Travel to the castrelo´s hydraulic central
Transcript
Page 1: Castrelos Hydraulic Central

Travel to the castrelo´s hydraulic central

Page 2: Castrelos Hydraulic Central

WATERFALL

• This is the Ezaro´s waterfall that it´s in the Corcubion´s estuary. The Xalla´s river finishes making this waterfall. It´s open because lasts days rained a lot. When it´s open they lose 100m3/s. it´s got 100m of high. They used it since 100 years ago to feed some furnaces that use silicio

Page 3: Castrelos Hydraulic Central

How does it work?

As this river bring a lot of water, they maked a dam( the dam of pindo).

The water has got a potencial energy to 200m of high. When it fall produce a cinetic energy that move the turbine producing mechanic energy and it moves the alternator that it changes the mechanic energy in electric energy.

The machines of the first building work with 100.000 kw

Page 4: Castrelos Hydraulic Central

FIRST BUILDING

• There are 2 vertical turbines of 50.000 kw each one.

• It built in 1992

Page 5: Castrelos Hydraulic Central

DISYUNTOR OF GAS

• This is a “disyuntor of gas”. It can be of oil or gas. Without this the current can´t flow for the lines. It´s a security measures.

Page 6: Castrelos Hydraulic Central

TURBINE FRANCIS VERTICALTURBINE FRANCIS VERTICAL

IT´s a plant of IT´s a plant of stimulation. It was stimulation. It was excited with excited with magnets. It has got a magnets. It has got a potencia of potencia of 4507200KW. It´s 4507200KW. It´s maked in 1987. net maked in 1987. net jump:20263m. jump:20263m. flow:2500m. flow:2500m. Velocity:42857r.p.m.Velocity:42857r.p.m.

Pd: the more information of the turbine is in Pd: the more information of the turbine is in another slide: parts(12) how does it work(13)another slide: parts(12) how does it work(13)

Page 7: Castrelos Hydraulic Central

BOTTLES OF NITROGENBOTTLES OF NITROGEN

They are bottles of They are bottles of nitrogen. When we nitrogen. When we give pressure to the give pressure to the oil, it is lubricateoil, it is lubricate

Page 8: Castrelos Hydraulic Central

TRANSFORMERS AUXILIARIES

• In each one go in 13000V and go out 70000V. In the factory of Dumbría the value of voltage changes in 220V

Page 9: Castrelos Hydraulic Central

THREE PHASES TRANFORMERS

Page 10: Castrelos Hydraulic Central

REFRIGERATOR FULL OF OIL

Page 11: Castrelos Hydraulic Central

SECOND BUILDING

• There is a horizontal turbine of 10000kw.

• It is 100 years old

Page 12: Castrelos Hydraulic Central

Horizontal turbineHorizontal turbine

Parts of turbine: Parts of turbine: stimulation( to make stimulation( to make turn the rotor) turn the rotor) alternator ( to change alternator ( to change the mechanic energy the mechanic energy into electric energy) into electric energy) turbine ( part mobile, turbine ( part mobile, it moves the axis that it moves the axis that get until the get until the stimulation). It is 8 stimulation). It is 8 years oldyears old

Pd: another information of this turbine is in the Pd: another information of this turbine is in the next slidenext slide

Page 13: Castrelos Hydraulic Central

Small museum: old turbineSmall museum: old turbine

How do the most How do the most turbines work?turbines work?

The water goes in the The water goes in the down size of caracol. down size of caracol. The water get and go The water get and go out for the “arabes out for the “arabes diretrices” push the diretrices” push the rodete and make turn rodete and make turn the alternatorthe alternator

Page 14: Castrelos Hydraulic Central

ALTERNATOR

• It has got 110v and provided direct current to the poles. It produce altern current. We give tension of 110V to the magnets. It creates a magnetic field that produce a altern current to 6000A

Page 15: Castrelos Hydraulic Central

CONTROL PANELS

Page 16: Castrelos Hydraulic Central

THIRD BUILDING

• There are two vertical turbines of 12000kw and one of 6000kw

• It is 50 years old

Page 17: Castrelos Hydraulic Central

TURBINETURBINE

Page 18: Castrelos Hydraulic Central

EMPLOYERS

There are 15 employers of maintenance the total of the factory are 30 and the total of the company are 260.

The employers work 8 hours by day

Page 19: Castrelos Hydraulic Central

PHOTOS OF US

Page 20: Castrelos Hydraulic Central

MADE BY :

SARA VIDAL CASTILLO