CONSTRUCTIONS PTY LTD Capability Statement www.vassallo.com.au | Ph (07) 4968 0068
Transcript

CONSTRUCTIONS PTY LTD

Capability Statementwww.vassallo.com.au | Ph (07) 4968 0068

Table of Contents

company profile 4

the people behind the name 5

corporate structure 6

company details 7

our products & services 7

our community involvement 8

dam & irrigation 9

roadworks 16

earthworks 29

pipeworks 36

landscaping 40

residential developments 44

concrete works 54

environmental remediation 58

surveying 61

equipment 62

our policies 64

4

Company Profile

Our company’s aim is to provide a complete, cost effective service with attention to detail, offering our customers a competitive edge within their own market place. We achieve this through well trained and motivated staff and by keeping up to date with the latest advancements in technology. We continually strive to improve processes and techniques in our business.

We are committed to undertake our operations in a safe and environmentally friendly manner whilst achieving high quality outcomes. All operations are carefully planned and executed to comply with all relevant legislation and regulations. To deliver these outcomes, our Integrated Management System has third party accreditation to AS/NZ ISO 9001 (Quality), 14001 (Environment) and 4801 (Safety) in addition to Federal Safety Accreditation.

Vassallo Constructions strength comes from a team of four brothers; Victor, Joseph, Peter and Michael Vassallo. These four directors make a formidable team, combining a variety of skills and wide range of practical experience. They have brought this family company to the forefront of construction in the Mackay and Whitsunday regions.

Since our establishment in 1997 we have built up a highly skilled and experienced management team. Our site staff are all hand picked and have been with the company for many years giving stability to the company and ensuring the quality of work.

We have a strong emphasis on training to ensure our services are continually improving. Vassallo Constructions is committed to the industry and have training programs that mentor trainees who are developing their skills.

Our valued client base includes long and short-term partnerships, business large and small and includes among others Main Roads, BMA, Mackay Regional Council, CSR Distilleries, Queensland Rail, Dalrymple Bay Coal Terminal, North Queensland Bulk Ports Corporation, Mackay Sugar Limited and an array of large residential and commercial private development companies.

5

The people behind the name

At Vassallo Constructions we are focused on strong customer partnerships and to achieve this we aim to provide the best service available. To deliver outstanding service we employ the best personnel.

Each employee is selected for their exceptional skills and experience within their respective fields. They ensure that our philosophy is upheld in all facets of our projects, and we deliver on time to a superior standard.

PROJECT MANAGEMENTDedicated, reliable and efficient. Just a few words to sum up our experienced management team. They meet project targets and often exceed them. Our management team oversees the construction of high quality products within a safe working environment.

TENDER TEAMAccurate estimating is the cornerstone of any successful construction business. Our team’s knowledge and experience ranges from major roadworks and pipeline infrastructure to bridge construction and subdivisional works. We can assist clients with estimates for complex projects or a simple driveway and will ensure that you receive timely accurate information. A key element to our success is the ability to assess capabilities of regional subcontractors and suppliers.

ADMINISTRATIONNo construction company can flourish unless it has the backup of and efficient administration. Our modern offices house an efficient administration staff who ensure the early processing of orders to prevent delays to project.

6

Corporate Structure

Board of DirectorsPeter Vassallo, Joseph Vassallo, Victor Vassallo, Michael Vassallo

Managing DirectorVictor Vassallo

ConstructionManager

ResourceManager

Systems Manager /Financial Controller

Survey Manager Estimator

ProjectManagers

PayrollManager/

RecruitmentA/C Payable

Safety/Rehab/HRManager

Engineers

Supervisors

EngineeringSurveyor

7

Company Details

Company Name: Vassallo Constructions Pty Ltd

Australian Company Number: 80 078 963 498

Australian Business Number: 078 963 498

Date of Incorporation: 18/06/1997

Street Address: 79 Phillips Street, Mackay QLD 4740

Postal Address: PO Box 8158, Mount Pleasant QLD 4740

Telephone: (07) 4968 0068

Facsimile: (07) 4942 4648

Email: [email protected]

Web Site: www.vassallo.com.au

Builders Licence Number BSA: 1131454 - Medium Rise

TMR Prequalifications : R3 (Conditional for QLD) B1 F20

Our Products & Services

Civil Constructions:RoadworksInfrastructureEarthworksPipeworksResidential DevelopmentsIndustrial DevelopmentsCommercial DevelopmentsBridge / Concrete Environmental Remediation

Associated Companies:Summit Construction MaterialsQuarries -Palmyra, Habana, Sarina, and numerous pits located around Mackay and surrounding areas.

Products - TMR certified, Fill (general & select), roadbase (2.5-2.1), Aggregates, Rock (Gabion, Armour), Sand, Sealing Aggregates.

8

Our Community Involvement

We are strong believers in giving back to our local community. Throughout the years we have supported many local events and organisations.

Vassallo Constructions is a Bronze Sponsor for the Flagon and Dragon Luncheon Fundraiser which is a bi-annual event that supports the Mackay Children’s Wards.

Vassallo Constructions is also an major sponsor of the Mayor’s Charity Ball each year which is organised by the Mackay Sunrise Rotary Club and supports different charities each year from around Mackay.

9

DAMS

10

Marian Bagasse and Mud Ash Pads

Client:Mackay Sugar Limited

Principal Contractor:Vassallo Constructions

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

As part of Mackay Sugar Cogeneration construction, the Marian mill required bagasse and mud ash pads to be constructed for surplus product. Set on seven hectares of poor ground Vassallo Construction completed this bulk earthworks project in time for their crushing season. The client made some significant increases to the scope during construction including the installation of a fire main and relocation of fill from a different mill, all which Vassallo Constructions were able to successfully provide within the timeframes required.

11

Oonooie Dunder Storage

Client:CSR

Principal Contractor:Vassallo Constructions

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

This project called for a superior finish to earthworks to enable a protective cover to be installed. This cover was attached to a concrete filled anchor, trenched into the dam wall. The dam capacity is approximately 100 mega litres.

12

Kelly’s Dam

Client:

Principal Contractor:Vassallo Constructions

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

inhouse design and construction of a 110mL farm dam plus a 10mL sump for flood harvesting. Particular attention was taken when geological testing found a substrata of a sand deposit under an overlaying clay strata. The base of the dam was thoroughly ripped cultivated and blended to ensure that no sand lenses extended into the base of the dam. The dam functions exactly as designed with no leakage

13

Borg’s Dam

Client:

Principal Contractor:Vassallo Constructions

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

inhouse design and construction of a 200mL ring tank used as an irrigation storage dam. The dam was situated on an old creek bed and particular attention was paid to the bottom of the impervious clay core extending below the old creek bed (approx 8 metres deep) to ensure the integrity of the Dam. This dam functions exactly as designed with no leakage.

14

MARIAN MILL - MOLASSES STORAGE

Client:

Principal Contractor:Vassallo Constructions

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

The molasses storage tank had a 2mm liner installed and was covered with a 2.5mm bladder anchored to a concrete perimeter beam. A pump pit and leakage inspection pit were also constructed. A megaflo drainage grid and other associated pipework was installed within the bladder structure.

15

MACKAY HARBOUR - MOLASSES TANKS

Client:North QLD Bulk Ports

Principal Contractor:Vassallo Constructions

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

As part of their overall upgrade to their offshore molasses delivery system, Mackay Sugar engaged Vassallo Constructions to construct a 55,000 tonne molasses storage facility located on an old residential area within the Port of Mackay. The works consisted of the removal of 50,000m3 of earthworks to another site located outside of the port precinct, installation of 200 metres of 500mm dia and 800mm dia poly pipe, concrete spillways and a 450m long concrete road encircling the facility. The existing soil consisted of a fine dune sand, which provide a challenge to traverse in road trucks, which was mitigated by using dozer and excavators to load trucks in stable areas.

During the works it was discovered that the surface was contaminated by fragmented asbestos created during the demolition of the residential buildings that had once been situated on the site. Vassallo Construction in conjunction with a specialist sub-contractor undertook to remove approximately 5000m3 of contaminated material to a buried dump site within the property. This involved the creation of a spray down area for trucks to pass through in order to remove the creation of dust.

16

ROADWORKS

Roadworks form a substantial part of our project list. These include urban residential road requiring kerb and channel work and rural and major roads to Main Roads standards. GPS and laser assisted graders ensure that road finishes are well within tolerances and have been successful in reducing overall construction time.

17

Evans Avenue Rehabilitation

Client:Mackay Regional Council

Principal Contractor:Vassallo Constructions

Evans Avenue is a busy thoroughfare and also a small business precinct. The project consisted of full width road rehabilitation whilst maintaining traffic flow in both directions and access to the local businesses. After four years of adjacent construction activities affecting the area, businesses where understandably concerned about the impact of the works. Vassallo Constructions in conjunction with Mackay Regional Council undertook extensive liaison with stakeholders to ensure disruption was minimised. To reduce the impact, stabilisation of the road was completed at night after business hours including businesses such as restaurants.

Due to a major water trunk main being located adjacent to the kerb, stormwater drainage upgrades were undertaken within the traffic lanes. An upgrade to the consumer water main, required careful coordination to ensure businesses were not adversely affected, including temporary supply pipes being installed.

During construction, illegally dumped waste was encountered and Vassallo Constructions managed the clean-up and reprogramming of the works to minimise the impact on the project.

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

18

Hill End Road

Client:Mackay City Council

Principal Contractor:Vassallo Constructions

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

Located within a residential street this road upgrade required Vassallo Constructions to closely liaise with homeowners to provide access to their properties during construction. This was compounded by extremely poor subgrade that required lime stabilisation however Vassallo Constructions managed to keep disruptions to a minimum. Works also included drainage upgrades, cement treated base course, kerb, asphalt, guardrail, footpaths and line marking activities.

19

Archibald Street/Paradise Street Roundabout

Client:Mackay Regional Council

Principal Contractor:Vassallo Constructions

Archibald Street is one of the two main access point into the Paget industrial centre and is a designated B-Double truck route. Consequently it services a large volume of the precinct traffic both day and night.

Vassallo Constructions approach to traffic management was critical to the successful delivery of the project and an innovative “elongated roundabout” solution was utilised to maintain traffic flow without the impact of traffic controllers or signals and hence minimise disruption during construction. Night works were also utilised to reduce the effect on traffic for parts of the project.

The project provided a number of other challenges including high quantities of underground services (including those not known about), 1350mm dia stormwater duplication, poor subgrades, complicated pavement structures and large landscaped areas.

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

20

Bowen Overtaking Lanes

Client:Main Roads Queensland

Principal Contractor:Vassallo Constructions

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

Located 15 kilometres south of Bowen, additional one kilometre long passing lanes were constructed on both north and south bound lanes of the Bruce Highway. Constructed during the wet season, including impacts from Cyclone Ita, Vassallo Constructions was able to complete this project on budget and within time.

Works included the extension of culverts with concrete pours being undertaken at night to reduce the effect of temperature, private entrances, unsuitable material replacement, unbound pavements, primer seal and rubberised second coat seals.

21

Mackay Bucasia Road Duplication

Client:Main Roads Queensland

Principal Contractor:Vassallo Constructions

Mackay Bucasia Road was in urgent need of an upgrade. The duplication helped alleviate the building stress on the commuters caused by the booming population of the Northern Beaches District. Special works included duplication of two lanes to form four, a duplicated bridge to pass over the railway and an extended drainage system. An R2 Pre-Qualification was required to construct the road to Main Roads strict standards.

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

22

Caneland Central Redevelopment

Client:Lend Lease

Principal Contractor:Bovis Lend Lease

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

The Canelands project was managed by Bovis Lend Lease and saw the extension of the existing Shopping Centre and construction of a multi-storey car park. Vassallo Constructions was contracted to build the base level of the car park under the multi-storey car park and external roadworks. The centre continued to trade during the construction and disruption to existing businesses had to be kept to a minimum. Roadworks were completed after hours, under lights; at all times ensuring adequate signage and access to the centre. Low ceilings and existing structures added a degree of difficulty to the car park construction.

23

Habana Road Rebuild

Client:Pointglen Developments

Principal Contractor:Vassallo Constructions

Vassallo Constructions were contracted to construct the new entrance and road widening of Richmond Hills Estate on Mackay Habana Road. The intersection work was combined with planned NDRRA road reconstruction project and was built under the supervision of Main Roads. Traffic was managed via a side track and temporary sensor traffic lights at either end of the works.

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

24

Joint Levee Road

Client:Main Road Queensland

Principal Contractor:Vassallo Constructions

The new Joint Levee Road has linked Sams Road with the Kooyong intersection and improved safety. The new link is a dedicated heavy vehicle route to the Mackay Port while bypassing Malcomson Street and Evans Avenue. Vassallo Constructions completed stage 2 of the 3 stage upgrade in 2010.

Stage 2 required the importation and compaction of approximately 70,000m3 of embankment fill to complete the second stage lift of the road. The road is constructed through an environmentally sensitive mangrove area and the works called for stringent environmental management practices. The management of traffic was required at the busy Sams Road intersection as well as timing access to the site from various access points so as not to interrupt peak hour traffic. Culverts, apron and end structures were also installed.

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

25

Blacks Beach Road

Client:Mackay Regional Council

Principal Contractor:Vassallo Constructions

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

The upgrade to the main access into Blacks Beach also included part of the entry to the Blacks Beach Cove Estate was commissioned by the Mackay Regional Council. With beautiful landscaping making a very attractive entrance and a viewing platform for the public. Savings in construction costs enabled us to undertake further footpath works, which was in addition to the original brief of the project.

26

Flood Package 9

Client:Mackay Regional Council

Principal Contractor:Vassallo Constructions

The Mackay West Flood Package 9 was contracted as part of the Mackay Regional Council’s response to widespread storm and flood damage on local roads. The package consisted of seven rural roads which required extensive reconstruction and drainage improvements. Several of the roads were worked on concurrently to minimise the contract period. Traffic Control and the safety of road users were a major consideration.

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

27

Mackay Regional Council Depot

Client:Mackay Regional Council

Principal Contractor:FK Gardner Pty Ltd

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

The subcontract involved construction of the new carpark as part of the building works for the Mackay Regional Council Depot relocation. An area of approximately 45,000m3 was trimmed and compacted, subsoil drainage was installed and approximately 13,000m3 of select fill was imported.

28

Braeside Road

Client:Pacific National

Principal Contractor:ABI Group

Located near Nebo, Vassallo Constructions was selected to construct an intersection for the new Waitara Pacific National Road Facility to connect to Braeside Road. Works included drainage, pavements, seals and line marking. All these works were undertaken with traffic conditions.

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

29

EARTHWORKS

Specialised heavy earthmoving equipment makes light work of large earthmoving projects. Owning our own fleet of earthmoving equipment ensures that your work starts on time and is completed within the contract period. Previous projects include bulk cut to fills, building platforms, irrigation channels and drains to construction of large storage dams.

30

First Stage Earthworks - Showground Intersection

Client:Main Roads Queensland

Principal Contractor:Vassallo Constructions

In preparation for an upgrade of the Bruce Highway/Gordon St intersection Main Roads commissioned Vassallo Constructions to undertake a bulk earthworks package as the site was located within a tidal mangrove area. As one of the most heavily trafficked intersections within Mackay, there were stringent traffic control limitations on the construction. Vassallo Constructions decided to provide access via a different route, with nil impact on traffic as a result.

Due to the works being within mangrove areas, strict environmental controls were instigated and cultural monitors were also involved during parts of the construction. Construction was coordinated with tidal movements including the extension of a drainage pipe, geotextile, geogrid and rock mattress placement.

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

31

Lanai Apartment Building

Client:Built QLD

Principal Contractor:Vassallo Constructions

Vassallo Constructions were awarded the contract to complete the earthworks forming the base for Lanai. Lanai was one of the first high rise apartment buildings lining Mackay’s Pioneer River. Excavation of around 10,000m3 was removed to allow for the construction of the underground car park.

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

32

Mandalay Road - Airlie Beach

Client:Mandalay PeninsulaPrivate Estate Body Corporate

Principal Contractor:Vassallo Constructions

This steep site required extensive retaining structures to enable the reconstruction of a road and associated drainage to a group titled project at Airlie Beach. The owners were careful to ensure that the engineering and construction methods employed were of the highest standards and a high quality finish was expected. The work involved the installation of approximately 652m2 of Keystone Walls and 365m2 of Gabion Walls, stone pitched walls, roadworks and stormwater drainage.

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

33

Mount Pleasant Batter Protection

Client:Mackay City Council

Principal Contractor:Vassallo Constructions

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

This project for the Mackay City Council was to stabilise the batter below the Mount Pleasant Water Reservoir. it involved earthworks for the erection of 375m of block retaining walls 2100mm in height. Drainage and turf was also installed.

34

The Leap Cutting

Client:Queensland Rail

Principal Contractor:Vassallo Constructions

An embankment adjacent to the main rail line at the Leap was stabilised on behalf of Queensland Rail. A berm was excavated and approximately 280 linear metres of gabion rock baskets were installed. The finished batter was seeded, mulched and watered. The work was co-ordinated around the movements of rail traffic.

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

35

Lucas Paddock

Client:Sun Water

Principal Contractor:Vassallo Constructions

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

Torrential rain caused a landslip on the Teemburra Range which necessitated the reconstruction of the existing road. Approximately 160m was demolished and rebuilt utilising salvaged pavement materials. Stormwater was managed with the installation of approximately 100m of 450mm dia concrete pipes, gullypits and subsoil drainage.

36

PIPEWORKS

Vassallo Constructions have extensive experience in the installation of stormwater lines, water, sewerage reticulation and conduits. Dewatering equipment, trench boxes and other equipment are on hand when deep lines are required.

37

Blue Water Quay on River Street

Client:Mackay Regional Council

Principal Contractor:TF Woollams & Sons

The Blue Water Quay recreation precinct was constructed on the banks of the Pioneer River as part of the State Government Q150 initiative. The subcontract works required the demolition of an aging storm water system and reinstatement with steel enforced concrete pipe from 525mm dia to 1500mm dia. One section of old pipework was reinforced with a poly pipe line which had to be floated into the River Street outlet and inserted into place.

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

38

Mulherin Drainage Project

Client:North QLD Bulk Ports

Principal Contractor:Vassallo Constructions

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

The stormwater installation for the Ports Corporation comprised of saltwater treated reinforced concrete pipe ranging in size from 375mm dia twin barrel 1650mm dia. The project was complicated by a high water table which required purpose built trench shoring and dewatering. Existing live services had to be protected and supported to allow installation of the twin barrel 1650mm dia pipes underneath. Traffic was diverted via a temporary sidetrack to enable excavation and then reinstatement of the existing roadway, at all times ensuring that public safety was paramount.

39

Northern Beaches Water

Client:Mackay City Council

Principal Contractor:Vassallo Constructions

Approximately 14km of pipework (150mm dia - 750mm dia) was installed to augment the Northern Beaches water system. A railway line and major arterial road were underbored for the installation of 750 DIFL water and enveloper pipe. Existing services were located and protected and road and footpaths were reinstated to pre-contract conditions.

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

40

LANDSCAPING

Vassallo Constructions is responsible for all the landscaped sections within all Pointglen Developments projects. Through their team of experts they are able to implement the perfect look for a community development or sophisticated scenery for their next commercial district.

Out landscape team makes sure that all of our gardens, footpaths, lagoons and even our rock walls always look their best. Regular maintenance schedules can be arranged so that your project always presents well to prospective customers.

41

Northview Gardens

Client:Pointglen Developments

Principal Contractor:Vassallo Constructions

This project called for a construction of a landscaped 3 hectare lagoon park which comprised of water habitat planting, pathways and landscaped gardens.

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

42

Palm Bay Resort, Long Island

Client:NDH Developments Pty Ltd

Principal Contractor:Vassallo Constructions

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

Palm Bay Resort is an exclusive island resort located in the Whitsundays. The project involved construction of a road and retaining walls together with installation of water, sewerage, electrical services and the removal of an existing desalination plant. All materials had to be carried from the mainland and barged to the island with significant leadtimes to facilitate construction programmes.

A specialist subcontractor was employed to provide a superior finish to the stone pitched walls. All work was precisely finished in keeping with the resorts high standards.

43

Richmond Hills Estate

Client:Pointglen Developments

Principal Contractor:Vassallo Constructions

McCreedy’s Creek runs through the front of Richmond Hills. Pointglen wanted the landscaping to encompass the natural surroundings.

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

44

RESIDENTIAL DEVELOPMENTS

From Northview Gardens to Binnington Sands, Glenfields to Palm Bay Resort at Long Island, Vassallo Constructions provides an integral part of the construction in a broad range of subdivisions in the Mackay and Whitsunday regions.

45

Sugarview Estate - Stage 4

Client:Sugarview Developments Pty Ltd

Principal Contractor:Vassallo Constructions

Construction of this 19 Lot subdivision included a significant culvert to be construction beneath Mackay-Habana road. As a Main Roads certified contractor, Vassallo Construction was well placed to provide expertise for both portions of the work.

Construction activities such as sewer, stormwater, electrical conduiting, NBN conduiting and water services were undertaken. In addition, pavements, asphalt, concrete pathways and driveways, retaining walls and fencing were built.

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

46

Royal Sands - Stage 10c

Client:Raceview Developments

Principal Contractor:Vassallo Constructions

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

Comprising 31 Lots this extension to the estate was completed in record time to the developers demanding standards. Including a large park area, Vassallo Constructions undertook to construct bulk earthworks, sewer, stormwater, electrical conduiting, NBN conduiting and water services. Asphalt finished roads were built and significant quantities of footpath areas also constructed. High water tables in sandy soils provided a challenge that was overcome with good planning and execution of dewatering techniques.

47

Galbraith Park - Stage 5A

Client:Riordanvale

Principal Contractor:Vassallo Constructions

Located in Cannonvale, adjacent to Airlie Beach, this 8 lot extension to the current estate was constructed in a record five weeks. Having workded with our company before the client chose Vassallo Constructions to undertake their works because of our excellent quality of work, speed of construction and understanding and compliance with the Whitsunday Regional Council requirements.

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

48

Industroplex - Stage 5/6

Client:Knobel Consulting

Principal Contractor:Vassallo Constructions

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

Consisting of 13 industrial lots covering twenty five hectares included an intersection to the Bruce Highway. This subdivision included 6 meter deep sewer construction, most drainage consisting of culverts including a number of gross pollutant traps, construction of shotcrete and retaining wall drainage swales and an extension to a Queensland Rail culvert.

Poor existing ground was lime stabilised to provide a firm foundation for future buildings. The intersection was constructed in accordance with Main Roads standards and demolition of existing farm sheds was also supervised by Vassallo Constructions.

49

Northview Gardens

Client:Pointglen Developments

Principal Contractor:Vassallo Constructions

Construction of all the operational works for about 400 allotments was required at the Northview Gardens Project. This included the installation of a sewerage pump station, culvert widening and major trunk drainage. Shot firing was also required when rock was encounted on deep sewer lines. A landscaped 3 hectare lagoon park was constructed which comprises water habitat planting, pathways and landscaped gardens.

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

50

Richmond Hills Estate

Client:Pointglen Developments

Principal Contractor:Vassallo Constructions

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

Construction of Richmond Hills Estate included operational works for the first three stages. This included the installation of a sewerage pump station, box culverts, major trunk drainage, roadworks and kerbing. The estate also features a spectacular park area that includes the surrounding McCreedy’s Creek. Due to the natural landscape of the estate benching and retaining of some blocks was required for the stages.

51

Shoal Point Waters

Client:Pointglen Developments

Principal Contractor:Vassallo Constructions

As a fully master-planned community which offers prestige living, Shoal Point Waters is a high end residential development. Incorporating a man made lake, park, landscaped buffer zones and impressive entry statement. Vassallo Constructions directly undertook construction of these areas whilst delivering stages 1 & 2 of the development incorporating 73 lots. Infrastructure upgrades included a new roundabout on the existing road, stormwater upgrades and refurbishment of the existing sewer pump station and construction of an additional pump station.

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

52

Nabilla Riverlinks

Client:Nabilla Investments Pty Ltd

Principal Contractor:Vassallo Constructions

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

This very appealing residential development at Marian has proved very popular with local buyers. Construction has included two pump stations and associated rising mains, rock excavation in deep trenches and all associated earthworks, roadworks and services to bring the estate up to a finished standard.

53

Danastas Avenue

Client:Lexco Pty Ltd

Principal Contractor:Vassallo Constructions

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

This 32 Lot subdivision included a significant stormwater system to cater for upstream flows into the development. Retaining wall and concrete roads were a highlight to the subdivision.

54

CONCRETE WORKS

The Vassallo Construction crew are equipped to build concrete structures including culverts, headwalls, pits, pathways and ancillary works. They understand the importance of appearance in a subdivision and are committed to the highest quality transitions, driveways and footpaths.

With major concrete works, such as bridges, suitably qualified and experienced sub-contractors are engaged and managed to ensure a quality product and the client’s are satisfied.

55

Mackay Bucasia Road

Client:Main Road Queensland

Principal Contractor:Vassallo Constructions

Significant concrete works were required as part of the much needed upgrade to Mackay Bucasia Road. Specialist sub-contractors were employed to construct the piers and bridge structure in order to meet the prequalification requirements of Main Roads. Vassallo Constructions installed precast RSS walls and the reinforced concrete box culverts and bases. Concrete islands, footpaths and drainage paths were also constructed as part of the contract.

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

56

Flotation Concrete Thickener

Client:Outokumpu Technologies

Principal Contractor:Vassallo Constructions

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

This project at Saraji was timed to coincide with a scheduled mine shutdown. it comprised excavation to the underside blinder with bored piers of 600mm-1000mmm dia to a depth of 3.6m deep.

57

Richmond Hills Estate

Client:Pointglen Developments

Principal Contractor:Vassallo Constructions

A feature of the Richmond Hills Estate is a variety of concrete and porphyry roads. Exposed aggregates and coloured concrete have been utilised to provide a contrast point to the regular road.

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

58

ENVIRONMENTAL REMEDIATION

All operations are carefully planned and executed to minimise any impact on the environment.

59

Bayersville Landfill Remediation

Client:Mackay Regional Council

Principal Contractor:Vassallo Constructions

Mackay Regional Council commissioned Vassallo Constructions to undertake environmental remediation on a disused landfill site. The proposal accepted by Council entailed profiling the site, capping with a Geosynthetic clay material and then overlaying with an imported clay layer to form an impervious cover to an area approximately 176,000m2. A leachate trench was installed at the perimeter to prevent the escape of any contaminants. The methodology submitted in the alternate tender represented a considerable saving for the council with no comprise in the final results. Heavy machinery utilised GPS guidance to ensure precise conformance to design and minimum cover tolerances. This project was also a finalist in the 2013 CCF Earth Awards.

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

60

Gordon Street

Client:Pointglen Developments

Principal Contractor:Vassallo Constructions

Vassallo ConstructionsPh (07) 4968 0068www.vassallo.com.au

Vassallo Constructions undertook the remediation of an Old Railway site on Gordon Street. The project involved the onsite treatment of contaminated soil, removal of soil to an approved location where necessary and importation of clean fill. All work and testing was carried out under the strict guidelines of the EPA.

61

SURVEYING

Our team of licensed and engineering surveyors have extensive experience in both private and public sectors in Mackay and the Whitsunday Region. They are up to date with key legislative and local government requirements for all subdivisional works.

We have an extensive range of top of the line GPS and Laser Surveying Systems including Robotic Total Stations, Millimetre GPS, GPS Rovers, Survey Controllers, Pipe Lasers, Dumpie Levels, Single and Dual Grade Lasers and Receivers, Machine Mounted Lasers and Theodolites.

62

EQUIPMENT

All equipment is maintained to strict operational and safety requirements by our own team of mechanics with a fully equipped workshop and field maintenance vehicles.

Vassallo Construction’s fleet currently comprises of over 120 pieces of equipment - and is constantly growing. With this collection we are able to achieve current projects and facilitate future strategic growth.

63

Mobile PlantExcavators 25 7-100 Tonne (equipped with laser control)Backhoes 11 4WD 85-100 HPDozers 3 300-600 HP (equipped with laser control)Graders 5 14 Foot Blades (equipped with GPS and laser control)Scrapers 6 Elevating - 12m3

Open Bowl - 24m3

Loaders 8 2-6m3 Bucket capacityArticulated Dump Trucks 7 30-40 TonnesFleet of Road Transport Trucks 23 - Tandem Trucks with Super Dogs, Quad Dogs and Tri axle

Tipper Trailers.- Tandem Water Cart 10,000-15,000Lt

Rollers 13 1-20 Tonne Smooth Drum, Pad Foot and Multi-Tyred, Trench and Double Drum

Bulk Earthwork Compactors 2 35 Tonne Pad FootSkid Steer Loaders 4 Posi Track or Wheeled MachinesSpecialist Equipment Tilt Tray Truck

Vacuum TruckCCTV Pipe Camera & Truck

Excavator Attachments - General Purpose and Mud Buckets, Tilt Blades, Rock Breakers, Rock Grabs, Rollers, Rippers, Grader Blades, Rock Saw and Dredging PumpBackhoe Attachments - General Purpose and Mud Buckets, Rippers, Augers, Forks, Pipe Lifters, Spreader BarsMowing and Maintenance equipment, Manhole Boxes, Trench Boxes, Kibbles, Dewatering Pumps and Spears, Wacker Packers, Flex Drive Pumps and Vibrating Plates.

Crushing and ScreeningLoaders 6 4.5m3 (with scales)Loader 1 3m3 (with scales)Cone Crushers 2 1000Cone Crusher 1 1300Jaw Crusher 1 350 HPImpact Crusher 2 350 HPScreeners 4 Reclaimer InclinedScreeners 3 20 x 5 Incline ScreenerScreeners 2 20 x 6 HorizontalPre-Coater 1 Powamac with WasherScreening (sand) 1 Sand Washer

1 Sand Dewaterer

64

65

QUALITY

Vassallo Constructions provide civil earthworks, construction and road building through Central Queensland. Our aim is to provide the highest quality product at the lowest practical cost for our customers. Quality workmanship is the focus of all our employees. The maintain our excellent reputation for quality workmanship, we comply with all specification, standards and contractual obligations. We also encourage a robust customer feedback process. All levels of management, supervision staff and personnel are committed to our quality policy. The Quality System for Vassallo Constructions is based on ISO 9001:2008

SAFETY

Vassallo Constructions consider the safety and welfare of its employees to be of paramount importance. It believes that all industrial injuries can be prevented and does not consider work to be so important that time cannot be taken to find safe methods. The safety system for Vassallo Constructions is based on ISO 4801:2001

Management ensures that each employee follows safe work methods and accepts responsibility for working safety in the interest of not only their own welfare but also that of their fellow employees.

We believe that accident prevention is the responsibility of both management and every employee. A culture of working safely has been established and continues to the developed and is therefore part of the normal working culture.

Safety issues are continually assessed by our Workplace Health and Safety Officer, Safety Committee the site representatives.

ENVIRONMENTAL

Vassallo Constructions strives to undertake its operations in an environmentally responsible manner so that it achieves its moral and community expectations and complies with all relevant legislation and regulations. Vassallo Constructions Environmental system is based on ISO 14001:2004

All operations are carefully planned and executed in order to minimise any impact on the environment. An assessment of this impact has highlighted air and water quality, the preservation of native flora and fauna, the need for weed management practices and the management of water and hazardous materials as significant aspects. Staff are aware of their environmental responsibilities through procedures and training. They are trained to minimise effects on the environment during their everyday work activities. All processes and actions performed are continually monitored and refined so to improve their effectiveness.