CARSON CITY FREEWAY PHASE 2B-1
PHASE 2PHASE 2A
PHASE 2B
CARSON CITY FREEWAY – PHASE 2
PHASE 2A FUN RUN
PHASE 2B-1 MAJOR FEATURESCLEARVIEW TO FAIRVIEW DRIVE
Clearview Drive BridgeClearview Drive Bridge Koontz Lane BridgeKoontz Lane Bridge Resurfacing of Edmonds Drive IntersectionResurfacing of Edmonds Drive Intersection Clearview DriveClearview Drive Koontz LaneKoontz Lane Closure of Valley View DriveClosure of Valley View Drive Closure of Colorado Street Closure of Colorado Street Construct Cul-De-SacConstruct Cul-De-Sac Drainage FacilitiesDrainage Facilities
Concrete Lined Channels and Box Culverts Concrete Lined Channels and Box Culverts Local Street DrainageLocal Street Drainage Landscaping – Topsoil and Hydroseeding of Disturbed AreasLandscaping – Topsoil and Hydroseeding of Disturbed Areas
Utility RelocationsUtility Relocations Carson City Water LinesCarson City Water Lines Southwest Gas, NV Energy, AT & T and Charter CableSouthwest Gas, NV Energy, AT & T and Charter Cable
Estimated Construction Cost $15 MillionEstimated Construction Cost $15 Million
R/W
DRAINAGE CHANNEL
VALLEY VIEW DRIVE
KOONTZ LANE
S. EDMONDS DRIVE
CLEARVIEW DRIVE
LINE DRIVER/W
S. EDMONDS DRIVE
COLORADO STREET
FAIRVIEW DRIVE INTERCHANGE
DRAINAGE CHANNELR/W
R/W
CARSON CANYON AT KOONTZ LANE BRIDGE
LANDSCAPING – CARSON CITY ENHANCEMENTSLANDSCAPING – CARSON CITY ENHANCEMENTS
CARSON CITY FREEWAY – PHASE 2
Typical Section with ChannelEXISTING GROUND DRAINAGE CHANNEL
Native Landscaping Treatments
PHASE 2B-1 UTILITIES UTILITY RELOCATIONS
CLEARVIEW DRIVE
EDMONDS DRIVE
LINE DRIVE
DRAINAGE CHANNEL
TEMP. WATER LINE
TEMP. AT & T
AT & T
NV ENERGY
G
W
R/W
R/W
KOONTZ LANEVALLEY VIEW DRIVE
DRAINAGE CHANNEL
S. EDMONDS DRIVE R/W
TEMP. WATERTEMP. GAS
W GNV ENERGY
R/W
COLORADO STREET CLOSED
VALLEY VIEW DRIVE CLOSED
FAIRVIEW DRIVE
FREEWAY CORRIDOR
US-395