+ All Categories
Home > Documents > Case Study

Case Study

Date post: 03-Feb-2016
Category:
Upload: josh
View: 35 times
Download: 0 times
Share this document with a friend
Description:
Case Study. Integrated Metadata Driven Statistical Data Management System (IMD SDMS) CSB of Latvia [email protected] METIS 2010. Outline. The main steps for IMD SDMS creation IMD SDMS fundamental elements Costs & benefits IMD SDMS implementation strategy - PowerPoint PPT Presentation
Popular Tags:
20
1 Case Study Integrated Metadata Driven Statistical Data Management System (IMD SDMS) CSB of Latvia [email protected] METIS 2010
Transcript
Page 1: Case Study

1

Case Study

Integrated Metadata Driven Statistical Data Management System (IMD SDMS)

CSB of Latvia

[email protected] 2010

Page 2: Case Study

2

Outline

• The main steps for IMD SDMS creation• IMD SDMS fundamental elements• Costs & benefits• IMD SDMS implementation strategy• GSBPM versus SBPM of CSB• Current situation and further developments• The main lessons learned• Proposal for GSBPM

Page 3: Case Study

3

The main steps for IMD SDMS creation (1)

• Data and metadata collection (1999)• Thoughtful analysis of data and metadata flows

(1999)• To set the requirements to the system (1997-

1999)

Page 4: Case Study

4

The main steps for IMD SDMS creation (2)

the main requirements to IMD SDMS were:• covers full cycle of statistical data processing; • uses process oriented approach;• IMD SDMS must be: - standardized; - integrated; - meta data-driven; - allows automated generation of user application forms (incl. web); - centralized; - has a modular structure; - transparent;

Page 5: Case Study

5

IMD SDMS fundamental elements (1)

• Core Meta data base module handles all processes of IMD SDMS

• Structure of Micro data [Bo Sundgren model] Objects characteristics:

Co = O(t).V(t) where: O - is an object type; V - is a variable; t - is a time parameter. Every results of

observations is a value of variable (data element) – Co

• Two types of tables• Structure of Macro data

Page 6: Case Study

6

IMD SDMS fundamental elements (2)

• Structure of Micro data (an example)

Page 7: Case Study

7

IMD SDMS fundamental elements (3)

• Two types of tables: - fixed table (data matrix); - open table (data matrix with various number of rows or columns);

Questionnaire consists of chapters and chapters consist of tables.

Page 8: Case Study

8

IMD SDMS fundamental elements (4)

• Structure of Macro data The estimations are made on the basis of a set of Micro data. Statistical

characteristics:

Cs = O(t).V(t).f

where: O and V - is an object characteristics; t - is a time parameter, f – is an aggregation function (sum, count, average, etc) summarizing the true values of V(t) for the objects in O(t).

Page 9: Case Study

9

Costs & benefits

• Standardization of statistical data production processes

• The basis for the CSB regional restructuring (2003-2004): 5 Data Collection and processing centres replaced previously existing 26 Statistical Regional offices and city Riga office;

• Decreasing of statisticians from 180 to 115

Page 10: Case Study

10

IMD SDMS implementation strategy (1)

• Step-wise approach • 1997 – 1999 CSB and

PricewaterhouseCoopers experts were prepared General Technical Requirements for the project “Modernisation of CSB – Data Management System”

Page 11: Case Study

11

IMD SDMS implementation strategy (2)

• The main requirement: Meta data should be used as the key element in statistical data processing

• Additional requirements: - Increase efficiency of the production of statistical information; - Avoid hard code programming via standardisation of procedures and use of Meta data within the statistical data processing; - Increase the quality of the information produced; - Improve processes of statistical data analysis; - Modernise and increase the quality of data dissemination;

Page 12: Case Study

12

GSBPM versus SBPM of CSB

GSBPM versus SBPM of CSB (draft version)

~51 %

Page 13: Case Study

13

ADS

Current situation (1)

Page 14: Case Study

14

MACRO DATA

RAW DATA

STATISTICAL REGISTRIES

USER ADMINISTRATIONOLAP

Metadata description

and analysys subsystem

Data entry and

validation subsystem

WEB data entry

subsystem

Registries operational subsystem

Data agregation

and retrievalsubsystem

Missed data Imputation Subsystem

Import export facylities

Data Analysis

subsystem

Data dissemination

subsystemUser administration subsystem

GIS subsystem

Data ACTIVE ArchivingSubsystem

META DATA

ARCHIVED

ACTIVE

REFERENCE METADATA

MICRO DATA

Data archivingfor State archivesubsystem

Current situation (2)

Page 15: Case Study

15

Further developments

• Since 2009 a project has been launched for the IMD SDMS to cover Social statistics domain.

Starting from: - Population Census; - Agricultural Census; - Labour Force Survey; - EU-SILC …

Page 16: Case Study

16

The main lessons learned (1)

• Design of the new information system should be based on the results of deep analysis of statistical surveys:

- statistical questionnaires and variables; - statistical processes and data flows;

• Statistical data processes and “Variables and questionnaires system” must be harmonized and standardized before creation of the new system;

Page 17: Case Study

17

The main lessons learned (2)

• The system should provide a full cycle of statistical data processing;

• The system should be: - standardized; - integrated; - meta data-driven; - allows automated generation of user application forms (incl. web); - centralized; - has a modular structure; - transparent;

Page 18: Case Study

18

The main lessons learned (3)

• Motivation of the statisticians to move (from stove-pipe to process oriented) to the new data processing environment is essential;

• To establish Metadata group; • Data electronic archiving reduces human

resources, expenses of CSB for deposition in the State Archives, time of archiving and physical amount of archiving information (In 2000, Population Census - 21 m3 = 4 DVD)

Page 19: Case Study

19

Proposal for GSBPM (1)

• Extension of phase 4 – Collect, between sub-processes 4.1 and 4.2

• Extension, between sub-processes 4.3 and 4.4 Why ?: - statistician’s work with respondents and with the list of respondents is a

very difficult, heavy process and time consuming process (…; sending of letters to respondents; conduction of the respondents lists; creation of the sample Matrix; clarifications; response control; reminding process; …);

- sometimes statistician’s work is pressed for time (…Business tendencies survey…)

Page 20: Case Study

20

Proposal for GSBPM (2)Survey’s integration

Sample Matrix

List of indicators

From analytic’s view

From statistician’s view:

-amount of work

-respondents burden

-statisticians burden

-response control

- etc.From mathematician’s view…


Recommended