Structural Calcularions
* ADDITION STEEL BEAM AT CLUBHOUSE (Rev.01)
Submitted by : Tacheng Metal Co.
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
2/44
BackgroundThe Vista is a high-rise condominium development located in Ho Chi Minh City, Vietnam. The faadeconsists of numerous cladding systems, in accordance with the architectural intent.
This report consists of the revision of structural check of additional beam at second storey made to supportcurtainwall.
The structural checks are for faade elements only. The adequacy of building structures supporting thesefaade systems is to be verified by structural engineers separately.
Design Criteria
Design Referencesa. Project Specificationsb. BS 6399 - Design Loading for Buildingc. BS 5950 - Structural Use of Steelwork in Buildingsd. AS 1288 Glass in Buildings-Selection and Installatione. WONJIN Stud Anchor WSA Design Data (attached)
Material SpecificationsStructural steel, Grade 43 fy = 275 N/mm2
E = 2.0 x 105 N/mm2
Design Loadings
Dead Load
Glass gl = 27 kN/m3
Wind Load
-1.72kPa, +1.29kPa
Serviceability Limit
Permissible Deflection Under Service Load
Steel span/240Glass Panel span/90, not exceeding 20mm
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
3/44
Additional beam
Dead load, DL = 12mm thick glass + fixings + framing (20% glass load)= 1.2x0.012x27x6= 2.33kN/m
Wind suction, WL = 1.72x6= 9.98kN/m
Wind pressure, W L = 1.29x6= 7.74kN/m
SAP2000 Model
Nodes diagram
Model extrude view
The upper column end is released vertically withvertical slot hole for vertical tolerance.
All beams are designed wind pinned ends by released in bending moment,(refer frame released assignment table)
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
4/44
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
5/44
Loading condition
Dead load vertical force= 1.2x0.012x27x6.0= 2.33kN/m
Dead load moment due toeccentricity= 1.2x0.012x27x6.0x0.43
= 1.003kNm/m
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
6/44
Wind load in Y direction
Pressure in windward;
Suction in side wall
Wind load in X direction
Pressure in windward;
Suction in side wall
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
7/44
Load combinations
Thermal expansion force= 60 oC
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
8/44
Member fail ratio
Member fail ratio = 0.921 at notched part < 1.0 OK
Member code checking
NOTE: Member UB300x175x14x9 is referred to the notched member UB300x300x14x9 notched 125mm
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
9/44
Deflection
Maximum dead load deflection = 1.48mm < lesser of 5500/240 or 20mm< 20mm - OK
Maximum thermal expansion = 4.2mm < lesser of 6000/300 or 20mm< 20mm - OK
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
10/44
Maximum wind load deflection = 14.8mm < lesser of 5500/240 or 20mm
< 20mm - OK
Maximum wind load deflection = 12.9mm < lesser of 5500/240 or 20mm
< 20mm - OK
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
11/44
Connection Design
Connection between beam UB300x300 and column UB250x250 & UC300x300 to UB300x300
All beams is designed pinned-pinned,Max. beam end force:Shear in major, Vx = 38.4kNShear in minor, Vy = 12.2kN
Axial, N = 26.7kNTorsion, T = 3.85kNm
Steel angle 100x100x6@150mm length
SS bolt M12
Beam to column flange
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
12/44
Bolt connected to beam webBolt used = SS316 Class 70 M20Shear strength of bolt, pv = 311MPaTensile strength of bolt, pt = 374MPaBolt area, A = 245mm2No. of bolt = 2
Shear force per bolt, V = [(38.42+26.72)0.5/2]/2 - double shear= 11.69kN
Shear capacity of bolt, Vc = 245x311/1000= 76.2kN > V - OK
Bolt connected to main web or column flangeBolt used = SS316 Class 70 M20Shear strength of bolt, pv = 311MPaTensile strength of bolt, p t = 374MPaBolt area, A = 157mm2No. of bolt = 4Shear force per bolt, V = [(38.42+12.22)0.5/4
= 10.07kNShear capacity of bolt, Vc = 157x311/1000
= 48.8kN > V - OKTension force per bolt, V = 26.7/4+38.4x0.05/(2x0.1)
= 16.28kNTension capacity of bolt, Vc= 157x374/1000
= 58.7kN > T - OK
Combined strength = 0.48 < 1.4 - OK
SS bolt M12
SS bolt M12
Steel angle 100x100x6@150mm length
Steel angle 100x100x6@150mm length
Beam to column web
Beam to beam
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
13/44
Reaction force
Connection A
Connection B
Connection C
Connection C
Connection A
Connection D
Connection D
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
14/44
Column bottom end connection (Connection A)Fx = 11.43kNFy = 1.71kNFz = 33.62kN (Compression)Mx = 4.95kNMy = 36.65kNm
Welding to base 12mm thick base plateConservatively consider only the welding at bolt flange end,Welding strength = 220MPaWelding throat size = 0.7X9
= 6.3mmWelding length = 2x250
= 500mmLongitudinal stress = {[11.43x103/(500x6.3)]2+[1.71x103/(500x6.3)]2}0.5
= 6.32MPaTransverse strength, ptc = 220MPa
Transverse stress, pt = 36.65x106/[2(250x6.33/12+1252x250x6.3)/125]+4.95x106/[2(6.3x2503/12)/125]= 130.8MPa
Transverse strength, ptc = 1.25x220= 275MPa
Combined stress = 6.32/220+130.8/275= 0.504 < 1.0 - OK
9mm fillet weldis structurally adequate.
WSA M20 stud boltShear force per anchor, V = [(11.432+1.712)0.5/6
= 1.93kNShear capacity of anchor = min(26.4x1.46x1.65, 34.27)
= 34.27kN > V - OKPull-out force per anchor, P = 4.95/(3x0.4)+37.65x0.4/[2x(0.42+0.22)]-33.62/6
= 36.17kNTensile capacity of anchor = min(52.6x1.46x0.83x1.0, 54.4)
= 54.4kN > P - OKCombined capacity = 1.93/34.27+36.17/54.4
= 0.721 < 1.2 - OKHence 6 x WSA M20 stud boltis adequate.
Full fillet weld 9mm
Steel plate 500x500x12mm400mm
200mm
200mm
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
15/44
Bracket for beam end (Connection B)Slot hole is provided for the connection between the cantilever beam to the main beam to allow for thermalexpansion,Vertical shear, Vv = 37.41kNPull-out force, P = 85.08kNMoment, M = 1.02kNm
Welding to base 12mm thick base plateWelding strength = 220MPaWelding throat size = 0.7X9
= 6.3mmWelding length = 2x250
= 500mmLongitudinal stress = 37.41x103/(500x6.3)
= 11.88MPaTransverse strength, ptc = 220MPa
Transverse stress, pt = 1.02x106/[2(250x6.33/12+1252x250x6.3)/125]+85.05x103/(500x6.3)= 29.6MPa
Transverse strength, ptc = 1.25x220= 275MPa
Combined stress = 11.99/220+29.6/275= 0.162 < 1.0 - OK
9mm fillet weldis structurally adequate.
WSA M20 stud boltShear force per anchor, V = 37.41/6
= 6.24kNShear capacity of anchor = min(26.4x1.46x1.65, 34.27)
= 34.27kN > V - OKPull-out force per anchor, P = 1.02x0.4/[2x(0.42+0.22)]+85.08/6
= 15.2kNTensile capacity of anchor = min(52.6x1.46x0.83x1.0, 54.4)
= 54.4kN > P - OKCombined capacity = 6.24/34.27+15.2/54.4
= 0.461 < 1.2 - OKHence 6 x WSA M20 stud boltis adequate.
400mm
200mm
12mm think plate
500mm
Full fillet weld 9mm @ both flange.Since the moment force is less than thatfor connection A, 9mm weld is adequate.
4x bolt M16 with horizontal slot
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
16/44
Bracket for beam end (Connection C)Vertical shear, Vv = 12.83kNHorizontal shear, VH = 31.42kNPull-out force, P = 34.65kN
Bolt M12 connect the bracket and webBolt used = SS316 Class 70 M20Shear strength of bolt, pv = 311MPaTensile strength of bolt, pt = 374MPaBolt area, A = 84mm2No. of bolt = 2Shear force per bolt, V = (12.832+34.652)0.5/2
= 18.47kNShear capacity of bolt, Vc = 245x311/1000
= 76.2kN > V - OK
Steel plate 12 mm thickBending moment, M = 31.42x0.05
= 1.571kNmBending capacity, Mc = 270x122/6x275/106
= 1.78kNm > M - OK
10mm welding connecting the steel plate to base plateEffective throat = 7mmZH = 2x2702x7/6 = 170100mm3ZV = (2x73x270/12+2x62x270x7)/6 = 25252.5mm3MH = 0.04x12.83 = 0.513kNm
MV = 0.04x31.42 = 1.257kNmTransverse stress =1.257x106/25252.5+0.513x106/170100+34.65x103/(7x2x270)
= 62MPa
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
17/44
WSA M20 stud bolt,
Pull out force per anchor, P = 34.65x0.25/(2x0.2)+12.95x0.04/(2x0.22)+31.42x0.04/(2x0.2)= 25.98kN
Shear force per anchor, Vc = [(12.83/4)2+(31.42/2)2]0.5= 16.03kN
Tensile capacity of anchor = min(52.6x1.46x0.805x1.0, 54.4)
= 54.4kN < P - OKShear capacity of anchor = min(26.4x1.46x1.60, 34.27)
= 34.27kN < V - OKCombined capacity = 25.98/54.4+16.03/34.27
= 0.95 < 1.2 - OK
Pull-out force per anchor, P = [(12.83/4)2+(31.42/2)2]0.5= 16.03kN
Shear force per anchor, V = 34.65x0.25/(2x0.2)+12.95x0.04/(2x0.22)+31.42x0.04/(2x0.2)= 25.98kN
Tensile capacity of anchor = min(52.6x1.46x0.805x0.97, 54.4)= 54.4kN < P - OK
Shear capacity of anchor = min(26.4x1.46x1.14, 34.27)= 34.27kN < V - OK
Combined capacity = 25.98/54.4+16.03/34.27= 1.06 < 1.2 - OK
Hence 4 x WSA M20 stud bolt is adequate.
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
18/44
Column top end connection (Connection D)Vertical shear force, Fz = 5.18kN
Bolt M12 connect the bracket and web
Bolt used = SS316 Class 70 M20Shear strength of bolt, pv = 311MPa
Tensile strength of bolt, p t = 374MPaBolt area, A = 84mm2No. of bolt = 2Shear force per bolt, V = 5.18/2
= 2.59kNShear capacity of bolt, Vc = 245x311/1000
= 76.2kN > V - OK
WSA M12 stud bolt,Shear force per anchor, V = 5.18/2
= 2.59kNShear capacity of anchor = min(12.9x1.46x6.0, 8.12)
= 8.12kN < Vc - OKHence 2 x WSA M12 stud boltis adequate.
WSA stud bolt M12
Steel Angle 125x75x12 @100 mm length
SS bolt M12 with vertical slot hole
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
19/44
APPENDIX:
WONJIN TECHNICAL DATA
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
20/44
KENSUM ORIENT, INC. 05.Aug.2009
WONJIN STUD ANCHOR WSA / FOR INFORMATION
- 1 -
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
21/44
- 3 -
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
22/44
- 4 -
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
23/44
- 5 -
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
24/44
APPENDIX:
DETAIL REFERENCE
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
25/44
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
26/44
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
27/44
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
28/44
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
29/44
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
30/44
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
31/44
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
32/44
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
33/44
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
34/44
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
35/44
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
36/44
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
37/44
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
38/44
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
39/44
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
40/44
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
41/44
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
42/44
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
43/44
7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311
44/44