Case Study for the CWC July 17, 2013
Transcript
Page 1: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Case Study for the CWC

July 17 , 2013

Page 2: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Purpose

NODOS as a case study in public and non-public benefits

Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Page 3: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Caveats:

• Preliminary • Subject to revision

Page 4: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Proposed Water Bond - Requirements

Non Public

Ecosystem

Emergency Response

Recreation

Water Quality

Flood

Page 5: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

NODOS Objectives

Primary Objectives and

Secondary Objectives M&I and Environmental Water Quality

Emergency Response

Recreation

Flexible Generation

Water Supply

Ecosystem

Flood Protection

Page 6: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

NODOS Alternatives Components

• Location • Conveyance • Size • Operations

Page 7: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

NODOS Reservoir Location Alternatives

• Red Bank Reservoir • Newville Reservoir • Colusa Reservoir • Sites Reservoir

Red Bank Project (Dipping Vat Reservoir

and Schoenfield Reservoir)

Newville Reservoir

Colusa Reservoir

Sites Reservoir

Page 8: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Proposed Sites Reservoir Elements

Page 9: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Benefits

How Methods Where

Page 10: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

How: Proposed Reservoir Operations Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Fill Reservoir

Drain Reservoir

SWP

Wildlife Refuges

CVP

Augment Delta Water Quality

Hydropower

Page 11: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

How: Integrated Operations Shasta

Sites Oroville

Folsom

Trinity

Page 12: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Methods: System-Wide Benefits

Hydrology & System Operations

CALSIM II, USRDOM

Water supply impacts, river flows, exports, storage

Salinity (EC, Cl, TDS, Br) and fingerprinting (EC, volume)

Delta Hydrodynamics DSM2-HYDRO

Delta Water Quality DSM2-QUAL

Reservoir/River Temp USRWQM,

Reclamation Temperature

Power LTGEN, PLEXOS

SWP Power, NODOS Power

Economics SWAP,

LCPSIM/SUPEM, LCRBWQM/SBWQM

Delta channel flows, stages, velocities

Reservoir, River temperatures

Fisheries Reclamation

Mortality, SALMOD, WRCLCM (IOS)

Quantification of Economic Benefits

Net Generation, Daily Pump-Back and Benefits

Survival, Potential Production, Population

Page 13: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Methods: Local Benefits

SRH-SIAM

Sediment Loads

SRH-Meander

Point Bar Growth

SRH-2D Local Velocity, Scour, & Stage

SRH-1DV Riparian Vegetation

Survival

RHEM Riparian

Vegetation Growth

Fluvial Geomorphology and Riparian Habitat

Surface Water Quality

USRWQM Daily Sacramento River

Temperature

Other Quantitative and Qualitative

Analyses

CAL2DOM CALSIM II

Monthly storage, flow &

diversion operations

USRDOM Daily storage, Sac River and tributary flow and

diversion operations

Surface Water Resources

Aquatic Biological Resources

WRCLCM (IOS/DPM Model)

Sacramento River Winter Chinook

SALMOD Sacramento River

Fall, Late-Fall, Winter & Spring Chinook

SAC-EFT Sacramento River Chinook salmon, steelhead, green

sturgeon, bank swallow, western pond turtle

Other Quantitative and Qualitative

Analyses

Page 14: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Recreation

• Two potential recreation sites • Potentially improves lake

levels at existing reservoirs

Page 15: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Recreation

Page 16: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Flood Protection

Flood damage reduction in project vicinity (up to 8,600 acres)

Page 17: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Potential Contribution to Hydropower Generation

• Potentially generates up to 125 MW of new hydropower through pump-back facilities

• Could be quickly ramped up or down to complement other renewable energy sources

PHOTO: DWR. CASTAIC

Page 18: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Water Benefits Summary

Ecosystem Enhancement

Water Quality

Water Supply

Yiel

d En

hanc

emen

t, TA

F

Long-Term Average Dry/Critical Years Average

700

600

500

400

300

200

100

0

Page 19: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Water Supply

Municipal & Industrial

Agricultural

Wildlife Refuges

Page 20: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

System Flexibility and Emergency Response

Additional Water in System Storage

Sites Shasta Oroville

Addi

tiona

l Wat

er in

Sys

tem

Sto

rage

(TAF

)

Average Driest Period

1600

1400

1200

1000

800

600

400

200

0

Trinity Folsom

Page 21: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Water Quality

Municipal & Industrial

Agricultural

Environmental – X2

Page 22: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Ecosystem

Coldwater pool

In-stream flows

X2

Page 23: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

$151.9

$19.7

$45.4

$0.7 $2.2 $0.0

100-Year Period of Analysis

Water Supply Water Quality Ecosystem Enhancement Hydropower (Net Revenue) Recreation Flood Damage Reduction

Values in $millions

Estimated Federal Annual Benefits

Page 24: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Preliminary Benefit Cost Ratio

($M)

Proposed Project Costs $3,384

Interest During Construction $972

Annual Costs:

Interest/Amortization $176

Operations & Maintenance $14

Total Annual Costs $190

Total Annual Benefits

$231

Net Annual Benefits $41

Benefit Cost Ratio 1.2 Preliminary – Subject to Change

Page 25: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Cost Allocation

Page 26: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Preliminary Proposed Project Costs

Dams

Outlet Works

Pump/Gen Plants

Conveyance

Roads Misc

Total: $3.4 Billion

Page 27: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

$2,041.3 $374.6

$864.4

$86.9 $41.9 $0.05

Water Supply Water Quality Ecosystem Enhancement Hydropower (Net Revenue) Recreation Flood Damage Reduction

Values in $millions

Preliminary Total Cost Allocation Summary

Page 28: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Public and Non-Public Share

Benefit Type Percentage Allocation

Public Allocation Non-Public Allocation

Water Supply 53.4% 53.4%

Water Quality 11.0% 11.0%

Ecosystem 31.9% 31.9%

Hydropower 2.5% 2.5%

Recreation 1.2% 1.2%

Flood Reduction 0.0% 0.0%

TOTAL 44.1% 55.9%

Note: Ecosystem is 72.3% of Public Benefits

Page 29: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Finance

Page 30: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Potential Funding Partners

State Water Bond Federal CVP

Contractors SWP

Contractors Power Utility

Water Supply M&I SWP

Ag CVP Ag SWP

Water Quality M&I SWP

Ag CVP Ag SWP

Ecosystem Recreation Power Flood

Emergency Storage

Page 31: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Estimated Construction Cost Assignment by Cost Share Partner

$-

$500.0

$1,000.0

$1,500.0

$2,000.0

$2,500.0

$3,000.0

$3,500.0

$4,000.0

Scenario 1 Scenario 2 Scenario 3

Utility Providers Water Bond Water Contractors/Users Federal

Values in $millions

Page 32: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Purpose

Sites Joint Powers Authority

Page 33: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Sites Joint Powers Authority (JPA)

• Authorized under Section Water Code 79749(a). – The purpose of JPA is to establish a public entity to

design, acquire, manage and operate Sites Reservoir and related facilities to improve the operation of the state's water system and provide improvements in ecosystem and water quality conditions the Sacramento River system and in the Bay-Delta as well as provide flood control and other benefits for the State of California.

• Senate (Feinstein) also proposing similar language in current Appropriations Bill

Page 34: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

JPA Members

• Glenn County • Colusa County • Glenn-Colusa Irrigation District • Tehama Colusa Canal Authority • Reclamation District 108 • Maxwell Irrigation District • Yolo County Flood Control and Water Conservation

District • DWR – no voting member

Page 35: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

2013 Actions and Engagement

• Conduct Public Outreach and Information • Address Affordability & Funding Options • Identify Beneficiaries and Cost/Benefit Evaluation • Project Construction Cost Evaluation

Page 36: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Conduct Public Outreach and Information

• Cooperating with DWR and Center for Collaborative Policy

• Focused Outreach to Stakeholders – Landowners - Project Footprint – Counties – Road relocation, bridge, Recreation Areas – Sac Valley Region – Districts, Counties, IWRMP’s – NGO’s – aquatic and terrestrial goals

• JPA not limited by state/federal pre-decisional concerns

• Outreach could true-up EIR/EIS to improve formal public review process and comments

Page 37: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Address Affordability

• Financial Feasibility vs. Affordability • Economics (benefits to costs) vs. Repayment (is there a

customer base) • Pooled Benefits and Repayment or value discounting? • How will the public share be funded?

– Water Bond, capital or annual payments? – Valuing Public Benefits, are or science?

• How will the non-public share be funded + terms? – Federal Authorization and Budget – WIFIA – Equity/Bond Market

Page 38: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Identify beneficiaries and cost/benefit evaluation

• “What will I get, and what will it cost me?” • How do I finance my share? Local bonding or Project

bonding? • How does Sites perform without and with BDCP?

– Without BDCP, operations provide dry and critical year water supply.

– With BDCP, could meet new outflow requirements and water supply reliability

• How do we value reoperation benefits? • JPA developing a financial modeling tool to evaluate

different funding and payment scenarios

Page 39: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Project Construction Cost evaluation

• Conducting a new capital cost study for Sites - current costs indexed for inflation

• Cost of Construction at $972M and 12 years -need to expedite construction schedule, timing of capital purchases

Page 40: Case Study for the CWC Case Study... · Purpose NODOS as a case study in public and non-public benefits Outline – Background – Measuring Benefits – Allocation of Costs – Financing

Contacts:

Sean Sou Department of Water Resources P.O. Box 942836 Sacramento CA 94236 916-651-9269 [email protected]