Date post: | 16-Apr-2017 |
Category: |
Documents |
Upload: | castillianresources |
View: | 185 times |
Download: | 0 times |
2
3
4 TSX-V: CT OTCQX: CTIIF Please refer to Page 2 for full disclosures on these result figures
•
•
5
*For full technical details please see press release dated January 17, 2013
6
Total Mineral Resource--Hope Brook Gold Project as of October 1, 2012*
Category Tonnes
(millions) Gold (g/t)
Gold (oz)
Indicated 12.3 1.48 590,000
Inferred 8.3 2.07 548,000
7
Drilling and geophysics have
identified a major fold structure
that closes below surface in the
Connector Zone. This explains
why the silicified horizon doesn’t
come to surface southwest of the
existing mine where historical
drilling failed to intersect the
mineralized silicified zone.
8
9
10
11
12
open
open
open 240 Zone
open
Mine Zone
Newly Identified Major Near
Surface Target Zone
13
Growing the Resource
14
15
Chetwynd
South
Chetwynd
Prospect
240 Zone
NW Zone
Mine Zone
16
17
Good Road Network
Air Strip
Wharf
Modern Winterized Camp
Ramp Portal
18
*Figures reflect a 5:1 share consolidation approved by
shareholders at the last AGM (May 9th, 2012). The
consolidation occurred on February 19th 2013.
$0.00
$0.05
$0.10
$0.15
$0.20
$0.25
$0.30
$0.35
$0.40
19
–
–
–
–
–
–
–
–
–
–
20
21 Member of Forbes & Manhattan Group of Companies
22
•
•
–
–
23
24
Former HB Mine
Major
Target
Zone
Extensive Resistivity Low Marks
Footwall Conductor (Blue)
25
26
0 50 100 150 200 250
4
5
6
7
8
9
10
11
12
13
0 1 2 3 4 5 6 7 8 9 10
AuGrade(ppm)forHB11-023Outlier
δ18O(‰
VSM
OW)
AuGrade(ppm)
AuGrade(ppm)Vs.δ18O(‰VSMOW)
HoleHB10-003
HoleHB11-013
HoleHB11-023
HoleHB11-029
HoleHB11-031
HoleHB11-033
HoleHB11-034
HoleHB11-060
HoleHB11-061
HoleHB11-023AuOutlier
27
•
•
•
•
1 2
3
1
2
3
28
29