campus needs
CANDLEWOOD elementary school Originally Built Years of Previous work (since 1988) AcreageTotal Square Footage Number of Buildings on Campus Number of Classrooms Current Number of Portables
1988 2009 8.011 94,024 1 45 2
$279,780 $1,398,900
$61,250 $10,000
$348,000 $100,000
$60,000 $210,000
$27,000 $2,494,930
2016 Bond ProposalThe above listed campus is programmed to receive the following items:
Proposed Facility Improvements:Replace Panel, Upgrade Fire Alarm System, Upgrade Smoke & Duct Detectors - Complete Replace Sewer Lines under Building - Fall 2020Modifications to Life Skills - Fall 2020Add ADA/TAS Compliant Room Signage - Fall 2020Minor Library Expansion - Fall 2020Repair Roof Leaks ‐ Thru Wall Flashing - Spring 2019 (In progress)Refurbish Metal Roof - Spring 2019 (In progress)Clinic & Lounge Relocation - Fall 2020Playground Shade Structure 30’x40’ - Complete
campus needs
CONVERSE elementary school
Proposed Facility Improvements: Repair Amphitheater and Site Drainage Playground - On Hold Shade Structure 30’x40’ - Fall 2020
Originally Built Years of Previous work (since 2007) AcreageTotal Square Footage Number of Buildings on Campus Number of Classrooms Current Number of Portables
2007 None 22.14 115,880 1 38 2
campus assessment
$450,000 $27,000
$477,000
2016 Bond ProposalThe above listed campus is programmed to receive the following items:
campus needs
CORONADO VILLAGE elementary school Originally Built Years of Previous work (since 1988) AcreageTotal Square Footage Number of Buildings on Campus Number of Classrooms Current Number of Portables
1970 2009 5.916 68,526 3 27 None
campus assessment
$1,537,500 $2,800
$65,520 $75,600 $80,000 $27,000
$1,788,420
2016 Bond ProposalThe above listed campus is programmed to receive the following items:
Proposed Facility Improvements: Replace Roof - Fall 2020ADA sidewalk to Playground Equipment - Fall 2020Replace Gym Flooring with Resilient Sports Floor - CompleteReplace Roof (Gym) - - Fall 2020Provide Covered Walkways between Classrooms & Gym - Fall 2020Playground Shade Structure 30’x40’ - Complete
campus needs
CRESTVIEW elementary school
Proposed Facility Improvements: Add Secure Entry Vestibule - Fall 2020Provide Accessible Curb Ramps to Main Entrance - Fall 2020Replace Egress Doors - Fall 2020Add ADA/TAS Compliant Room Signage - Fall 2020Kitchen Addition, Stage Addition, and Minor Cafeteria Renovations - Fall 2020 Replace Gym Flooring With Resilient Sports Floor - CompleteReplace Roof (Gym) - Fall 2020Renovate Toilet Rooms - Fall 2020Playground Shade Structure 30’x40’ - Fall 2020
Originally Built Years of Previous work (since 1974) AcreageTotal Square Footage Number of Buildings on Campus Number of Classrooms Current Number of Portables
1974 1994 7 66,184 3 30 None
campus assessment
$60,000 $36,000 $82,500 $10,000
$3,444,000 $65,520 $75,600
$836,400 $27,000
$4,637,020
2016 Bond ProposalThe above listed campus is programmed to receive the following items:
campus needs
ELOLF elementary school
Proposed Facility Improvements: Add Secure Entry Vestibule - CompleteReplace Chillers - CompleteReplace Corroded Galvanized Water Pipes Campus Wide - Fall 2020Replace Roof (Original Building) - CompleteLife Skill Modifications - Fall 2020Provide ADA/TAS Compliant Room Signage - Fall 2020Kitchen Addition and Minor Cafeteria Renovations - Fall 2020Minor Library Expansion - Fall 2020Playground Shade Structure 30’ x 40’ - Fall 2020Relocate Clinic & Lounge - Fall 2020
Originally Built Years of Previous work (since 1993) AcreageTotal Square Footage Number of Buildings on Campus Number of Classrooms Current Number of Portables
1993 None 10.302 92,847 1 47 None
campus assessment
$60,000 $250,000 $187,500
$1,391,955 $61,250 $8,000
$2,460,000 $348,000
$27,000 $210,000
$5,003,705
2016 Bond ProposalThe above listed campus is programmed to receive the following items:
campus needs
FRANZ elementary school Originally Built Years of Previous work (since 1968) AcreageTotal Square Footage Number of Buildings on Campus Number of Classrooms Current Number of Portables
1968 2008 6.232 59,543 2 22 None
campus assessment
$250,000 $3,850
$65,520 $75,600
$760,515 $135,000
$85,000 $27,000
$1,402,485
2016 Bond ProposalThe above listed campus is programmed to receive the following items:
Proposed Facility Improvements: Add Outdoor Parking and Security Lighting - Fall 2019ADA Sidewalk to Playground Equipment - Fall 2019Replace Gym Flooring with Resilient Sports Floor - Complete Replace Roof (Gym) - Fall 2019Replace Roof - Fall 2019Upgrade Flooring to Match Throughout Campus - Summer 2019Playground Equipment Replacement - CompletePlayground Shade Structure 30'x40‘ - Complete
campus needs
HARTMAN elementary school Originally Built Years of Previous work (since 2002) AcreageTotal Square Footage Number of Buildings on Campus Number of Classrooms Current Number of Portables
2002 2008 18.376 97,476 1 42 1
campus assessment
$60,000 $75,250 $37,500 $54,000
$226,750
2016 Bond ProposalThe above listed campus is programmed to receive the following items:
Proposed Facility Improvements: Add Secure Entry Vestibule - Fall 2019Replace Carpeting In Corridors With VCT - CompleteRemove Wall Covering In Corridor - CompletePlayground Shade Structure 30’x40’ - Complete
campus needs
HOPKINS elementary school Originally Built Years of Previous work (since 1969 ) AcreageTotal Square Footage Number of Buildings on Campus Number of Classrooms Current Number of Portables
1969 2003 11.89 105,741 2 44 1
campus assessment
$60,000 $250,000
$61,500 $100,000
$8,050 $75,600
$555,150
2016 Bond ProposalThe above listed campus is programmed to receive the following items:
Proposed Facility Improvements: Add Secure Entry Vestibule - CompleteReplace Chillers - CompleteImprove Drainage Next to Gym - Spring 2019Mechanical Ductwork Modifications - Summer 2020ADA Sidewalk to Playground Equipment - CompleteReplace Roof (Gym) - Complete
campus needs
MASTERS elementary school Originally Built Years of Previous work (since 2008) AcreageTotal Square Footage Number of Buildings on Campus Number of Classrooms Current Number of Portables
2008 2009 16.53 94,532 1 38 2
campus assessment
$12,450 $12,450
2016 Bond ProposalThe above listed campus is programmed to receive the following item:
Proposed Facility Improvements: Playground Swings- 1 bay 5" arch swing frame - Complete
campus needs
MILLER’S POINT elementary school Originally Built Years of Previous work (since 1986) AcreageTotal Square Footage Number of Buildings on Campus Number of Classrooms Current Number of Portables
1986 1991 8.291 82,101 2 40 None
campus assessment
$1,065,000 $2,460,000
$64,800 $60,000
$125,000 $3,774,800
2016 Bond ProposalThe above listed campus is programmed to receive the following items:
Proposed Facility Improvements: Renovate Administration Area to Centralize; Add Secure Entry Vestibule - Fall 2020 Kitchen Addition; Minor Cafeteria Renovations - Fall 2020Remove Wall Covering in Corridor - CompleteRemodel PPCD Restroom - Fall 2020Add Kinder Playground Equipment and Shade Structure - Fall 2019 (In Progress)
OLYMPIA elementary school Originally Built Years of Previous work (since 1978) AcreageTotal Square Footage Number of Buildings on Campus Number of Classrooms Current Number of Portables
1978 1985 7 64,767 3 30 None
$315,000 $2,400,000
$124,100 $40,000 $65,520 $75,600
$102,000 $3,122,220
2016 Bond ProposalThe above listed campus is programmed to receive the following items:
Proposed Facility Improvements: Renovate Administration Area to Centralize; Add Secure Entry Vestibule - Fall 2020Kitchen Addition; minor Cafeteria renovations - Fall 2020Remove Carpet in Classroom and Add VCT - CompleteRemove Carpet in Corridor and Add VCT - Complete Replace Gym Flooring with Resilient Sports Floor - CompleteReplace Roof (Gym) - Fall 2020Playground Shade Structure 30’ x 40’ and Kinder Playground Equip. Replacement - Fall 2020
campus needs
PARK VILLAGE elementary school
Proposed Facility Improvements: Add Secure Entry Vestibule - Fall 2020Replace Roof (Annex) - CompleteKitchen Addition & Minor Cafeteria Renovations - Fall 2020 Replace Roof (Original) - CompleteReplace Roof (Gym) - CompleteAttach Gym and 12-classroom Wing to Building - Fall 2020Playground Shade Structure 30’ x 40‘ - Fall 20201 Playground Equipment Replacement - Fall 2020
Originally Built Years of Previous work (since 1999) AcreageTotal Square Footage Number of Buildings on Campus Number of Classrooms Current Number of Portables
1999 2009 22.52 77,770 2 34 1
campus assessment
$60,000 $258,375
$2,460,000 $373,500
$75,600 $4,250,000
$54,000 $125,000
$7,656,475
2016 Bond ProposalThe above listed campus is programmed to receive the following items:
campus needs
PASCHALL elementary school Originally Built Years of Previous work (since 2000) AcreageTotal Square Footage Number of Buildings on Campus Number of Classrooms Current Number of Portables
2000 None 20 104,243 2 47 6
campus assessment
$60,000 $250,000
$1,200,000
$15,500 $27,000
$100,000 $2,460,000 $4,112,500
2016 Bond ProposalThe above listed campus is programmed to receive the following items:
Proposed Facility Improvements: Add Secure Entry Vestibule - Fall 2020Replace Chillers - CompleteRegrade and Excavate Under Floor - Fall 2020Add 6-ft Chainlink Fence at Bus Loop to Secure Campus (425 LF); Complete front 4-ft Chainlink Fence with 6-ft High Fence (350 LF) - CompletePlayground Shade Structure 30’x40’ - Fall 2020Repair Roof Drainage - CompleteKitchen Addition; Minor Cafeteria Renovations - Fall 2020
campus needs
ROLLING MEADOWS elementary school
Proposed Facility Improvements: Install Portable Classrooms - Complete
Originally Built Years of Previous work (since 2009) AcreageTotal Square Footage Number of Buildings on Campus Number of Classrooms Current Number of Portables
2009 None 16.34 109,231 1 24 None
campus assessment
$150,000 $150,000
2016 Bond ProposalThe above listed campus is programmed to receive the following item:
campus needs
SALINAS elementary school
Proposed Facility Improvements: Add 6-ft Chainlink Fence at Playground Area by Gym - CompletePlayground Shade Structure 30’x40’ - Complete
Originally Built Years of Previous work (since 2005) AcreageTotal Square Footage Number of Buildings on Campus Number of Classrooms Current Number of Portables
2005 None 19.38 101,105 1 39 None
campus assessment
$5,500 $54,000 $59,500
2016 Bond ProposalThe above listed campus is programmed to receive the following items:
campus needs
SPRING MEADOWS elementary school
Proposed Facility Improvements: Renovate Administration Area to Centralize; Add Secure Entry Vestibule - Fall 2020 Replace Sewer System - Fall 2020Replace Roof (Classroom Annex) - Fall 2019 Add ADA/TAS Compliant Signage - Fall 2020 Remove Carpet in Classrooms; Install VCT - CompleteReplace Gym Flooring with Resilient Sports Floor - CompleteReplace Roof (Gym) - Fall 2020
Originally Built Years of Previous work (since 1984) AcreageTotal Square Footage Number of Buildings on Campus Number of Classrooms Current Number of Portables
1984 1991 8.906 79,606 2 36 None
campus assessment
$600,000 $750,000 $139,290
$8,000 $188,500
$65,520 $75,600
$1,826,910
2016 Bond ProposalThe above listed campus is programmed to receive the following items:
campus needs
WOODLAKE elementary school Originally Built Years of Previous work (since 1978) AcreageTotal Square Footage Number of Buildings on Campus Number of Classrooms Current Number of Portables
1978 1992 9.327 73,489 3 44 2
campus assessment
$315,000 $360,000 $210,300
$8,000 $2,460,000
$1,430,000 $141,800
$65,520 $75,600
$100,000 $54,000
$5,220,220
2016 Bond ProposalThe above listed campus is programmed to receive the following items:
Proposed Facility Improvements: Renovate Administration Area to Centralize; Add Secure Entry Vestibule - Fall 2020 Upgrade Fire Alarm System, Smoke Detectors & Duct Detectors - Spring 2019 (In Progress)Replace Roof - Fall 2019Add ADA/TAS Compliant Signage - Fall 2020Kitchen Addition; Minor Cafeteria Renovations - Fall 2020Replace Library (4,850sf); Remodel old Library Space (2,300sf); Convert to New Classrooms and Staff Restrooms - Fall 2020VCT for Classrooms and Café - CompleteReplace Gym Flooring with Resilient Sports Floor - CompleteReplace Roof (Gym - Fall 20201 Playground Structure Replacement - CompletePlayground Shade Structure 30’ x 40’ - Complete
campus needs
JUDSON middle school Originally Built Years of Previous work (since 1985) AcreageTotal Square Footage Number of Buildings on Campus Number of Classrooms Current Number of Portables
1985 1987 62.775 281,641 5 129 None
campus assessment
$23,000 $22,200 $31,000
$150,000 $700,406
$20,000 $1,039,805
$90,000 $2,076,411
2016 Bond ProposalThe above listed campus is programmed to receive the following items:
Proposed Facility Improvements: Secure Public Entrance (after hours near front office) - Spring 2021Upgrade Smoke Detector to Addressable Devices ADA - Spring 2020Upgrades based on TEA Audit - Spring 2021Upgrade Life Skills Room - Spring 2021Overlay Asphalt Parking and Drives - Spring 2021Add ADA/TAS Compliant Room Signage - Spring 2021Replace Flooring Campus Wide - Fall 2019 (In progress)Replace Gym Bleachers - Complete
campus needs
KIRBY middle school Originally Built Years of Previous work (since 1964) AcreageTotal Square Footage Number of Buildings on Campus Number of Classrooms Current Number of Portables
1964 2014 19.015 193,999 7 51 None
campus assessment
$750,000 $409,500
$10,080,000 $10,000,000
$40,000 $50,000
$115,872 $120,000
$40,000 $21,605,372
2016 Bond ProposalThe above listed campus is programmed to receive the following items:
Proposed Facility Improvements: Replace Main Switchgear - Summer 2020Replace Roof (700 Buildings) - Summer 2020Raze & Replace 600 Building (Gym/Athletics) - Summer 2020 Raze 400 Building; Replace 100, 500 Buildings (Admin/Athletics) - Summer 2020 Upgrade Sound System at Fine Arts - PendingRepair Bus Loop - Summer 2020Retrofit Lighting at 100, 200, 700 Buildings (CPS Rebate) - Summer 2020Relocate and Replace Water Line Under Sidewalks - Summer 2020Replace Bleachers at Sports Field - Complete
campus needs
KITTY HAWK middle school Originally Built Years of Previous work (since 1975) AcreageTotal Square Footage Number of Buildings on Campus Number of Classrooms Current Number of Portables
1975 2009 24 197,952 13 71 None
campus assessment
$1,125,000 $750,000 $519,580
$10,340,000 $7,980,000
$150,000 $247,173
$15,000 $21,126,753
2016 Bond ProposalThe above listed campus is programmed to receive the following items:
Proposed Facility Improvements: Replace Roofs (100, 400, 500, 600, 1000, and 1100 Buildings) - Summer 2020Replace Panel Boards, Switchgear, & Transformer - Summer 2020Replace Bus Loop - Summer 2020Raze & Replace 1300 Building (Gym) - Summer 2020Raze & Replace 200, 300, 1200 Buildings (Acad) - Summer 2020Replace Sewer Piping at 400 Building - Summer 2020Retrofit Lighting (CPS Rebate) - Summer 2020Add ADA/TAS Compliant Room Signage - Summer 2020
campus needs
METZGER middle school Originally Built Years of Previous work (since 2002) AcreageTotal Square Footage Number of Buildings on Campus Number of Classrooms Current Number of Portables
2002 2005 51.739 221,892 1 51 None
campus assessment
$20,000 $25,000
$195,500 $35,520
$276,020
2016 Bond ProposalThe above listed campus is programmed to receive the following items:Proposed Facility Improvements: Secure Entry Vestibule - Spring 2020Repair Dilution Tanks and Chemical Drain Lines - Complete Remove Carpet in Classrooms; Replace with VCT - Fall 2019 (In Progress)Replace Carpet (Not in Classrooms) - Complete
campus needs
WOODLAKE HILLS middle school
Proposed Facility Improvements: Repair/Replace Chiller - CompleteReplace Tennis Courts; Repair Soil Retainers; Repair Student Drop Off; Replace Roof - CompleteRetrofit Light Fixtures (CPS Rebate) - CompleteRepair/Replace Acid Dilution Tanks - CompleteReplace Stage Lighting - Fall 2020 & Sound System - CompleteRelocate Life Skills Restroom and Add Shower - Spring 2021Replace VCT Floor in Corridor - Complete
Originally Built Years of Previous work (since 1996) AcreageTotal Square Footage Number of Buildings on Campus Number of Classrooms Current Number of Portables
1996 None 37.717 169,145 1 62 None
campus assessment
$600,000 $4,548,400
$253,718 $25,000 $10,000
$160,000 $125,000
$5,722,118
2016 Bond ProposalThe above listed campus is programmed to receive the following items:
campus needs
JUDSON high school Originally Built Years of Previous work (since 2008) AcreageTotal Square Footage Number of Buildings on Campus Number of Classrooms Current Number of Portables
2008 2014 54.77 439,273 2 131 3
campus assessment
$45,000 $350,000 $395,000
2016 Bond ProposalThe above listed campus is programmed to receive the following items:Proposed Facility Improvements: Motorized Shades - Commons Area J118 - CompleteRemodel Ag Farm Complex - Complete
campus needs
WAGNER high school Originally Built Years of Previous work (since 2003) AcreageTotal Square Footage Number of Buildings on Campus Number of Classrooms Current Number of Portables
2003 2011 100.00 419150 2 68 7
campus assessment
$220,000 $65,090 $20,000 $75,000
$150,000 $45,000
$150,000 $150,000 $150,000
$1,025,090
2016 Bond ProposalThe above listed campus is programmed to receive the following items:Proposed Facility Improvements: Lightning Protection - CompleteRetrofit Lighting - 46 Chandelier Fixtures at Main Corridor - CompleteRetrofit Lighting - Replace Canister Lights at Auditorium - CompleteLED Marquee 8’x 5’ - Fall 2021Remedy Heaving Piping on Main Water Line to Campus - Spring 2021ADA Room Sign Replacement & Graphics Package - Spring 2021Xeriscape Landscaping at All Building Entrances - Fall 2019 (In Progress)Repair Buckling Roof Drains - CompleteRe-direct Scuppers to Not Drain into Building - Complete
campus needs
PERFORMING ARTS CENTER
Proposed Facility Improvements: Replace Chiller - CompleteReplace Low Slope Built-Up Roof - Fall 2019Replace Carpet - Complete
Originally Built Years of Previous work (since 1996) AcreageTotal Square Footage Number of Buildings on Campus Number of Classrooms Current Number of Portables
1996 None 18.612 66,899 1 1 None
campus assessment
$450,000 $1,305,000
$69,828 $1,824,828
2016 Bond ProposalThe above listed campus is programmed to receive the following items:
campus needs
RUTLEDGE STADIUM
Proposed Facility Improvements: Replace Parking at Stadium (600 Spaces)- Complete
Originally Built Years of Previous work (since 2007) AcreageTotal Square Footage Number of Buildings on Campus Number of Classrooms Current Number of Portables
2007 None Included w/ Alt. 33,677 11 None None
campus assessment
$1,432,460 $1,432,460
2016 Bond ProposalThe above listed campus is programmed to receive the following item:
campus needs
SECONDARY alternative school
Proposed Facility Improvements: Add Secure Entry Vestibule - Spring 2021ADA Upgrades based on TEA Audit - CompleteAdd Parking (68 Spaces) - Spring 2021Retrofit Lighting Throughout Campus – Replace all T12 Fixtures with LED - CompleteProvide ADA/TAS Compliant Room Signage - CompleteAdd Identifying Signage - CompleteReplace Gym Flooring with Resilient Sports Floor - CompleteReplace Roof (Gym) - Summer 2019
Originally Built Years of Previous work (since 1955) AcreageTotal Square Footage Number of Buildings on Campus Number of Classrooms Current Number of Portables
1955 1984 10 136,380 3 47 2
campus assessment
$80,000 $44,000 $89,760
$169,000 $8,000
$15,000 $65,520 $75,600
$546,880
2016 Bond ProposalThe above listed campus is programmed to receive the following items:
campus needs
POLICE DEPARTMENT
Proposed Facility Improvements: ADA Upgrades based on TEA Audit - CompleteRetrofit Lighting - Replace all T12 Fixtures to LED - Complete
Originally Built Years of Previous work (since -) AcreageTotal Square Footage Number of Buildings on Campus Number of Classrooms Current Number of Portables
Included in JECC Included in JECC Included in JECC 1,928 Included in JECC None None
campus assessment
$46,000 $6,960
$52,960
2016 Bond ProposalThe above listed campus is programmed to receive the following items:
campus needs
JISD TRANSPORTATION Originally Built Years of Previous work (since 1976) AcreageTotal Square Footage Number of Buildings on Campus Number of Classrooms Current Number of Portables
1976 2005 8.959 24,158 2 None 2
campus assessment
$148,500 $148,500
2016 Bond ProposalThe above listed campus is programmed to receive the following item:
Proposed Facility Improvements: Roof Replacement - Repair Garage on School Street - Fall 2020