2 CARING | COMMUNITY MEMORIAL HEALTH SYSTEM
2011 2012 2013 2014 2015
PRE-CONSTRUCTIONSite Preparationof New Hospital Site Site Preparation and Excavation
Buy Out / Submittals / Approvals / OSHPD Approvals Footings Foundations Work Basement Walls / 1st Floor Post Installation Verification; Backfill Structural Steel / Welding Elevated Sleds
OFOI Equipment Final Test & Balance; Final Cleaning Superintendent Punch List Punch List; Final Inspection Final Inspections; Substantial Completion Certificate of Occupancy CMHS Moves In
FOUNDATION / STRUCTURE
SITE UTILITY RELOCATIONSite Utilities
GROUND IMPROVEMENTGround Improvement & Shoring Ground Replacement
BUILDING SHELLExterior Skin / Windows Roof
CORRIDOR TIE-INSBasement & First Floor Tie-in Renovations
INTERIOR FINISHES
CLOSEOUT
M.E.P. & Fire Protection Framing Finishes
2011 2012 2013 2014 2015
PRE-CONSTRUCTIONSite Preparationof New Hospital Site Site Preparation and Excavation
Buy Out / Submittals / Approvals / OSHPD Approvals Footings Foundations Work Basement Walls / 1st Floor Post Installation Verification; Backfill Structural Steel / Welding Elevated Sleds
OFOI Equipment Final Test & Balance; Final Cleaning Superintendent Punch List Punch List; Final Inspection Final Inspections; Substantial Completion Certificate of Occupancy CMHS Moves In
FOUNDATION / STRUCTURE
SITE UTILITY RELOCATIONSite Utilities
GROUND IMPROVEMENTGround Improvement & Shoring Ground Replacement
BUILDING SHELLExterior Skin / Windows Roof
CORRIDOR TIE-INSBasement & First Floor Tie-in Renovations
INTERIOR FINISHES
CLOSEOUT
M.E.P. & Fire Protection Framing Finishes