California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By
Transcript
Page 1: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

California Department of Education

Pre-State Allocation Board MeetingAugust 24, 2011

Presented By

Page 2: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

School Facility Program Funds Available

(in millions) July. 2011 Aug. 2011

Nov 2010 Bond Sale $60.7 $46.5

March 2010 Bond Sale 175.4 159.4

Nov/Dec 2009 Bond Sales 8.1 8.1

Oct/Nov 2009 Bond Sales 45.2 45.2

April 2009 Bond Sale 40.7 36.2

Total Funds Available $330.1 $295.4

Page 3: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

Status of Bond Authority

Propositions 1D, 55 & 47New Construction Bond Authority - $14.908 billion*

(in millions)

Remaining Bond Authority, $424.0

Unfunded Approvals, $640.8

Apportioned, $13,842.9

Prop 1D 1,668.2$ Seismic Repair 4.7$ Prop 55 5,265.1$ Prop 47 6,904.9$

Apportioned 13,842.9$ 92.9%Prop 1D 31.0$ Seismic Repair -$ Prop 55 520.7$ Prop 47 89.1$

Unfunded Approvals 640.8$ 4.3%Prop 1D 1.3$ Seismic Repair 194.8$ Prop 55** 203.8$ Prop 47 24.1$

Remaining Bond Authority 424.0$ 2.8%Grand Total 14,907.7$ 100.0%

New Construction Totals

Page 4: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

Agenda Highlights

•Disbursal of Bond Sale Proceeds Unused by the Charter School Facilities Program

•Labor Compliance Program Requirements

Page 5: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

Questions and Answers

Page 6: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

State Allocation Board MeetingAugust 24, 2011

Pre-Meeting: DSA Updates

Page 7: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

Division of the State Architect

Seismic Mitigation Program

DSA Procedure 08-03: – Draft available for public review– Includes evaluation template, CGS guidelines– Clarification on process & submittal requirements

Public Meeting for discussion and Q&A:– Thursday August 25, 2011, 1:00 pm – 3:30 pm– Participation in Sacramento or DSA Regional

Offices

Page 8: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

Division of the State Architect

PC Approvals & OTC Reviews

Use of 2007 Pre-Checked Designs: – Extended until December 31, 2011– Details: DSA Bulletin 07-02

Related Procedures: – PL 07-02: Over-the-Counter Review of PC Designs

(rev. 7-29-11)– IR 16-1: Design and Construction Requirements for

Relocatable Buildings (rev. 08-03-11)– Updates include non-deferred sprinkler system

approvals; energy requirements per Green Code

Page 9: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

Division of the State Architect

Fire & Life Safety Updates

Security vs. Exiting Guidelines: Door Locking Hardware in Schools:

updated on 7/20/2011 for 2010 CBC and AB 211 requirements

Bulletin 11-06 (7/14/2011) replaces publication “Fire Apparatus Access, Fire-Flow & Fire Hydrant Requirements for California's Relocatable School Buildings,“ & provides up to date sources of information regarding FLS aspects of relocatable school buildings for California public schools.

Page 10: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

Division of the State Architect

Bin Status Reports as of August 19, 2011

             

  Structural Bin Times (weeks)  

 

Region

Category  

  1 2 3  

   

  Oakland 4.3 4.0 4.9  

  Sacramento 3.3 - 5.1  

  Los Angeles 3.9 4.0 5.3  

  San Diego 3.4 4.4 5.3  

   

   

     

Page 11: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

Division of the State Architect

Bin Status Reports as of August 19, 2011

     

  Fire & Life Safety (weeks)  

 

Region

Category  

  1 2 3  

   

  Oakland 2.0 2.0 3.0  

  Sacramento 3.3 5.1 5.3  

  Los Angeles 1.0 - 7.0  

  San Diego 6.0 4.5 8.5  

   

       

Page 12: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

Division of the State Architect

Bin Status Reports as of August 19, 2011

         

  Access Bin Times (weeks)  

 

Region

Category  

  1 2 3  

   

  Oakland 6.0 4.1 5.6  

  Sacramento 3.3 - 4.4  

  Los Angeles - - 7.5  

  San Diego 5.0 4.5 6.5  

   

             

Page 13: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

Department of General ServicesDivision of the State ArchitectPlan Review Scorecard Summary Chartsas of July 31, 2011

ProjectSchool District

Incomplete DaysDSA Bin Time Days

DSA Plan Review Days

Design Professional

Correction Days

DSA & Design Professional Back

Check Days

Stamp Out/ Approval

Total Processing Days

Access Only                                 6                               29                               10                               42                                  6                                -    93                            Over-the-Counter (OTC)                               -                                    1                                  1                                  8                                  2                                -    12                            0 - $1,000,000 8                               34                             12                             70                             10                             1                               135                          $1,000,001 - $5,000,000 19                             40                             29                             86                             15                             1                               190                          $5,000,001  and larger 22                             44                             56                             81                             25                             4                               232                          Average Processing Days  8                               22                             13                             47                             8                               1                               99                            

- 10  20  30  40  50  60  70  80  90  100 

Calendar Days

Access Only School District  Incomplete Days

DSA Bin Time Days

DSA Plan Review Days

Design Professional Correction Days

DSA & Design Professional Back Check Days

Stamp Out/ Approval

Page 14: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

Department of General ServicesDivision of the State ArchitectPlan Review Scorecard Summary Chartsas of July 31, 2011

ProjectSchool District

Incomplete DaysDSA Bin Time Days

DSA Plan Review Days

Design Professional

Correction Days

DSA & Design Professional Back

Check Days

Stamp Out/ Approval

Total Processing Days

Access Only                                 6                               29                               10                               42                                  6                                -    93                            Over-the-Counter (OTC)                               -                                    1                                  1                                  8                                  2                                -    12                            0 - $1,000,000 8                               34                             12                             70                             10                             1                               135                          $1,000,001 - $5,000,000 19                             40                             29                             86                             15                             1                               190                          $5,000,001  and larger 22                             44                             56                             81                             25                             4                               232                          Average Processing Days  8                               22                             13                             47                             8                               1                               99                            

- 2  4  6  8  10  12 

Calendar Days

OTC School District  Incomplete Days

DSA Bin Time Days

DSA Plan Review Days

Design Professional Correction Days

DSA & Design Professional Back Check Days

Stamp Out/ Approval

Page 15: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

Department of General ServicesDivision of the State ArchitectPlan Review Scorecard Summary Chartsas of July 31, 2011

ProjectSchool District

Incomplete DaysDSA Bin Time Days

DSA Plan Review Days

Design Professional

Correction Days

DSA & Design Professional Back

Check Days

Stamp Out/ Approval

Total Processing Days

Access Only                                 6                               29                               10                               42                                  6                                -    93                            Over-the-Counter (OTC)                               -                                    1                                  1                                  8                                  2                                -    12                            0 - $1,000,000 8                               34                             12                             70                             10                             1                               135                          $1,000,001 - $5,000,000 19                             40                             29                             86                             15                             1                               190                          $5,000,001  and larger 22                             44                             56                             81                             25                             4                               232                          Average Processing Days  8                               22                             13                             47                             8                               1                               99                            

- 20  40  60  80  100  120  140 

Calendar Days

$0 - $1,000,000,000 School District  Incomplete Days

DSA Bin Time Days

DSA Plan Review Days

Design Professional Correction Days

DSA & Design Professional Back Check Days

Stamp Out/ Approval

Page 16: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

Department of General ServicesDivision of the State ArchitectPlan Review Scorecard Summary Chartsas of July 31, 2011

ProjectSchool District

Incomplete DaysDSA Bin Time Days

DSA Plan Review Days

Design Professional

Correction Days

DSA & Design Professional Back

Check Days

Stamp Out/ Approval

Total Processing Days

Access Only                                 6                               29                               10                               42                                  6                                -    93                            Over-the-Counter (OTC)                               -                                    1                                  1                                  8                                  2                                -    12                            0 - $1,000,000 8                               34                             12                             70                             10                             1                               135                          $1,000,001 - $5,000,000 19                             40                             29                             86                             15                             1                               190                          $5,000,001  and larger 22                             44                             56                             81                             25                             4                               232                          Average Processing Days  8                               22                             13                             47                             8                               1                               99                            

- 20  40  60  80  100  120  140  160  180  200 

Calendar Days

$1,000,001 - $5,000,000 School District  Incomplete Days

DSA Bin Time Days

DSA Plan Review Days

Design Professional Correction Days

DSA & Design Professional Back Check Days

Stamp Out/ Approval

Page 17: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

Department of General ServicesDivision of the State ArchitectPlan Review Scorecard Summary Chartsas of July 31, 2011

ProjectSchool District

Incomplete DaysDSA Bin Time Days

DSA Plan Review Days

Design Professional

Correction Days

DSA & Design Professional Back

Check Days

Stamp Out/ Approval

Total Processing Days

Access Only                                 6                               29                               10                               42                                  6                                -    93                            Over-the-Counter (OTC)                               -                                    1                                  1                                  8                                  2                                -    12                            0 - $1,000,000 8                               34                             12                             70                             10                             1                               135                          $1,000,001 - $5,000,000 19                             40                             29                             86                             15                             1                               190                          $5,000,001  and larger 22                             44                             56                             81                             25                             4                               232                          Average Processing Days  8                               22                             13                             47                             8                               1                               99                            

- 50  100  150  200  250 

Calendar Days

$5,000,001 and larger School District  Incomplete Days

DSA Bin Time Days

DSA Plan Review Days

Design Professional Correction Days

DSA & Design Professional Back Check Days

Stamp Out/ Approval

Page 18: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

Department of General ServicesDivision of the State ArchitectPlan Review Scorecard Summary Chartsas of July 31, 2011

ProjectSchool District

Incomplete DaysDSA Bin Time Days

DSA Plan Review Days

Design Professional

Correction Days

DSA & Design Professional Back

Check Days

Stamp Out/ Approval

Total Processing Days

Access Only                                 6                               29                               10                               42                                  6                                -    93                            Over-the-Counter (OTC)                               -                                    1                                  1                                  8                                  2                                -    12                            0 - $1,000,000 8                               34                             12                             70                             10                             1                               135                          $1,000,001 - $5,000,000 19                             40                             29                             86                             15                             1                               190                          $5,000,001  and larger 22                             44                             56                             81                             25                             4                               232                          Average Processing Days  8                               22                             13                             47                             8                               1                               99                            

- 10  20  30  40  50  60  70  80  90  100 

Calendar Days

Average Processing Days School District  Incomplete Days

DSA Bin Time Days

DSA Plan Review Days

Design Professional Correction Days

DSA & Design Professional Back Check Days

Stamp Out/ Approval

Page 19: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

THANK YOU

Page 20: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

California Department of Education Update

School Facilities Planning Division

August 24, 2011

Page 21: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

Topics• SPI Transition Advisory Team

• Schools of the Future Initiative

• Pipeline Working Group

• Title 5 Design Principle

• Organization news

Page 22: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

Superintendent’s Transition Advisory Team Report

• A Blueprint for Great Schools, provides vision and direction for our education system, including a focus on 21st Century learning, meeting the needs of the whole child, and rebuilding the ranks of California’s teachers with resources and respect.

Page 23: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

Transition Advisory Team Report

• Educator Quality• Curriculum and Assessment• Higher Education and Secondary Alignment• Accountability and School Improvement• Early Childhood Education• Health, Nutrition and Physical Fitness• School Finance• Facilities and Construction Reform

Available at: http://www.cde.ca.gov/nr/ne/yr11/yr11rel53.asp

Page 24: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

Facilities and Construction Reform

• Chair: Cesar Diaz• Members:

– Cruz Bustamante, Former Lieutenant Governor– Ted Dutton President, School Facility Advisors– Aram Hodess, Commissioner California

Apprenticeship Council– Richard Jackson, Professor, UCLA School of

Public Health– Bob Linscheid, CSU Board of Trustees– Jose Perez, Chair, California Utilities Diversity

Council

Page 25: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

Facilities and Construction Reform

Key Recommendations:•Collaborate with the Governor to consolidate or better coordinate agencies•Inventory school facilities•Enable districts to engage in more efficient facilities construction and re design•Establish a Superintendent’s Council of Business/Labor•Foster joint use agreement that support schools as community hubs

Page 26: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

Schools of the Future Initiative

• Report to be released in early September

Page 27: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

Schools of the Future Initiative

• Advisory panels convened by Superintendent Torlakson

• Schools of the Future Task Force

presented to Superintendent Torlakson on June 1, 2011

Page 28: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

Schools of the Future Initiative

High Performance Schools Sub-Committee• Financing• Renewable Energy• High Efficiency Schools• Grid Neutral Schools

Page 29: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

Schools of the Future Initiative

School Facility Program Reform Sub-Committee• Funding and Governance• School Site Selection and Community

Impact• Modernization• Educational Impact of Design

Page 30: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

Pipeline Technical Advisory Group

• Held June 30, 2011

• Review of technical aspects of 2007 CDE Protocol

• Next: Convene policy advisory group

Page 31: California Department of Education Pre-State Allocation Board Meeting August 24, 2011 Presented By.

Organization News

• AlignmentAs of October 1, 2011, will be in the Administrative Service and District Infrastructure Branch, Jeannie Oropeza, Deputy Superintendent

• New nameAs of October 1, 2011: “School Facilities Services Division”

• RetirementAs of August 31, 2011, Barbie Ross, Education Program Consultant.