  • 1DFI 37th Annual Conference

    Cased Auger Piles (CAP): An Effective Piling Solution

    Federico PagliacciSoilmec S.p.A. Cesena Italy

    Cased Auger Piles (CAP): an effective piling solution

    Continuous Flight Auger piles (CFA) are performed by means ofa continuous flight auger assembled on a central hollow pipe.

    Upon completion of the boring operation, the auger is extractedwhile the concrete is poured throughout the internal hollowpipe.

    The steel reinforcement cage is finally lowered into the freshconcrete.

    Piles with a maximum diameter of 55 in to a maximum depth of108 ft can be performed.

  • 2Cased Auger Piles (CAP): an effective piling solution

    CFA advantages: The method can be utilised in a wide range of cohesive and

    cohesionless soils, with or without the presence of a water-bearing stratum and without bentonite fluid as wall support.

    The technology does not produce shocks, vibrations, noise, thus allowing to work in urban areas.

    The minimum required equipment (the rig plus the concrete pump) allows to minimise the job site installation plant and to operate in very restricted areas.

    An industrial production of 950 1300 ft/day

    CFA limitations:Difficulty of penetrating hard layers and cross strata with cobblesand boulders.Difficulty of maintaining the required verticality in coarsematerials with cobbles.

    Cased Auger Piles (CAP): an effective piling solution

    Auger rotary

    Casing rotary

    Cased Auger Piles (CAP) are performed by means of acontinuous flight auger housed inside a steel casing.

    Auger and Casing are driven by two independent rotaries. Piles with a maximum diameter of 47 in to a maximum depth of

    88 ft can be performed. The maximum cased depth is of 69 ft.

  • 3Cased Auger Piles (CAP): an effective piling solution

    Cased Auger Piles (CAP) have been first developed to constructsecant piles to form a continuous, watertight diaphragm wall.

    Construction sequence: primary and secondary piles withproper overlap.

    Different possible option for steel reinforcement solutions.

    Cased Auger Piles (CAP): an effective piling solution

    The excavated material is loaded onto the flight to betransported from the top of the casing to the base of the rigthrough a Spoil Chute.

  • 4Cased Auger Piles (CAP): an effective piling solution

    Type of casing, auger tips and type of teeth depend on soilconditions and soil abrasiveness.

    Drill tools available to drill into rock with UCS up to 12,000 psi.

    Guide Walls are of paramount importance to ensure the properalignment of piles and to guide the casing at the surface.

    Cased Auger Piles (CAP): an effective piling solution

    Equipment

    SR-70 SR-80 SR-90 SR-100

    Max pile depth 77.1 ft 77.1 ft 82 ft 91.9 ft

    Max caseddepth

    57.5 ft 57.5 ft 62.3 ft 68.9 ft

    Max diameter 31 in 31 in 39 in 47 in

    Operative weight

    196,430 lb 201,712 lb 255,734 lb 330,690 lb

  • 5Cased Auger Piles (CAP): an effective piling solution

    Concrete quality

    Concrete aggregate: fine gravel of max size 0,7 in. Cement content: 20 28 lb/ft3. Slump: greater than 9 in (cages length up to 60 ft). Pie diameter: greater than 25 in (cages length up to 100 ft).

    S5 Concrete

    Slump > 9 inSSC Concrete

    Pie diameter >25 in

    Cased Auger Piles (CAP): an effective piling solution

    Cages have to be properly manufacturedand well assembled (preferably welded).

    The external dimension has to bemaintained smaller than for standardbored piles, to grant a sufficient cover.

    A conic shape at the bottom of the steelcage is obtained by adopting a bottom ringsmaller in size than the standard ones.

  • 6Cased Auger Piles (CAP): an effective piling solution

    A computerised system allows, through a touch screen monitorinto the operators cab, to monitor and download all the CAPprocess parameters, both during drilling and concreting phases.

    Drilling phase:The rotaries speed/torque,The auger and casing pull-down force,The auger and casing tips drilling depth.

    Extraction phase:Concrete pressure and delivery.The auger and casing pull-up force.The auger and casing tips elevation.

    Cased Auger Piles (CAP): an effective piling solution

    Railway network (Palermo Italy) Modernization of the railway network in the Palermo area. Over 19 miles of railroad extension 12 miles crossing urban

    areas. 17 stations and 22 stops. 76,000 ft of secant piles.

  • 7Cased Auger Piles (CAP): an effective piling solution

    Railway network (Palermo Italy) Drilling was carried out at a depth of 82 ft, pile diameter was

    36 in and 3,5 in was the overlapping. A deviation from verticality of less than 0,5% had to be

    guaranteed. An average production of 3,5 piles/shift has been achieved. The most powerful rig on site had an average production of 4,3

    piles/shift. Industrial production rate: 287 353 ft/day

    Cased Auger Piles (CAP): an effective piling solution

    Railway network (Palermo Italy)

  • 8Cased Auger Piles (CAP): an effective piling solution

    Railway network (Palermo Italy) Several underground passageways have been constructed, as

    part of the citys General Plan to smooth both road and railtraffic.

    Cased Auger Piles (CAP): an effective piling solution

    Merano Ring Road Project Italy

    Merano Municipality planned in 2010 the construction of a 2,5miles long underground ring road to solve the problem of thetransit of heavy traffic through the city.

    A cut and cover tunnel was constructed in the west portion; atunnel boring machine was adopted for the east portion of thetunnel, after the railway station.

    The tunnel is 35 ft large and 16 ft high.

    Section 2 39 ft diameter tunnel

    Section 1 35 ft large tunnel

    1

    2

  • 9Cased Auger Piles (CAP): an effective piling solution

    Merano Ring Road Project Italy

    24 in diameter pile: excavation 70 min; concreting and steelcage 20 min.

    47 in diameter pile: excavation 120 min; concreting and steelcage 30 min.

    Industrial production rate: 259 430 ft/day

    Cased Auger Piles (CAP): an effective piling solution

    Merano Ring Road Project Italy

  • 10

    Cased Auger Piles (CAP): an effective piling solution

    Merano Ring Road Project Italy

    Cut & Cover Tunnel

    Railway station junction and exit

    Cased Auger Piles (CAP): an effective piling solution

    ConclusionCAP advantages

    CAP does not induce disturbances toadjacent structures and it prevents soildecompression.

    CAP does not induce vibrations, shocks,noise

    CAP grants verticality in the range of 0,5%.

    CAP limitations

    CAP needs a more expansive concrete. CAP steel reinforcement requires more

    attention in assembling and lowering.

  • 11

    Thank you.

    Federico PagliacciSoilmec S.p.A. Cesena Italy

    Cased Auger Piles (CAP): an effective piling solution