Balco Overview
➢ Bharat Aluminium Company (BALCO) has made significant contributions as
the,1st PSU in India’s Aluminium sector Incorporated in 1965, BALCO is
India’s first integrated Aluminium business.
➢ One of the first disinvestments of the Government of India. It now a part of
Vedanta Limited, with 51% stake held by Vedanta Limited and 49% held by
Government.
➢ Balco is based in Chhattisgarh State having Captive Bauxite mines in
Mainpat and Kawardha, Captive coal mines in Chotia, 2010 MW power
generation capacity and 5.7 LTPA Aluminium Smelting capacity at Korba
Complex.
➢ Balco produces Wire rods, ingots, Alloy rods, Alloy ingots and Rolled
products. Balco is also selling power.
➢ Balco has been India’s first - to have Captive Power Plant, to venture into +
300kA Prebake pots, to produce Alloy Rods for conductors used in power
transmission industry, to roll material for Aerospace in the Country, online
riser replacement and busbar insulation in potroom and single beam
implementation, holds patent for aluminium cell fuse technology.
Vedanta Limited, Aluminium - BALCO | 2
Process Flow –Aluminium Production
Prebaked Rodded Anode
Butts
Crust
Bath
Fumes after
Dry scrubbing
FumeEnriched
Al2O3
Cast house
DC Power
Cryolite, Soda, ALF3
Bamboo
UtilitiesAir
Carbon
Liquid Al
To the air
Central Store
FTP
Electrolyte cell
(Pot)
Captive Power Plant
Stack
- Electrical Power as
part of COP – 38%
- Electrical Power as
part of energy
consumption – 98%Prebaked smelting processes (Hall Heroult) involve electrolytic reduction
of the Alumina by Carbon to Hot metal and Carbon dioxide.
2 Al2O3 (dissolved) + 3C(s) ------> 4Al(l) +3CO2(g)
Technology Provider –
Potline1 GAMI (320KA),
Potline2 GAMI (340KA)
Vedanta Limited, Aluminium - BALCO | 3
Over Growth story & Vision
Vedanta Limited, Aluminium - BALCO | 4
Energy Objectives
➢ Reduce Net AC Power consumption 12677KWH/MT
➢ Reduce Auxiliary Power Consumption ofpotline-1 423 KWH/MT
➢ Reduce Auxiliary Power Consumption ofPotline-2 from 475 KWH/MT
:
➢ Reduce Net AC Power consumption for
Potline-1 (13525 KWH/MT to 13079 KWH/MT )446 KWH/ MTPotline-2 (13513 KWH/MT to 13074 KWH/MT )439 KWH/MT
➢ Reduce Auxiliary Power Consumption of potline-1from 480 to 463 KWH/MT- 17 KWH/MT
➢ Reduce Auxiliary Power Consumption of Potline-2from 568 to 524 KWH/MT - 44 KWH/MT
ENERGY OBJECTIVES (FY18) : ENERGY OBJECTIVES (Vision FY21)
Vedanta Limited, Aluminium - BALCO | 5
Energy Conservation Vision 2021
S. No. Major Projects / Action Plan for Vision FY 21 Power Saving UnitTarget
Completion
1 Up gradation of Pot-control system in Pot-line 1 250 Kwh/MT Oct-18
2 Reduction in Pot-line Aux. power consumption 53 Kwh/MT Mar-19
3 Increase in Pot-line Current Efficiency from 93.38 to 94.38% 150 Kwh/MT Mar-19
4 Installation of 100% graphitized Cathodes 560 Kwh/MT Mar-20
5 Up gradation of Pot-control system in Pot-line 2 417 Kwh/MT Mar-21
6 Replacement of conventional motors with energy efficient motors 230 KW Mar-21
5956.9 55.9 55 54.4 52.9 51.7
49.3 48.6
FY-13 FY-14 FY-15 FY-16 FY-17 FY-18 FY-19 FY-20 FY-21
Specific Energy Conservation Journey (GJ/MT)
VISION 2021
Vedanta Limited, Aluminium - BALCO | 6
12
68
0
12
85
6
12
88
0
13
24
4
13
25
0
13
29
5
13
38
0
13
48
0
13
18
1
13
29
1
13
29
7
13
39
2
13
43
3
13
43
9
13
51
3
13
07
5
12
50
0
pin
gg
uo
Alo
uet
te
Weiq
iao
Du
bal
Alb
a
Ma
den
Em
al
Qata
lum
BA
LC
O P
L-1
Va
l
BA
LC
O
BA
LC
O P
L-2
Va
l S
ez
Ad
itya
Hin
da
lco
FY
-20
20
FY
-20
21
International Benchmark National Benchmark BALCO Vision
Pot-line DC Specific-Power Kwh/MT & Benchmarking
Vedanta Limited, Aluminium - BALCO | 7
Major Energy Conservation Projects-2015
S.No Title of ProjectAnnual Energy Saving
Million KWH
Investment
Million
KWH KCAL INR
1 Automation of cooling pump house motors based on flow and temperature control 2.05 0.2
2 Cast house 2 - To minimize Extra & Idle running hours of Cold water motor in pump house 0.423 NIL
3 Cast house 3 - Optimization of all 4 Wire rod mill Furnaces set point from 790 to 770 0.21 NIL
4Cast house 3 - Increasing the capacity of furnaces from 50 MT to 60 MT by frequent hot
cleaning of WRM furnaces 0.52
NIL
5Cast house 3 - Increasing the capacity of furnaces from 45 MT to 60 MT by frequent hot
cleaning of T furnaces0.42
NIL
NIL
6 Cast house 3 - Running 2 WRM with 2 Furnaces 0.16 NIL
7Bake oven - To reduce the HFO Consumption from 48.58 Lt/No to 46 Lt/No of Baked
Anode 0.31 NIL
8 Rodding - Reduction in specific power consumption 72.59 Kwh/No to 63.85 Kwh/No.0.80 NIL
9 Bake oven - Reduction in specific power consumption 58.5 Kwh/No to 50 Kwh/number 0.10 NIL
TOTAL (ROI-Immediate) 4.68 0.31 0.2
Vedanta Limited, Aluminium - BALCO | 8
Major Energy Conservation Projects-2016
S.No Title of ProjectAnnual Energy
Saving Million
KWH
Investment
Million
INR
1 Energy reduction in Utility area (Compressor and pump houses 3.6 NIL
2 Use of 100% Graphitized Cathode (done in 77 pots) 44.71 84.6
3Cast House 2- 1. LTA to be reduce to 15 min so has to utilize metal heat from Pot-
room,2.Improving Air to oil Fuel ratio in HF 1 and HF 2 for less oil consumption. 0.3 NIL
4Rodding 2- 1. Minimize idle running hours in all bet conveyors,2.-Installation of
timers in all De-dusting unit,3.Induction Furnace Process Optimization. 0.09 NIL
5Installation of 10000 nos, 18 W LED tube lights in place of 40 W conventionaltube lights through EESL scheme 0.91 1.9
6 Installation of Motion Sensors for lighting control in Washrooms / Conference room 0.09 0.3
7 Installation of no's 420 90W LED Street lights in place of 250W HPSV 0.3 3
8 One compressor Air end up-gradation 1.72 2
9 NCRM AC Plant cooling water system to be merged with RCW line. 0.3 0.5
TOTAL (ROI-7 months) 52.2 92.3
Vedanta Limited, Aluminium - BALCO | 9
Major Energy Conservation Projects-2017
S.No Title of ProjectAnnual Energy
Saving Million
KWH
Investment
Million
INR
1 Increase in Pot-line Current Efficiency from 93.38 to 94.48% to save 140 KWH/MT 46.26 NIL
2 Cathode upgrade & Process optimization in Potline-1 & 2 to save 500 KWH/ MT 9.58 12
3 Modification in Cooling tower wheel with FRP in Cast House-3 0.06 0.81
4 Installation of VFD for Hot well pumps Cast House 3 0.47 1.55
5 ID fan motor overhauling and bearing replacement for FTP1 0.22 0.12
6 Pre-Heating f/c power saving by reducing temperature of heaters during PM/SD 0.14 NIL
7 Load shifting from under loaded transformers 0.42 NIL
8
Optimization of running hours of FTA vacuum unit(20% reduction in
consumption).Safety filter of FTA1 & 2 changed to increase suction rate of sucking
pipe
0.15 0.03
9Closed looping in cooling pump house of Air compressor house-1(Potline-1) &
Rectifier Pump House -2(Potline-2)0.5 4.5
TOTAL (ROI-4 Months) 57.8 19.01
Vedanta Limited, Aluminium - BALCO | 10
HRM Productivity increase by 7.8 % per day
with reduction in Specific consumption.
Project Title:
Innovation-Project 1
Project Details
➢ Modification done in Preheating furnace to
accommodate 43 No's of slabs per day which
results 43 slabs rolling per day instead of 40 slabs .
➢ Study of furnace heating process to accommodate
additional 3 slabs and its impact on furnace operation
& soaking time
➢ Shoe modified to reduce space in between the slabs.
➢ Charging Pusher Hydraulic system pressure
increment and synchronization
Pre-Heating Furnace
Hot Rolling Mill
Vedanta Limited, Aluminium - BALCO | 11
Analysis
➢ From detail analysis of design parameters/ dimension of Preheating furnace and it’s mounting parts, it was found
that we can increase the slab charging capacity of Furnace by reducing the length of slab carrying shoe in which
Aluminum Slab rest and travel inside the Furnace.
Analysis
Vedanta Limited, Aluminium - BALCO | 12
In-house modification and with our own resources.
➢ Inside length of preheating furnace-
18220mm,
➢ Length of slab carrying shoe- 450mm,
➢ Length of 40 pairs of slab carrying shoe-
450*40= 18000 mm,
➢ Now a extended steel plate of 32 mm, mounted
on slab carrying shoe, If it will be removed
then length of slab carrying shoe- 418 mm,
➢ Now the maximum Pair of modified shoe can
be accommodate inside furnace will be –
18220/418= 43 nos.
➢ By this calculation we found that we can
increase slab charging capacity of Preheating
furnace from 40 nos to 43 nos.
Action Plan Before Modification After Modification
Stroke Length of pusher cylinder increase by 20
Increase the
length of piston
stroke by 20 mm
Plate Removed
Implementation
Vedanta Limited, Aluminium - BALCO | 13
282 268
428 413
Q2 Q3
Specific Power Consumption
KWH/MT
PHFC HRM
➢ PHFC Specific power consumption
reduction by 14 KWH/MT
➢ HRM Specific Power Consumption
Reduction by 15 KWH/MT.
➢ Saving Monthly Rs. 1.2 Lakh in power
➢ Production increases 7.8% per day,
➢ Average nos of slab/month to be roll in HRM-650
➢ Before Modification, No of days taken to roll 650 slabs-17 days,
after modification no. of days taken to roll 650 slabs-16 days,
1 Day power consumption of Preheating furnace- 30000 KWH,
1 day power consumption of Hot Rolling Mill- 8000 KWH,
Total Power Saving- 38000 KW-Hr per Month,
➢ Total Power saving from Oct17 to Jan18 –
38000*4= 152000 KWH
➢ Total Cost saving from Oct 17 to Jan 18
152000*3.2= INR 486400,
➢ Hence Total Annual saving will be - 38000*3.2*12= 14,59,200
Power Saving Calculation
Results Achieved & Benefits
Vedanta Limited, Aluminium - BALCO | 14
Enrich Silo De-dusting Unit pipeline modification –
use of suction for created by ID-fan
➢ Electrolysis in pots produces Hydrogen Fluoride, which
is environmentally hazardous.
➢ In FTP, Hydrogen Fluoride is reacted with fresh Alumina
to obtain Enriched Alumina.
➢ Enriched Alumina deposited on filter bags is periodically
pulsed and collected at hopper bottom.
Project Title:
Innovation-Project 2
Project Details
Vedanta Limited, Aluminium - BALCO | 15
➢Used to clean dust laden air created while loading of silo
➢The air enters the collector under pressure or suction from a fan or blower
➢The air travels through the filters and exits the collector cleans the bags.
➢The jet of compressed air blows the dust off the filter.
➢The dust then falls with gravity to the bottom of the collector.
➢A dust collector pulses the filter with a jet of compressed air to clean the
filter.
➢A voltage signal that trips a pulse valve that opens to let the compressed air
into the filter.
De-Dusting Unit
:
Project Details
Vedanta Limited, Aluminium - BALCO | 16
➢ Suction created by ID fans can be utilized for de-dusting.
➢ De-dusting airline can be connected to ID fan duct.
➢ A pipeline was fabricated.
➢ Main de-dusting pipeline was tapped atEnrich silo top, while fume duct was tappedat ground level.
➢ They were than connected by theaforementioned 10” pipe.
➢ A sliding damper was given to close ID Fansuction when DDU is working.
Main de-dusting pipe
Pipe
Fume Duct
Alumina Silo Tank:
Action Taken & Modification Done:
Solution & Implementation
Vedanta Limited, Aluminium - BALCO | 17
➢ Suction through ID Fan can assist de-dusting during
normal course of operation.
➢ This reduces load on DDU motor, prolonging its life
and also saving energy
Current drawn by motor:
Before modification = 36 A
After modification = 25 A Difference ΔI = 10 A
Power saved = (√3 x V x ΔI x cosØ x T)/1000 kW-H
where, V=415 volt,cosØ= Power Factor = 0.85
Time of running per month (in hours) = 24x30 = 720 hour
Power-saved=(1.732x415x10x0.85x720)/1000=4398.93 KWH
Monetary saving = ₹ 3x 4398.93 = ₹ 13,196.8 per month
Tangible Benefits➢ Saving of ₹ 13,196.8 per month in
power consumption.
➢ Uninterrupted availability of suction
mechanism, even when DDU is down.
➢ Time for proper manpower and
resource planning before starting job.
➢ No fatigue and stress for workers due
to working overtime.
➢ Work has become safer than before.
➢ Improvement in Team work
➢ Improvement in Communication
➢ Improvement in commitment
Intangible Benefits
Saving Calculation
Results Achieved & Benefits
Vedanta Limited, Aluminium - BALCO | 18
Project Start Date :Jan-2018
Project End Date :Oct-2018
➢ Hardware Up-gradation ➢ Up-gradation of control system software
(Alumina concentration control fine tuned)
Innovation -Project -3
Project Details
Pot-line -1 Pot-control Up-gradation
Project Title :
Hardware Up-gradation
The hardware Up-gradation is
being done on the existing control
system, Mainly there are two
newly added hardware as
following
➢ Accurate Anode travel distance
measurement device.
➢ Intelligent tapping device.
Up-gradation of control system software
The main features of the latest software
are as follows:
➢ “Two-path Curve” Al2O3 feeding
control
➢ Multi-mode Fluoride excessive control
➢ Multi-stage noise control
➢ Voltage shoot up control during Anode
change , Tapping (Step wise reduction)
➢ Accurate Beam level measurement
▪ Mass
Balance
▪ Heat
Balance
▪ Algorithm
Vedanta Limited, Aluminium - BALCO | 19
Action Plan Implemented
Pot energy utilization optimization
➢Pot heat Insulation improvement.
➢ Improvement of pot hooding.
➢ Increment in anode covering
height.
➢Accurate beam movement
measurement device.
Vedanta Limited, Aluminium - BALCO | 20
Results Achieved/Benefits Achieved
13378 1337113341 13341
13245
April MAY JUNE JULY OCT
Benefits to organization:-
Tangible Benefits:
1. Energy saving- 56606806 KWH/Month
(219 KWH/MT)
2. Energy Cost saving- INR 17 Cr /Month
Specific Ac Energy Reduction Trend Potline-1
Potline-1 UOM Apr-18 May-18 Jun-18 Jul-181 Total Specific AC (KWH/MT) 13378 13371 13341 13341
2 100% graphitization cathode blocks (KWH/Month) 186200 570019 934608 1630780
3
Pot-controller modification in Potline-1 to
save 219 KWH/ MT (KWH/Month) 663415 2024697 5378499 5417028
4
Auxiliary Energy Consumption reduction in to save 16 KWH/ MT
(KWH/Month)
776736 880706 515396 547836
Vedanta Limited, Aluminium - BALCO | 21
➢ Installed 28 KW Grid connected Solar power plant & Planning for Installation of 5 MW Solar power plant.
➢ Installation of transparent roof sheets & light bottles (liters of light) for harnessing sunlight at day time inside
office buildings, stores and containers to reduce lighting loads during day time has saved 350 KWh/annum.
➢ Planning for installation solar water heater in canteen.
➢ Planning to make Green building in township.
Utilization of Renewable Energy
S.No. Area Load (KW)
Plant Capacity
(KW) Target
Investment INR
Lac
1 Guest house-1 170 200 Dec-18 110
2 Guest house-2 60 100 Dec-18 56
3 Guest house-3 35 100 Dec-18 56
4 Hospital 260 500 April-19 225
5 DPS school 9 50 April-19 28
6 Expert club 50 100 April-19 56
7 GET Hostel 265 200 Oct-19 110
Action Plan for Installation of Solar Plant
Vedanta Limited, Aluminium - BALCO | 22
➢ Reduction in Specific water consumption 1.4 m3/MT (FY17) to 0.74 m3/MT (FY18) (Lowest ever).
➢ Plant 1 water allocation reduction from 6.6 MCM to 3.6 MCM (savings 3.6 Cr in a year).
➢ Designated Consumer under PAT scheme for Aluminum Sector. PAT cycle -1 target over achieved by 0.088
TOE (awarded 22203 EScerts).
➢ PAT cycle-2 Target: 5.0275 TOE/MT by 2018-19,Till date performance-3.31 TOE/MT
Environment Management Initiatives
3.4
2.31
1.31
0.75 0.79 0.67 0.44
FY-15 FY-16 FY-17 FY-18 (YTD) FY-18 BP FY-19 BP Benchmarking
Specific Water Consumption (KL/MT)Zero
Waste
Zero Discharge
Zero Harm
HSE VISION
Vedanta Limited, Aluminium - BALCO | 23
Waste Management
FY 2016-17 FY 2017-18 FY 2018-19 FY 2019-20 FY 2020-21
115078160
11390 11390 11390
625
8956
2914426600 26600
SPL
Generation(MTPA) Utilization (MTPA)
➢ Usage of Emulsion after treatment Qty. – 4860
MT/year
➢ Reuse of Roll oil coolant after distillation in NCRM-
Approx. 2.1 KL oil saving-INR -8.38 lakhs per year
➢ Initiative taken to align BEE & cement industry for
Co-processing of SPL.
➢ Total 298 MT Co Processing trial in Ambuja
Cement (Holcim Group)
➢ 2880 MT/year Co-processing approval received
from CPCB & SPCB by Ultratech, Hirmi works for
BALCO for 5years (366 MT despatched for trial)
➢ A SLF of capacity of 36000 M3 to store 54000 MT
of SPL will be constructed in this FY within the
plant premises.
110
0.85
110.85
23.65 24.51
48.16
66
22.04
88.04
0
20
40
60
80
100
120
Fresh oil Value in Lakhs Purified oil value in Lakhs Total Expenses
Roll Coolant oil expenses trend for 3 years
2017-18 2018-19 2019-20
Vedanta Limited, Aluminium - BALCO | 24
SPL
10500 MTPA
Al. Dross
6000 MTPA
Coke Dust
3000 MTPA
Filter Bags
70 MTPA
Short Term 8000 MT Co-
Processing with
Cement industry
Dross Processing Machine at
Foundry in addition to CH
Reuse of Rodding Coke -
dust in GAP - 100
MT/month
In-house facility to Detoxify
Bags
Medium Term Erection and
Commissioning of SPL
Detoxification plants
Melt loss reduction in Wire
Rod from 0.49 to 0.35% &
Ingot from 0.38 to 0.32%
Increase in Rodding Coke
dust quantity in GAP -
300MT/Month
Approval from CPCB to sell
detoxified filter Bags
Long Term SPL Free BALCO Using Dross as raw material in
refractory manufacturing
Use of Coke dust in Power
plant as a substitute of
Coal
Modification of filter bags
in potline FTP to increase
life
Waste Management
➢ SPL – SPL detoxification plant set up in under progress by M/s Star Regenerate-N-
Recycle LLP (Korba) and M/s GreenMac Technology Pvt Ltd (Raipur). (First Company in
India to do so)
➢ SPL – Successful trail done for SPL Co-Processing at Ambuja Cement and Ultratech
Cement. Ambuja Cement Received the authorization for Regular Co-processing of SPL.
➢ Plan to recover heat energy from spent anode-utilizing the hot air to preheat green anode
Vedanta Limited, Aluminium - BALCO | 25
GHG Inventorisation
YearScope 1 emissions
KG CO2/Ton of Final product
Scope 2 emissions
KG CO2/Ton of Final product
Total KG CO2/Ton Final
product
2014 - 15 23.3 2.3 25.6
2015 - 16 18.24 0.2 18.44
2016 - 17 18.85 0.03 18.88
2017 - 18 17.28 0.27 17.55
Plantation Drive
FY 15 – 183700FY 16 – 102500FY 17 – 87000FY 18 – 92500
Vedanta Limited, Aluminium - BALCO | 26
Green Supply Chain & Ongoing Plans with Various Vendors
Sl.
No.
Name of the
Vendor
Description of the Collaboration / energy
reduction initiative
1 SGL For energy efficient cathodes
2 GAMI & AP Pot controller upgradation
3 SKF For energy efficient bearing & V-belts
4 EESL Energy Efficient Motor replacement
5 Atlas Copco Compressed Air Audit
SN Initiatives Savings
1 BTAP Capacity Enhancement 396 GJ/Month
2 Use of Higher Capacity Truck( from 16MT to 25MT) 1697 GJ/Month
3 Use of 12MT instead of 6MT ladles & Energy
efficient engine
116 GJ/Month
4 Use of GPS to identify shortest route
200 GJ/Month
5 Door to Door delivery initiative for issue of material
from stores
6 Transportation of finished goods in Container rake
7 Use of Re-Fuelling Vehicle
Implementation of Idea generation portal & !DEA@BALCO APP for
generation of idea for All Balco & Contract employees.
➢ Idea generated- 1018
➢ Idea implemented- 462
➢ Idea under implementation-556
➢ Energy saving achieved- 6800 Kwh/day
Implementation of Best Practices
Vedanta Limited, Aluminium - BALCO | 27
Energy Conservation Journey & Review Mechanism
Corporate Sustainability Review
Monthly Management Review by CEO
Monthly Operational Review by Plant Head
Weekly Energy Cell review by Energy
Manager
SBU Level review – Daily War Room
Energy Excellence Model
Bench-
marking
Innovatio
nAwareness
Involveme
nt
Certific
ation &
Awards
Energy Saving, Cost
Reduction, Sustainable
Operation
Vedanta Limited, Aluminium - BALCO | 28
Energy savings from Employee & Stakeholder Involvement
23%
34%
56% 58%
FY 15-16 FY 16-17 FY 17-18 FY 18 - 19 (YTD)
QC Involvement in Plant
Details Unit 2014-15 2015-16 2016-17 2017-18
FIP Projects No. 5 3 6 8
QCs / Kaizen Projects No. 25 15 18 32
Energy Savings Kwh 7664358 4375000 26892304 59584971
Benefits due to energy
savingsRs. lacs 229 131 806 1788
➢ 24 Gold & 1 Silver Awards in Chapter Conventions, 10 Par excellence awards at National convention and 2 Gold
Awards at International Convention (QCFI & Juse Japan)
Vedanta Limited, Aluminium - BALCO | 29
Training & Workshop
Vedanta Limited, Aluminium - BALCO | 30
Creating Awareness Among Stakeholders
Vedanta Limited, Aluminium - BALCO | 31
Energy Policy & Certifications
# Description Certification Benefits
1 Quality management system ISO 9001:2015 Enhanced customer satisfaction and improved customer loyalty
leading to repeat business , Consistency in the delivery of your
product or service.
2 Environment Management
System
ISO 14001:2015 Identify cost savings with greater emphasis on resource, waste
and energy management, Demonstrate compliance with current
and future statutory and regulatory requirements.
3 Occupational Health & Safety
Management System
OHSAS
18001:2007
Give signals to our clients and stakeholders that our organization
is committed to protecting the needs of all our stakeholders.
4 Energy Management System ISO 50001:2011 Increase energy cost savings for the organization by reducing
costs via a structured approach to managing our energy
consumption.
5 Asset Management System ISO 55001:2014 Better management of risks, Enhanced brand reputation ,
Improved financial performance.
6 Quality Management System
for the automotive industry.
TS 16949 Ability/helps to enter auto manufacturing market.
7 Information Security
Management System(ISMS)
ISO/IEC
27000:2013
Safeguard our valuable data and intellectual property
8 NABL accredited Lab ISO 17025:2005 Reliable testing, measurement and calibration services
9 Social Accountability SA8000 Addresses and prevent social and labor risks, motivates worker
engagement
Vedanta Limited, Aluminium - BALCO | 32
Status of EnMS (ISO 50001:2011) Audit Observation
IMS Year No. of NC No. of Observation Open NC Open Observation
Balco 15-16 3 17 0 0
Balco 16-17 0 10 0 0
Balco 17-18 0 6 0 0
FY Project DescriptionInvestment
(Rs. Crs)Turnover (Rs. Crs)
% Investment on Turnover
ROI(Months)
2016-17 100% Graphitized Cathodes 85 6400 1.3% 12
2017-18Pot Controller up gradation Pl-1 and 100% Graphitized Cathodes
132 9063 1.4% 18
2018-19Projected investment –Pot controller up gradation Pl-2 & Energy efficient cathode
183 9063 2.0% 20
%Investment for Major Energy conservation projects on Turnover
By Implementation of ISO-50001 we have
➢ Reduced specific energy consumption 55.9 to 52.9 GJ/MT.
➢ Improved energy monitoring by installation of Ems & meters in LT system.
➢ Improved focus in Common areas –Energy saved 5000 KWH/Day.
Vedanta Limited, Aluminium - BALCO | 33
Awards and Accolades
Balco received 2018 Clean Energy Management Insight Award for implementation ISO 50001 Energy Management System -May’2018 from CEM
CII- Excellent Energy Efficient Award-2017 Metal SectorCII- Most Innovative project Award-2017 Power Sector
AWARD CATEGORY AGENCY
Excellent Energy efficient unit award-2016 & 2017 Energy- Metal Sector CII
Most Innovative project-2017 Energy- Power Sector CII
BEE Most Energy efficient unit Poster ENERGY BEE
Global Energy management INSIGHT AWARD Energy-ISO EnMS 500001 CEM
Water Digest Award Water management Times Group
Sustainability 4.0 Awards 2017 Sustainable business
practices
Frost & Sullivan and
Teri
Grow Care India EHS Award-2017 HSE Grow Care India
The Srishti G-Cube Awards Environment Shrishti G- Cube
Green Tech Safety Safety Green Tech
CII 5S Excellence Award 5S CII
IMEA-Platinium Award ManufacturingFrost & Sullivan and
Teri
CII- National HR Excellence Award HR Initiatives/Performance CII
The ET 2 Good 4 Good Certificate’ Community development
programThe Economics Time
CSR Project of the year Award for Balco Skill School
Initiative - May’2018CSR BRAND MEDIA
Vedanta Limited, Aluminium - BALCO | 34
2550Farmers Benefited
117 villages
Covers 2 LakhPopulation
60,000Fruit bearing Trees Planted
Core Programs10,000
7000Youth trained and placed
Children free from malnutrition
1500 SHG women covered,
500 linked to income generation activities.
646 Acres of land brought under irrigation.