+ All Categories
Home > Documents > Capacity Development for CDM Capacity Development for CDM in Mozambique Njeri Wamukonya Side Event...

Capacity Development for CDM Capacity Development for CDM in Mozambique Njeri Wamukonya Side Event...

Date post: 23-Dec-2015
Category:
Upload: lawrence-maxwell
View: 220 times
Download: 0 times
Share this document with a friend
Popular Tags:
17
Capacity Development for Capacity Development for CDM CDM in Mozambique Njeri Wamukonya Side Event June10 2003
Transcript
Page 1: Capacity Development for CDM Capacity Development for CDM in Mozambique Njeri Wamukonya Side Event June10 2003.

Capacity Development for CDM Capacity Development for CDM in Mozambique

Njeri Wamukonya

Side Event June10 2003

Page 2: Capacity Development for CDM Capacity Development for CDM in Mozambique Njeri Wamukonya Side Event June10 2003.

What are the project objectives?What are the project objectives?

Develop institutional (CDM framework Develop institutional (CDM framework and internal institutional) and technical and internal institutional) and technical capacity to enable Mozambique access capacity to enable Mozambique access CDMCDM

Page 3: Capacity Development for CDM Capacity Development for CDM in Mozambique Njeri Wamukonya Side Event June10 2003.

What is the CD approach used?What is the CD approach used?

regional centre- EDRC

national institutions –Uni Eduardo Mondlane (centre for engineering studies)

Ministry of Coordination of Environmental Affairs (MICOA)

Inception meetings- introduce project

Page 4: Capacity Development for CDM Capacity Development for CDM in Mozambique Njeri Wamukonya Side Event June10 2003.

Specific objectives: define how toSpecific objectives: define how to-Establish institutional framework for CDM and -Establish institutional framework for CDM and develop relevant capacitydevelop relevant capacity-Develop technical capabilities of project -Develop technical capabilities of project developers developers -Establish a pipeline of the CDM projects-Establish a pipeline of the CDM projects

Uni Eduardo Mondlane- lead

Worked very closely with MICOA

Phase 1: Phase 1: development of a national work plan

Page 5: Capacity Development for CDM Capacity Development for CDM in Mozambique Njeri Wamukonya Side Event June10 2003.

Undertook institutional analysis for framework

How was the plan developed?How was the plan developed?

Guiding principle:

-sustainability beyond project

Process of establishing the framework was explored –transparency & inclusive

Recomendations for framework based on:

-ability to fulfil DNA role and capacity of institution

Page 6: Capacity Development for CDM Capacity Development for CDM in Mozambique Njeri Wamukonya Side Event June10 2003.

Output of institutional analysis for Output of institutional analysis for frameworkframework

Matrix indicating DNA roles, relevant institutions for each role, and capacity gaps (sketch)

Recommendations for framework- models

Page 7: Capacity Development for CDM Capacity Development for CDM in Mozambique Njeri Wamukonya Side Event June10 2003.

Project developers- analysis

How was the plan developed? (2)How was the plan developed? (2)

what project development skills should be built and who should be targeted?

Guiding principle:CDM project developer needs to sustain themselves.

Page 8: Capacity Development for CDM Capacity Development for CDM in Mozambique Njeri Wamukonya Side Event June10 2003.

Output of institutional analysis for Output of institutional analysis for project developmentproject development

Matrix indicating potential project developers and capacity

gaps (sketch)

Page 9: Capacity Development for CDM Capacity Development for CDM in Mozambique Njeri Wamukonya Side Event June10 2003.

Work plan development processWork plan development process

Draft work plan was workshopped

Stakeholder comments on DNA framework and proposals for modification

Regional project workshop

Page 10: Capacity Development for CDM Capacity Development for CDM in Mozambique Njeri Wamukonya Side Event June10 2003.

Elements of the work Elements of the work plan plan

Page 11: Capacity Development for CDM Capacity Development for CDM in Mozambique Njeri Wamukonya Side Event June10 2003.

1. 1. EEstablishment of a designated stablishment of a designated national authority (DNA) national authority (DNA)

-further work shopping proposed -further work shopping proposed structure structure

-elaboration of gaps and how to -elaboration of gaps and how to address gapsaddress gaps

-defining legal framework for DNA-defining legal framework for DNA

Page 12: Capacity Development for CDM Capacity Development for CDM in Mozambique Njeri Wamukonya Side Event June10 2003.

Political Unit

MICOA-DNAIA NATIONAL DIRECTORATE FOR ENVIRONMENTAL IMPACT ASSESSMENT lead

Technical Unit

Eduardo Mondlane

-lead

DNA SET-UP

OTHER MEMBERS

Centre for promotion investments

National directorate for industry

Energy Ministry

Forestry Directorate

Page 13: Capacity Development for CDM Capacity Development for CDM in Mozambique Njeri Wamukonya Side Event June10 2003.

2. 2. StrengthenStrengtheninging the capa the capacitycity of public of public and private sector players to identify, and private sector players to identify, formulate, and secure financing for formulate, and secure financing for CDM projectsCDM projects

2.1 2.1 updating the list of developersupdating the list of developers

2.2 imparting skills2.2 imparting skills

Page 14: Capacity Development for CDM Capacity Development for CDM in Mozambique Njeri Wamukonya Side Event June10 2003.

3. C3. Creation of a pipeline of CDM reation of a pipeline of CDM eligible projectseligible projects

3.1 elaboration of projects3.1 elaboration of projects

3.2 packaging of projects 3.2 packaging of projects

3.3 marketing projects – promotion 3.3 marketing projects – promotion materialmaterial

Page 15: Capacity Development for CDM Capacity Development for CDM in Mozambique Njeri Wamukonya Side Event June10 2003.

4. 4. Training of trainersTraining of trainers

4.1 identifying trainers4.1 identifying trainers

4.2 capacity development of 4.2 capacity development of trainers trainers

Page 16: Capacity Development for CDM Capacity Development for CDM in Mozambique Njeri Wamukonya Side Event June10 2003.

Year I –focus on DNAYear I –focus on DNAThough parallel PD activities Though parallel PD activities

Page 17: Capacity Development for CDM Capacity Development for CDM in Mozambique Njeri Wamukonya Side Event June10 2003.

Thank you


Recommended