+ All Categories
Home > Documents > CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy...

CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy...

Date post: 23-Jul-2020
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
36
CAPABILITY STATEMENT (March 2020) www.rcogenasia.com
Transcript
Page 1: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

CAPABILITY STATEMENT (March 2020)

www.rcogenasia.com

Page 2: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

1

www.rcogenasia.com

ABOUT RCA

enewable Cogen Asia (RCA) is a consulting and advisory services company

with experience in more than 50 countries and is specialized in climate

change, renewable energy (solar, hydro, wind, biogas, MSW, etc.), energy

efficiency, SE4ALL, SDG projects, GEF projects, CDM, new market mechanisms, low

carbon city, waste to energy, policies, national energy planning, country level program

design, sectoral MRV design, climate financing, due diligence, risk assessment, rural

electrification, carbon markets, project development, training & capacity building, etc.

RCA has executed more than 200 international projects in countries that include

Afghanistan, Bangladesh, Bosnia, Brunei, Burundi, Cambodia, Canada, Chad, China, Congo,

Denmark, Egypt, France, Gabon, Germany, Honduras, Hong Kong, India, Indonesia, Italy,

Japan, Kenya, Kuwait, Laos, Macau, Malaysia, Moldova, Mauritius, Myanmar, Nepal,

Netherlands, Nigeria, Pakistan, Philippines, Rwanda, Singapore, South Africa, South

Korea, Spain, Sri lanka, Sudan, Sweden, Tanzania, Thailand, UAE, Uganda, UK, USA and

Vietnam.

Our clients include The World Bank, UNIDO, UNFCCC, UNDP, ADB, DEM, EC, other

international agencies, various country governments and private sectors.

Our footprints around the globe…

R

Page 3: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

2

www.rcogenasia.com

KEY ACHIEVEMENTS

More than 1,300 MW of renewable energy based power plants with different

technologies and various plant sizes (<1 to 90 MW). Annual GHG emission mitigation

of around 1 million tonnes of CO2.

Projects with value more than 10 billion dollars undertaken.

Work experience with reputed organizations such as The World Bank, UNDP,

UNFCCC, UNIDO, European Commission, Embassies, Country Governments, multi-

national and private sector companies.

Experience in more than 50 countries with strong understanding of local culture,

customs and local conditions.

More than 25 years of international experience with a strong foot print in Asia and

Africa.

More than 200 projects undertaken in the fields of climate change, GHG inventory,

sustainable development, SE4ALL, carbon credit (CDM/PoA, GS, New Market

Mechanism), energy efficiency, renewable energy (biomass, wind, solar, MSW, biogas,

cogeneration), rural electrification (grid tied and non-grid tied), climate finance,

carbon finance, E+, clean cooking, energy plantation, etc.

Proven track record of more than 30 country development programmes designed.

More than 100 capacity development programmes and workshops for various levels

of stakeholders including Government Ministries, policy makers, government officials,

financial institutions, project developers, etc.

Page 4: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

3

www.rcogenasia.com

OUR SERVICES

Our services include the following. For more details, visit sectors page on the website and

click the relevant title.

Climate change

SE4ALL

SDGs

CDM / SDM

Mitigation and Adaptation

New Market Mechanism

Gold Standard

Low Carbon Cities

GHG Inventory

Carbon Footprinting

Nationally Determined Contributions

Sustainability reporting

Climate finance

National / Sectoral MRV

Energy efficiency

Renewable energy (Solar, wind, hydro, biomass…)

Biomass power / Cogeneration

MSW power

Mini-grids design

Rural electrification

Project development

Resource assessment studies

Feasibility studies

Technology assessment

Engineering and design

Equipment specification, bid preparation and bid evaluation

Bid negotiation and contracting

Business plans

Project due diligence

Project risk assessment

Fund mobilization

Market studies

Policy study and gap analysis

Capacity building

Page 5: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

4

www.rcogenasia.com

SECTORS COVERED Following sectors / resources are available on the website. For more details, visit sectors

page on the website and click the relevant title.

Climate change

SE4ALL

SDGs

Climate change mitigation and adaptation

CDM / SDM

New market mechanism

Gold standard

Climate finance

Low carbon cities

Sustainability reporting

National / Sectoral MRV

GHG inventory

Carbon foot printing

NDC

Energy efficiency

Rural electrification

Renewable energy

Solar PV power

Wind power

Small & micro hydro power

Biomass power / cogeneration

Rice husk power

Wood waste power

Sugar cogeneration

Palm waste cogeneration

Multifuel biomass power

BiopowerAsia

Biopower Africa

Cogeneration Asia

Cogeneration Africa

Biomass fuel price

Rice husk ash

Power plant retrofitting

Biomass pellets and briquettes

Biomass project development

Gasification power

Biogas power / cogeneration

Biogas power Asia

Page 6: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

5

www.rcogenasia.com

Biogas power Africa

Gas engine power

MSW power

MSW incineration power

MSW RDF power

MSW biogas power

MSW power Asia

MSW power Africa

Landfill gas power

Clean &efficient cooking

Ethanol

Project development

Project due diligence

Project risk assessment

Liquid waste management

EIA / IEE

Page 7: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

6

www.rcogenasia.com

LIST OF PROJECTS

A) Climate Change Projects (selected)

Customer:

Project:

Country / location:

Project description:

The World Bank, Washington DC / Ministry of Industry and Trade

(MOIT)

Vietnam energy efficiency and carbon crediting program

Vietnam

A new carbon market mechanism for six years is developed targeting

energy efficiency improvement in more than 100 industrial enterprises

including cement, iron & steel, chemical, pulp & paper, food & beverage,

plastic sectors, etc. Country specific carbon crediting methodology is

developed based on consultations with ministries, donor agencies,

carbon credit buyers, bank authorities, private sectors, etc.

Customer:

Project:

Country / location:

Project description:

The World Bank, Washington DC / HIVOS

Promoting biogas cooking in East African countries

Ethiopia, Kenya, Rwanda, Tanzania and Uganda

The assignment involves transition of project activities from Gold

Standard to CDM. The challenges in the transition and realignment of

project activities as per the rules and regulations of CDM are assessed.

Customer:

Project:

Country / location:

Project description:

The World Bank, Washington DC / Ministry of Finance

Vehicle Scrapping and Recycling Program (PoA)

Egypt

The CDM PoA is about scrapping and replacing vehicles that are

inefficient and aged above 20 years like cars, buses, etc. with energy

efficient vehicles in Egypt. Due diligence is conducted to assess the

performance of the project vehicles. CERs are issued for the project.

Customer:

Project:

Country / location:

Project description:

The World Bank, Washington DC / Punjab State Power Corporation

Limited

High Voltage Distribution System for Agricultural Consumers in the Rural

Areas (PoA)

India

The low voltage electricity distribution system for the agricultural

feeders is replaced with high voltage distribution system to reduce line

losses, improve power quality and prevent power theft. Technical

support offered to the project for identifying gaps in MRV, addressing

them to comply with carbon credit verification requirements and in the

quantification of emission reductions.

Customer:

Project:

Country / location:

Project description:

The World Bank, Washington DC / Rwanda Energy Group (REG)

Rwanda Electrogaz Compact Fluorescent Lamp (CFL) distribution project

Rwanda

Around 0.4 million CFLs are distributed across households in Rwanda.

Page 8: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

7

www.rcogenasia.com

Due diligence is carried out in evaluating the lighting performance and

the verification aspects. CERs are issued for the project.

Customer:

Project:

Country / location:

Project description:

The World Bank, Washington DC / Rural Energy Agency

Tanzania Renewable Energy Program (PoA)

Tanzania

Rural electrification is increased through isolated mini-grid and national grid using carbon credits for RE projects like hydro, biomass, solar, etc. in various locations of Tanzania such as Darakuta, Ikondo, Kiwira, Maguta, Mbinga, Ngombeni Island, Tulila, Dar es Salaam, Iringa, Ruaha, etc. Technical support offered to the program through selection, design and addition of new projects, training and capacity building on project operations and third party verification. Ten projects are included under the program and the CERs are issued

Customer:

Project:

Country / location:

Project description:

The World Bank, Washington DC / West Nile Rural Electrification Company Limited

West Nile electrification small hydro power project

Uganda

Rural electrification is improved through installation of 3.5 MW small

hydro power plant. The project received carbon finance support. Due

diligence is carried out for the project design and technical support is

offered for reducing the deviations from the initial design. CERs are

issued for the project.

Customer:

Project:

Country / location:

Project description:

The World Bank, Washington DC / IDCOL

Implementation of 3.6 Million Solar Home Systems (SHS) (PoA)

Bangladesh

The SHS markets in the off-grid and rural areas of Bangladesh are scaled

up with a sales / performance oriented incentive mechanism. Fund for

the incentives is partly generated using sale of carbon credits. Work

includes streamlining the data management, monitoring, reporting,

verification, capacity building of the stakeholders, addressing the

challenges in obtaining CDM credits and CER issuance. Travelled

throughout Bangladesh covering districts such as B.Baria, Barisal, Bogra,

Chittagong, Comilla, Coxs Bazar, Dhaka, Faridpur, Dinajpur, Gazipur,

Gopalganj, Hobiganj, Jamalpur, Jessore, Khulna, Kishoreganj, Laxmipur,

M.bazar, Madaripur, Manikganj, Munshiganj, Mymensingh, Narayanganj,

Narsingdi, Natore, Rajbari, Rajshahi, Serajganj, Shariatpur, Sherpur,

Sylhet, Tangail, etc. for carrying out various project activities.

Customer:

Project:

Country / location:

Project description:

The World Bank, Washington DC / IDCOL

Efficient Lighting project – Phase II (PoA)

Bangladesh

Five million energy efficient CFL lamps are distributed to the households

nation-wide through the program. Lessons learnt from Phase I are

applied for the stroll-out of the phase II. Training and capacity building is

provided to the relevant stakeholders. Travelled throughout Bangladesh

to various Palli Bidyut Samities, which are responsible for electrification

in rural areas.

Customer: The World Bank, Washington DC / IIDFC

Page 9: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

8

www.rcogenasia.com

Project:

Country / location:

Project description:

HHK brick kilns project- bundle 1

HHK brick kilns project - bundle 2

Bangladesh

Installation and production of bricks from the modern energy efficient

HHK kilns is promoted as an energy efficiency measure in the brick kiln

sector. Due diligence was carried out on the individual kiln energy

performance, the GHG mitigation achievements, etc. CERs are issued for

the project. Travelled to more than 10 locations where the project brick

kilns are located.

Customer:

Project:

Country / location:

Project description:

The World Bank, Washington DC

Workshop on CDM PoA to stakeholders

United States of America (USA)

One week training and capacity building workshop at the World Bank

headquarters in Washington DC, USA on the CDM PoA to the officials

from Ministries of 15 countries.

Customer:

Project:

Country / location:

Project description:

The World Bank, Washington DC

GHG mitigation potential from solar technologies

Kenya

GHG emission reduction potential for different types of solar

technologies such as solar lamps, solar home systems, solar mini-grids

and roof-top solar PV for institutions are assessed.

Customer:

Project:

Country / location:

Project description:

The World Bank, Washington DC / AEL

Energy efficient street lighting in seven cities of India

India

Energy efficient CFL street lightings are installed in seven cities from

three Indian states based on ESCO model between each city

administration and the service provider (AEL). Due diligence is carried

out on the program implementation, performance of street lighting, etc.

Customer:

Project:

Country / location:

Project description:

The World Bank, Washington DC

World Commission on Dams (WCD) compliance report for hydro project

India

Compliance reporting as per WCD requirements is done for the 192 MW

Allain Duhangan Hydroelectric run-of-river Project.

Customer:

Project:

Country / location:

Project description:

The World Bank, Washington DC / Carbon Finance Unit

Efficiency improvements and fuel switching measures for public

building heating systems – bundle 1

Efficiency improvements and fuel switching measures for public

building heating systems – bundle 2

Efficiency improvements and fuel switching measures for public

building heating systems – bundle 3

Moldova

The old and inefficient coal based building heating system is replaced

with modern energy efficient natural gas based public heating systems in

the households and public institutions. Travelled extensively in various

Page 10: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

9

www.rcogenasia.com

districts such as Chisinau (capital city), Floresti and Ungheni to carry out

the project activities. Due diligence was conducted to evaluate and

address the country specific challenges faced in reporting the emission

reduction of the program. CERs are issued for the project.

Customer:

Project:

Country / location:

Project description:

The World Bank, Washington DC

GHG emission reductions in transport sector

GHG emission reductions in pig farming sector

Philippines

The transport and pig farming sectors were analysed and the nationwide

potential GHG emission reduction is estimated.

Customer:

Project:

Country / location:

Project description:

The World Bank, Washington DC / Northwind Power Development

Corporation

Northwind Bangui Bay Project

Philippines

Due diligence was conducted for the 33 MW wind farm to evaluate and address the country specific challenges faced in reporting the emission reduction of the program.

Customer:

Project:

Country / location:

Project description:

The World Bank, Washington DC / PEA

Implementation of Efficient Street Lighting (PoA)

Thailand

LED street lights are installed replacing the Sodium Vapour Lamps in the

peri-urban and rural roads of Thailand. Stakeholder coordination

meeting is held for various ministries, departments of highways and

rural roads as well as electricity distribution companies. Complete

training and capacity building is provided to the ministries, relevant

departments, local government agencies, municipalities, etc. to meet the

terms amicable to all the stakeholders on MRV and operations of the

programme.

Customer:

Project:

Country / location:

Project description:

The World Bank, Washington DC / Advance Energy Plus Co. Ltd. (AEP) /

PEA

Biomass gasifier based power plants (PoA)

Thailand

The project involves installation of forty three biomass gasifier based

power plants. Supported in technical design and inclusion of several

component project activities under the PoA.

Customer:

Project:

Country / location:

Project description:

The World Bank, Washington DC / MOIT

Vietnam Renewable Energy Development Program (PoA)

Vietnam

Small hydro power generation is scaled up in Vietnam using the carbon

finance support. Project activities ranging from 6 – 30 MW are included

under the program. Operational practices in hydro power plants are

studied, operations manual designed, training and capacity building

given to various stakeholders and verification completed. CERs are

issued for the project.

Customer: UNDP / Ministry of Rural Rehabilitation and Development (MRRD)

Page 11: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

10

www.rcogenasia.com

Project:

Country / location:

Project description:

Sustainable energy for rural development program

Afghanistan

The project involves (i) development of action plan for rural energy

strategy and (ii) design of management and environmental protection

guideline for renewable energy projects for Afghanistan.

Customer:

Project:

Country / location:

Project description:

UNDP / Ministry of Rural Rehabilitation and Development (MRRD)

Sustainable energy for rural development program

Afghanistan

The project involves development of a framework for testing and quality

assurance of renewable energy equipment for Afghanistan.

Customer:

Project:

Country / location:

Project description:

UNDP / Ministry of Energy and Minerals of Tanzania

Tanzania Five Year SE4ALL Program

Tanzania

A five year program budgeted to USD 5 billion is designed to enable

Tanzania to achieve its Sustainable Development Goals (SDG7) in the

energy and power requirement. Extensive consultations are carried out

with more than 250 stakeholders namely the Government Ministries and

departments, international and national donors, NGOs, academic

institutions, finance institutions / banks, private sectors, etc.

Customer:

Project:

Country / location:

Project description:

United Nations Framework Convention on Climate Change (UNFCCC)

Recommendations for additionality consideration of distributed / de-

centralised energy systems

Germany

Technology penetration, market barriers and investment cost

characteristics of distributed / de-centralised energy systems such as

clean cooking solutions, solar home systems, solar lightings, micro-

irrigation, etc., are studied and additionality considerations are analysed.

Recommendations on revisions / updates of CDM tools / guidelines are

accepted and adopted at the 98th meeting of CDM Executive Board.

Customer:

Project:

Country / location:

Project description:

United Nations Framework Convention on Climate Change (UNFCCC)

Market penetration as a means to evaluate additionality and common

practice in CDM

Germany

Expert support is provided in developing rationale for setting thresholds

for market penetration indicators to prove additionality for different

technologies along with road testing with sample technologies. The CDM

Executive Board has accepted the recommendations at the 105th meeting

and provided directions to the UNFCCC Methodology panel for further

development of guidelines.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna / GEF

Restoration of degraded ecosystems through clean energy services and

improved agro-business value chain

Chad

Land degradation and climate change mitigation are multi-focally

Page 12: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

11

www.rcogenasia.com

targeted in this USD 18 million GEF project. Key components of project

include establishment of 20 demonstration farms with efficient irrigation

systems in addition to the RE powered agro-business centres and

community mini-grids.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna / GEF

Promotion of small hydro power (SHP) for productive use and energy

services in Burundi

Burundi

Small hydro power projects are scaled up in this USD 8 million GEF

funded project. 1 MW power is installed cumulatively. More than 40%

women participation in all activities of the project is ensured in the

design.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna / GEF

Reduction of GHG emission through promotion of investments in biogas

mini-grids.

Cambodia

Biogas mini-grids based rural electricity enterprises are promoted in this

USD 10 million GEF funded project for increasing the rural electrification.

A revolving fund provides finance for the commercial farms.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna / GEF

Promotion of MSW to energy options for sustainable urban management

in Congo

Democratic Republic of Congo

The USD 20 million GEF funded project promote establishing sustainable

municipal waste collection system, 2 MW landfill gas (LFG) based power

plant at the existing landfill, 1 MW bio-methanisation power plant from

the segregated organic waste and 300 tons per day (tpd) refuse derived

fuel (RDF) processing plant along with other material recovery options.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna / GEF

Demonstration of the feasibility and viability of small to medium scale

renewable energy technologies

Guinea Bissau

More than 2.5 MW RE projects are installed in this USD 9 million GEF

project. Favourable RE polices are formed and adopted as well as

capacity of key market enablers and local training entities are

strengthened for sustenance of the RE project installation.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna / GEF

Sustainable conversion of waste into clean energy to reduce GHG

emissions

Kenya

USD 16 million GEF project promoted investments in waste-to-energy

(WTE) technologies through installation of 0.75 KWe and 0.6 kWth biogas

plants. Other parallel activities carried out are establishing standards for

agro-waste to energy projects, creating enabling environment including

Page 13: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

12

www.rcogenasia.com

provision of incentives for WTE projects and appropriate capacity

building at all levels.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna / GEF

Reducing of GHG emissions in the industrial sector through pelletization

technology in Lao PDR

Lao PDR

Production and use of industrial grade solid bio-fuel for thermal energy

generation is promoted in the USD 8 million GEF project. A pelletization

unit for around 30 tpd capacity is also included.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna / GEF

Mini-grid based on renewable energy (biomass) sources to augment

rural electrification

Nigeria

Feasibility study is conducted for a 5 MW rice husk based power plant

project in a rice mill cluster consisting of more than 300 rice mills.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna / GEF

Scaling up small hydro power (SHP)

Nigeria

USD 30 million GEF funded project to strengthen the local manufacturing

of cross flow turbines and control equipment from 125 kW to 300 kW

capacities. Cumulative capacity of 3 MW SHP project is installed and

national standards for SHP in Nigeria are also focused.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna / GEF

Reduction of GHG emission through promotion of gasification in rice

mills

Myanmar

Investments from the private sector in rice husk based mini-grids are

promoted in this USD 9 million GEF project. To support the promotion,

creation of conducive policy and regulatory frameworks, local fabrication

of high quality gasification power plants and installation of 2 MW

cumulative capacity rice husk gasification based mini-grids are carried

out.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna

Enhancing opportunities for clean lighting industry

Kenya

Modern lighting solutions such as solar lantern, solar home lightings, etc.

are promoted in order to replace kerosene consumption in Kenya.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna

Energy+ Program for Kenya: enhancing access to clean and sustainable

energy

Kenya

USD 42 million project promotes the use of modern lighting technologies,

alternate fuels and efficient cooking technologies throughout the country.

The key component was development of public-private sector

Page 14: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

13

www.rcogenasia.com

partnership to enable the sustainable promotion.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna / GEF

5 MW biomass cogeneration project

Nigeria

This is part of USD 15 million GEF project. Following were the activities

towards implementation of 5 MW cogeneration plant in a rice mill

complex of Abakaliki, Ebonyi State, Nigeria:

Fuel supply-availability study

Full feasibility study

Assessment and selection of appropriate site to install the biomass

power plant

Preparation of business plan report

Detailed technical design report

Environmental and social impact study report

Draft power purchase agreement

Draft fuel purchase agreement

Preparation of documents for bank loan approval

Training various stakeholders on biomass cogeneration plant

development

Advising different stakeholders on the project development

Preparation of tender documents

Tendering, tender negotiation, equipment supplier selection and

finalization

Preparation of technical contract documents

Advice on commercial contract documents

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna / GEF

5 MW rice husk cogeneration project

Thailand

The project involves training Nigerian Delegates including Government

officials. Six operating biomass power plants of size ranging from 3–10

MW in various regions of Thailand are visited.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna / GEF

5 MW rice husk cogeneration project

China

The project involves visit to Chinese equipment suppliers, manufacturing

plants and power plant installations in various parts of China such as

Shanghai, Hangzhou, Qingdao, Jinan, Chengdu, etc. as part of due

diligence for equipment supply and construction in Nigeria for a 5 MW

power plant. The Nigerian Minister and Government officials were also a

part of the team.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna / GEF

5 MW rice husk cogeneration project

India

The project involves training the Nigerian Delegates including Minister

Page 15: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

14

www.rcogenasia.com

and Government officials. Due diligence of the Indian equipment

suppliers also carried out. For that purpose, 3 operating biomass power

plants, operating gasification power plants, equipment suppliers and

manufactures are visited in various states of India.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna / GEF

Scaling up of micro hydro power (MHP) for productive use and rural

electrification

Rwanda

This USD 10 million GEF project develops local manufacturing of hydro

power equipment and mapping of Mini Hydro Project sites in country

along with installation of 1 MW cumulative capacity of MHP plants.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna / GEF

Promoting market based development of solar PV mini grids for

productive uses in rural areas

Sudan

This USD 11 million GEF project promotes investments in Solar PV mini-

grids for increasing electricity access in rural areas, framing of RE policy,

Feed-in-Tariff for RE and development of private public partnership for

RE generation, component fabrication and import promotion.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna / GEF

Promotion of Bio-Ethanol as alternative clean fuel for cooking

Tanzania

This USD 25 million GEF funded project involves rolling out of 500,000

ethanol stoves as clean cooking alternatives replacing traditional cook

stoves in peri-urban areas of Dar-es-Salaam, Tanzania through a strong

Public-Private Partnership development. The Government plans to have

an agreement with the private companies assuring the defined and set

quality of stoves. Those companies responsible for the stoves are

responsible for the fuel also. Also, there is a learning centre, where all

stakeholders can approach for their requirements regarding the project.

The sustainability of the project is assured.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna / GEF

Promotion of waste-to-energy applications in the agro-industries

Tanzania

This USD 40 million GEF project addresses the market barriers and

involves installation of 6.8 MW cumulative capacity of RE generation

from the agro wastes. The project also includes setting up of information

& learning centres as well as revision of policy aspects.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna / GEF

Promotion of geothermal energy as an alternative source for electricity

generation

Tanzania

This USD 15 Million GEF project is to augment electricity availability in

Tanzania by promoting geothermal technology. The project also includes

Page 16: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

15

www.rcogenasia.com

identification and mapping of geothermal resources in the country.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna / GEF

Mini-grids based on small hydropower sources to augment rural

electrification

Tanzania

This is USD 13 million project to promote the installation of micro / mini

hydropower based mini-grids of 3.2 MW cumulative capacity and further

scaling up.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna / GEF

Promoting small scale biomass power plants in rural Thailand

Thailand

This USD 4 million GEF project involves installation of 1.25 MW

cumulative capacity biomass gasification power plants, along with policy

strengthening and sustainable knowledge management measures at

community level.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna / GEF

Promoting production and usage of solid bio-fuel in Thai industries

Thailand

This USD 34 million GEF project involves installation of solid bio-fuel

production plants to a cumulative production capacity of 200 tons / day

and special soft loan schemes promoting investment in solid bio-fuel

machinery and supporting industries.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna / GEF

Reducing carbon footprint (CPF) in SMEs through RE technologies

Thailand

This USD 9 million GEF project focuses on CPF labelling in SMEs and

promoting RE technologies for thermal energy generation in industries.

Customer:

Project:

Country / location:

Project description:

European Commission / AIT

EC-ASEAN COGEN Program, COGEN 3

ASEAN & Europe

The programme mainly promoted biomass projects using European

technologies in ASEAN. More than 20 projects were implemented and

100 pipeline projects developed. CDM was also promoted through

capacity building workshops, training programmes, seminars, etc.

Specific project development trainings were also given to various

stakeholders. Business meetings and seminars were also organized in

various parts of Europe such as UK, France, Germany, Sweden, Denmark,

Italy, Netherlands, etc. to assist European companies for ASEAN market.

Customer:

Project:

Country / location:

Project description:

European Commission / AIT

Conduct of feasibility study, biomass project development and CDM

trainings

Cambodia

The project involved Conduct of feasibility study, biomass project

development and CDM trainings in Phnom Penh, Siem Reap and

Page 17: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

16

www.rcogenasia.com

Battambang.

Customer:

Project:

Country / location:

Project description:

European Commission / AIT

Conduct of feasibility study, biomass project development and CDM

trainings

Vietnam

The project involved Conduct of feasibility study, biomass project

development and CDM trainings in Hanoi, Danang and Ho Chi Minh City.

Customer:

Project:

Country / location:

Project description:

European Commission / AIT

Conduct of feasibility study, biomass project development and CDM

trainings

Malaysia

The project involved Conduct of feasibility study, biomass project

development and CDM trainings in Kuala Lumpur, Johar Bahru, Sibu,

Kota Kinabalu, Lahad Datu, Alor Setar, Penang, Klang, Perak, Sabah,

Pendang, Johor, Sarawak, Pahang, Selangor, Negeri Sembilan, etc.

Customer:

Project:

Country / location:

Project description:

European Commission

Conduct of feasibility study, biomass project development and CDM

trainings

Indonesia

The project involved conducting feasibility study, biomass project

development and CDM trainings in Medan, Jakarta, Palembang, Bandung,

Bali, etc.

Customer:

Project:

Country / location:

Project description:

European Commission / AIT

Conduct of CDM seminars, Workshops and Trainings

ASEAN

Conducting CDM trainings, workshops and seminars in Singapore,

Brunei, Malaysia, Thailand, Philippines, Indonesia, Vietnam, Laos,

Myanmar and Cambodia on CDM project development, PDD preparation,

etc.

Customer:

Project:

Country / location:

Project description:

Regional Biomass Energy Agency (Belgium) / EAEF

Conduct of feasibility studies and estimation of CO2 emission reduction

potential for power plants in various locations throughout Laos

Lao PDR

The project involved conducting feasibility study and estimation of

CO2 emission reduction potential using biomass co-firing for several

power plants including rice husk, wood and coal power plants for cement

industries. The project involved extensive travel throughout Laos

including Vientiane, Luang Prabang, Huay Xai, Savannakhet, Salavan, etc.

Customer:

Project:

Country / location:

Project description:

ADB / AECOM

Integrated solid waste management

Philippines, Myanmar and Thailand

Technical support for solid waste management in Philippines, Myanmar

and Thailand. Feasibility studies are conducted for implementing MSW

incineration power plants, MSW biogas plants, MSW landfill gas projects

Page 18: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

17

www.rcogenasia.com

and engineered land fill projects, etc. Climate change vulnerabilities,

mitigation and adaptation for SWM sector are also carried out.

Recommendations are made on good practices for reducing GHGs in the

SWM sector and guidance are given on CDM aspects also.

Customer:

Project:

Country / location:

Project description:

Royal Danish Embassy (RDE) / BNB / Saraff Energies Limited

9.5 MW palm oil waste fuelled power plant

Thailand / Krabi

The project involved conducting site visit, plant performance study, CDM

risk assessment, and recommendations for CDM and CER sales.

Customer:

Project:

Country / location:

Project description:

RDE / TMB / BNB / Sima Interproduct – Plant 1

2 MW wastewater treatment with biogas system (UASB) in a starch plant

Thailand / Nakhon Ratchasima

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

Project description:

RDE / TMB / BNB / Sima Interproduct – Plant 2

Biogas from treating wastewater in starch plant used for heating purpose

Thailand / Chachoengsao

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

Project description:

RDE / BNB / Roi Et Flour Company

2.5 MW wastewater treatment with biogas technology in tapioca

processing plant

Thailand / Roi Et

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

Project description:

RDE / BNB / P.V.D. International

4 MW wastewater treatment with biogas technology in tapioca

processing plant

Thailand / Nakhon Ratchasima

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

Project description:

RDE / BNB / Natural Palm Oil

1 MW electricity generation from biogas plant

Thailand / Surat Thani

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

Project description:

RDE / BNB / Northeastern Starch

Fuel switching from LPG to biogas

Thailand

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

RDE / DEM / AEP / Buayai Bio Power

8 MW grid-connected electricity generation from rice husk

Thailand / Bua Yai

Page 19: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

18

www.rcogenasia.com

Project description: Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

Project description:

RDE / DEM / AEP / Advance Bio Power

9.5 MW grid-connected electricity generation from wood waste

Thailand / Buriram

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

Project description:

RDE / DEM / AEP / OTACO

1 MW biogas power plant from waste water treatment facility in a palm

oil mill

Thailand / Trang

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

Project description:

RDE / DEM / AEP / Thai Tallow and Oil 2

1 MW biogas power plant from waste water treatment facility in a palm

oil mill

Thailand / Sai Kung

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

Project description:

RDE / DEM / AEP / Thai Tallow and Oil 1

1 MW biogas power plant from waste water treatment facility in a palm

oil mill

Thailand / Bang Sawan

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

Project description:

RDE / DEM / AEP / SeangSiri Agro Industries

1 MW biogas power plant from waste water treatment facility in a palm

oil mill

Thailand / Kankanady

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

Project description:

RDE / DEM / AEP / S.P.O Agro Industry

1 MW biogas power plant from waste water treatment facility in a palm

oil mill

Thailand / Sin Pun

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

Project description:

Advance Energy Plus Co. Ltd. (AEP) / Energy Absolute

90 MW solar power plant at Lampang

Thailand / Lampang

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

AEP / Energy Absolute

90 MW solar power plant at Phitsanulok

Page 20: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

19

www.rcogenasia.com

Country / location:

Project description:

Thailand / Phitsanulok

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

Project description:

AEP / Energy Absolute

90 MW solar power plant

Thailand / Nakhon Sawan

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

Project description:

AEP / Energy Absolute

45 MW wind power plant

Thailand / Hua Sai

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

Project description:

AEP / Energy Absolute

45 MW wind power plant at Pak Phanang

Thailand / Pak Phanang

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

Project description:

AEP / Bangchak Petroleum Public Company Limited

38 MW solar power plant

Thailand / Bangchak

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

Project description:

Alternate Power International Inc., Canada

32 MW Power generation from biomass

Canary Islands

Emission reduction potential assessment for a 32 MW biomass power

plant using elephant grass as fuel

Customer:

Project:

Country / location:

Project description:

Olam International

10 MW wood waste power plant

Gabon

Preparation of CDM PDD and stakeholder consultation for a 10 MW wood

waste power plant in a wood special economic zone

Customer:

Project:

Country / location:

Project description:

AEP / Energy Absolute

8 MW solar power plant

Thailand

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

Project description:

MINERGY / CEPALCO

8 MW Cabulig River Mini-Hydroelectric Power Project

The Philippines / Cagayan de Oro

CDM project design, registration, monitoring and verification. Support

also included in selecting and contracting DOE for verification and

facilitation of CER sales.

Page 21: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

20

www.rcogenasia.com

Customer:

Project:

Country / location:

Project description:

AEP / SAHASIN Cogeneration

8 MW wastewater treatment with biogas system in starch plant

Thailand / Chantaburi

Preparation of CDM PDD, stakeholder meeting, validation, verification and CER issuance.

Customer:

Project:

Country / location:

Project description:

Ministry of Industry and Trade (MOIT)

6-30 MW hydro projects in Vietnam

Vietnam

The project involves implementing more than 10 hydro power plant

projects of size 6 – 30 MW in various provinces such as Lao Cai, Son La,

Quang Ngai, DakLak, DakNong, Dien Bien Phu, Thanh Hoa, etc. All the

projects were registered under CDM PoA.

Customer:

Project:

Country / location:

Project description:

Revonergy Inc., UK

5 MW biogas power generation from swine farm waste

Spain

GHG mitigation potential assessment study for a 5 MW biogas power

generation from swine farm waste in Spain

Customer:

Project:

Country / location:

Project description:

Vidullanka PLC

4.8 MW hydro

Sri Lanka

CDM project design, validation, verification and registration for a 4.8 MW

hydro project in Sri Lanka.

Customer:

Project:

Country / location:

Project description:

AEP / Sima 3

4 MW biogas power plant from starch waste water

Thailand

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

Project description:

AEP / CAMCO

4 MW biogas power plant from ethanol waste water

Thailand

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

Project description:

AEP / TBEC

1.4 MW x 2 palm oil effluent biogas power plant

Thailand

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

Project description:

Revonergy Inc., UK

2 MW cattle dung to electricity project

South Africa

Assessment of carbon credits generation potential from a ranch for a 2

MW biogas project

Customer:

Project:

Country / location:

IDCOL

3.6 Million Solar Home System (SHS) implementation

Bangladesh

Page 22: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

21

www.rcogenasia.com

Project description: The project was to scale up SHS market in off-grid and rural areas of

Bangladesh with sales / performance linked incentive mechanism with

multi-stakeholder involving IDCOL, Grameen Shakti and other private

sector / NGO participation. Fund for incentives was partly generated

using sale of carbon credits. Assistance provided in streamlining of

operations in aspects of data management, monitoring, reporting and

verification, capacity building to stakeholders, addressing challenges in

obtaining CDM credits and successfully delivered CER issuances from

CDM Executive Board.

Customer:

Project:

Country / location:

Project description:

Advance Energy Plus Co. Ltd.

International best practices in MRV and recommendations for country

MRV framework

Thailand

Development of national level MRV framework for (i) industrial sectors

including food sector and (ii) building energy efficiency.

Customer:

Project:

Country / location:

Project description:

AEP

Biogas from swine farm waste water

Thailand

Design and development of CDM project for biogas generation from

swine farm wastewater.

Customer:

Project:

Country / location:

Project description:

AEP / Thai Oil Power

Heat recovery from gas turbine flue gas

Thailand

Assessment study on carbon credits generation potential for heat

recovery project from gas turbine flue gas

Customer:

Project:

Country / location

Project description:

AEP / EGAT

Energy efficiency improvement through retrofitting the turbines

Thailand

Design and development as CDM project for an energy efficiency

improvement project through retrofitting the turbines

Customer:

Project:

Country / location:

Project description:

AEP / KS Bio Plus

Biogas generation from waste water treatment

Thailand

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

Project description:

AEP / PVD

4 MW Biogas power plant from starch plant waste water at PVD

Thailand

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

Project description:

AEP / K. S. Chanthaburi

1 MW Biogas power plant from starch plant waste water at Chanthaburi

Thailand / Chanthaburi

Preparation of CDM PDD, stakeholder meeting, validation, verification

Page 23: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

22

www.rcogenasia.com

and CER issuance for a 1 MW biogas power plant from starch wastewater

at Chanthaburi.

Customer:

Project:

Country / location:

Project description:

AEP / Sima1

4 MW Biogas power plant from starch plant waste water at Roi-et

Thailand / Roi-et

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance for a 4 MW biogas power plant from starch waste

water.

Customer:

Project:

Country / location:

Project description:

Olam International, Gabon

CDM afforestation project

Gabon / Malysia / Indonesia / Thailand

Technical support in design of CDM afforestation project based on palm

oil plantation through data collection on oil palm plantation based

research centres in Malaysia, Indonesia and Thailand.

Customer:

Project:

Country / location:

Project description:

Green and Smart

Biogas power plant in a palm oil mill

Malaysia

Technical assistance in development of CDM project for a biogas power

plant in waste water treatment of a palm oil mill.

Customer:

Project:

Country / location:

Project description:

API, Canada

Large scale wind energy projects in Asia

Pakistan & Sri Lanka

Assessment of carbon credit generation potential from electricity

generation through wind farms.

Customer:

Project:

Country / location:

Project description:

ENVIMA (Thailand) Co., Ltd.

Training on “Reducing Carbon Footprints in Textile Industries”

Thailand

The project involved providing training on methods to reduce carbon

footprint in 40 textile industries of Thailand

Customer:

Project:

Country / location:

Project description:

ENVIMA (Thailand) Co., Ltd.

Biogas from POME

Thailand

Assistance in design and development of CDM project for biogas

generation from palm oil mill effluent.

Customer:

Project:

Country / location:

Project description:

A UK based company

Preliminary market study

Dubai, Sharjah and Abu Dhabi

Market assessment study for the development of solar energy business

for a UK based company in Dubai, Sharjah and Abu Dhabi.

Customer:

Project:

Country / location:

Project description:

A private Company

Study on Carbon Foot Printing approaches in selected industries

General

Technical assistance for study of carbon foot printing in various

industrial sectors.

Page 24: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

23

www.rcogenasia.com

Customer:

Project:

Country / location:

Project description:

AEP / Energy Absolute

36 MW wind power plant at Ranad

Thailand

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

Project description:

Advance Bio Power (ABP)

9.5 MW grid connected biomass power plant

Thailand / Buriram

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

Project description:

Bua Yai Bio Power (BBP)

9.5 MW grid connected biomass power plant

Thailand/ Bua Yai

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

Project description:

AEP / K. S. Chanthaburi

4.2 MW Biogas power plants from starch plant waste water at

Chanthaburi

Thailand

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

Project description:

AEP / CAMCO / NP Bio Energy

1.5 MW biogas power plant from starch waste water

Thailand

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

Project description:

AEP / NP

1 MW electricity generation from palm oil waste

Thailand

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Customer:

Project:

Country / location:

Project description:

AEP / KS Bio Power

2.75 MW Biogas power plant from waste water treatment

Thailand

Preparation of CDM PDD, stakeholder meeting, validation, verification

and CER issuance.

Note: The above list is only the selected projects of Renewable Cogen Asia and its Directors. For

more details, please contact us.

Page 25: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

24

www.rcogenasia.com

B) Other Projects (selected)

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna

2 MW wood waste based project

Nigeria

Conduct of feasibility study for 2 MW wood waste based gasification and

steam thermal power plant.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna

3 MW rice husk based power generation

Nigeria

Conduct of feasibility study for 3 MW rice husk based power plant in a

rice mill cluster consisting of more than 300 very small rice mills.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna

10 MW wood waste based power plant in Akure South

Nigeria / Akure South

Project involves conducting full feasibility study, fuel resource

assessment, site selection, stakeholder consultations, assessment of grid

infrastructure, site visit, etc., and business plan preparation for the wood

mill clusters.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna

5 MW wood waste based power plant in Akure North

Nigeria / Akure North

Project involves conducting full feasibility study, fuel resource

assessment, site selection, stakeholder consultations, assessment of grid

infrastructure, site visit, etc., and business plan preparation for the wood

mill clusters.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna

5 MW wood waste based power plant in Ijebu North

Nigeria / Ijebu North

Project involves conducting full feasibility study, fuel resource

assessment, site selection, stakeholder consultations, assessment of grid

infrastructure, site visit, etc., and business plan preparation for the wood

mill clusters.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna

5 MW wood waste based power plant in Ijebu Ode

Nigeria / Ijebu Ode

Project involves conducting full feasibility study, fuel resource

assessment, site selection, stakeholder consultations, assessment of grid

infrastructure, site visit, etc., and business plan preparation for the wood

mill clusters.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna

5 MW wood waste based power plant in Odigbo

Nigeria / Odigbo

Project involves conducting full feasibility study, fuel resource

Page 26: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

25

www.rcogenasia.com

assessment, site selection, stakeholder consultations, assessment of grid

infrastructure, site visit, etc. and business plan preparation for the wood

mill clusters.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna

5 MW wood waste based power plant in Owo

Nigeria / Owo

Project involves conducting full feasibility study, fuel resource

assessment, site selection, stakeholder consultations, assessment of grid

infrastructure, site visit, etc. and business plan preparation for the wood

mill clusters.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna

2 MW wood waste based power plant in Abeokuta

Nigeria / Abeokuta

Project involves conducting full feasibility study, fuel resource

assessment, site selection, stakeholder consultations, assessment of grid

infrastructure, site visit, etc. and business plan preparation for the wood

mill clusters.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna

2 MW wood waste based power plant in Idanre

Nigeria / Idanre

Project involves conducting full feasibility study, fuel resource

assessment, site selection, stakeholder consultations, assessment of grid

infrastructure, site visit, etc. and business plan preparation for the wood

mill clusters.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna

Biogas generation for cooking and electricity from slaughter house

wastes in Arusha

Tanzania

Conduct of feasibility study for installation of environmental friendly

biogas cooking systems for the National College of Tourism (NCT) at its

Arusha campus by using the wastes generated from nearby slaughter

houses.

Customer:

Project:

Country / location:

Project description:

UNIDO, Vienna

Training of African project development team members in various

biomass power plants in Thailand

Thailand

Training program for an African team in more than 5 biomass power

plant projects of size ranging from 3 – 10 MW at various parts of

Thailand

Customer:

Project:

Country / location:

Project description:

European Commission / AIT

Implementation of biomass cogeneration plants

Thailand, Malaysia, Singapore, Indonesia and Philippines

Implementation of biomass cogeneration plants in wood, rice husks,

palm oils and sugar industries. Also, power plants using tree trimmings,

Page 27: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

26

www.rcogenasia.com

multi-fuel biomass, etc. The project size ranges from 1 to 41 MW.

Customer:

Project:

Country / location:

Project description:

AIT / EAEF

Capacity building in policy instruments for the promotion of renewable

energy and energy efficiency in the ASEAN Member Countries

ASEAN member countries

The project involved analysis of the existing Renewable Energy (RE) and

Energy Efficiency (EE) policies in the different ASEAN Member countries,

document their success, conduct gap and barrier analysis and build

capacity in the formulation and implementation of harmonized

renewable energy and efficiency energy policies in the ASEAN. The

project also involved creating a network of policy makers, business

executives, consumers and civil society to push for the formulation and

adoption of appropriate and consistent policy instruments.

Customer:

Project:

Country / location:

Project description:

AIT / EAEF

Setting up of national associations for cogeneration and decentralized

energy systems in ASEAN countries

ASEAN

To establish national associations for promoting cogeneration and

distributed energy systems in individual ASEAN countries and to create a

regional network of these associations in different countries

Customer:

Project:

Country / location:

Project description:

EU-Thailand Economic Cooperation, Small Project Facility / AIT

Training on and transfer of the efficient EU technologies in the sugar

sector in Thailand

Thailand

To prepare the Thai sugar mills for business co-operation with European

suppliers of modern and energy efficient technologies associated with

the sugar sector

Customer:

Project:

Country / location:

Project description:

Regional Biomass Energy Agency (Belgium) / EAEF

Development of National Scheme for decentralised power generation

systems in Lao PDR

Lao PDR

The project involved designing a national scheme to promote the use of

biomass and / or indigenous coal in decentralised power plants of Lao

PDR

Customer:

Project:

Country / location:

Project description:

Centre for Rural Technology, Nepal

Electricity generation from rice husk

Nepal / Lumpini

Conduct of a pre-feasibility study for 500 kW rice husk gasification

power plant in Kathmandu and Lumpini.

Customer:

Project:

Country / location:

Project description:

Cagayan Electric Power and Light Co. / EAEF

Feasibility study for distributed generation and renewable energy

portfolio of a distribution company

Philippines / Cagayan de Oro

To map out a distributed generation and renewable energy strategy for a

Page 28: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

27

www.rcogenasia.com

distribution utility involving (i) a bagasse-fired cogeneration plant, (ii) a

mini-hydro plant that directly supplies to the electric grid and (iii) grid-

connected roof top photovoltaic plant serving daytime dedicated load of

a building and supply any excess power to the electric grid

Customer:

Project:

Country / location:

Project description:

Philippine Rice Research Institute / EAEF

Enhancing the energy self sufficiency of rice mills

Philippines

The project required travelling throughout Philippines and conducting

feasibility studies in various parts of the Philippines such as Tuguegarao

city, Tabuk city, San Jose city, Isabela, Banaue rice terrace, Manila, Iloilo

city, Bacolod city, Cebu city, Roxas city, Cotabato city, Davao city,

Palawan, Bohol, etc. Ten full feasibility studies are conducted for the size

ranging from 2-10 MW and business plans are also developed. Fuel

supply availability study, CDM trainings and project development

trainings are also conducted. Various rice mills / rice mill clusters are

identified for the project implementation.

Customer:

Project:

Country / location:

Project description:

CEPALCO / EAEF

Feasibility study for a 6 MW biomass cogeneration power plant

Philippines / Cagayan de Oro

Conduct of feasibility study for biomass fired cogeneration power plant

including estimation of CO2 emission reduction potential

Customer:

Project:

Country / location:

Project description:

Dan Chang Bio-Energy Co., Ltd.

41 MW sugar cogeneration plant

Thailand / Suphan Buri

The project involved feasibility study, project development, project

implementation, performance evaluation of a 41 MW new high pressure

system using bagasse and other biomass fuels.

Customer:

Project:

Country / location:

Project description:

PhuKhieo Bio-Energy Co., Ltd.

41 MW sugar cogeneration plant

Thailand / Chaiyaphum

The project involved feasibility study, project development, project

implementation and performance evaluation of a 41 MW new high

pressure system using bagasse and other biomass fuels.

Customer:

Project:

Country / location:

Project description:

Elgrey Power Pte. Ltd

2 x 30 MW multi-biomass power plant

Singapore

Conduct of feasibility study for 2×30 MW multi fuel biomass power plant

in Singapore.

Customer:

Project:

Country / location:

Project description:

Electrowatt-Ekono / Thai Power Supply

37 MW + 2x10.5 MW power plants retrofitting

Thailand / Chachoengsao

Replacing the existing pollution control equipment with new ESPs

through tender document preparation, tendering and equipment

supplier selection.

Page 29: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

28

www.rcogenasia.com

Customer:

Project:

Country / location:

Project description:

Revonergy Inc., UK

30 MW MSW power plant

Kuwait

Feasibility study for the electricity generation using refuse derived fuel

(RDF)

Customer:

Project:

Country / location:

Project description:

Revonergy Inc., UK

30 MW MSW power plant

Nigeria / Lagos

Feasibility study and carbon credits generation potential assessment

from the MSW based power plant.

Customer:

Project:

Country / location:

Project description:

A.T. Biopower Co. Ltd.

22 MW rice husk power plant

Thailand

Due diligence and technical assistance for 22 MW grid connected SPP

using rice husk as fuel.

Customer:

Project:

Country / location:

Project description:

Gulf Electric Public Co., Ltd.

Fuel supply availability study for a 20 MW wood waste power project

Thailand / Trang

Establishment of a 20 MW power project that will utilize wastes from

rubber wood as primary fuel and export the electricity generated to the

grid. Fuel supply availability study was also conducted.

Customer:

Project:

Country / location:

Project description:

Revonergy Inc., UK

15 MW wood waste fired power plant

Nigeria

Feasibility study and fuel supply assessment study is conducted for a 15

MW wood waste power plant.

Customer:

Project:

Country / location:

Project description:

THS Bio-Energy Sdn. Bhd.

14 MW cogeneration plant project development

Malaysia / Sabah

14 MW cogeneration plant uses the oil palm empty fruit bunches (EFB),

fibres and shells as fuel. In addition to power and steam requirement of

the palm oil mill, 10 MW of excess power supply to grid is achieved.

Customer:

Project:

Country / location:

Project description:

Patum Rice Mill and Granary Public Co. Ltd

10 MW rice husk cogeneration plant

Thailand / Pathumthani

Feasibility study, project development and project implementation is

carried out for a 10 MW rice husk cogeneration plant. The project is

upgraded from 2.4 MW cogeneration to 10 MW cogeneration capacity by

replacing the turbines and modifying the boilers. The excess power from

the plant is sold to the grid under the Small Power Producer (SPP)

scheme.

Customer:

Project:

Country / location:

Olam International

10 MW wood waste power plant

Gabon

Page 30: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

29

www.rcogenasia.com

Project description: Conduct of full feasibility study for 10 MW wood waste power plant in a

wood special economic zone

Customer:

Project:

Country / location:

Project description:

Earthwatts Lanka Pvt. Ltd.

10 MW biomass dendro power plant

Sri Lanka

Conduct of feasibility study, fuel supply assessment and project valuation

for a 10 MW biomass dendro project.

Customer:

Project:

Country / location:

Project description:

MINERGY / Cagayan de Oro

10 MW multi-fuel biomass power plant

Philippines

Conduct of full feasibility study, fuel availability study, risk assessment

and strategic recommendation for different project implementation

options.

Customer:

Project:

Country / location:

Project description:

Vidullanka PLC

10 MW Municipal Solid Waste (MSW) power plant

Sri Lanka / Colombo

Technical and financial due diligence for a 10 MW Municipal Solid Waste

power plant

Customer:

Project:

Country / location:

Project description:

Abakaliki Power Plant Limited

5 MW rice husk fired power plant

Nigeria / Ebonyi

Technical design, environmental and social impact assessment, electrical

load management, power purchase and fuel purchase agreements,

business plan, tender documents and project funding.

Customer:

Project:

Country / location:

Project description:

UNIDO

Feasibility study for a 4 MW sugar cogeneration system

Tanzania / Zanzibar

The project involves conducting feasibility study for cogeneration system

in a sugar mill complex with Ethanol and alcohol manufacturing units.

Customer:

Project:

Country / location:

Project description:

Fumase Pvt. Ltd.

King grass based 3 MW biomass power plant

Honduras

Conduct of site visit to king grass cultivation, harvesting and fuel

preparation facilities and preparation of feasibility study for a 3 MW

biomass power plant.

Customer:

Project:

Country / location:

Project description:

Vidullanka PLC

3 MW rice husk power plant project

Sri Lanka

Conduct of fuel supply availability study, fuel risk assessment, technical

& financial due diligence and implementation strategy for a rice husk /

multi fuel biomass power plant.

Customer:

Project:

Country / location:

Marshal Energy Resources, Bangladesh

2 MW rice husk fired power plant

Bangladesh

Page 31: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

30

www.rcogenasia.com

Project description: Feasibility study for 2 MW rice husk power plant is carried out in

Bangladesh.

Customer:

Project:

Country / location:

Project description:

Angkor Bio Cogen Co., Ltd.

Feasibility study for a 2 MW cogeneration project in a rice mill

Cambodia / Phnom Penh,

Conduct of feasibility study for a 2 MW cogeneration plant in rice milling

facility that will utilize rice husk as the primary fuel, to replace diesel

power generation.

Customer:

Project:

Country / location:

Project description:

Fumase Pvt. Ltd.

2 MW solar PV plant

Honduras

Site assessment for development of techno-economic feasibility study for

a 2 MW solar PV power plant project is carried out.

Customer:

Project:

Country / location:

Project description:

A wood industry from Gabon

1.2 MW wood waste gasification power plant

Gabon

Conduct of feasibility study for a 1.2 MW wood waste based gasification

technology to replace the existing diesel technologies.

Customer:

Project:

Country / location:

Project description:

Winrock International India

1 MW electricity generation from MSW based biogas project

India

Conduct of site visit, assessment and preparation of full feasibility study

for a city corporation to manage MSW wastes through installation of

biogas based power plant

Customer:

Project:

Country / location:

Project description:

Relab Energy

Feasibility study for 1 MW gasification power plant

Thailand

Conduct of feasibility study for 1 MW gasification power plant using rice

husk as fuel.

Customer:

Project:

Country / location:

Project description:

TMB-Energietechnik

720 kW biomass gasification power plant

Nepal

Project due diligence, CDM potential assessment and review of

equipment supply contract.

Customer:

Project:

Country / location:

Project description:

Ban Heng Bee Rice Mill (1952) Sdn. Bhd.

Project development and performance study of a 450 kW rice husk based

cogeneration plant

Malaysia / Pendang,

Biomass cogeneration plant performance evaluation, Boiler efficiency

and cogeneration efficiency estimations, recommendations to improve

efficiency and plant operation, etc. in a rice mill.

Customer:

Project:

PT. Kurnia Musi Plywood Industries

Project development and performance study of a 2 MW wood waste

cogeneration plant

Page 32: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

31

www.rcogenasia.com

Country / location:

Project description:

Indonesia / Palembang

Biomass cogeneration plant performance evaluation, Boiler efficiency

and cogeneration efficiency estimations, recommendations to improve

efficiency and plant operation, etc. in a plywood industry.

Customer:

Project:

Country / location:

Project description:

THS Bio-Energy Sdn. Bhd.

14 MW cogeneration plant performance study

Malaysia / Sabah,

Biomass cogeneration plant performance evaluation, Boiler efficiency

and cogeneration efficiency estimations, recommendations to improve

efficiency and plant operation, etc. in a palm oil mill.

Customer:

Project:

Country / location:

Project description:

Chia Meng Co. Ltd.

Project development and performance study for a 2.5 MW cogeneration

plant in a rice mill

Thailand / Nakhon Ratchasima

Biomass cogeneration plant performance evaluation, boiler efficiency

and cogeneration efficiency estimations, recommendations to improve

efficiency and plant operation, etc. in a rice industry.

Customer:

Project:

Country / location:

Project description:

Kumpulan Guthrie Sg Dingin Palm Oil Mill

Project development and performance study for 2 MW cogeneration

plant in a palm oil mill

Malaysia / Kedah

Biomass cogeneration plant performance evaluation, Boiler efficiency

and cogeneration efficiency estimations, recommendations to improve

efficiency and plant operation, etc. in a palm oil factory.

Customer:

Project:

Country / location:

Project description:

Kilang Sawit Linggi Sdn. Bhd.

Project development and performance evaluation for a 2 MW

cogeneration plant

Malaysia / Johor

Biomass cogeneration plant performance evaluation, Boiler efficiency

and cogeneration efficiency estimations, recommendations to improve

efficiency and plant operation, etc. in a palm oil mill

Customer:

Project:

Country / location:

Project description:

Homet Raya Sdn. Bhd.

Project development and performance study for a 1.65 MW wood waste-

fired cogeneration plant

Malaysia / Sarawak,

Biomass cogeneration plant performance evaluation, Boiler efficiency

and cogeneration efficiency estimations, recommendations to improve

efficiency and plant operation, etc. in a wood working complex.

Customer:

Project:

Country / location:

Project description:

Titi Serong Edar Sdn. Bhd.

Project development and performance study for a 1.5 MW cogeneration

plant in a rice mill

Malaysia / Perak

Biomass cogeneration plant performance evaluation, Boiler efficiency

and cogeneration efficiency estimations, recommendations to improve

Page 33: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

32

www.rcogenasia.com

efficiency and plant operation, etc. in a rice mill.

Customer:

Project:

Country / location:

Project description:

Kumpulan Guthrie Berhad

Project development and performance evaluation for a 1 MW

cogeneration plant

Malaysia / Kedah

Biomass cogeneration plant performance evaluation, Boiler efficiency

and cogeneration efficiency estimations, recommendations to improve

efficiency and plant operation, etc. in a timber processing plant.

Customer:

Project:

Country / location:

Project description:

Sim Hoe Wood Industry Sdn. Bhd.

Performance study for a 1 MW cogeneration plant

Malaysia / Pahang

Biomass cogeneration plant performance evaluation, Boiler efficiency

and cogeneration efficiency estimations, recommendations to improve

efficiency and plant operation, etc. in a wood working complex.

Customer:

Project:

Country / location:

Project description:

Bee Joo Industries, Pte. Ltd.

Project development and performance study for a 1 MW cogeneration

plant

Singapore

The 1 MW cogeneration plant was designed to use wood chips from used

pallets, building materials and furniture. The steam and electricity

generated (including waste heat recovery) by the plant are utilized for

the waste processing & management operation of the company.

Customer:

Project:

Country / location:

Project description:

ECO Special Waste Management Private Limited

Project development and performance study for a 1 MW cogeneration

plant

Singapore

The 1 MW cogeneration plant was designed to use wood chips from tree

trimmings and horticultural wastes. The steam and electricity generated

is utilized for the waste processing & management operation of the plant.

Customer:

Project:

Country / location:

Project description:

Rayong Municipality

Project development and performance evaluation of a 600 kW MSW

biogas plant

Thailand / Rayong

Development of waste management system to treat 25,550 tons

municipal solid waste (MSW) per year through anaerobic digestion

producing 5,800 tons of organic fertilizer and 5,100 MWh of electricity

using a 600 kW gas engine system.

Customer:

Project:

Country / location:

Project description:

Heveafil Sdn. Bhd.

Project development and performance evaluation for a biogas plant

Malaysia / Selangor

Treatment of wastewater by anaerobic digestion and utilization of the

biogas produced (7,820 Nm³/day) as fuel for thermal oil heater to

replace use of medium fuel oil.

Customer: Bekok Kiln Drying & Molding Sdn. Bhd.

Page 34: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

33

www.rcogenasia.com

Project:

Country / location:

Project description:

Project development and performance evaluation for a wood waste

steam boiler

Malaysia / Negeri Sembilan

Project development and performance study is conducted for a wood-

waste steam boiler serving heating requirement of wood moulding plant,

using wood waste generated during its operation.

Customer:

Project:

Country / location:

Project description:

Areechai Wood Tech. Co. Ltd.

Project development and performance study for a wood waste boiler

Thailand / Srakaew

Project development and performance study is carried out for the boilers

in the wood waste complex .

Customer:

Project:

Country / location:

Project description:

Laem Chabang Industry Co., Ltd.

Project development and performance study for a wood waste boiler

Thailand / Chonburi

The project involves designing systems to utilize residues in a hot water

boiler with a total capacity of 400,000 kcal/hr and its performance study.

Customer:

Project:

Country / location:

Project description:

Olam International Inc.

Centralized steam supply system

Gabon

The project aims at setting up of centralized steam supply system to

distribute steam to various nearby industrial customers within a special

economic zone.

Customer:

Project:

Country / location:

Project description:

Olam International

Fuel supply availability study for a 10 MW wood waste power plant

Gabon

Detailed survey on biomass generation from industries is conducted and

wood waste availability for fuel use is evaluated.

Customer:

Project:

Country / location:

Project description:

DRDO, Pondicherry

Designing, constructing and commissioning of solar water heaters

India / Pondicherry

Site assessment, design, construction and commissioning of solar water

heaters for domestic and industrial use at various places in Pondicherry

Customer:

Project:

Country / location:

Project description:

MGT & Co. Ltd, Mauritius

Biogas power generation from waste water treatment facility

Mauritius

Power generation potential assessment from a waste water treatment

plant

Customer:

Project:

Country / location:

Project description:

UNIDO

Feasibility study for biogas plant in a sugar mill

Tanzania / Zanzibar

Conduct of feasibility study for a 1 MW biogas power generation from

the wastewater treatment of ethanol production plant.

Customer:

Project:

An Egypt based multinational company

10 MW rice straw fired power plant

Page 35: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

34

www.rcogenasia.com

Country / location:

Project description:

Egypt

Techno-economic assessment for a 10 MW rice straw fired power plant

in Egypt.

Customer:

Project:

Country / location:

Project description:

A rice mill in India

Market study for rice husk ash

India

Market study to evaluate business opportunities in production and sale

of rice husk ash

Customer:

Project:

Country / location:

Project description:

A private company based in Ecuador

Renewable energy projects including biomass and hydro

Ecuador

Carbon finance and CER sales facilitation for CDM projects for a private

company in Equador.

Customer:

Project:

Country / location:

Project description:

An agro industry from Kenya

2 MW Power generation from wood waste

Kenya

Conduct of techno-economic feasibility analysis for a wood waste power

plant in Kenya.

Customer:

Project:

Country / location:

Project description:

US Based project developer

15 MW coffee husk based power plant

Uganda

Assessment of carbon credit generation potential from a 15 MW coffee

husk based power project.

Customer:

Project:

Country / location:

Project description:

A private company in Sri Lanka

Identification of possibility of biomass project implementation in Sri

Lanka

Sri Lanka

This project involved travelling throughout Srilanka including Colombo,

Kandy, Batticaloa, Kalmunai, Galle, Dambulla, Anuradhapura, Vavuniya,

Jaffna, Negombo, etc. to assess the biomass availability and make

replications in site selection.

Note: The above list is only the selected projects of Renewable Cogen Asia and its Directors. For

more details, please contact us.

Page 36: CAPABILITY STATEMENT · Sustainability reporting Climate finance National / Sectoral MRV Energy efficiency Renewable energy (Solar, wind, hydro, biomass…) Biomass power / Cogeneration

35

www.rcogenasia.com

CONTACT DETAILS

For services:

Dr. Balasankari, B.E., M.Engg., Ph.D.

Executive Director

[email protected]

Mr. Arul Joe Mathias, B.E., M.Engg., M.B.A.

Managing Director

[email protected]

For comments & feedback:

[email protected]

SS Renewable Cogen Pvt. Ltd.

No. 4, Naana Kalyani Apartments,

First main road, RK Nagar,

Chennai – 600 028.


Recommended