Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved
Transcript
Page 1: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.

Carleton CollegeScience Building Addition & Renovation

January 26, 27, 28 & 29, 2015

© Copyright EYP Architecture & Engineering. All rights reserved

Page 2: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.

/ Schedule

PROG. & CONCEPT. PHASE

Estimate & review

Board Meeting

SCHEMATIC DESIGN

Estimate & review

Board Meeting

PAUSE for funding

Oct Nov Dec Jan Feb Mar April May 20152014

Page 3: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.

PAUSE Complete

DESIGN DEVELOPMENT

Estimate & review

CONSTRUCTION DOCS

BID & NEGOTIATE

CONSTRUCTION

May June July Aug Sept Oct Nov Dec Jan Feb Mar Apr May20172016 / Schedule

Page 4: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.

• Support integrated science education:- experience the connections

• Support student-faculty research:- increase ability to involve more students- incorporate meaningful research opportunities into the science curriculum

• Enhance the strengths of facilities and programs:- reflect leadership in educating scientists

• Articulate the (compelling) vision in a robust way:- synergies across departments- continue to provide high standard of education- greater than the sum of its parts

GOALSCarletonCollegeScience Building Addition & Renovation

January 26-29, 2015

Page 5: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.

“Carleton is renowned for its rigorous liberal arts curriculum and excellence in undergraduate teaching.”

Page 6: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.

“intentional contiguities”

Page 7: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.

Teaching & Research @ Carleton

Page 8: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.

TeachingLaboratory

1,200 sf

S/FResearch

Lab600 sf

TeachingLaboratory

1,200 sf

Modular Planning & Flexibility

Classroomand

Pre-Lab&

Data Analysis

S/FResearch

Lab600 sf

Instrument& Prep.

S/FResearch

Lab600 sf

S/FResearch

Lab600 sf

Study

ClassroomandData

Analysis

Page 9: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.

TeachingLaboratory

1,200 sf

S/FResearch

Lab600 sf

TeachingLaboratory

1,200 sf

Modular Planning & Flexibility

S/FResearch

Lab600 sf

Instrument& Prep.

S/FResearch

Lab600 sf

S/FResearch

Lab600 sf

Study

ClassroomandData

Analysis

Page 10: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.

TeachingLaboratory

1,200 sf

S/FResearch

Lab600 sf

TeachingLaboratory

1,200 sf

40’30

40 + 30 + 40 = 110’

Modular Planning & Flexibility

S/FResearch

Lab600 sf

Instrument& Prep.

S/FResearch

Lab600 sf

S/FResearch

Lab600 sf

Study

ClassroomandData

Analysis

30 +

30

= 60

Page 11: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.

TeachingLaboratory

1,200 sf

S/FResearch

Lab600 sf

TeachingLaboratory

1,200 sf

40 + 30 + 40 = 110’

Modular Planning & Flexibility

S/FResearch

Lab600 sf

Instrument& Prep.

S/FResearch

Lab600 sf

S/FResearch

Lab600 sf

Study

ClassroomandData

Analysis

30 +

30

= 60

’6’ 6’

Page 12: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.

Teaching&

ResearchSuite

6,600 sf

Teaching&

ResearchSuite

6,600 sf

Modular Planning & Flexibility

Offices

Hulings

Olin

Commons

Commons

Page 13: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.

Modular Planning & Flexibility

Commons

Commons

Page 14: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.

Mudd Exchange

Page 15: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.
Page 16: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.
Page 17: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.

El. -2’-6” .

El. 0 .

Page 18: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.
Page 19: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.
Page 20: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.
Page 21: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.
Page 22: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.

Modified Master Plan (MoMa)

Page 23: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.
Page 24: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.
Page 25: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.

E

E

E

El. – 2’-6”’ .

El. 0’ .

El. - 3’ .

Page 26: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.
Page 27: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.
Page 28: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.
Page 29: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.
Page 30: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.
Page 31: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.

Cost

Page 32: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.

Estimate of Total Project Cost:

• Budget:$70,000,000

• MoMa:$79,750,000

• MuddEx:$95,800,000

Page 33: Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.

MoMa: MuddEx


Recommended