+ All Categories
Home > Documents > Capital Markets Day 2012 Bilfinger Industrial Technologies · 2012. 11. 22. · Feasibility Study...

Capital Markets Day 2012 Bilfinger Industrial Technologies · 2012. 11. 22. · Feasibility Study...

Date post: 06-Sep-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
27
Gerhard Schmidt | CEO Bilfinger Industrial Technologies GmbH Bilfinger SE Rotterdam/ Amsterdam | November 23, 2012 Capital Markets Day 2012 Bilfinger Industrial Technologies
Transcript
Page 1: Capital Markets Day 2012 Bilfinger Industrial Technologies · 2012. 11. 22. · Feasibility Study for Natural gas pipeline from Mtwara to Dar Es Salaam; FEED Study for the Tanzania

Gerhard Schmidt | CEO Bilfinger Industrial Technologies GmbH

Bilfinger SE

Rotterdam/ Amsterdam | November 23, 2012

Capital Markets Day 2012

Bilfinger Industrial Technologies

Page 2: Capital Markets Day 2012 Bilfinger Industrial Technologies · 2012. 11. 22. · Feasibility Study for Natural gas pipeline from Mtwara to Dar Es Salaam; FEED Study for the Tanzania

Agenda Page 2

A. Company structure and portfolio 3

B. Markets and clients 11

C. Key success factors and strategy 22

Page

Page 3: Capital Markets Day 2012 Bilfinger Industrial Technologies · 2012. 11. 22. · Feasibility Study for Natural gas pipeline from Mtwara to Dar Es Salaam; FEED Study for the Tanzania

A. Company structure and portfolio

Page 3

Page 4: Capital Markets Day 2012 Bilfinger Industrial Technologies · 2012. 11. 22. · Feasibility Study for Natural gas pipeline from Mtwara to Dar Es Salaam; FEED Study for the Tanzania

Short profile: Bilfinger Industrial Technologies generates

~€ 1 bn output volume with 8,000 own employees Bilfinger Industrial Technologies

Page 4

Bilfinger Industrial

Bilfinger Industrial Services GmbH

"Full service

maintenance"

Ensuring and

optimizing plant

availability

Bilfinger Industrial Technologies GmbH

"From engineering to

Installation"

Execution of broad

engineering, project

management services,

fabrication and

construction works

1) Lost Time Incident Frequency Rate

Bilfinger Industrial Technologies:

Output: ~ €0.9 bn

Growth: >5% CAGR, organic

~ 8,000 employees (>3,000 engineers)

12 operational companies

25 countries

Continuously successful safety record:

LTIF1): 2.0 (Q1-Q3, 2012)

Bilfinger Industrial Services GmbH

"Full service

maintenance"

Ensuring and

optimizing plant

availability

Bilfinger Industrial Technologies GmbH

"From engineering to

Installation"

Execution of broad

engineering, project

management services,

fabrication and

construction works

Page 5: Capital Markets Day 2012 Bilfinger Industrial Technologies · 2012. 11. 22. · Feasibility Study for Natural gas pipeline from Mtwara to Dar Es Salaam; FEED Study for the Tanzania

Our business is structured in two Divisions: Engineering

and Technology Bilfinger Industrial Technologies

Page 5

Bilfinger Industrial Technologies GmbH

G. Schmidt CEO

D. Rehm CFO

P. Koolen COO

Dr. Kreysing COO

Corporate Departments

Ensuring corporate governance

Division Technology

Divisions

Division management with responsibility for operational business

Division Engineering

Page 6: Capital Markets Day 2012 Bilfinger Industrial Technologies · 2012. 11. 22. · Feasibility Study for Natural gas pipeline from Mtwara to Dar Es Salaam; FEED Study for the Tanzania

We offer a broad range of services related to engineering

and technology Bilfinger Industrial Technologies

Page 6

AUTOMATION

& CONTROL

CONSULTANCY

ENGINEERED

PRODUCTS

PROJECT

MANAGEMENT

CONSTRUCTION

& FABRICATION

ENGINEERING

En

gin

eeri

ng

Tech

no

log

y

Page 7: Capital Markets Day 2012 Bilfinger Industrial Technologies · 2012. 11. 22. · Feasibility Study for Natural gas pipeline from Mtwara to Dar Es Salaam; FEED Study for the Tanzania

En

gin

eeri

ng

Planning & scheduling

Cost estimating & control

Procurement

Construction mgmt.

Technical supervision

Commissioning mgmt.

PROJECT

MANAGEMENT

Our engineering portfolio includes consultancy and

project management services Bilfinger Industrial Technologies

Page 7

Feasibility studies

Cost estimates

Master planning

Routing studies

Safety studies

Authority engineering

Life cycle analysis

CONSULTANCY

Conceptual design

Process modeling

Basic and detail

design

Multidisciplinary

projects

ENGINEERING

Page 8: Capital Markets Day 2012 Bilfinger Industrial Technologies · 2012. 11. 22. · Feasibility Study for Natural gas pipeline from Mtwara to Dar Es Salaam; FEED Study for the Tanzania

Design & manufacturing

Automation software

EI&C installation

Operation simulation

Storage optimization

Training & maintenance

AUTOMATION

& CONTROL

Our technology portfolio comprises automation & control,

engineered products and construction & fabrication Bilfinger Industrial Technologies

Page 8

Gas processing units

Bio-methane upgrade

Automation systems

Gas odorizing

Bio reactors

Pharmaceutical skids

Turbine inlet units

Noise control systems

ENGINEERED

PRODUCTS

Multidisciplinary

projects

Piping and mechanical

Fabrication

Pipelines

ISP services

Equipment installation

CONSTRUCTION

& FABRICATION

Tech

no

log

y

Page 9: Capital Markets Day 2012 Bilfinger Industrial Technologies · 2012. 11. 22. · Feasibility Study for Natural gas pipeline from Mtwara to Dar Es Salaam; FEED Study for the Tanzania

Contracts in our Division Engineering are usually

below €1m Bilfinger Industrial Technologies

Page 9

Contract Volumes

(Share of contracts in total output volume)

Contract types

Project types and volumes

Increasing

project volume

Studies

Project

Management

Greenfield

plants

€0.5m-€1.5m

<€0.5m ~50%

> €1.5m

~25%

~25%

Reimbursable contracts

Lump-sum contracts

Division

Engineering

Modification

Page 10: Capital Markets Day 2012 Bilfinger Industrial Technologies · 2012. 11. 22. · Feasibility Study for Natural gas pipeline from Mtwara to Dar Es Salaam; FEED Study for the Tanzania

Most contracts within our Division Technology have

values below €5m Bilfinger Industrial Technologies

Page 10

Contract Volumes

(Share of contracts in total output volume)

Contract types

Project types and volumes

~50 contracts with volume > €5m in the

last 3 years

Average size of contracts >€5m : €8m

Increasing

project volume

Modification

Debottlenecking

Upgrading, etc.

Greenfield

plants

Division

Technology

~40% <€1m

€1m-€5m

~20%

> €5m

~40%

Unit rate contracts

Lump-sum contracts

Page 11: Capital Markets Day 2012 Bilfinger Industrial Technologies · 2012. 11. 22. · Feasibility Study for Natural gas pipeline from Mtwara to Dar Es Salaam; FEED Study for the Tanzania

B. Markets and clients

Page 11

Page 12: Capital Markets Day 2012 Bilfinger Industrial Technologies · 2012. 11. 22. · Feasibility Study for Natural gas pipeline from Mtwara to Dar Es Salaam; FEED Study for the Tanzania

We cover a broad range of process industries with a well

balanced portfolio Bilfinger Industrial Technologies

Page 12

Client industries of Bilfinger Industrial Technologies

• Chemicals/petrochemicals

• Oil and Gas

• Refinery

• Energy

• Pharma

• Metallurgy

• Others (e.g. consumer goods, pulp & paper)

Share of output volume per industry

~18%

Oil & gas/

refinery

Chemicals/

petrochemicals

Energy

~28%

~7%

~14%

Metallurgy ~6%

~27%

Pharma

Others

Page 13: Capital Markets Day 2012 Bilfinger Industrial Technologies · 2012. 11. 22. · Feasibility Study for Natural gas pipeline from Mtwara to Dar Es Salaam; FEED Study for the Tanzania

Markets & Clients: We are present in 25 different

countries in Europe, Asia and Middle East Bilfinger Industrial Technologies

Page 13

Regional presence

China India Indonesia Thailand Vietnam Malaysia

Asia:

Libya

Africa:

Bahrain Oman Qatar

United Arab Emirates

Saudi Arabia

Middle East: Abu Dhabi

Austria Belgium Czech Rep. Hungary

Russia

Netherlands

Romania

Germany

Serbia Slovak Rep. Ukraine

Europe:

Poland

Page 14: Capital Markets Day 2012 Bilfinger Industrial Technologies · 2012. 11. 22. · Feasibility Study for Natural gas pipeline from Mtwara to Dar Es Salaam; FEED Study for the Tanzania

Well known clients from different industries and regions

value our services Bilfinger Industrial Technologies

Page 14

Page 15: Capital Markets Day 2012 Bilfinger Industrial Technologies · 2012. 11. 22. · Feasibility Study for Natural gas pipeline from Mtwara to Dar Es Salaam; FEED Study for the Tanzania

Conclusion: Strong diversification is our core asset

Bilfinger Industrial Technologies

Page 15

Diversification in clients

Large basis of long-term clients of different sizes

→ 30% of revenues are generated with Top 10 clients

Diversification in client industries

Strong diversity by industries - clients with different business cycles

→ Top 10 clients are in 6 different industries

Diversification in geography

Presence in developed and developing countries

→ Local companies in 25 countries

Top 10 Clients

Bilfinger Industrial Technologies

Page 16: Capital Markets Day 2012 Bilfinger Industrial Technologies · 2012. 11. 22. · Feasibility Study for Natural gas pipeline from Mtwara to Dar Es Salaam; FEED Study for the Tanzania

Project references Page 16

Feasibility Study for Natural gas pipeline

from Mtwara to Dar Es Salaam;

FEED Study for the Tanzania Natural

Gas Pipeline (Phase-1) from Songo

Island to Somanga (offshore) and from

Somanga to Dar Es Salaam (onshore),

Tanzania

CONSULTING

Ras Al Khaimah Gas

Commission│Tanzania (volume <€ 1 mio.)

Bilfinger Industrial Technologies

Page 17: Capital Markets Day 2012 Bilfinger Industrial Technologies · 2012. 11. 22. · Feasibility Study for Natural gas pipeline from Mtwara to Dar Es Salaam; FEED Study for the Tanzania

Project references Page 17

ENGINEERING

DSM │ Worldwide (volume ~€ 5 mio. p.a.)

Engineering services framework

agreement, global

Bilfinger Industrial Technologies

Page 18: Capital Markets Day 2012 Bilfinger Industrial Technologies · 2012. 11. 22. · Feasibility Study for Natural gas pipeline from Mtwara to Dar Es Salaam; FEED Study for the Tanzania

Project references Page 18

PROJECT MANAGEMENT

NAM (Shell Group) │

The Netherlands (volume ~€ 20 mio. p.a.)

Basic design and EPCM services for

various depletion compression projects

Bilfinger Industrial Technologies

Page 19: Capital Markets Day 2012 Bilfinger Industrial Technologies · 2012. 11. 22. · Feasibility Study for Natural gas pipeline from Mtwara to Dar Es Salaam; FEED Study for the Tanzania

Project references Page 19

ENGINEERED PRODUCTS

Gas processing units │

E.ON Gas Storage│UK (volume ~€ 7 mio.)

Project Holford

Delivery of two gas dehydration units for

the Holford Underground Storage

Bilfinger Industrial Technologies

Page 20: Capital Markets Day 2012 Bilfinger Industrial Technologies · 2012. 11. 22. · Feasibility Study for Natural gas pipeline from Mtwara to Dar Es Salaam; FEED Study for the Tanzania

Project references Page 20

CONSTRUCTION &

FABRICATION

Sanofi-Aventis│France (volume ~€ 15 mio.)

Project: Biotech Facility BIOLAUNCH

Biotech production plant for MAB

(monoclonal antibodies)

Mechanical installation of product and

pure media piping

Assembly of apparatus

Fabrication and assembly of two utility

skids

Bilfinger Industrial Technologies

Page 21: Capital Markets Day 2012 Bilfinger Industrial Technologies · 2012. 11. 22. · Feasibility Study for Natural gas pipeline from Mtwara to Dar Es Salaam; FEED Study for the Tanzania

Project references Page 21

CONSTRUCTION &

FABRICATION

Client in the Chemical

Industry │ U.S.A. & Germany (volume ~€ 35 mio.)

Detail engineering, fabrication and

erection of columns for chemical industry

2 columns

Total height: 58 m each

(Prefabricated in 2 parts)

17 columns

Total height: 72 m each

(Prefabricated in 2 parts)

Bilfinger Industrial Technologies

Page 22: Capital Markets Day 2012 Bilfinger Industrial Technologies · 2012. 11. 22. · Feasibility Study for Natural gas pipeline from Mtwara to Dar Es Salaam; FEED Study for the Tanzania

C. Key success factors and strategy

Page 22

Page 23: Capital Markets Day 2012 Bilfinger Industrial Technologies · 2012. 11. 22. · Feasibility Study for Natural gas pipeline from Mtwara to Dar Es Salaam; FEED Study for the Tanzania

Organic growth, external growth and profitability are our

major strategic goals Bilfinger Industrial Technologies

Page 23

Output volume BIT

[EUR bn]

Organic growth

Further strengthening of client relationships and key account management

Benefit from Cross-selling within Industrial Technologies and Bilfinger Group

Further expansion of activities in the gas market

External growth

Selected acquisitions of automation/EI&C and engineering targets

Further internationalization of construction activities (high level of profitability,

growth markets, portfolio supplementation)

Profitability and professionalization

Continuous efficiency and performance improvement

Focus on HR development throughout the Subgroup

2013 2016

~0.9

Page 24: Capital Markets Day 2012 Bilfinger Industrial Technologies · 2012. 11. 22. · Feasibility Study for Natural gas pipeline from Mtwara to Dar Es Salaam; FEED Study for the Tanzania

Common market development within Bilfinger Industrial is a key pillar of

our organic growth strategy Page 24

Levels of common market development

Bilfinger Industrial

Bilfinger Industrial Services GmbH

Bilfinger Industrial Technologies GmbH

Division Engineering

Division Technology

Level 1: Within Bilfinger Industrial Technologies (between Engineering & Technology)

Level 2: Within Bilfinger Industrial segment (with Bilfinger Industrial Services)

Level 3: Within Bilfinger SE (with other Bilfinger subgroups)

2

1

Dimensions of common market development

Targeted and common client relationship management

Further development of joint portfolio for strategic industries (e.g. oil & gas, pharma)

Co

mm

on

ind

us

try d

eve

lop

me

nt

Common client development

Bilfinger Industrial Technologies

Bilfinger SE

3

Page 25: Capital Markets Day 2012 Bilfinger Industrial Technologies · 2012. 11. 22. · Feasibility Study for Natural gas pipeline from Mtwara to Dar Es Salaam; FEED Study for the Tanzania

Key clients within the segment are regularly assessed and commonly

approached Page 25

Bilfinger Industrial Technologies

22 common

Top-Clients

e.g.:

29 Focus-Clients

of Tebodin

147 Focus-Clients

of Bilfinger Industrial

Segment

(excl. Tebodin) Potential clients

for the Bilfinger

Industrial

Segment

(excl. Tebodin)

Potential clients

for the division

Engineering

(Tebodin)

Page 26: Capital Markets Day 2012 Bilfinger Industrial Technologies · 2012. 11. 22. · Feasibility Study for Natural gas pipeline from Mtwara to Dar Es Salaam; FEED Study for the Tanzania

Our key success factors are competent solutions, qualified

staff, entrepreneurial managers and our client network

Comprehensive Competence in solutions

▪ Competencies in planning and project execution

▪ Competencies in all construction activities

▪ Best practices by the use of international networks

High share of own employees, well trained

▪ Technical know-how and client specific experience

▪ Fulfilling high requirements in safety

▪ Training of technical specialists/skills

Entrepreneurial managers

▪ Decentralized structure, empowerment of local staff

▪ Flat organizational structure, fast decisions

▪ Development of high potentials to managers and key personnel

Bilfinger Industrial client network

▪ Common client relationship management

▪ Structured info pipeline about markets and business

Page 26

Bilfinger Industrial Technologies

Long-term,

profitable,

trust-based

partnerships

with clients

Page 27: Capital Markets Day 2012 Bilfinger Industrial Technologies · 2012. 11. 22. · Feasibility Study for Natural gas pipeline from Mtwara to Dar Es Salaam; FEED Study for the Tanzania

Thank you for your attention Gerhard Schmidt, | CEO Bilfinger Industrial Technologies GmbH

Rotterdam/ Amsterdam | November 23, 2012


Recommended