CARPE DIEM FMI (Partner 5) progress report. Jarmo Koistinen , Heikki Pohjola Finnish Meteorological Institute. Work Packages. Area 1/WP3: Development of a variational assimilation scheme for Doppler winds (FMI+SMHI, responsible persons at FMI Heikki Järvinen, Kirsti Salonen). - PowerPoint PPT Presentation
50
06/27/22 FINNISH METEOROLOGICAL INSTITUTE Jarmo Koistinen, Heikki Pohjola Finnish Meteorological Institute CARPE DIEM FMI (Partner 5) progress report
Transcript
Page 1: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

Jarmo Koistinen, Heikki PohjolaFinnish Meteorological Institute

CARPE DIEMFMI (Partner 5) progress report

Page 2: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

Work Packages

· Area 1/WP3: Development of a variational assimilation scheme for Doppler winds (FMI+SMHI, responsible persons at FMI Heikki Järvinen, Kirsti Salonen).

· Area 2/WP7: Advanced surface radar-based precipitation estimate applying NWP data (FMI, Jarmo Koistinen, Heikki Pohjola).

Page 3: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

Objective: Improve the accuracy of operational precipitation

measurements

Page 4: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

National End User Meeting in Feb. 2003

1. Finnish Road AuthorityApplies observed and nowcast distributions of rain,

sleet and snow for road operations (snow clearing and salting costs ~100 M euros/winter).

2. Kemijoki hydroelectric power companySee the presentation of Hannu Puranen.3. FMI Continuous need to improve radar products (we are

working in the Operative Services).

Page 5: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

Better accuracy with integrated

data· Existing: Hydrometeor

phase analysis (rain, sleet, snow) based on surface data (T,RH). Resolution 5 min & 1 km.Time-space variable Z – R / Ze – S relations.

· New from CARPE DIEM: apply a NWP model (HIRLAM) to obtain 3D hydrometeors.

Page 6: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

WP 7.1: Attenuation correction based on 3D water phase diagnosis from

NWP model quantities (single polarisation).

Deliverables:· Diagnosis of hydrometeor water phase in 3D radar

volumes based on NWP model fields.· Large attenuation statistics for rain only (assumed

in most existing radar systems) compared to variable hydrometeor phase statistics.

· Improvement in surface precipitation estimates.

Page 7: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

An axample of severe C-band attenuation

Page 8: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

WP 7.1: Attenuation correction based on 3D water phase diagnosis from

NWP model quantities (single polarisation).

Work started in spring 2003:· Software to read 3D HIRLAM real time fields

from the FMI database into the 3D radar composite grid partly ready (see the manual slides by Harri Hohti).

· Hail algorithm (POH) implemented (see separate manual slides by Harri and Markus Peura).

Page 9: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

WP 7.2: Elimination of overhanging precipitation (OP) from surface estimates

Altostratus 19 % of all VPR in Finland

Page 10: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

WP 7.2: Rejection of overhanging precipitation (OP) from surface

estimates

Deliverables:· 1D diagnosis of OP from polar volumes above

each radar (see WP 7.3).· 3D diagnosis of OP from NWP fields between

radar sites. · Integrated radar-NWP correction method to reject

OP from the network products.Work done:· 1D diagnosis ready, 3D HIRLAM fields can be

read.

Page 11: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

WP 7.3: Vertical reflectivity profile (VPR) correction applying radars and NWP

Deliverables:

•Automatic classification of VPR above each radar based on radar, soundings and NWP.

•Automatic quality control of each measured VPR.

•Operational VPR correction in a network of 7 radars.

Page 12: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

Measured VPR

• 7 radars • every 15 minutes• layer thickness 200 m• range 2 - 40 km• max bin count 5000 / layer

3D polar

volume

Vertical Profile of Reflectivity

(VPR)

Page 13: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

Classification and QC of each VPR

• representativity • rain• bright band• snow• clutter• clear air echo• overhanging precipitation• unphysical gradient

Statistics

Reference dBZ at ground level (green dot in VPR)

Calculation of the correction

Freezing level (FL) from radio

soundings (soon: from HIRLAM also)

Climatological profile adjusted to freezing level

Page 14: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

Overhanging

precipitation

Examples of classified VPR´s

Main parameters in profile recognition:

• Height

• Intensity

• Gradients (dBZ/km)

• Freezing level

Page 15: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

Clear air echo and clutterEvaporation and clutter

Page 16: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

Snow

1(2)

Rain and bright band

Page 17: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

Climatological profileBright band at ground,

sleet

Page 18: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

Profile representativity

Page 19: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

40 %

19 %

2 %

12 %

4 %

23 %

Snow

Rain (no bright band)

Rain (with bright band)

Sleet

Overhanging prec.

Clear air echo

Statistics of VPR from March 2001 to February 2002 (234 908 profiles)

Page 20: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

Precipitation top height Mar 2001 – Feb 2002

0

5

10

15

20

25

0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000

Height (m)

%

Page 21: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

VPR correction ),(

)0(log10

rhZ

ZS

e

e

Page 22: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

Snow

1(2)

Profile correction for 500

m PsCAPPI

Page 23: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

Rain Profile correction

Page 24: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

Bright band at ground Profile correction

Page 25: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

Climatological profile Profile correction

Page 26: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

Time averaging of the single radar VPR correction

t

httt

t

httcp

t

htttccpp

www

wwCwCC

66

6

)(

))((

h

twt 6

1

Page 27: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

VPR correction in the network

Page 28: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

24 h accumulated precipitation Nov 7, 2002, 14 UTC No VPR correction With VPR correction

Page 29: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

24 h accumulated precipitation Nov 8, 2002, 23 UTC No VPR correction No VPR correction

Page 30: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

24 h accumulated precipitation Dec 21, 2002, 21 UTC No VPR correction VPR correction

Page 31: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

Yearly average VPR correction

Page 32: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

Validation of the VPR correction 1. With rain gauges2. With overlapping radars

Page 33: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

Page 34: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

Validation of VAN VPR correction with ANJ data (distances 130-150 km)

· Only precipitation cases included (dBZ>10 and ANJ profile classified as precipitation).

· Length of validation period 13 months (other radar pairs 2 months, not shown).

· Blue: non-corrected ANJ-VAN (dB)· Red: VPR correction performed for VAN data,

ANJ-(VAN+correction), (dB). Correction applies both measured and climatological VPR at VAN.

· Black: VPR correction performed for VAN data applying only climatological profiles.

Page 35: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

Page 36: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

Page 37: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

Page 38: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

Future development of the VPR correction

· Diagnosis and rejection of OP prior to the VPR correction WP 7.2).

· Improved climatological profile (now overcorrecting).

· Use of freezing level height from HIRLAM model and simulated VPR (at least comparison of measured and NWP profiles).

· More validation, also with gauges.· Fully operational in all FMI products in

2003 even without OP-correction (End User requirement).

Page 39: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

Dissemination of the results

· Operational FMI products, feedback from End Users and other customers

· CARPE DIEM and related EU-projects· Textbook (eds. Meischner et al.)· Peer reviewed papers · AMS Radar Conference· 3rd GPM Workshop· ERAD 2004· BALTEX/CEOP, NORDRAD, OPERA

Page 40: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

Monthly classified VPR´s from Mar 2001 to Feb 2002

Page 41: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

0

5

10

15

20

25

0 1000 2000 3000 4000 5000 6000 7000 8000 9000

Height (m)

%Precipitation top height March 2001 (snow)

Page 42: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

0

5

10

15

20

25

0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000

Height (m)

%

Precipitation top height July 2001 (rain)

Page 43: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

0

1

2

3

4

5

6

7

8

92

00

40

0

60

0

80

0

10

00

12

00

14

00

16

00

18

00

20

00

22

00

24

00

26

00

28

00

30

00

32

00

34

00

36

00

38

00

40

00

Height (m)

Fra

cti

on

(%

)

Bright band height Mar 2001 – Feb 2002

Page 44: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

0

2

4

6

8

10

12

14

16

18

20

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30

Amplitude (dBZ)

Fra

cti

on

(%

)

Bright band amplitude Mar 2001 – Feb 2002

Page 45: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

Snow and clutter Profile correction

Page 46: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

Rain Profile correction

Page 47: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

Rain Profile correction

Page 48: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

Rain Profile correction (no

cutter)

Page 49: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

Profile correction (no

extrapol.)

Bright band at ground

Page 50: CARPE DIEM FMI (Partner 5) progress report

04/20/23 FINNISH METEOROLOGICAL INSTITUTE

1(2)

Magnitude of the VPR correction at various rangesMarch 2001 – February 2002

0

10

20

30

40

50

60-3

0...

-25

-25

..-2

0

-20

..-1

5

-15

...-1

0

-10

...-5

-5...

-0

0...

5

5...

10

10

...1

5

15

...2

0

20

...2

5

25

...3

0

> 3

0

Correction (dB)

%

50 km100 km150 km250 km


Recommended