1
ORWAY MINERAL CONSULTANTS (WA) PTY LTD Level 4, 1 Adelaide Terrace, East Perth WA 6004, A.B.N 40 093 277 126 Tel: +61 8 6210 5601 Fax: +61 8 6210 5555 Email: [email protected] Web: www.orway.com.au Scope of Work OMC worked in conjuction with Hydromet Pty Ltd (Hydromet) and Murray Hill Metallurgical Consultant to produce a Scoping Study for the Marenica Uranium Project. Flowsheet Two process options were examined in the Marenica Uranium Scoping Study. The first of these was a heap leach option comprising crushing, screening and partial scrubbing of the ore, belt filtration to dewater slurries, agglomeration, heap leach, resin ion exchange and finally a classical alkali based refinery. The second option incorporated a similar crushing circuit followed by a beneficiation circuit and a concentrate tank leach circuit. The balance of the circuit was similar to the first option. Outcome The Marenica Uranium Project scoping study was delivered in Q3 2011. Case Study – Marenica Uranium Project Kambalda Mill Survey Project Category: Scoping Study Client: Marenica Energy Ltd Location: Namibia Capacity: 20Mt/annum ore to produce a uranium tetroxides product Commodity: Uranium Marenica deposit major mineralogy - Carnotite
Transcript
Page 1: Case Study – Marenica Uranium Project - Orway Mineral …orway.com.au/wp-content/uploads/2015/10/CaseStudy... · Title: Microsoft Word - CaseStudy - Marenica Uranium Project final.docx

ORWAY MINERAL CONSULTANTS (WA) PTY LTD Level 4, 1 Adelaide Terrace, East Perth WA 6004, A.B.N 40 093 277 126

Tel: +61 8 6210 5601 Fax: +61 8 6210 5555 Email: [email protected] Web: www.orway.com.au

Scope of Work

OMC worked in conjuction with Hydromet Pty Ltd (Hydromet) and Murray Hill Metallurgical Consultant to produce a Scoping Study for the Marenica Uranium Project.

Flowsheet

Two process options were examined in the Marenica Uranium Scoping Study. The first of these was a heap leach option comprising crushing, screening and partial scrubbing of the ore, belt filtration to dewater slurries, agglomeration, heap leach, resin ion exchange and finally a classical alkali based refinery. The second option incorporated a similar crushing circuit followed by a beneficiation circuit and a concentrate tank leach circuit. The balance of the circuit was similar to the first option.

Outcome

The Marenica Uranium Project scoping study was delivered in Q3 2011.

Case Study – Marenica Uranium Project

Kambalda Mill Survey

Project Category: Scoping Study

Client: Marenica Energy Ltd

Location: Namibia

Capacity: 20Mt/annum ore to produce a uranium tetroxides product

Commodity: Uranium Jacare Project Site

Marenica deposit major mineralogy - Carnotite