+ All Categories
Home > Documents > Cameroon: Unlocking value in a producing basin …...Past performance is not a guide to future...

Cameroon: Unlocking value in a producing basin …...Past performance is not a guide to future...

Date post: 04-Jun-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
16
Proactive Investors 31 May 2018 Cameroon: Unlocking value in a producing basin © 2018 Tower Resources plc 1
Transcript
Page 1: Cameroon: Unlocking value in a producing basin …...Past performance is not a guide to future performance. The cover photo in this Presentation is for illustrative purposes only and

Proactive Investors

31 May 2018

Cameroon:

Unlocking value in a producing basin

© 2018 Tower Resources plc 1

Page 2: Cameroon: Unlocking value in a producing basin …...Past performance is not a guide to future performance. The cover photo in this Presentation is for illustrative purposes only and

Disclaimer

Important Notice

2

DISCLAIMER

The information contained in these slides has been prepared by Tower Resources plc (the “Company”). This Presentation is being made for information purposes only and does not constitute an offer or invitation for the sale or purchase of securities or any of the assets described in it nor shall they nor any part of them form the basis of or be relied on in connection with, or act as any inducement to enter into, any contract or commitment whatsoever or otherwise engage in any investment activity (including within the meaning specified in section 21 of the Financial Services and Markets Act 2000).

The information in this Presentation does not purport to be comprehensive and has not been independently verified. While this information has been prepared in good faith, no representation or warranty, express or implied, is or will be made and no responsibility or liability is or will be accepted by the Company or any of its officers, employees, agents or advisers as to, or in relation to, the accuracy or completeness of this Presentation, and any such liability is expressly disclaimed. In particular, but without prejudice to the generality of the foregoing, no representation or warranty is given as to the achievement or reasonableness of any future projections, management estimates or prospects contained in this Presentation. Such forward-looking statements, estimates and forecasts reflect various assumptions made by the management of the Company and their current beliefs, which may or may not prove to be correct. A number of factors could cause actual results to differ materially from the potential results discussed in such forward-looking statements, estimates and forecasts including: changes in general economic and market conditions, changes in the regulatory environment, business and operational risks and other risk factors. Past performance is not a guide to future performance.

The cover photo in this Presentation is for illustrative purposes only and is not a photo of the Company’s assets.

The Presentation is not a prospectus nor has it been approved by the London Stock Exchange plc or by any authority which could be a competent authority for the purposes of the Prospectus Directive (Directive 2003/71/EC). This Presentation has not been approved by an authorised person for the purposes of section 21 of the Financial Services and Markets Act 2000.

The information contained in this Presentation is subject to change, completion or amendment without notice. However, the Company gives no undertaking to provide the recipient with access to any additional information, or to update this Presentation or any additional information, or to correct any inaccuracies in it or any omissions from it which may become apparent.

Recipients of this Presentation in jurisdictions outside the UK should inform themselves about and observe any applicable legal requirements. This Presentation does not constitute an offer to sell or an invitation to purchase securities in any jurisdiction.

© 2018 Tower Resources plc

Page 3: Cameroon: Unlocking value in a producing basin …...Past performance is not a guide to future performance. The cover photo in this Presentation is for illustrative purposes only and

3

Focus on getting into production in Cameroon

▪ Thali license in shallow water

▪ 3 discovery wells already drilled by Total

▪ 39 million bbls (gross) contingent OIP* in Njonjidiscovery alone

▪ Numerous prospects for scaling up

▪ Reprocessed 3D being analysed, well planning underway

▪ Independent reserve report to be completed in June, 2018

▪ Goal is to begin drilling in coming months

Additional upside from legacy assets

▪ Algoa Gamtoos operated by NewAge in S Africa

▪ Blocks 40 & 41 in Zambia, low commitments

▪ Royalty agreements in SADR

▪ Application in Namibia

Tower Resources

Summary

© 2018 Tower Resources plc

*OIP: Oil in Place

Page 4: Cameroon: Unlocking value in a producing basin …...Past performance is not a guide to future performance. The cover photo in this Presentation is for illustrative purposes only and

Data correct at close on 30 May 2018

* Director † Source: Vox Markets

‡ As at 30 May 2018

ShareholdersCapital Structure

Listing AIM

Share price 1.725p

Market capitalisation ~ £6.5m

Issued share capital 377.3m

Options & warrants‡ 38.2m (9.3%)

Director, staff and

consultant holdings14.7%

Average Daily Volume† 1.85 million

12 month low (at close) 0.751p

12 month high (at close) 2.375p

Tower Resources

Capital Structure

4© 2018 Tower Resources plc

Page 5: Cameroon: Unlocking value in a producing basin …...Past performance is not a guide to future performance. The cover photo in this Presentation is for illustrative purposes only and

Tower Resources

Tower’s Team

© 2018 Tower Resources plc 5

▪ Small committed board with significant

personal investment

▪ Directors own ~15% of issued share

capital

▪ Staff with the company since 2013 and

supported its rationalisation

▪ Strategic partnership with EPI (formerly

PDF) providing Outsourced Exploration

Department (OExD®) led by Mark Enfield:

• specialised personnel

• technical support systems

OExD

SpecialistsExploration Team

Structural

geology

Stratigraphy

Exploration

Geoscientists

Geochemistry

Petrophysics

Reservoir

Engineering

Geophysics

Potential

Fields

Seismic QC

Jeremy Asher

Chairman &

CEO

Peter Taylor

Non-Executive

Director

Graeme Thomson

Non-Executive

Director

Mark Enfield

Technical Advisor to the Board,

Head of Exploration, OExD

Andrew Matharu

VP – Corporate AffairsAndrew Smith

Financial Controller

David M Thomas

Non-Executive

Director

Page 6: Cameroon: Unlocking value in a producing basin …...Past performance is not a guide to future performance. The cover photo in this Presentation is for illustrative purposes only and

6

Thali Block

THALI PSC

Tower Resources

Cameroon, Rio del Rey Basin

© 2018 Tower Resources plc

Page 7: Cameroon: Unlocking value in a producing basin …...Past performance is not a guide to future performance. The cover photo in this Presentation is for illustrative purposes only and

Cameroon, Thali Block

Rio del Rey – proven plays in Niger Delta

© 2018 Tower Resources plc 7

Bioko Island

CameroonNigeria

Equatorial Guinea

Extensional Province

Mobile Shale Belt

Fold-Thrust Belt

Regional Hydrocarbon Provinces

ZAFIRO1.2 Billion bbl

EDOP1 Billion bbl

ALBA>5 TCF

UBIT2 Billion bbl

USAN>500 MMbbl

THALI

RIO DEL REY BASIN> 2 Billion bbl / >1.4 TCF

SODALITA WESTOIL DISCOVERY (2015)

RODO-1OIL DISCOVERY

(2015)

Rio Del Rey Basin

▪ Underexplored sub-

basin of the prolific

Niger Delta

▪ >> 34.5 Billion bbls

found in whole Niger

Delta Basin

▪ >1 billion barrels

produced to date in

Rio del Rey basin

▪ 2012 Oak discovery

extends play fairway

OAK

Page 8: Cameroon: Unlocking value in a producing basin …...Past performance is not a guide to future performance. The cover photo in this Presentation is for illustrative purposes only and

Cameroon, Thali Block

Proven Oil and Gas on BlockLow-Risk Fault-Blocks Close to Existing Infrastructure

▪ 25 MMbbl Dissoni North field lies

immediately north of the Thali block

• Developed by Perenco – planned to

reach 12,500 bpd of 35o API oil

▪ Since 1990s 3D, six wells drilled on

block, all encountered oil/gas

▪ Undeveloped discoveries on the Thali

block, including Njonji

• 20+ undrilled fault block leads

• Low risk, shallow, stacked targets

• Summed Pmean gross prospective

potential: >315 MMbbl (OIP)

• All figures now being updated

▪ Objective is early production

• Reprocessing of 3D data covering

full license area is now complete,

analysis underway

• New wells can be tied in to existing

local infrastructure

© 2018 Tower Resources plc 8

RUMPI

DISSONI SOUTH IDENAO FAULT

BLOCKS~150 MMbbl

NJONJI EAST, S & SW FAULT BLOCKS~99 MMbbl

AKONO-ERONG FAULT BLOCKS~67 MMbbl

Oil Field

Gas Field

Oil Field (Undeveloped)

Gas Field (Undeveloped)

FIELDS/DISCOVERIES

Pipeline Platform

Fault Block Prospects (Pmean prospective OIP gross)

DISSONI NORTH25 MMbbl net reserves

(recoverable)

NJONJI DISCOVERY*39 MMbbl Pmean

contingent OIP Gross

* TOTAL and Tower have estimated net contingent recoverable resources of 7 and 15 MMbbl respectively. Tower has not yet booked any reserves on this asset.

2.5km

Page 9: Cameroon: Unlocking value in a producing basin …...Past performance is not a guide to future performance. The cover photo in this Presentation is for illustrative purposes only and

Cameroon, Thali Block

Significant Exploration Potential in Addition to Near-Term

Production

© 2018 Tower Resources plc 9

Turbidites to South-East

▪ Potential Alba-type plays

Deeper Underexplored Sandstone Plays

▪ Billion barrel fields along trend in Equatorial

Guinea

▪ Similar leads identified in Thali

▪ Marathon and Exxon oil discoveries in Equatorial

Guinea extend and de-risk fairway

2.5km

ZAFIRO OIL FIELD THALI BLOCK

Giant Zafiro Oil Field (Equatorial Guinea) along trend of the Thali Block

New Zafiro-type Strat Play

>1 billion bbl

Page 10: Cameroon: Unlocking value in a producing basin …...Past performance is not a guide to future performance. The cover photo in this Presentation is for illustrative purposes only and

10

▪ Seismic Reprocessing - COMPLETE

▪ Interpretation & Prospect Inventory - IN PROGRESS

▪ Drilling ESIA - IN PROGRESS

▪ Well Planning & Design - IN PROGRESS

Cameroon, Thali Block

Forward Plan

© 2018 Tower Resources plc

Timings are indicative, plan is subject to change, drilling is based on further financing

2018Q1 Q2 Q3 Q4+

REPROCESSING(LEGACY 3D SEISMIC DATA)

G&G STUDIES(INTERPRETATION, MAPPING & PROSPECT INVENTORY)

KEY

G&G

3D seismic

Operations

DRILLING ESIA

EARLY WELL PLANNING(REVIEW OF OFFSET WELLS)

DETAILED WELL PLANNING, DESIGN & MOBILISATION(RIG IDENTIFICATION, CONTRACT NEGOTIATION, MOBILISATION)

DRILLING

CPR

Page 11: Cameroon: Unlocking value in a producing basin …...Past performance is not a guide to future performance. The cover photo in this Presentation is for illustrative purposes only and

11© 2018 Tower Resources plc

2014 Acquisition

of Rift Petroleum

▪ Algoa-Gamtoos (50%,

Operator: New Age)

▪ 3D acquired in 2014

▪ 1st Renewal Period of

Algoa-Gamtoos granted in

Sept 2015, agreed in 2017

– additional geophysical

data planned in 2019

▪ Oil-majors in neighbouring

South African licences:

• Total, Exxon, Shell,

Anadarko, Statoil

• Recent Qatar Petroleum

farm-in

• Brulpadda 1 testing new

deep-water play

South Africa

Well placed in areas targeted by Majors

Page 12: Cameroon: Unlocking value in a producing basin …...Past performance is not a guide to future performance. The cover photo in this Presentation is for illustrative purposes only and

12

250 km

Exploration in Zimbabwe portion of basin concluded best

prospectivity lay in Zambia

Historic focus 25-30yrs ago in Luangwa Basin –Only two wells drilled

Tower Resources Blocks 40 & 41

- 6,526km2 position in untested

Mid-Zambezi Basin

Zambia, Blocks 40 and 41

Why Zambia? ‘There is no oil there….’

▪ The Mid-Zambezi Basin:

A 25,000+ km2 rift basin with no oil &

gas exploration wells, nor even any

seismic data

▪ But source rock, reservoir and seals

all appear to be present

▪ Excellent potential for gas to power

market, good infrastructure

© 2018 Tower Resources plc

Page 13: Cameroon: Unlocking value in a producing basin …...Past performance is not a guide to future performance. The cover photo in this Presentation is for illustrative purposes only and

13

Tower Resources

Summary

© 2018 Tower Resources plc

*OIP: Oil in Place

Focus on getting into production in Cameroon

▪ Thali license in shallow water

▪ 3 discovery wells already drilled by Total

▪ 39 million bbls (gross) contingent OIP* in Njonjidiscovery alone

▪ Numerous prospects for scaling up

▪ Reprocessed 3D being analysed, well planning underway

▪ Independent reserve report to be completed in June, 2018

▪ Goal is to begin drilling in coming months

Additional upside from legacy assets

▪ Algoa Gamtoos operated by NewAge in S Africa

▪ Blocks 40 & 41 in Zambia, low commitments

▪ Royalty agreements in SADR

▪ Application in Namibia

Page 14: Cameroon: Unlocking value in a producing basin …...Past performance is not a guide to future performance. The cover photo in this Presentation is for illustrative purposes only and

Tower Resources

Appendix

14

▪ Cameroon – Thali block history

▪ Zambia – Play stratigraphy

© 2018 Tower Resources plc

Page 15: Cameroon: Unlocking value in a producing basin …...Past performance is not a guide to future performance. The cover photo in this Presentation is for illustrative purposes only and

Thali Block Prospectivity

Exploration history

15© 2018 Tower Resources plc

▪ Three wells drilled in the 1960-80’s on 2D seismic data

▪ ERM1 (1967) - oil shows (‘PS.9’ sands)

▪ EUM1 (1980) - dry

▪ ISM1 (1981) - dry

▪ Result: proved the presence of deltaic ’S’ reservoirs

▪ Reasons for failure:

▪ Not drilled on structure

▪ Six wells drilled in 1990’s - 2000’s on 3D seismic data, resulted in

multiple shallow discoveries

▪ Thali Block wells;

• RUM1 (1998) - gas discovery (‘S4’ sands)

• NJONJI 1 (2008) - oil discovery (3 oil zones)

• NJONJI 2 (2010) - appraisal (2 oil & 2 gas zones)

▪ Dissoni North wells;

• DIM1 (2001) - oil discovery (‘S5F’ sands)

• DIM2 (2006) - appraisal, encountered 50m oil pay

(‘S5F’)

• DIM3 (2007) - appraisal, oil

THALI BLOCK (PREVIOUSLY ‘DISSONI’) - HISTORIC EXPLORATION

1960’s 1970’s 1980’s 1990’s 2000’s

MULTIPLE OIL & GAS DISCOVERIES

RUM1 DIM1 DIM2/3 NJO

NJI

-1

NJO

NJI

-2

EUM1ERM1

2D SEISMIC ACQUISITION

2D SEISMIC ACQUISITION

3D SEISMIC ACQUISITION

Page 16: Cameroon: Unlocking value in a producing basin …...Past performance is not a guide to future performance. The cover photo in this Presentation is for illustrative purposes only and

▪ Key play elements proven in Blocks 40 & 41

by initial field work in 2014, additional work in 2015/16:

• Widespread source rocks

• Excellent Gas potential

• Additional Oil potential

• Multiple reservoirs

• Thick regional seals

▪ Fieldwork focused on evaluation of the proven plays

▪ Seeps reported – more field investigation planned

▪ Next major step likely to be aerogravity survey

16

PLAY ELEMENTS

SOURCE RESERVOIR SEAL

Presence Effectiveness Presence Effectiveness Presence Effectiveness

Oil & Gas Prone Multiple Plays Thick & Regional

✓ ✓ ✓

‘LO

WE

R K

AR

OO

[Delta P

lain

]

[

Lacustr

ine]

‘UP

PE

R K

AR

OO

[Flu

via

l]

DELTA-

FRONT

PE

RM

IAN

TR

IAS

SIC

ALLUVIAL FAN

=

~250

~300

~200

AGE (Ma)

JURA.

TERT.

STAGESUPER-

GROUP

BASEMENT

CARB?

INTERBEDDED

SANDS AND MUDS

KALAHARI SSTS

GWEMBE

MUDSTONES

& COALS

SUB-GWEMBE

SSTS

MADUMABISA

MUDSTONES

RED SST

BATOKA BASALT

ESCARPMENT

GRIT

BASAL

COARSE CLASTICS

Play Stratigraphy of Blocks 40 & 41

Zambia, Blocks 40 and 41

Proven Source Rocks & Reservoirs

© 2018 Tower Resources plc


Recommended