CASE STUDY #1 Packer Isolation Test
Transcript
Page 1: CASE STUDY #1 Packer Isolation Test - Nelgar Services · 2009-11-13 · Well Location H2S Content Date Pass or Fail Casing Pressure (kPa) = 3721 Tubing Pressure (kPa) = Well Type

CASE STUDY #1

Packer Isolation Test

Page 2: CASE STUDY #1 Packer Isolation Test - Nelgar Services · 2009-11-13 · Well Location H2S Content Date Pass or Fail Casing Pressure (kPa) = 3721 Tubing Pressure (kPa) = Well Type

Company Pressure Truck CompanyField Name Logger serial # Well Location H2S ContentDate Pass or Fail

Casing Pressure (kPa) = 3721 Tubing Pressure (kPa) = Well Type (see note A) =

Bled pressure to 0.0 kPa and recovered 79.0 litres ofLet well stabilize at 0.0 kPa for 15 minutes. (minimum of 5 minutes)Started a 24 hour pressure build up on xxxx-08-27 at

0 kPa.Finished a 24 hour pressure build up on xxxx-08-28 at

24.0

Comments

Please Note: All class 1 & 2 wells must be pressure tested to 1400 kPa EXCEPT class 1A disposal wells which must be pressured up to 7000 kPa.

NOTE A Well Type NOTE B Fluid Recovery Type1. WATER INJECTION/DISPOSAL (OPERATING) 4. H2S > 5% (SHUT-IN SUSPENDED) 1. GAS (SWEET) 4. WATER (FRESH) 8. OTHER (SPECIFY)

2. WATER INJECTION/DISPOSAL (SHUT-IN/SUSPENDED) 5. GAS INJECTION 2. GAS (SOUR) 5. WATER (SALT)

3. H2S > 5% (PRODUCING) 6. OTHER (SPECIFY) 3. OIL 7. INHIBITED WATER

.

P704NILPass

Initial pressure at start of build up was10:13:00 (date & time) (See Graph)

10:54:40 (date & time) (See Graph)

100/00-00-000-00 W0M/00xxxx-08-27

Final Pressure was kPa. (less than 3% is a pass)

diesel

1

PACKER ISOLATION TEST CASE #1Case 1: Casing pressure is greater than 1400 kPa upon arrival

Golden Company Ltd. Pressure Company

952

Black Gold

pstiles
Stamp
Page 3: CASE STUDY #1 Packer Isolation Test - Nelgar Services · 2009-11-13 · Well Location H2S Content Date Pass or Fail Casing Pressure (kPa) = 3721 Tubing Pressure (kPa) = Well Type

0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0 Time (hours)

-100.0

-80.0

-60.0

-40.0

-20.0

0.0

20.0

40.0

60.0

80.0

100.0

Pressure kPa

4.2

6.1

7.9

9.8

11.7

13.6

15.4

17.3

19.2

21.0

22.9

Temperature C

Company:Field:

Surface Location:Downhole Location:

Start Date:End Date:

Logger ID:

Golden Company Ltd.PIT - BU00-00-000-00 W0M100/00-00-000-00 W0M/00

P704

xxxx-08-27 10:13:00xxxx-08-28 10:54:40

Pressure Plot

JTang
Text Box
Casing pressure was 3721 kPa upon arrival. Bled pressure to 0.0 kPa and recovered 79 litres of diesel.
JTang
Text Box
Started 24 hours pressure buildup on xxxx-08-27 at 10:13:00. Initial pressure was at 0.0 kPa.
JTang
Text Box
Finished 24 hour pressure buildup on xxxx-08-28 at 10:54:40. Final pressure was 24 kPa.
pstiles
Stamp
Page 4: CASE STUDY #1 Packer Isolation Test - Nelgar Services · 2009-11-13 · Well Location H2S Content Date Pass or Fail Casing Pressure (kPa) = 3721 Tubing Pressure (kPa) = Well Type

CASE STUDY #2

Packer Isolation Test

Page 5: CASE STUDY #1 Packer Isolation Test - Nelgar Services · 2009-11-13 · Well Location H2S Content Date Pass or Fail Casing Pressure (kPa) = 3721 Tubing Pressure (kPa) = Well Type

Company Pressure Truck CompanyField Name Logger serial # & FilenameWell Location H2S ContentDate Pass or Fail

Casing Pressure (kPa) = 51 Tubing Pressure (kPa) = Well Type (see note A) =

Bled Casing Pressure to 0.0 kPa in 0.5 minutes.Recovered 0.0 litres of fluid.

5.0 litres of 2509.0 kPa.24.0 minutes. (minimum 15 minutes)

Started 15 minutes of pressure monitoring at at 2003.0 kPa. (See Graph #1)Finished 15 minutes of pressure monitoring at at 1969.0 kPa. Change in pressure was 34.0 kPa. (less than 3% is a pass)Bled pressure to 0.0 kPa and recovered 2 litres of minutes.

15 minutes (minimum 5 minutes)Started a 24 hour build up on xxxx-07-20 at

7.0 kPa.Finished a 24 hour build up on xxxx-07-21 at

13.0

Comments

Please Note: All class 1 & 2 wells must be pressure tested to 1400 kPa EXCEPT class 1A disposal wells which must be pressured up to 7000 kPa.

NOTE A Well Type NOTE B Fluid Recovery Type1. WATER INJECTION/DISPOSAL (OPERATING) 4. H2S > 5% (SHUT-IN SUSPENDED) 1. GAS (SWEET) 4. WATER (FRESH) 8. OTHER (SPECIFY)

2. WATER INJECTION/DISPOSAL (SHUT-IN/SUSPENDED) 5. GAS INJECTION 2. GAS (SOUR) 5. WATER (SALT)

3. H2S > 5% (PRODUCING) 6. OTHER (SPECIFY) 3. OIL 7. INHIBITED WATER

fluid pressuring annulus up to

P107

diesel

Black Gold100/00-00-000-00 W0M/00xxxx-07-20

1

PACKER ISOLATION TEST CASE #2Case 2: Casing pressure is between 1 and 1400 kPa upon arrival

Golden Company Ltd Pressure Company

13:54:00

-5.7

Final Pressure was kPa. (less than 3% is a pass)

14:09:00 hrs:min:sec

14:28:10

diesel fluid in 5

Injected

NILPass

Initial pressure at start of build up was

Let well stabilize for

14:28:10 (date & time) (See Graph#2)Let well stabilize at 0.0 kPa for

(date & time)

hrs:min:sec

pstiles
Stamp
Page 6: CASE STUDY #1 Packer Isolation Test - Nelgar Services · 2009-11-13 · Well Location H2S Content Date Pass or Fail Casing Pressure (kPa) = 3721 Tubing Pressure (kPa) = Well Type

0.00 0.08 0.16 0.25 0.33 0.41 0.50 0.58 0.66 0.74 0.83 Time (hours)

-100.0

170.0

440.0

710.0

980.0

1250.0

1520.0

1790.0

2060.0

2330.0

2600.0

Pressure kPa

5.2

5.6

5.9

6.2

6.6

6.9

7.2

7.6

7.9

8.2

8.6

Temperature C

Company:Field:

Surface Location:Downhole Location:

Start Date:End Date:

Logger ID:

Golden Company Ltd.Packer Isolation Test (graph #1)00-00-000-00 W0M100/00-00-000-00 W0M/00

P107

xxxx-07-20 13:22:30xxxx-07-20 14:12:00

Pressure Plot

JTang
Text Box
Casing pressure was at 51 kPa upon arrival. Bled pressure to 0.0 kPa and no fluid was recovered
JTang
Line
JTang
Text Box
Pressured up casing to 2509 kPa and used 5.0 litres of diesel fluid.
JTang
Line
JTang
Text Box
Let well stabilize for 24 minutes.
JTang
Line
JTang
Text Box
Finished 15 minutes pressure monitoring at 14:09:00. Final pressure was at 1969 kPa. Change in pressure was 34 kPa.
JTang
Line
JTang
Text Box
Started 15 minutes pressure monitoring at 13:54:00 with pressure at 2003 kPa.
JTang
Line
JTang
Text Box
Bled pressure to 0.0 kPa and recovered 2.0 litres of diesel fluid.
JTang
Line
pstiles
Stamp
Page 7: CASE STUDY #1 Packer Isolation Test - Nelgar Services · 2009-11-13 · Well Location H2S Content Date Pass or Fail Casing Pressure (kPa) = 3721 Tubing Pressure (kPa) = Well Type

0.7 3.2 5.7 8.2 10.6 13.1 15.6 18.1 20.5 23.0 25.5 Time (hours)

-100.0

-80.0

-60.0

-40.0

-20.0

0.0

20.0

40.0

60.0

80.0

100.0

Pressure kPa

3.0

4.3

5.5

6.7

8.0

9.2

10.4

11.6

12.9

14.1

15.3

Temperature C

Company:Field:

Surface Location:Downhole Location:

Start Date:End Date:

Logger ID:

Golden Company Ltd.Packer Isolation Test (graph #2)00-00-000-00 W0M100/00-00-000-00 W0M/00

P107

xxxx-07-20 14:28:10xxxx-07-21 14:52:30

Pressure Plot

JTang
Text Box
Started 24 hour pressure buildup on xxxx-07-20 at 14:28:10. Initial pressure was at 7 kPa.
JTang
Line
JTang
Text Box
Finished 24 hour pressure buildup on xxxx-07-21 at 14:28:10. Final pressure was at 13 kPa.
JTang
Line
pstiles
Stamp
Page 8: CASE STUDY #1 Packer Isolation Test - Nelgar Services · 2009-11-13 · Well Location H2S Content Date Pass or Fail Casing Pressure (kPa) = 3721 Tubing Pressure (kPa) = Well Type

CASE STUDY #3

Packer Isolation Test

Page 9: CASE STUDY #1 Packer Isolation Test - Nelgar Services · 2009-11-13 · Well Location H2S Content Date Pass or Fail Casing Pressure (kPa) = 3721 Tubing Pressure (kPa) = Well Type

Company Pressure Truck CompanyField Name Logger serial # & FilenameWell Location H2S ContentDate Pass or Fail

Casing Pressure (kPa) = -2 Tubing Pressure (kPa) = Well Type (see note A) =

Injected litres of mixture pressuring annulus up to 1897 kPa.15.0 minutes. (minimum 15 minutes)

Started 15 minutes of pressure monitoring at at 1870 kPa. (See Graph)Finished 15 minutes of pressure monitoring at at 1877 kPa. Change in pressure was 7 kPa. (less than 3% in a pass)Bled pressure to 0.0 kPa and recovered 45.0 litres of mixture.

Comments

Please Note: All class 1 & 2 wells must be pressure tested to 1400 kPa EXCEPT class 1A disposal wells which must be pressured up to 7000 kPa.

NOTE A Well Type NOTE B Fluid Recovery Type1. WATER INJECTION/DISPOSAL (OPERATING) 4. H2S > 5% (SHUT-IN SUSPENDED) 1. GAS (SWEET) 4. WATER (FRESH) 8. OTHER (SPECIFY)

2. WATER INJECTION/DISPOSAL (SHUT-IN/SUSPENDED) 5. GAS INJECTION 2. GAS (SOUR) 5. WATER (SALT)

3. H2S > 5% (PRODUCING) 6. OTHER (SPECIFY) 3. OIL 7. INHIBITED WATER

Black Gold100/00-00-000-00 W0M/00 0

Pass

Let well stabilize for

xxxx-06-24

1

hrs:min:sechrs:min:sec

14:20:00

P642

Diese & Inhibited water

PACKER ISOLATION TEST CASE #3Case 3: Casing pressure 0 kPa upon arrival

Golden Company Ltd. Pressure Company

340.0 Diesel/Inhibited Water

14:05:00

-77

pstiles
Stamp
Page 10: CASE STUDY #1 Packer Isolation Test - Nelgar Services · 2009-11-13 · Well Location H2S Content Date Pass or Fail Casing Pressure (kPa) = 3721 Tubing Pressure (kPa) = Well Type

0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 Time (hours)

-30.0

193.0

416.0

639.0

862.0

1085.0

1308.0

1531.0

1754.0

1977.0

2200.0

Pressure kPa

18.1

18.2

18.3

18.4

18.5

18.7

18.8

18.9

19.0

19.1

19.2

Temperature C

Company:Field:

Surface Location:Downhole Location:

Start Date:End Date:

Logger ID:

Golden Company Ltd.PIT-Pressure Monitoring00-00-000-00 W0M100/00-00-000-00 W0M/00

P642

xxxx-06-24 13:39:45xxxx-06-24 14:39:05

Casing Pressure Plot

PJacobi
PJacobi
PJacobi
PJacobi
PJacobi
jtang
Text Box
Casing pressure was -2 kPa upon arrival.
jtang
Line
jtang
Text Box
Pressured up casing to 1897 kPa and used 340 litres of diesel and inhibited water.
jtang
Text Box
Let well stabilize for 15 minutes.
jtang
Text Box
Started 15 minutes pressure monitoring at 14:05:00 at 1870 kPa.
jtang
Text Box
Finished 15 minutes pressure monitoring at 14:20:00 at 1877 kPa. Change in pressure was 7 kPa.
jtang
Text Box
Bled pressure to 0 kPa and recovered 45 litres of diesel and inhibited water.
pstiles
Stamp

Recommended