Casella Waste Systems CNG Initiative
Strive for Sustainability, Bolton Landing, New York. May 19, 2014
1
CASELLA RESOURCE SOLUTIONS: Beyond The Curb…
Operating Footprint
2
CASELLA RESOURCE SOLUTIONS: Beyond The Curb…
Casella CNG Locations
Geneva
Elmira
FortEdward
Williston
CASELLA RESOURCE SOLUTIONS: Beyond The Curb… 4
CASELLA RESOURCE SOLUTIONS: Beyond The Curb…
Where does our Natural Gas come from ?
Renewable Sources• Landfills• Dairy Farms• Food Waste
North America Gas Fields• 29 states have reserves• Large reserves off shore
Imports• Russia has 30% of world
reserves
<1% 97% 2%
5
CASELLA RESOURCE SOLUTIONS: Beyond The Curb…
Casella’s Path to CNG Power
2006 – Rise in fuel prices and new sustainability objectivesprecipitated a search for alternatives.
2007 – short dance with HD hybrids, investigated fuelcatalysts, some bio-fuels (still used), propane, LNG.
2008 - 2009 –strategic plan, budget, project plan, time line
2010 – first station on line, first 3 trucks purchased,Williston, Vermont.
2011 – 2013 3 more stations in NY; 30 trucks, NY & VT
6
CASELLA RESOURCE SOLUTIONS: Beyond The Curb… 14
CASELLA RESOURCE SOLUTIONS: Beyond The Curb…
• Produces less CO, VOCs, NOX and PM than gasoline or diesel,equates to 23 - 25% less GHG emissions
• Simpler solution amid forever tightening EPA requirements
• Non hazardous, will not pollute the ground or water
• 15% quieter than diesel trucks (happier drivers, customers, andneighbors)
• For RNG the decomposed waste can be traced back to the organicsource that replenished it; leads to even higher GHG emissionreductions over carbon life cycle
8
Environmental Considerations
CASELLA RESOURCE SOLUTIONS: Beyond The Curb…
• Provides positive investment returns andreduced fuel cost volatility. Domestic!
• Maintenance about equal to diesel and canbe lower. No DPF or SCR, installed 3 waycatalyst only.
• Natural gas delivered is one-half the cost ofdiesel fuel
• Natural gas prices historically less volatileand reserves estimated at 120 years??
9
Business and Operating
CASELLA RESOURCE SOLUTIONS: Beyond The Curb…
Casella’s first CNG front load truck
• Autocar with Cummins-Westport ISL G CNG engine with Agility 63 DGECNG Tank, in service in April 18, 2011.
10
CASELLA RESOURCE SOLUTIONS: Beyond The Curb…
2011 Autocar Bridgeport Split Body Geneva,NY
CASELLA RESOURCE SOLUTIONS: Beyond The Curb… 12
CASELLA RESOURCE SOLUTIONS: Beyond The Curb… 13
CASELLA RESOURCE SOLUTIONS: Beyond The Curb… 14
CASELLA RESOURCE SOLUTIONS: Beyond The Curb…15
CNG makes economic sense for waste trucks
Equipment costs
• CNG trucks cost roughly $40-50k more than a diesel truck (fuel cylindersand system)
• Chassis cost is equal
• CNG time fill fueling station costs $695k to $990k
• Federal and some state grant money available.
CASELLA RESOURCE SOLUTIONS: Beyond The Curb…
Transportation Petroleum Dependence
16
CASELLA RESOURCE SOLUTIONS: Beyond The Curb…
GLOBAL COMPETITION FOR OIL INCREASING
17
CASELLA RESOURCE SOLUTIONS: Beyond The Curb…
• Time fill station - $600k – $850k
• CNG waste vehicle incremental - $35k - $40k
• Maintenance facility modifications - $50k - $90k
• Training, maintenance and ops - $10k
Implementation Costs
18
CASELLA RESOURCE SOLUTIONS: Beyond The Curb… 19
CASELLA RESOURCE SOLUTIONS: Beyond The Curb… 20
CASELLA RESOURCE SOLUTIONS: Beyond The Curb… 21
CASELLA RESOURCE SOLUTIONS: Beyond The Curb…
Decoupling of natural gas and oil due to the “Shale Gale”
22
CASELLA RESOURCE SOLUTIONS: Beyond The Curb… 23
CASELLA RESOURCE SOLUTIONS: Beyond The Curb…
Price Stability Example
24
CASELLA RESOURCE SOLUTIONS: Beyond The Curb…
Cummins Natural Gas Line Up
ISB6.7 G
20162016
ISX12 G ISX 15 G
20162016
Displ:Power:Torque:Cert:
6.7 L~260 hp
~660 lb-ftEPA 13Euro 6
12 L400 hp
1450 lb-ftEPA 13
15 L450 hp
1750 Lb-ft
25
8.9 L320 hp
1000 lb-ftEPA 13Euro 6
ISL G
CASELLA RESOURCE SOLUTIONS: Beyond The Curb…
Gap Analysis
1) Station load profile, gas and electricity vs demand, time fill fast fill?
2) Adequate gas supply
3) Emergency procedures, emergency power
4) Shop upgrade
5) Vehicle specifications
6) Vehicle fuel capacity, range anxiety!
7) Mileage penalty is a reality, use +- 10%
8) O&M
9) Sighting/permitting
10) CAPEX
11) Training
12) Fueling redundancy26
CASELLA RESOURCE SOLUTIONS: Beyond The Curb… 27
PoneyTank
PoneyTank
CASELLA RESOURCE SOLUTIONS: Beyond The Curb…
Williston, VT – 2 x 40HP Bauer Compressors
28
CASELLA RESOURCE SOLUTIONS: Beyond The Curb… 29
Elmira, NY - 2 X 50 HP ANGI Compressors, 16 Stanchions
CASELLA RESOURCE SOLUTIONS: Beyond The Curb…
Geneva, NY- 2 X 50 HP ANGI Compressors, 16 Stanchions
30
CASELLA RESOURCE SOLUTIONS: Beyond The Curb…31
Williston, VT 8 dedicated CNG
2 dual fuel vehicles
13 stanchion station
Geneva, NY 8 dedicated CNG trucks
16 stanchion station
Ft Edward, NY 10 dedicated CNG
2 dual fuel
16 stanchion station
Elmira, NY 8 dedicated CNG,
16 stanchion station
Fleet-to-Date
CASELLA RESOURCE SOLUTIONS: Beyond The Curb…
Casella Partners
32
CASELLA RESOURCE SOLUTIONS: Beyond The Curb…
For more information, please visit:
CASELLA RESOURCE SOLUTIONSrecycling · collection · organics · energy · bio-fuels · landfills
casella.comPeter Vanderhoof
Fleet and Facility Energy [email protected]
Thanks!