Capital Budgeting Chapter 11 1
Transcript
Page 1: Capital  Budgeting

1

Capital Budgeting

Chapter 11

Page 2: Capital  Budgeting

2

Introduction• Planning in advance for capital expenditures.• Process used by companies for making decisions on long

term projects.• Importance of capital budgeting for a financial analyst• Principles we’ll study here will be used for valuation of

projects or valuation of entire companies.• Capital budgeting – proper planning helps achieve the goal

of maximizing shareholder wealth.

Page 3: Capital  Budgeting

3

Capital Budgeting Process• Capital budgeting process comprises of the

following steps:– Generating an investment decision– Forecasting cash flow for each project– Scheduling and prioritizing projects– Monitoring and auditing

Page 4: Capital  Budgeting

4

Categories of Capital Budgeting Projects

• Replacement Projects– Maintaining the business– Cost reduction

• Expansion projects– Requires complex decision making

• New products and services– Complex decision making– High uncertainty

Page 5: Capital  Budgeting

5

Important Definitions• Independent Projects

– Independent projects basically mean that if analysis reveal that it is profitable to do both projects A and B, we will do both of them.

• Mutually Exclusive Projects– A set of projects where only one project can be accepted. Even if

analysis reveals it is profitable to do projects A and B we can only do one of them. Example: Warehouse – fleet of forklift, conveyor belt system.

• Unlimited Funds vs. Capital Rationing

Page 6: Capital  Budgeting

6

Company’s Investment Decisions• Short term – T-bills– CD’s– Bank deposit– Shares– Other

• Long term

Page 7: Capital  Budgeting

7

Why Investment decisions are so important to analyze in the beginning?

• Two most important reasons:– The value of investment is very large– Irreversible

Page 8: Capital  Budgeting

8

Tools of Capital Budgeting1. Payback Period– Simple Payback– Discounted Payback period

2. NPV3. IRR4. MIRR

Page 9: Capital  Budgeting

9

1. Payback Perioda. Simple Payback Period• Definition: Number of years it takes for project’s cumulative cash flows to recover the cost of the project. • The sooner the cost is recovered the better it is.• Calculation (Example)

– Suppose the firm requires cost to be recovered within 3 years.• Formula: • Years before full recovery + unrecovered cost at the start of the year cash flow during full recovery year

• Which project we would accept?• What if the two projects are mutually exclusive?• What if the two projects are independent? What if cash flows are received evenly during the year?• Formula:

Original investment cash inflows per period

Cut-off payback period: It is the pre-determined (desired) length of time for an investment to be recovered.

Page 10: Capital  Budgeting

10

a. Simple Payback PeriodAdvantages1. Easy to calculate.2. Easy to comprehend.3. Easy to analyze.4. Very good indicator of liquidity of a project.

Disadvantages5. Ignores the principal of TVM.6. Sets off unrealistic expectations. 7. Does not consider cash inflows after the original investment is recovered.8. Biased against long-term projects that take longer time periods to become

lucrative .

Page 11: Capital  Budgeting

11

b. Discounted Payback Period• Definition: Number of years it takes for project’s cumulative discounted cash flows to recover

its costs. or Length of time required to recover original investment from the present value of expected

future cash flows.

• Calculation (Example)– Suppose the firm requires cost to be recovered within 3 years.

• Formula: • Years before full recovery + unrecovered cost at the start of the year cash

flow during full recovery year

• Which project we would accept?• What if the two projects are mutually exclusive?• What if the two projects are independent?

Page 12: Capital  Budgeting

12

a. Discounted Payback PeriodAdvantages1. A more realistic measure than simple pay back period. 2. Takes into account the principle of time value of money (PV

of cash inflows taken into consideration).

Disadvantages3. Ignores cash flows beyond cut-off point.

Page 13: Capital  Budgeting

13

2. Net Present Valuea. Net Present Value (NPV)• Definition: NPV is the present value of cash inflows minus the present value of cash

outflows.• Characteristics• A very important capital budgeting tool.• Helps firm assess the level of importance various capital budgeting projects have.

– Why doing such a thing is important?– Capital budgeting projects normally requires expenditures in millions and billions of dollars,

before embarking on any such project they want to be reasonably sure that the cash inflows generated from the project will pay off project’s costs within a reasonable amount of time.

• Firms generally can carry out multiple projects, capital budgeting tools like NPV help firms choose the best among them.

Page 14: Capital  Budgeting

14

2. Net Present Value (contd.)• Formula: i. NPV = Present value of cash inflows - Present value of cash outflows• Cash outflows: As on today (PV)• Cash inflows: Discounted back (To find PV)ii. .

• Decision Criteria (3 scenarios):– NPV = Positive (Cash inflows than outflow) => Accept the project.– NPV = Zero (Cash inflows than outflow) => Indifferent– NPV = Negative (Cash inflows than outflow) => Reject the project.

Page 15: Capital  Budgeting

15

2. Net Present Value (contd.)• In case of:• Independent projects: NPV > 0 (Accept both projects or all within budget)

• Mutually exclusive projects: Accept the project with highest positive NPV

• Example:• Global Enterprises is considering two projects. Each project requires an initial outlay of

$100,000 and provides the following cash flows. The firm requires a required ROR of 10% on both projects.

• Project A: Cash Outflow = 100,000Cash Inflows: 1st year = 30,000 2nd year = 40,000 3rd year = 50,000 4th year = 60,000

• Project B: Cash Outflow = 100,000Cash Inflows: 1st year = 40,000 2nd year = 30,000 3rd year = 30,000 4th year = 20,000

Page 16: Capital  Budgeting

16

2. Net Present Value (contd.)• Remember: For doing NPV analysis always make a timeline.

Advantages1. Adjusts for the TVM.2. Provides a straight forward method for controlling risk of competing projects, higher risk cash flows

can be discounted at higher costs whereas lower risk cash flows are discounted at lower costs. 3. Tells whether the investment will increase firm’s value.4. Considers all the cash flows.

Disadvantages5. May not be considered as simple or intuitive as some other methods. 6. Requires an estimate of cost of capital in order to calculate NPV.7. Expressed in dollar terms, not as a percentage.

Page 17: Capital  Budgeting

17

3. IRR• IRR stands for ‘Internal Rate of Return’.• Concept:

– IRR quite simply tells you what is the return on a project. – IRR is the discount rate at which NPV of a project is equal to ‘zero’.– When we say NPV of a project is equal to ‘zero’ we mean PV of cash

inflows = PV of cash outflows.• Definition: IRR is the discount rate at which PV of cost is equal to PV of future

cash inflows.

Page 18: Capital  Budgeting

18

3. IRR– We stated, “IRR is the discount rate at which NPV of a project is equal

to zero”. – Using the NPV formula

– In IRR we calculate the discount rate, the ‘r’ at which NPV = 0

Page 19: Capital  Budgeting

19

3. IRR• Decision Criteria• For Independent Projects IF IRR > cost of capital => accept the project IF IRR < cost of capital => reject the project• For Mutually Exclusive Projects Accept the project with highest IRR provided IRR for

the project is greater than cost of capital.

Page 20: Capital  Budgeting

20

3. IRRAdvantages1. Considers all cash flows of the project. 2. Considers time value of money.

Disadvantages3. Requires an estimate of cost of capital in order to make a

decision.4. Cannot be used in situations where sign of the cash flows of

the project change more than once during project’s life.

Page 21: Capital  Budgeting

21

Class Practice Question 1

Page 22: Capital  Budgeting

22

4. MIRR• MIRR stands for ‘Modified Internal Rate of Return’.• Definition: MIRR is the discount rate at which the

present value of a project’s cost is equal to the PV of its terminal value where the terminal value is found by summing up the future value of the cash inflows, compounded at company’s cost of capital.

• Formula: PV costs = Terminal Value (1+MIRR)n

Page 23: Capital  Budgeting

23

4. MIRR• Decision Criteria• For Independent Projects IF MIRR > cost of capital => accept the project IF MIRR < cost of capital => reject the project• For Mutually Exclusive Projects Accept the project with highest MIRR provided MIRR

for the project is greater than cost of capital.

Page 24: Capital  Budgeting

24

4. MIRRAdvantages1. Considers all cash flows of the project. 2. Considers time value of money.3. A better capital budgeting tool than IRR as it assumes cash inflows are

reinvested at the cost of capital.

Disadvantages4. Requires an estimate of cost of capital in order to make a decision.5. Cannot be used in situations where sign of the cash flows of the project

change more than once during project’s life.

Page 25: Capital  Budgeting

25

Class Practice Question 2

Page 26: Capital  Budgeting

26

Key differences between NPV, IRR and MIRR

NPV• Calculation

– We determine the PV of future cash inflows and then subtract the initial cash outflow from them to obtain NPV.

• Cost of capital is used as the actual discount rate.

• Projects with positive NPV’s are accepted.

• NPV assumes cash flows are reinvested at cost of capital.

IRR• Calculation

– We calculate the rate at which NPV is zero ‘or’ simply stated we calculate the rate of return on a project.

– IRR is the rate at which PV of cost is equal to PV of future cash inflows.

• IRR is compared with cost of capital to determine if it is feasible to accept the project.

• Projects with IRR > cost of capital are accepted.

• IRR assumes cash flows are reinvested at IRR.

• Calculation– We calculate the terminal value

(TV) by summing up the future value of the cash inflows, compounded at company’s cost of capital then find the PV of the TV.

– MIRR is the rate at which PV of cost is equal to PV of the TV.

• MIRR is compared with cost of capital to determine if it is feasible to accept the project.

• Projects with MIRR > cost of capital are accepted.

• MIRR assumes cash flows are reinvested at cost of capital.

MIRR

Page 27: Capital  Budgeting

27

Reinvestment Rate Assumption• In slide no. 26 the last difference points towards an important

assumption built into the three capital budgeting tools. – NPV: The NPV technique assumes that cash inflows are reinvested

at the cost of capital (i.e. the same rate by which they were discounted).

– IRR: The IRR technique assumes that cash inflows are reinvested at IRR.

– MIRR: The MIRR technique assumes that cash inflows are reinvested at the cost of capital.

Page 28: Capital  Budgeting

28

Conclusion• MIRR is a superior method to the regular IRR

as an indicator of a project’s true rate of return.

but,• NPV is better than IRR and MIRR when

choosing among competing projects.

Page 29: Capital  Budgeting

29

Conclusion• Independent Projects– For independent projects, NPV, IRR and MIRR all give the

same result if NPV says accept, IRR and MIRR also say reject and vice versa.

• Mutually Exclusive Projects– For mutually exclusive projects, NPV is the best method

to use because it focuses on maximizing shareholder value.

Page 30: Capital  Budgeting

30

Class Practice Question 3

Page 31: Capital  Budgeting

31

Class Practice Question 4

Page 32: Capital  Budgeting

32

Class Practice Question 5