CARROLL STREET Project Development & Environment Study From John Young Parkway to Michigan Avenue P DE & Issue #2, August 2015 Carroll Street Project Development and Environment (PD&E) Study Continues Meeting Purpose The purpose of the Alternatives Public Information Meeting is to obtain input from the public for the development of the alternatives for Carroll Street. The alternatives include the “no-build” alternative, Alternative 1 and Alternative 2. Alternative 1 includes adding two through lanes and installing a median. Alternative 2 includes adding two through lanes and keeping (or installing) a center turn lane. Both Alternatives 1 and 2 will require additional right-of-way. The impacts of widening each alterna- tive to the north or to the south are being evaluated. The PD&E Study began in December 2014. A Public Kickoff Meeting was held on February 26, 2015. A Public Hearing is currently scheduled for the spring of 2016. Osceola County is conducting a Project Development and Environment (PD&E) Study for Carroll Street from John Young Parkway to Michigan Avenue in Osceola County. The PD&E Study involves developing and evaluating alternatives to widen the existing roadway and possibly adding a median. A no-build alternative is also being considered. Upcoming Public Meeting The Alternatives Public Information Meeting, scheduled for September 24, 2015, will have an open house format starting at 5:30 p.m. with a formal presentation at 6:00 pm. Team members will be available to answer questions one-on-one at any time during the informal open house from 5:30 p.m. to 7:00 p.m. Members of the public may submit written comments at the meeting or by contacting Ms. Joedel Zaballero (contact information on reverse side). She may also be contacted by persons with disabilities who require special accommodations under the Americans with Disabilities Act or persons who require translation services (free of charge) at least seven (7) days prior to the Alternatives Public information Meeting. Thursday, September 24, 2015, 5:30 pm to 7:00 pm Formal Presentation at 6:00 pm Osceola County Administrative Building Commission Chambers (4th Floor) 1 Courthouse Square Kissimmee, Florida 34741 To receive your input for the development of alternatives for improving Carroll Street. Your input is encouraged both at the public meeting as well as through the project website at www.ImproveCarrollStreet.com. WE NEED YOUR INPUT! At a Public Alternatives Meeting for Carroll Street When: Where: Why: Emmet St Main St Broadway Ave John Young Pkwy 192 441 Meeting Location Up-to-date information on the status of the project including information on upcoming public meetings is available at www.ImproveCarrollStreet.com Begin Study Kickoff Meeting Evaluation of Public Input Develop Alternatives Alternatives Public Meeting Preferred Alternative Public Hearing Recommended Alternative Study Complete 2014 2015 2016 ACTIVITY
Transcript

CARROLL STREETProject Development & Environment StudyFrom John Young Pa rkway t o M i ch i gan AvenuePD E&

Issue #2, August 2015

Carrol l Street Project Developmentand Environment (PD&E) Study Cont inues

Meet ing Purpose

The purpose of the Alternatives Public Information Meeting is to obtain input from the public for the development of the alternatives for Carroll Street. The alternatives include the “no-build” alternative, Alternative 1 and Alternative 2. Alternative 1 includes adding two through lanes and installing a median. Alternative 2 includes adding two through lanes and keeping (or installing) a center turn lane. Both Alternatives 1 and 2 will require additional right-of-way. The impacts of widening each alterna-tive to the north or to the south are being evaluated.

The PD&E Study began in December 2014. A Public Kickoff Meeting was held on February 26, 2015. A Public Hearing is currently scheduled for the spring of 2016.

Osceola County is conducting a Project Development and Environment (PD&E) Study for Carroll Street from John Young Parkway to Michigan Avenue in Osceola County. The PD&E Study involves developing and evaluating alternatives to widen the existing roadway and possibly adding a median. A no-build alternative is also being considered.

Upcoming Publ ic Meet ing

The Alternatives Public Information Meeting, scheduled for September 24, 2015, will have an open house format starting at 5:30 p.m. with a formal presentation at 6:00 pm. Team members will be available to answer questions one-on-one at any time during the informal open house from 5:30 p.m. to 7:00 p.m. Members of the public may submit written comments at the meeting or by contacting Ms. Joedel Zaballero (contact information on reverse side). She may also be contacted by persons with disabilities who require special accommodations under the Americans with Disabilities Act or persons who require translation services (free of charge) at least seven (7) days prior to the Alternatives Public information Meeting.

Thursday, September 24, 2015,5:30 pm to 7:00 pmFormal Presentation at 6:00 pm

Osceola County Administrative BuildingCommission Chambers (4th Floor)1 Courthouse SquareKissimmee, Florida 34741

To receive your input for the development of alternatives for improving Carroll Street.

Your input is encouraged both at the public meeting as well as through the project website at

www.ImproveCarrollStreet.com.

WE NEED YOUR INPUT!At a Public Alternatives Meeting for Carroll Street

When:

Where:

Why:

Emmet St

Mai

n St

Broa

dway

Ave

John

You

ng P

kwy

192

441

MeetingLocation

Up-to-date information on the status of the project including information on upcoming public meetingsis available at www.ImproveCarrollStreet.com

Begin Study

Kickoff Meeting

Evaluation of Public Input

Develop Alternatives

Alternatives Public Meeting

Preferred Alternative

Public Hearing

Recommended Alternative

Study Complete

2014 2015 2016ACTIVITY

E Alternat ive 1 - 4 Lanes with Grass Median

Alternat ive 2 - 4 Lanes with Paved Center Turn Lane

Contact Informat ion

If you have any questions, need more information or would like for us to speak at your next community group or homeowner’s association meeting, please contact:

E Carroll St

Mic

higa

n Av

e

Wel

ls A

ve

Bay

Ave

Flor

ida

Ave

Carlton St

Raleigh St

Beckley St

E Fletcher St

Oran

ge B

loss

om T

rail

E Martin St

Whitney St

E Duncan Ave

W Jackson St

N Horseshoe Bay Dr

Home St

Joelson RdWoodland Creek Blvd

Sawdust Trail

Bam St

W Carroll St

W Tropicana Ct

Country Blvd

Reag

an L

n

Sam

ple

St

Lehi

gh A

veLe

high

Ave

John

You

ng P

kwy

Libe

rty

Blvd

Milt

on A

ve

N Ce

ntra

l Ave

Trop

ical

Lak

e Dr

Mar

tina

Ave

Cora

l Ave

Ranc

ho D

r

Beau

mon

t Ave

Hig

hlan

d Av

e

Mia

mi T

erra

ce

Gree

n M

eado

wCi

rcle

Texa

s Av

e

New

com

be L

n

Ceda

r AV

e

441

Begin Study

End Study

Ms. Joedel Zaballero, P.E., PTOEOsceola County Project ManagerOsceola County Public Works Department1 Courthouse Square, Suite 3100Kissimmee, FL 34741Phone: 407-742-0623Email: [email protected]

Mr. Clif Tate, P.E.Consultant Project ManagerKimley-Horn and Associates Inc.3660 Maguire Boulevard, Suite 200Orlando, FL 32803Phone: 407-898-1511Email: [email protected]

Up-to-date information on the status of the project including information on upcoming public meetingsis available at www.ImproveCarrollStreet.com

5’11’10’

ConcreteSidewalk

Conc.Sdwk.

TravelLane

11’

TravelLane

11’

TravelLane

11’

TravelLane

19.5’

Median

CL

92.5’ Right-of-Way

5’11’10’

ConcreteSidewalk

TravelLane

11’ 11’

TravelLane

11’

TravelLane

11’

TravelLane

Conc.Sdwk.

CL

Center TurnLane

84’ Right-of-Way

(Existing Right of Way Varies from 50 to 75 feet)

(Existing Right of Way Varies from 50 to 75 feet)


Recommended