INFORME CAPACITY PLANNING BANCO ESTADO DE CHILE PERIODO: ABRIL 2010 A JUNIO 2010
Transcript
  • INFORME CAPACITY PLANNING BANCO ESTADO DE CHILE

    PERIODO: ABRIL 2010 A JUNIO 2010

  • Informe de Capacity Planning BECH

    Abril Junio 2010 Pg. 2

    TABLA DE CONTENIDO

    RESUMEN EJECUTIVO ...................................................................................................3

    RECOMENDACIONES .....................................................................................................5

    INTRODUCCIN ..............................................................................................................6

    ARQUITECTURA DE MONITOREO ..............................................................................6

    CAPACITY PLANNING ....................................................................................................7

    RESUMEN DE PROYECCIONES DE CAPACIDAD ........................................................7

    DETALLE DE LA INFORMACIN ANALIZADA ...........................................................11

    RESUMEN DE LAS 30 MAYORES PROYECCIONES DE RENDIMIENTO ..................15

    GLOSARIO .....................................................................................................................19

  • Informe de Capacity Planning BECH

    Abril Junio 2010 Pg. 3

    El presente informe tiene como objetivo entregar una proyeccin sobre la utilizacin de Ancho de Banda de los principales enlaces de la red WAN MPLS del cliente Banco Estado de Chile.

    La informacin utilizada en este informe considera 3 meses de registros muestreados lo que permite que el algoritmo predictivo proyecte la utilizacin de los enlaces a 30, 60 y 90 das.

    Para el perodo Abril Junio del 2010 se consideraron 518 nodos de las cuales 1030 interfaces estn configuradas en modo Full-duplex y 21 en modo Half-duplex. La interfaces detectadas en modo Half Duplex son:

    N DISPOSITIVO INTERFACE BW Mbps

    1 bech_yungay_543 FastEthernet0/0 2

    2 bech_regimiento_teleco_844 FastEthernet0/1 2

    3 bech_portales377_255 FastEthernet0/0 3

    4 bech_penaflor_369 FastEthernet0/0 6

    5 bech_panamericana_nortekm60_16 FastEthernet0/0 4

    6 bech_nva_york_80_3100_bkp FastEthernet0/2 100

    7 bech_lor_gotuzzo96_bkp FastEthernet0/5 100

    8 bech_jose_leyan853_373_pri FastEthernet0/0 6

    9 bech_inp_saavedra986_99 FastEthernet0/1 100

    ATM0/0/0 2.048

    10 bech_inp_ordonez130_66 FastEthernet0/0 100

    11 bech_inp_independencia3517_74 FastEthernet0/0 20

    12 bech_gran_avda113910_306_bkp FastEthernet0 100

    13 bech_gral_baquedano791_273 FastEthernet0/0 3

    14 bech_freire512_995 FastEthernet0/0 100

    15 bech_esmeralda460_847 FastEthernet0/0 2

    16 bech_el_monte_374 FastEthernet0/0 2

    17 bech_colon140_551_bkp FastEthernet0 5

    18 bech_besoain24_419_pri FastEthernet0/0 3

    19 bech_argentina521_248 FastEthernet0/0 3

    20 bech_ambrosio_ohiggins1665_310 FastEthernet0/0 2

    21 bech_12octubre538_439 FastEthernet0/0 2 (Referencia: Pg7-Tabla1, Pg10-Tabla4).

    Con respecto al mayor trfico promedio registrado, se indica: El promedio ms alto de trfico de salida (OUT) fue de 37% y lo registr la sucursal bech_del_parque179_999_pri: FastEthernet0/0, interfaz Full-Duplex.

    El mayor trfico de entrada (IN) lo registr la misma sucursal bech_del_parque179_999_pri: FastEthernet0/0 con 77% de utilizacin.

    Es importante indicar que solo el trfico de entrada sobrepasa el umbral del 65%, por lo tanto, puede comprometer el rendimiento de la red. (Referencia: Pg8-Tabla2).

    Resumen Ejecutivo

  • Informe de Capacity Planning BECH

    Abril Junio 2010 Pg. 4

    Con respecto a las sucursales con mayor crecimiento de trfico, que superan el 65% proyectado a 90 das se indica lo siguiente: Existen 21 sucursales que presentan dicho comportamiento en el trfico entrante y saliente:

    N DISPOSITIVO F/H INTERFACE BW

    Mbps TIPO PROMEDIO F30 F60 F90

    1 bech_conchali_el_cortijo_275 F FastEthernet0/0 3 IN 63 178 245.87 314.05

    2 bech_uno_oriente280_444 F FastEthernet0/0 2 IN 49 158 222.32 286.73

    3 bech_inp_henriquez523_82 F ATM0/0/0 1 IN 59 136 181.66 227.33

    4 bech_la_florida_mall_plaza_290 F FastEthernet0/0 3 IN 40 102 138.68 175.63

    5 bech_copiapo_los_carrera_122 F FastEthernet0/0 3 IN 35 95 130.31 165.66

    6 bech_el_salto2833_277 F FastEthernet0/0 6 IN 24 85 120.48 156.31

    7 bech_independencia681_517 F FastEthernet0/0 6 IN 33 82 110.87 139.98

    8 bech_bulnes_525 F FastEthernet0/0 2 IN 25 68 93.41 118.98

    9 bech_inp_chacabuco70_62 F ATM0/0/0 1.024 IN 24 61 82.65 104.55

    10 bech_pdte_ibanez_pto_montt_824 F FastEthernet0/0 2 OUT 24 61 82.37 104.02

    11 bech_serviestadoconce_984 F FastEthernet0/0 4 IN 13 54 78.73 103.14

    12 bech_manuel_rodriguez895_534 F FastEthernet0/0 2 IN 20 57 78.18 99.79

    13 bech_mulchen_561 F FastEthernet0/0 2 IN 25 57 76.12 95.27

    14 bech_ignacio_serrano1102_523 F FastEthernet0/0 2 IN 21 51 69.33 87.15

    15 bech_inp_heras553_89 F ATM0/0/0 1 IN 32 56 70.86 85.27

    16 bech_rosas94_557 F FastEthernet0/0 2 IN 20 46 62.15 78.07

    17 bech_cabrero_537 F FastEthernet0/0 2 IN 24 48 61.79 75.9

    18 bech_carlos_fresno227_387 F FastEthernet0/1 2 IN 6 38 56.3 74.91

    19 bech_chillan_mercado_s_520 F FastEthernet0/0 6 IN 14 41 57.22 73.49

    20 bech_serviestado_los_angeles_943 F FastEthernet0/0 2 IN 16 42 57.29 72.54

    21 bech_san_martin397_833_pri F FastEthernet0/0 3 IN 37 53 62.76 72.48

    22 bech_san_martin368_555 F FastEthernet0/0 2 IN 23 44 56.28 68.54

    23 bech_lanco_715 F FastEthernet0/1 1 IN 6 33 48.98 65.19

    El trfico de entrada ms alto proyectado a 90 das fue de 314,1% y lo registr la sucursal bech_conchali_el_cortijo_275: FastEthernet0/0. El trfico de salida ms alto proyectado a 90 das fue de 104% y lo registr la sucursal bech_pdte_ibanez_pto_montt_824: FastEthernet0/0. Se recomienda verificar el comportamiento del trfico de entrada de las sucursales

    mencionadas, ya que no tiene simetra con el trfico de salida. (Referencia: Pg11-Tabla5).

  • Informe de Capacity Planning BECH

    Abril Junio 2010 Pg. 5

    Con respecto a las sucursales con mayor utilizacin de recursos, se indica lo siguiente: El nodo que registro el mayor uso de CPU fue la sucursal bech_del_parque179_999_pri registrando un 56,39%, con una proyeccin a 90 das de un 63,91%. Para la mtrica de Buffer el nodo bech_bombero_ossa1010_3000_pri, registr un 7,3% de utilizacin promedio y es el nodo que presenta el mayor crecimiento proyectado a 90 das de 22.44%. Para la mtrica de Memoria el nodo bech_bombero_ossa1010_3000_pri, registr un 24,23% de utilizacin promedio y es el nodo que presenta el mayor crecimiento proyectado a 90 das de 49.19%. Se concluye que no existen nodos que presenten problemas de rendimiento, ya que ninguno sobrepasa el umbral del 65%. (Referencia: Pg15-Tabla8, Pg16-Tabla9, Pg17-Tabla10, Pg18-Tabla11).

    Telmex realizar la validacin de las interfaces que actualmente estn configuradas en modo Half dplex.

    Se recomienda verificar el trfico de entrada de las sucursales que proyectan un comportamiento de Capacity Planning sobre el 65%, ya que no demuestra el mismo comportamiento para el trfico de slida.

    Recomendaciones

  • Informe de Capacity Planning BECH

    Abril Junio 2010 Pg. 6

    El servicio de redes administradas se basa en la experiencia que Telmex tiene en la administracin y control de complejas redes de telecomunicaciones. El cual, tiene como finalidad, detectar, registrar y notificar en forma proactiva eventos que pudiesen afectar la operacin normal de la red y equipos de comunicaciones del cliente. La herramienta que se utiliza para el monitoreo es HP Software. La implementacin de un sistema de monitoreo que permita medir los niveles de calidad del servicio resulta un tema fundamental en la toma oportuna de decisiones, tanto para cambios, mejoras y adquisicin de equipos y/o servicios.

    El servicio consiste en un esquema de monitoreo que se puede apreciar en la Figura 1:

    Figura 1

    Introduccin

    Arquitectura de Monitoreo

  • Informe de Capacity Planning BECH

    Abril Junio 2010 Pg. 7

    Este reporte considera la informacin recolectada durante 3 meses y obedece al % de utilizacin correspondiente a la interface o enlace principal de la LAN o WAN del cliente. Esta informacin se plasma en un reporte que muestra el % promedio de utilizacin de los ltimos 3 meses y proyecta la informacin, en base a estos indicadores, en intervalos de 30, 60 y 90 das, todo bajo un algoritmo estadstico, previamente establecido en la herramienta de reportes cuyo motor predictivo permite generar este Capacity Planning.

    Las interfaces que se consideraron para el informe de Capacity Planning fueron todas aquellas en el cual su % de lnea base de utilizacin proyectado a 90 das es mayor que el 10 % de Ancho de Banda utilizado.

    En la Tabla 1 se presenta el total de interfaces que se consideraron para el informe:

    RESUMEN N INTERFACES % INTERFACES NODOS

    FULL-DUPLEX 1030 98.00

    HALF-DUPLEX 21 2.00

    TOTAL 1051 100.00 518

    Tabla 1

    Capacity Planning

    Resumen de Proyecciones de Capacidad

  • Informe de Capacity Planning BECH

    Abril Junio 2010 Pg. 8

    Los TOP 30 de los mayores trficos ENTRANTES o SALIENTES por interfaz en los ltimos 3

    meses (en amarillo los 10 ms importantes) se presentan en la Tabla 2:

    N DISPOSITIVO F/H INTERFACE BW

    Mbps TIPO PROMEDIO

    1 bech_del_parque179_999_pri F FastEthernet0/0 20 IN 77

    2 bech_conchali_el_cortijo_275 F FastEthernet0/0 3 IN 63

    3 bech_anibal_pinto400_818 F FastEthernet0/0 2 IN 62

    4 bech_independencia666_381_pri F FastEthernet0/0 4 IN 62

    5 bech_inp_henriquez523_82 F ATM0/0/0 1 IN 59

    6 bech_uno_oriente280_444 F FastEthernet0/0 2 IN 49

    7 bech_la_florida_mall_plaza_290 F FastEthernet0/0 3 IN 40

    8 bech_las_lomas_285 F FastEthernet0/0 3 IN 38

    9 bech_subtte_valenzuela202_383 F FastEthernet0/1 2 IN 38

    10 bech_del_parque179_999_pri F FastEthernet0/0 20 OUT 37

    11 bech_san_martin397_833_pri F FastEthernet0/0 3 IN 37

    12 bech_inp_chacabuco70_62 F ATM0/0/0 1.024 OUT 35

    13 bech_independencia666_381_pri F FastEthernet0/0 4 OUT 35

    14 bech_copiapo_los_carrera_122 F FastEthernet0/0 3 IN 35

    15 bech_gral_velasquez60_261_pri F FastEthernet0/0 3 IN 34

    16 bech_independencia681_517 F FastEthernet0/0 6 IN 33

    17 bech_ohiggins562_625 F FastEthernet0/0 2 IN 33

    18 bech_inp_heras553_89 F ATM0/0/0 1 IN 32

    19 bech_quintero_229 F FastEthernet0/0 2 OUT 30

    20 bech_nva_york_80_3100_pri F FastEthernet0/1 100 OUT 28

    21 bech_nva_york_80_3100_pri F FastEthernet0/5 100 OUT 28

    22 bech_concepcion170_330 F FastEthernet0/0 2 IN 28

    23 bech_nva_york_80_3100_pri F FastEthernet0/1 100 IN 28

    24 bech_nva_york_80_3100_pri F FastEthernet0/5 100 IN 28

    25 bech_balmaceda141_617 F FastEthernet0/0 2 IN 27

    26 bech_chorrillos390_615_pri F FastEthernet0/0 3 IN 27

    27 bech_inp_errazuriz1040_71 F ATM0/0/0 1.024 IN 27

    28 bech_serviestado_bilbao_944 F FastEthernet0/0 2 IN 27

    29 bech_german_riesco580_393 F FastEthernet0/0 2 IN 26

    30 bech_san_antonio427_975 F FastEthernet0/0 2 IN 26 Tabla 2

  • Informe de Capacity Planning BECH

    Abril Junio 2010 Pg. 9

    Tomando como referencia solamente las interfaces en modo Full-Duplex (F) de la Tabla 2, se presenta el resumen del comportamiento para el perodo de los nodos de la plataforma en la Tabla 3. Los datos estn ordenados por la direccin del trfico, IN para trfico entrante y OUT para trfico saliente de la interfaz de red:

    CONDICION TRAFICO N Interfaces

    Afectadas % del Total

    de Interfaces

    Interfaces FDX BW promedio > 65% IN 1 0.10

    65% > interfaces FDX BW promedio > 1% IN 414 40.19

    Interfaces FDX BW promedio < 65% IN 593 57.57

    % Promedio Proyeccin 30 das > 65% IN 8 0.78

    % Promedio Proyeccin 60 das > 65% IN 14 1.36

    % Promedio Proyeccin 90 das > 65% IN 22 2.14

    % Promedio Proyeccin 30 das < 65% IN 1000 97.09

    % Promedio Proyeccin 60 das < 65% IN 994 96.50

    % Promedio Proyeccin 90 das < 65% IN 986 95.73

    Interfaces FDX BW promedio > 65% OUT 0 0

    65% > interfaces FDX BW promedio > 1% OUT 383 37.18

    Interfaces FDX BW promedio < 1% OUT 625 60.68

    % Promedio Proyeccin 30 das > 65% OUT 0 0.00

    % Promedio Proyeccin 60 das > 65% OUT 1 0.10

    % Promedio Proyeccin 90 das > 65% OUT 1 0.10

    % Promedio Proyeccin 30 das < 65% OUT 1008 97.86

    % Promedio Proyeccin 60 das < 65% OUT 1007 97.77

    % Promedio Proyeccin 90 das < 65% OUT 1007 97.77

    Tabla 3

  • Informe de Capacity Planning BECH

    Abril Junio 2010 Pg. 10

    Las interfaces en modo Half-duplex (H) no han sido consideradas para el anlisis, sin embargo, se entrega un resumen de las sucursales involucradas en la Tabla 4 para que puedan ser validadas si poseen dicha configuracin:

    N DISPOSITIVO INTERFACE BW Mbps

    1 bech_yungay_543 FastEthernet0/0 2

    2 bech_regimiento_teleco_844 FastEthernet0/1 2

    3 bech_portales377_255 FastEthernet0/0 3

    4 bech_penaflor_369 FastEthernet0/0 6

    5 bech_panamericana_nortekm60_16 FastEthernet0/0 4

    6 bech_nva_york_80_3100_bkp FastEthernet0/2 100

    7 bech_lor_gotuzzo96_bkp FastEthernet0/5 100

    8 bech_jose_leyan853_373_pri FastEthernet0/0 6

    9 bech_inp_saavedra986_99 FastEthernet0/1 100

    ATM0/0/0 2.048

    10 bech_inp_ordonez130_66 FastEthernet0/0 100

    11 bech_inp_independencia3517_74 FastEthernet0/0 20

    12 bech_gran_avda113910_306_bkp FastEthernet0 100

    13 bech_gral_baquedano791_273 FastEthernet0/0 3

    14 bech_freire512_995 FastEthernet0/0 100

    15 bech_esmeralda460_847 FastEthernet0/0 2

    16 bech_el_monte_374 FastEthernet0/0 2

    17 bech_colon140_551_bkp FastEthernet0 5

    18 bech_besoain24_419_pri FastEthernet0/0 3

    19 bech_argentina521_248 FastEthernet0/0 3

    20 bech_ambrosio_ohiggins1665_310 FastEthernet0/0 2

    21 bech_12octubre538_439 FastEthernet0/0 2

    Tabla 4

  • Informe de Capacity Planning BECH

    Abril Junio 2010 Pg. 11

    A continuacin se entregar un detalle de los nodos con las mediciones ms significativas que se encuentran involucrados en cada uno de los umbrales indicados anteriormente:

    TOP DE LAS SUCURSALES CON FORCAST MAYOR A 65% PROYECTADO EN 90 DAS

    N DISPOSITIVO F/H INTERFACE BW

    Mbps TIPO PROMEDIO F30 F60 F90

    1 bech_conchali_el_cortijo_275 F FastEthernet0/0 3 IN 63 178 245.87 314.05

    2 bech_uno_oriente280_444 F FastEthernet0/0 2 IN 49 158 222.32 286.73

    3 bech_inp_henriquez523_82 F ATM0/0/0 1 IN 59 136 181.66 227.33

    4 bech_la_florida_mall_plaza_290 F FastEthernet0/0 3 IN 40 102 138.68 175.63

    5 bech_copiapo_los_carrera_122 F FastEthernet0/0 3 IN 35 95 130.31 165.66

    6 bech_el_salto2833_277 F FastEthernet0/0 6 IN 24 85 120.48 156.31

    7 bech_independencia681_517 F FastEthernet0/0 6 IN 33 82 110.87 139.98

    8 bech_bulnes_525 F FastEthernet0/0 2 IN 25 68 93.41 118.98

    9 bech_inp_chacabuco70_62 F ATM0/0/0 1.024 IN 24 61 82.65 104.55

    10 bech_pdte_ibanez_pto_montt_824 F FastEthernet0/0 2 OUT 24 61 82.37 104.02

    11 bech_serviestadoconce_984 F FastEthernet0/0 4 IN 13 54 78.73 103.14

    12 bech_manuel_rodriguez895_534 F FastEthernet0/0 2 IN 20 57 78.18 99.79

    13 bech_mulchen_561 F FastEthernet0/0 2 IN 25 57 76.12 95.27

    14 bech_ignacio_serrano1102_523 F FastEthernet0/0 2 IN 21 51 69.33 87.15

    15 bech_inp_heras553_89 F ATM0/0/0 1 IN 32 56 70.86 85.27

    16 bech_rosas94_557 F FastEthernet0/0 2 IN 20 46 62.15 78.07

    17 bech_cabrero_537 F FastEthernet0/0 2 IN 24 48 61.79 75.9

    18 bech_carlos_fresno227_387 F FastEthernet0/1 2 IN 6 38 56.3 74.91

    19 bech_chillan_mercado_s_520 F FastEthernet0/0 6 IN 14 41 57.22 73.49

    20 bech_serviestado_los_angeles_943 F FastEthernet0/0 2 IN 16 42 57.29 72.54

    21 bech_san_martin397_833_pri F FastEthernet0/0 3 IN 37 53 62.76 72.48

    22 bech_san_martin368_555 F FastEthernet0/0 2 IN 23 44 56.28 68.54

    23 bech_lanco_715 F FastEthernet0/1 1 IN 6 33 48.98 65.19

    Tabla 5

    Detalle de la Informacin Analizada

  • Informe de Capacity Planning BECH

    Abril Junio 2010 Pg. 12

    Figura 2

    Figura 3

    Figura 4

    Figura 5

    Figura 6

  • Informe de Capacity Planning BECH

    Abril Junio 2010 Pg. 13

    TOP 5 DE LAS SUCURSALES CON LOS MAYORES FORCAST ENTRE EL RANGO 65% Y 1% PROYECTADO EN 90 DAS

    N DISPOSITIVO F/H INTERFACE BW

    Mbps TIPO PROMEDIO F30 F60 F90

    1 bech_ignacio_serrano1102_523 F FastEthernet0/0 2 OUT 15 37 50.04 63.01

    2 bech_colon140_551_pri F FastEthernet0/0 10 IN 17 38 50.22 62.78

    3 bech_independencia681_517 F FastEthernet0/1 4 IN 6 31 46.18 61.3

    4 bech_quilicura_364 F FastEthernet0/0 2 IN 25 41 51.33 61.28

    5 bech_vicuna_mack3311_294_pri F FastEthernet0/0 2 IN 16 35 46.18 57.58

    Tabla 6

    Figura 7

    Figura 8

    Figura 9

    Figura 10

    Figura 11

  • Informe de Capacity Planning BECH

    Abril Junio 2010 Pg. 14

    TOP 5 DE LAS SUCURSALES CON LOS PRIMEROS VALORES MENORES AL 1% PROYECTADO EN 90 DAS

    N DISPOSITIVO F/H INTERFACE BW

    Mbps TIPO PROMEDIO F30 F60 F90

    1 bech_j_j_perez4242_349_pri F FastEthernet0/1 100 OUT 1 1 0.95 0.97

    2 bech_22_de_mayo399_837 F FastEthernet0/1 1 OUT 0 1 0.78 0.97

    3 bech_inp_independencia_641_85 F FastEthernet0/0/0 100 OUT 0 1 0.78 0.97

    4 bech_urmeneta444_825_pri F FastEthernet0/1 100 OUT 3 2 1.58 0.96

    5 bech_osorno_patricio_lynch_814 F FastEthernet0/0 4 IN 8 5 2.86 0.95

    Tabla 7

    Figura 12

    Figura 13

    Figura 14

    Figura 15

    Figura 16

  • Informe de Capacity Planning BECH

    Abril Junio 2010 Pg. 15

    Se presenta en la Tabla 8 la consolidacin de rendimiento, ordenados desde los nodos que ocupan mayor cantidad de recursos (segn indicadores de CPU, Memoria y Buffer). Estos valores se proyectan a travs de un clculo Forecast a 30, 60 y 90 das.

    N NODO Promedio

    CPU Promedio

    Buffer Promedio

    MEM F30 - CPU

    F30 - Buffer

    F30 - MEM

    F60 - CPU

    F60 - Buffer

    F60 - MEM

    F90 - CPU

    F90 - Buffer

    F90 - MEM

    1 bech_del_parque179_999_pri 56.39 4.36 33.01 60.46 5.28 33.15 62.08 5.64 33.2 63.71 6.01 33.26

    2 bech_bombero_ossa1010_3000_pri 8.43 7.3 24.23 0.55 15.71 38.09 0 19.07 43.64 0 22.44 49.19

    3 bech_san_diego81_sdo81_pri 22.41 5.97 34.73 21.02 6.45 34.45 20.46 6.65 34.34 19.9 6.84 34.23

    4 bech_urmeneta444_825_pri 16.63 3.51 18.72 25.82 3.7 18.73 29.5 3.78 18.74 33.18 3.85 18.74

    5 bech_vicuna_mack1326_vm1326_pri 4.7 9.82 28.14 4.9 15.69 28.2 4.99 18.04 28.22 5.07 20.38 28.25

    6 bech_core_morande_pri_1 13.54 5.66 34.03 13.99 4.95 34.12 14.17 4.66 34.15 14.35 4.38 34.19

    7 bech_serrano63_3120_bkp 4.53 11.37 28.16 4.43 15.79 28.25 4.39 17.56 28.28 4.36 19.33 28.31

    8 bech_core_starosa_bkp_1 12.24 5.44 34.05 12.2 5.53 34.03 12.19 5.57 34.02 12.18 5.6 34.02

    9 bech_b_ohiggins486_533_bkp 4.1 1.99 44.77 3.99 1.98 45.01 3.95 1.97 45.11 3.9 1.97 45.21

    10 bech_chorrillos390_615_bkp 1.19 2.13 44.39 1.24 3.27 44.58 1.26 3.73 44.66 1.28 4.18 44.73

    11 bech_san_martin301_13_bkp 0.66 1.3 43.57 0.68 1.3 45.83 0.68 1.29 46.74 0.69 1.29 47.64

    12 bech_arturo_prat656_239_pri 26.4 3.72 18.73 26.36 3.99 18.74 26.35 4.09 18.75 26.33 4.2 18.75

    13 bech_1140_moneda_4 4.61 10.76 32.73 4.53 11.12 32.76 4.5 11.27 32.78 4.47 11.42 32.79

    14 bech_b_ohiggins486_533_pri 22.75 4.38 20.56 22.81 4.88 20.55 22.83 5.08 20.54 22.85 5.28 20.54

    15 bech_bdo_ohiggins3401_262_bkp 1.06 2.01 44.61 1.1 2.06 44.94 1.12 2.08 45.07 1.14 2.1 45.21

    16 bech_lor_gotuzzo96_pri 4.99 11.18 28.36 4.98 13.2 28.41 4.98 14 28.43 4.98 14.81 28.45

    17 bech_constitucion500_521_pri 15.23 4.34 18.46 20.84 4.35 18.47 23.08 4.35 18.47 25.33 4.36 18.47

    18 bech_arturo_prat100_223_bkp 1 2.03 44.12 1 1.98 44.62 1 1.96 44.82 1 1.94 45.02

    19 bech_pza_m_gamero799_919_bkp 0.97 2.05 44.57 0.99 2.19 44.52 1 2.24 44.5 1.01 2.3 44.48

    20 bech_a_silva_carvallo1415_108_bkp 1.1 1.8 44.5 1.19 1.85 44.51 1.23 1.87 44.51 1.27 1.88 44.52

    21 bech_irarrazaval5544_345_bkp 0.61 2.01 44.8 0.63 2.05 44.82 0.63 2.07 44.83 0.64 2.08 44.84

    22 bech_carrera683_227_bkp 0.88 2.17 43.74 0.78 2.5 43.92 0.74 2.63 43.99 0.7 2.76 44.06

    23 bech_sto_domingo930_318_bkp 1.16 1.15 44.16 1.26 1.34 44.45 1.31 1.41 44.56 1.35 1.49 44.68

    24 bech_j_j_perez4242_349_bkp 0.99 1.96 44.56 0.97 1.96 44.57 0.96 1.96 44.57 0.96 1.97 44.57

    25 bech_vitacura4200_334_bkp 0.75 1.96 44.45 0.84 1.95 44.55 0.88 1.95 44.58 0.92 1.95 44.62

    26 bech_san_pablo5877_342_bkp 1.22 1.17 44.43 1.24 1.08 44.86 1.24 1.05 45.03 1.25 1.02 45.2

    27 bech_bandera84_3006_pri 5.24 10.93 30.2 5.49 11.19 30.28 5.59 11.29 30.31 5.69 11.39 30.34

    28 bech_serrano63_3120_pri 4.91 11.36 28.69 4.92 12.34 29.04 4.93 12.73 29.18 4.93 13.12 29.32

    29 bech_matta950_319_bkp 0.74 2 44.57 0.63 2.1 44.6 0.59 2.14 44.61 0.55 2.18 44.62

    30 bech_apoquindo6095_338_bkp 0.65 1.95 44.63 0.59 1.95 44.74 0.57 1.95 44.78 0.55 1.95 44.83

    Tabla 8

    Resumen de las 30 Mayores Proyecciones de Rendimiento

  • Informe de Capacity Planning BECH

    Abril Junio 2010 Pg. 16

    TOP 30 - UTILIZACIONES DE CPU

    N NODO Promedio

    CPU F30 - CPU F60 - CPU F90 - CPU

    1 bech_del_parque179_999_pri 56.39 60.46 62.08 63.71

    2 bech_urmeneta444_825_pri 16.63 25.82 29.5 33.18

    3 bech_arturo_prat656_239_pri 26.4 26.36 26.35 26.33

    4 bech_constitucion500_521_pri 15.23 20.84 23.08 25.33

    5 bech_b_ohiggins486_533_pri 22.75 22.81 22.83 22.85

    6 bech_prat400_25_pri 20.29 21.15 21.49 21.83

    7 bech_claro_solar931_629_pri 28.88 24.82 23.19 21.57

    8 bech_independencia666_381_pri 27 23.64 22.3 20.96

    9 bech_san_diego81_sdo81_pri 22.41 21.02 20.46 19.9

    10 bech_balmaceda506_125_pri 17.36 17.7 17.83 17.96

    11 bech_ohiggins2690_327_pri 12.89 14.07 14.54 15.01

    12 bech_camilo_henriquez562_721_pri 14.46 14.54 14.58 14.61

    13 bech_core_morande_pri_1 13.54 13.99 14.17 14.35

    14 bech_independencia681_517 6.58 10.78 12.46 14.14

    15 bech_san_martin301_13_pri 12.52 13.34 13.67 13.99

    16 bech_dgo_sta_maria4054_350_pri 14.19 13.94 13.85 13.75

    17 bech_ohiggins694_121_pri 12.68 12.92 13.02 13.11

    18 bech_bandera861_321 8.17 10.79 11.84 12.89

    19 bech_1_sur971_435_pri 15.74 13.86 13.11 12.36

    20 bech_core_starosa_bkp_1 12.24 12.2 12.19 12.18

    21 bech_bdo_ohiggins90_233_pri 11.39 11.72 11.85 11.98

    22 bech_matta950_319_pri 12.72 12.17 11.95 11.73

    23 bech_conchali_el_cortijo_275 8.6 10.16 10.78 11.4

    24 bech_moneda1000_315 11.85 11.36 11.17 10.97

    25 bech_carmen600_425_pri 11.2 10.78 10.62 10.45

    26 bech_ohiggins2690_esta_pri 6.88 8.77 9.53 10.28

    27 bech_21demayo228_10_pri 9.91 10.11 10.19 10.27

    28 bech_artesanos657_981 7.58 9.07 9.66 10.26

    29 bech_pza_m_gamero799_919_pri 9.65 9.79 9.85 9.91

    30 bech_providencia1710_347_pri 10.27 9.94 9.81 9.67 Tabla 9

  • Informe de Capacity Planning BECH

    Abril Junio 2010 Pg. 17

    TOP 30 - UTILIZACIONES DE BUFFER

    N NODO Promedio

    Buffer F30 - Buffer F60 - Buffer F90 - Buffer

    1 bech_bombero_ossa1010_3000_pri 7.3 15.71 19.07 22.44

    2 bech_vicuna_mack1326_vm1326_pri 9.82 15.69 18.04 20.38

    3 bech_phillipi265_921 15.36 16.33 16.72 17.11

    4 bech_a_prat301_11 14.17 14.7 14.91 15.13

    5 bech_diego_portales258_556 14.9 15.02 15.07 15.12

    6 bech_lor_gotuzzo96_pri 11.18 13.2 14 14.81

    7 bech_risopatron573_839 15.06 14.91 14.86 14.8

    8 bech_esmeralda460_847 14.54 14.64 14.68 14.72

    9 bech_ohiggins603_840 14.32 14.54 14.63 14.72

    10 bech_carrera799_841 14.54 14.54 14.53 14.53

    11 bech_ohiggins56a_252 14.02 14.29 14.4 14.51

    12 bech_urmeneta850_131 14.43 14.41 14.41 14.4

    13 bech_balmaceda_23 14.37 14.32 14.3 14.28

    14 bech_pedro_gonzalez112_845 14.31 14.26 14.24 14.22

    15 bech_humeres701_217 14.39 14.26 14.21 14.16

    16 bech_carlos_bories492_915 13.39 13.61 13.69 13.78

    17 bech_nva_york_33_5_pri 11.35 12.65 13.17 13.69

    18 bech_nva_york_80_3100_bkp 10.92 12.16 12.65 13.14

    19 bech_serrano63_3120_pri 11.36 12.34 12.73 13.12

    20 bech_nva_york_80_3100_pri 11.08 12.14 12.56 12.99

    21 bech_moneda970_1001_bkp 10.9 11.92 12.34 12.75

    22 bech_nva_york9_1000_pri 10.79 11.8 12.2 12.61

    23 bech_nva_york_33_5_bkp 10.87 11.76 12.12 12.48

    24 bech_bandera84_3006_bkp 11.14 11.52 11.68 11.83

    25 bech_lor_gotuzzo96_bkp 10.78 11.28 11.48 11.69

    26 bech_1140_moneda_4 10.76 11.12 11.27 11.42

    27 bech_bandera84_3006_pri 10.93 11.19 11.29 11.39

    28 bech_bombero_ossa1010_3000_bkp 10.97 11.06 11.09 11.13

    29 bech_serviestado_santiago_ula_980 10.57 10.82 10.93 11.03

    30 bech_18_de_sept365_421 8.63 9.65 10.06 10.47

    Tabla 10

  • Informe de Capacity Planning BECH

    Abril Junio 2010 Pg. 18

    TOP 30 - UTILIZACIONES DE MEMORIA

    N NODO Promedio

    MEM F30 - MEM F60 - MEM F90 - MEM

    1 bech_bombero_ossa1010_3000_pri 24.23 38.09 43.64 49.19

    2 bech_san_martin301_13_bkp 43.57 45.83 46.74 47.64

    3 bech_b_ohiggins486_533_bkp 44.77 45.01 45.11 45.21

    4 bech_bdo_ohiggins3401_262_bkp 44.61 44.94 45.07 45.21

    5 bech_san_pablo5877_342_bkp 44.43 44.86 45.03 45.2

    6 bech_arturo_prat100_223_bkp 44.12 44.62 44.82 45.02

    7 bech_irarrazaval5544_345_bkp 44.8 44.82 44.83 44.84

    8 bech_apoquindo6095_338_bkp 44.63 44.74 44.78 44.83

    9 bech_pza_armas583_375_bkp 44.72 44.74 44.74 44.75

    10 bech_independencia2181_296_bkp 44.74 44.74 44.75 44.75

    11 bech_chorrillos390_615_bkp 44.39 44.58 44.66 44.73

    12 bech_sto_domingo930_318_bkp 44.16 44.45 44.56 44.68

    13 bech_arturo_prat621_367_bkp 44.6 44.62 44.63 44.64

    14 bech_gran_avda15018_3004_bkp 44.15 44.42 44.52 44.63

    15 bech_vitacura4200_334_bkp 44.45 44.55 44.58 44.62

    16 bech_matta950_319_bkp 44.57 44.6 44.61 44.62

    17 bech_j_j_perez4242_349_bkp 44.56 44.57 44.57 44.57

    18 bech_independencia3642_339_bkp 44.56 44.56 44.57 44.57

    19 bech_a_silva_carvallo1415_108_bkp 44.5 44.51 44.51 44.52

    20 bech_arturo_prat656_239_bkp 44.54 44.53 44.53 44.52

    21 bech_san_diego2230_337_bkp 44.34 44.44 44.48 44.52

    22 bech_pza_m_gamero799_919_bkp 44.57 44.52 44.5 44.48

    23 bech_independencia666_381_bkp 44.13 44.31 44.39 44.46

    24 bech_chacabuco2701_247_bkp 44.32 44.39 44.42 44.45

    25 bech_bdo_ohiggins334_225_bkp 44.44 44.44 44.44 44.44

    26 bech_providencia2690_336_bkp 44.04 44.26 44.35 44.44

    27 bech_dgo_sta_maria4054_350_bkp 44.24 44.34 44.38 44.42

    28 bech_recoleta51_351_bkp 44.31 44.35 44.37 44.39

    29 bech_eleuterio_ramirez229_831_bkp 44.14 44.27 44.32 44.36

    30 bech_valparaiso783_251_bkp 44.09 44.23 44.28 44.34

    Tabla 11

  • Informe de Capacity Planning BECH

    Abril Junio 2010 Pg. 19

    Algoritmo: es una lista bien definida, ordenada y finita de operaciones que permite hallar la solucin a un problema. Dado un estado inicial y una entrada, a travs de pasos sucesivos y bien definidos se llega a un estado final, obteniendo una solucin. Capacity Planning: es una actividad estratgica que planifica la incorporacin y asignacin de recursos para enfrentar necesidades actuales y futuras del negocio. Forecast : El trmino forecast significa en espaol predecir, pronosticar o presagiar. Tambin se puede utilizar para referirse a planificar o proyectar. Permite predecir cierto comportamiento de acuerdo a cierta informacin que es recopilada de ciertas fuentes en un tiempo determinado a travs de alguna clase de algoritmo matemtico.

    Full-Duplex: Capacidad de un dispositivo para trabajar y comunicarse en los dos sentidos

    (recibir/enviar) al mismo tiempo.

    Half-Duplex: Capacidad de un dispositivo para trabajar y comunicarse en los dos sentidos

    (recibir/enviar) pero no al mismo tiempo. Interfaz: En el contexto de este informe, se refiere a la tarjeta de red integrada en el equipo de comunicaciones que permite interconectar la red del cliente con el servicio contratado al ISP (datos, voz, video). LAN (siglas Local Area Network - Red de rea local): es una red informtica que abarca un rea fsica pequea, como un hogar, oficina, o pequeo grupo de edificios, como una escuela o un aeropuerto. Cisco-Netflow: es un protocolo de red creado por Cisco Systems (propietario), usado para anlisis y monitoreo de redes. En el servicio se utiliza las capacidades de este protocolo para determinar que clase de trfico est atravesando una determinada interface.

    MPLS (siglas de Multiprotocol Label Switching): es un mecanismo de transporte de datos estndar que opera entre la capa de enlace de datos y la capa de red del modelo OSI. Fue diseado para unificar el servicio de transporte de datos para las redes basadas en circuitos y las basadas en paquetes. Puede ser utilizado para transportar diferentes tipos de trfico, incluyendo trfico de voz y de paquetes IP. WAN (Wide Area Network Red de rea Amplia): es un tipo de red de computadoras capaz de cubrir distancias desde unos 100km hasta unos 1000 km, dando el servicio a un pas o un continente.

    Glosario