Ben Atkinson Building Heating Plant Upgrades
TPC: $37.8M (FY12: $19.3M)
The plant is over 45 years old and many components have completely exceeded their useful life. This project will address partial revitalization of the highest priority deficiencies including the steam, electrical, and water systems.
UNIVERSITY OF ALASKA FAIRBANKS
Upper Dorms Emergency Egress Code Corrections
TPC: $1.8M (FY12: $1.8M )
Installation of new exit doors and reconfiguration of the exterior stairs from the MBS complex.
UNIVERSITY OF ALASKA FAIRBANKS
Fine Arts Salisbury Theater Renovation
TPC: $2.8M (FY12: $750,000)
Revitalize and upgrade lighting, seating, sound systems and the stage. FY12 funding will be for a programming study and facilities review.
UNIVERSITY OF ALASKA FAIRBANKS
Fine Arts Complex Vapor Barrier Design & Installation
TPC: $5.0M (FY12: $600,000)
Correct damaged vapor barrier in Music wing. Using a phased approach to investigate design and construction for mitigation of icing and moisture problems in the Music Department areas.
UNIVERSITY OF ALASKA FAIRBANKS
Northwest Campus Energy Conservation Work
TPC: $100,000 (FY12: $100,000)
Energy conservation tasks to include, but not be limited to, lighting.
UNIVERSITY OF ALASKA FAIRBANKS
Utilities Critical Electrical Distribution Renewal Phase 1C
TPC: $30.0M (FY12: $13.8M)
Install all the major electrical equipment in the building constructed in Phase 1B, including switchgear, transformers, switches, and cable for two electrical feeders to be energized.
UNIVERSITY OF ALASKA FAIRBANKS
Utilities Waste Line Repairs and Replacement 3
TPC: $6.1M (FY12: $2.0M)
Repair or replace failing main sanitary waste lines on UAF Campus. Prepare a master plan of existing and future storm and sanitary waste line repairs.
UNIVERSITY OF ALASKA FAIRBANKS
Patty Ice Arena Roof Replacement
TPC: $6.3M (FY12: $3.5M)
Replace failing roofs to include the Patty Ice Center on the UAF campus.
UNIVERSITY OF ALASKA FAIRBANKS
West Ridge Deferred Maintenance
TPC: $134.9M (FY12: $3.6M)
Revitalization of the West Ridge to include Life Sciences Research and Teaching Facility backfill.
UNIVERSITY OF ALASKA FAIRBANKS
Campus Wide ADA Guidelines Compliance
TPC: $10.5M (FY12: $1.1M)
Upgrade non-compliant facilities, sidewalks, parking lots, elevators, ramps, and restrooms to current ADA guidelines.
UNIVERSITY OF ALASKA FAIRBANKS
Tanana Loop and Alumni Drive Roundabout
TPC: $8.8M (FY12: $900,000)
Begin planning process for design and construction of an improved intersection at Alumni Drive and Tanana Loop.
UNIVERSITY OF ALASKA FAIRBANKS
Kuskokwim Campus Critical Deferred andVoc-Tech Renewal
TPC: $14.9M (FY12: $4.8M)
Urgent needs at this remote campus include repairing railings, boardwalks, upgrading electrical systems, boiler replacements, and upgrading ventilation systems. FY12 funding will go towards critical code upgrades.
UNIVERSITY OF ALASKA FAIRBANKS
UAF Combined Heat and Power Plant Replacement Permitting• Prepare environmental permits for filing with the appropriate agencies
to replace the existing UAF heating and power plant.• TPC: $3.0M (FY12: $3.0M)
Utilities VoIP Power Installation• Voice over Internet Protocol (VoIP) allows both voice and data
communications to be run over a single network, which can significantly reduce infrastructure costs.
• TPC: $3.5M (FY12: $3.5M)
Campus Wide Housing Sprinkler Installation• This project includes installation of a wet pipe fire sprinkler system
within Hess Village Apartments and Stuart Hall.• TPC: $1.2M (FY12: $1.2M)
UNIVERSITY OF ALASKA FAIRBANKS
Community and Technical College (CTC) Roof Project• Investigate failing roof system at 604 Barnette Street and scope out the
need to repair and/or replace the roof as necessary.• TPC: $850,000 (FY12: $850.000)
Palmer Center for Sustainable Living Deferred Maintenance• Complete high priority deferred maintenance and facility survey of the
Palmer Center for Sustainable Living.• TPC: $800,000 (FY12: $800,000)
Community and Technical College (CTC) Garage Evaluation• Do an evaluation to address top level sealing to prevent water
infiltration, remove unnecessary exterior panels and recommend security improvements, paint and lighting.
• TPC: $0.0M (FY12: $2.0M)