+ All Categories
Home > Documents > Case Study - Amazon Web Services · 2018-04-30 · Implementing the Eco Management and Audit Scheme...

Case Study - Amazon Web Services · 2018-04-30 · Implementing the Eco Management and Audit Scheme...

Date post: 21-Jul-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
2
Implementing the Eco Management and Audit Scheme (EMAS), Forest Green Rovers have been named by the world governing body FIFA as “football’s greenest club”, with an organic pitch, solar panels and charging points for electric cars, among other things. The works carried out had to be in line with their sustainable culture. No other football club in the world has put the environment at the heart of what it does, embedded it into its DNA. Forest Green Rovers are the only club in the world to have EMAS accreditation – the gold standard of environmental management – and are the first and only vegan football club in the world. Following two successive promotions, Forest Green Rovers Football Club - based in Nailsworth, Gloucestershire - is competing in the English Football League for the first time in their 128-year history. Due to the FA league’s security and safety regulations, a new Control Room and IP CCTV system had to be installed at the Club’s grounds, The New Lawn Stadium, in advance of the upcoming season. call us for your bespoke solution: (0)2920 641 509 Vertical Market: Entertainment The Project: The installer: The system: - Bespoke system design - Post sales commissioning More information about all our products as well as techincal datasheets can be found at: www.oprema.co.uk Case Study: Find out about how this system helped Gloucestershire Police catch two offenders at a FGR game at: www.stroudnewsandjournal.co.uk
Transcript
Page 1: Case Study - Amazon Web Services · 2018-04-30 · Implementing the Eco Management and Audit Scheme (EMAS), Forest Green Rovers . have been named by the world governing body FIFA

Implementing the Eco Management and Audit Scheme (EMAS), Forest Green Rovers have been named by the world governing body FIFA as “football’s greenest club”, with an organic pitch, solar panels and charging points for electric cars, among other things. The works carried out had to be in line with their sustainable culture.

No other football club in the world has put the environment at the heart of what it does, embedded it into its DNA. Forest Green Rovers are the only club in the world to have EMAS accreditation – the gold standard of environmental management – and are the first and only vegan football club in the world.

Following two successive promotions, Forest Green Rovers Football Club - based in Nailsworth, Gloucestershire - is competing in the English Football League for the first time in their 128-year history. Due to the FA league’s security and safety regulations, a new Control Room and IP CCTV system had to be installed at the Club’s grounds, The New Lawn Stadium, in advance of the upcoming season.

call us for your bespoke solution: (0)2920 641 509

Vertical Market:

Entertainment

The Project:

The installer:

The system:- Bespoke system design- Post sales commissioning

More information about all our products as well as techincal datasheets can be found at:www.oprema.co.uk

CaseStudy:

Find out about how this system helped Gloucestershire Police catch two offenders at a FGR game at:www.stroudnewsandjournal.co.uk

Page 2: Case Study - Amazon Web Services · 2018-04-30 · Implementing the Eco Management and Audit Scheme (EMAS), Forest Green Rovers . have been named by the world governing body FIFA

The Result

The works were delivered on time and within budget, in a professional and efficient manner, with minimal disruption to the Club’s preparations for the upcoming season. The Control Room has a view of the stadium to satisfy security regulations, which stipulate that fans and stadium occupants have to be visible from the room by security staff.

The Installer

Based in Stonehouse, EESI Group Services is a leading provider of specialist building services, including electrical installations, fire and security systems, air conditioning, heating and ventilation, data cable networking, technical testing and 24/7 support.

Gareth Williams - Sales Director Oprema:

“ For this particular project, it was vital that the recommended solution met with the FA’s security and safety regulations, that it could be installed with minimum disruption to the Club’s busy schedule and that it could operate within the Club’s sustainability policy.”

Cas

eStud

y:The Solution

Working in partnership with installers EESI Group Services Ltd, who were under time pressures to have a solution in place for the pre-season friendlies ahead of the start of the EFL in August, Oprema supplied an IP CCTV system and Control Room which surpasses even the FA’s stringent requirements.

A total of 30 IP cameras were installed in and around the stadium. This number included 27 static and three PTZ (Pan, Tilt, Zoom) cameras which satisfied the FA’s requirements. Specialist lifting equipment to install the CCTV cameras was brought in to avoid damaging the pitch. Given that the Forest Green Rovers players have become the first outside of Europe’s top divisions to be face captured for FIFA 18 – the best-selling football game on the planet – it seems fitting that their supporters and opposition should also see the benefits that face capture brings in terms of safety.

The Control Room - which continues the sustainable ethos of the club and features energy saving LED lights and an energy efficient heat pump air conditioning unit - was fitted with three PCs, two of which are used by CCTV operators during match days and one to provide a CCTV overview on two high level monitors.

call us for your bespoke solution: (0)2920 641 509

Detailed case studies for a number of our bespoke design systems can be found at:www.oprema.co.uk/news

Equipment:

1 x Dahua 64 Channel 4K NVR with 36TB Seagate HDD

9 x Dahua 12MP 4K Static Cameras with 50M IR

3 x Dahua 4MP PTZ Cameras with 100M IR

17 x Dahua 4MP VR IR Dome Cameras

2 x Dahua 4K IR Fish Eye Cameras

4 x Dahua 32” HDMI 24/7 Rated Monitors

Justin McEvoy Senior Technical Engineer, EESI Group Services Ltd

“When working with Oprema on this project, we found them quick to respond and very helpful when we had any questions. Tight timescales were identified due to upcoming pre-season friendlies taking place at the stadium, and Oprema were able to supply what we needed by the required deadlines to ensure that works could be completed without disrupting the team’s training and play schedules. Regular pre-works consultations and great communication between EESI, Oprema and the club’s management allowed for identification of any potential problems prior to the works taking place, which resulting in the smooth delivery of this project.”


Recommended