+ All Categories
Home > Documents > Capability StatementLR Jun11

Capability StatementLR Jun11

Date post: 07-Apr-2018
Category:
Upload: chris-hazeldine
View: 219 times
Download: 0 times
Share this document with a friend
7
COMPANY PROFILE CAPABILITY STATEMENT Web Based Solutions • O&M Manuals • WorksDB • MPlan • Consulting
Transcript

8/6/2019 Capability StatementLR Jun11

http://slidepdf.com/reader/full/capability-statementlr-jun11 1/7

COMPANYPROFILE

CAPABILITYSTATEMENT

Web Based Solutions • O&M Manuals • WorksDB • MPlan • Consulting

8/6/2019 Capability StatementLR Jun11

http://slidepdf.com/reader/full/capability-statementlr-jun11 2/7

 WebFM provides Contractors and their Clients visibility of the manuals well in advance of handover. It savestime and reduces costs associated with handover delaysand project management inefficiencies. The system is

a greener way to produce and distribute manuals by avoiding the need to produce expensive draft and finalsets of hard copy manuals.

Introduction

Key Personnel

Project Experience

Web Based Solutions • O&M Manuals • WorksDB • MPlan • Consulting

PO Box 632 Camden NSW 2570T +61 2 46 55 50 44 F +61 2 46 55 50 66 E [email protected] W www.webfm.com.au

ACN 091 893 588 ABN 97 091 893 588

CONTENTS

8/6/2019 Capability StatementLR Jun11

http://slidepdf.com/reader/full/capability-statementlr-jun11 3/7

INTRODUCTION

• Electronic, fully searchable

and indexed Operation &

Maintenance Manuals

• Client tailored Asset register,

matched to clients Asset

Management system for direct

import, compiled by theSub-contractors/Contractors.

• Templated system to assist

Sub-contractors in meeting

requirements

• Online creation/review/sign off

of manuals is the greener and

more efficient way to produce the

handover manuals

• Single repository on DVD of all

As-built Drawings, Asset

information, Maintenance

requirements and associated

Handover documentation.

Working as a consultant during

the Sydney Olympic construction

activities, Stuart Smith realised that

the current asset handover process

and associated documentation was

extremely inefficient and resulted

in high levels of costs and delays.He set to work developing a system

that would revolutionize the whole

handover process and bring it into

the 21st century.

By leveraging the new

communications medium of the

internet, and creating a database

system to capture the information

required in handover documentation

Stuart was able to deliver all

the Operating and Maintenance

information to clients in formats that

could be tailored for direct import into

Asset Management systems. This

was one of the greatest inefficiencies

in the current process as this

information had to be manually

entered from the handover

manuals by the owner.

Another flaw of the current

process was the lack ofvisibility of the manuals to the

owner prior to handover, by

hosting the manual system in

a web environment owners

can review and ensure that

their requirements are met

progressively through a project.

WebFM has set a new standard

for the delivery of Capital Works

through simple thinking and

utilizing the latest in technology to

provide:

Our approach is based on creating long term sustainablesolutions for our clients. Our motto is complexity is the

outcome of incomplete development.

Web Based Solutions • O&M Manuals • WorksDB • MPlan • Consulting

8/6/2019 Capability StatementLR Jun11

http://slidepdf.com/reader/full/capability-statementlr-jun11 4/7

KEY PERSONNEL

Perth Office

P +61 430 157 176

Chris HazeldineBusiness Development ManagerWA/NT

Head Office

21 Mitchell StCamden NSW 2570

P +61 2 4655 5044F +61 2 4655 5066

Melbourne Office

P +61 430 305 341

Nick SuthersBusiness Development ManagerVIC/SA

The WebFM system “adds value to our process, it a llowsus to manage the process from start to completion with

no surprises”. Eric Bishop, Design Manage r, Thiess.

Web Based Solutions • O&M Manuals • WorksDB • MPlan • Consulting

Stuart Smith Managing Director

Brett DarbyWeb Products Manager

Brisbane Office

P +61 467 493 007

Brett HulyerBusiness Development ManagerQLD

New Zealand Office

P +64 275 600 070

Alistair LambieManaging ConsultantNZ

Brook BakerNational Development Manager

Adam CapovillaBusiness Development ManagerNSW

8/6/2019 Capability StatementLR Jun11

http://slidepdf.com/reader/full/capability-statementlr-jun11 5/7

PROJECT

EXPERIENCE

CURRENT

WA

QEII Cenral Energy PlantBrookfeild Multiplex 

Kalgoorie Hospital Stage 2Pindan 

Coca-Cola AmatilDistribution CentreGavin Construction 

Hedland Multi PurposeRecreation CentreDoric 

Edith Cowan UniverstyEngineering BuildingDoric 

The Shops At Ellenbrook Stage 2

Built Environs 

Comprehensive Cancer CentreBGC Construction 

PathWestLaboratory Medicine WABGC Construction 

Beachside LeightonMirvac 

Hedland Health CampusDoric 

RAAF Pearce Redevelopment

John Holland 

Web Based Solutions • O&M Manuals • WorksDB • MPlan • Consulting

Helicopter Underwater EscapeTraining (HUET)Thomas & Coffey 

C2Brookfield Multiplex 

State Theatre of WAJohn Holland 

Joondalup Heath CampusJohn Holland 

The LeightonPindan 

437 Roberts RdQube Property Group 

NT

RAAF Dawin Stage 2 Fuel FarmMacmahon 

RAAF Tindal AEW&C worksLeighton Contractors 

Stokes Hill, Naval Fuel InstallationThomas & Coffey 

Shoal Bay Receiving StationJohn Holland 

Robertson BarracksJohn Holland 

8/6/2019 Capability StatementLR Jun11

http://slidepdf.com/reader/full/capability-statementlr-jun11 6/7

PROJECT

EXPERIENCE

Various Geelong Hospital Works Kane Constructions 

Swinburne Universityof TechnologyKane Constructions 

Barwon Health PETCT Scan ProjectH.Troon 

Bunnings Warehouse Craigieburn Bunnings Group 

Geelong Super ClinicKane Constructions 

Bendigo ResidentialAged Care Facility

Bendigo Health 

Austin Neuroscience DevelopmentHooker Cockram 

Kew Residential Development(Main Drive Kew)Walker Corporation 

Simpson Barracks - DefenceForce School of SignalsGrocon 

CURRENT

VIC

Highlands Shopping CentreStockland 

Enhanced Landforce Stage 2St Hilliers 

Geelong HospitalKane Construction 

State Coronial Services CentreRedevelopmentJohn Holand 

Westfield Fountain GateWestfield Design & Construction 

Waurn Ponds LibraryE J Lyons 

Collins Square Building AWalker Corporation 

Australian Red CrossBlood ServiceCockram Construction 

AgriBio - The Centrefor AgriBioScienceGrocon 

NMIT Epping CampusStudent CentreDevco 

Melbourne Park Redevelopment

Major Projects Victoria 

Web Based Solutions • O&M Manuals • WorksDB • MPlan • Consulting

SA

City Central Tower 8Baulderstone 

RAAF Edinburgh RedevelopmentStage 2St Hilliers 

State Aquatic Centre& GP Plus CentreCandetti Constructions 

Murray Bridge - MarksmanshipTraining RangeLeed Engineering and Constructions 

RAAF Base Edinburgh - SpecialistTraining & Vehicle Support FacilityAbigroup 

RAAF Edinburgh HNA HC2Stage 2Baulderstone 

SA School PPPHansen Yuncken 

8/6/2019 Capability StatementLR Jun11

http://slidepdf.com/reader/full/capability-statementlr-jun11 7/7

QLD

Gold Coast University HospitalBovis Lend Lease 

Westfield Carindale Stage 5 Westfield 

Townsville HospitalRedevelopmentThiess 

Stockland NorthshoreHead OfficeBaulderstone 

Mackay Base Hospital 

RedevelopmentBaulderstone 

Brisbane Airport LinkThiess John Holland 

Stockland TownsvilleStockland Development 

Queensland Childrens Hospital& Central Energy FaciltyAbigroup 

Caneland Shopping CentreBovis Lend Lease 

Kestrel Mine ExtensionThomas & Coffey 

PROJECT

EXPERIENCE

CURRENT

NSW & ACT

Stockland Shellharbour

Brookfield Multiplex 

Macquarie UniversityNew Library Building 

University of Sydney

Campus Wide Projects 

Charles Sturt University NaLSH

Joss Constructions 

Metcash

Hansen Yuncken 

Charles Sturt University

EL + N & EIC

Southern Cross Developers 

The Residence Hyde Park

Hutchinson Buiders 

Liverpool Hospital

Bovis Lend Lease 

Penith Health Care Redelopment

Laing O’Rourke 

Allied Pickfords Monaro

Walker Corporation 

Westfield Belconnen

Westfield Design & Construction 

Nepean HospitalKane Constructions 

Lismore Base Hospital CCL 

Buildplan Group 

Bunnings Warehouse Seven HillsBunnings Group 

Australian Red Cross Blood

Service NAPS

Buildcorp Contracting 

Lismore Base Hospital ICCC

Buildplan Group 

ELF Stage 1 Kapooka Works

John Holland 

Grafton Base Hospital

Surgical Services and

Emergency Department

Lahey Constructions 

Manilla Combined MPS

and HealthOne

Hansen Yuncken 

Enhanced Land Force Stage 1

Singleton Works

John Holland 

NSW Police Stations

United Group Services 

Darling QuarterBovis Lend Lease 

Web Based Solutions • O&M Manuals • WorksDB • MPlan • Consulting

QLD

Gold Coast University HospitalBovis Lend Lease 

Westfield Carindale Stage 5 Westfield 

Townsville HospitalRedevelopmentThiess 

Stockland NorthshoreHead OfficeBaulderstone 

Mackay Base Hospital RedevelopmentBaulderstone 

Brisbane Airport Link

Thiess John Holland 

Stockland TownsvilleStockland Development 

Queensland Childrens Hospital& Central Energy FaciltyAbigroup 

Caneland Shopping CentreBovis Lend Lease 

Kestrel Mine ExtensionThomas & Coffey 


Recommended