The form of Bank Guarantee Bond may be seen in any office of
BRO.
21. Accepting Officer reserves the right to accept the tender submitted by a Public Sector
Undertaking, giving a price/purchase preference over other tender(s), which may be lower, as
are admissible under the Govt. Policy. No claim for any compensation or otherwise shall be
admissible from those, whose tenders may be rejected on account of the said Policy.
22. BLANK
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 6
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
23. The tender shall remain open for acceptance for a period of Thirty (30) days from the
date of opening of Q- Bid of the tender. (excluding the date of opening)
24. BLANK
25. On acceptance of tender, the name of authorized representative(s) of the contractors who
would be responsible for taking instructions from Engineer- in – Charge or its authorized
representatives shall be intimated by the contractor within 7 days of issue of Acceptance letters.
26. Revision/ Modification of quoted of quoted price
(a) The tenderer shall quote his rates in figures only in the provided column in
schedule „A‟ given in Excel sheet only. In case the tenderer has to revise / modify the
rates quoted in the schedule „A‟ before tender submission end date as mentioned in
critical data sheet, resubmission bid shall be allowed.
(b) In case the tenderer has to revise /modify /withdraw his quoted rates / offer after
it is submitted, he may do so on his on line before the latest date & time fixed for
submission of tenders. Any revision/ modification in offer / withdrawal of offer in the form
of an open letter shall not be taken into account, while considering in his original offer.
(c) The tenderer shall not be permitted /modify /withdraw price bid unopened after
closure of the time fixed for receipt of tender.
(d) The bidder modifying or withdrawing his bid after last date of submission of bid will
either have to forfeit the EMD submitted or will have to deposit an amount equivalent to
that of EMD (in case of enlisted contractor), within a period of one month. In case bidder
fails to deposit amount as specified above, then bidder will be debarred for participation in
the tender process for a period of 12 month from the date of opening of bid.
27. Any effort by a bidder or his representative to influence the department in the process of
examination, clarification and Evaluation of bids and in decision concerning award of contract
may result in the rejection of the bid.
28. The lowest financial bid as whole or in a part (if so defined) and if found complete
in all respect will generally be invited for execution of contract agreement. However, Accepting
Officer does not bound himself to accept the lowest or any bid received or to give any reason for
doing so and reserve the right to accept a tender in whole or in part (if defined) as he may
decide at his sole discretion.
29. If the successful bidder fails within the specified time limit to sign the agreement, the
earnest money as submitted with the tender will be forfeited. In case of enlisted contractor, they
will have to deposit an amount equal to the specified EMD value. In case the lowest bidder fails
to deposit the amount as specified above, then he will be debarred for participation in the tender
process for a period of 12 months, from the date of opening of bid.
30. Revocation of offer
In case of the lowest tenderer revoke his offer or revise rates upwards (which will be
treated as revocation of offer), after opening of tender and before expiry of original validity
period stipulated in tender documents, the earnest money deposited by him shall be forfeited. In
case of BRO enlisted contractors, the amount equal to the earnest money stipulated in the Notice
of tender, shall be notified to the tenderer for depositing the amount through MRO, failing which
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 7
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
the amount shall be recovered from any payment due to such contractor or shall be adjusted
from the Standard Security deposit. In case bidder fails to deposit amount as specified above or
organisation will not in a position to recover the amount equal to the EMD from enlisted
contractor, then bidder will be debarred for participation in the tender process for a period of 12
month from the date of opening of bid.
Appx 'A'
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 8
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
(Clause 4 refers)
UNDERTAKING/AFFIDAVIT ON PERFORMANCE OF THE FIRM
It is certified that :-
(i) There is no poor/slow progress in running work. (If yes please submit details and
reasons of delay to check that these are not attributable to you or are beyond your
control).
(ii) There are no serious defect observed in works which stand rectified(If yes please
submit details and reasons)
(iii) There are no cancelled/ abandoned contracts in which Govt unrealized recoveries
exist (If yes please submit details and reasons)
(iv) My/Our firm has not been blacklisted by any Govt Deptt (If yes please submit
details and reasons)
(v) There are no any Govt dues outstanding against the firm (If yes please submit
details and reasons)
(vi) Proprietor/partners/directors of firm are not involved in anti-national/social
activities and have neither been convicted nor any proceeding are pending in court for
such activities (If yes please submit details)
Place : (Signature of contractor with seal)
Date:
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 9
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
Appx 'B'
(Clause 4 refers)
PARTICULARS OF FIRM
Sl No. Items Details
1. Name of firm or Individual
2. Legal status of the firm Individual company (incorporated/
un-incorporated) /partnership
firm/public limited
3. Address
4. Contact telephone, Mobile, Fax No.
5. PAN No. (Enclose photocopy)
6. Details of Banker & Bank A/C
7.
Registration details:
(a) Registration class & No.
(b) Validity date of registration
(c) Authority with whom
registered and their address
(d) Letter ref under which
registered
8. Passport No of
Proprietor/Partners/directors (Please
enclose photocopy)
Date: (Signature of Contractor with seal)
Note : Exempted for the contractors enlisted with BRO in any class.
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 10
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
(E-TENDERING NOTICE)
NOTICE INVITING TENDER
(NATIONAL COMPETITIVE BIDDING)
BORDER ROADS ORGANISATION
CHIEF ENGINEER, PROJECT BRAHMANK, C/O 99 APO
NIT No: 80182/BMK/22/15-16/E8
1. Bids are invited on single stage single bid system for “HANDLING AND / OR
CONVEYANCE OF TWO NOS HYDRAULIC EXCAVATORS BEML BE 300 BEARING EM
No.11Q-31608 AND EM No.11Q-31609 FROM SIKKU BRIDGE SITE KM 560.200
(ARUNACHAL PRADESH) TO EBW AT TEZPUR (ASSAM) UNDER 1443 BCC UNDER 44
BRTF OF PROJECT BRAHMANK IN ARUNACHAL PRADESH STATE.”
2. Tender documents may be downloaded from https://eprocure.gov.in/epublish/app and
http://bro.gov.in as per the schedule as given in critical date sheet as under:-
CRITICAL DATE SHEET
Published Date 18 Jan 2016
Bid Document Download / Sale Start Date 18 Jan 2016 (1000 Hrs)
Clarification Start Date 18 Jan 2016 (1100 Hrs)
Pre bid meeting 27 Jan 2016 (0900 Hrs)
Clarification End Date 28 Jan 2016 (1200 Hrs)
Bid Submission Start Date 28 Jan 2016 (1400 Hrs)
Bid Document Download / Sale End Date 20 Feb 2016 (0900 Hrs)
Bid Submission End Date 20 Feb 2016 (1000 Hrs)
Bid Opening Date 20 Feb 2016 (1100 Hrs)
3. Bids shall be submitted offline only at the office of HQ CE (P) Brahmank.
4. The Technical Bid shall be submitted in hard bound manner with pages serially numbered
and provided with an index page in sealed cover in manual form to the Chief Engineer, Project
Brahmank, PIN: 931722, C/o 99 APO. The original instruments in respect of cost of tender
document, earnest money, original copy of affidavits, credit facility certificate, tender document duly
signed on each page with pages serially numbered and provided with an index page and all the
requisite documents must be delivered to the Chief Engineer Project Brahmank, PIN: 931722, C/O
99 APO on or before the bid opening date/time as mentioned in critical date sheet. Tender not
accompanied with the cost of tender is liable to be rejected.
5. The work is estimated to cost Rs. 1.20 lacs (Rupees One lac twenty thousand only)
approximately or as subsequently amended in tender documents or uploaded in BRO website
http://bro.gov.in and https://eprocure.gov.in/eprocure/app. This estimate, however, is not
a guarantee and is merely given as a rough guide and if works cost more or less, a tenderer
shall have no claim on that account of what so ever nature.
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 11
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
6. The tender shall be based on General Conditions of Contracts IAFW-2320 (Revised-
1964) special conditions, particular specifications and drawings with schedule „A‟ (list of works)
to be priced by tenderers.
7. Not more than one tender shall be submitted by one contractor or contractors having
business relationship. Under no circumstances will a father or his son(s) or other close relations
who have business relationship with one another (i.e. when one or more partner(s)/director(s)
are common) be allowed to tender for the same contract as separate competitors. A breach of
this condition will render the tenders of both parties liable to rejection.
8. The total work is to be completed within 30 days without reference to total cost of the
work commencing from the date of placing work order.
9. The Chief Engineer (P) Brahmank will be Accepting Officer, here in after, referred to
as such for all purposes in this contract.
10. Earnest money is not required to be attached with tender by the enlisted contractor with
BRO who have submitted standing security deposit but it is required from other contractors
(Scanned and Original Copy) with tender documents for Rs. 3,000.00 (Rupees three
thousand only) in the shape of call deposit receipt/DD/FDR in favour of Chief Engineer (P)
Brahmank C/o 99 APO obtained from any Nationalized /Scheduled Bank and having
maturity/validity period 30 days more than validity period of his offer shall be submitted by post.
Un-enlisted contractor may note that they will be required to lodge security deposit of the work
in the prescribed form on receipt in writing from the Accepting Officer if their offer is accepted.
11. Applicant tenderer must provide Demand Draft for Rs 300/- (Rupees three hundred
only) towards cost of tender documents, in favour of Accepting officer i.e., Chief Engineer (P)
Brahmank C/O 99 APO and Payable at Pasighat, Code No - 1395 (Arunachal Pradesh
State) obtained from any Nationalized/ Scheduled Bank valid for Six months and send by post.
The all applicable bank charges shall be borne by the applicant and he shall not have any claim
what so ever on this account on Government. In case of re-tendering, the firm which has
submitted the DD in earlier calls will require to submit DD along with their tender/application in
subsequent calls also. Tender not accompanied with the cost of tender document is liable
to be rejected. However, public sectors undertaking /Govt undertaking firms are exempted
from the payment towards cost of tender documents. The Demand Draft in respect of tender
documents shall be non refundable.
12. Intending tenderers are advised to visit again BRO website http://bro.gov.in and CPPP
website https://eprocure.gov.in/epublish/app at least 03 days prior to date of submission
of tender for any corrigendum / addendum/ amendment.
13. The security deposit amount for this work shall be 25% more than the amount of earnest
money deposit calculated as per scale laid down based on the contract amount. The amount of
security deposit shall, however, not exceed Rs. 11,25,000.00. The security deposit is required to
be lodged in the prescribed form on receipt in writing from the Accepting Officer.
14. Earnest money deposit of all unsuccessful tenderer will be returned immediately by
endorsing an authority for its refund. The earnest money deposit of the successful tenderer will
be returned on receipt of the full security deposit or will retain it as a part of security deposit.
15. Copies of drawings and other documents pertaining to the work (signed for the purpose
of identification by the Accepting Officer or his accredited representative) and sample of
materials and stores to be supplied by the contractor will be opened for inspection at the
following locations:-
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 12
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
Office of the CE (P) Brahmank/Commander Contract/OC Contract
16. The tenderers are advised to visit the work site by making prior appointment with the
Commander 44 BRTF/OC 1443 BCC, C/O 99 APO.
17. A tenderer shall be deemed to have full knowledge of all relevant documents, samples,
site etc whether he had inspected them or not.
18. Any qualification documents/ tender which stipulates any alternative to any of the
conditions laid down or which proposes any other conditions of any description whatsoever is
liable to be rejected.
19. Accepting Officer reserves his right to accept a tender submitted by a public undertaking,
giving a purchase preference over other tender(s) which may be lower, as are admissible under
the Govt. policy. No claim for any compensation or otherwise shall be admissible from such
tenderers whose tenders may be rejected on account of the said policy.
20. The submission of a tender by a tenderer implies that he had read this notice and
conditions of contract and has made himself aware of the scope and specifications of the work to
be done and of the conditions and rates at which stores, tools and plants etc will be issued to
him, local conditions and other factors bearing on the execution of the work.
21. The Accepting Officer does not bind himself to accept the lowest or any tender or to give
any reasons for doing so.
22. In the event of lowest tenderer revoking his offer or revising his rates upward
(which will be treated as revocation of offer), after opening of tenders, the earnest
money deposited by him shall be forfeited. In case of BRO enlisted contractors, the
amount equal to the earnest money stipulated in the Notice of tender, shall be notified
to the tenderer for depositing the amount through MRO, failing which the amount shall
be recovered from payment due to such Contractor or shall be adjusted from the
Standing Security Deposit. In addition, such tenderer and his related firm shall not be
issued the tender in second call or subsequent calls.
23. The tender will be accepted as a whole and not in parts. The tender shall remain open for
acceptance for a period of 30 days from the stipulated date of its receipt.
24. Above particulars may change due to Adm or any other reasons and shall be
available on BRO web site www.bro.gov.in and CPPP website
https://eprocure.gov.in/eprocure/app. Therefore bidders/ contractors are requested to visit
BRO web site www.bro.gov.in and CPPP website https://eprocure.gov.in/eprocure/app
frequently and at least THREE DAYS prior to End date of Bid Submission for changes in
above particulars.
25. This notice of tender shall form part of the contract.
Sd/- XXX
SE (Civ)
Dir (Contract)
Dated: 18 Jan 2016 For Accepting Officer
Headquarters
Chief Engineer
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 13
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
Project Brahmank NIT No : 80182/BMK/22/15-16/E8
C/O 99 APO Dated : 18 Jan 2016
Distribution:
CA NO CE (P) BRAHMANK/ /2014-2015 Srl Page No 14-46
(Signature of Contractor) AEE (Civ) ASW For Accepting Officer
GENERAL CONDITION OF CONTRACT
(IAFW-2320 (Revised 1964 print).
“HANDLING AND / OR CONVEYANCE OF TWO NOS HYDRAULIC EXCAVATORS BEML BE 300 BEARING EM No.11Q-31608 AND EM
No.11Q-31609 FROM SIKKU BRIDGE SITE KM 560.200 (ARUNACHAL PRADESH) TO EBW AT TEZPUR (ASSAM) UNDER 1443 BCC UNDER 44
BRTF OF PROJECT BRAHMANK IN ARUNACHAL PRADESH STATE.”
1. A Copy of the GENERAL CONDITIONS OF CONTRACTS (IAFW-2320) including errata
and amendments has been supplied to me/us and in my/our possession. I/We have read and
understood the provision contained in the aforesaid GENERAL CONDITIONS OF CONTRACT
before submission of this tender and I/we agree that I/we shall abide by the terms and
conditions thereof, as modified, if any, elsewhere in these tender documents.
2. It is hereby further agreed and declared by me/us, the General Conditions of Contracts
including Condition 36 thereof pertaining to the settlement of disputes by arbitration containing
19 pages (Serial page No 26 to 45) including up to date errata and amendments form part of
these tender documents.
3. Wherever the Phases Commander Works Engineer (CWC) and Garrison Engineer (GE)
have been used in the General Conditions of Contract (IAFW-2320) the same are considered as
Task Force Commander (TFC) and OC Contract respectively as applicable to Border Roads
Organization.
4. This tender submitted by me/us is subject to the aforesaid General Condition of Contract
(IAFW-2320), errata and amended copy of which is in my/our possession and which I/we have
read and fully understood before submission of tender.
5. My/our signature here under is in token of my/our having accepted the aforesaid amended
General Conditions of Contract including errata & amendments thereto (IAFW-2320) and the
clause relating to arbitration forming as integral part of this tender.
CA NO CE (P) BRAHMANK/ /2014-2015 Srl Page No. 47
(Signature of Contractor) AEE (Civ)
ASW For Accepting Officer
SPECIAL CONDITIONS OF CONTRACT
General
1. The following Special Conditions shall be read in-conjunction with General Conditions of
Contract based on IAFW-2320 including up to date amendments and errata thereto. Any
provisions in Special Conditions if at variance with the General Conditions mentioned above,
provisions of this Special Condition will take precedence over the General conditions of contract,
IAFW 2320.
Scope of Work
2. The work under this contract comprised of handling and conveyance of shifting of
hydraulic excavators as described in Schedule-„A‟ under Project Brahmank. The area of
applicability of contract shall be as specified in the tender documents and stores shall be
transported from and to any places within the area of operation, as per the work order to be
placed by the OC Contract.
Visit to the Site
3. The Contractor shall carry out the work of handling and/or conveyance of stores of any
description within the specified area (hereinafter referred to as the “area of works”) and shall be
deemed to have satisfied himself as to the nature of the site or sites where the work is required
to be executed and as to working conditions and local facilities of access and all other matters
affecting or likely to affect the handling and/or conveyance of stores. No extra charge
consequent on any misunderstanding shall be allowed. The rates quoted in Schedule-„A‟ of the
contract documents shall be deemed to include all sorts of trans-shipment including loading and
unloading operations at any stages en-route during transportation necessitated due to vehicle at
town , crossing the nallah, river, channel, slushy ground, poor road condition etc wherever
required. The contractor shall not be entitled to any additional payment on account of
transhipment /handling of stores en-route to cross the water channel, nallah, river through ferry
or otherwise necessitated during monsoon or flood or otherwise due to any interruption in the
area of operation, during currency of the contract once the goods have been handed over to the
contractor for conveyance. The contractor is advised to visit site of work and acquaint himself
with the working conditions of the area and ascertain the accessibility of routes, verify the
distance and other requisite details of routes, etc. before quoting the percentage rates
above/below against Schedule-„A‟ rates.
Rates
4. The rates quoted by the contractor in schedule „A‟ shall be deemed to have included all
such provisions as highlighted above including all types of taxes/charges payable en-route as per
the local laws. The rates quoted shall not be subjected to any adjustment therein due to any
reason whatsoever during the currency of the contract. The rates quoted shall include provision
for all types of fuel, transportation tools, plants expenses on loading/unloading, crew, adequate
protection of Govt store in transit and while loading/unloading etc as required for the entire
completion of work without any loss/damage to the Govt store. Consider there is no escalation
charges will be paid to the contractor.
Plying of Vehicles
5. Contractor shall make his own arrangement for obtaining necessary permit from local
authorities for plying of vehicles for the work in accordance with rules and regulation of the land
and shall pay all the taxes whatsoever in this connection. The vehicles shall ply through
authorized route only as directed by OC Contract/Engineering-In-Charge and shall report to
concern check posts en-route & get necessary endorsement made on convey note. The vehicles
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 48
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
shall not carry any other store than issued by Govt. The contractor shall not have any
reservation if department details a representative to travel alongwith the vehicles.
Natural Calamities/Road Blocks
6. In case of natural calamities like earthquake, militant activity, landslide, rain, floods and
certain roads becoming slushy etc. nothing extra in the form of compensation will be payable to
the contractor, except that a reasonable extension of time be given on affected work within the
scope and provisions of Contract Agreement. In case of road blocks, breaches and road or route
remaining out of service, the contractor may be allowed to transport goods via alternate route
(longer route or shorter routes) as the situation may be, and will be paid accordingly. The OC
Contract will obtain prior permission of Accepting Officer in writing before resorting to such
action. However, distance involved via alternate route (longer route or shorter route) will be
ascertained by the Task Force Commander who will convene a Board of Officers for ascertaining
distance and same will be communicated to the Accepting Officer for his approval. The decision
of the Accepting Officer shall be final and binding on the Contractor. The distance for the longer
or shorter route ascertained by the Board of Officers shall be considered for the payment
purpose.
Detention of Contractor‟s Vehicles
7. In case detention of Contractor‟s vehicles becomes inevitable due to unavoidable
circumstances, Contractor shall not be allowed any detention charges or compensation on this
account. However, the contractor shall be allowed reasonable extension of time in terms of
conditions 6 of General Conditions of Contract, IAFW-2320. Whatever the reason, the contractor
is responsible for penalties which are initiated by railway authorities due to delay in release of
goods.
Loss of Stores while under contractor Custody
8. Goods handed over to the Contractor shall remain at the risk and the sole responsibility of
the Contractor. No additional facility by way of providing waterproof covers for perishable stores
or godowns for storage en-route shall be provided to the Contractor for Govt. stores, after being
handed over to him for handling and conveyance. Contractor shall deliver all stores intact at
destination whatever handed over to him. In the event of any item of stores being lost or
damaged while in the custody of the Contractor due to his not taking adequate precautions for
protection of stores or intentionally lost//not delivered by him with intended benefits the
recovery will be effected from him for stores lost or damaged, as per the rate to be worked out
on the following basis. The contractor is therefore advised to have transit insurance for the
purpose.
(a) Two (2) times the departmental stock book rate (assessed including all the
taxes and freight paid) or two (2) times the market rate whichever is higher as
applicable at the place of handing over of the stores to the Contractor.
(b) An overhead charge of 11.30% shall be added further on the rates as
assessed above to cover inspection, departmental and other charges.
(c) The decision of OC Contract in this regard shall be final and binding.
9. In case the loss of stores while in the custody of contractor has taken place due to the
reasons beyond the control of the contractor, the recovery will be effected from him in
accordance with condition- 19 of the General Condition of the contract (IAFW- 2320). The
decision of the accepting Officer whether the loss of stores is due to the reasons beyond the
control of the contractor or otherwise will be final and binding in this respect.
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 49
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
Unloading of Stores Departmentally
10. As per the provisions made in the Schedule-„A‟ the Contractor shall carry out the loading
and unloading of stores at this own arrangement. However, if any occasion arises when the
Contractor is not in a position to unload the stores after transporting the same to the
destination, necessary assistance for unloading the vehicles departmentally, may be provided to
the contractor by OC Contract on receipt of written request from the contractor or his accredited
representative. OC, Contract shall be the sole and final authority to decide the necessity of
providing departmental assistance to the contractor for unloading. When the contractors vehicles
are unloaded departmentally, the relevant convey notes shall be endorsed accordingly and an
amount equal to the 2 (two) times the amount worked out based on the rates specified for
unloading/loading of the stores at the schedule „A‟ rate and percentage above/below accepted
thereon for the contract agreement be deducted from the bill / recovered from the contractor. In
such cases no payments shall be admissible to the contractor for loading/unloading of that
quantity of stores on account his failure in meeting the contractual liabilities and recovery shall
be effected from the contractor in the manner as specified herein above.
Orders before Termination or Expiry of the Contract
11. Handling and conveyance of any stores for which orders are placed before the termination
or expiry of the contract although the time of completion of such work orders may fall after the
dates of termination of expiry of the contract, the contractor shall carry out such handling and
conveyance work till expiry date of work orders, failing which contractor shall be liable to pay
compensation as per Clause 22 of General Conditions of Contract, IAFW-2320.
Order under the Contract
12. All work order(s) under this contract shall be placed by the OC Contract. The OC Contract
is also to carry out any deviation/cancellation thereof. The contractor shall have no claim
whatsoever if the work order(s) once placed for any quantity of stores/materials to be shifted
during a particular period, from and to any of the places covered under this contract are varied
due to any reason. All order, notices, etc to be given under the contract shall be in writing
typescript or printed and if sent by post to the last known place of business of contractor shall be
deemed to have been served on the date when in the ordinary course or post it would have been
delivered to him. The contractor shall carry out without delay all instructions/orders given to
him. Govt. shall reserve the right to send the work order to the contractor by registered post as
and when Railway receipts are received. A copy of Railway receipts will also be sent to the
contractor along with the work order. Such work orders if sent by Registered post to the last
known place of above or business of the contractor shall be deemed to have been served on the
date when in the ordinary course of post it would have been delivered to him. The contractor
shall carry out without delay all orders given to him. Generally work orders shall be placed within
a month from the date of acceptance of the contract. However in case of any strike restricting
movement of wagons and other events which are beyond the control of the department, placing
of work order may be delayed further and the contractor shall not have any claim on account of
such delay.
Conveyance and Coverage
13. The maximum stores expected at one time during currency of this contract has been
mentioned in the dumping schedule. But this is a rough guide only and will not be binding if the
actual requirement is less or more. The Contractor shall provide adequate waterproof covering
to protect the stores while stacking at Railway Platform and also use covered transport to protect
the stores while in transit against damage due to rain, storm, etc,. The Contractor‟s rate shall be
deemed to be inclusive of all the arrangements like, providing godown, tarpaulin or other
covered transhipment including tools and plants, transports, etc. required as per the conditions
of contract. No extra claim for all such arrangement required to be provided by the contractor
for completion of the work shall be entertained. The contractor‟s quoted rates shall also include
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 50
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
transportation of stores on un-surfaced class 5 roads of any description in the area specified in
the tender documents.
Distance
14. Work orders shall be placed on the contractor by OC Contract through shortest route to
be ascertained by the OC Contract before placing of work orders. The decision of OC Contract in
this respect shall be final and binding on the contractor. The approximate distance and the
dumping schedule given is a rough guide line only. Task Force Commander shall convene a
Board of Officers for ascertaining the correct distance of various locations from where the stores
are to be transported & approved which shall be final and binding on the contractor. In case the
contractor transports the stores by the longer route at his own, payment shall be restricted to
the distance specified in the work orders. The decision of the OC Contract in this respect shall
be final and binding on the contractor. It is the responsibility of the contractor to obtain requisite
permits including inner line permits of labour and vehicles from all concerned authorities
required for the full and entire completion of this contract work. The OC contract and engineer-
in-charge will provide all necessary assistance to contract or for obtaining such permits.
Handling of Stores
15. The Contractor shall maintain a register keeping record of receipts of stores and date
wise-dispatch indicating therein the convoy note number, vehicle number and work order
number, Daily entries shall be signed by the contractor or his accredited agent and by Engineer-
In-Charge or his authorized representative. The Register should at all time show total stores
received, dispatched and balance held in stock.
16. The stores shall be transported to the destination in the same vehicle in which the stores
were loaded initially from the railway station/godowns and the stores shall not be unloaded and
reloaded in another vehicle en-route by the contractor under normal circumstances. In case of
any mechanical breakdown of any of the contractor‟s vehicle or natural calamity, store can be
unloaded and loaded into other vehicle at the cost of the contractor. No extra payment shall be
admissible to the contractor on this account. The contractor will notify this fact to the OC
contract/engineer-in-charge within 3 clear days of such happening.
Distance Chart
17. The approximate distances shown below are for rough guidance only. Contractor shall not
have any claim for any changes/variations in the distances shown as hereunder:-
S/No Location Approximate Distance from
HQ 1443 BCC, Ranaghat
(Arunachal Pradesh
(Km)
1. Sikku Bridge 10.000 (plain Sector)
2. Eastern Base Workshop
(Assam)
410.000 (Plain Sector)
18. Distance shown above is a rough guide only and shall be considered for reference only.
For the purpose of payment to the contractor for the stores conveyed to any destination under
the contract provisions, the exact distance/lead for various destinations/delivery point of
stores/materials shall be ascertained by the Board of Officers convened and approved by Task
Force commander. The distances so ascertained by the Board of Officers and approved by Task
Force Commander shall be final and binding to the contractor and they shall not have any claim
on this account.
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 51
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
Inspection of Stores while in Custody of the Contractor
19. The Contractor vehicles shall ply as per the local restrictions imposed by the authorities
responsible for this purpose. The contractor‟s vehicles under no circumstances shall carry out
stores other than project stores. All or part of vehicles are liable to be checked at number of
times during transit or under custody with Contractor at any place by departmental authorities or
any other person detailed by the Accepting Officer.
Minimum Fair Wages Payable to Labour
20. The Contractor shall pay wages not less than the minimum fair wages fixed from time to
time by the local authorities. He shall have no claim, whatsoever, if on account of any local
regulations or otherwise, he is required to pay wages in excess of the wages so fixed. The
contractor shall observe the laws/rules/regulations of Government of Assam/Arunachal
Pradesh/Nagaland regarding the employment of labour, payment of wages and cognate matter
relating to the local conditions. The contractor will be required to obtain written permit from
appropriate authority of Assam/Arunachal Pradesh/Nagaland whichever is applicable to import
labour, if required by him.
21. Labour Regulation and Abolition Act 1970, Workman Compensation Act-1923, Child
Labour Act-1986 and Minimum Wages Act-1948 are applicable to the contractors working under
this department. Rates quoted by the tenderer shall be deemed to have taken into account the
cost etc, required to comply with the provisions contend in the said Acts and the rules framed
under said Acts.
Testing of Cement
22. Deleted.
Transit Insurance
23. The contractor shall secure and maintain transit insurance cover for full value of all
equipments to be shifted during currency of contract at his own expense. Such insurance shall
cover any loss or damage of equipment during transit from source of dispatch to work sites
including loading and unloading. Beneficiary of all insurance policies shall be Chief Engineer, Project
Brahmank. Unless insurance document in this regard are furnished to the Engineer-in-Charge no
payment will be made to the contractor for the work done.
Arbitration (Refer 36 of General Condition of Contract IAFW- 2320)
24. All the disputes or differences arising as aforementioned under condition No. 36 of
General Condition of Contract IAFW- 2320 other than those for which the decision of the
accepting officer or any other person by the contract expresses to be final and binding shall after
written notice by either party of the contract to the other of them, be referred to the sole
arbitrator in accordance with the rules specified hereunder:-
Rules for Arbitration
(a) Matter to be arbitrated shall be referred to the sole arbitration of an Engineer
Officer to be appointed by Director General Border Roads, or in his absence the Officer
officiating as the DGBR whose decision shall be finding and binding.
(b) The Venue of Arbitration be such a place or places as may be fixed by the
arbitrator at is his sole discretion.
(c) The Arbitration proceedings shall be governed by the Arbitration and Reconciliation
Act 1996.
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 52
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
(d) The arbitrators shall give reasons for the award in each and every case
irrespective of the value of claims or counter claims.
(e) The award of the arbitrator shall be final and binding on both the parties.
(f) Legal Jurisdiction for this Contract Agreement shall be “Pasighat Court,
Arunachal Pradesh” only.
(g) The expenses incurred by each party in connection with preparation, presentation
etc. of its proceedings as also fees and expenses paid to the arbitrator shall be borne by
each party.
25. Distance shown in Schedule „A‟ is a rough guide only and shall be considered for reference
only. For the purpose of payment to the contractor for the stores conveyed to any destination
under the contract provisions, the exact distance/lead for various destinations/delivery point of
stores/materials shall be ascertained by the Board of Officers convened and approved by Task
Force Commander. The distances so ascertained by the Board of Officers and approved by
Commander, Task Force shall be final and binding to the contractor and they shall not have any
claim on this account.
Quantity and Type of Stores
26. The approximate quantity of stores to be handled under this contract and type thereon is
shown below are for guidance. The contractor shall not have any claim for any
changes/variations in the tonnages.
HANDLING AND / OR CONVEYANCE OF TWO NOS HYDRAULIC
EXCAVATORS BEML BE 300 BEARING EM No.11Q-31608 AND EM No.11Q-31609 FROM SIKKU BRIDGE SITE KM 560.200
(ARUNACHAL PRADESH) TO EBW AT TEZPUR (ASSAM) UNDER 1443
BCC UNDER 44 BRTF OF PROJECT BRAHMANK IN ARUNACHAL PRADESH STATE.
(a) Qty of Stores
(a) Equipments - 48.00 MT
(b) Type of Store
(a) 02 Nos of Hydraulic Excavators - 48.00 MT
Non Delivery of Stores in time
27. In case any stores are not delivered by the contractor within a reasonable period of time
(maximum 15 days) from the date of dispatch of store, suitable action as deemed fit under the
contract and law shall be initiated by the OC contract and Commander TF, including Lodging of
FIR thereon.
Payment of Work
28. The payment will be released by Task Force through E-Payment mode, for which the
contractor is required to submit the NEFT/RTGS Mandate Form (enclosed at Appx „B‟) duly filled
in the specified details. Otherwise, it will be released through A/c Payee Cheque.
29. In case where the payment is released through cheque it will be sent by post to the
Contractor for which the postage charges will be deducted from the net amount due to the
Contractor.
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 53
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
Discrepancies /Doubts
30. In case of any disputes or discrepancies or any doubt or obscurity as to the interpretation
of any of the conditions contained in the tender documents i.e. General conditions of Contract,
Special Conditions, Particular Specifications etc , the matter shall be referred to the Accepting
Officer, whose decision in this regard shall be final and binding.
Implementation of Section 113 of Motor Vehicle Act 1988
31. Hon‟ble Apex Court verdict on the WP (C) No. 136 of 2003 in the matter of Paramjit
Bhasin and Ors V/s Union of India and Ors regarding implementation of Section 113 of MV Act
1988 will be strictly adhered to during execution of this contract. No overloading of the vehicles
beyond permissible limit shall be carried out by the contractor during transportation.
Deduction of Taxes At Source
32. Income Tax at source at the rate notified by the Govt. of India from time to time along with
Surcharge and Education Cess as applicable shall be deducted from the RAR(s)/Final Bill.
33. Similarly, Entry Tax at source at the rate of notified by the State Govt. from time to time
along with surcharge as applicable shall be deducted from the RAR(s) /Final bill. The contractor may
ascertain full details in this respect from the concern department(s). Royalty or other taxes on
materials issued in the process of full-filling contract, payable to the concerned state Govt under
rule in force will be paid by the contractor himself.
34. Contractor should produce either paid receipt or no objection certificate on this account from
the concerned State Govt. before release of RAR/ Final bill.
REIMBURSEMENT/ REFUND ON VARIATION IN TAXES
35. The rates quoted by the contractor shall be deemed to be inclusive of all taxes (including
sales tax/VAT on materials, sales Tax/VAT on work contracts, turnover tax, service tax, labour
welfare cess tax, etc.), duties, royalties, octroi & other levies payable under the respective states.
No re-imbursement / refund for variation in rates of taxes, duties, royalties, octroi & other levies
and/or imposition/abolition of any new/existing taxes, duties, royalties, octroi & other levies shall be
made as applicable except as provided in sub para 37 (i) to (iv) here-in below.
36. (i) the taxes which are levied by Govt. at certain percentage rates of contract sum/amount
shall be termed as “taxes directly related to contract” such as sales tax/VAT on works
contracts, turnover tax, labour welfare cess/tax and like but excluding income tax. The
tendered rates shall be deemed to be inclusive of all “taxes directly related to contract value“
with existing percentage rates as prevailing on last due date for receipt of tenders. Any
increase in percentage rates of “taxes directly related to contract value” with reference to
prevailing rates on last due date for receipt of tenders shall be reimbursed to the contractor
and any decrease in percentage rates of “taxes directly related to contract value “with
reference to prevailing rates on last due date for receipt of tenders shall be refunded by the
contractor to the Govt. / deducted by the Govt. from any payments due to the contractor.
Similarly imposition of any new “taxes directly related to contract value” after the last due
date for receipt of tenders shall be reimbursed to the contractor and abolition of any “taxes
directly related to contract value” prevailing on last due date for receipt of tenders shall be
refunded by the contractor to the Govt./deducted by the Govt. from the payments due to the
contractor.
(ii) The contractor shall, within a reasonable time of his becoming aware of variation in
percentage rates and/or imposition of any” taxes” directly related to contract value” give
written notice thereof to the OC contract stating that the same is given pursuant to this
Special Condition, together with all information relating thereto which he may be in a position
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 54
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
to supply. The contractors shall submit the other documentary proof/information as the OC
Contract Aug require.
(iii) The contractor shall, for the purpose of this condition keep such books of account and
other documents as are necessary and shall allow inspection of the same by a duly authorized
representative of Govt., and shall further, at the request of the OC contract furnish, verified in
such a manner as the OC contract may require, any documents so kept and such other
information as the OC contract may require.
(iv) Reimbursement for increase in percentage rates/imposition of “taxes directly related to
contract value” shall be made only if the contractor necessarily & properly pays additional
“taxes directly related to contract value” to the Govt. without getting the same adjusted,
against any other tax liability or without getting the same refunded from the concerned Govt.
Authority and submit documentary proof for the same as the OC Contract may require”.
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 55
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
Appendix „C‟
(Ref para-23 of Special Condition of contract)
NEFT/RTGS MANDATE FORM
(1) Name of firm/contractor as
per account in the Bank
(2) Beneficiary‟s Account Number (As
appearing on the Cheque Book)
(3) Name of Bank where a/c is
held
(4) Name of Branch
(5) Address of Branch
(6) Telephone No. of Branch
(7) IFSC Code of Branch
(8) 9-Digit MICR Code Number of the
Bank & Branch
(9) E-Mail ID of Contractor
Note Please attach a blank cancelled cheque for verification of the above
particulars.
I, hereby, declare that the particulars given above are correct and
complete. If the transaction is delayed or not effected due to incomplete or
incorrect information of the bank details, I will not hold the payment releasing
authority responsible for it.
Dated : Signature of the contractor (Seal)
CERTIFICATE BY BANK
Certified that the particulars furnished above are correct as per our records.
Seal of Bank Signature of the branch manager of the Bank
Dated:-
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 56
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
Appendix „D‟
(Ref para-16 (f) of forwarding letter)
UNDERTAKING BY AUTHORISED SIGNATORY
I, the under signed do hereby under take that our firm M/s
__________________________ agree to abide by Terms and conditions of tender No.
CE (P) BRAHMANK/22/2015-2016 for “HANDLING AND / OR CONVEYANCE OF
TWO NOS HYDRAULIC EXCAVATORS BEML BE 300 BEARING EM No.11Q-
31608 AND EM No.11Q-31609 FROM SIKKU BRIDGE SITE KM 560.200
(ARUNACHAL PRADESH) TO EBW AT TEZPUR (ASSAM) UNDER 1443 BCC
UNDER 44 BRTF OF PROJECT BRAHMANK IN ARUNACHAL PRADESH
STATE.” from page No._______to __________ as advertised in the CPPP site
https://eprocure.gov.in/eprocure/app and it shall be binding on us and may accepted at any
time before the expiration of stipulated tender conditions.
______________________________________
(Signed by an Authorized Officer of the Firm)
_____________________
Title of Officer
_____________________
Name of Firm
____________
Date
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 57
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
SCHEDULE „B‟
LIST OF STORES/MATERIALS TO BE ISSUED TO THE CONTRACTOR
Description of Materials Unit Rate (in `) Place of issue Remarks
1 2 3 4 5
_____________________Nil_____________________
SCHEDULE “C”
(LIST OF TOOLS AND PLANTS (OTHER THAN TRANSPORT)
WHICH WILL BE HIRED TO THE CONTRACTOR)
S.N
o
Qty Particulars Details of
BRO Crew
supplied
Hire Charges
per unit per
working Hours
Stand by
Charge per
unit per
Hours
Place of
Issue
Remarks
1 2 3 4 5 6 7 8
---------------------------------NIL----------------------------------
SCHEDULE “D”
(TRANSPORT TO BE HIRED TO THE CONTRACTOR)
S.No. Qty Particulars Rate per unit per working day Place(s) of Issue Remarks
1 2 3 4 5 6
-------------------------------------NIL------------------------------------
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 58
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
TENDER/CONDITIONS ACCEPTANCE LETTER
(To be given on Company Letter Head)
Date:
To,
______________________
______________________
______________________
______________________
______________________
Sub: Acceptance of Terms & Conditions of Tender.
Tender Reference No: ________________________
Name of Tender / Work: -
_____________________________________________________________________
_____________________________________________________________________
_____________________________________________________________________
_____________________________________________________________________
_____________________________________________________________________
_______________________________________________________
Dear Sir,
1. I/ We have downloaded / obtained the tender document(s) for the above mentioned
„Tender/Work‟ from the web site(s) namely:
_____________________________________________________________________________
_____________________________________________________________________________
______as per your advertisement, given in the above mentioned website(s).
2. I / We hereby certify that I / we have read entire terms and conditions of the tender
documents from Page No. _______ to ______ (including all documents like annexure(s),
schedule(s), etc .,), which form part of the contract agreement and I / we shall abide hereby the
terms / conditions / clauses contained therein.
3. The corrigendum(s) issued from time to time by your department/ organisation too has also
been taken into consideration, while submitting this acceptance letter.
4. I / We hereby unconditionally accept the tender conditions of above mentioned tender
document(s) / corrigendum(s) in its totality / entirety.
5. In case any provisions of this tender are found violated , your department/ organisation shall
be at liberty to reject this tender/bid including the forfeiture of the full said earnest money
deposit absolutely and we shall not have any claim/right against deptt in satisfaction of this
condition.
6. I/we have downloaded the tender from BRO website www.bro.gov.in or www.bro.nic.in (link
tender-link-Brahmank) & Central Public Procurement Portal- and I/we have not tempered/
modified the tender form in any manner. In case if the same is found to be tempered/ modified
in any manner, I/we understand that my/our tender will be summarily rejected and I/we are
liable to be banned from doing business with BRO.”
Yours Faithfully,
(Signature of the Bidder, with Official Seal)
TENDER
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 59
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
To,
The President of India,
Having examined and perused the following documents: -
1. Schedule „A‟ attached hereto.
2. General Conditions of Contract, IAFW-2320 (Revised-1964).
3. Special Conditions.
I/We (herein after called the contractor) do hereby offer to execute upon the terms and
conditions herein set for the handling and or conveyance of stores of any description specified in
the Schedule „A‟ hereto within the area/location mentioned in the contract as Schedule „A‟ for
“HANDLING AND / OR CONVEYANCE OF TWO NOS HYDRAULIC
EXCAVATORS BEML BE 300 BEARING EM No.11Q-31608 AND EM No.11Q-31609 FROM SIKKU BRIDGE SITE KM 560.200 (ARUNACHAL PRADESH)
TO EBW AT TEZPUR (ASSAM) UNDER 1443 BCC UNDER 44 BRTF OF PROJECT BRAHMANK IN ARUNACHAL PRADESH STATE.”
at______% (In words_______________________________________) above/below
(refer Para 2 item 1 and 2 at Serial Page No 64) the rates entered in the said Schedule, as may
be required/demanded by the OC Contract for a period of 30 days commencing from the date of
commencement of the contract (whose requirements is estimated within amount to Rs. 1.20 lac
but this cost is a rough guide only and will not be binding if the actual requirement are less or
more) and further offer to executed by price work upon the same terms and conditions and or
any additional work in connection with the handling/conveyance of this contract as such rates or
rate as shall be determined in accordance with clause 32 of the conditions of the contract
annexed hereto.
In consideration of President of India, hereinafter called the Govt., agreeing that for the
said period and so long as the contractor carries on this contract and it is in force no one but the
contractor shall be employed to do the said work except as provided in condition 5 of the
contract annexed hereto, the contractor hereby agrees to abide by the rates hereby tendered
and fulfil all the terms and provisions of the said conditions of contract, the sum of money
mentioned in the said condition of contract without prejudice to the Govt. right to claim damage
for breach of contract :-
Note: - In the event of discrepancy between description in words and figures quoted by a
contractor the description in words shall prevail.
Should this tender be accepted, the sum Rs. 3,000.00 (Rupees three thousand only)
forwarded as earnest money shall either be retained on account of Security Deposit or be refunded
by the Govt. on receipt of an equal amount as security deposit, within the time specified in
Condition 9 of IAFW 2320. And further agree to refer all disputes as required by condition 36 of
General condition of the Contract (IAFW-2320) to the sole arbitrator of a Serving Engineer Officer to
be appointed by the Director General Border Roads, New Delhi or in his absence, by the officer
officiating as Director General Border Roads, whose decision shall be final, conclusive and binding.
However, in case of dispute with PSE and or PSU the same will be referred to a Sole Arbitrator to be
appointed by Secretary Bureau of Public sector Enterprises.
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 60
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
TENDER (Contd..)
Signature of
contractor____________________
Witness :- (In the capacity of_____________
Signature ___________ duly authorized to sign the tender documents
for and
behalf of ____________________________
Name ________________________
(IN BLOCK LETTERS)
Address : ______________________ Postal Address :- ______________________
______________________
Telegraphic Address:-
___________________
Note: - In the event of the tender being submitted by partnership firm it must be signed separately
by each partner thereof or on behalf of all the partners of the firm by a person holding a valid
power of attorney authorized him to do so. In the absence of any partner it must be signed on his
behalf by a person holding his power of attorney (such power of attorney shall specifically
authorized the signatory to the documents to bind all partners of the firm as the case Aug be in all
matters pertaining to the contract including the arbitration clause). In the case of limited company
registered under the Act, the tender shall be signed in accordance with the provisions contained in
this behalf in the articles of association of the company or by a person having express authority to
bind the company.
Note: No percentage above/ below the Schedule „A‟ rate to be quoted in this page at line
8 during bidding process. The % above and below schedule „A‟ rate is to be quoted in
BOQ (Excel Sheet) only.
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 61
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
ACCEPTANCE
_______________alterations have been made in this document and as evidence that
these alterations were made before the execution of this Contract Agreement, these have been
initialled by the Contractor and Shri ..................................……………… AEE (Civ), Assistant
Surveyor of Works, of HQ CE (P) Brahmank.
The said Officer is hereby authorised to sign and initial on my behalf the documents
forming part of this Contract Agreement.
The above tender of M/s ____________________________________ accepted by
me on behalf of the President of India, in respect of schedule "A" attached hereto at the prices
quoted therein
for_______%(_______________________________________________________________)
above/below schedule „A‟ attached hereto at the prices quoted there-in.
dated___________day of ______________________two thousand sixteen (2016).
Signature of the Contractor Chief Engineer (P) Brahmank
(For and on behalf of the President of India)
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 62
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
PART-II (PRICED BID)
BORDER ROADS ORGANISATION
The following shall form part of this contract agreement: -
Document annexed hereto
S/No Particulars Page No
1. Contents 62
2. Schedule „A‟ (Notes) 63
3. Schedule „A‟ 64 - 65
Total Nos (Pages
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 63
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
SCHEDULE `A'
SCHEDULE OF REQUIREMENTS
NAME OF WORK : “HANDLING AND / OR CONVEYANCE OF TWO NOS
HYDRAULIC EXCAVATORS BEML BE 300 BEARING EM No.11Q-31608
AND EM No.11Q-31609 FROM SIKKU BRIDGE SITE KM 560.200
(ARUNACHAL PRADESH) TO EBW AT TEZPUR (ASSAM) UNDER 1443 BCC
UNDER 44 BRTF OF PROJECT BRAHMANK IN ARUNACHAL PRADESH
STATE.”
1. The quantities given in column No 4 of Schedule `A' are approximate and are inserted as
a guide only.
2. The percentage rates shall be filled only in the provided column in schedule A given in BOQ.
The schedule „A‟ given in page No. 64-65 is for reference only.
3. The percentage of rates quoted by the tenderer in schedule `A' shall be deemed to include,
inter-alia for all materials, tools and plants, transport and labour etc., required for the supply. Sale/
VAT tax, Goods tax, Entry tax, labour welfare cess, terminal tax, royalty, monopoly, Octroi etc. for
carriage, delivery, all types of tests specified in CA document and stacking etc at the specified place
of supply. No payment other than the rates quoted in schedule `A' shall be made to the contractor.
If tenderers have Rate/Running contract with DGS&D of any item mentioned in the schedule “A‟, a
copy of the same may be enclosed for our guidance and a certificate to the effect be given that
prices quoted are as per DGS&D Rate/Running contract. Quoted rates will hold good for a period of
30 days from the date of opening of tender.
4. The item under this contract shall be delivered / supplied at Eastern Base workshop
(Assam) and stacked neatly at places/intervals as directed by Engineer-in-Charge.
5. Period of completion: - The total period of completion for supply of all the items of
schedule „A‟ shall be 30 days from the date of commencement indicated in the first work order.
6. The tender will be accepted as a whole and not in parts. The tenderers will not have any
claim on this account and the Accepting Officers‟ decision shall be final.
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 64
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
SCHEDULE 'A'
(Description of work to be executed)
1. The under mentioned terms used in this schedule shall be interpreted as follows:-
(A) „Unloading‟, „Loading‟, „Removing‟, „Stacking‟ shall means these operations are carried
out by manual labour without the use of crane or other appliance.
(B) In particular the terms „Stacking‟ shall mean the neat or orderly arrangement (as may be
directed) of Packed Bitumen irrespective of their size and shall include such arrangement
in the open places/stores. The terms shall also include the placing in position on tonnage
as may be necessary to facilitate sufficient stacking.
(C) Wagon‟ shall mean a Railway wagon whether open or closed.
2. Payment shall be made on the basis of weight of the goods handled/conveyed, weights less
than a tonne but exceeding half tonne shall be paid as one tonne and weights of half tonne and less
shall be paid as half tons. The rate of half a tonne shall be half of the rate given for one tonne.
S/
No.
Description of work Unit of
calculation
Rate of payment Estimated
Cost Rs.
1 2 3 4 5
1.
Removing any class of goods other
than cement and items of steel
including BB parts from any place
inside or outside buildings, loading into
road vehicles, unloading at the required
site inside or outside buildings and
stacking neatly as directed
(Transporting charges not included in
the rate and shall be paid under item
10 below).
Tonne
(48.00)
Rs. 4.05 (Rupees
four and paise five
only)
Rs. 194.40
2. Transporting any class of goods by any
means to a distance exceeding 10 km
Tonne/
Km
(48 MT 420
Km)
Rs. 0.53 (Paise fifty
three only)
Rs. 10684.80
Total (Schedule-„A‟) Rs. 10879.20
Say
Rs. 1.20 Lac
Notes :-
1. Reference items 2
Distance less than a kilometer but exceeding half a kilometer should be paid as tonne
kilometer and the distance of half a kilometer and less shall be paid ½ a tonne kilometer. The rate
for 1/2 a tonne kilometer shall be 1/2 of the rate given for tonne kilometer shall be ½ the rate
given of tonne kilometer.
CA NO CE (P) BRAHMANK/ /2015-2016 Srl Page No 65
(Signature of Contractor) AEE (Civ)
ASW
For Accepting Officer
2. Rates quoted by the contractor is deemed to be inclusive of any unforeseen expenditure on
account of transhipment of stores enroute to cross the water channels/nallahs/river through ferry or
otherwise necessitated during monsoon or ford or otherwise due to any interruption.
3. Approximate quantities to be shifted to various locations are as under:-
Part
No
Items
Location
Approximate/
(Average)
distance in KMs
Approximate
quantity to
be shifted From To
1 Shifting of
02 Nos
Hydraulic
Excavators
Sikku Bridge
(KM 560.200)
(Arunachal
Pradesh
Eastern Base
workshop,
Tezpur (Assam)
420 Km
(Plain area)
48.00 MT
4. The above mentioned quantities and distances are merely a rough guide and if the
quantities are more or less, contractor will have no claim on this account.
5. The trailer shall be provided by the contractor for conveyance of Hydraulic
excavators.