Corridor at a Glance
• Started in 1993 - Completed in 2013
Building upon our Investment
Canyon Corridor – North of SR 512
Canyon Road Regional Connection
• 4-5 lanes, C/G, SW, paved shoulders, illumination
• BNSF Grade Separation
• Clarks Creek and Puyallup River bridges
• Traffic signals at Pioneer Way, 66 AV E, River RD, N Levee RD
• Non-motorized facilities and connections to future Puyallup Levee Trail
• Stream relocation
• Wetland mitigation
Project Features
Canyon Road Regional Connection
Direct link to SR167 Gateway Project
CRP 5643 (Pioneer Way to 52 ST E/62 AV E)• Preliminary Design – Completed
• ROW Plans – Completed spring 2017
• ROW Phase – Start mid 2017
• Final Engineering – Start mid 2017
CRP 5498 (52 ST E/62 AV E to 70 AV E)• Preliminary Design – Underway with scheduled completion August 2017
• Traffic Report – Completed
• Type, Size & Location Study – Completed
Design Summary
BNSF Crossing
Existing Milroy Bridge
New Puyallup River Bridge
What is the project cost?
• $160 - $190 million
Funding partners
• FMSIB $5 million
• BNSF (anticipated participation in grade separation)
• Four federal grants secured (2000 to present) totaling $7.07 million for engineering and environmental documentation
Canyon Road Regional Connection
Canyon Road Regional Connection
What We Heard
PSRC is now reviewing all the regional centers
Regional Centers Planning Context
The Frederickson Manufacturing Industrial Center
Regional Centers Planning Context
2015 2030
Households 870 1370
Employment 5270 9685
• Project briefings and continued outreach
• Continue project progress
• Funding strategy – PSRC
– FMSIB
– TIB
– TIGER
– FASTLANE
– Local options
Next Steps
QUESTIONS?Letticia M. Neal, P.E.(253)798-7041 or [email protected]