Date post: | 07-Apr-2018 |
Category: |
Documents |
Upload: | chris-hazeldine |
View: | 219 times |
Download: | 0 times |
8/6/2019 Capability StatementLR Jun11
http://slidepdf.com/reader/full/capability-statementlr-jun11 1/7
COMPANYPROFILE
CAPABILITYSTATEMENT
Web Based Solutions • O&M Manuals • WorksDB • MPlan • Consulting
8/6/2019 Capability StatementLR Jun11
http://slidepdf.com/reader/full/capability-statementlr-jun11 2/7
WebFM provides Contractors and their Clients visibility of the manuals well in advance of handover. It savestime and reduces costs associated with handover delaysand project management inefficiencies. The system is
a greener way to produce and distribute manuals by avoiding the need to produce expensive draft and finalsets of hard copy manuals.
Introduction
Key Personnel
Project Experience
Web Based Solutions • O&M Manuals • WorksDB • MPlan • Consulting
PO Box 632 Camden NSW 2570T +61 2 46 55 50 44 F +61 2 46 55 50 66 E [email protected] W www.webfm.com.au
ACN 091 893 588 ABN 97 091 893 588
CONTENTS
8/6/2019 Capability StatementLR Jun11
http://slidepdf.com/reader/full/capability-statementlr-jun11 3/7
INTRODUCTION
• Electronic, fully searchable
and indexed Operation &
Maintenance Manuals
• Client tailored Asset register,
matched to clients Asset
Management system for direct
import, compiled by theSub-contractors/Contractors.
• Templated system to assist
Sub-contractors in meeting
requirements
• Online creation/review/sign off
of manuals is the greener and
more efficient way to produce the
handover manuals
• Single repository on DVD of all
As-built Drawings, Asset
information, Maintenance
requirements and associated
Handover documentation.
Working as a consultant during
the Sydney Olympic construction
activities, Stuart Smith realised that
the current asset handover process
and associated documentation was
extremely inefficient and resulted
in high levels of costs and delays.He set to work developing a system
that would revolutionize the whole
handover process and bring it into
the 21st century.
By leveraging the new
communications medium of the
internet, and creating a database
system to capture the information
required in handover documentation
Stuart was able to deliver all
the Operating and Maintenance
information to clients in formats that
could be tailored for direct import into
Asset Management systems. This
was one of the greatest inefficiencies
in the current process as this
information had to be manually
entered from the handover
manuals by the owner.
Another flaw of the current
process was the lack ofvisibility of the manuals to the
owner prior to handover, by
hosting the manual system in
a web environment owners
can review and ensure that
their requirements are met
progressively through a project.
WebFM has set a new standard
for the delivery of Capital Works
through simple thinking and
utilizing the latest in technology to
provide:
Our approach is based on creating long term sustainablesolutions for our clients. Our motto is complexity is the
outcome of incomplete development.
Web Based Solutions • O&M Manuals • WorksDB • MPlan • Consulting
8/6/2019 Capability StatementLR Jun11
http://slidepdf.com/reader/full/capability-statementlr-jun11 4/7
KEY PERSONNEL
Perth Office
P +61 430 157 176
Chris HazeldineBusiness Development ManagerWA/NT
Head Office
21 Mitchell StCamden NSW 2570
P +61 2 4655 5044F +61 2 4655 5066
Melbourne Office
P +61 430 305 341
Nick SuthersBusiness Development ManagerVIC/SA
The WebFM system “adds value to our process, it a llowsus to manage the process from start to completion with
no surprises”. Eric Bishop, Design Manage r, Thiess.
Web Based Solutions • O&M Manuals • WorksDB • MPlan • Consulting
Stuart Smith Managing Director
Brett DarbyWeb Products Manager
Brisbane Office
P +61 467 493 007
Brett HulyerBusiness Development ManagerQLD
New Zealand Office
P +64 275 600 070
Alistair LambieManaging ConsultantNZ
Brook BakerNational Development Manager
Adam CapovillaBusiness Development ManagerNSW
8/6/2019 Capability StatementLR Jun11
http://slidepdf.com/reader/full/capability-statementlr-jun11 5/7
PROJECT
EXPERIENCE
CURRENT
WA
QEII Cenral Energy PlantBrookfeild Multiplex
Kalgoorie Hospital Stage 2Pindan
Coca-Cola AmatilDistribution CentreGavin Construction
Hedland Multi PurposeRecreation CentreDoric
Edith Cowan UniverstyEngineering BuildingDoric
The Shops At Ellenbrook Stage 2
Built Environs
Comprehensive Cancer CentreBGC Construction
PathWestLaboratory Medicine WABGC Construction
Beachside LeightonMirvac
Hedland Health CampusDoric
RAAF Pearce Redevelopment
John Holland
Web Based Solutions • O&M Manuals • WorksDB • MPlan • Consulting
Helicopter Underwater EscapeTraining (HUET)Thomas & Coffey
C2Brookfield Multiplex
State Theatre of WAJohn Holland
Joondalup Heath CampusJohn Holland
The LeightonPindan
437 Roberts RdQube Property Group
NT
RAAF Dawin Stage 2 Fuel FarmMacmahon
RAAF Tindal AEW&C worksLeighton Contractors
Stokes Hill, Naval Fuel InstallationThomas & Coffey
Shoal Bay Receiving StationJohn Holland
Robertson BarracksJohn Holland
8/6/2019 Capability StatementLR Jun11
http://slidepdf.com/reader/full/capability-statementlr-jun11 6/7
PROJECT
EXPERIENCE
Various Geelong Hospital Works Kane Constructions
Swinburne Universityof TechnologyKane Constructions
Barwon Health PETCT Scan ProjectH.Troon
Bunnings Warehouse Craigieburn Bunnings Group
Geelong Super ClinicKane Constructions
Bendigo ResidentialAged Care Facility
Bendigo Health
Austin Neuroscience DevelopmentHooker Cockram
Kew Residential Development(Main Drive Kew)Walker Corporation
Simpson Barracks - DefenceForce School of SignalsGrocon
CURRENT
VIC
Highlands Shopping CentreStockland
Enhanced Landforce Stage 2St Hilliers
Geelong HospitalKane Construction
State Coronial Services CentreRedevelopmentJohn Holand
Westfield Fountain GateWestfield Design & Construction
Waurn Ponds LibraryE J Lyons
Collins Square Building AWalker Corporation
Australian Red CrossBlood ServiceCockram Construction
AgriBio - The Centrefor AgriBioScienceGrocon
NMIT Epping CampusStudent CentreDevco
Melbourne Park Redevelopment
Major Projects Victoria
Web Based Solutions • O&M Manuals • WorksDB • MPlan • Consulting
SA
City Central Tower 8Baulderstone
RAAF Edinburgh RedevelopmentStage 2St Hilliers
State Aquatic Centre& GP Plus CentreCandetti Constructions
Murray Bridge - MarksmanshipTraining RangeLeed Engineering and Constructions
RAAF Base Edinburgh - SpecialistTraining & Vehicle Support FacilityAbigroup
RAAF Edinburgh HNA HC2Stage 2Baulderstone
SA School PPPHansen Yuncken
8/6/2019 Capability StatementLR Jun11
http://slidepdf.com/reader/full/capability-statementlr-jun11 7/7
QLD
Gold Coast University HospitalBovis Lend Lease
Westfield Carindale Stage 5 Westfield
Townsville HospitalRedevelopmentThiess
Stockland NorthshoreHead OfficeBaulderstone
Mackay Base Hospital
RedevelopmentBaulderstone
Brisbane Airport LinkThiess John Holland
Stockland TownsvilleStockland Development
Queensland Childrens Hospital& Central Energy FaciltyAbigroup
Caneland Shopping CentreBovis Lend Lease
Kestrel Mine ExtensionThomas & Coffey
PROJECT
EXPERIENCE
CURRENT
NSW & ACT
Stockland Shellharbour
Brookfield Multiplex
Macquarie UniversityNew Library Building
University of Sydney
Campus Wide Projects
Charles Sturt University NaLSH
Joss Constructions
Metcash
Hansen Yuncken
Charles Sturt University
EL + N & EIC
Southern Cross Developers
The Residence Hyde Park
Hutchinson Buiders
Liverpool Hospital
Bovis Lend Lease
Penith Health Care Redelopment
Laing O’Rourke
Allied Pickfords Monaro
Walker Corporation
Westfield Belconnen
Westfield Design & Construction
Nepean HospitalKane Constructions
Lismore Base Hospital CCL
Buildplan Group
Bunnings Warehouse Seven HillsBunnings Group
Australian Red Cross Blood
Service NAPS
Buildcorp Contracting
Lismore Base Hospital ICCC
Buildplan Group
ELF Stage 1 Kapooka Works
John Holland
Grafton Base Hospital
Surgical Services and
Emergency Department
Lahey Constructions
Manilla Combined MPS
and HealthOne
Hansen Yuncken
Enhanced Land Force Stage 1
Singleton Works
John Holland
NSW Police Stations
United Group Services
Darling QuarterBovis Lend Lease
Web Based Solutions • O&M Manuals • WorksDB • MPlan • Consulting
QLD
Gold Coast University HospitalBovis Lend Lease
Westfield Carindale Stage 5 Westfield
Townsville HospitalRedevelopmentThiess
Stockland NorthshoreHead OfficeBaulderstone
Mackay Base Hospital RedevelopmentBaulderstone
Brisbane Airport Link
Thiess John Holland
Stockland TownsvilleStockland Development
Queensland Childrens Hospital& Central Energy FaciltyAbigroup
Caneland Shopping CentreBovis Lend Lease
Kestrel Mine ExtensionThomas & Coffey