+ All Categories
Home > Documents > Casing Scrapers 10-17-07 · 2018-01-25 · toward the box connection (See Figure 9). After...

Casing Scrapers 10-17-07 · 2018-01-25 · toward the box connection (See Figure 9). After...

Date post: 07-Apr-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
14
Transcript
Page 1: Casing Scrapers 10-17-07 · 2018-01-25 · toward the box connection (See Figure 9). After installation of the proper size of blades, the scrapers are ready to be installed on the
Page 2: Casing Scrapers 10-17-07 · 2018-01-25 · toward the box connection (See Figure 9). After installation of the proper size of blades, the scrapers are ready to be installed on the
Page 3: Casing Scrapers 10-17-07 · 2018-01-25 · toward the box connection (See Figure 9). After installation of the proper size of blades, the scrapers are ready to be installed on the
Page 4: Casing Scrapers 10-17-07 · 2018-01-25 · toward the box connection (See Figure 9). After installation of the proper size of blades, the scrapers are ready to be installed on the
Jeanne
Highlight
Jeanne
Sticky Note
1" AMMT
Jeanne
Highlight
Jeanne
Sticky Note
2-3/8" PAC DSI
Jeanne
Highlight
Jeanne
Sticky Note
2-3/8" PAC
Page 5: Casing Scrapers 10-17-07 · 2018-01-25 · toward the box connection (See Figure 9). After installation of the proper size of blades, the scrapers are ready to be installed on the
Page 6: Casing Scrapers 10-17-07 · 2018-01-25 · toward the box connection (See Figure 9). After installation of the proper size of blades, the scrapers are ready to be installed on the
Page 7: Casing Scrapers 10-17-07 · 2018-01-25 · toward the box connection (See Figure 9). After installation of the proper size of blades, the scrapers are ready to be installed on the
Page 8: Casing Scrapers 10-17-07 · 2018-01-25 · toward the box connection (See Figure 9). After installation of the proper size of blades, the scrapers are ready to be installed on the
Page 9: Casing Scrapers 10-17-07 · 2018-01-25 · toward the box connection (See Figure 9). After installation of the proper size of blades, the scrapers are ready to be installed on the
Page 10: Casing Scrapers 10-17-07 · 2018-01-25 · toward the box connection (See Figure 9). After installation of the proper size of blades, the scrapers are ready to be installed on the
Page 11: Casing Scrapers 10-17-07 · 2018-01-25 · toward the box connection (See Figure 9). After installation of the proper size of blades, the scrapers are ready to be installed on the
Page 12: Casing Scrapers 10-17-07 · 2018-01-25 · toward the box connection (See Figure 9). After installation of the proper size of blades, the scrapers are ready to be installed on the
Page 13: Casing Scrapers 10-17-07 · 2018-01-25 · toward the box connection (See Figure 9). After installation of the proper size of blades, the scrapers are ready to be installed on the
Page 14: Casing Scrapers 10-17-07 · 2018-01-25 · toward the box connection (See Figure 9). After installation of the proper size of blades, the scrapers are ready to be installed on the

Recommended