NOISE IMPACT STUDY - Project: 13209
Canaan Quarry Noise Impact Study Geographic Township of Cumberland City of Ottawa, Ontario
Prepared for:
Cornwall Gravel Co. Ltd. 390 Eleventh Street West Cornwall, Ontario K6H 5R9 Prepared by:
Derek Flake, M.Sc., P.Eng.
Bob Rimrott, M.A.Sc., P.Eng.
May 3, 2016
Cornwall Gravel Co. Ltd. – Canaan Quarry Page 2
Table of Contents
1 Introduction 3
2 Site Description 3
3 Noise Criteria 4
Acoustical Classification .................................................................................. 4
MOECC Sound Level Limits .............................................................................. 4
4 Aggregate Quarry Operation 4
Hours of Operation ............................................................................................ 5
Site Preparation and Rehabilitation .................................................................. 5
Extraction and Processing & Transport ........................................................... 6
Equipment .......................................................................................................... 6
5 Noise Predictions & Controls 6
Noise Prediction Methodology ......................................................................... 6
Aggregate Quarry Noise Sources ..................................................................... 7
Recommended Noise Controls ......................................................................... 7
Predicted Sound Levels with Controls ........................................................... 10
6 Truck Traffic Noise on Haul Route 11
7 Conclusions 11
Cornwall Gravel Co. Ltd. – Canaan Quarry Page 3
1 Introduction Cornwall Gravel Co. Ltd. (Cornwall Gravel) is applying for a new licence to replace the existing Canaan Quarry licence (ARA Licence Number: 4124) to a Category 2 Class “A” licence for the proposed Canaan Quarry extension, located at East Half of Lot 14, Concession 1, Geographic Township of Cumberland, City of Ottawa. The existing area of operation within the licensed area consists of approximately 19.2 HA. The applicant proposes to increase the existing area of operation to approximately 32.1 HA.
Aercoustics Engineering Limited (Aercoustics) has been retained to prepare a Noise Impact Study. The purpose of this study is to provide noise control recommendations in order that the operation within the aggregate quarry will satisfy the Ontario Ministry of the Environment and Climate Change (MOECC) noise guidelines.
Sound level limits for the aggregate quarry noise on the residential receptors were first established. These were based on the noise guidelines of the MOECC. Next, the noise predictions of the aggregate quarry operations were performed at these residential receptors. Where the predicted levels were found to exceed the MOECC sound level limits, noise control measures were recommended to satisfy these limits.
Figure 1 provides a key plan showing the location of the aggregate quarry. A site plan is provided as Figure 2, illustrating the aggregate quarry area and the locations of local residences (receptors).
2 Site Description Figure 1 provides a key plan showing the location of the quarry and the surrounding area. The site is located about 600 m north of Magladry Road and about 700 m west of Nolan Road, in the Geographic Township of Cumberland. The site is in a rural area where aggregate extraction, and agriculture are the dominant land uses. The existing Canaan Quarry (different quarry from the subject licence, ARA Licence Number 4143) and the existing Canaan II Quarry (ARA Licence Number 608401), both operated by R.W. Tomlinson Limited, are located immediately northwest and west of the subject site.
The aggregate quarry addressed by this noise impact study consists of operations within the lands outlined in Figure 2. These operations include excavation, rock drilling, aggregate haulage/shipping, and processing with a portable processing plant (crushing, screening and washing). There are several existing single family residential dwellings in the vicinity of the quarry area. These are identified as Receptors R01 to R16. Receptors VL17 to VL20 have been used to identify potential noise receptors on noise sensitive zoned lots. The location of these receptors has been assigned on the basis of guidance provided in NPC-300 and the applicable municipal zoning by-law. Receptor locations R01 to R16 and VL17 to VL20 are shown in Figure 2.
Cornwall Gravel Co. Ltd. – Canaan Quarry Page 4
3 Noise Criteria
Acoustical Classification
The appropriate noise criteria for the receptors in the vicinity of the Canaan Quarry were based on the MOECC Noise Pollution Control publication NPC-300 “Environmental Noise Guideline – Stationary and Transportation Sources – Approval and Planning” (MOE, August 2013).
Points of reception R01 to R16 and VL17 to VL19 are located in an ambient acoustical environment consistent with the Class 3 (Rural) designation as defined by the MOECC Publication NPC-300. This is reserved for a rural area with a prevailing acoustical environment that is dominated by natural sounds with little or no road traffic. There is some existing aggregate activity and steady road traffic near some of these residences, but for conservatism and simplicity these were assumed to be Class 3.
Point of reception VL20 is considered to be located in a Class 2 area, since the dwelling would front onto the current established haul route for the existing quarry license. As such, the construction of a new dwelling here should reflect the Class 2 sound level limits. The location of the vacant lot receptor VL20 has been chosen based on the planned location of a future dwelling.
MOECC Sound Level Limits
The applicable limits for noise from a stationary source at a noise sensitive point of reception (receptor) in a Class 2 (Urban) area and a Class 3 (Rural) area are outlined in Table 1.
Table 1 : Sound Level Limits for Stationary Sources – Hourly LEQ (dBA)
Time of Day Class 2 Area (Urban) Class 3 Area (Rural)
Daytime (07:00 to 19:00) 50* 45*
Evening and Nighttime (19:00 to 07:00) 45* 40*
*or background sound level if higher
The noise from a stationary source should not exceed these limits in any hour. At some points of reception in the vicinity of the subject quarry, the lowest background sound level may be higher than the exclusion limits listed above due to existing activities and road traffic. Regardless, the minimum exclusion limits were used to define the sound level criteria.
4 Aggregate Quarry Operation The site plans outline the sequence and direction of operations in each phase. In general terms, the types of work consist of site preparation and rehabilitation, extraction and processing, and shipment off-site.
Cornwall Gravel Co. Ltd. – Canaan Quarry Page 5
Hours of Operation
The proposed hours of normal operation are from 7:00 a.m. to 7:00 p.m. seven days per week, excluding statutory holidays. At no time shall crushing, rock breaking or blasting take place on a statutory holiday. Shipping and loading is permitted outside the normal hours of operation. Equipment maintenance may take place outside of the normal operating hours. The proposed hours of operation are summarized below in Table 2.
Table 2 : Operating Hours
Time of Day Day of Week Operations
07:00 to 07:00 (24 hours)
Monday to Sunday Loading & Shipping Only
07:00 to 19:00 Monday to Sunday Full Operation – Extraction, Processing, Rock Drilling, Loading & Shipping
Site Preparation and Rehabilitation
Site preparation includes the construction of acoustic barriers and any required visual screens specified on the site plan. Topsoil and overburden will be removed. This work will be done primarily with bulldozers, scrapers, trucks, loaders and excavators. Rehabilitation phases will involve similar equipment in establishing the final grading for the site.
The site preparation and rehabilitation work described above is not part of the daily operation of the quarry and is of short duration. These construction activities are not considered in the noise control analysis. The equipment used for these activities must satisfy the noise emission requirements of the MOECC document NPC-115 “Construction Equipment”. By defining a maximum permissible noise emission for construction equipment rather than directly limiting the noise impact at a sensitive point of reception, the MOECC is recognizing that construction is a temporary and largely unavoidable source of noise.
In order to minimize the noise impact associated with the construction activities, it is suggested that:
Operations should be restricted to the daytime hours. When possible, site preparation should be conducted during the fall, winter, or spring months when there is a reduced level of extraction and when residential windows are more likely to remain closed.
Perimeter berms or fences should be constructed as soon as practical during site preparation so as to provide the surrounding residences with some acoustical shielding for the remaining overburden stripping and extraction operations.
Cornwall Gravel Co. Ltd. – Canaan Quarry Page 6
Extraction and Processing & Transport
The maximum annual tonnage to be removed is 2,000,000 tonnes. The quarry will operate with a portable processing plant which follows the working face. The west extraction limit has no setback from the property line because extraction along that property line is to be coordinated with the neighbouring quarry operator (R.W. Tomlinson Limited; ARA Licence Numbers 4143 and 608401).
Aggregate will be extracted using up to two (2) front end loaders at the working face. Material will be transported directly into the primary processing plant. Processed material will be stored in stockpiles in the vicinity of the processing area. Two shipping loaders will be used in the processing area to load highway trucks with finished aggregate product for transport to market.
Equipment
The extraction, processing and shipment equipment operating in the quarry is limited to:
One (1) Processing Plant
Two (2) Extraction Loaders
Two (2) Shipment Loaders
One (1) Rock Drill
40 Highway truck trips/hr – assumed worst case 1 hr volume
5 Noise Predictions & Controls
Noise Prediction Methodology
The aggregate quarry operations described in the previous section were modelled. Noise predictions were conducted based on the predictable worst case noise impact for each of the aggregate quarry operation areas at each of the receptors. This represents a design case where the quarry is running at full capacity with all of the equipment operating simultaneously and at locations where noise impact is highest for each receptor. The majority of the time, work would be occurring in other areas of the site with lower associated noise impacts.
The noise prediction model was generated using Datakustik’s Noise Prediction Software, CadnaA (Version 4.5). This model is based on established noise prediction methods outlined in the ISO 9613-2 standard entitled “Acoustics – Attenuation of sound during propagation outdoors – Part 2: General method and calculation”.
Cornwall Gravel Co. Ltd. – Canaan Quarry Page 7
Noise levels were predicted using existing topography under conditions of downwind propagation, generally with hard ground modelled in the quarry area and soft ground conditions near the points of reception. There is some foliage surrounding the site, but this was not modelled for conservatism. Appendix A contains sample stationary source calculations.
As the lands in the adjacent Canaan II Quarry (ARA Licence Number 608401) to the west are extracted, some of the shielding provided by those lands will be reduced. However, this adjacent quarry has been designed in accordance with the MOECC guidelines as per the noise study titled “Acoustical Study of the Proposed Canaan II Quarry”, prepared by Hugh Williamson Associates Inc., dated December 19, 2005. The perimeter earth berms specified in this study are predicted to replace the shielding lost by the removal of the natural topography.
The drill elevation was modelled with a base elevation located on the top of the bench during any given lift.
The noise impact of the operation was predicted. Where the MOECC sound level limits were calculated to be exceeded, noise control measures were modelled and the noise impact recalculated. This process was repeated until the sound level limits were satisfied.
Aggregate Quarry Noise Sources
The reference sound pressure levels used for the aggregate quarry equipment are outlined in Table 3. These were based on similar equipment from the Aercoustics database.
Table 3: Reference Sound Pressure Levels of Aggregate Quarry Equipment
Equipment Reference Sound Pressure Level at 30m
(dBA)
Portable Processing Plant (crushing, screening & washing)
86
Extraction Loader 74
Shipment Loader 711
Rock Drill 76
Highway Truck – 25 km/hr 65
1 - The shipment loaders were assumed to operate at a 50 % duty cycle.
Recommended Noise Controls
The recommended noise controls presented in this section have been determined through noise impact predictions to be effective in controlling the noise generated by the aggregate quarry activity, satisfying the MOECC sound level limits. It should be noted that there may be other effective noise controls that could replace or revise some of the recommended controls of this report. Prior to implementing any changes to the noise controls,
Cornwall Gravel Co. Ltd. – Canaan Quarry Page 8
appropriate studies should be undertaken to demonstrate that the MOECC sound level limits will be satisfied.
No additional noise controls are required to address receptors on vacant noise sensitive zoned lots.
An acoustic barrier is required to be solid, with no gaps or openings, and shall satisfy a minimum area density of 20 kg/m2.
Refer to Figures 3 to 11 for the noise prediction model at various scenarios and an illustration of the timing and implementation of noise controls such as acoustic barriers and administrative requirements.
The following list presents a comprehensive summary of the recommended noise controls:
1. The hours of operation shall be as described in Table A.
Table A: Operating Hours
Time of Day Day of Week Operations
07:00 to 07:00 (24 hours)
Monday to Sunday Loading & Shipping Only
07:00 to 19:00 Monday to Sunday Full Operation – Extraction, Processing, Rock Drilling, Loading & Shipping
2. The extraction, processing and shipment equipment operating in the quarry is limited to:
a. One (1) Processing Plant
b. Two (2) Extraction Loaders
c. Two (2) Shipment Loaders
d. One (1) Rock Drill
e. 40 Highway truck trips/hr – assumed worst case 1 hr volume
3. The aggregate quarry equipment shall satisfy the noise emission levels listed in Table B.
Cornwall Gravel Co. Ltd. – Canaan Quarry Page 9
Table B: Reference Sound Pressure Levels of Aggregate Quarry Equipment
Equipment Reference Sound Pressure Level at 30m
(dBA)
Portable Processing Plant (crushing, screening & washing)
86
Extraction Loader 74
Shipment Loader 711
Rock Drill 76
Highway Truck – 25 km/hr 65
1 - The shipment loaders were assumed to operate at a 50 % duty cycle.
4. The sound emissions of all construction equipment involved in site preparation and rehabilitation activities shall comply with the sound level limits specified in the MOECC publication NPC-115 “Construction Equipment”.
5. Any proposed changes to the aspects of the extraction and processing operations relating to noise control shall be reviewed by a qualified acoustical consultant for compliance with the relevant noise criteria.
6. Prior to extraction of the newly licensed area of extraction, an acoustic barrier shall be installed to a height of 106 m a.s.l. along the south property line, returning 100 m north along the east property line, and shall remain for the project lifetime.
7. The north escarpment shall not be extracted until the first and second lifts are completed such that the entire remainder of the site has been extracted down to a quarry floor of 84 m a.s.l.
8. During the first and second lifts, a local acoustic barrier with a minimum height of 10 m shall be located on the west, south and east sides of the processing plant, between the processing equipment and receptors R01 to R14. This barrier shall be within 50 m of the processing equipment. It could take the form of a working face, a stockpile, ISO containers, a combination of these, or any other construction satisfying the requirements of an acoustic barrier. During the first lift, when the processing plant is within 250 m of the south extraction limit, the south local acoustic barrier between the processing equipment and receptors R05 to R09 shall be within 30 m of the processing equipment.
9. During the first lift, the portable processing plant shall not operate when the rock drill is operating within 150 m of the south extraction limit.
10. During the second lift, once extraction of the north escarpment has begun, the portable processing plant shall not operate when the rock drill is operating within 100 m of the north extraction limit.
Cornwall Gravel Co. Ltd. – Canaan Quarry Page 10
11. During the second lift, once extraction of the north escarpment has begun, the portable processing plant shall remain within 50 m of the north working face.
12. During the third lift, a local acoustic barrier with a minimum height of 10 m shall be located on the east side of the processing plant, between the processing equipment and receptors R09 to R14. This barrier shall be within 50 m of the processing equipment. It could take the form of a working face, a stockpile, ISO containers, a combination of these, or any other construction satisfying the requirements of an acoustic barrier.
Predicted Sound Levels with Controls
The predicted worst case noise levels produced by operations within the Canaan Quarry area are summarized in Table 4 below.
Table 4 : Worst Case Predicted Sound Levels and Criteria – Hourly LEQ (dBA)
Point of Reception
Shipping Only (05:00 to 07:00)
Extraction, Processing & Shipping (07:00 to 19:00)
Sound Level Limit Predicted
Maximum Sound Level
Sound Level Limit Predicted
Maximum Sound Level
R01 40 27 45 45
R02 40 23 45 43
R03 40 24 45 43
R04 40 23 45 43
R05 40 25 45 45
R06 40 25 45 43
R07 40 24 45 44
R08 40 25 45 45
R09 40 28 45 45
R10 40 31 45 44
R11 40 30 45 43
R12 40 31 45 43
R13 40 35 45 44
R14 40 40 45 45
R15 40 32 45 45
R16 40 28 45 44
VL17 40 34 45 44
VL18 40 24 45 44
VL19 40 26 45 45
VL20 45 34 50 47
With the incorporation of the recommended noise controls, the predicted noise impact will satisfy the MOECC sound level limits.
Cornwall Gravel Co. Ltd. – Canaan Quarry Page 11
6 Truck Traffic Noise on Haul Route The noise impact of truck traffic on public roadways is not addressed by the MOECC in their noise guidelines. However, the MOECC requires consideration of noise impact in choosing the off-property haul route.
The annual tonnage limit and general operation of the existing Canaan Quarry is not expected to change materially. Shipment trucks will continue to exit north onto Canaan Road and proceed to Colonial Road. This is the haul route that is currently being used by the existing quarry. Therefore, the off property haul route noise is not expected to change. With this, the existing haul route is the preferred route with respect to noise.
7 Conclusions Aercoustics has conducted a noise impact study for the Canaan Quarry. The purpose of this noise impact study was to provide noise control recommendations in order that the operation within the quarry will satisfy the Ontario Ministry of the Environment and Climate Change (MOECC) noise guidelines. Figure 2 provides a site plan outlining the aggregate quarry areas and the locations of local residences (receptors).
To this end, sound level limits, based on the MOECC noise guidelines, were developed. Calculations were then carried out to determine the worst case noise for each of the aggregate quarry operation areas at each of the receptors. Where noise was predicted to exceed the MOECC sound level limits, noise control recommendations and required equivalent source reference sound levels were provided.
Refer to Appendix B for a summary of the qualifications of the authors.
With the implementation of the recommended noise controls, the proposed aggregate quarry operation is predicted to satisfy the MOECC noise guidelines.
The scope of the work outlined in this document is limited to the acoustic, noise and/or vibration
control aspects of the design. Contractor to verify all dimensions
Scale: N.T.S. Drawn: DF Eng: DF Date: 2015.05.22 50 Ronson Drive, Suite 165, Toronto, ON P: 416.249.3361 F: 416.249.3613
Project Name:
Canaan Quarry
AEL File: 13209
Drawing Title: Key Plan Showing Site Location
Figure 1
R09
R10
R11
R12
R13
R14
R15
R16
R01
R02
R03
R04
R05
R06
R07
R08
VL17
VL18VL19
VL20
Canaan Quarry
Project ID: 13209.00
Scale:Drawn by:
Reviewed by:Date:
Revision:
NTSDFDFMay 2, 20162
Project Name
Canaan Quarry
Figure Title
Site Location Showing Nearby Receptors Figure 2
R09
R13
R17R14
R05
R08
R07
R18
Shipment Loaders
Highway Trucks
Project ID: 13209.00
Scale:
Drawn by:
Reviewed by:
Date:
Revision:
NTS
DF
DF
May 22, 2015
1
Project Name
Canaan Quarry
Figure Title
Noise Impact Predictions
Shipping and Loading Only (Nighttime)Figure 3
R09
R13
R17R14
R05
R08
R07
R18
Plant
Loaders
Drill
Highway Trucks
Project ID: 13209.00
Scale:
Drawn by:
Reviewed by:
Date:
Revision:
NTS
DF
DF
May 22, 2015
1
Project Name
Canaan Quarry
Figure Title
Noise Impact Predictions
Existing Operation in ComplianceFigure 4
R09
R13
R17R14
R05
R08
R07
R18
106 m
Drill
Loaders Plant
106 m
10 m high acoustic barriers
Highway Trucks
Project ID: 13209.00
Scale:
Drawn by:
Reviewed by:
Date:
Revision:
NTS
DF
DF
May 22, 2015
1
Project Name
Canaan Quarry
Figure Title
Noise Impact Predictions
First Lift - Scenario 1Figure 5
R09
R13
R17R14
R05
R08
R07
R18
106 m
Drill
106 m
10 m high acoustic barriers
Plant
Loaders
Highway Trucks
Project ID: 13209.00
Scale:
Drawn by:
Reviewed by:
Date:
Revision:
NTS
DF
DF
May 22, 2015
1
Project Name
Canaan Quarry
Figure Title
Noise Impact Predictions
First Lift - Scenario 2Figure 6
R09
R13
R17R14
R05
R08
R07
R18
106 m
Drill
Simultaneous Plant and Drill
operation prohibited when plant
is within 150 m of south limit
106 m
10 m high acoustic barriers
PlantSouth local barrier setback of
30 m when plant is within
250 m of south limitLoaders
Highway Trucks
Project ID: 13209.00
Scale:
Drawn by:
Reviewed by:
Date:
Revision:
NTS
DF
DF
May 22, 2015
1
Project Name
Canaan Quarry
Figure Title
Noise Impact Predictions
First Lift - Scenario 3Figure 7
R09
R13
R17R14
R05
R08
R07
R18
106 m
106 mPlant
10 m high acoustic barriers
Loaders
Drill
Highway Trucks
Project ID: 13209.00
Scale:
Drawn by:
Reviewed by:
Date:
Revision:
NTS
DF
DF
May 22, 2015
1
Project Name
Canaan Quarry
Figure Title
Noise Impact Predictions
Second Lift - Scenario 1Figure 8
R09
R13
R17R14
R05
R08
R07
R18
106 m
106 m
10 m high acoustic barriers
Plant
Loaders
Drill
Simultaneous Plant and Drill
operation prohibited when plant
is within 100 m of north limit
Highway Trucks
Project ID: 13209.00
Scale:
Drawn by:
Reviewed by:
Date:
Revision:
NTS
DF
DF
May 22, 2015
1
Project Name
Canaan Quarry
Figure Title
Noise Impact Predictions
Second Lift - Scenario 2 (Escarpment Extraction)Figure 9
R09
R13
R17R14
R05
R08
R07
R18
106 m
106 m
Highway Trucks
10 m high acoustic barrier
Loaders
Plant
Drill
Project ID: 13209.00
Scale:
Drawn by:
Reviewed by:
Date:
Revision:
NTS
DF
DF
May 22, 2015
1
Project Name
Canaan Quarry
Figure Title
Noise Impact Predictions
Third LiftFigure 10
R09
R13
R17R14
R05
R08
R07
R18
106 m
106 m
Highway Trucks
Drill
Plant
Loaders
Project ID: 13209.00
Scale:
Drawn by:
Reviewed by:
Date:
Revision:
NTS
DF
DF
May 22, 2015
1
Project Name
Canaan Quarry
Figure Title
Noise Impact Predictions
Fourth LiftFigure 11
Cornwall Gravel Co. Ltd. – Canaan Quarry Appendices
Appendix A
Sample Stationary Source Noise Calculations
Cornwall Gravel Co. Ltd. – Canaan Quarry Appendices
Sound Power Data
Source ID 63 125 250 500 1000 2000 4000 8000 A Lin
Portable Processing Plant
128 127 120 121 119 117 114 107 124 132
Rock Drill 111 119 106 106 106 107 107 103 114 121
Extraction/ Shipment Loader 116 114 110 106 109 100 97 97 112 120
Highway Truck 106 100 98 100 100 96 88 78 103 111
ISO 9613-2 Sample CalculationPage 1 of 19
Receiver: R01Project: Caanan Quarry
Project Number: 13209
Time Period Total (dBA)
Day 43
Receiver Name Receiver ID X Y Z
4085 birchgrove R01 945814.6 5046793.4 97.9
Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr
Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 69.7 0.0 0.4 9.8 3.8 0.0 0.0 0.0 0.0 0.0 40
Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 68.3 0.0 0.1 5.0 2.7 0.0 0.0 0.0 0.0 0.0 38
Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 70.5 0.0 0.7 4.1 5.7 0.0 0.0 0.0 0.0 0.0 33
Highway Trucks D08_Trucks 946646.3 5047327.0 96.4 0 79 21.7 A 70.9 0.0 -0.4 5.2 3.9 0.0 0.0 0.0 0.0 0.0 21
Highway Trucks D08_Trucks 946593.8 5047269.1 96.4 0 79 8.7 A 70.2 0.0 -0.4 6.1 3.6 0.0 0.0 0.0 0.0 0.0 8
Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 71.8 0.0 -0.6 5.3 4.2 0.0 0.0 0.0 0.0 0.0 16
Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 73.4 0.0 1.5 10.4 4.9 0.0 0.0 0.0 0.0 0.0 7
Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 72.2 0.0 -0.6 5.4 4.4 0.0 0.0 0.0 0.0 0.0 13
Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 72.7 0.0 -0.6 5.4 4.6 0.0 0.0 0.0 0.0 0.0 13
Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 72.4 0.0 -0.6 5.4 4.5 0.0 0.0 0.0 0.0 0.0 12
Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 73.2 0.0 0.9 13.4 4.8 0.0 0.0 0.0 0.0 0.0 2
Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 73.7 0.0 1.6 6.8 5.0 0.0 0.0 0.0 0.0 0.0 7
Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 73.3 0.0 1.3 12.1 4.8 0.0 0.0 0.0 0.0 0.0 2
Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 73.1 0.0 0.2 9.6 4.7 0.0 0.0 0.0 0.0 0.0 5
Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 72.9 0.0 -0.4 12.1 4.7 0.0 0.0 0.0 0.0 0.0 3
Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 73.5 0.0 1.6 9.0 4.9 0.0 0.0 0.0 0.0 0.0 3
Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 73.3 0.0 1.3 12.7 4.8 0.0 0.0 0.0 0.0 0.0 -1
Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 72.8 0.0 -0.7 5.4 4.6 0.0 0.0 0.0 0.0 0.0 6
Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 72.9 0.0 -0.7 5.5 4.6 0.0 0.0 0.0 0.0 0.0 -1
ISO 9613-2 Sample CalculationPage 2 of 19
Receiver: R02Project: Caanan Quarry
Project Number: 13209
Time Period Total (dBA)
Day 43
Receiver Name Receiver ID X Y Z
4141 birchgrove R02 945905.4 5046616.9 90.4
Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr
Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 70.0 0.0 0.4 9.5 3.9 0.0 0.0 0.0 0.0 0.0 40
Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 68.7 0.0 0.1 5.1 2.8 0.0 0.0 0.0 0.0 0.0 38
Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 70.7 0.0 0.6 4.2 5.8 0.0 0.0 0.0 0.0 0.0 32
Highway Trucks D08_Trucks 946643.9 5047324.2 96.4 0 79 21.9 A 71.2 0.0 -0.5 5.9 4.0 0.0 0.0 0.0 0.0 0.0 20
Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 72.1 0.0 -0.6 5.4 4.3 0.0 0.0 0.0 0.0 0.0 16
Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 73.8 0.0 1.4 10.7 5.1 0.0 0.0 0.0 0.0 0.0 6
Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 72.5 0.0 -0.6 5.4 4.5 0.0 0.0 0.0 0.0 0.0 12
Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 73.0 0.0 -0.7 5.5 4.7 0.0 0.0 0.0 0.0 0.0 12
Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 72.7 0.0 -0.6 5.4 4.6 0.0 0.0 0.0 0.0 0.0 11
Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 73.5 0.0 0.8 8.9 4.9 0.0 0.0 0.0 0.0 0.0 6
Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 74.1 0.0 1.5 9.7 5.2 0.0 0.0 0.0 0.0 0.0 3
Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 73.7 0.0 1.3 12.5 5.0 0.0 0.0 0.0 0.0 0.0 1
Highway Trucks A02_Trucks 946839.8 5047552.7 92.2 0 79 11.1 A 73.4 0.0 0.3 11.0 4.9 0.0 0.0 0.0 0.0 0.0 0
Highway Trucks A02_Trucks 946837.8 5047540.0 94.2 0 79 11.1 A 73.4 0.0 0.0 10.0 4.9 0.0 0.0 0.0 0.0 0.0 1
Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 73.2 0.0 -0.4 15.4 4.8 0.0 0.0 0.0 0.0 0.0 -1
Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 74.0 0.0 1.5 10.3 5.1 0.0 0.0 0.0 0.0 0.0 2
Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 73.6 0.0 1.1 14.1 5.0 0.0 0.0 0.0 0.0 0.0 -3
Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 73.1 0.0 -0.7 5.5 4.8 0.0 0.0 0.0 0.0 0.0 5
Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 73.2 0.0 -0.7 5.5 4.8 0.0 0.0 0.0 0.0 0.0 -1
ISO 9613-2 Sample CalculationPage 3 of 19
Receiver: R03Project: Caanan Quarry
Project Number: 13209
Time Period Total (dBA)
Day 43
Receiver Name Receiver ID X Y Z
4153 birchgrove R03 945927.6 5046544.4 91.1
Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr
Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 70.3 0.0 -1.7 10.0 4.0 0.0 0.0 0.0 0.0 0.0 42
Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 69.1 0.0 -1.5 6.3 2.9 0.0 0.0 0.0 0.0 0.0 38
Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 71.0 0.0 -0.9 5.7 5.9 0.0 0.0 0.0 0.0 0.0 32
Highway Trucks D08_Trucks 946643.9 5047324.2 96.4 0 79 21.9 A 71.5 0.0 -2.3 7.3 4.1 0.0 0.0 0.0 0.0 0.0 20
Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 72.4 0.0 -2.5 7.3 4.4 0.0 0.0 0.0 0.0 0.0 15
Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 74.1 0.0 -0.4 11.8 5.2 0.0 0.0 0.0 0.0 0.0 6
Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 72.7 0.0 -2.6 7.4 4.6 0.0 0.0 0.0 0.0 0.0 12
Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 73.2 0.0 -2.7 7.5 4.8 0.0 0.0 0.0 0.0 0.0 12
Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 73.0 0.0 -2.7 7.4 4.7 0.0 0.0 0.0 0.0 0.0 11
Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 73.8 0.0 -1.0 10.8 5.0 0.0 0.0 0.0 0.0 0.0 5
Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 74.4 0.0 -0.2 10.3 5.3 0.0 0.0 0.0 0.0 0.0 4
Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 73.9 0.0 -0.5 14.0 5.1 0.0 0.0 0.0 0.0 0.0 1
Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 73.6 0.0 -1.7 10.5 5.0 0.0 0.0 0.0 0.0 0.0 5
Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 73.5 0.0 -2.4 17.4 4.9 0.0 0.0 0.0 0.0 0.0 -1
Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 74.2 0.0 -0.3 10.7 5.3 0.0 0.0 0.0 0.0 0.0 3
Highway Trucks A02_Trucks 946832.2 5047602.2 87.0 0 79 11.9 A 73.9 0.0 -0.6 14.5 5.1 0.0 0.0 0.0 0.0 0.0 -3
Highway Trucks A02_Trucks 946834.9 5047594.0 87.6 0 79 2.6 A 73.8 0.0 -0.7 10.2 5.1 0.0 0.0 0.0 0.0 0.0 -7
Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 73.4 0.0 -2.7 7.5 4.9 0.0 0.0 0.0 0.0 0.0 5
Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 73.4 0.0 -2.7 7.5 4.9 0.0 0.0 0.0 0.0 0.0 -1
ISO 9613-2 Sample CalculationPage 4 of 19
Receiver: R04Project: Caanan Quarry
Project Number: 13209
Time Period Total (dBA)
Day 43
Receiver Name Receiver ID X Y Z
4161 birchgrove R04 945959.2 5046480.7 86.9
Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr
Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 70.5 0.0 0.4 7.7 4.0 0.0 0.0 0.0 0.0 0.0 41
Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 69.5 0.0 0.1 4.8 3.0 0.0 0.0 0.0 0.0 0.0 37
Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 71.2 0.0 0.8 4.0 6.0 0.0 0.0 0.0 0.0 0.0 32
Highway Trucks D08_Trucks 946643.9 5047324.2 96.4 0 79 21.9 A 71.7 0.0 -0.4 5.4 4.2 0.0 0.0 0.0 0.0 0.0 20
Highway Trucks D08_Trucks 946735.6 5047415.0 96.4 0 79 15.3 A 72.7 0.0 -0.5 5.4 4.6 0.0 0.0 0.0 0.0 0.0 12
Highway Trucks D08_Trucks 946709.6 5047393.1 96.4 0 79 15.4 A 72.4 0.0 -0.6 5.3 4.5 0.0 0.0 0.0 0.0 0.0 12
Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 74.3 0.0 1.4 10.3 5.3 0.0 0.0 0.0 0.0 0.0 6
Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 73.4 0.0 -0.6 5.4 4.9 0.0 0.0 0.0 0.0 0.0 11
Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 72.9 0.0 -0.6 5.4 4.7 0.0 0.0 0.0 0.0 0.0 12
Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 73.2 0.0 -0.6 5.4 4.8 0.0 0.0 0.0 0.0 0.0 11
Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 73.9 0.0 0.8 10.0 5.1 0.0 0.0 0.0 0.0 0.0 4
Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 74.6 0.0 1.5 8.5 5.4 0.0 0.0 0.0 0.0 0.0 4
Highway Trucks A02_Trucks 946817.6 5047633.9 86.7 0 79 5.7 A 74.2 0.0 1.3 11.4 5.2 0.0 0.0 0.0 0.0 0.0 -8
Highway Trucks A02_Trucks 946824.1 5047620.8 86.6 0 79 14.0 A 74.1 0.0 1.3 12.2 5.2 0.0 0.0 0.0 0.0 0.0 0
Highway Trucks A02_Trucks 946839.6 5047551.6 92.3 0 79 11.8 A 73.8 0.0 0.3 9.9 5.1 0.0 0.0 0.0 0.0 0.0 1
Highway Trucks A02_Trucks 946837.6 5047538.9 94.3 0 79 10.3 A 73.8 0.0 0.1 11.6 5.0 0.0 0.0 0.0 0.0 0.0 -2
Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 73.7 0.0 -0.4 16.0 5.0 0.0 0.0 0.0 0.0 0.0 -2
Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 74.4 0.0 1.5 9.0 5.4 0.0 0.0 0.0 0.0 0.0 2
Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 74.0 0.0 1.1 10.1 5.2 0.0 0.0 0.0 0.0 0.0 0
Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 73.6 0.0 -0.7 5.5 4.9 0.0 0.0 0.0 0.0 0.0 5
Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 73.6 0.0 -0.7 5.5 5.0 0.0 0.0 0.0 0.0 0.0 -2
ISO 9613-2 Sample CalculationPage 5 of 19
Receiver: R05Project: Caanan Quarry
Project Number: 13209
Time Period Total (dBA)
Day 44
Receiver Name Receiver ID X Y Z
4469 Birchgrove R05 946451.8 5046596.4 90.4
Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr
Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 66.8 0.0 -1.6 15.8 3.0 0.0 0.0 0.0 0.0 0.0 40
Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 65.9 0.0 -1.7 8.1 2.1 0.0 0.0 0.0 0.0 0.0 40
Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 67.5 0.0 -0.3 5.1 4.8 0.0 0.0 0.0 0.0 0.0 37
Highway Trucks D08_Trucks 946674.9 5047358.5 96.4 0 79 18.1 A 69.0 0.0 -2.4 8.2 3.3 0.0 0.0 0.0 0.0 0.0 19
Highway Trucks D08_Trucks 946630.6 5047309.6 96.4 0 79 18.3 A 68.3 0.0 -2.3 12.6 3.1 0.0 0.0 0.0 0.0 0.0 15
Highway Trucks D08_Trucks 946599.5 5047275.4 96.4 0 79 13.9 A 67.8 0.0 -2.2 11.1 2.9 0.0 0.0 0.0 0.0 0.0 13
Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 69.6 0.0 -2.5 7.2 3.4 0.0 0.0 0.0 0.0 0.0 19
Highway Trucks A02_Trucks 946794.7 5047699.8 86.4 0 79 2.5 A 72.3 0.0 -0.5 10.7 4.4 0.0 0.0 0.0 0.0 0.0 -6
Highway Trucks A02_Trucks 946805.9 5047667.2 86.6 0 79 18.3 A 72.0 0.0 -0.7 8.9 4.3 0.0 0.0 0.0 0.0 0.0 12
Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 70.0 0.0 -2.5 7.3 3.6 0.0 0.0 0.0 0.0 0.0 16
Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 70.7 0.0 -2.6 7.4 3.8 0.0 0.0 0.0 0.0 0.0 15
Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 70.3 0.0 -2.6 7.3 3.7 0.0 0.0 0.0 0.0 0.0 15
Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 71.4 0.0 -1.0 12.3 4.1 0.0 0.0 0.0 0.0 0.0 7
Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 71.2 0.0 -1.6 18.1 4.0 0.0 0.0 0.0 0.0 0.0 1
Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 72.5 0.0 -0.5 9.4 4.5 0.0 0.0 0.0 0.0 0.0 8
Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 71.8 0.0 -0.7 9.9 4.2 0.0 0.0 0.0 0.0 0.0 8
Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 71.0 0.0 -2.3 21.3 3.9 0.0 0.0 0.0 0.0 0.0 -2
Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 72.3 0.0 -0.5 10.4 4.4 0.0 0.0 0.0 0.0 0.0 6
Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 71.6 0.0 -0.7 12.6 4.2 0.0 0.0 0.0 0.0 0.0 3
Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 70.9 0.0 -2.6 7.4 3.9 0.0 0.0 0.0 0.0 0.0 8
Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 70.9 0.0 -2.6 7.4 3.9 0.0 0.0 0.0 0.0 0.0 2
ISO 9613-2 Sample CalculationPage 6 of 19
Receiver: R06Project: Caanan Quarry
Project Number: 13209
Time Period Total (dBA)
Day 42
Receiver Name Receiver ID X Y Z
3741 maglady R06 946695.5 5046425.8 87.8
Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr
Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 68.9 0.0 -1.4 14.7 3.6 0.0 0.0 0.0 0.0 0.0 38
Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 69.1 0.0 -0.1 4.8 5.3 0.0 0.0 0.0 0.0 0.0 34
Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 68.7 0.0 -1.5 6.6 2.8 0.0 0.0 0.0 0.0 0.0 38
Highway Trucks D08_Trucks 946659.1 5047341.0 96.4 0 79 20.4 A 70.2 0.0 -2.0 6.8 3.7 0.0 0.0 0.0 0.0 0.0 20
Highway Trucks D08_Trucks 946612.7 5047289.9 96.4 0 79 14.3 A 69.8 0.0 -2.0 9.9 3.5 0.0 0.0 0.0 0.0 0.0 12
Highway Trucks D08_Trucks 946601.6 5047277.7 96.4 0 79 7.7 A 69.7 0.0 -1.9 17.9 3.5 0.0 0.0 0.0 0.0 0.0 -3
Highway Trucks D08_Trucks 946595.5 5047270.9 96.4 0 79 10.9 A 69.6 0.0 -1.9 9.7 3.4 0.0 0.0 0.0 0.0 0.0 9
Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 70.8 0.0 -2.1 6.9 3.9 0.0 0.0 0.0 0.0 0.0 17
Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 72.9 0.0 -0.3 6.3 4.7 0.0 0.0 0.0 0.0 0.0 13
Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 71.6 0.0 -2.3 7.0 4.1 0.0 0.0 0.0 0.0 0.0 14
Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 71.1 0.0 -2.2 6.9 4.0 0.0 0.0 0.0 0.0 0.0 14
Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 71.3 0.0 -2.2 7.0 4.0 0.0 0.0 0.0 0.0 0.0 13
Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 72.3 0.0 -0.5 16.1 4.4 0.0 0.0 0.0 0.0 0.0 2
Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 72.1 0.0 -1.2 20.0 4.3 0.0 0.0 0.0 0.0 0.0 -3
Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 73.4 0.0 -0.3 5.6 4.9 0.0 0.0 0.0 0.0 0.0 10
Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 72.6 0.0 -0.4 9.0 4.5 0.0 0.0 0.0 0.0 0.0 7
Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 71.9 0.0 -1.9 21.8 4.3 0.0 0.0 0.0 0.0 0.0 -4
Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 73.2 0.0 -0.3 5.8 4.8 0.0 0.0 0.0 0.0 0.0 9
Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 72.5 0.0 -0.3 12.0 4.5 0.0 0.0 0.0 0.0 0.0 2
Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 71.8 0.0 -2.3 7.0 4.2 0.0 0.0 0.0 0.0 0.0 7
Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 71.8 0.0 -2.3 7.1 4.2 0.0 0.0 0.0 0.0 0.0 1
ISO 9613-2 Sample CalculationPage 7 of 19
Receiver: R07Project: Caanan Quarry
Project Number: 13209
Time Period Total (dBA)
Day 42
Receiver Name Receiver ID X Y Z
3799 maglady R07 946807.0 5046531.9 84.7
Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr
Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 68.0 0.0 0.5 14.1 3.3 0.0 0.0 0.0 0.0 0.0 38
Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 68.1 0.0 1.2 3.7 5.0 0.0 0.0 0.0 0.0 0.0 36
Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 68.1 0.0 0.0 5.6 2.6 0.0 0.0 0.0 0.0 0.0 38
Highway Trucks D08_Trucks 946650.2 5047331.2 96.4 0 79 21.4 A 69.2 0.0 -0.3 5.2 3.3 0.0 0.0 0.0 0.0 0.0 22
Highway Trucks D08_Trucks 946600.7 5047276.7 96.4 0 79 10.0 A 68.8 0.0 -0.2 11.6 3.2 0.0 0.0 0.0 0.0 0.0 5
Highway Trucks D08_Trucks 946594.3 5047269.7 96.4 0 79 9.5 A 68.7 0.0 -0.2 5.3 3.2 0.0 0.0 0.0 0.0 0.0 11
Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 69.9 0.0 -0.4 5.2 3.5 0.0 0.0 0.0 0.0 0.0 19
Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 72.1 0.0 1.3 7.1 4.3 0.0 0.0 0.0 0.0 0.0 12
Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 70.6 0.0 -0.4 5.2 3.8 0.0 0.0 0.0 0.0 0.0 15
Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 70.1 0.0 -0.4 5.2 3.6 0.0 0.0 0.0 0.0 0.0 15
Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 70.4 0.0 -0.4 5.2 3.7 0.0 0.0 0.0 0.0 0.0 15
Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 71.4 0.0 1.1 16.8 4.1 0.0 0.0 0.0 0.0 0.0 1
Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 71.1 0.0 0.5 19.6 4.0 0.0 0.0 0.0 0.0 0.0 -3
Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 71.8 0.0 1.2 10.7 4.2 0.0 0.0 0.0 0.0 0.0 5
Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 70.9 0.0 -0.1 21.2 3.9 0.0 0.0 0.0 0.0 0.0 -4
Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 72.7 0.0 1.3 4.9 4.6 0.0 0.0 0.0 0.0 0.0 11
Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 72.4 0.0 1.3 5.3 4.5 0.0 0.0 0.0 0.0 0.0 9
Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 71.6 0.0 1.2 14.6 4.1 0.0 0.0 0.0 0.0 0.0 -1
Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 70.8 0.0 -0.5 5.2 3.9 0.0 0.0 0.0 0.0 0.0 9
Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 70.8 0.0 -0.5 5.2 3.9 0.0 0.0 0.0 0.0 0.0 2
ISO 9613-2 Sample CalculationPage 8 of 19
Receiver: R08Project: Caanan Quarry
Project Number: 13209
Time Period Total (dBA)
Day 45
Receiver Name Receiver ID X Y Z
(untitled) R08 946718.7 5046751.7 89.8
Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr
Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 64.5 0.0 0.1 16.8 2.5 0.0 0.0 0.0 0.0 0.0 40
Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 64.7 0.0 0.7 4.5 4.0 0.0 0.0 0.0 0.0 0.0 40
Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 64.6 0.0 -0.3 7.9 1.9 0.0 0.0 0.0 0.0 0.0 40
Highway Trucks D08_Trucks 946653.1 5047334.4 96.4 0 79 21.1 A 66.4 0.0 -0.7 6.6 2.5 0.0 0.0 0.0 0.0 0.0 25
Highway Trucks D08_Trucks 946603.9 5047280.2 96.4 0 79 12.5 A 65.7 0.0 -0.6 15.0 2.4 0.0 0.0 0.0 0.0 0.0 9
Highway Trucks D08_Trucks 946595.9 5047271.4 96.4 0 79 7.8 A 65.6 0.0 -0.6 7.3 2.3 0.0 0.0 0.0 0.0 0.0 12
Highway Trucks D08_Trucks 946592.6 5047267.8 96.4 0 79 5.8 A 65.5 0.0 -0.6 14.1 2.3 0.0 0.0 0.0 0.0 0.0 3
Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 67.3 0.0 -0.8 6.1 2.8 0.0 0.0 0.0 0.0 0.0 21
Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 70.3 0.0 0.8 9.5 3.7 0.0 0.0 0.0 0.0 0.0 13
Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 67.7 0.0 -0.9 6.0 2.9 0.0 0.0 0.0 0.0 0.0 18
Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 68.4 0.0 -0.9 5.9 3.1 0.0 0.0 0.0 0.0 0.0 18
Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 68.1 0.0 -0.9 5.9 3.0 0.0 0.0 0.0 0.0 0.0 17
Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 69.4 0.0 0.6 18.1 3.4 0.0 0.0 0.0 0.0 0.0 3
Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 69.1 0.0 0.0 21.2 3.3 0.0 0.0 0.0 0.0 0.0 -1
Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 68.8 0.0 -0.7 22.3 3.2 0.0 0.0 0.0 0.0 0.0 -1
Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 69.9 0.0 0.7 12.7 3.5 0.0 0.0 0.0 0.0 0.0 6
Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 70.9 0.0 0.9 7.8 3.9 0.0 0.0 0.0 0.0 0.0 10
Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 70.7 0.0 0.9 8.4 3.8 0.0 0.0 0.0 0.0 0.0 9
Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 69.7 0.0 0.7 14.8 3.5 0.0 0.0 0.0 0.0 0.0 2
Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 68.7 0.0 -0.9 5.8 3.2 0.0 0.0 0.0 0.0 0.0 11
Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 68.7 0.0 -0.9 5.8 3.2 0.0 0.0 0.0 0.0 0.0 5
ISO 9613-2 Sample CalculationPage 9 of 19
Receiver: R09Project: Caanan Quarry
Project Number: 13209
Time Period Total (dBA)
Day 43
Receiver Name Receiver ID X Y Z
147 Belvedere R09 947215.2 5047131.9 90.8
Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr
Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 67.2 0.0 -0.4 13.6 3.1 0.0 0.0 0.0 0.0 0.0 40
Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 66.1 0.0 0.2 4.8 4.4 0.0 0.0 0.0 0.0 0.0 38
Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 68.6 0.0 -0.8 11.4 2.7 0.0 0.0 0.0 0.0 0.0 33
Highway Trucks D08_Trucks 946643.9 5047324.2 96.4 0 79 21.9 A 66.6 0.0 -1.1 6.9 2.6 0.0 0.0 0.0 0.0 0.0 25
Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 66.0 0.0 -0.8 6.8 2.5 0.0 0.0 0.0 0.0 0.0 22
Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 67.6 0.0 1.9 3.8 2.9 0.0 0.0 0.0 0.0 0.0 21
Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 65.7 0.0 -0.1 11.6 2.4 0.0 0.0 0.0 0.0 0.0 15
Highway Trucks A02_Trucks 946763.0 5047438.2 96.4 0 79 15.2 A 65.7 0.0 -0.5 6.8 2.4 0.0 0.0 0.0 0.0 0.0 19
Highway Trucks A02_Trucks 946749.5 5047426.6 96.4 0 79 4.4 A 65.8 0.0 -0.6 7.4 2.4 0.0 0.0 0.0 0.0 0.0 8
Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 66.3 0.0 1.9 9.1 2.5 0.0 0.0 0.0 0.0 0.0 14
Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 65.7 0.0 -0.3 6.5 2.4 0.0 0.0 0.0 0.0 0.0 19
Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 66.0 0.0 1.8 12.4 2.4 0.0 0.0 0.0 0.0 0.0 10
Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 65.8 0.0 1.5 20.7 2.4 0.0 0.0 0.0 0.0 0.0 2
Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 67.0 0.0 1.9 5.8 2.7 0.0 0.0 0.0 0.0 0.0 16
Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 68.4 0.0 2.0 3.5 3.1 0.0 0.0 0.0 0.0 0.0 17
Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 68.1 0.0 2.0 3.5 3.0 0.0 0.0 0.0 0.0 0.0 16
Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 66.6 0.0 1.9 7.5 2.6 0.0 0.0 0.0 0.0 0.0 12
Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 65.8 0.0 0.1 14.2 2.4 0.0 0.0 0.0 0.0 0.0 6
Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 65.8 0.0 0.1 13.9 2.4 0.0 0.0 0.0 0.0 0.0 0
ISO 9613-2 Sample CalculationPage 10 of 19
Receiver: R10Project: Caanan Quarry
Project Number: 13209
Time Period Total (dBA)
Day 41
Receiver Name Receiver ID X Y Z
3002 Nolan R10 947626.8 5047368.9 85.3
Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr
Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 71.6 0.0 -1.9 10.9 4.4 0.0 0.0 0.0 0.0 0.0 39
Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 70.8 0.0 -0.6 5.4 5.8 0.0 0.0 0.0 0.0 0.0 32
Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 72.5 0.0 -2.2 9.2 3.9 0.0 0.0 0.0 0.0 0.0 31
Highway Trucks D08_Trucks 946648.3 5047329.1 96.4 0 79 21.6 A 70.8 0.0 -2.0 6.8 3.9 0.0 0.0 0.0 0.0 0.0 21
Highway Trucks D08_Trucks 946595.8 5047271.2 96.4 0 79 11.2 A 71.3 0.0 -2.2 6.9 4.0 0.0 0.0 0.0 0.0 0.0 10
Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 70.1 0.0 -1.8 7.0 3.6 0.0 0.0 0.0 0.0 0.0 18
Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 69.8 0.0 0.6 0.0 3.5 0.0 0.0 0.0 0.0 0.0 23
Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 69.4 0.0 -1.3 11.5 3.4 0.0 0.0 0.0 0.0 0.0 12
Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 69.2 0.0 0.6 0.0 3.3 0.0 0.0 0.0 0.0 0.0 21
Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 69.8 0.0 -1.6 8.8 3.5 0.0 0.0 0.0 0.0 0.0 14
Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 69.6 0.0 -1.5 10.9 3.4 0.0 0.0 0.0 0.0 0.0 11
Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 70.3 0.0 0.6 0.0 3.7 0.0 0.0 0.0 0.0 0.0 19
Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 69.5 0.0 0.6 0.0 3.4 0.0 0.0 0.0 0.0 0.0 20
Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 69.1 0.0 0.6 0.0 3.3 0.0 0.0 0.0 0.0 0.0 20
Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 69.2 0.0 0.6 4.4 3.3 0.0 0.0 0.0 0.0 0.0 15
Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 70.1 0.0 0.6 0.0 3.6 0.0 0.0 0.0 0.0 0.0 18
Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 69.4 0.0 0.6 0.0 3.4 0.0 0.0 0.0 0.0 0.0 18
Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 69.3 0.0 0.1 21.3 3.3 0.0 0.0 0.0 0.0 0.0 -6
Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 69.2 0.0 0.5 22.9 3.3 0.0 0.0 0.0 0.0 0.0 -14
ISO 9613-2 Sample CalculationPage 11 of 19
Receiver: R11Project: Caanan Quarry
Project Number: 13209
Time Period Total (dBA)
Day 41
Receiver Name Receiver ID X Y Z
(untitled) R11 947659.7 5047546.0 82.9
Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr
Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 72.1 0.0 0.5 7.6 4.6 0.0 0.0 0.0 0.0 0.0 39
Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 71.4 0.0 1.0 3.8 6.1 0.0 0.0 0.0 0.0 0.0 31
Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 73.0 0.0 -0.3 6.5 4.1 0.0 0.0 0.0 0.0 0.0 31
Highway Trucks D08_Trucks 946643.9 5047324.2 96.4 0 79 21.9 A 71.3 0.0 -0.1 4.9 4.0 0.0 0.0 0.0 0.0 0.0 20
Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 70.5 0.0 0.1 5.6 3.8 0.0 0.0 0.0 0.0 0.0 17
Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 69.7 0.0 2.1 0.0 3.5 0.0 0.0 0.0 0.0 0.0 22
Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 69.6 0.0 0.9 10.1 3.5 0.0 0.0 0.0 0.0 0.0 10
Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 69.3 0.0 2.0 0.0 3.4 0.0 0.0 0.0 0.0 0.0 19
Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 70.1 0.0 0.2 7.4 3.6 0.0 0.0 0.0 0.0 0.0 13
Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 70.0 0.0 2.1 0.0 3.6 0.0 0.0 0.0 0.0 0.0 18
Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 69.5 0.0 2.1 0.0 3.4 0.0 0.0 0.0 0.0 0.0 18
Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 69.9 0.0 0.3 7.4 3.5 0.0 0.0 0.0 0.0 0.0 12
Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 69.3 0.0 2.0 0.0 3.3 0.0 0.0 0.0 0.0 0.0 18
Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 69.4 0.0 2.0 0.0 3.4 0.0 0.0 0.0 0.0 0.0 18
Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 69.9 0.0 2.1 0.0 3.6 0.0 0.0 0.0 0.0 0.0 17
Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 69.4 0.0 2.0 0.0 3.4 0.0 0.0 0.0 0.0 0.0 16
Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 69.5 0.0 1.8 20.0 3.4 0.0 0.0 0.0 0.0 0.0 -7
Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 69.5 0.0 2.0 21.1 3.4 0.0 0.0 0.0 0.0 0.0 -14
ISO 9613-2 Sample CalculationPage 12 of 19
Receiver: R12Project: Caanan Quarry
Project Number: 13209
Time Period Total (dBA)
Day 40
Receiver Name Receiver ID X Y Z
(untitled) R12 947480.7 5047908.3 86.2
Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr
Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 72.2 0.0 0.4 8.1 4.6 0.0 0.0 0.0 0.0 0.0 39
Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 71.6 0.0 1.0 3.8 6.1 0.0 0.0 0.0 0.0 0.0 31
Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 73.1 0.0 -0.3 7.0 4.1 0.0 0.0 0.0 0.0 0.0 31
Highway Trucks D08_Trucks 946657.1 5047338.9 96.4 0 79 20.7 A 71.0 0.0 0.0 4.8 3.9 0.0 0.0 0.0 0.0 0.0 19
Highway Trucks D08_Trucks 946604.6 5047281.0 96.4 0 79 16.0 A 71.6 0.0 -0.2 5.0 4.2 0.0 0.0 0.0 0.0 0.0 14
Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 70.2 0.0 0.1 5.0 3.6 0.0 0.0 0.0 0.0 0.0 18
Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 68.1 0.0 2.0 0.0 3.0 0.0 0.0 0.0 0.0 0.0 24
Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 68.1 0.0 2.0 0.0 3.0 0.0 0.0 0.0 0.0 0.0 21
Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 68.2 0.0 2.0 0.0 3.0 0.0 0.0 0.0 0.0 0.0 21
Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 69.0 0.0 1.2 12.8 3.3 0.0 0.0 0.0 0.0 0.0 8
Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 68.1 0.0 2.0 0.0 3.0 0.0 0.0 0.0 0.0 0.0 20
Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 69.7 0.0 0.3 6.3 3.5 0.0 0.0 0.0 0.0 0.0 14
Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 68.3 0.0 2.0 0.0 3.1 0.0 0.0 0.0 0.0 0.0 19
Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 68.1 0.0 2.0 0.0 3.0 0.0 0.0 0.0 0.0 0.0 19
Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 69.3 0.0 0.3 9.7 3.4 0.0 0.0 0.0 0.0 0.0 11
Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 68.6 0.0 2.0 0.0 3.1 0.0 0.0 0.0 0.0 0.0 19
Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 68.1 0.0 2.0 0.0 3.0 0.0 0.0 0.0 0.0 0.0 18
Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 68.7 0.0 1.8 16.1 3.2 0.0 0.0 0.0 0.0 0.0 -2
Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 68.7 0.0 2.0 17.1 3.2 0.0 0.0 0.0 0.0 0.0 -9
ISO 9613-2 Sample CalculationPage 13 of 19
Receiver: R13Project: Caanan Quarry
Project Number: 13209
Time Period Total (dBA)
Day 42
Receiver Name Receiver ID X Y Z
(untitled) R13 947342.2 5047989.4 93.0
Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr
Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 71.8 0.0 -1.9 9.4 4.5 0.0 0.0 0.0 0.0 0.0 40
Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 71.2 0.0 -0.7 5.5 6.0 0.0 0.0 0.0 0.0 0.0 32
Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 72.7 0.0 -2.2 8.0 4.0 0.0 0.0 0.0 0.0 0.0 32
Highway Trucks D08_Trucks 946643.9 5047324.2 96.4 0 79 21.9 A 70.7 0.0 -2.0 6.8 3.8 0.0 0.0 0.0 0.0 0.0 21
Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 69.6 0.0 -1.7 6.7 3.5 0.0 0.0 0.0 0.0 0.0 19
Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 66.9 0.0 0.5 0.0 2.7 0.0 0.0 0.0 0.0 0.0 27
Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 66.7 0.0 0.5 0.0 2.6 0.0 0.0 0.0 0.0 0.0 24
Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 67.3 0.0 0.5 0.0 2.8 0.0 0.0 0.0 0.0 0.0 23
Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 68.3 0.0 -0.3 11.8 3.1 0.0 0.0 0.0 0.0 0.0 12
Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 67.1 0.0 0.5 0.0 2.7 0.0 0.0 0.0 0.0 0.0 23
Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 66.8 0.0 0.5 0.0 2.6 0.0 0.0 0.0 0.0 0.0 23
Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 67.5 0.0 0.5 0.0 2.8 0.0 0.0 0.0 0.0 0.0 22
Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 69.1 0.0 -1.5 8.4 3.3 0.0 0.0 0.0 0.0 0.0 15
Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 68.7 0.0 -1.3 10.1 3.2 0.0 0.0 0.0 0.0 0.0 13
Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 67.8 0.0 0.5 0.0 2.9 0.0 0.0 0.0 0.0 0.0 21
Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 67.1 0.0 0.5 0.0 2.7 0.0 0.0 0.0 0.0 0.0 21
Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 68.0 0.0 0.3 17.4 3.0 0.0 0.0 0.0 0.0 0.0 -1
Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 68.0 0.0 0.5 18.7 3.0 0.0 0.0 0.0 0.0 0.0 -8
ISO 9613-2 Sample CalculationPage 14 of 19
Receiver: R14Project: Caanan Quarry
Project Number: 13209
Time Period Total (dBA)
Day 45
Receiver Name Receiver ID X Y Z
2838 Nolan R14 947071.2 5047846.5 86.0
Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr
Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 69.2 0.0 -0.2 8.8 3.7 0.0 0.0 0.0 0.0 0.0 43
Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 68.4 0.0 0.4 4.5 5.1 0.0 0.0 0.0 0.0 0.0 35
Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 70.3 0.0 -0.9 5.8 3.2 0.0 0.0 0.0 0.0 0.0 36
Highway Trucks D08_Trucks 946643.9 5047324.2 96.4 0 79 21.9 A 67.6 0.0 -0.6 5.3 2.9 0.0 0.0 0.0 0.0 0.0 25
Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 66.0 0.0 -0.2 5.0 2.5 0.0 0.0 0.0 0.0 0.0 24
Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 61.1 0.0 1.6 0.0 1.5 0.0 0.0 0.0 0.0 0.0 33
Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 60.6 0.0 1.6 0.0 1.4 0.0 0.0 0.0 0.0 0.0 30
Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 62.1 0.0 1.7 0.0 1.7 0.0 0.0 0.0 0.0 0.0 29
Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 61.5 0.0 1.7 0.0 1.6 0.0 0.0 0.0 0.0 0.0 28
Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 60.8 0.0 1.6 0.0 1.5 0.0 0.0 0.0 0.0 0.0 29
Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 64.0 0.0 1.0 10.4 2.0 0.0 0.0 0.0 0.0 0.0 17
Highway Trucks A02_Trucks 946839.3 5047549.4 92.7 0 79 13.0 A 62.5 0.0 1.7 0.0 1.7 0.0 0.0 0.0 0.0 0.0 26
Highway Trucks A02_Trucks 946837.3 5047536.7 94.7 0 79 7.9 A 62.8 0.0 1.7 0.0 1.8 0.0 0.0 0.0 0.0 0.0 20
Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 63.1 0.0 1.7 0.0 1.9 0.0 0.0 0.0 0.0 0.0 26
Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 61.7 0.0 1.7 0.0 1.6 0.0 0.0 0.0 0.0 0.0 26
Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 64.6 0.0 0.2 7.4 2.1 0.0 0.0 0.0 0.0 0.0 19
Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 65.2 0.0 0.0 5.3 2.3 0.0 0.0 0.0 0.0 0.0 21
Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 63.5 0.0 1.6 16.7 1.9 0.0 0.0 0.0 0.0 0.0 4
Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 63.4 0.0 1.7 17.8 1.9 0.0 0.0 0.0 0.0 0.0 -3
ISO 9613-2 Sample CalculationPage 15 of 19
Receiver: R15Project: Caanan Quarry
Project Number: 13209
Time Period Total (dBA)
Day 43
Receiver Name Receiver ID X Y Z
3765 canaan R15 946595.2 5048399.5 95.2
Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr
Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 72.6 0.0 -1.6 6.3 4.7 0.0 0.0 0.0 0.0 0.0 42
Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 72.4 0.0 -0.4 5.2 6.4 0.0 0.0 0.0 0.0 0.0 30
Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 73.0 0.0 -1.7 6.5 4.1 0.0 0.0 0.0 0.0 0.0 33
Highway Trucks D08_Trucks 946643.9 5047324.2 96.4 0 79 21.9 A 71.6 0.0 -1.7 6.7 4.2 0.0 0.0 0.0 0.0 0.0 20
Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 71.0 0.0 -1.5 7.7 3.9 0.0 0.0 0.0 0.0 0.0 16
Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 68.6 0.0 0.5 0.0 3.1 0.0 0.0 0.0 0.0 0.0 25
Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 67.7 0.0 0.5 0.0 2.9 0.0 0.0 0.0 0.0 0.0 23
Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 68.1 0.0 0.5 0.0 3.0 0.0 0.0 0.0 0.0 0.0 21
Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 69.7 0.0 0.6 0.0 3.5 0.0 0.0 0.0 0.0 0.0 20
Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 70.4 0.0 -0.6 5.4 3.7 0.0 0.0 0.0 0.0 0.0 16
Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 69.2 0.0 0.6 0.0 3.3 0.0 0.0 0.0 0.0 0.0 20
Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 70.8 0.0 -1.3 6.8 3.9 0.0 0.0 0.0 0.0 0.0 14
Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 70.6 0.0 -1.4 0.0 3.8 0.0 0.0 0.0 0.0 0.0 21
Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 70.0 0.0 0.6 0.0 3.6 0.0 0.0 0.0 0.0 0.0 19
Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 70.1 0.0 0.6 0.0 3.6 0.0 0.0 0.0 0.0 0.0 18
Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 69.4 0.0 0.6 0.0 3.4 0.0 0.0 0.0 0.0 0.0 18
Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 70.3 0.0 0.3 8.2 3.7 0.0 0.0 0.0 0.0 0.0 6
Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 70.2 0.0 0.5 18.1 3.7 0.0 0.0 0.0 0.0 0.0 -11
ISO 9613-2 Sample CalculationPage 16 of 19
Receiver: R16Project: Caanan Quarry
Project Number: 13209
Time Period Total (dBA)
Day 41
Receiver Name Receiver ID X Y Z
3744-3750 canaan R16 946374.3 5048561.5 92.3
Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr
Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 73.8 0.0 0.9 3.9 5.1 0.0 0.0 0.0 0.0 0.0 40
Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 73.7 0.0 1.5 3.3 6.9 0.0 0.0 0.0 0.0 0.0 28
Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 74.0 0.0 0.3 4.6 4.5 0.0 0.0 0.0 0.0 0.0 31
Highway Trucks D08_Trucks 946643.9 5047324.2 96.4 0 79 21.9 A 73.1 0.0 0.4 4.5 4.7 0.0 0.0 0.0 0.0 0.0 18
Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 72.6 0.0 0.5 5.9 4.6 0.0 0.0 0.0 0.0 0.0 13
Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 70.9 0.0 2.2 0.0 3.9 0.0 0.0 0.0 0.0 0.0 20
Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 70.3 0.0 2.1 0.0 3.7 0.0 0.0 0.0 0.0 0.0 18
Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 72.3 0.0 1.1 0.0 4.4 0.0 0.0 0.0 0.0 0.0 17
Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 71.7 0.0 2.2 0.0 4.2 0.0 0.0 0.0 0.0 0.0 16
Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 70.5 0.0 2.1 0.0 3.8 0.0 0.0 0.0 0.0 0.0 16
Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 71.3 0.0 2.2 0.0 4.1 0.0 0.0 0.0 0.0 0.0 16
Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 72.5 0.0 1.0 8.4 4.5 0.0 0.0 0.0 0.0 0.0 8
Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 72.4 0.0 0.6 0.0 4.5 0.0 0.0 0.0 0.0 0.0 16
Highway Trucks A02_Trucks 946839.0 5047547.3 93.0 0 79 13.8 A 72.0 0.0 2.2 0.0 4.3 0.0 0.0 0.0 0.0 0.0 14
Highway Trucks A02_Trucks 946836.9 5047534.6 95.0 0 79 2.6 A 72.0 0.0 2.2 0.0 4.3 0.0 0.0 0.0 0.0 0.0 3
Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 72.1 0.0 2.2 0.0 4.3 0.0 0.0 0.0 0.0 0.0 14
Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 71.5 0.0 2.2 0.0 4.1 0.0 0.0 0.0 0.0 0.0 13
Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 72.2 0.0 2.0 3.7 4.4 0.0 0.0 0.0 0.0 0.0 6
Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 72.1 0.0 2.2 15.9 4.4 0.0 0.0 0.0 0.0 0.0 -13
ISO 9613-2 Sample CalculationPage 17 of 19
Receiver: R17Project: Caanan Quarry
Project Number: 13209
Time Period Total (dBA)
Day 41
Receiver Name Receiver ID X Y Z
Vacant Lot 1 R17 947408.1 5047857.3 89.4
Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr
Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 71.5 0.0 -1.9 10.9 4.4 0.0 0.0 0.0 0.0 0.0 39
Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 70.8 0.0 -0.7 5.5 5.8 0.0 0.0 0.0 0.0 0.0 32
Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 72.5 0.0 -2.2 9.3 3.9 0.0 0.0 0.0 0.0 0.0 31
Highway Trucks D08_Trucks 946657.2 5047338.9 96.4 0 79 20.7 A 70.2 0.0 -2.0 6.8 3.6 0.0 0.0 0.0 0.0 0.0 21
Highway Trucks D08_Trucks 946604.7 5047281.1 96.4 0 79 16.0 A 70.9 0.0 -2.2 7.0 3.9 0.0 0.0 0.0 0.0 0.0 15
Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 69.3 0.0 -1.7 6.9 3.4 0.0 0.0 0.0 0.0 0.0 19
Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 67.0 0.0 0.5 0.0 2.7 0.0 0.0 0.0 0.0 0.0 27
Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 67.0 0.0 0.5 0.0 2.7 0.0 0.0 0.0 0.0 0.0 24
Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 67.1 0.0 0.5 0.0 2.7 0.0 0.0 0.0 0.0 0.0 24
Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 68.0 0.0 -0.4 15.1 3.0 0.0 0.0 0.0 0.0 0.0 9
Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 67.0 0.0 0.5 0.0 2.7 0.0 0.0 0.0 0.0 0.0 23
Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 67.2 0.0 0.5 0.0 2.8 0.0 0.0 0.0 0.0 0.0 22
Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 68.7 0.0 -1.6 8.5 3.2 0.0 0.0 0.0 0.0 0.0 15
Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 67.0 0.0 0.5 0.0 2.7 0.0 0.0 0.0 0.0 0.0 22
Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 68.4 0.0 -1.4 12.1 3.1 0.0 0.0 0.0 0.0 0.0 11
Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 67.5 0.0 0.5 0.0 2.8 0.0 0.0 0.0 0.0 0.0 22
Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 67.0 0.0 0.5 0.0 2.7 0.0 0.0 0.0 0.0 0.0 21
Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 67.7 0.0 0.3 17.8 2.9 0.0 0.0 0.0 0.0 0.0 -1
Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 67.6 0.0 0.5 18.7 2.9 0.0 0.0 0.0 0.0 0.0 -8
ISO 9613-2 Sample CalculationPage 18 of 19
Receiver: R18Project: Caanan Quarry
Project Number: 13209
Time Period Total (dBA)
Day 42
Receiver Name Receiver ID X Y Z
Vacant Lot 2 R18 947288.9 5046747.5 85.2
Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr
Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 69.6 0.0 -1.5 13.5 3.8 0.0 0.0 0.0 0.0 0.0 39
Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 69.0 0.0 -0.2 4.9 5.2 0.0 0.0 0.0 0.0 0.0 35
Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 70.3 0.0 -1.6 6.4 3.2 0.0 0.0 0.0 0.0 0.0 36
Highway Trucks D08_Trucks 946643.9 5047324.2 96.4 0 79 21.9 A 69.7 0.0 -2.1 6.9 3.5 0.0 0.0 0.0 0.0 0.0 22
Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 69.8 0.0 -2.2 7.0 3.5 0.0 0.0 0.0 0.0 0.0 19
Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 71.3 0.0 0.6 5.0 4.0 0.0 0.0 0.0 0.0 0.0 16
Highway Trucks A02_Trucks 946817.3 5047505.6 96.4 0 79 2.4 A 70.0 0.0 -1.8 6.6 3.6 0.0 0.0 0.0 0.0 0.0 3
Highway Trucks A02_Trucks 946805.6 5047489.6 96.4 0 79 15.8 A 69.9 0.0 -2.0 6.8 3.6 0.0 0.0 0.0 0.0 0.0 16
Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 69.8 0.0 -2.2 7.0 3.5 0.0 0.0 0.0 0.0 0.0 16
Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 69.8 0.0 -2.3 7.0 3.5 0.0 0.0 0.0 0.0 0.0 15
Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 70.5 0.0 0.6 10.5 3.7 0.0 0.0 0.0 0.0 0.0 9
Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 70.2 0.0 0.6 14.1 3.7 0.0 0.0 0.0 0.0 0.0 4
Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 70.9 0.0 0.6 6.4 3.9 0.0 0.0 0.0 0.0 0.0 11
Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 70.1 0.0 -0.9 22.7 3.6 0.0 0.0 0.0 0.0 0.0 -3
Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 71.9 0.0 0.6 4.4 4.3 0.0 0.0 0.0 0.0 0.0 13
Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 71.7 0.0 0.6 4.5 4.2 0.0 0.0 0.0 0.0 0.0 11
Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 70.7 0.0 0.6 7.3 3.8 0.0 0.0 0.0 0.0 0.0 9
Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 70.0 0.0 -1.8 6.6 3.6 0.0 0.0 0.0 0.0 0.0 10
Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 70.1 0.0 -1.8 6.6 3.6 0.0 0.0 0.0 0.0 0.0 3
ISO 9613-2 Sample CalculationPage 19 of 19
Receiver: R19Project: Caanan Quarry
Project Number: 13209
Time Period Total (dBA)
Day 43
Receiver Name Receiver ID X Y Z
Vacant Lot 3 R19 945845.3 5046722.2 96.8
Source Name Source ID X Y Z Refl. Lw L/A Freq Adiv K0 Agr Abar Aatm Afol Ahous Cmet Dc RL Lr
Plant D08_Plant 946572.3 5047202.6 97.5 0 124 0.0 A 69.8 0.0 -1.7 11.4 3.8 0.0 0.0 0.0 0.0 0.0 41
Loaders D08_Loader988_2 946456.2 5047154.3 96.5 0 115 0.0 A 68.5 0.0 -1.5 6.4 2.7 0.0 0.0 0.0 0.0 0.0 38
Drill D08_Drill 946657.3 5047229.8 104.0 0 114 0.0 A 70.6 0.0 -0.9 5.7 5.8 0.0 0.0 0.0 0.0 0.0 32
Highway Trucks D08_Trucks 946662.8 5047345.1 96.4 0 79 20.0 A 71.2 0.0 -2.3 7.1 4.0 0.0 0.0 0.0 0.0 0.0 19
Highway Trucks D08_Trucks 946610.3 5047287.2 96.4 0 79 17.5 A 70.6 0.0 -2.2 7.6 3.8 0.0 0.0 0.0 0.0 0.0 16
Highway Trucks D08_Trucks 946722.4 5047403.9 96.4 0 79 18.3 A 71.9 0.0 -2.5 7.3 4.3 0.0 0.0 0.0 0.0 0.0 16
Highway Trucks A02_Trucks 946805.6 5047668.1 86.6 0 79 18.4 A 73.6 0.0 -0.3 12.3 5.0 0.0 0.0 0.0 0.0 0.0 6
Highway Trucks A02_Trucks 946762.0 5047437.4 96.4 0 79 15.5 A 72.3 0.0 -2.6 7.3 4.4 0.0 0.0 0.0 0.0 0.0 13
Highway Trucks A02_Trucks 946806.1 5047490.3 96.4 0 79 16.0 A 72.8 0.0 -2.7 7.5 4.6 0.0 0.0 0.0 0.0 0.0 12
Highway Trucks A02_Trucks 946784.9 5047461.6 96.4 0 79 15.0 A 72.6 0.0 -2.6 7.4 4.5 0.0 0.0 0.0 0.0 0.0 12
Highway Trucks A02_Trucks 946838.0 5047576.1 89.4 0 79 15.4 A 73.3 0.0 -0.9 15.4 4.9 0.0 0.0 0.0 0.0 0.0 1
Highway Trucks A02_Trucks 946788.2 5047742.2 85.0 0 79 15.5 A 73.9 0.0 -0.1 9.7 5.1 0.0 0.0 0.0 0.0 0.0 6
Highway Trucks A02_Trucks 946823.3 5047622.5 86.6 0 79 14.6 A 73.5 0.0 -0.4 14.8 4.9 0.0 0.0 0.0 0.0 0.0 0
Highway Trucks A02_Trucks 946838.8 5047546.4 93.2 0 79 14.2 A 73.2 0.0 -1.6 12.0 4.8 0.0 0.0 0.0 0.0 0.0 4
Highway Trucks A02_Trucks 946830.0 5047523.9 96.8 0 79 13.8 A 73.1 0.0 -2.3 15.5 4.7 0.0 0.0 0.0 0.0 0.0 1
Highway Trucks A02_Trucks 946791.1 5047712.7 85.9 0 79 14.0 A 73.7 0.0 -0.2 11.2 5.0 0.0 0.0 0.0 0.0 0.0 3
Highway Trucks A02_Trucks 946832.5 5047601.3 87.1 0 79 12.4 A 73.4 0.0 -0.5 15.7 4.9 0.0 0.0 0.0 0.0 0.0 -3
Highway Trucks A02_Trucks 946820.3 5047509.9 96.4 0 79 9.4 A 73.0 0.0 -2.7 7.5 4.7 0.0 0.0 0.0 0.0 0.0 6
Highway Trucks A02_Trucks 946823.0 5047513.8 97.4 0 79 3.3 A 73.0 0.0 -2.7 7.5 4.7 0.0 0.0 0.0 0.0 0.0 -1
Cornwall Gravel Co. Ltd. – Canaan Quarry Appendices
Appendix B
Qualifications of the Authors
derek flake M.Sc., P.Eng.
Profile
Derek is an employee of Aercoustics Engineering Limited, an engineering consulting company specializing in acoustics, noise and vibration. Prior to that, he worked for several years at another acoustics, noise and vibration firm and he completed a Master of Science in the field of ultrasound transducer design. Derek is a Professional Engineer with the Professional Engineers Ontario.
Employment History
2012 – Present Project Engineer, Aercoustics Engineering Ltd.
2009 – 2012 Engineering Intern, Jade Acoustics Incorporated
Additional Activities / Committees
2014 – Present Member of Training and Development Committee at the Ontario Sand, Stone and Gravel Association (OSSGA)
Professional Registration / Affiliations
Licensed Professional Engineer with the Professional Engineers of Ontario (PEO)
Education
Master of Science (M.Sc.) Medical Biophysics (Ultrasound Physics) University of Toronto
Bachelor of Applied Science (B.A.Sc.) Engineering Physics (Mechanical) Queen’s University
Courses and Speaking Events
Instructor, Municipal Law Enforcement Officers’ Association (MLEOA) Environmental Noise training courses. This is an annual four-day training program which provides the officers with an understanding of sound measurement and its relationship with
Derek Flake M.Sc., P.Eng. Page 2
environmental noise impact. The officer is trained in the utilization of technical equipment required in the application of sound measurement theories. This course also covers the unique elements of qualitative noise regulations and is authorized by the Ministry of the Environment and Climate Change.
1-day course on “Aggregates 101 Training,” OSSGA Health and Safety Seminar, Toronto, 2015. Mr. Flake both attended and aided in the development for parts of the course.
Speaker, “The New NPC-300 Noise Guideline: What does it mean for your noise by-law?” MLEOA Annual General Meeting, Kingston, 2014.
Professional Activities
Land Use Planning
In the field of environmental acoustics, Mr. Flake has completed numerous projects involving noise impact from planned stationary sources as well as noise impact studies for proposed residential developments. These projects included conducting studies for proposed operations and developments and addressing noise concerns for existing operations. Peer reviews of noise studies prepared by other acoustic consultants were also completed by Mr. Flake. In the land use planning process, Mr. Flake has completed studies which provide assessments of the noise impact on proposed residential, commercial and industrial developments from the local environment which includes noise from road, rail, and aircraft traffic and stationary noise sources such as industrial and commercial uses. Also, vibration measurements and studies were conducted to assess vibration from rail traffic such as trains, streetcars and subways. The studies include recommendations for noise control of the sources, dwelling building components, wall, window, and door constructions to satisfy the Ministry of Environment and Climate Change noise guidelines.
In addition, Mr. Flake has conducted architectural drawing reviews for residential and commercial developments to ensure the construction plans will meet the requirements set out in environmental noise studies and specifications documents.
Aggregates
Mr. Flake has done work in the aggregates industry which involved the preparation and support of over a dozen noise impact studies to determine technical feasibility of aggregate license applications to the Ministry of Natural Resources. This work included preparing the noise impact studies, supporting the findings at public meetings, and performing acoustic audits to confirm compliance with the noise requirements.
Renewable Energy
Mr. Flake has performed IEC 61400 testing of Wind Turbines and Transformer Station noise audits.
Derek Flake M.Sc., P.Eng. Page 3
Environmental Compliance Approvals
Mr. Flake was involved with in several noise and vibration impact studies for industrial uses. He has prepared several Acoustic Assessment Reports for use in applications for Environmental Compliance Approvals. These studies provided conceptual as well as detailed designs of noise mitigation to reduce in-plant noise or noise emission into the environment. In-plant projects generally involved noise surveys, detailed noise/vibration measurements of equipment, data analysis and computer modelling of noise controls to evaluate effectiveness. In some cases, detailed designs and specifications have been provided.
Noise Source Investigations and Room Acoustics
Mr. Flake has completed several projects involving design of spaces where sound privacy and room acoustics were critical. These projects have included noise complaint investigation, room acoustics, mechanical noise, noise measurements to quantify sound isolation, and environmental noise impact. Examples of spaces include cinemas, hospitals and residential condominiums.
PROFESSIONAL PROFILE
H. ROBERT RIMROTT, M.A.Sc., P.Eng.
EDUCATION
B.A.Sc., University of Toronto
M.A.Sc., University of Toronto
PROFESSIONAL MEMBERSHIPS
Professional Engineer, Ontario (PEO)
Consulting Engineer, Ontario (PEO)
Acoustical Society of America (ASA)
American Society of Mechanical Engineers (ASME)
PROFESSIONAL BACKGROUND
In 1987, Mr. Rimrott began his work as an acoustics and vibration consultant. In his many years in this field, he has completed many successful projects. In 1992, he joined Aercoustics Engineering Limited. He is a partner and principal engineer with the firm. Mr. Rimrott is recognized as an expert by the Ministry of Environment and Energy and has provided expert testimony in the forum of the Ontario Municipal Board Hearings.
In the field of environmental acoustics, Mr. Rimrott has completed numerous projects involving noise from planned stationary sources as well as noise studies for residential developments. These projects included conducting studies for both proposed operations and developments, studies addressing noise concerns for existing operations, and peer review of noise studies conducted by other acoustic consultants. Projects have included Industrial plants, Aggregate Pits and Quarries, and many other operations.
In the land use planning process Mr. Rimrott has completed studies provide assessments of the noise on the proposed residential development from the local environment which includes noise from road, rail, and aircraft traffic and stationary noise sources such as industries, and gun clubs. The studies include recommendations on noise control of the sources, dwelling building components, wall, window, and door constructions to satisfy the Ministry of Environment and Energy noise guidelines.
Bob Rimrott M.A.Sc., P.Eng. Page 2
Partial Listing of Representative Projects
PITS AND QUARRIES INDUSTRIAL
Dufferin Aggregates, many Pits Coutrice Steel
Wimpey, Nolan Quarry Co Steel Lasco
Truax Pit Georga Pacific Flakeboard
United Aggregates, Acton quarry Boise Cascade Oriented Strand Board Plant
Cox Construction, Puslinch Pit Boise Cascade Co-Generation Station
Beamish Construction, Moore Business Forms
Coboconk Quarry Metal Coating
Alcan Foil Products
INCO
Alcan Rolled Products
Townsend Lumber
BLAST / IMPULSE NOISES
Quarry Blasting Noise
Meaford Artillery Range
Walker Dog Kennel
Pioneer Sportsmen Club