Risk Assessment and Management M Museum of
Transcript
Page 1: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Risk Assessment and Management Framework

MMuseum ofApplied Arts

Page 2: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Document Control

Document Title: MAAS Preliminary Risk Report

Copies and Distribution:Prepared By: MAAS/JohnstaffReviewed By:Revision: 002

Date of Issue: 12 October 2016

File No:

Server Location: NSW135

Page 3: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Johnstaff MAAS DRAFT Risk Report 1

Page 4: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Contents

Executive Summary 3

2 Risk Management Approach 4

2.1Risk Categories 5

2.2Risk Analysis 6

2.3Risk Evaluation7

2.4

Outcomes of the Risk Workshops9

2.5Risk Treatment Solutions 9

2.6

Monitoring and Reporting 9

2.7Risk Summary Table9

2.8

Detailed Risk Register 9

Attachment A —Summary Risk Table 11

Attachment B — Detailed MAAS FBC Risk Register 16

Page 5: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Johnstaff MAAS DRAFT Risk Report 2

Page 6: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

1 EXECUTIVE SUMMARY

This Risk Management Report documents and summarises the key, project unique, risk management issues and mitigation strategies for the identified risks facing the New Museum. The Risk Management Report has been prepared in accordance with AS/NZS ISO 31000:2009 Risk Management — Principles and Guidelines.

The report will be used to monitor and review the risks identified as potential threats to the successful planning, delivery and commissioning of the project. These Risks will be addressed at the Project Control Group (PCG) and Project Steering Committee (PSC) and updates provided on mitigation measures in place and to any changes to risk ratings. The Report will be used to continuously monitor and review the risks identified as potential threats to the successful delivery of the Final Business Case and subsequent project phases.

This report provides the preliminary findings and recommendations of the risk assessment conducted for the New Museum. It is intended that the risk register captures risks at all project phases, from the Business Case phase through to implementation and commencement of museum operations on the new site, and will be used and updated throughout the project.

The project will be subject to a rigorous and ongoing risk management process to ensure that material risks are identified and managed effectively to date. The risk assessment has and will be an ongoing process in consultation with the MAAS, Arts NSW, the Department of Justice and Infrastructure NSW. Further consultation with other government agencies will be undertaken during the Final Business case phase.

Page 7: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

The project risks identified in this report relate to all phases of the project including the Final Business Case, Planning, Design and Implementation of the project.

More specifically the key risks to the project during the present project stage (Final Business Case) are as follows:

· Site definition and acquisition;

· The tight time frames for the development and delivery of the FBC; and

· Ensuring cross agency briefing and engagement on the New Museum.

Johnstaff MAAS DRAFT Risk Report 3

Page 8: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

2 RISK MANAGEMENT APPROACH

Risk Management Strategy and Register details the key, project unique, risk management issues and mitigation strategies for the identified risks facing the New Museum. The Register will be used as a proactive project management tool to monitor and review the risks identified as potential threats to the successful planning, delivery and commissioning of the project. These risks will be addressed at the Project Control Group (PCG) and Project Steering Committee (PSC) and updates provided on mitigation measures in place and to any changes to risk ratings. The Register will be used to continuously monitor and review the risks identified as potential threats to the successful delivery of the FBC and subsequent project phases.

The project will be subject to a rigorous and ongoing risk management processes to ensure that material risks are identified and managed effectively to date. The risk assessment has and will be an ongoing process in consultation with the MAAS, Arts NSW, the Department of Justice and Infrastructure NSW. Further consultation with other government agencies will be undertaken during the FBC phase.

The project risks identified in this report relate to all phases of the project including the FBC, Planning, Design and Implementation of the project.

More specifically the key risks to the project during the present project stage (FBC) are as follows:

· Site definition and acquisition;

· Congruency of the project vision across project stakeholders;

· The tight time frames for the development and delivery of the FBC; and

· Ensuring cross agency briefing and engagement on the New Museum.

To inform the project risk management activities, MAAS has carried out a detailed analysis of process and project risks. Risk workshops and individual discussions have been held in August and September 2016, attended by representatives from MAAS, Arts NSW, and the Department of Justice, as well as a range of

specialists including design, cost planning, legal and financial advisors. The risk analysis has involved the following steps:

· Risk identification — identification of all material process and project risks;

· Assessing risk impact — determination of whether there is a cost or delay impact, or less tangible impact (e.g. Stakeholder objection);

· Assessing risk exposure — determination of the risk exposure, being a function of:risk likelihood— being the likelihood or probability of the risk occurring; — risk consequence— being the consequence the risk will have; and

· Developing the mitigation strategy — identification of possible mitigation strategies to reduce the risk exposure. The scope of the risk assessment relates to the New Museum and is focused on significant process risks that affect the project planning and procurement phases as well as project risks that may arise during the pre-construction, construction and operation phases.

An early and robust risk assessment during the Final Business Case phase of the project has enabled risk management strategies to be developed, to give confidence to the New Museum project governance.

The key elements in the risk assessment process for the Final Business Case are:

· Review, and evaluation of the previous Preliminary Business Case Risk Assessment;

· Develop the Final Business Case risk register (including mitigations and risk owners);

Page 9: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Johnstaff MAAS DRAFT Risk Report 4

Page 10: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

· Risk workshop 01 with the project team, MAAS and Arts NSW in which risks were identified/reviewed, analysed and evaluated (held 16 August);

· Issue revised risk matrix for comment, review and acceptance by workshop participants and governance;

· Risk workshop 02 with the MAAS and broader project stakeholders in which concept option and site based risks were identified/reviewed analysed and evaluated (held 28 September); and

· Finalise FBC Risk Register and Report, and circulate for comment and endorsement by workshop participants and project Governance.

2.1Risk Categories

The following risk categories have been identified:

· Final Business Case Risks

· Reputational Risks

· Planning and Site Risks

· Design Risks

· Regulatory Process and Legislative Requirements

· Collection, Storage and Logistics

· Construction

· Museum Operations and Content

Johnstaff MAAS DRAFT Risk Report 5

Page 11: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

3 RISK ANALYSIS

Each identified risk has been assessed to determine its level of consequence, and the likelihood of the consequence occurring based on the criteria in Table 1 and Table 2.

Primary impact areas considered in the risk analysis criteria include project cost increases, delays and reduction in the functionality of the built facility.

Table 1 Likelihood Measures

Descriptor Definition

Almost Certain This event is expected to occur in most circumstances.

Likely This event will likely occur in most circumstances.

Possible This event could occur sometime.

Unlikely This event is not expected to occur.

Rare This event may occur in exceptional circumstances only

Table 2 Consequence Measures

Descriptor Impact

Cost TimeRating Quality

Severe Over $2M Delay over 3 months Dysfunctional facilities

Major Over $1M Delay over 1 month Significant disruption

Moderate Over $200K Delay up to 1 month Some disruption to operations

Minor Over $201< Delay up to 1 week Minor defects easily rectified

Insignificant Less than $20K

Delay less than 1week

Minor defects not requiringrectification

Johnstaff MAAS DRAFT Risk Report 6

Page 12: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

NSW

Government Property

Table 3 Risk & Treatment Owner

MAAS MAAS Project Team

MAAS Trustees MAAS Board of Trustees

Arts NSW Art NSW

Justice NSW Department of Justice

INSW Infrastructure NSW

Council City of Parramatta Council

Treasury

G P N S W

PSC Project Steering Committee

PCG

JSP Johnstaff and the FBC Consultant Team

3.1 Risk Evaluation

During the risk evaluation phase, the consequence and likelihood for each identified risk were assessed together to determine the overall risk rating.

The purpose of deriving an overall risk rating is to assist in determining the frequency of monitoring and reporting of the risks identified.

Johnstaff MAAS DRAFT Risk Report 7

Page 13: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Consequence

Insignifica Mino Moderat Majo

Rare

Unlikely

Possible

Likely

Almost Certain

Table 4 Risk Matrix

Overall Risk Score

Low: Mitigate and monitor risk. Occasional monitoring and review

Medium: Treat risk until risk level is acceptable. Regular monitoring and review

High: Immediate action required to eliminate or reduce risk. Frequent monitoring and review

Johnstaff MAAS DRAFT Risk Report 8

Page 14: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

3.2 Outcomes of the Risk Workshops

Overall, 97 risks were identified. The post mitigation the risk exposure of the project is:

3.3 Risk Treatment Solutions

Alternative strategies can be implemented to manage identified risks. The treatment choices available are dependent on the risk and the associated costs and benefits of implementing the desired option. A list of risk treatment strategies and the associated accountability for monitoring were established for each risk identified. The consequence and likelihood of the residual risk has been assessed following risk treatment.

3.4 Monitoring and Reporting

Risks will be managed within the proposed governance structure for the project. Within this structure, the PSC will be responsible for endorsing treatments for strategic risks and project risks with high consequence and/or likelihood ratings. The project director will be responsible for monitoring and re-assessing risks and risk ratings, maintaining and updating the risk register, identifying potential treatments for risks and escalating risk management to the PSC as appropriate. Critical risks and the proposed treatment will be reported to the MAAS Board of Trustees and other key Stakeholders as required.

Risk will be managed and categorised as either strategic or project-level risks. Strategic risks will be those expected to have broader impacts beyond the project, for example, inter-agency risks and state-wide risks. These may have state or region wide significance and require high levels of management and coordination. Project-level risks will be those with specific impact on the project's ability to meet its objectives or operate within the specified constraints.

Key features of the risk identification and management process incorporate the following:

· All risk treatments have been assigned ownership and treatment actions will be incorporated into the project work plan (particularly for those risks categorised as requiring urgent and immediate action).

· The status of each risk has been assigned as open or closed. When risks are completely mitigated through some form of treatment or completion of a project milestone, these will be listed as closed (but not deleted).

· A risk profile for strategic and project risks will be identified and managed using a dedicated risk register and reporting through the project management structure and project governance structure.

3.5 Risk Summary Table

A Risk Summary Table for the project is provided at Attachment A. The table summarises the top risks to be monitored and reviewed by the project.

3.6 Detailed Risk Register

A detailed Risk Register for the project is provided at Attachment B This register is to be reviewed and updated accordingly on an ongoing basis to ensure practical and effective management of risks on the project.

Page 15: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Johnstaff MAAS DRAFT Risk Report 9

Page 16: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

1Johnstaff MAAS DRAFT Risk Report

Page 17: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

38 All

Risk No. Option Risk Description and Impact Mitigation Strategy /Status

Cost allowance have been made within FBC cost plan for appropriate flood mitigation measures.

Risk Open /

Procurement methodology determined by Government is misaligned with the projectobjectives. Procurement methodology selected does not enable MAAS to control the design, and procurement decisions for the

FBC procurement strategy to consider the recommendation of a procurement model the best aligns with the project objectives, and the bespoke nature of MAAS' operational and facility

Detailed analysis and assessment of the various Government funded models or private funding options to be undertaken post investment

Open

There are challenges, delays, or contingent requirements in seeking the relevant planning and development approvals for the New Museum (including competing ] objectives of State and Local· authorities), which has potential toimpact all aspects of the Project,

Ongoing project governance to ensure appropriately levels of government remain briefed on the project.

MAAS and the project team to commence engagement with planning authorities (for SSD) prior to the design competition to include requirements and understand issues prior to that process.

Ongoing consultation prior to planning submission required to facilitate understanding of the project.

Planning requirements and timeframes to be included within the

41 , All O p e n

Thorough investigation of additional opportunities on the site to be undertaken during the design development.All additional opportunities should be explored with consideration to the project objectives, the MAAS vision and in line with political commitments to provide an iconic building. FBC Heritage due diligence to provide advice as to significance of heritage items.

Planning phase strategies regarding appropriate consultation with authorities to be established.

Indigenous heritage to be included within heritage assessment report.

MAAS whole of project approach to be developed with respect to indigenous engagement.

Design

45 All O p e n

Risk that the Heritage issues and outcomes are not understood, addressed and supported (Willow Grove and St. Georges Terrace). Additional inclusion of development opportunities (additional built form on site) results in more intensive development on the site to the extent that the operations,

Option Gallery space provided within the46

1,2 New Museum is not comparable to

The FBC to support and recommend the project option that achieves the FDB, is comparable to the Ultimo site, and provides an iconic building.

O

Johnstaff MAAS DRAFT Risk Report 13

Page 18: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Risk No. Option

Open

69 All

70 All

Constructi

7 1

Risk Description and Impact Mitigation Strategy/Status Risk Open /

Category Closed

to provide additional 40% of collection on display.

Risk that a strictly value managed option will not allow the New Museum to fully reach its goal in becoming an 'Iconic' museum,

47 Option 1 constraining museum operations and

diminishing public value as compared to the current facilitates. There N a risk that fit-for-purpose requirements are not met.

Overall requirements stated within the Functional Design Brief are unable to be met due to stringent

value48 Option 1 management. Stringent value

management activities result in misalignment between aspirational design competition schemes and the preferred FDB concept.

Collection, Storage and Logistics

Failure to adequately understand the breadth of requirements (time, cost,

62 All resources) to enable collections

logistics activities to occur within I project timeframes and budget.

Interim staging requirements for the collection transition negatively impacts on project budget.

Preferred option recommended by the

Page 19: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Encourage a value managed design that fully allows the New Musuem to reach the outcome within the Function Design Brief and its objectives and vision for the Museum.

Different design options have been developed by the FBC and the financial

Open

• Open

Open

Ope

business case to support the provision of

funding necessary to support the

development of the New Museum in line

with MAAS' objectives and vision.

Encourage a value managed design that fully allows MAAS to reach the outcome within the Function Design Brief and its objectives and vision for the Museum.

Preferred option recommended by the •business case to support the provision of funding necessary to support the development of the New Museum in line with MAAS' objectives and vision.

A specific Collections and Logistics Plan (by others) that will provide

programme, collection and budget is being developed concurrent to the FBC and key findings detailed within the FBC.

Collection and logistics body of work to provide optimal solution for transition requirements.

Transition requirements to be costed and included within FBC budget.

Future collection growth space (MDC) is diminished by the projects and additional storage capacity is required soon than anticipated, or concurrent to the opening of the New Museum.

Adjacent construction projects negatively impact construction activities (access, site amenity etc.) and visitor access once the museum is operational.

Collection and logistics body of work to provide a review of spatial requirements for the

collection and to provide advice on additional storage requirements.

Detailed construction management activities and site etc. Plans to be detailed during later project phases.

Timing and type of other projects on the site to be considered with reference to the Museums requirements/operations.

FBC Cost Planner to consider impact of concurrent surrounding projects in the

Johnstaff MAAS DRAFT Risk Report

Page 20: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Risk No. Option Risk Description and ImpactMitigation Strategy /

Status Parramatta area (re

Risk Open/

Museum Operations and

Loss of key project personnel,

81 All resulting in loss of Mitigate knowledge loss by implementing retention O p e n

82 All

Opex requirements to be programmed against project schedule to understand requirements.

New operational model being developed as part of the FBC.

Additional commercial opportunities being considered in the FBC.

Johnstaff MAAS DRAFT Risk Report 15

Page 21: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

ATTACHMENT B - DETAILED MAAS FBC RISK REGISTER

Johnstaff MAAS DRAFT Risk Report 16

Page 22: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Sev

Conseque

Insignificant Minor Moderate Major

Risk Matrix - Risk

M e d i u m

M e d i u m

M e d i u m

M e d i u m

H

M e d i u m

M e d i u m

Hi

High

High

M e d i u m

High High Extreme

Reference Likelihood Almost CertainConsequence

SevereLikelyMajor

Medi

Medi

MAAS NIW Museum FBC

Page 23: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Risk Register

1A _____ is

0.1.

A. / 5

A O.mr

LOWeeod

Conn.. • Par. Oisk.e..—S

.difted

Coa5 • Reny

Menn...

. pop. InsartereM punk. Pr ....M1 ft.( Mu

nws

Poul.

Modena •,..r.- . MAAS by reed.. on ........ (mes. of 1 BC Impn to Aside., MASS, on.orwlon to Po' ...... , . . . . .

,a„,„

.r„,

M.

I

All

RI.Ant the druenft. of dm Uhirno Wm Is not In ns.. Win. PSW ........es SW .......... rapute.n A MAAS Mtn is ...I Mtn ne M... prawn).

.CrAPAkku

U....m

rd 5 5 en t pi • (ou• or .Idoder. cornmeny..... ..

nes.. paund Y. d.sensent Ann ann.. re•preenle sr.

U..

.dnere I 11.1.

Tone *eel

Al

Page 24: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Urennanty era. Mat an.. nap P.M.. do MAAS and tns pnest rep..

ixSW

MM. knnemmr............s. of PAC no. to no. • Isen. a re.rewon so theMod.. du"... me...1.1.

Pew.I

Mernren Med. •

M..*

T . Au .. . round ft wr l I e f t . ry Inn. .1 Wan, a Impacts nege. r on . . . . . . . . t . M AAS

NAAS

Pan

mauS 5 . . . . . . . . . . 1 . 1 . . . . . . . .s re . . end proem. e nd Ampe re res pons e. . . . .Apt, speak flia.. COO, GIANSW. INS. reponse.. no... es p.a.Mode.M MASS! eissupew. commoWnnee Wu.. toads MAW .awl 0 prodde e Penne o Iwo.. mew.....te,..... Ow pordent Emmal can* dam ...a Is peeld•el to MAAS AVDP..

P".".

".'"' ''''""

In pl.

S

AS

N.. ...fr. lo..........."...

me...dour Am paid. .I S. . Po..e.) A...

.w. the waft. Aid. ten.. P.m Cas• profts.

MAAS

Pranitee

Page 25: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Mode.

MAASand . pen,. nem we W.. int nwired treas. messes .ft ...Ina. ens. prous, andnurn of Are run. Wonsan is sa.et In eandenc• es a re. of . pften.MAIS to m•Intain sown, al Ivy Mon rahael .P..........rn.MAAS ny nessernon mewunionens plan. icemen APR[ nowl re prune. Panm of innemenn se ft

P.

Modena WO*

15 05A.

$

AO

Per... net On We fen U... . dewr che 1.0dunernp e n . . u p w i n d P . M . f u w e o n a l t e n o

n e r . . . m o n . r o w . . o r M . . . w e a r W

........, ,—"'""W"

Ponl.

Modena

MAAS My nunnery on dernmunkstnas ftmene(.ns. or PBC now) to pror...nor onnformWors ISO,.dueftwAY MPAMII. p55.5Mawr. ere.. derenmencand prnnuer.... •ftes........CP... Steedne Coned. In ft. Wm..,

Poss.

Mader. To. eanned

7

Ay

AW ft( MAW b... stoten .4 cesurn...... dn. WC denloprvuot

.....,

Pon.

Mont• 71. k W . wIth Own.ne downurPortiorntra ter IM MAAS

LOWP

Page 26: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Inn.

All

AA

Cong.. or. Prone els. Is not and amongst A en stanhelders OW. NSW Corernment. onsisol, end t. ern •W dun. semen

ensallorwent.temen Are PSC. On WpWruenlel AM.,.

MAAS A PSC

PSC

MAASPLUS

pen.

P1..M

P r o n n V I s l o n I s M i n g u p r i s e n d u . . M C M o d o P e m e e

M U . . . A l M a n n P S C . . . . M e n . . . . . . ) .Pd. In...newnel comm.dnions and 1.1.1 nee. regard. . Mann . An emPft MAPM . P.*.

....).• unwed and Wren..nen= dew.. ...ewe meft P.P. MAAS.. of P.m

Mane PSC members ftes MP P., Inperranant of Ante, CPC. NSW to ensure adequate .11......

Vie menet.. 01 sagn .MA MAIS re. sonar On MAAS An ft MC ......ae Wreand ...ed..MA 0 wok ten. net th• communnn manse in dill,,nt wefts W..

Pon.

p.....

u ,,,

Win Iftlese

...r.„ To Iso nee.

r„. n pl.

ID

AO. Pro,.n offer. don Paten.. prf...... comenen.....00.• 11.15•Pre of MUSA..... ... ......—..„

Page 27: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

11

AA

111:11111:1111atigali5g5525101:111.11.:11111 TM MAAS Pens.. ProMal WW1. an not approp.....1 Po eneft ftlewl....dryeemerned sr. On Prof... tir..

MAAS

Unlienv

AM. oenWenem Wing of.. mew. AC development. Pe be en.nd by pronst PSC p.n.s. of..... op. stenho.nl.

Arena WOW. to Men M. Om Museums mission... wenn ronenswennle to en. nu.. of

Or.. emu sper....., .unirn AreN. end Ann h emenno.......pment al An PAC 7..MI.ed pn. structures WA espare non pp. euppors of ine preens met..

Un''''''

Lin..

La'. Annft

Mon. to....

13

AA

Rowfte. Hewn ... On pro.. we.. kW. to WAY/ n P.m deft. re.,

PSC

Pos.

Page 28: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Mennewannsaily . eftung/gcrannenc• sten. W..... dennefte......anew.. les per PSC ompo11.1.R.N.MM., led ny !igen.,

m.o. onl ......... near. key preten M.o. per Gowned. mem.lotrapurromenel consennkeows and Well. pop. nparden tin Munn and My often 1.0•1 to pronct 11....) to keen.. and WM...Rag. Wands lor lay ....

Ponble

1.0. In..

IA

All

Prolen Gomm. structure WI re pin. menu. Deems.. We. raw. ftsfremes.

u..

u

mAuft, dow.............. by ... non swum. mulftpedeper urniftd ovum.. ....I. Arena Aftmenc• en hwn aupplred PrIn en

"u,.., ,„. ::::„..7„::" .„...',....,..d ,c, „ u„ puu u„,.. _

A.. Mien for ern. men..On .1...........% ny propm p.n.s pa cow.. ern...

anew.

Moderner. to In . ad.

ss

AY

. Oft.. for An S. B.. Can .M On Intern. of I.e. erodes don ren ... dearowe re....., m• R.

Page 29: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

„,,,,uu„...uu

,0„n„

Nee

P d . . a w n e d . . r e w n W p o r e r n e n s . . . • t r y . . . . . . . . . . . . . . . . . . t i n p r . n u n i n ne d e w e . . s e n M e n P r o l . . . . . e s . 1 5 . . . . 5 5 w speodneen and to An Sean. of A. Dept of tuft if rep .d.Arena Commarde . been pupplinf W. en neforsornem rn•Me remr. to ftet . PK ...A Don.. prod sennus of Or FAC robe pr.. to g•Men..........5...C.....1 RIC to .erfy ernWeer.m•net net bear, and Mee rear bean do... Confrn res.Wm ,woe lew• AM. ...

''''''.

.."'''r 4.010

li

17

All

AO

MARK don ...ire turtle. Midge es PAW • Anne. museum

.„,,,,,,,

u,„,uu.s.0

Pas

u.....

Mpor

Idelm

liggi;giggalCIS1111=111Owerin engwemennulte IH. A GP11. to warm •.nt of ft ro Pe en...Bess use In. elneleped do . Atdie MAW Deem. As agreed nth PSC Concept op.ro la* on. Dewto be

Page 30: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Prought to KG A PSC.MA............ Wnew process rweWng t. PnWa AM ne dn.. ...InPr el.....) to 1.......e .ne .q....e.

An..

•Awn Pro.

Co... of the MA s. bon. oanprom. PAC end osonn ..ss dwelownot

MAAS SIC A. Wanshop OE Oultornes RS Auras( 10155MAPS NeWSeerrl BBC

Page 31: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Risk Register

LS

All

Nak WM the makeelder aware/low butler.. rep Wel aw wiralerwl

..,

Unewe

Newawing staNhaear wnwItatlarr and ropermant WI owe. [Nne am Me dereawnant.Nwelml swam.. strwOrra w• Web. and req..** or kw/react thtemralilw 1/2611.11. F013. wean Newel Gnawer

Unlewly

War

M Ow.

w.

NAAS Ilarruneb React bar 00) WYNN are erwiler on meter ININ w a Panaa= eulture Prat........

.......

Oneofie consulallan NW Me NSW w faMeala Wm. MW Wrt Nweer NNW.34.

.66414.

Npha20

.Thaeraletwelawlen and roc art IrearNatant well weterl 42101111/113.1c1wwwwwleals bore[[. Onlitrt

ow,ut.y.....

..1..1........ an ..2 up:4M coin.ft RIC development ea A2.0...saums aita, Ai. ardwrwureawalet to weak assarwere of went 000m went de oklarewe

...M....

Irt plea

21

A.

Falk. la cmoirnntly de.............. laNNessne ON W. plea NAAS Parowerr rawirawanw

,...

U V

83 wNAMwwWwwer

Cworrant Weems earning to ha wean:Man le hew. Neel re1,111101114.00 that maws Noweroallne are Oanchnw rem or °War Intemallonal BONN

Page 32: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

facto Klemm. pawl. New .60.0.101W Ira Nape at a war wee.

US e

Wee.

In Mare

22

IIIN Wm wake dwarretwricalrein NNW* ma Wane. dm 100 n I e n a n n pontenentra.drerniors.

MAUI

premsw

Neer

w vaeowwwwwl OirrtInurierns V. Walk. wawa. ra•Wes IW ewlaW4/6 NV weNe NNNN N NO." gown/cal to re nwpwe and Implawantarlra Warr/sneer as awe al preen re turrNe WwWWwes

,.,..

./..

Mpa

23

All

Ins/Meant conwharlon MN ft/Mee lemmata lawlwo dememmnant hers We weem, er New 00 Op mei Sweelw Car. Panama= Wan. WWwwwwew

NSW

Unewly

Nedwata

werearnant MN UM &Ws NM w a separa Sorry 0. work le WSW)ecencer /maw Powwow, gnat.. SetewDanko OW VW and wwwww rawletwental are Wing rowlearwl,ma remowelata. ellen Re wrens.NAAS Carnarertatlew Watery te ler updatad la Inches wasraeneare angwaware WM WNW, WNW.......

IIIIIMIIIME

WNW,

Page 33: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Nahum

IMEEINES

In pew

Awe* Name.24

are IseN•Wra avetewww• All

/new) mew tlareeerrent we wane. alAWAS In arwerlarea weln .),.......).,/,...

I/MS

Pmbla

Gwerenes Nth th• Armen. Of AwIlei MS w00 Servo /WINSNalwaer

Broler mere 011/0.111.0 pules rawdranwel le lta ureateken Sisha clateed Owen. elara 01 Ma Newt.

UM.N

......•

75 ba wee.

II

.

Weary 10 awn Warmer 10 IN Nue., of Awed Are end Wows Art INS WSW) An within W. NSW Newnan, Orme WwW Wenn./ sr norm, le ow. the 6•110, el W. Preens

.0.

WNW,

Medals

Weber rwlaw ol NOW. are galley rawer/ewe le b• welamakan N. Weller Names ewe New Newt.

Rata

Nana

Te Ira atlenel

24

lea lude,1Wwwwww

Page 34: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

All

we .11hlaewe an reneralms 0 othar 0.1a tIve or reeNeorr warier". that Wpm We ewer. or Welmianwftn 01.• Nolan in accordanw We 013 P WNW. New..

NAM

Pmt.

0.4eN1.ta

7 unharness) 01 MelslaWa we poley repuftwnone N. undartalwn In Ma/NNW Amen. New of dr went

UM.Ny

Warm

ing661313.1)

To So wtlawel

17

Ne inallweve w Inewrcerlas kW security, and Ws coNalon, mew). wog.. owe relo to w Impaeln. crew

MUM

ewer.

Meer

T. Waring Wpwl awe. wdertalew Wolfe. NC Wks. Wm aNwerlala W10060 manures ran. orrewoltan *WM). Inman. 51 le* . 32 ma on /woe InmallatIon 01 ewe paw wwwwwers &ewe)tha tes Name Nat no Nacre! roam swap w Wm/tun. bawd Me.. INN ere NNW. =Wm Ns Wan Inclarkeeast akar. Nun haw ware Mere Ma MX mu planter wwwWw INN a011ween /wawa,

Page 35: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

brsIala

Mslwara

., ewe

II

MI

ma nood prone .. royathly Impact. oats ane1 ...tot I wwirawanw b w lerie Nrw.

Rem ernlel Nara

letve

III

TN hear. Wpm analyse premenkal replan we Oulu. works wiener. duere to 1 Be Newer Net NrIeweirawnitleaslon mauve rant se/anew 10 /Wen • stnew• that fan withsentl wow mind Inewir front 110Wrie Weeaba.nu haw Saw awe wain tha FIK we plan ex appraprew reed widen. PliaillIOS.

LINNla

ZS

AR

1161 tra 0 basanunt an/ were will kw wheetatl tr• So-Wry w./..e000/ Wept. nee...Taarn

Newt Owen

..„0.„...

.a...

Be Ilswae Swam awe. weartrikandwIle 16 MSC edemas that awe/Wm WSW). wearwas mob undarolten wed) includa estWatlem 01 Arly N./ warm on grouse Wavle wn of llocrl pm, rnanapnews PISIM II..1 K“.•••••.1....1....11.-d el.

......,

..

Page 36: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

In Ware

30

AllConerninaten Report - kw ewe al siN senteenalew awn/ el wnwrenatIon kw* Owner* rowederlorwast an also relloww

NAM

SINN

Mew

Cowl winmlon rworwhaws that me wad cont•Wwwi 1/11 wise 6/ Ma, Nrew ranwelnmen Nur we ha

sendrewl war 111C, h....were use bee bowie anew W anent*/ el 1111 owiewlowers Cart

INN

fens

Te tra wirond

31

SW tlut milk Wawa/ hy dm am. al a me amen marten will.......Welk crummt. within Panama= 00.

..

WNW,

0.131.

Twee analyse ha. Wham./ We Wee earentlen Wwww sweated wan murwm Is Nein WASeildaleas Mg Ma awe. arldelonal Wer well Val. 040.20arowN.IWIter on . /Mem mule In WNW Inwa en surnweeng Wee mewls

Mew

Mplow

32

One Ewe arms to nee br tarp mew iww wwww which amen. Ws Ware es/ /4/4s.prooa Nao.

Tam

Mew

A trallk study demon/Me aW mullahs WI* loraerre lb *Sr Km,. phowirioni moms Maw, r..), me...nee...erre wwwwwl slaw oa IN &wee. lay NAM.

WW2

Page 37: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Senor

,,))).

36

All

Orelt• paren.werklant fix peek WIN bawd se nuniar er6ors eNellee ev WNW) whisks

NAAS

Pau.

Weer

iweing Mcwrion l• wiWeParrawatta CW Courwil guirlOnar mrt ram Tarts WItor 10.6/104 NeWell,Neharwora de de. mei is toparnew all Wear tem parlee to Ws le'. wee.Marvel or par.. 6 tehe nem* as a rawnsardal wlew wen. Mt••••••••....,...n. e.6.....M leel.WTO orni M .....1

Iola

1)1,

NlNWm. CONVIIVIIIM al mato pay .11Parremato parldnerlew 233 . push /My we el Oa am ..I . am 0 as while to Ix NW to rk R.

nom

Pam.

w e e p P a p 6 w h e w a n d a w i r n W e e r w l a w s o I r a a . . . a d b a d e . N a m e * a r e w a l l a w , a l w e e p a r k l r e a a W M a s d i ff o n n t E n . m o m ( p l . m w s p . . . 1

era

,. o...

All

01101 deem Wm ardwattlemul rarnerne garb Nwd owes Wee. dui ans... O.O...

1.116.1160PmeW Contrast.)

..„e

rm.amen awe. areliaeolegka.w.p.ixawatn N. unclean law/tan rwrearl le

Page 38: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

3.6.14

6666,

In Nara

1600.•waren OA 01 NW.. teralwarnant Wad.. owelteral w Oa wed a• a pracelael 70 Owe1ane..

31

Allewe,. Whastnaunt and owe mews raw,. WON. NON ....ons to suppett the and al 13.• museum clud,e...........s wre wwwww,.....,

Newt Ikella

in*

Nine.

SW InWstructura mummer rwort Ns Wan are. rhoMe Fie daweliewer 0PNW• weWw Saw wheal/ wlern we New..

Illialr

New

in pew

37

All

la allem1 raweas avers haw Prwarnatta W. lw Inarreltlant elth largrwroaunt al row Irdrammetura Sake tnerdurad.

Newt OWS. ream

PersNa

Name

Wearer See. CaremluNer *Mar merman) War.. te we/We amerce. MN. kr servlus 2iiruslocon inPrramato

Page 39: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

miner

10 W anew

31

"

Procuranwe weredeleremetweenal by 40werwee Is rroballewd NW eur 0.4.7 rerwerar. 160wwwwwwWwelogy War. a net anahe AWAS 00 mewl IN Wren.. precurarnantdweera W de lacew

Pre. ..0, isara

).)

New

MK peon/.M resew lerwaklar In• worms... et a prearawant wee Ite Melee,. MN as ow. WNW., and . Owe. wow er NNW awnewal aner bale ape wane.Oaollarl analyse antl arras/maw dela mews Grearnwee Am. morals ar pr.. NW.. options Ia. *woken pat Inwornantdarlews

Unlaaly

Norlarae

in plaw

31

ew proprwar/ whoa., War no semen tre Weewwwwww erwara a aarly ware wars IN new.).

...i.....Tam

uMbN

.421a.

Fee prrnorwron) Ws Wry lc =mew Ws rawnwirreatke 01 a wswrawat wade de Wm Wee well ew .1.................,..,...• apotiatm ..a el...Mob... o.o. o.......,

wparler W. 0,1.4.....Mt.

Unewly

Wane.

6. pew

Page 40: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

NAAS IBC Rue WorI3M1opet Oulterner 121 August 2016)MAAS New Museum 58C

Page 41: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Riok lieffigel

Y

An

AA

Alum. precurement nuteadalogy (e.• pa. bane eddelvesI Is adepted Michresults....uler .04....

INer• areeluesnms. MimeorureIngens requireme. In relema Mann. end development appro." las MAAS Persona. M.S. amps. alqueres alluse aosi Sucel siuMaridesl, uNce lus mum. en M.. MI um. doe Na.. emlullnulases timelines. w design Rod funcnanal form

Arca. Design Team

MAAS

,,.....

Paul.

14.0

Malat

tusiebn cleu eresurement. under stream as p..5114 ruMfeinme..mlop detailed program. Ws de.annelestaeas to In considered and enders. as requi. In me.. WO MI peal. ureernsem.MC praamment on.. to aalene ern. eel. mu.. 0.11...traellean

..Iv

Mal.

ad..

Onsdn• eta. p.m. es emus appromis..., gavernment nanaInlvieled m the peal. SAMS end els project mem to oanmen. enpurnant sulth plermanea... (lud SSD( Mee tow ensign ump•Man se .ude requirements and under.. Muss pr. m slut preens.mum, mom. ms. to alma. sub.. required to UM.. under... al the p.ect. Kenning require.. end ...In Tabs i.Sed ware . UK Menu Schedule.

Page 42: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

are•elv

'I'M'

to be see med

41

A.

Imp. al0.40. Campetelen tImerrameselel. she lodgement al ...pplIonans Mal al ...a. lee SUM.,,,,,s

PossibleTIT4 r...e P. 4. AP.. MM4 elm.. .elopms. se mune WM slelse.....ostary sdend.

Mules. 1.11. /Ism. ma... TI. us be deve...ing 054 ...rm.

SI..

MM.^.

p In lece

All .

.u.d. welds. nemnd to MAAS Pgarne......s. .U. matuleAlty. A Sagis. ...men. ..... Out. end •111.1a usereilon of du si. Tles Includes loge end ismry uslecist mass (0 • kuding bucks, bums. and ...lend Usher cm, park. eues6

e, 0.,..,T...,

Paul.

Tref. ..141...plen.4 rep.. mew we Wu me.a. dying .......ensMader. Dete....14 amd summundrensents es be consIdered durIn4 des. derelamerreS

MMUS

Medias.

MAI.

44 Muleelthes

AP

Page 43: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

The 61.3 Pane. az design and derefamunt does not mov. sunk. ea. as eannudelts la mai. esel/ or men peak spun. menus innut. the Asl.e............m,5 Mlels Mall. um pla.ng and urIssn devaimmant smegles ase rm..

.,...„ 0... Turn

Ureiely

0...cormention briello.curnenu end dueled neclekstion to UMAS • Ur an uneeelete ieral el r.....4Mader. es agreed .II breeder pt.. askehalders.IMMISSINEI

un.,

..d.,..

is

Al

on

. Slut. Mali. green . au.nes ere not meant. addressed and summed (.... and Su nearps TerneeS ....Man el dmelopenent empar.d. (...10. Ionar. Mb) nsults in ma meow dam.. an wee to Su fluentoeut qua.... Mr.mailes end M. el Us museum are asearsined

psc

Pau.

Mel.

Storemn Swot peon el .11..1 emorturdtles an tile ate ia . uees.m. diss. Me des. deselapment Al uldltional op..* seas. be AM.. MO sanaMmulen ta the 4..........MS0mm .5 M . WU 4.0.1 caienelments lo preMle as 60* hen.. MK NerIum dun Mimi. to ma. uleke as to andSeerme al hue. lime...V P.s...4..P.M.P.M. consaluilan MN suthultles ta be esuliislud....us ise.ge to In Included sun. Su eat.. runesMAAS.. el pranct sp... Se M.o. MU own es insilmlausengapmere.

Page 44: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Panlisle

Map e. M..

4.

0...1.26411......../..4.4 von. dr Xaw Yuman Is net oanp•rable es MI. nor peohles suf.. sp. se prers. Md. . 445./ mileellememdlui.

PSC

pp..,

Mapsue md u euuumeed sem.. An 'NO. QOM tlut ad... Mg. is camper. te ...... uel proa en Male ledidln•

P....

M„1.

in..

o

DP...

MA......... 044. w• ne10.04.5.. re. . psi In Wm.. en lande......... museum 0461.556 TM Vie.WM. velue es carn0.1. the current T.. ns TM.. a TM .14•40.pase require... nat me6

Prafect MA. Tum

M.)ce

Mamma a aeon managed deslen ear .s. Maui MATS ta reed.. emsame .I. On Sunetbn Onign Meand lu els.... end vislon for . New Museum.MIT•rent des. apt. I. Men dem.. by. MC end . Man.( Imput al ea. es...pram. mt. recumnungled les . Imainnume te sum. she paean MM.. nue.. lu sum. Ondualopment d' New Museum MI...AM 01.4....

Paul.

Madan. sue

In Ph.

44

Page 45: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

M

Optim 1

Urtlan1A

Merell requIremonta neted 0.0. the hinclia...Mel us unable As be met d. u ming.* rnmeaermin6 SM.... Ins... 4.0.......11.....een esplrallanel Male. tanspelMon sellemel erel the preferred MB oan. pc

081.4804...........dlume0 menclu see. to miseemed with useernment eleeee.

P.... Team

P.m Ou. Team

9.....

M.

ki.sr

MI.

riummuesellue mensal deg. that S.M. MAAS so re.. onleume MIMI. imet. Des. (410 And Ite MM.. end Alm. the Mums.Praral apton reamnumeed es. bus.ss an le suppert .... at funding num. ta support Au deulaiment .01 M.N. Maven In I. ONSIAAT..... el.n.

Passible

Madera.

In pluss

Page 46: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

M. 3 S.. Tuorim 121811.8. the mu.. a... G..6 ten he um.. suertel. MT eons... M e.r auto. a. required.

SISM

Mew

. P.s.

Oplen 3

Ian a, hefty Imnis on se..the TIUMASI Mout al MAASes.. wIthin the h... 0.14n B. Malan of du lu.p Men wen. alia.A.AS so fully set.the........

,....,...... 0. T.T: ..."

Pass.

Ensure .0,....44 Items. included dul thlulaes not come at 414 pr. 0 ese TM m......I.6 MIA.* maims Out Mamoru. ...items are es ensure .. of Me museum men.. Mu consirMis al nuireMIng Me .4.1....4 WO( end a.. and ...I se Me .rimse Cm. end PI.. .1... (II.quiesdS

Pose.

p.

Maderate

In*.

sl

SS

0,....

Oulen 3

Ilea of heMsge iteau amte . I. to .1Ie al.. end .4

Amen...num rompnu.. imam an P.. cans.

Page 47: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

N.0. 0.9,

o r el.1 0.4. Tem

p.....

.......

1..

Sngsp In iscurnmIty ennsi... erm the an.. use of du nun. item.. 4. et.... Mnur .P..

Mierre Su s.resd

Ensure ....... .. ere M.O. Pat. does octane at eta pd. doe Me mown. net Oak. . Arspdes. opt. ...rm. h.. It. are ea ensue 0.11.1. of sin musem aperetims.mu suumuno al men . Fernery items us Ise well ark.. And am.. to . Merit. Mune endPlar.41....s OrMid.S

Pass.

.

Ta Ise .a.

Sl

us..

Peas1.1. of . lurlup Item nmatively ellectim... Mu to MAT ......• eums and con............, im Nue Museum Iram Kum. Mau Is acennamIsed...m. presence of the hualim 0.1 I. amnia MIlas emu..

..i......

Team

/mg.

Ens. Mit II du Iserlt10 hems ere Induled MA Mk does nat aon0 ate price cd du 005 mum. net M.1.4.44r.1. rnst. Any c.i.f.... dm Mom.. luirlime kerns we to enes......ty el tne en.. aperations.

Out esser.a al mel......ge Items sa be .......1 and sanneed In ...As Mund and Plena. Aut.. Ilmequired4

ma.

....

Page 48: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

-:010

Ta bee.*

SO

Proms. N.. Uden .1..01.e.s. site a.tInes lenputsPm. Design

P,..,,,..j.,... SM ta.W. A I. In ilmelepatl to plan daunt actfoltles skuld listing occur.

M. d

SS

AN

T. des. al TAMS Pun.. is not develop. In • manner smultive es du .sion ...on , MAAS end Me lansuln are end culmal .....pectim an the 0.030 roan Iv the wane

MAPS

urIllaN

..'"' tiadvl Des‘gp YIN to Include MIAS preiect velan and obi... as cora repulterrunta.

Uniii.

Mules.,Aleallan

Te let seamed

54

Alle. meign use armer•d end crewlitw d' des. 04800. .0.. nu Adequately resser. weer. In.. an IN Mel of responses

MAAS

Poss.

D.. brIellin .114.0.1 to 0.1..41auid lar.....1 des. camp...Maelerale Wily .411 ow...on p.rameers m be Imnemulmel.

Pass.

Ma..

To Mad...

MAAS MC Usk Workshop 01 Outcomes (00 August 2016)MAAS New Moscow FBC

Page 49: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Risk Register

Si

AN

Th• design el MAAS Pananutia dews rot ,0.w lea, mt. Wpm.. co Ole anityto.vlopsne V* ausesure .vonipt *en 0 Oen*. era inseasamel marina

MASS

Pc.,,,,

Passible

,,,,,,....

karat

turtalenal Design Ikea . includa MOAN paint teslat and ubjecaus as ma repuirunents.NC to be deal** salt .. IntenNen of MAN.Mmeri.............1*.t.k. Min. ...MuMAAS. bannuetant lawn to *alma thoteur Oda in in.. .1 eutemes required el tiv SlairPtlayte1.• km. saws MAMAS also naes also men. progratnalts... ef.....en,....x be deselepal byMAAS cluing tam putlea stages. .

ems.

Modem. in.."

Al

The prop* gut. ang *Watt reNaernerta ...cast ranktruhlys lament Me. Ow timlan of MAAS Parma. me net *able to *Nu on the WAS Paranoia er.slon and Aka

NAAS

Page 50: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

ay..* protect ruairemuna to be Numughly Wag me .1tal*N.IMAANva mulua•munsmeA

Unlikely

Lamle 0 plass

A

Thetas., el MAMA net welksultsd ea Paernm.a. Veak elay. Anat. •ne *eat.. then.l.npactkv tiv Mk**, situatt.

M..

SIMAMy

Maar.

MAAS lunctiona reclubemene to ha tn. timing FOS gereloquaaenti enbritatblausia.meumme.

it..

ave... to beak.*

.

ACat4......1.

"

Mt

*Vaal.r.....l.Tv do, al MAMParramtoIs notedeveloped in • manner save*to ..broader tub* ad naval truirennanSSSD obleaue...• buNang er.......Musept and TimmyAMNIA.

..,,,,,- - . A .

U N M A N

p . a .

Model. Aluesiste

EMIEZME

gave design sal.. era am.. itral tem.*. mpu.nutels al the Parma. art.a.

Puobla

Mean. To be fain*

tants to ba scam*

Page 51: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

ENO reptenvents to 1.• viel ...tee in tam el besallt for min spin...Ina in mama emend.*

.

Ali

Ma* to aletitaasly agent.. the M.. of requIremena lam. coa away.] to snahla saltubunamtlam mnsMsk M mmm 1..1.

,,,,,y (.r., 0...1 consul.nal

M.N.***

P.

0.....

Mau

A mesas Cella.. ad leg.. Pan lity Waal .1 sty yro*. Pulammtan..ama karliMmi. gualepati =mama to I,. FIC and kstairangs deist* ea. the NAG

the mope ...VOW iltusave etUrIng sas covicievel 1n. FBCA avails ...tn.* Maks. Pan lity *v. Nat*. N.V. Iali...... ... Mei., l.M.11

deve.yed conosant bake AK sr. lay finik.....1 WO.. ii1C.

UN a.

UM...

me* in eb.

itiUm in P.m

M

lack el °legation a tku ecilealo n Amara. atety to trea, melnuinAnd tan oblaa *tan the solieulon w.n ungutalerm .•*nal., urea., Oaks to.. safety of .• WY** a* the Ma*ummimuml

Page 52: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Li

A

Siva ls insufiltleaticesa le AVM cal. suanditure funang to era. .e enabling...sad* Arum.. to man** prlor n. ....naval. a Iv broader wake analeted Ai.. 0.04 Penby Imitating Pisa. deNtstry Val.. N.... davit cum.

.....

Pm*.

iamb

as...

A saals Casaba mg taMa. Pan Myatt that MI pion* roogrunt............t latei.seatrant to the ell° e*kul ...PM*. atills Me .0.

11411.4

Mar.. . few.

FS

M

W.A.. consitieratimt of Ns tanntion end legialmi raparanunts br *Mae al slentficant us. V.... MAAS Galati. that ay.. Mai. abansinti. pas.... a* lui.......1.4.tletnolitlallmates slatamnt logistkal an ttne allay ...a *ma.

eat., of th. Project widen.. Wert.* emanas.

MAAS

Unlikely

Ma*.

deal**

A speci.CoNesutions and Logluir. Pan ay Want Out will we** prom*... mesa. and bugged. beingconsnent to Oa FM sag lay Win. dueled wil.. th. TAC.

Ma

Matures in iti.m

Page 53: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

*

llyaspalv low., v. puuttalna we. tell sol..mtntattage laell.. a* amatlom owe gas to the till., and urea of the, o,

MARS

Ur.*

klageists

develop*

A sped. gelle*ans vtd loam. Nen lbytatent Nat sal ma itmOsuenet..**.* ',MP.. bangconeurrent to the MC** key Vulkas gat. uti.nt. MK

Unlikely

Manes 0 Aims

.2

.

Vats Is... or los. of *Vox durinmilsnantling sni coserve.. *as tam.. Om ea Oa saurnememaut a the tan.. mai

MA.

Uri.*

Malersa

Urinary

kftl•rate .01.•

amyl** ,wok CoNe*on. asi Login* Plan My ottani at MI peg. proaanunet anat. And budget. ban.

eoneurant to .. FOC and itey finammleageg ultign .• NG

.

MIJm.kawthus A .ely gamma, or Ion mi. co.......t in Ma. staging panty Vv., se •*mit as pert el the *NY. .1.1.tlotemertiss .. traumas th. at.enun

MA.

U nlikuly

Page 54: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Nam.

*mac galectlas a* Loa.. glen flty *via tha vat Pales mearammsteellatic. ord bawl I. bee. eat** consurvert to the SSC ang kAtinnetgia.......2.-

kNolam Mem

.

!name stm,ug reou.rnene fur Um sae.. pars.. raga..&la.* erolea hop...Tranalen ,,,,,,,

Rae

A.m.

Cone*.end leMakt. hotly ol work m.o.. optimal uslaon fuaransitlan tepu.venaraw. manta tam lova° and ..luded M.. 20Gbutleek

ball.

Mk* in Mae

10 Construalon

AN

Faun caectIon rough gam (AMC) le muvuoug by. Pula..* Naga* von. opacity is waited soon.. ...me* se

MARS

P.M.

Aleauste

mama ad loam. hay a wont *pro... • anew of ...I requitumnis kr the sollection snd to awl. al* on WM.* ann. agues myna

...., Mph*

21

Al

Adjacent *naval* mama rag..., *pat *nab* oak*. yams, as smithy ea) ad taltur seem ones I. emnatun I. Vara..

pygmy

u(4

Peak°comma. mamma atMlie. and Us stu Plans ie. dash° Nur., le. ma. Muses.

Page 55: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Ruing sue tuts Meet pteiat.on.. Um to he consklual tui.relsvms le . Ma.* vbarentenalayasuatsPlanner utpact a In. Paranst.•

Pat.

Was To Iv aliened

BC.. to saran canain*.ayounding *Neat eve 1..........02

.,,,,,,

Cornp*g pais. In P anunaturimpat . mu..* Pa. SOMuntrant

P.a.

1.1.11.

Modem.

e.g..... ...may ankh *re artua amp... e.Me im Mum.* ........1 ...,.....gyvy

Vasa.

Mesiente ...aimed

AN

latent Ms al.. Ispallitay atavategal final dam and inima on construalon cote a* our* pay. pages

M A . N . M . w a v e .

...,...

SitsAsiNgdue alprora aettrities dur.g MC gevelopment to Mena" ... Usu. sal viniran .10.1.. lut invelleekNalled coviruction van•gavent naly1.1....sets. asru to la clevNed during later moan Musaappeoplael ear.° was Me natalboun rem., *angina ammeoloacal *NamMean ...des to Ina*. ...lent *aka*. fa inVeset a usismattOM kn.. *tim

Rua.

Page 56: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Magerse. Ye in sawed

MI

.

Ceestituilm may have *arse *peat col surrounglaanulanssan Ole Paw.. mu gang Ow per.1 a ennautsc....stueag nu. .nd Impact. to fox141 and va. 1.re lea . drab, aunty bets glut*. alectiry matoluest............ du°.

MAAS iMuNding „.,,,t,,,,

u1s4

Miner

NW* conserualen management ativ.e. nut its etu plans ...ailed are, lasr ...a ph.ses

l VON

Mk* . lac.*

Al

Dituvery of Yu soma Mad. Van. oma... at contruction that v.... val tet tutaltneni and arnadiatien. dare. *pm*.

. . , " . . . . . . t . ,

....g.,,

016:61r.

err

UMNegy

WNW* SO Iv gam*

NW* conanoction manapineut ace... sal Ms ...pant to. °eta* during last proton ithne.

Page 57: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

76

ANCons.* a* ga woe. vats ere Ng., Ilan ...ad in th. maul met ntimatlan usestaltsn a. part or. enact ear... Han..

..."?....1'7"

Mmin.

MM.*a

be

NW* ea allance to . under.* to Wenn the tlestat ....MY ................*M.ensue ad waved* tutm as a..., vtl design eaceme.

Unigaly

La.. Ye tut aliened

77

"

,.W Wass Oen tesnaext the ...Av... MARS Magmata end the *ation of tiv co.** is not allated m. Orman senantuien tlindine. thereety knivaing ae ea*. tiveliarms. ada., mg aim tmerdepeedenties a. Mast °mei. end lundIng regultement. on muss comp..* and *Ws. Pramsuislas run Man lavas was.

WAS Mulkikv eunumtml

ikes.

&area

nigFla

emus. programme m indtele agateer a* logistic prognmain. requirenano la...41.1.?Oast Schegule Nam.. vas. Vahan.. IV Al (swan. knaunatrolat actitities.

UntgaM

M*... Ina..

.

AN

Aaterislisatian et risks In a., arum.. Palest Mea l. , Navin. . ..I inw.n... .... ..1 the Program clue.. relemft

.,,,s......,,,,,.„,,,,,

Page 58: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Pam.

Moan.

Mail* vatetrustion manaNemat ea.. mg gte etc popbale dm** Nun, Mar "Mat Oasts

Moan. To. sated

MAAS SSC Risk iihrkellop 01 Oulu*. (211 August 20161MAAS New Museum FRC

Page 59: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

Risk Register

a=21711

AI

se

Moe Is inedilelmmusese usual.. sad atlas musk md me.... ..... .. . ...... ... s ......Damage is mused to Mean. Wham or ler. Ingestrukture N..ummuctieg damp ems.. the need lor rerneMmlasmeark end

MAAS (1.11dIng .. a .,. A,AA,......A ,

unou,

laikels

..... Detelled cansamtron menegernent MIMI. sal sIlm.plans lobe Ile* duanMaser psalms Ones

karate OMB. coma.. rnemarnen1 eel.. end MI me. Mem to Ise dwelled during Mau project Muses

UnIlleskr UnreeM

Moderan To he earl

Madera. M km WM.

ci

All

mos a/ my masa mammal. resulting In km u1Pramr/emparsteus.. • .

InsuMaeut am... assMsesM kudIs11. sm..'

MASS

MAAS

MAASMAAS

CA.As

1.1.11 Pau.

Pomba

LInlibly

Meknes Mama knoulear lass kOmplemenOnMeternlan armed...

Likely

Page 60: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

io b• salimed In*.

LIMN

elm

0

AN

AN

AA

MAAS self as e . ri - M. Me un, est Gus, eine mama. of trse row Willa fails so whim. panned mmullarsel

Me ree. as *IMAM Pernmelts lo prams maw. end mom sumo revenue. opportunities Im/Mueserdanste Os Me opervang ov mane to mem. and Improm Me a. and MAAS lecaMs IMI

Moderate ONeratIoner Masks, rupserernents to be ereN Mead In ilumktelled FOB and brie, fl~eMum.. to wrokes· ' '' • ''

Wirx IF . °prat., motel to opt. Wealens goo.. 1.14 npuiremute.1141 .1,1

Passible

WM MN*.Mame. o be mewl

.4. In ploca

AN

llm soma. oMMASP•rrermoss to...ewes avAnamvaseed. revenue Is bulesientrelease so clung. M NSW

MAAS

IMMely

MC Operatlanal a us c.a. Mme.'s opera.. AMY% repulrernme

UMW,

Madames In W.

Page 61: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

V

MI•

Mere le ...dent weenie...nal end so Mngopecles end cemedirry so ma. .• mem.. outruns. of MAAS Parlernelta OS k• Ml. . . . .

NMS

Unlba

Opmetangrequhrnante ...mama lo a.m. mscmang ma...mum lobe e metope/ estimate prof.MamaUm... P.m. Mumma. so he mode M omrs.. and *up rnenmement am.. emesurana.

Odd,

Manta M be attlerd

M

Si

MPS. es creme sed IAN 41v0•01,••••ser.11, omonunkles Mmes. esPouge awn me mum, rummulenmeMg omoranales, end she

MAAS

UreMls

°Perm* rasserements erttli respect toes M, end remardm nesammenu . M NemMerOM 11..11 rks1 luMmsYoder.Mern0M nhem. Annum. mod nude In mar*. end Mame men...rums Men.. amassment s.

0555,

5...,.. TOW Mimed

1.1

M

AN

EMErinageiga5t511111111:1:11

11111111111111:11:11 imam sonsurtma us respond. dm mom roma. . Om MAAS... ..ih.ra 1. Iniadliciont opeary In Ausale to undue the ConantProductan, M.Mtlan andlustMetlan nuulremerae kw am Museum.... ... . ... . . .. ....Ineulesient rembilIss end raw.. a1 Nu N.M. Mr.. and Mensgement support as• hem aillul1 Imulastlam an ate Mathes arul slavery or am Praect's olgenives MN. Ms WM. MIn

MAAP

h...

..s

Page 62: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

MAAS

Rem

11.111V

UnIgea

Cpureslonel requireinenre Sean respect to stehry and meaning m...menet m be Mee. skrim she projectuaneh MemMtakme. Amesement . he made .marstlems1 and elesup macrameMenreng usesernence

OPmenonel requiems. M. mama ta Bs...end mum.m massremenes to Cm Me* Mang the maims MemMil PM.. *ens robe made In amrsdonsl end Maw maMNemerrl ;Munk,. nsaumsnes.Opera.. requirements Mth rem. so MON, and rosemary requirement. to Isu dmelopird claim du oral.Madera......P.A. ksansmant min made In aqraden.1 and chd. rnarupownplanning usnarnwn.

Operetlonel remeremerde MN r•Sp•M to MeNnOnd reSourting repolmnunt, WIN talon. dud,. the profett r....• 1.... a.m..... Ina. In grnanlan.1...........0.........^.

......... • • rstiwal tpulnIllienia Wall •••Ip.ea Co Mal.. and rascurclog rquirwelema ea ...pad ...mese moj Masa. Mummer...se mule In openionsl and amuse memenueut Marinmemsensenu.

Moderate SuseemeMeNC•11.S. Mama Sob developed M.N. MC

...

Ran

A.r.

u...,

UNMAN

Modern a Ise *I

...... TOM a

Me4nM To 1m sctlased

Minor To Ise mewed

Modena To M actlanee

Morkerets In seem

0

NS

An

Page 63: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

AA

Governance ermnpaserm emaciated sol. Me Project Implementation an<I summing need CM Mom.. Iss enable Me Ream and us lame the ...dawns linkages M. key/rams saltekeiden.

IS

Si

1^1.01srms us MumuMM1 knimmernena in elsturam •M opereasa mama. el Use *Menu Memo. Mem sla maims rakes macre hew Me paten. to Mears* Moms Me smut.. of Ur Ames wed wake trio erwswreeewrweerwr .0.0.11.0 MM. end Pr corurnera mamas MAIMS Pmmes.

MAAS

Unlikely

iladereas Museum oententaMelopnlen1 Is Mal OM same. Ised, dm. anuelde o1.111C)

wash

Moderate IOW actlar.

MI

Led of Mangum a [assent MONrumneM me sunms..111011.1.1 will Irrip.1 en tne abgity to Altman roe vAl mew. r egurnmenm.. .. . .. ...11.. pmparnmil.. 'rm...., and a.m. 4inprment..... C. nal pre.•16“..1Reient sm... ane repufaclon Ic.A.A.11.11rrametia es Amoy gold summer" bat tempos', eshaslaormMAAS

Page 64: maasbusinesscase.commaasbusinesscase.com/business case/New Western... · Web viewRisk Assessment and Management FrameworkMIMuseum ofApplied Arts AS& Sciences. Document Control. Document

MARS

Issuable

UnIgnsly

Moderate Museum gement dame.. Is sublect la • Seism. body of mark leuesied 01Me MM

/Mame lawmen swims ...mut Is subject so a mousse sommussommage es me 1m1

R.. wash

hicalenta I'M.*

Madera. lo Ise ealmed

MAAS FBC Pak Workshop 01 Maumee (ZS August 10161