20
DISTRICT 7 A&E OUTREACH CONSTRUCTION INSPECTION SUPPORT SERVICES CALTRANS - District 7 DIVISION OF PROGRAM/PROJECT MANAGEMENT OFFICE OF CONSULTANT SERVICES Contact: erto Angelini, Office Chief 213-897-0208 [email protected]. assan Safari, Contract Manager 213-897-0333 [email protected] October 13, 2014
Transcript

DISTRICT 7 A&E OUTREACH CONSTRUCTION INSPECTION SUPPORT

SERVICES

CALTRANS - District 7 DIVISION OF PROGRAM/PROJECT MANAGEMENT

OFFICE OF CONSULTANT SERVICES

Contact:Alberto Angelini, Office Chief 213-897-0208 [email protected] Safari, Contract Manager 213-897-0333 [email protected]

October 13, 2014

DISTRICT 7 A&E OUTREACH CONSTRUCTION INSPECTION SUPPORT SERVICES

AGENDA

• Welcome/Introduction Alberto Angelini• Contract Information Alberto Angelini/HassanSafari• DPAC Saad Samani/John Neri• Q & A• Networking

DISTRICT 7 A&E OUTREACH CONSTRUCTION INSPECTION SUPPORT SERVICES

Introduction

One On-Call “as-needed” Construction Engineering Inspection/CPM (Critical Path Method) Analysis Contract in Ventura County • Estimated Contract Amount $5,000,000• Three Years Duration

DISTRICT 7 A&E OUTREACH CONSTRUCTION INSPECTION SUPPORT SERVICES

Project Map

DISTRICT 7 A&E OUTREACH CONSTRUCTION INSPECTION SUPPORT SERVICES

Excluded Projects

The work shall be performed on projects to improve the State transportation system in Ventura County and Route 5 in Los Angeles County in District 7. The approximate boundary of the contract: Ventura County within county lines and Route 5 from Route 134 to Orange County Line excluding the following projects:

EA Co Rt Limits Description21591 LA 5 01.2/02.1 WIDEN AND REALIGN FREEWAY21592 LA 5 00.0/01.5 ROADWAY WIDENING (SEG 2)21593 LA 5 02.7/04.0 ROADWAY WIDENING (SEG 3)21594 LA 5 04.0/05.8 ROADWAY WIDENING (SEG 4)21595 LA 5 05.8/06.8 ROADWAY WIDENING & STRIPING (SEG 5)2159C LA 5 01.8/03.0 WIDEN AND REALIGH FREEWAY WITH PCC25350 LA 5 06.8/11.6 REPLACE BEAM WITH TYPE 60 BARRIER24690 LA 5 13.6/18.5 HIGHWAY PLANTING AND IRRIGATION28420 LA 5 18.2/26.7 VINE PLANTING12184 LA 5 26.7 /36.4 CONSTRUCT HOV LANE1786A LA 5 27.4/28.1 MODIFY INTERCHANGE23750 LA 5 23.6/23.8 WIDEN HYPERION OVERCROSSING2777U LA 5 25.2/27.5 ERROSION CONTROL

DISTRICT 7 A&E OUTREACH CONSTRUCTION INSPECTION SUPPORT SERVICES

• ADA Curb Ramp• Install Treatment BMPS Devices• Interchange Improvement• Modify Signal & Widen Intersection• Pavement Preservation, Slab Replacement,

Shoulder• Pavement Rehabilitation• Preventive Maintenance• PSSR for BMP’s in Ventura Trash TMDL• Repair Slope Failure• Road Widening *SEPA• Roadway Improvements• Seawall Restoration• Slab Replacement and CP & OL AC• Sub-Scour MIT and Railing Upgrade• Upgrade ADA Ramps & Accessibility• Upgrade Ramp Metering System• Widen Roadway with PJCP Over

Project Descriptions

DISTRICT 7 A&E OUTREACH CONSTRUCTION INSPECTION SUPPORT SERVICES

Personnel Requirements for Construction Inspection/ CPM Analysis Contract:

• Contract Manager• Construction Inspectors• Office Engineers• CPM Schedulers

DISTRICT 7 A&E OUTREACH CONSTRUCTION INSPECTION SUPPORT SERVICES

Tentative Contract Procurement Schedule

• RFQ Advertise: Late October 2014• Contract Award: January 2015

(This is a Tentative Schedule and May Be Subject to Change)

DISTRICT 7 A&E OUTREACH CONSTRUCTION INSPECTION SUPPORT SERVICES

DPAC Presentation

Pilot Procurement Process

DPAC

Navigating the Caltrans Webwww.dot.ca.gov

Look Ahead Report List of Currently Advertised

Contracts Pilot Selection Process

DPAC WEBSITE

www.dot.ca.gov

www.dot.ca.gov

http://caltrans-opac.ca.gov/

http://caltrans-opac.ca.gov/aeinfo.htm

http://caltrans-opac.ca.gov/ae/doc/lookahead.pdf

http://caltrans-opac.ca.gov/aeinfo.htm

Pilot Selection ProcessCHANGES TO EXISTING PROCESS

Consensus scoringSOQ used during initial and final evaluationSOQ attached to the contract for transparencyQuestions provided to consultant before InterviewRelevant projects based on individuals5 of 10 relevant projects require verification and reference

checkWeights of final evaluation criteria revised

DISTRICT 7 A&E OUTREACH CONSTRUCTION INSPECTION SUPPORT SERVICES

Questions & Answers