CALTRANS SMALL BUSINESS COUNCIL MEETINGTuesday, August 15, 2017
1:00 p.m. – 2:30 p.m. District 4 – Executive Conference Room, 15-240
111 Grand Avenue, Oakland, CA 94612
Participants: Bijan Sartipi, Chairperson, Members of the Caltrans Small Business Council; Other Caltrans Management Staff and Guests
Special Guest(s):
Time Agenda Item Presenter
1:00 p.m. Item #1: Welcome/ Introductions Bijan Sartipi, District Director
1:10p.m. Item #2: Approval of June 20th, 2017 Meeting Minutes
Bijan Sartipi, District Director
1:20p.m.
Item #3: District 4 Update A Look Ahead at Upcoming Projects:
Construction Projects
Maintenance Projects
Design Projects
Architectural & Engineering Contracts
OBEO
Small Business Update
Ray Pang, Supervising Transportation Engineer: Construction
Stanley Ng, District Branch Chief: Maintenance
Lenka Culik-Caro, Deputy District Director: Design
Romy Fuentes, District Branch Chief, Transportation Engineer
Kelly Schluter, Business Outreach Specialist: OBEO Training & Outreach Branch
Osayahde Nesbitt, Small Business Program
2:20 p.m. Item #4: Review of Action Items Prejit Rai- Deputy District Director: Administration/Business Mgmt.
2:25 p.m. Item #5: New Business Bijan Sartipi, District Director
2:30 p.m Adjourn: Next Meeting – Oct 17th, 2017 Bijan Sartipi, District Director
FORECAST OF UPCOMING CONSTRUCTION PROJECTS IN DISTRICT 04 AS OF AUGUST 7, 2017
# EA RTE WORK DESCRIPTION ENGR'S EST WD PE A+B RTL AD BO DBE GOAL
DVBE GOAL COMMENTS
1 4H0101 880 Roadside slope area paving $1,720,000 60 03/22/2017 07/10/2017 08/08/2017 12.002 1SS431 880 Install pressure grouting $3,760,000 100 Y 04/05/2017 07/17/2017 08/09/2017 3.003 4G7901 580 Rehabilitation bridge deck, replace bridge railing $2,240,000 180 Y 03/21/2017 07/17/2017 08/15/2017 9.004 3G3051 80,84,92 Replace navigation and decorative lights, radar beacons and foghorns $4,030,000 250 06/07/2017 07/03/2017 08/24/2017 3.005 4G4901 29 Concrete barrier, HMA pavement, drainage improvements $740,000 60 03/02/2017 08/07/2017 08/30/2017 11.006 3G3641 580 Upgrade electrical substations $7,400,000 200 06/12/2017 07/03/2017 09/07/2017 Incentive DVBE participation incentive up to $250,0007 4G0561 680 Roadway rehab, bridge replacement, ret. walls, toll systems $120,000,000 700 06/28/2017 08/14/2017 10/03/2017 12.00
TOTAL $139,890,000
# EA RTE WORK DESCRIPTION ENGR'S EST WD PE A+B RTL AD BO DAYS BID LOW BID APPARENT LOW BIDDER DBE GOAL
DVBE GOAL
DBE CERT
DVBE CERT COMMENTS
1 3S9101 1 Construct roadway and soldier pile tie back wall $3,902,968 90 06/28/2017 07/05/2017 07/13/2017 $3,686,540 THOMPSON BUILDERS CORPORATION 9.002 4H8601 152 Install rumble strip and pavement delineation $1,308,280 90 02/01/2017 07/03/2017 07/26/2017 $1,008,000 CAL STRIPE, INC 14.003 2J6601 237 Widen existing shoulder west bound and modify median island $1,041,457 60 04/21/2017 07/03/2017 08/02/2017 $1,242,301 GRANITE CONSTRUCTION COMPANY 14.00
TOTAL $6,252,705 TOTAL $5,936,841
# EA APPARENT LOW BIDDER APPARENT LOW BIDDER'S LISTED SUBS AT TIME OF BID1 3S9101 THOMPSON BUILDERS CORPORATION AVAR, BULLSEYE BORING, CAL-CON PUMPING, CHRISP, HUTCHISON ELECTRICAL, JARRETT FOUNDATIONS, NITTA EROSION CONTROL, R & S TRUCKING, RUPERT CONST. SUPPLY, SONOMA REINFORCING, WK MCCLELLAN2 4H8601 CAL STRIPE, INC MANERI TRAFFIC CONTROL, PAVEMENT RECYCLING SYSTEMS, STORMWATER SERVICES3 2J6601 GRANITE CONSTRUCTION COMPANY CMC, COLUMBIA ELECTRIC, HIGHWAY SPECIALTY CO., SUPER SEAL & STRIPE
# EA RTE WORK DESCRIPTION ENGR'S EST WD PE A+B RTL AD BO DAYS BID AWARD AMOUNT AWARDED TO DBE
GOALDVBE GOAL
DBE CERT
DVBE CERT
AWARDED DATE COMMENTS
1 3S9001 1 Construct roadway and soldier pile wall with ground anchors $4,925,902 120 06/28/2017 07/05/2017 07/13/2017 $4,469,753 THOMPSON BUILDERS CORPORATION 07/21/20172 4J3401 80 Cold plane and overlay pavement, install guardrail and curb ramps $31,792,944 350 Y 03/02/2017 04/03/2017 06/15/2017 210 $33,384,923 O.C. JONES & SONS, INC. 14.00 13.41 07/24/2017
TOTAL $36,718,846 TOTAL $37,854,676
# EA AWARDED TO APPARENT LOW BIDDER'S LISTED SUBS AT TIME OF BID1 3S9001 THOMPSON BUILDERS CORPORATION AVAR, BULLSEYE BORING, CHRISP, HUTCHISON ELECTRICAL, JARRETT FOUNDATIONS, NITTA EROSION CONTROL, SONOMA REINFORCING2 4J3401 O.C. JONES & SONS, INC. ABSL, BRADLEY TANKS, CENTRAL STRIPING, FARWEST SAFETY, MIDSTATE BARRIER, NOR-CAL CONCRETE, SPIRIT ROAD OILS, ST. FRANCIS ELECTRIC
# EA RTE WORK DESCRIPTION ENGR'S EST WD PE A+B RTL CTC Vote Date COMMENTS
1 3G4421 80 Replace existing dampers and modify related brackets $22,221,000 600 09/13/2016 N/A BATA funded2 4H5801 880 Rehabilitate pavement $47,443,000 375 05/30/2017 08/17/20173 1G8701 152 Drainage improvements and shoulder widening $4,463,000 90 06/08/2017 08/17/20174 4H2001 29 Repair pavement and ada improvement $18,629,000 150 Y 06/14/2017 08/17/20175 3G2101 101, 131 Reconstruct curb ramps $992,000 80 06/14/2017 08/17/20176 4H7511 80, 82, 130, 152 Install pedestrian hybrid beacon system and reconstruct curb ramps $4,547,000 120 Y 06/16/2017 08/17/2017
7 1G8401 116 Reconstruct curb ramps and sidewalks $3,241,000 90 06/19/2017 08/17/2017
8 4G8501 1 Replace pedestrian overcrossing $4,412,000 140 Y 06/20/2017 08/17/2017
9 0J0001 4, 13, 24, 61 80 Pedestian crosswalk upgrade $1,841,000 220 Y 06/21/2017 08/17/2017
10 4G9801 4, 24 Construct mvp, gore paving, and vegetation control $5,801,000 220 Y 06/26/2017 08/17/2017
11 4G8001 580 Bridge deck rehabilitation $2,613,000 150 Y 06/26/2017 08/17/2017
12 4G8101 242 Rehabilitation bridge deck, replace bridge railing $1,944,000 140 Y 06/29/2017 08/17/2017
13 4G8711 101 Bridge scourmitigation $889,000 60 250 06/30/2017 08/17/2017
14 4G2201 12 Roadway surfacing, concrete barrier, and signal and lighting $7,000,000 220 Y 06/30/2017 08/17/2017
15 4G1151 680 Ramp metering and traffic operation systems (TOS) $13,234,000 240 06/30/2017 08/17/2017
16 4H2101 1 Asphalt concrete surfacing, grind PCC pavement $14,710,000 150 Y 06/30/2017 08/17/2017
17 4H8701 1, 29 Construct centerline rumble strip, widen ac shoulders $3,864,000 100 Y 06/30/2017 08/17/2017
18 2J0301 4 Highway planting and irrigation system $1,300,000 230 750 06/30/2017 TBD
19 2G3501 280 Install flashing beacons, improve signing and striping $802,000 45 06/30/2017 TBD
20 2537H1 680 Replacement highway planting $1,999,000 180 750 06/30/2017 TBD
21 3G1401 29, 128 Construct ADA curb ramps $1,165,000 150 Y 07/03/2017 08/17/201722 3G6031 680 Pavement rehabilitation and ramp metering $29,023,000 350 Y 07/05/2017 TBD23 4G8901 580 Bidge seismic retrofit $10,400,000 310 07/07/2017 TBD
TOTAL Estimated Cost $192,133,000
# EA RTE WORK DESCRIPTION ENGR'S EST WD PE A+B Target RTL
TOTAL Estimated Cost
CCAla
MrnCC
SM
Ala
Mrn, Nap
CC
CC
Nap
Ala
AlaAla
SF,SMNap
CC,MrnAla
ADVERTISED AND UPCOMING PROJECTS
PROJECTS BID OPENED / CURRENTLY AWAITING AWARD
PROJECTS AWARDED (SINCE FORECAST SPREADSHEET DATED JULY 5, 2017)
CO
CO
Ala
SCl
NOTE: BID INFORMATION CAN BE OBTAINED AT THE FOLLOWING WEBSITE:
SF
CO
CO
SCl
Mrn
http://www.dot.ca.gov/hq/esc/oe/bidsopened.html
SCl
Mrn
Mrn
Son
Ala
SCl, SF
Son
Ala, CC
SM
PROJECTS READY TO LIST BUT NOT FUNDED FOR ADVERTISEMENT YET
PROJECTS PLANS, SPECIFICATIONS, AND ESTIMATES (PS&E) COMPLETED. UNDER QUALITY ASSURANCE REVIEW (NOT RTL YET)
CO
CC
Ala
SCl
Nap
page 1 / 1 Downloaded from DESOE Database on 8/7/2017
District 4 Emergency Contracts Small Business Utilization FY 16/17 Report
(End of Fiscal Year Report) Prepared by Division of Maintenance
Total: $250,808,000
Director’s Orders Force Account/ELB
1
District 4 Emergency Contracts Small Business Utilization FY 16/17 Report
(End of Fiscal Year Report) Prepared by Division of Maintenance
2
No. CO RTE PM EA Prime Contractor Type Subcontractors Description of Work Amount
1 Ala 123 0.2 2K4604 OC Jones ELB
ABSL (SBE/DBE)ChrispSchotka (SBE/DBE)Cal-Vet (DVBE)Nor-CalJensen DrillingSt. Francis ElectricStatewide Safety
install dewatering drains, underdrains, and reconstruct pavement, MacArthur Boulevard, Oakland
$ 5,850,000
2 Son 101 0.7/2.6 2K2304 Ghilotti Brothers FACal-Vet (DVBE)Team EES (DVBE)
construct RSP at four slide locations, Skinner Road to Kastania Road, Petaluma
$ 4,200,000
3 var var var 2K2504 Professional Tree (SBE) FA TBDremove dead and dying trees due to drought in Lake, Marin, Napa, Solano, and Sonoma counties
$ 3,400,000
4 SM 1 39.6/40.1 2K9104Pacific States Environmental
ELB
Mountain CascadeBleycoInternational Lining TechnologySelby's Soil Erosion Control (SBE)Sapper West (DVBE)
mitigation site restoration, Devil's Slide Tunnel, Pacifica
$ 1,975,000
5 Son 1 15.3/15.6 1K7904 Ghilotti Construction Supp
Bentancourt Brothers (SBE)Case PacificChrisp CompanyFarwest Safety (SBE)
construct RSP, inject grout, and reconstruct pavement, Gleason Beach, Jenner
$ 1,950,000
6 var var var 1K8404 Atlas Tree (SBE) FABay Area Traffic SolutionsCoast Ridge Ecology (SBE)
remove dead and dying trees due to drought in San Francisco, San Mateo, and Santa Clara counties
$ 1,450,000
7 Mrn 1 14.4/14.5 2K5104 Argonaut ELBRoll 'N Rock Construction (DVBE)Western Tree Removal SpecialistsAC Dike Company
shift pavement due to washout, Bolinas Lagoon, north of Stinson Beach
$ 1,100,000
8 var var var 1K4804 Bay Area Tree (SBE) FA Bay Area Traffic Solutionsremove dead and dying trees due to drought in Alameda and Contra Costa counties
$ 760,000
9SMSCl
var var 4A9244 Mike Brown Electric Repl TBDinstall traffic systems, various routes and locations in San Mateo and Santa Clara counties
$ 675,000
10 SF 80 8.3 3K1104 CEC ELS TBDre-grout anchor rods, San Francisco-Oakland Bay Bridge eastern span tower
$ 8,478,000
11 Ala 13 6.5/9.1 2K1804 Disney ELB TBDreplace bridge steel baluster railing with concrete railing, Lincoln Avenue to Broadway Terrace, Oakland
$ 6,510,000
12 SF 80 6.1 3G4454 Dutra ELB TBDreconstruct fender, San Francisco-Oakland Bay Bridge pier W4
$ 3,250,000
13SClSM
28084
2.9/4.427.9
1K5204 Yerba Buena EFA TBDpump station repairs in San Jose and Ravenswood
$ 2,220,000
14 Mrn 101 6.0/6.9 1K6304 Gordon Ball ELB TBDrepair slope and construct drainage at slope wash out, Tamalpais Drive, Corte Madera
$ 1,500,000
15 SF 80 7.8 2K9604 Golden State Bridge ELB TBDrepair tunnel wall concrete, drainage, and joint seals, San Francisco-Oakland Bay Bridge, Yerba Buena Island tunnel
$ 1,400,000
16 SM 101 11.9 3K1304 Valentine (SBE/DVBE) ELB TBDreplace joint seal assembly, Route 92 connector, San Mateo
$ 500,000
17 SCl 680 1.7 3K3804 Pipe & Plant Solutions ELB TBDreplace pumps and controls, Alum Rock Avenue (Route 130), San Jose
$ 400,000
18 CC 4 22.8/23.8 0K8704 Suarez & Munoz (SBE) Supp Advanced Trenchless (SBE)convert irrigation system to recycled water use, Railroad Avenue, Pittsburg
$ 200,000
19 Mrn 1 10.8/10.9 4K2404 Drill Tech EFA TBDconstruct soldier pile wall, south of Panoramic Highway north junction, Stinson Beach
$ 16,900,000
20 Mrn 37 11.7/12.0 4K3304 Ghilotti Construction EFA TBDregrade AC pavement, construct drainage, and construct concrete barrier, Route 101 to Novato Creek, Novato
$ 8,000,000
21 Mrn 1 4.0/5.0 4K2604 Maggiora Ghilotti EFA TBDtwo soldier pile walls and replace culvert, north of Panoramic Highway south junction, Muir Beach
$ 7,000,000
22 SM 84 15.4/16.1 4K1604 Granite Construction EFA TBDconstruct soldier pile and tie-back walls, Grandview Drive and Friars Lane, La Honda
$ 6,500,000
1st Quarter
FY 2016/17 Director's Order - Force Account and ELB
2nd Quarter
3rd Quarter
3
No. CO RTE PM EA Prime Contractor Type Subcontractors Description of Work Amount
23 Ala 13 4.4 4K4704 RGW EFA TBDsoldier pile wall, Mountain Boulevard, Oakland
$ 6,000,000
24 SM 35 11.5 4K5504 ACC West Coast EFA TBDsheet pile wall and two tie-back walls, Morse Lane, Skylonda
$ 6,000,000
25 Son 1 25.1/25.2 4K3904 Gordon Ball EFA TBDconstruct soldier pile wall, north of Muniz Ranch Road, Jenner
$ 5,000,000
26 SCl 9 0.0/5.0 4K2704 Granite Rock EFA TBD
sheet pile walls, anchored drapery, off-haul slide debris, repair AC pavement, Santa Cruz County line to Sanborn Road, Saratoga
$ 4,880,000
27 SM 35 9.8/9.9 4K4804 Disney EFA TBDconstruct tie-back wall and soilnail wall, Chapman Road, Skylonda
$ 4,000,000
28 SCl 35 9.5 4K7104 Granite Rock ELB TBDtie-back wall, Las Cumbres Road, Los Gatos
$ 3,000,000
29 SCl 130 9.3 4K6804 Flatiron EFA TBDsoldier pile wall and sheet pile wall, Quimby Road, San Jose
$ 3,000,000
30 SM 1 17.0/17.5 4K4604 RGW EFA TBDconstruct tie-back wall and RSP, south of Route 92, Pescadero
$ 3,000,000
31 Son 101 37.1/37.2 4K4504 DeSilva Gates EFA TBDsoldier pile wall, Dry Creek Road, Healdsburg
$ 3,000,000
32 Mrn 1 33.4 4K5004 Team Ghilotti ELB TBDsheet pile wall and bio-armoring, Millerton Gulch, Point Reyes Station
$ 2,600,000
33 SCl 17 5.8 4K2304 AVAR ELB TBDsoilnail wall, North Santa Cruz Avenue, Los Gatos
$ 2,600,000
34 Mrn 1 1.6/2.5 4K4904 Ghilotti Brothers EFA TBDtwo sheet pile walls and install RSP, Shasta Way to California Avenue, Mill Valley
$ 2,500,000
35 SCl 152 1.5 4K3804 Bay Cities EFA TBDoff-haul slide debris, grading, construct debris barrier, east of Pole Line Road, Gilroy
$ 2,500,000
36 Son 128 1.3 4K4304 Valentine (SBE/DVBE) EFA TBDconstruct tie-back wall, west of North Cloverdale Avenue, Cloverdale
$ 2,500,000
37 SCl1785
1.6/3.111.1
4K4104 Case Pacific EFALane Safety (SBE)Pacific Boring (SBE)
replace failed culvert and grout underground voids, Idylwild Road and Winchester Boulevard, Los Gatos
$ 2,100,000
38 Ala 13 9.2/10.3 4K2504 Granite Construction EFA TBDreplace failed culvert and grout underground voids, Route 24 interchange and Bridge Road, Oakland
$ 2,000,000
39 Ala 580 1.5/3.9 4K2504 Bay Cities EFA TBDAC digouts and overlay, Grant Line Road to North Flynn Road, Livermore
$ 2,000,000
40 SCl 152 17.0 4K4204 Condon-Johnson EFACal Safety (SBE)Redgwick (SBE)
sheet pile wall and RSP, Bloomfield Avenue, Gilroy
$ 2,000,000
41 SF 80 8.3 3K5004 CEC EFA TBDreplace anchor rods and nuts, San Francisco-Oakland Bay Bridge eastern span tower
$ 2,000,000
42 Son 128 16.2/16.4 4K2004 Ghilotti Construction EFA TBDRSP, bio-armoring, and secant wall, Maacama Creek to Kreck Road, Kellogg
$ 2,000,000
43 SM 35 13.1 4K2104 Golden State Bridge EFA TBD tie-back wall, Bear Creek Road, La Honda $ 1,800,000
44 Sol 113 1.5/5.5 4K1704 Teichert EFA TBDreplace five culverts, Flannery Road to north of Creed Road, Dixon
$ 1,500,000
45 Son 1 31.4/31.9 4K6604 Piazza (SBE) EFA TBDtwo sheet pile walls, Fort Ross Road, Fort Ross
$ 1,500,000
46 SCl 35 9.5/10.5 4K6404 Redwood Eng. (SBE) EFA TBDtraffic control, detour traffic, site mangement, Las Cumbres Road, Los Gatos
$ 1,000,000
47 Son 116 43.3 4K2904 Engelke (SBE) EFA TBDconstruct geosynthetic reinforced embankment, Arnold Drive, Schellville
$ 1,000,000
4
No. CO RTE PM EA Prime Contractor Type Subcontractors Description of Work Amount
48 Sol 128 0.4/0.5 4K1804 Vintage Paving (SBE) EFA TBDblasting, scaling, and repair AC pavement, west of Yolo County line, Lake Berryessa
$ 800,000
49 SM 101 3.5/12.6 4K3204 O'Grady Paving EFA TBDAC digouts and overlay, Whipple Avenue to Route 92, Redwood City
$ 700,000
50 Nap 128 17.8 4K4304 Pridmore Brothers (SBE) EFA TBDgrading and off-haul slide debris, Berryessa Knoxville Road, Napa
$ 400,000
51 SCl 35 10.5 4K8004 Disney ELB TBDsoldier pile walls, north of Las Cumbres Road, Los Gatos
$ 27,610,000
52 Mrn 1 11.5 0P1304 Ghilotti Construction ELB TBDsoldier pile wall, Panoramic Highway north junction, Stinson Beach
$ 8,000,000
53 SM 84 16.3/17.6 0P4904 CEC ELBBentancourt Brothers (SBE)Hillside Drilling (SBE)
soldier pile walls, east of Friars Lane, Skylonda
$ 4,330,000
54 Mrn 1 22.8 4K8504 Valentine (SBE/DVBE) ELB nonereplace culvert and construct sheet pile wall, Giacomini Creek, Olema
$ 4,000,000
55 Ala 880 16.5/30.0 4K5704 Bay Cities EFA ABSL (SBE/DBE)AC paving, Jackson Street to 16th Avenue, Hayward
$ 3,970,000
56 Mrn 1 8.2/8.5 4K8404 Thompson Builders EFA TBDconstruct two soldier pile walls, north of Slide Ranch
$ 3,790,000
57 SM 1 13.5/15.1 0P1604 Yerba Buena ELB TBDconstruct gabion wall, RSP, and sheet pile wall, Pescadero Creek Road, Pescadero
$ 3,600,000
58 CC 24 8.0/9.0 4K5904 OC Jones ELB TBDAC digouts and overlay, Pleasant Hill Road to Route 680, Walnut Creek
$ 2,800,000
59 CC 680 12.7/17.6 4K2204 Granite Rock ELB TBDAC planing and overlay, Rudgear Road to Monument Boulevard, Walnut Creek
$ 2,600,000
60 Ala 84 22.2/22.5 4K7604 RJ Gordon (SBE) ELB TBDRSP and erosion control, west of Ruby Hills Drive, Fremont
$ 2,450,000
61 Mrn 1 8.1 4S6604 Thompson Builders EFA TBDconstruct soldier pile wall, Cold Stream Road, Slide Ranch
$ 2,200,000
62 Sol 12 7.4/17.1 4K6504 Ghilotti Brothers ELB
Cal Vet (DVBE)Wells Sweeping (DVBE)Team EES (DVBE)Verux (SBE)Farwest Safety (SBE)
AC digouts, Lawler Ranch Parkway to Olsen Road, Fairfield
$ 2,200,000
63 SM 92 0.9 0P1504 RGW ELB TBDsoldier pile wall, east of Main Street, Half Moon Bay
$ 2,000,000
64 Sol 113 4.0/17.0 4K9404 Ghilotti Construction ELBABSL (SBE/DBE)Centerline Striping (SBE)
AC paving, Creed Road to Midway Road, Dixon
$ 1,800,000
65 Ala 185 0.4/3.2 4K5604 Bay Cities ELB TBDAC digouts, A Street to Plaza Drive, Hayward
$ 1,750,000
66 Son 116 39.9/40.1 4K9604 Piazza (SBE) ELB TBDreconstruct embankment with lightweight fill, Lakeville Highway, Petaluma
$ 1,700,000
67SMSF
10117.5/26.10.0/1.8
4K2804 CF Archibald (SBE) ELB TBDAC planing and overlay, Millbrae Avenue to Silver Avenue, Millbrae to San Francisco
$ 1,500,000
68 Mrn 1 35.3 4K8604 Argonaut ELB TBDreplace culvert and reconstruct embankment, south of Marshall-Petaluma Road, Marshall
$ 1,400,000
69 Nap 121 17.4/18.4 0P1404 GD Nielson (SBE/DBE) ELB TBDreplace culverts, south of Waters Road, Napa
$ 1,400,000
70 SCl 35 12.4 4K9304 Granite Rock ELB TBDjack culvert, north of Las Cumbres Road, Los Gatos
$ 1,400,000
71 Ala 238 14.4/16.6 0P2004 Alaniz (SBE) ELB Anrak (SBE)AC planing and overlay, Route 880 to Route 580, San Leandro
$ 1,250,000
72 SM 280 8.5/10.0 0P2504 RGW ELB TBDreplace culverts, Edgewood Road to Route 92, Woodside
$ 1,220,000
4th Quarter
5
No. CO RTE PM EA Prime Contractor Type Subcontractors Description of Work Amount
73 Ala 580 36.8/38.5 4K9204 Redgwick (SBE) ELB nonereconstruct embankment, Oak Knoll Boulevard to Seminary Drive, Oakland
$ 1,150,000
74 Mrn 1 0.1 0P0004 QA Constructors (SBE) ELB TBDmodify drainage and repair electrical and pavement, Route 101 interchange, Mill Valley
$ 1,100,000
75 SCl 101 26.7 0P4604 Eaglelift (DVBE) EFALane Safety (SBE)QA Constructors (SBE)
injection grouting, Route 85 interchange, San Jose
$ 1,100,000
76 SCl 101 52.2 4K7904 Flatiron ELB TBDreplace reinforced concrete girder, Embarcadero Road, Palo Alto
$ 1,050,000
77 SCl 152 7.9/9.4 4K6204 QA Constructors (SBE) ELB TBDplane and overlay AC, Santa Teresa Boulevard to Monterey Road, Gilroy
$ 1,000,000
78 Son 101 1.2 4K3604 Ghilotti Brothers EFA
Cal Vet (DVBE)Wells Sweeping (DVBE)Team EES (DVBE)Verux (SBE)
construct RSP, Tunzi Road, Petaluma $ 1,000,000
79 SM 280 20.4 0P2804 Redwood Eng. (SBE) ELB TBDreplace culverts and construct RSP, Cedar Mills Lane, San Bruno
$ 850,000
80 CC 80 10.7/13.0 4K6104 Vanguard ELB
Cal Vet (DVBE)Tri-Valley Water and Trucking (SBE)Global Environmental Network (SBE)Bayline Cutting and Coring (SBE)
replace PCC pavement, Willow Avenue to Cummings Skyway, Hercules
$ 840,000
81 SM 35 26.1/28.9 0P2604 Yerba Buena ELB TBDreplace culverts and construct RSP, Fleetwood Drive to Highgate Drive, Daly City
$ 800,000
82 SM 84 7.8 4K8904 JMB ELB TBDconstruct RSP, Pescadero Creek Road, La Honda
$ 800,000
83 CC 680 0.0/7.5 2K2204 Vanguard ELBCal Vet (DVBE)Tri-Valley Water and Trucking (SBE)Global Environmental Network (SBE)
replace PCC pavement, Alcosta Boulevard to Diablo Road, San Ramon
$ 700,000
84 Ala 680 0.4 0P2104 GN Henley (SBE) ELB TBD construct RSP, Scott Creek Road, Fremont $ 600,000
85 SM 84 12.0/12.5 4K9004 Redwood Eng. (SBE) ELB TBDAC paving and replace culvert, west of Grandview Drive, Skylonda
$ 450,000
86 Sol 220 2.1 0P7804 Vintage Paving (SBE) EFA TBDconstruct shoulder backing, East Ryer Road, Ryer Island
$ 400,000
87 Son 12 17.6/18.5 0P1804 Ghilotti Brothers ELB
Farwest Safety (SBE)Team EES (DVBE)Cal-Vet (DVBE)Wells Sweeping (DVBE)
AC paving, Farmers Lane to Mission Boulevard, Santa Rosa
$ 400,000
- Update since previous reportFA - Force Account (No Bid)ELB - Force Account (Bid Markups)ELS - Lump Sum BidRepl - FA to replace defaulted contractorSupp - Supplemental
6
District 4 Emergency Contracts Small Business Utilization FY 16/17 Report
(End of Fiscal Year Report) Prepared by Division of Maintenance
Total: $5,915,000
District Director’s Orders Force Account
7
No. CO RTE PM EA Contractor Amount Description of Work
1 Mrn 101 3.6 3K0904 Case Pacific $200,000 repair separated culvert and inject grout, Donohue Street, Marin City
2 SF 101 3.0 2K2704 Golden State Bridge $200,000 repair hole in bridge deck, Cesar Chavez Street, San Francisco
3NapSol
12832.0/34.20.0/0.7
2K9304 Teichert $150,000 replace fire-damaged guardrailing and install access gates, Lake Berryessa, Napa/Solano County line
4 Ala 880 28.0/29.2 3K9904 Myers and Sons $291,000 replace PCC slabs, 23rd Avenue to 29th Avenue, Oakland
5 Nap 121 12.7 3K2504 GD Nielson (SBE/DBE) $291,000 replace failed culvert, Vichy Avenue, north of Napa
6 SCl 101 7.5/15.1 3K2204 ABSL (SBE/DBE) $291,000 replace PCC slabs, Leavesley Road to Tennant Avenue, near Gilroy
7 SCl 101 0.9 4K0303 Granite Rock $291,000 install K-railing, Sargents Bridge, south of Gilroy
8 SF 80 6.3 2K5604 Myers and Sons $291,000 refill leaking seismic dampers, San Francisco-Oakland Bay Bridge
9 SM 380 6.4 3K1904 Valentine (SBE/DVBE) $291,000 replace failed joint seal, Route 101 connector, South San Francisco
10 Son 12 14.5 3K2604Groundwater Pump & Well (SBE)
$291,000 replace failed pumps, Stony Point Road, Cotati
11 Son 101 15.1 3K4704 Vintage Paving (SBE) $200,000 replace AC pavement, Commerce Boulevard, Rohnert Park
12 Nap 121 14.7 4K0104 Gordon Ball $150,000 remove slide debris and repair AC pavement, Wooden Valley Road, north of Napa
13 SM 280 20.4 3K4804Redwood Engineering Construction (SBE)
$150,000install drainage and erosion control, Cedar Mills Lane, San Bruno
14 CC 4 20.9/21.4 3K6804 ABSL (SBE/DBE) $291,000 replace PCC slabs, Railroad Avenue to Bailey Road, Pittsburg
15 Mrn 1 43.3 4K5104 Rege (SBE) $291,000 replace culvert, Snake Road, Tomales
16 SCl 101 0.9 4K0304 Granite Rock $291,000 install temporary K-railing at Sargents Bridge, north of the San Benito County line
17 SCl 280 1.7/4.0 4K1004North American Fence and Railing (SBE)
$291,000install security fencing, 4th and 5th streets and Macredes Avenue, San Jose
18 SM 84 3.5 3K5304 Andreini Brothers (SBE) $291,000 replace failed culvert, Bear Gulch Road, San Gregorio
19 Ala 680 6.3 4K7204 Vanguard $200,000 repair hole in bridge deck, Mission Boulevard, Fremont
20 SM 280 4.5 4K1204Redwood Engineering Construction (SBE)
$100,000 replace failed sewer pipe, Woodside Maintenance Station
21 Mrn 101 5.7 0P0204 Vintage Paving (SBE) $291,000 replace AC pavement, East Blithedale Avenue, Mill Valley
22 SF 1 5.9/6.3 4K5304 Hanford ARC (SBE) $291,000 construct RSP and repair drainage, Mountain Lake, San Francisco
23 SM 84 6.2 0P2204 Vanguard $291,000 replace bridge railing, San Gregorio Creek Bridge, San Gregorio
24 Nap 121 12.9 4K9904 GD Nielson (SBE/DBE) $200,000 replace culvert, Vichy Avenue, Napa
- Update since previous report
No. CO RTE PM EA Contractor Amount Description of Work
1 Mrn 1 6.6 3S9004 Thompson Builders $6,230,000 construct soldier pile wall, Muir Beach
2 Mrn 1 7.7/7.8 3S9104 Gordon Ball $6,100,000 construct soldier pile wall, Slide Ranch
- Update since previous report
4th Quarter
None
FY 2016/17 Director's Order - Informal Bid
1st Quarter
2nd Quarter
None
3rd Quarter
None
FY 2016/17 District Director's Order - Force Account
1st Quarter
2nd Quarter
3rd Quarter
4th Quarter
8
0 500 6,010 7,1609,350 7,2554,460
25,30018,150
37,378 28,810
218,348
34%
17%
27%
13%
0% 1%
15%
3%
0%
5%
10%
15%
20%
25%
30%
35%
40%
0
50,000
100,000
150,000
200,000
250,000
300,000
2013/14 2014/15 2015/16 2016/17
SBEan
dMBPe
rcen
tages
Dollars($1,00
0)
Fiscal Year
D 4 SBE UtilizationDirector's Orders FA/ELB
Non SBE
SBE (non MB)
MB
% SBE &MB
% MB
9
190
9431,253 1,123
1,252
1,605
2,046
2,437
1,010
1,224
1,885
2,355
59%
68%
64%
60%
8%
25%24%
19%
0%
10%
20%
30%
40%
50%
60%
70%
80%
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
2013/14 2014/15 2015/16 2016/17
SBEan
dMBPe
rcen
tages
Dollars($1,00
0)
Fiscal Year
D 4 SBE UtilizationDistrict Director's Orders
Non SBE
SBE (non MB)
MB
% SBE & MB
%MB
10
District 4 Emergency Contracts Small Business Utilization FY 17/18 Report
(As of 08/08/17) Prepared by Division of Maintenance
Total: $8,380,000
Director’s Orders Force Account/ELB
11
No. CO RTE PM EA Prime Contractor Type Subcontractors Description of Work Amount
1 Mrn 1 7.8 4K6904 Not Yet Awarded EFA TBDsoldier pile wall, Cold Streamfire Road, Muir Beach
$ 2,400,000
2 Ala24980
4.4/6.01.5/2.0
4K7404Bay Cities Paving and Grading
EFA TBDAC planing, digouts, and overlay, 27th Street to Caldecott Tunnel, Oakland
$ 1,500,000
3 SCl 237 3.0 0P5204 Not Yet Awarded ELB TBDreconstruct portion of bridge deck, diaphragm, and girder, North Mathilda Road, Sunnyvale
$ 1,050,000
4 Ala 84 12.0/13.0 0P0104 Not Yet Awarded ELB TBDconstruct rockfall fence, Palomares Road, Fremont
$ 1,000,000
5AlaCC
980424
var 0P5604 Not Yet Awarded ELB TBDinstall BASE radio links at various locations in Oakland, Orinda, and Clayton
$ 750,000
6 Nap 121 16.7/20.3 1K8004 Gordon Ball Supp
Statewide SafetyBentancourt (SBE)DrilltechChrispCase PacificEngeo
construct soldier pile wall, Wooden Valley Road, Napa
$ 700,000
7 Sol3780
9.826.6
0P3304 Not Yet Awarded ELB TBDreplace joint seals and elastomeric bearing pads, at Ulatis Creek and the Routes 29/37 interchange, Fairfield and Vallejo
$ 680,000
8 SF 80 8.2/8.6 0K6914 Golden State Bridge Supp nonerepair leaking grease caps, install bird barriers, install access, San Francisco-Oakland Bay Bridge Eastern Span
$ 300,000
FA - Force Account (No Bid)ELB - Force Account (Bid Markups)Supp - Supplemental
No. CO RTE PM EA Contractor Amount Description of Work
1 SCl 680 1.7 0P7904 Pipe and Plant Solutions $291,000 provide temporary pumping, Alum Rock Avenue, San Jose
1st Quarter
FY 2017/18 Director's Order - Force Account and ELB
FY 2017/18 District Director's Order - Force Account
1st Quarter
12
Proposed Projects under $291,000 not funded from the Minor B Program, to be Advertised under the Small Business Process FY17/18 August 2017
Item # EA Project Manager County Route Post
Miles Location Type of Work Fiscal Year
Contr. Type
Programmed amount
Engineer's Estimate
PS&E to DPAC Contract No. CALTRANS Comments Bid Opening Small Business
CommentsBid
Amount
Most Qualified
Bidder
Small Business
Bid Amount
2nd Bidder
Small Business
Bid Amount
3rd Bidder
Small Business
1 2A32A AHMAD K RAHIMI
NAP 121 9.2 / 9.4 Near Napa, at Sarco Creek Bridge No. 21-0018.
Plant establishment for bridge replacement project.
17/18 201.111 $100,000 1/18/18 (T)
10/15/18 (T)
TOTAL $100,000 .
D4 Small Business capital projects under 291K 17 18 FY August 2017.xlsxile ]
Proposed Minor B Projects for Small Business, FY 17/18 August 2017
Item # EA County Route Post Miles Location Type of Work Fiscal Year
Contr. Type
Programmed Amount
Engineer's Estimate
PS&E to DPAC
Contract No. CALTRANS Comments Bid Opening
Small Business
Comments
Bid Amount
Most Qualified
Bidder
Small Business
Bid Amount 2nd Bidder Small
BusinessBid
Amount 3rd Bidder Small Business
1 3L070_ SON 116 11.2
On WB Rte. 116 approaching the intersection of Old Cazadero Rd. at the Guernewood Park area.
Replace the existing solar powered flashing beacon and Install PG&E powered Speed Feedback Sign 17/18 201.010 $210,000.00 $90,000.00 7/14/2017 (A) 04A5268
8 Prospective Contractors, Bid package to be sent out to Contractors on 8/10/2017 (T) 8/24/2014 (T)
2 3L160_ SON 1 20.8/22.0In Sonoma County on Rte. 1 in the town of Jenner.
Install Guardrail and Vehicle Speed Feedback Signs. (VSFS) 17/18 201.010 $291,000.00 $291,000.00 7/11/2017 (A) 04A5266
8 Prospective Contractors, Bid packages sent to Contractors on 7/27/2017 (A). 8/11/2017 (T)
3 4K440_ CC 4 R40.4/M41.1
In Contra Costa County, in the City of Brentwood on the Marsh Creek Road segment of Route 4.
Install two Solar Powered Vehical Speed Feedback Signs (VSFS) 17/18 201.010 $80,000.00 2/1/2018 (T)
TOTAL 581,000
DBE1
UDBE2
104A4952
Materials Sampling and Testing - South Bay [04A4305 SIGNET]Completed ALTA VISTA (DVBE)3 2016 Material Sampling and Testing 3.0 $5.0 M N/A 12% N/A N/A
2 04A4969On-Call Professional and Technical Environmental Engineering Support Services[04A4426 Brown and Caldwell] Completed BROWN & CALDWELL 2016
Construction Support/Environmental 3.0 $8.0 M N/A 17.0% N/A N/A
304A4997 On-Call Design Engineering and Traffic Operations Analysis for SF Bay Area
Completed AECOM3 2016 Traffic Operations 3.0 $3.0 M N/A 13.5% N/A N/A
404A4995 On-Call Water Quality Support Services of various Caltrans facilities
Completed WRECO (DBE) 1,3 2016 Environmental/Water Quality 3.0 $2.0 M N/A 16%/69% N/A N/A
504A5006
On-Call Right of Way Engineering Completed
MICHAEL BAKER,
INTERNATIONAL3 2016 R/W Support 3.0 $3.0 M N/A 13.5% N/A N/A
604A5010 On-Call Conventional and Specialty Land Surveying Support Services
[04A4309 PSOMAS] Completed R.E.Y. ENGINEERING 2017 Land Surveying 3.0 $2.0 M N/A 32.0% N/A N/A
7 04A45020 On-Call Professional Technical Materials Sampling and Testing Support Services
Completed ALTA VISTA (DVBE)3 2017 Material Sampling and Testing 3.0 $5.0 M N/A 15.0% N/A N/A
8 04A5022 On-Call Construction Engineering, Scheduling and Inspection Support Services - East Bay ALA & CC County, South Bay SCL County & Toll Bridge.
Completed CALTROP3 2017 Construction Support 3.0 $5.0 M N/A 20.0% N/A N/A
9 04A5054 On-Call Proj/Prgm Mgmt Services for Oakland Bay Bridge, East Span Projects
Completed HNTB3 2017 Toll Bridge Administration 3.0 $2.5 M 25.0% N/A N/A 3.0%
10 04A5077 On-Call Construction Engineering, Scheduling and Inspection Support Services - Peninsula SF & SM Counties, North Bay MRN, NAP, SOL, SON Counties [04A4338 04A4339 PB AMERICAS, 04A4340 VALI COOPER] Completed HDR 2017 Construction Support 3.0 $5.0 M N/A 21.0% N/A N/A
11 04A5092 On-Call Visual Impact Analysis (VIA) Services; technical report composition; computer generated visual simulation (VS) graphics and legal defensibility to Caltrans. [04A4412 PARSONS BRINKERHOFF] Completed WSP 2017 Design 3.0 $1.0 M N/A 13.0% N/A N/A
12 04A5132 On-Call Professional and Technical Hazardous Waste Site Investigation and Remedial Design Services[04A4336 & 04A4337 GEOCON] Completed GEOCON3 2017 Environmental Engineering 3.0 $3.4 M N/A 14%/14.5% N/A N/A
104A4902
On-Call Traffic Control Districtwide Completed
THE PROFESSIONAL TREE CARE COMPANY (SBE) 2016 R/W Support 2.0 $930K N/A 13.0% N/A N/A
Advertised 15.5%
Hanford 18.2% Pacific 14.7%
Advertised 15%
Hanford 20.1% Pacific 14.7%
4 04A4986 Route 80 ICM ATM Public Information Services ContractCompleted
RADIOWAVE MARKETING (SBE) 2016 Administration/Public Affairs 1.0 $38.0 K 100.0% N/A NA N/A
504A4864 On-Call service for restoring wire theft damaged highway electrical facilities in Marin, Napa
Solano and Sonoma counties Completed ST. FRANCIS ELECTRIC 2016 Traffic Operations 2.0 $4.2 M N/A 17.4% N/A N/A
Advertised 16.0%
Norcal 100% Aegis 19.4%
Advertised 16.0%
Norcal 100% Aegis 16.2%
8 04A5053 Materials Laboratory Testing and Reporting Services. Invitation for BidsCompleted
CONSTRUCTION TESTING SERVICES 2017 Engineering Services 2.0 $1.25 M N/A 12.50% N/A N/A
9 04A5105 Plant Establishment Service Agreement for the Troutdale Project (EA 04-4A09A4)Completed NEARY LANDSCAPE (SBE) 2017 Landscape Design 2.0 TBD 100% N/A N/A N/A
DBE UDBE
1 04NEW525-17On-Call Districtwide Professional and Technical Services for Construction Claims Services. [04A4611 CH2M]
August 2017 (T) TBD 2017 Construction Support 2.0 $2.0 M N/A TBD NA NA
2 04NEW528-17 On-Call Districtwide Landscape Architecture Design Support Services
September 2017 (T) TBD 2017 Landscape Design 3.0 $2.0M NA TBD NA NA
3 04NEW529-18On-Call Districtwide Professional and Technical Services for Advance Planning & Project Initiation Document (PID) Support Services.
October 2017 (T) TBD 2018 Transportation Planning Services 3.0 $1.25 M N/A TBD NA NA
104A5075
04NEW508-17Advance Tree Cutting Service for Contracts In Design to reduce Impact on Nesting Birds
Completed TBD 2017 Environmental 3.0 TBD N/A 12.50% N/A N/A
204A5142
04NEW518-17Plant Establishment Service Agreement for the Carson Street UC Project (EA 04-4J2604)
August 2017 (T) TBD 2017 Landscape Design 3.0 TBD 100% N/A N/A N/A
304A5238
04NEW523-17On-Call Multiprovider Service Agreement to upgrade none operational Traffic Operation System dectection elements at nine Bay Area Counties
August 2017 (T) TBD 2017 Traffic Operations 2.0 $3.0M N/A 13.5% N/A N/A
404A5239
04NEW524-17On-Call Multiprovider Service Agreement to upgrade none operational Traffic Operation System, excluding dectection elements at nine Bay Area Counties
August 2017 (T) TBD 2017 Traffic Operations 2.0 $13.0M N/A 13.5% N/A N/ANote:
6 Top Ranked Firm is selected based on Qualification. Cost Negotiation to follow the interview selection.7 Estimated execution date of July & beyond subject to passing of budget.8 Contract # in parenthesis represents (Former Contract #)
4 No DBE participation under the race neutral program. However, DVBE patricipation is expected to be between 5 % to 10% before contract ends .
Legend: (A) Actual Dates (TBD) To Be Determined(T) Target Date TEXT Underlined: Updates/Changes on the last reporting (E) Advertisement End Date [ ] Incumbent of Previous Contract
November
November
September
6
7
304A4973 On-Call service for Erosion Control and Water Pollution Control in South Bay areas:
Alameda, Contra Costa, Santa Clara, San Francisco, and San Mateo Counties CompletedHANFORD ARC & PACIFIC
PARK LANDSCAPING Aug 2016 Environmental 3.0 $5.1 M N/A N/A N/A
204A4979
December
04A4865 On-Call service for restoring wire theft damaged highway electrical facilities in Alameda and Contra Costa counties Completed
Contract No.8 Contract Description
Estimated
Contract
Execution
Month/Year7
Upcoming New A&E Contracts
Contract
Amount
Contract Goal
Top Ranked Consultant6
DVBEContract Advertisement Status
5
2016 Traffic Operations 2.0 $8.0 M N/A N/A
June
May
On-Call service for Erosion Control and Water Pollution Control in North Bay areas: Napa, Sonoma, Solano, and Marin Counties Completed
Total DBE
SBE
Contract
Term
(Number of
years)
Contract Type
Sept
Oct.
Dec
Oct.
Aug
Jan
NORCAL GENERAL CONST. GROUP (DBE) & AEGIS ITS
District 4 Consultant Services Unit
Total DBE
DVBE
Recently Executed A&E Contracts
Contract Description Contract Advertisement Status Contract Type
Contract
Term
(Number of
years)SBE
Firm Selected
Recently Executed
Contracts
Month/YearContract No.
8
Contract Goal
Contract
Amount
5 For upcoming contracts, visit http://caltrans-opac.ca.gov/aeinfo.htm
3 Prime Consultant is a District 4 Calmentor Member
1 Disadvantaged Business Enterprise, minimum goal of 12.50%
Recently Executed Non A&E Contracts
Jun
HANFORD ARC & PACIFIC PARK LANDSCAPING Aug
2.0
Sept
2 Underutilized Disadvantaged Business Enterprise, minimum goal of 9.50%
October
August
Upcoming New Non-A&E Contracts
Aug
04A4866 On-Call service for restoring wire theft damaged highway electrical facilities in Santa Clara,San Mateo and San Francisco Counties
Sept 2016
CompletedNORCAL GENERAL CONST. GROUP (DBE) & AEGIS ITS Sept
January
Jan
Jan
Feb
N/A
$5.1 M N/A N/A N/A
N/A N/A N/A
2016 Environmental 3.0
Traffic Operations $6.0 M
Apr
Apr
June
\\sv04docifs1\data1\D4CSUD\Small Business Council\District 4\SBC Reports\Master Copy\03. SBC Monthly Report\FY 16-17\2017-08-08-SBC Monthly Report August 2017 Update.xlsx
Contact Romy Fuentes @ 510-622-8803
(Update:8/8/2017)
CALTRANS DIST. 4 CONSULTANT SERVICESDBE UTILIZATION
Federal Funded ContractsQuarterly Update
Update: 8/8/2017
Total =Prime+DBEs
Col 1 Col 2 Col 3 Col 4 Col 5 Col 6 Col 7 Col 8 Col 14 Col 9 Col 10 Col 11 2
Col 12 Col 13
1 04A4147 FARWESTERN (SBE) CULTURAL RESOURCES $1,300,000 $65,000 5.00% $1,300,000 $88,611 6.82% 100% 100% Contract expired. Exceeded contract goal.
2 04A4149 CH2MHill ENVIRONMENTAL SUPPORT $5,000,000 $650,000 13.00% $4,815,225 $872,585 18.12% 100% 96% Contract Expired. Exceeded contract goal.
3 04A4150 AECOM ENVIRONMENTAL SUPPORT $5,000,000 $400,000 8.00% $3,418,495 $759,077 22.21% 100% 68% Contract Expired. Exceeded contract goal.
4 04A4151 GANDA3
ENVIRONMENTAL SUPPORT $5,000,000 $3,000,000 60.00% $4,880,334 $2,701,471 55.35% 100% 98%
Contract Expired. Prime consultant GANDA graduated from DBE within the contract
period.
5 04A4312 WRECO (DBE) WATER QUALITY (ON-CALL) $2,000,000 $1,220,000 61.00% $1,234,171 $994,675 80.59% 100% 62% Contract Expired. Exceeded contract goal.
6 04A4317 DKS TRAFFIC MGMNT PLANNING (ON-CALL) $1,500,000 $45,000 3.00% $0 $0 0.00% 100% 0%
Contract Expired. No Task Orders Issued. Traffic Management is combined with Design
Contracts.4
7 04A4256 PRESCIENCE CONST SUPPORT $3,000,000 $1,500,000 50.00% $835,078 $0 0.00% 100% 28% Contract Expired. Structure Work for DBE Subs did not materialize.4
8 04A4254 CALTROP CONST SUPPORT $3,000,000 $600,000 20.00% $404,439 $138,074 34.14% 100% 13% Contract Expired. Exceeded contract goal.
9 04A4255 CALTROP CONST SUPPORT $3,000,000 $660,000 22.00% $188,812 $0 0.00% 100% 6% Contract Expired. Work allocated to DBE did not materialize.
10 04A4305 SIGNET MATERIALS TESTING (South Bay Labs) $3,000,000 $510,000 17.00% $2,860,062 $274,552 9.60% 100% 95% Contract Expired. Met 60% of work allocated to DBE.
11 04A4306 ALTA VISTA (DVBE) MATERIALS TESTING (North Bay Labs) $3,000,000 $450,000 15.00% $2,619,807 $375,803 14.34% 100% 87% Contract Expired. Met 96% of work allocated to DBE.
12 04A4309 PSOMAS LAND SURVEYING (ON-CALL) $1,949,952 $194,995 10.00% $831,978 $55,508 6.67% 100% 43% Contract Expired. Met 67% of work allocated to DBE.
13 04A4310 CHAUDHARY(DBE)(SBE) LAND SURVEYING (ON-CALL) $4,500,000 $3,690,000 82.00% $4,298,188 $3,523,331 81.97% 100% 96% Contract Expired. DBE Goal Met.
14 04A4353 PSOMAS R/W ENGR $4,000,000 $520,000 13.00% $1,382,290 $72,648 5.26% 100% 35% Contract Expired. Met 40% of work allocated to DBE.
15 04A4320 URS DESIGN $3,000,000 $120,000 4.00% $1,718,642 $440,209 25.61% 100% 57% Contract Expired. Exceeded contract goal.
16 04A4336 GEOCON, INC. ENVIRONMENTAL $3,621,356 $1,013,980 28.00% $719,210 $253,562 35.26% 100% 20% Contract Expired. Exceeded contract goal.
17 04A4371 CALTROP PROJECT MANAGEMENT $1,500,000 $150,000 10.00% $6,549 $0 0.00% 100% 0% Contract Expired. Caltrans In-house staff was used to complete these services.4
18 04A4338 PB AMERICAS CONST SUPPORT $3,000,000 $600,000 20.00% $496,729 $348,896 70.24% 100% 17% Contract Expired. Exceeded contract goal.
19 04A4340 PB AMERICAS CONST SUPPORT $3,000,000 $600,000 20.00% $0 $0 0.00% 100% 0%Contract Expired. No task order has been issued. Work has been done by Caltrans Staff.
4
20 04A4339 VALI COOPER CONST SUPPORT $3,000,000 $540,000 18.00% $1,303,500 $1,301,577 99.85% 100% 43% Contract Expired. Exceeded contract goal.
21 04A4412 PB AMERICAS VIA STUDY $2,000,000 $300,000 15.00% $374,005 $77,709 20.78% 100% 19% Contract Expired. Exceeded contract goal.
22 04A4426 BROWN & CALDWELL ENVIRONMENTAL $3,058,000 $519,860 17.00% $2,653,359 $112,966 4.26% 100% 87% Contract Expired.
23 04A4522 PROFESSIONAL TREE CARE COMPANY (SBE) ENVIRONMENTAL SUPPORT $2,491,350 $336,332 13.50% $2,491,350 $336,332 13.50% 100% 100% Contract Expired. Exceeded contract goal.
24 04A4542 ALTA VISTA (DVBE) MATERIALS TESTING (TOLL BRIDGE) $12,950,000 $647,500 5.00% $10,996,025 $6,763,402 61.51% 87% 85% Exceeding DBE Goal
25 04A4611 CH2MHill CONSTRUCTION SUPPORT $2,000,000 $400,000 20.00% $411,736 $0 0.00% 83% 21% Working to meet goals by the end of the contract.
26 04A4691 R.E.Y. ENGINEERING LAND SURVEYING $4,260,000 $1,618,800 38.00% $1,099,709 $329,382 29.95% 68% 26% Working to meet goals by the end of the contract.
27 04A4614 CH2MHill ENVIRONMENTAL $7,000,000 $1,260,000 18.00% $3,762,759 $252,712 6.72% 66% 54% Working to meet goals by the end of the contract.
28 04A4785 WRECO (DBE) HYDRAULICS $1,500,000 $1,125,000 75.00% $435,707 $435,707 100.00% 55% 29% Exceeding contract goal.
29 04A4902 PROFESSIONAL TREE CARE ((SBE) TRAFFIC CONTROL SUPPORT (ON-CALL) $930,000 $120,900 13.00% $25,913 $18,320 70.70% 55% 3% Exceeding contract goal.
30 04A4865-A NORCAL (DBE) TRAFFIC OPERATIONS/WIRE-THEFT REPAIR $3,000,000 $3,000,000 100.00% $642,053 $642,053 100.00% 49% 21% Meeting contract goal.
31 04A4865-B AEGIS TRAFFIC OPERATIONS/WIRE-THEFT REPAIR $3,000,000 $582,000 19.40% $16,958 $0 0.00% 49% 1% Working to meet goals by the end of the contract.
32 04A4866-A NORCAL (DBE) TRAFFIC OPERATIONS/WIRE-THEFT REPAIR $4,000,000 $4,000,000 100.00% $1,745,109 $1,745,109 100.00% 48% 44% Meeting contract goal.
33 04A4866-B AEGIS TRAFFIC OPERATIONS/WIRE-THEFT REPAIR $4,000,000 $648,000 16.20% $0 $0 0.00% 48% 0% No work has been issued yet under this on-call contract.
34 04A4864 ST. FRANCIS ELECTRIC TRAFFIC OPERATIONS/WIRE-THEFT REPAIR $4,200,000 $730,800 17.40% $774,049 $207,211 26.77% 47% 18% Exceeding contract goal.
35 04A4804 GANDA3
ENVIRONMENTAL $7,500,000 $1,125,000 15.00% $906,900 $98,508 10.86% 34% 12% Working to meet goals by the end of the contract.
36 04A4952 ALTA VISTA (DVBE) MATERIAL TESTING $5,000,000 $600,000 12.00% $248,684 $23,918 9.62% 47% 5% Working to meet goals by the end of the contract.
37 04A4973-A HANFORD ARC MULTI-PROVIDER EROSION CONTROL (SOUTH) $2,550,000 $512,550 20.10% $24,460 $3,962 16.20% 34% 1% Working to meet goals by the end of the contract.
38 04A4973-B PACIFIC PARK LANDSCAPING MULTI-PROVIDER EROSION CONTROL (SOUTH) $2,550,000 $374,850 14.70% $0 $0 0.00% 34% 0% New Contract: No Invoice submitted to date
39 04A4979-A HANFORD ARC MULTI-PROVIDER EROSION CONTROL (NORTH) $2,550,000 $512,550 20.10% $0 $0 0.00% 34% 0% New Contract: No Invoice submitted to date
40 04A4969 BROWN & CALDWELL ENVIRONMENTAL SUPPORT IN CONSTRUCTION $8,000,000 $1,360,000 17.00% $661,791 $8,854 1.34% 29% 8% New Contract. Working to meet goal.
41 04A4979-B PACIFIC PARK LANDSCAPING MULTI-PROVIDER EROSION CONTROL (NORTH) $2,550,000 $374,850 14.70% $0 $0 0.00% 34% 0% New Contract: No Invoice submitted to date
42 04A4803 CH2MHill ENVIRONMENTAL $7,000,000 $1,190,000 17.00% $171,000 $49,500 28.95% 27% 2% Exceeding contract goal.
43 04A4997 AECOM3
DESIGN & TRAFFIC OPS $3,000,000 $405,000 13.50% $0 $0 0.00% 26% 0% New Contract: No Invoice submitted to date
44 04A5006 MICHAEL BAKER, INTERNATIONAL R/W ENGRINEERING $3,000,000 $405,000 13.50% $0 $0 0.00% 22% 0% New Contract: No Invoice submitted to date
45 04A4995 WRECO (DBE) WATER QUALITY $2,000,000 $1,380,000 69.00% $138,938 $138,938 100.00% 25% 7% Exceeding contract goal.
46 04A5010 R.E.Y ENGINEERING SURVEYING $2,000,000 $660,000 33.00% $7,972 $0 0.00% 20% 0% New Contract. Working to meet goal.
47 04A5020 ALTA VISTA (DVBE) MATERIAL SAMPLING & TESTING $5,000,000 $750,000 15.00% $261,001 $90,494 34.67% 20% 5% New Contract. Exceeding contract goal.
48 04A5022 CALTROP CONSTRUCTION SUPPORT $5,000,000 $1,000,000 20.00% $0 $0 0.00% 19% 0% New Contract. Working to meet goal.
49 04A5077 HDR CONSTRUCTION SUPPORT $5,000,000 $1,100,000 22.00% $0 $0 0.00% 19% 0% New Contract. Working to meet goal.
TOTAL $174,460,658 $42,467,967 24.34% $61,162,986 $23,535,656 38.48%
Revision History: (11/04/14) Contracts advertised prior to 07/01/2009 under the Race Neutral program that only required DBE aspirational goals have been removed from report due to 100% time expired. Revision made after approval of the Small Business Council.
(12/12/16) As per comment from the October 2016 SBC Meeting, 100% completed Contracts with Underutilized DBE (UDBE) Goals have been removed.2
Contracts with Identifiable DBE Dollars
Contract
Amount
DBE Goal
$ $ Time%
Invoiced to Date
DBE COMMENTContract
NumberPrime Consultant Type of Work
Disadvantaged Business Enterprise (DBE)
38.48%
Notes:
2 - Beginnning 06/15/12 UDBE aspirational goal is not required.
$ % $
% Contract
Completion
12.50%
Statewide DBE Goal
3 - GANDA no longer a DBE as of July 18, 2015
1 - Current Goal Effective until 06/30/17, subject to FHWA DBE program approval.
Total DBE Achieved To Date
(Col 9/Col 8)
4 - See August 2016 Response to SBC Action Item # 2016-13
Total Proposed DBE Goal
(Col 6/Col 5)
24.34%
2017- 08-08 DBE_quarterly_ August 2017 Update.xlsx
CALTRANS DIST. 4 CONSULTANT SERVICES
SBE & DVBE UTILIZATION
Non-Federally Funded Contracts
Quarterly Update
Contracts with Identifiable DVBE and SBE Dollars Update: 8/8/2017
Total
Col 1 Col 2 Col 3 Col 4 Col 5 Col 6 Col 7 Col 8 Col 9 Col 10 Col 11 Col 12 Col 13 Col 14 Col 15 Col 16 Col 17
1 04A2835 PINNACLE ONE CLAIMS AND SCHEDULING (SSD-YBITS) $8,000,000 $240,000 3.00% $2,000,000 25.00% $3,089,720 $0 0.00% $1,075,716 34.82% 100% 39% Contract Expired. Exceeded SBE goal
2 04A2870 ATHALYE CONSULTING (DBE) (SBE) CONSTRUCTION SUPPORT (ON-CALL) $5,000,000 $150,000 3.00% $1,250,000 25.00% $2,918,470 $578,929 19.84% $2,298,310 78.75% 100% 58% Contract Expired. Exceeded SBE goal & DVBE goal
3 04A2871 HILL INTERNATIONAL CONSTRUCTION SUPPORT $5,000,000 $150,000 3.00% $2,500,000 50.00% $2,442,549 $0 0.00% $2,397,909 98.17% 100% 49% Contract Expired. Exceeded SBE goal & work allocated to DVBE did not materialize.
4 04A2893 CH2MHILL CLAIMS & SCHEDULING (OTD 1-2) $7,000,000 $210,000 3.00% $1,750,000 25.00% $1,576,429 $5,243 0.33% $51,734 3.28% 100% 23%Contract Expired. Met 13 % of work allocated to SBE and 11 % of work allocated to DVBE.
5 04A2968 HNTB PROGRAM/PROJECT MANAGEMENT $26,593,940 $797,818 3.00% $13,296,970 50.00% $26,233,359 $17,498 0.07% $11,456,731 43.67% 100% 99%Contract was terminated on 2/3/17. More than 87% of work allocated to SBE and 2% of work allocated
to DVBE were met.
6 04A3116 PB AMERICA ENVIRONMENTAL SERVICES $30,700,000 $1,535,000 5.00% $7,675,000 25.00% $7,812,868 $156,380 2.00% $3,127,150 40.03% 100% 25% Contract Expired. Exceeded SBE goal and 40% of work allocated to DVBE were met.
7 04A3357 CH2MHill CLAIMS AND SCHEDULING (SAS) $9,000,000 $9,652,742 10.00% $2,413,886 25.00% $6,139,724 $2,404,701 39.17% $1,220,675 19.88% 100% 68% Contract Expired. DVBE goal has been exceeded and 80% of work allocated to SBE has been met.
8 04A3819 ALTA VISTA (DVBE) MATERIAL ENGR. AND TESTING (ON-CALL) $21,000,000 $1,050,000 5.00% $5,250,000 25.00% $13,019,273 $5,105,889 39.22% $3,254,818 25.00% 100% 62% Contract Expired. SBE and DVBE goals exceeded.
9 04A3824 TY LIN DESIGN (ON-CALL) $13,000,000 $650,000 5.00% $3,250,000 25.00% $8,363,913 $91,890 1.10% $3,631,321 43.42% 100% 64% Meeting SBE goal and 22% of work allocated to DVBE.
10 04A4265 CALTROP RISK MANAGEMENT $2,000,000 $100,000 5.00% $500,000 25.00% $497,272 $0 0.00% $0 0.00% 100% 25% Caltrans Staff performed most of the work. Very limited use of this contract.
11 04A4337 GEOCON, INC. ENVIRONMENTAL SERVICES $1,200,000 $60,000 5.00% $300,000 25.00% $194,804 $11,473 5.89% $30,582 15.70% 100% 16% Contract Expired. DVBE goal exceeded and met 64% of SBE work allocated.
12 04A4534 EARTH MECHANICS INC (SBE) ENGINEERING SERVICES $4,000,000 $200,000 5.00% $1,000,000 25.00% $679,350 $0 0.00% $225,720 33.23% 95% 17% Exceeding SBE goal and work allocated to DVBE did not materialize.
13 04A4542 ALTA VISTA (DVBE) ENGINEERING SERVICES $12,950,000 $647,500 5.00% $3,237,500 25.00% $10,142,388 $6,763,402 66.68% $2,244,910 22.13% 55% 78% Exceeding DVBE goal and meeting 92% of work allocated to SBE. 14 04A4712 AECOM ENVIRONMENTAL SERVICES $8,000,000 $800,000 10.00% $2,000,000 25.00% $2,506,700 $20,040 0.80% $907,815 36.22% 41% 31% Exceeding SBE goal. Working to achieve DVBE goal.
15 04A5054 HNTB TOLL BRIDGE ADMINISTRATION $2,500,000 $75,000 3.00% $625,000 25.00% $0 $0 0.00% $0 0.00% 18% 0% New Contract.
TOTAL $155,943,940 $16,318,060 10.46% $47,048,356 30.17% $85,616,818 $15,155,445 17.70% $31,923,391 37.29%
Note: Contracts that expired before June 2015 are not reported.
Statewide
DVBE Goal
Statewide SBE
Aspirational Goal
5.00%
25.00%
$ %
COMMENTS
Invoiced to Date
DVBE SBE
$$% Time
% Contract
Completion
$
Contract
Number
Contract Goal
DVBE SBE
$
Prime Consultant
%
Type of WorkContract
Amount$ %
37.29%
(SBE) - Small Business Enterprise
10.46% 17.70%
30.17%Total SBE
Achieved To Date
(Col 13/Col 10)
(DBE) - Disadvantaged Business Enterprise
(DVBE) - Disabled Veteran Business Enterprise
Average Proposed SBE
(Col 8/Col 5)
Total DVBE
Achieved To Date
(Col 11/Col 10)
Average Proposed DVBE
(Col 6/Col 5)
2017-08-08 DVBE SBE_quarterly_August 2017 Update.xlsx
Calmentor/Mentor-Protégé Statewide Quarterly List of All Pairs April 1, 2017-June 30, 2017
Program Name District/s Mentor SB DVBE DBE Protégé SB DVBE DBE Start Date
Graduation
Date
District 4 Calmentor Program 4 Alta Vista Solutions X X Sun Mountain LLC X X 9/1/2016 8/31/2017
District 4 Calmentor Program 4 Stantec Area West Environmental, Inc. X X 1/1/2017 12/31/2017
District 4 Calmentor Program 4 Stantec Johnson Marigot Consulting X 5/1/2017 4/30/2018
Totals
Calmentor SBs #s %s DVBEs #s %s
North Region Mentors 4 15% Mentors 0 0%
Central Region
Calmentor Protégés 66 65% Protégés 6 6%
District 4
Calmentor 57**54 Graduates/3
Active Pairings
San Diego
Calmentor DBEs #s %s
Southern CA
Alliance Mentors 3 12%
Protégés 41 40%
Mentor-
Protégé Total Number of Pairs 3
District 4
Mentor-
Protégé Total Number of Mentor Firms 26
TOTAL 0 Total Number of Protégés 103
Note: 54 graduate protégé firms includes 3 that became mentor firms, and 101 proteges includes 1 graduate protégé firm which left program.
Review Date 7/26/2017
1
2017-2018 MEETING SCHEDULE
Joint Professional Liaison - Calmentor Program Quarterly Meetings are held on the
4th Thursday of the month in January, July, and October of each year from
1:00 p.m. – 3:00 p.m. at the Caltrans District 4 Offices located at 111 Grand Avenue in
Oakland, California. The meeting is held in the Park View Room, Room 700, 15th Floor.
The next Annual Calmentor Awards & Celebration Luncheon & Business
Networking Event will be held on Friday May 4, 2018, 11:00 a.m. – 2:00 p.m. (tentatively) at a venue that is to be determined and approved location by the program Steering Committee Members.
Mark your calendars for information on the latest in transportation sector news and
networking opportunities!
Jt. Professional Liaison – Calmentor Program Quarterly Meeting Dates
July 27, 2017
October 26, 2017
January 25, 2018
July 26, 2018
Please check the Caltrans District 4 Calmentor Program website regularly for
updates on scheduled meetings including Save the Date Flyers and Meeting
Agendas by visiting: www.dot.ca.gov/dist4/calmentor/
Revised 05-10-2017