63
1 www.kinross.com 1 KINROSS GOLD CORPORATION March 2018
Transcript
Page 1: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

1

www.kinross.com

1

KINROSS GOLD CORPORATIONMarch

2018

Page 2: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

2

www.kinross.com

2

CAUTIONARY STATEMENT ON FORWARD-LOOKING

INFORMATIONAll statements, other than statements of historical fact, contained or incorporated by reference in or made in giving this presentation and responses to questions,

including but not limited to any information as to the future performance of Kinross, constitute “forward looking statements” within the meaning of applicable securities

laws, including the provisions of the Securities Act (Ontario) and the provisions for “safe harbor” under the United States Private Securities Litigation Reform Act of

1995 and are based on expectations, estimates and projections as of the date of this presentation. Forward-looking statements contained in this presentation include

those statements on slides with, and statements made under, the headings “Kinross Value Proposition”, “2017 Highlights”, “Compelling Relative Value”, “2018

Outlook”, “High-Quality Organic Development Projects”, “Attractive Development Projects”, “Operating Highlights”, “Financial Discipline”, “Exploration Highlights”,

“Enhancing a Cornerstone Asset”, and “Appendix”, and include without limitation statements with respect to our guidance for production, production costs of sales,

all-in sustaining cost and capital expenditures, continuous improvement and other cost savings opportunities, as well as references to other possible events include,

without limitation, possible events; opportunities; statements with respect to possible events or opportunities; estimates (including, without limitation, gold / mineral

resources, gold / mineral reserves and mine life) and the realization of such estimates; future development, mining activities, production and growth, including but not

limited to cost and timing; success of exploration or development of operations; the future price of gold and silver; currency fluctuations; expected capital

requirements; government regulation; and environmental risks. The words “2018E”, “2021E”, “advancing”, “ahead”, “assumption”, “budget”, “contemplate”,

“continue” , “encouraged”, “enhancing”, “envisions”, “estimate”, “expect”, “explore”, “feasibility”, “flexibility”, “focus”, “forecast”, “forward”, “FS”, “future”, “goal”,

“growth”, “guidance”, “indicate”, “liquidity”, “momentum”, “objective”, “on schedule”, “on track”, “milestone”, “objective”, “opportunity”, “optimize”, “outlook”, “PFS”,

“plan”, “position”, “potential”, “pre-feasibility”, “preparing”, “priority”, “progressing”, “project”, “propose”, “risk”, “study”, “target”, or “upside”, or variations of or similar

such words and phrases or statements that certain actions, events or results may, can, could, would, should, might, indicates, or will be taken, and similar

expressions identify forward looking statements. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while

considered reasonable by Kinross as of the date of such statements, are inherently subject to significant business, economic, legislative and competitive

uncertainties and contingencies. Statements representing management’s financial and other outlook have been prepared solely for purposes of expressing their

current views regarding the Company’s financial and other outlook and may not be appropriate for any other purpose. Many of these uncertainties and contingencies

can affect, and could cause, Kinross’ actual results to differ materially from those expressed or implied in any forward looking statements made by, or on behalf of,

Kinross. There can be no assurance that forward looking statements will prove to be accurate, as actual results and future events could differ materially from those

anticipated in such statements. All of the forward looking statements made in this presentation are qualified by these cautionary statements, and those made in our

filings with the securities regulators of Canada and the U.S., including but not limited to those cautionary statements made in the “Risk Factors” section of our most

recently filed Annual Information Form, the “Risk Analysis” section of our FYE 2017 Management’s Discussion and Analysis, and the “Cautionary Statement on

Forward-Looking Information” in our news releases dated February 14, 2018, to which readers are referred and which are incorporated by reference in this

presentation, all of which qualify any and all forward‐looking statements made in this presentation. These factors are not intended to represent a complete list of the

factors that could affect Kinross. Kinross disclaims any intention or obligation to update or revise any forward‐looking statements or to explain any material difference

between subsequent actual events and such forward‐looking statements, except to the extent required by applicable law.

Other information

Where we say "we", "us", "our", the "Company", or "Kinross" in this presentation, we mean Kinross Gold Corporation and/or one or more or all of its subsidiaries, as

may be applicable.

The technical information about the Company’s mineral properties contained in this presentation has been prepared under the supervision of Mr. John Sims, an

officer of the Company who is a “qualified person” within the meaning of National Instrument 43-101.

Page 3: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

3

www.kinross.com

3

KINROSS VALUE PROPOSITIONEXCELLENT OPERATIONAL TRACK RECORD

• Diverse portfolio of operating mines consistently meeting or

outperforming our operational targets

STRONG BALANCE SHEET & FINANCIAL FLEXIBILITY

• $2.6B in liquidity with net debt to EBITDA ratio of 0.6x(i)

• No debt maturities prior to 2021

ATTRACTIVE DEVELOPMENT PROJECTS

• Executing on FIVE projects and advancing THREE additional

development opportunities

1) Tasiast Phase One

2) Tasiast Phase Two

3) Round Mountain Phase W

4) Bald Mountain Vantage Complex

5) Moroshka Satellite Deposit

COMPELLING RELATIVE VALUE

• Attractive value opportunity relative to peers, considering

annual production, cost structure, track record and relatively

low-risk growth opportunities

(i) As at December 31, 2017.

1) Fort Knox Gilmore

2) Tasiast Sud

3) La Coipa Re-Start

Page 4: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

4

www.kinross.com

42017 Results Highlights

Page 5: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

5

www.kinross.com

5

STRONG TRACK RECORD

2012 2013 2014 2015 2016 2017

MET or EXCEEDED annual

production guidance

MET or came in UNDER

annual cost guidance

MET or came in UNDER

annual capital expenditures

guidance

Consistently Meeting or Outperforming Targets5

Page 6: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

6

www.kinross.com

6

2017 HIGHLIGHTS

FINANCIAL STRENGTH & FLEXIBILITY

• Increased cash balance by

~$200 MILLION since year-end 2016,

a result of excellent operating results

and the disposition of Cerro Casale

• Strong financial position to fund

development projects from existing

cash and liquidity

Total liquidity of $2.6 BILLION(i)

(i) As at December 31, 2017.

Maintaining balance sheet strength & financial flexibility remain priority objectives

$1.4 $1.6

$0.8

$1.0

$2.3

$2.6

December 31, 2016 December 31, 2017

US

$ b

illio

ns

Strong Liquidity Position

Available credit Cash and cash equivalents

Totals may not add due to rounding

Page 7: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

7

www.kinross.com

7

2017 HIGHLIGHTS

ADVANCED DEVELOPMENT PROJECTS

• Advanced construction of Phase One

• On budget and on schedule for Q2 2018

• Completed feasibility study and approved Phase Two project

• Advanced engineering and procurement

• Completed feasibility study and approved the project, adding approximately

5 years of mining and upgrading 2Moz.(1) to reserve estimates

• Advanced engineering, procurement and permitting

• Completed pre-feasibility study

• Advanced engineering, procurement and permitting

• Gained mineral rights to Gilmore land and initiated feasibility study

• Accelerated drill program and initiated pre-feasibility study

• Completed project on time and on budget

• Advanced development of the twin declines

• Advanced permitting and reached an agreement to consolidate ownership

of Phase 7 concessions

Tasiast Phase One

Tasiast Phase Two

Round Mountain

Phase W

Bald Mountain

Vantage Complex

Fort Knox Gilmore

Tasiast Sud

September NE

Moroshka

La Coipa Phase 7

(1) Please refer to endnote #1.

Page 8: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

8

www.kinross.com

8

-13%

1%

6%

6%

6%

6%

6%

9%

14%

14%

17%

19%

20%

30%

38%

39%

Energy

Precious Metals

Real Estate

S&P / TSX

Utilities

Consumer Staples

Materials

Financials

Gold price ($/oz.)

Telecom

Technology

Industrials

Consumer Discr.

Base Metals

Health Care

Kinross

-44%

3%

5%

7%

8%

8%

13%

14%

18%

19%

23%

36%

39%

50%

52%

71%

Health Care

Technology

Real Estate

Gold Price ($/oz.)

Consumer Staples

Consumer Discr.

Utilities

Telecom

S&P / TSX

Financials

Industrials

Energy

Materials

Precious Metals

Base Metals

Kinross

COMPELLING RELATIVE VALUE

TSX SUB-INDICES PERFORMANCE

S&P/TSX 2016 Performance S&P/TSX 2017 Performance

Source: FactSet

Page 9: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

9

www.kinross.com

9

Enterprise Value(i)

(US$M)

Net Debt to

EBITDA(ii)

$1.0

$2.4

$4.6

$5.2

$9.7

$13.6

$14.8

Eldorado

Detour

Yamana

Kinross

Agnico

Goldcorp

Newcrest

0.5

2.1

2.5

0.6

0.8

1.7

1.2

COMPELLING RELATIVE VALUE

ENTERPRISE VALUE VERSUS PRODUCTION

Market capitalization does not reflect significant scale of production and history of achieving guidance

Historical Production (Moz)(iii)

Past 6 Years (2012-2017)

Consensus Production Estimates (Moz)

Next 4 Years (2018E-2021E)(iii)

Achieved Original Guidance(iii) Missed Original Guidance(iii)Market Capitalization Enterprise Value

(i) Source: Bloomberg

(ii) Source: Bloomberg; net debt to trailing 12-month adjusted EBITDA.

(iii) Source: company filings; metrics are for each company’s respective fiscal year. Guidance based on original figures provided at beginning of year, adjusted for acquisitions & sales.

Production is based on historical data and analyst consensus estimates.

Annual Average

0.6

0.4

1.1

2.5

1.4

2.8

2.3

0.6

0.6

1.2

2.5

1.8

2.7

2.6

Page 10: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

10

www.kinross.com

10Operational Excellence

Page 11: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

11

www.kinross.com

11

Bald Mountain

2018E GOLD EQUIVALENT

PRODUCTION(2,3)

OPERATONAL EXCELLENCE

DIVERSIFIED PORTFOLIO OF OPERATING MINES

GLOBAL PORTFOLIO

Operating mine

Development project

Round Mountain

Fort Knox

La Coipa

Paracatu

Kupol

Dvoinoye

Chirano

Tasiast

AMERICASRUSSIA

WEST AFRICA

(3) Refer to endnote #3.

60% of estimated 2018 gold equivalent production from mines located in the Americas

60%20%

20%

Americas West Africa Russia

2.5M ounces(+/- 5%)

(2) Please refer to endnote #2.

(3) Please refer to endnote #3.

Page 12: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

12

www.kinross.com

12

2017 Guidance Full-Year 2017 Results

Gold equivalent production (oz.)(3) 2.5 to 2.7 million 2,673,533

Production cost of sales (US$/oz.)(4) $660 to $720 $669

All-in sustaining cost (US$/oz.)(4) $925 to $1,025 $954

Capital Expenditures (US$M) $900 (+/-5%) $898

• Met guidance targets for sixth consecutive year

• Achieved the high-end of production and low-end of cost forecasts

Particularly impressive results at Tasiast and the Nevada mines

Continued solid performance at Fort Knox and at Kupol-Dvoinoye

Continued track record of meeting or outperforming our operational targets

OPERATIONAL EXCELLENCE

STRONG OPERATING TRACK RECORD

(3) Refer to endnote #3.

(4) Refer to endnote #4.

Page 13: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

13

www.kinross.com

13

OPERATIONAL EXCELLENCE

2018E PRODUCTION AND COSTS(2)

Kinross Total(3) Regional Forecast

2.5 million

+/- 5%

Americas

1.51 million

West Africa

500,000

Russia

490,000

Forecasting another solid year from operations, with guidance for production and

all-in sustaining costs in-line with 2017

20

18

E G

old

Eq

uiv

ale

nt P

rod

uctio

n (

ou

nce

s)

Region 2018E Cost of Sales

Americas $750/oz. +/- 5%

West Africa

(attributable)$795/oz. +/- 5%

Russia $620/oz. +/- 5%

2018E Regional Cost of Sales Forecast(4)

($ per gold equivalent ounce)

Cost of sales(4) $730/oz. +/- 5%

All-in sustaining cost(4) $975/oz. +/- 5%

2018E Unit Costs($ per gold equivalent ounce)

(2) Please refer to endnote #2.

(3) Please refer to endnote #3. Kinross total attributable production and regional forecasts for 2018 are +/- 5%.

(4) Please refer to endnote #4.

Page 14: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

14

www.kinross.com

14

ENHANCING A CORNERSTONE ASSET

ACQUISITION OF POWER PLANTS IN BRAZIL(i)

SUMMARY

• Kinross to acquire two hydro

power plants in Brazil from a

subsidiary of Gerdau

PURCHASE

PRICE• $257 millionii

FINANCING

• Approximately $200M in debt

(expected to be in place by

closing), with balance from

existing liquidity

CLOSING• Expected to close in

3 to 6 months

TRANSACTION OVERVIEW

(i) For more information, please refer to the news release “Kinross announces acquisition of power plants in Brazil to secure long-term, low-cost power for

Paracatu mine” dated February 14, 2018 and available on our website at www.kinross.com

(ii) Assumes foreign exchange rate of 3.25 Brazilian reais to the US dollar.

STRATEGIC RATIONALE

De-risked supply chain

• Secures ~70% of Paracatu’s future power needs at a low, fixed cost

• Reduces exposure for a key input in an environment where we are seeing input costs starting to rise

Investment in core asset

• Expected to further strengthen and enhance Paracatu; a large, long-life cornerstone operation

Expected to reduce Paracatu’s cost of sales by ~$80/oz.

over the life of mine

• Lowers operating costs by eliminating ~70% of future power

purchases

• Current legislation provides reduced power tariffs to

companies generating their own power

Tariff savings expected to be $15/oz. per ounce of the

overall $80/oz. cost of sales reduction over the life of mine

Attractive returns

• Expected to generate a levered IRR between 15% to 30%,

depending on final terms of a planned debt financing

• Additional terminal value beyond Paracatu’s mine life

Page 15: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

15

www.kinross.com

15Strong Balance Sheet & Financial Flexibility

Page 16: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

16

www.kinross.com

16

STRONG BALANCE SHEET & FINANCIAL FLEXIBILITY

SOLID FINANCIAL POSITION

$1.0

$1.6

Cash & cash equivalents Available credit

LIQUIDITY POSITION

Strong position to finance organic development projects with existing cash and liquidity

MAINTAINING FINANCIAL FLEXIBILITY

• Cash and cash equivalents of ~$1.0 billion

• Available credit: $1.6 billion

• Trailing net debt to EBITDA : 0.6x

• Manageable debt schedule with no

significant maturities prior to 2021

As at Dec. 31

$2.6B

Page 17: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

17

www.kinross.com

17

STRONG BALANCE SHEET & FINANCIAL FLEXIBILITY

2018E CAPITAL EXPENDITURES OUTLOOK(2)

Region Sustaining Non-Sustaining Regional Total

Americas $280 $285 $565

West Africa $40 $375 $415

Russia $30 $20 $50

Corporate $5 - $5

TOTAL $355 $680 $1,035

Capitalized Interest $40

TOTAL KINROSS $1,075 +/- 5%

Leveraging strong financial position to invest in development projects & our future

2018E Capital Expenditures ($ millions)

(2) Please refer to endnote #2.

Page 18: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

18

www.kinross.com

18

• Leveraging financial strength we’ve

built over past several years to

invest in our future

Organic projects spanning all 3 of

our regions offer opportunities to

expand production or extend mine

life at our operations

• Total capital expenditures for 2018 are

expected to be $1,075 MILLION

(+/- 5%)

Includes $355 million of sustaining

capital and $40 million of

capitalized interest

Expecting to invest $680 million of non-sustaining capital as we execute on five projects

and advance 3 development opportunities

STRONG BALANCE SHEET & FINANCIAL FLEXIBILITY

2018E NON-SUSTAININGCAPITAL GUIDANCE(2)

Forecasted

Expenditures

Tasiast Project $240 million

Round Mountain Phase W $185 million

Tasiast West Branch Stripping $130 million

Bald Mountain Vantage

Project$90 million

Development projects and

other$35 million

TOTAL $680 million

2018E Non-Sustaining Capital

(2) Please refer to endnote #2.

Page 19: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

19

www.kinross.com

19

STRONG BALANCE SHEET & FINANCIAL FLEXIBILITY

MANAGEABLE DEBT PROFILE

No debt maturities prior to 2021

$0

$500

$0

$500

$0

$500

$250

Through2020

2021 2022 to2023

2024 2025 to2026

2027 2028 to2040

2041

$ m

illio

ns

Debt Schedule

Senior Notes due 2021 5.125%

Senior Notes due 2024 5.950%

Senior Notes due 2027 4.50%

Senior Notes due 2041 6.875%

Interest Rates

Agency Rating

S&P BB+ (Positive)

Moody’s Ba1 (Stable)

Fitch BBB- (Stable)

Debt Ratings

$- $- $- $-

Page 20: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

20

www.kinross.com

20Attractive Organic Development Projects

Page 21: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

21

www.kinross.com

21

ATTRACTIVE DEVELOPMENT PROJECTS

ADVANCING ORGANIC PROJECTS

All of our organic development projects are advancing according to plan, with key

milestones planned for 2018 and beyond

2020

Q1 2018

Q2 2018

Q3 2018

Q4 2018

2019

Project Location

Americas

West Africa

RussiaLa Coipa Restart Project

Sectoral permits expected

Tasiast Phase 1

Expected to

reach full

commercial

production

Fort Knox Gilmore

Feasibility study

expected

mid-2018

Tasiast Phase 2

Construction

expected to begin

Tasiast Sud

Pre-feasibility

study expected

to be complete

Moroshka

Expected to commence mining of ore

Bald Mountain

Expected

commissioning of

Vantage

Round Mountain

Phase W

Construction

expected to be

complete

Tasiast Phase 2

Expected to begin

commercial

production in

Q3 2020

Page 22: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

22

www.kinross.com

22

ATTRACTIVE DEVELOPMENT PROJECTS

TASIAST TWO-PHASED MILL EXPANSION• Phase Two expected to transform Tasiast into a world-class mine with sizeable

production, low costs and a long estimated mine life

22

Page 23: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

23

www.kinross.com

23

RELATIVELY LOW-RISK BROWNFIELDS EXPANSION PROJECT

• Have owned and operated the mine for approixmately 8 years

• Highly trained local team

• Most infrastructure already in place

• Well-defined mineral resource estimate

ATTRACTIVE DEVELOPMENT PROJECTS

LARGE OREBODY WITH LOW EXECUTION RISK

Focus has been to right-size the processing capacity to capture the full value and potential

of Tasiast’s large mineral resource estimate

TASIAST OREBODY & MINERAL RESOURCE PIT(i)

(i) For additional information, please refer to the Tasiast Technical Report dated March 30, 2016 and to our news release dated March 30, 2016, available on

our website at www.kinross.com.

Page 24: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

24

www.kinross.com

24

ATTRACTIVE DEVELOPMENT PROJECTS

TWO-PHASED EXPANSION CONCEPT

PHASE ONE: EXPANSION TO 12,000 t/d

Gyratory

crusher

Ore

stockpile

Oversized

SAG mill

Existing ball mills

Leaching Refining

PHASE TWO: EXPANSION TO 30,000 t/d

Gyratory

crusher

Ore

stockpile

SAG mill New, larger ball

mill

Additional leaching

capacity

Thickening

Page 25: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

25

www.kinross.com

25

Phase Two expansion expected to transform Tasiast into a world-class mine

with low costs and a long estimated mine life

ATTRACTIVE DEVELOPMENT PROJECTS

PHASE TWO FEASIBILITY STUDY RESULTS

Combined Phase One and Phase Two

Estimates

Average annual production (2020-2024) 812,000 ounces

Production cost of sales (2020-2024) $440 per ounce

All-in sustaining cost (2020-2024) $655 per ounce

Capitalized stripping (non-sustaining) (2016-H1 2020) $560 million

Mine life 2029

Net present value(i)(ii) $1.43 billion

Phase Two Stand-Alone Estimates

Initial capital expenditures $590 million

Internal rate of return(i) 24%

Note: figures on this slide reflect a $1,200 per ounce gold price assumption.

(i) January 1, 2018 forward

(ii) After tax, 5% discount rate.

Page 26: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

26

www.kinross.com

26

Study estimates(ii)Study estimates(ii)

$25.46

$22.84 $22.24

$15.16$14.40

2015 2016 H1 2017 PFS FS

$2.18$2.05

$1.96

$2.37$2.25

2015 2016 H1 2017 PFS FS

ATTRACTIVE DEVELOPMENT PROJECTS

OPERATING EFFICIENCIES ENHANCING PROJECT

Recent operating and processing enhancements have positively benefitted both

Phase One and Phase Two expansion projects

• Recent performance outperforming study

estimates

• Further reduction in processing costs expected as

Phase Two increases throughput to 30,000 t/d

Mining costs($ per tonne mined)

Processing costs($ per tonne milled)(i)

(i) Excludes processing costs associated with the dump leach.

(ii) 30k t/d scenario. Estimated average for the period 2020-2030.

Page 27: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

27

www.kinross.com

27

ATTRACTIVE DEVELOPMENT PROJECTS

TASIAST PHASE ONE

Phase One progressing well

• Plant construction is approximately 93%

complete

Remaining work focused primarily on

electrical, instrumentation and controls

installations

• Tailings storage facility complete; have started

depositing tails at the new facility

• Mechanical installation of primary crusher,

stockpile and CIL plant modifications is

substantially complete

• Expect to begin commissioning of the primary

crusher and CIL plant in March

• Commissioning of the SAG mill expected to begin

in April

On track for full commercial production by end of June 2018

SAG mill

Page 28: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

28

www.kinross.com

28

ATTRACTIVE DEVELOPMENT PROJECTS

TASIAST PHASE ONE PROGRESSING WELL

On track for full commercial production by end of June 2018

Conveyor

Primary crusherSAG mill

CIL plant

Page 29: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

29

www.kinross.com

29

ATTRACTIVE DEVELOPMENT PROJECTS

TASIAST PHASE TWO

• Preparing to start development work with

Phase One nearing completion

• Early works for ball mill and power plant

expected to begin during Q2 2018

• Overall engineering approximately 33%

complete

• Procurement progressing well, with

power plant and EPCM contracts now

awarded

• Phase Two is expected to begin

commercial production in Q3 2020

Phase Two is expected to transform Tasiast into a large, world-class operation with low

costs and a long mine life

Page 30: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

30

www.kinross.com

30

ATTRACTIVE DEVELOPMENT PROJECTS

ROUND MOUNTAIN PHASE W OVERVIEW

Phase W project is expected to extend mining by 5 years at one of Kinross’ top performing

mines located in one of the world’s best mining jurisdictions

Page 31: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

31

www.kinross.com

31

ATTRACTIVE DEVELOPMENT PROJECTS

PHASE W FEASIBILITY STUDY RESULTS

Project expected to generate a 13% IRR at an assumed gold price of $1,200 per ounce

Current mine plan + Phase W Estimates

Average annual production (2018-2024) 341,000 gold ounces

Production cost of sales (2018-2024) $765 per gold equivalent ounce

All-in sustaining cost (2018-2024) $905 per gold equivalent ounce

Mine life

Mining – 2024

Stockpile milling – 2025

Residual leach – 2027

Phase W Stand Alone Estimates

Total ounces recovered 1.5 million ounces

Initial capital expenditures $230 million

Capitalized stripping (non-sustaining) $215 million

Internal rate of return(i) 13%

Net present value(i) (ii) $135 million

Note: figures on this slide reflect a $1,200 per ounce gold price assumption.

(i) January 1, 2018 forward.

(ii) After tax, 5% discount rate.

Page 32: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

32

www.kinross.com

32

ATTRACTIVE DEVELOPMENT PROJECTS

ADVANCING ROUND MOUNTAIN PHASE W

• Received Decision Record from the U.S. Bureau

of Land Management and other necessary

approvals in Q4 2017

• Stripping of Phase W was initiated in late 2017,

ahead of schedule

Mining of Phase W ore expected to begin

mid-2019

• Advancing detailed engineering

• Procurement commencing for long lead items

and mining equipment

• Construction of new heap leach, CIC plant and

relocation of infrastructure expected to be

completed in Q2 2019

Phase W construction expected to be complete in Q2 2019

Stripping activities at Phase W

Page 33: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

33

www.kinross.com

33

ATTRACTIVE DEVELOPMENT PROJECTS

ROUND MOUNTAIN RESOURCE UPDATE(1)

Added ounces to resource estimates since feasibility study published in September

July 31,

2017

Depletion Engineering and

Exploration change

December 31,

2017

Proven and probable reserves 3,107 (320) 97 2,884

Measured and indicated resources 1,969 (9) 433 2,393

Inferred resources 1,700 (6) 421 2,115

• Since the updated mineral reserve and resource estimate for Round Mountain published in September, we have added:

433,000 ounces to measured and indicated resource estimates

421,000 ounces to inferred resource estimates

• Majority of these estimated ounces are located in the south and west walls of the main Round Mountain pit

Engineering optimization work underway to determine if economic at our $1,200/ozgold price assumption for reserve estimates

(1) Please refer to endnote #1.

Page 34: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

34

www.kinross.com

34

ATTRACTIVE DEVELOPMENT PROJECTS

REALIZING BALD MOUNTAIN’S POTENTIAL

2016: Doubled reserve estimates

• Added 1.2 million ounces, doubling the

reserve estimate before depletion

2017: Doubled production & lowered costs

1.1

2.1

December 31, 2015 December 31, 2016

Pro

ve

n a

nd

Pro

ba

ble

Rese

rve

s (

Mo

z.)

130,144

282,715$1,182

$642

0

200

400

600

800

1000

1200

0

50000

100000

150000

200000

250000

300000

2016 2017

Cost o

f S

ale

s (

$/o

z.)

Pro

du

ctio

n (

ou

nce

s)

Page 35: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

35

www.kinross.com

35

ATTRACTIVE DEVELOPMENT PROJECTS

BALD MOUNTAIN VANTAGE COMPLEX

Construction of a new heap leach facility and related infrastructure to develop Vantage

Complex in the South Area of Bald Mountain

Vantage Complex Project

• Contemplates construction of a new heap leach

facility and related infrastructure

Design includes additional 68M tonnes of

capacity for both the known resources in the

Vantage area as well as potential future deposits

• Estimated capital expenditures: $105M

Progressing well

• Initial construction work now underway

• Engineering more than 80% complete

• Permitting is proceeding as planned

• Commissioning of the heap leach pad and

processing facilities is expected to commence

in Q1 2019Initial construction work

Page 36: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

36

www.kinross.com

36

ATTRACTIVE DEVELOPMENT PROJECTS

BALD MOUNTAIN EXPLORATION HIGHLIGHTS

Kinross envisions Bald Mountain as a long-life asset with

significant upside potential and mineral resource growth

2017 program largely focused on target identification

• Targeted extensions at existing pits in order to support

operational planning and grow the existing mineral resource

estimates

2018 exploration plan

• Planning infill drill programs with goal of upgrading mineral

resource estimates to reserves at several targets in both

North and South areas

• Also plan to conduct exploration work on earlier stage targets

within the large Bald Mountain land package

For additional information, please see Kinross’ news release dated February 14, 2018 and Appendices A and B, which are available on our website at

www.kinross.com.

Page 37: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

37

www.kinross.com

37

ATTRACTIVE DEVELOPMENT PROJECTS

TASIAST SUD

Pre-feasibility on track for completion in H2 2018

• Tasiast Sud pre-feasibility study progressing well

Study evaluating potential for dump leach operation

that combines material from Tamaya, C6.13 and

C6.15

Higher grade material expected to be transported to

the CIL mill

Successful exploration in 2017

• Completed over 47,000 metres of drilling, focused mainly

at the C6.13 and C6.15 targets

• Drilling has identified continuous mineralization along an

8 km strike, to depths up to 200 metres

• Total addition to Inferred resource estimates(1) in the

Tasiast Sud area: 820,000 ounces

C6.13 and C6.15: 670,000 ounces

Tamaya: 150,000 ounces

For additional information, please see Kinross’ news release dated February 14, 2018 and Appendices A and B, which are available on our website

at www.kinross.com.

(1) Refer to endnote #1.

Page 38: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

38

www.kinross.com

38

ATTRACTIVE DEVELOPMENT PROJECTS

FORT KNOX GILMORE

Commenced feasibility study analyzing potential layback to the west; expect to provide an

update in mid-2018

Page 39: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

39

www.kinross.com

39

ATTRACTIVE DEVELOPMENT PROJECTS

FORT KNOX GILMORE(1)

More than doubled Fort Knox’s measured and indicated resource estimates

• Drilling program initiated in 2014, completing 73,000 metres of core and reverse

circulation drilling in 205 holes

• Results of the drilling program, engineering work and gaining the mineral rights to

Gilmore:

Added 2.1 million ounces to measured and indicated resource estimates, which

was slightly offset by the conversion of measured and indicated resource to proven

and probable reserves, mainly from the East wall of the Fort Knox pit

2016 Depletion Gilmore

addition

Other engineering /

exploration changes

2017

Proven and probable reserves 1,506 (515) - 254 1,245

Measured and indicated resources 1,440 - 2,100 (311) 3,229

Inferred resources 193 (3) 300 199 689

(1) Please refer to endnote #1.

Mineral Reserves and Resources (Au koz.)

Page 40: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

40

www.kinross.com

40

EXPLORATION HIGHLIGHTS

KUPOL

Increasing 2018 exploration budget for Kupol to continue exploration of

high-potential targets

• Primary objective of 2017 drilling in the North Extension was to determine extent of

mineralization

We continue to intersect high grade narrow vein mineralization extending northwards

by up to 2 kilometres from the current limit of the Kupol mine workings

• Focus for 2018 will be a drilling program at tighter spacing to determine the potential for

additions to Inferred resource estimates

For additional information, please see Kinross’ news release dated February 14, 2018 and Appendices A and B, which are available on our website at

www.kinross.com.

Page 41: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

41

www.kinross.com

41

EXPLORATION HIGHLIGHTS

1-YEAR MINE LIFE EXTENSION IN RUSSIA

Continuing our track record of adding reserves to offset depletion at Kupol and Dvoinoye

• Estimated mill production extended

to 2022, another 1-year addition

Result of mine plan optimization

and exploration additions

• Continue to be encouraged by

potential for future resource

additions through exploration

0.6

1.6

2.3

3.0

3.5

4.1

4.8

5.6

6.3

6.9

5.0

4.1

4.0

5.1

4.1

3.9

3.6

3.1

2.6

2.3

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

Gold equivalent ounces (millions)

Ye

ar

Cumulative Production (Au eq.) Proven and Probable Reserves (Au eq.)

(1) Please refer to endnote #1.

(1)

Page 42: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

42

www.kinross.com

42

EXPLORATION HIGHLIGHTS

CURLEW DISTRICT

Promising underground opportunities in the Curlew District; drilling to define gaps and

extend mineralization along strike

• In 2018, we plan to dewater and rehabilitate the historic K2 mine in order to conduct

exploration drilling from underground to better target the extensions of mineralization

identified in 2017

For additional information, please see Kinross’ news release dated February 14, 2018 and Appendices A and B, which are available on our website at

www.kinross.com.

Page 43: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

43

www.kinross.com

43Compelling Relative Value

Page 44: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

44

www.kinross.com

44

(i) Source: Company reports. Figures reflect mid-point of guidance ranges. Production figures for Kinross represent gold only production guidance of 2.4 million

ounces +/- 5%. Kinross expects to produce 2.5 million gold equivalent ounces (+/- 5%) in 2018.

(ii) Source: Company reports. Figures represent mid-point of all-in sustaining cost guidance.

COMPELLING RELATIVE VALUE

2018E PRODUCTION & ALL-IN SUSTAINING COST

2018E Gold Production

(million ounces)

2018E All-In Sustaining Cost

($ per ounce)

0.0

1.0

2.0

3.0

4.0

5.0

Ne

wm

on

t

Barr

ick

Anglo

Gold

Gold

Fie

lds

Gold

corp

Kin

ross

Agnic

o

Yam

ana

Iam

go

ld

$0

$200

$400

$600

$800

$1,000

$1,200

Iam

go

ld

Anglo

Gold

Gold

Fie

lds

Ne

wm

on

t

Kin

ross

Agnic

o

Gold

corp

Barr

ick

Yam

ana

Page 45: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

45

www.kinross.com

45

COMPELLING RELATIVE VALUE

INDUSTRY-LEADING BALANCE SHEET

2.5

1.71.5

1.0 0.90.8

0.60.4

-1.2

Yamana Goldcorp AngloGold Barrick Gold Fields Agnico Kinross Newmont IAMGold

Net Debt to EBITDA (LTM)

Net debt to EBITDA ratio of 0.6x as of December 31, 2017

Source: Company reports; Bloomberg – net debt to trailing 12-month adjusted EBITDA.

Page 46: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

46

www.kinross.com

46Source: Factset analyst consensus – February 23, 2018.

COMPELLING RELATIVE VALUE

2018E METRICS

Attractive value opportunity relative to peers, considering Kinross’ annual production,

cost structure, track record and growth opportunities

EV / 2018E EBITDA P / 2018E OPERATING CF

10.7

8.6

7.9

5.85.4 5.4

4.3 4.1 3.9

Agnic

o

Ne

wm

on

t

Gold

corp

Yam

ana

Barr

ick

IAM

Gold

Kin

ross

Anglo

gG

old

Gold

Fie

lds

12.6

9.3

7.7 7.5

5.2

4.5 4.3

3.5 3.5

Agnic

o

Ne

wm

on

t

Gold

corp

IAM

Gold

Barr

ick

Yam

ana

Kin

ross

Gold

Fie

lds

Anglo

Gold

Page 47: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

47

www.kinross.com

47

Appendix47

Page 48: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

48

www.kinross.com

48

APPENDIX

CURRENCY & OIL SENSITIVITIES

Change

from

Assumptions

Estimated impact

to cost of sales

FX 10% US$17/oz.

Russian rouble 10% US$19/oz.(ii)

Brazilian real 10% US$38/oz.(iii)

Oil $10/bbl. US$3/oz.

Gold price $100/oz. US$4/oz.

2018 Budget Current Spot(i)

Gold US$1,200/oz. $1,330/oz.

Oil US$55/bbl. $63/bbl

Russian rouble 60 56

Brazilian real 3.25 3.24

2018 Budget Assumptions(2)

(i) Source: Factset – February 23, 2018.

(ii) Impact to production cost of sales of the Russian operations

(iii) Impact to production cost of sales of the Brazil operation

2018 Sensitivities (net of hedges)(2)

(2) Please refer to endnote #2.

Page 49: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

49

www.kinross.com

49

APPENDIX

FUEL & CURRENCY HEDGES

Managing exposure to fluctuations in foreign currency and input commodity prices

% of 2018 exposure hedged Average Rate

Brazilian real 31% 3.43 (put) – 4.12 (call)

Russian rouble 20% 60 (put) – 71.2 (call)

Canadian dollar 38% 1.35

Oil & Fuel 53%(i) 48.48

(i) As a result of pre-paid fuel purchases mainly relating to the Company’s Russian operations and fixed pricing in Ghana and Brazil, Kinross’ unhedged, free-

floating oil & fuel exposure for 2018 is ~33% of total consumption

Summary of 2018 foreign currency and energy hedges as at December 31, 2017

• Overall 2018 FX exposures ~30% hedged at favourable rates compared to current

spot prices

• Continue to monitor our FX and oil exposure and look for opportunities to establish

additional input cost hedges if market conditions are favourable

Page 50: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

50

www.kinross.com

50

• Impressive track record of operational excellence

• Estimated mine life: mill – 2020; mining – 2021

AMERICAS

FORT KNOX, USA (100%)

TONNES

(thousands)

GRADE

(g/t)

OUNCES

(thousands)

2P Reserves 88,858 0.4 1,245

M&I Resources 238,031 0.4 3,229

Inferred Resources 56,458 0.4 689

OPERATING RESULTS(4)

2017 GOLD RESERVE AND RESOURCE ESTIMATES(1)

Commenced Gilmore feasibility study to analyze potential future layback

2016 2017

Production (Au. Eq. oz.) 409,844 381,115

Production cost of sales ($/oz.) $741 $628

(1) As at November 30, 2017. Please refer to the news release dated December 12, 2017 for more information, available on our website at www.Kinross.com

(4) Refer to endnote #4.

Page 51: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

51

www.kinross.com

51

• Incremental, high-margin ounces from Process Solution

Management (PSM)

• Phase W is expected to generate solid returns and

extend mining

AMERICAS

ROUND MOUNTAIN, USA (100%)

Strong cash flow generator with opportunities to extend mine life

(1) Refer to endnote #1.

(4) Refer to endnote #4.

TONNES

(thousands)

GRADE

(g/t)

OUNCES

(thousands)

2P Reserves 124,382 0.7 2,884

M&I Resources 105,061 0.7 2,393

Inferred Resources 89,078 0.7 2,115

2017 GOLD RESERVE AND RESOURCE ESTIMATES(1)

OPERATING RESULTS(4)

2016 2017

Production (Au. Eq. oz.) 378,264 436,932

Production cost of sales ($/oz.) $773 $691

16 17 18 19 20 21 22 23 24 25 26 27

Mining

Milling

Leaching

ESTIMATED MINE LIFE

Page 52: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

52

www.kinross.com

52

Timeline Operational Metric Estimate

2018-2024

(Mining)

Strip ratio 2.9

Average grade processed 0.7 grams per tonne

Average annual production(i) 341,000 ounces

Average mining cost $2.00 per tonne

Average processing cost $4.60 per tonne

Production cost of sales $765 per Au eq. oz.

All-in sustaining cost $905 per Au eq. oz.

2025-2027

(Stockpile milling

/ residual leach)

Strip ratio N/A

Average grade processed 0.46 grams per tonne

Average annual production 46,000 ounces

Average re-handle cost $1.80 per tonne

Average processing cost $14.70 per tonne

Production cost of sales $720 per Au eq. oz.

All-in sustaining cost $785 per Au eq. oz.

2018-2027

(Life of project)

Strip ratio 2.9

Average grade processed 0.7 grams per tonne

Average annual production 253,000 ounces

Average mining cost $2.00 per tonne

Average processing cost $4.80 per tonne

Production cost of sales $765 per Au eq. oz.

All-in sustaining cost $900 per Au eq. oz.

ROUND MOUNTAIN PHASE W

SUMMARY OF FEASIBILITY STUDY RESULTS

Estimated Phase W Initial Capital Cost

Operating Estimates (current mine plan + Phase W)

Estimate ($ millions)

Mining fleet 73

Infrastructure 65

Heap leach pad 21

Process facilities 17

Tailings 9

Indirect and owner’s cost 18

Contingency 27

Total $230

Standalone Phase W Estimates

Estimate

Life of mine production 1.5 million ounces

Life of mine ore processed 77.6 million tonnes

Average grade processed 0.8 grams per tonne

Strip ratio 4.0

Initial capital costs $230 million

Capitalized stripping (non-sustaining) $215 million

Internal rate of return 13%

NPV $135 million

(i) Includes years with large variances from the forecast average of up to +/- 150,000 ounces.

Page 53: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

53

www.kinross.com

53

• Acquired in January 2016

• Large estimated mineral resource base with multiple

sources of potential mineral reserve additions

• Successfully doubled production in 2017

AMERICAS

BALD MOUNTAIN, USA (100%)

Forecasting strong near-term cash flow with significant upside potential

TONNES

(thousands)

GRADE

(g/t)

OUNCES

(thousands)

2P Reserves 95,216 0.6 1,698

M&I Resources 180,338 0.6 3,349

Inferred Resources 43,305 0.4 597

2017 GOLD RESERVE AND RESOURCE ESTIMATES(1)

OPERATING RESULTS(4)

2016 2017

Production (Au. Eq. oz.) 130,144 282,715

Production cost of sales ($/oz.) $1,182 $642

(1) Refer to endnote #1.

(4) Refer to endnote #4.

Page 54: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

54

www.kinross.com

54

• Paracatu is among the world’s largest gold operations

with annual throughput of ~60Mt

• Cornerstone asset in Kinross’ portfolio

• Estimated mine life: 2032

AMERICAS

PARACATU, BRAZIL (100%)

Large gold mine with a long mine life that extends to 2032

TONNES

(thousands)

GRADE

(g/t)

OUNCES

(thousands)

2P Reserves 642,321 0.4 8,824

M&I Resources 322,827 0.3 3,249

Inferred Resources 31,033 0.2 227

2016 2017

Production (Au. Eq. oz.) 483,014 359,959

Production cost of sales ($/oz.) $717 $871

OPERATING RESULTS(4)

2017 GOLD RESERVE AND RESOURCE ESTIMATES(1)

(1) Refer to endnote #1.

(4) Refer to endnote #4.

Page 55: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

55

www.kinross.com

55

AMERICAS

OVERVIEW OF ACQUIRED POWER PLANTS

Agreement to acquire the Barra dos Coquieros and Cacu hydro power plants

Location

• Both are located on the Claro River in the

State of Goias, approximately 660km west of

Paracatu

• No additional infrastructure is required to

provide power to the mine site

Generation

capacity

• Combined installed capacity of 155 MW

• Expected to meet approximately 70% of

Paracatu’s future power needs

Remainder expected to be fulfilled from

third party suppliers under

fixed-term power purchase agreements

Long life

assets

• Both plants commissioned in 2010 and are

in good working condition

• Concessions expire in 2037, after Paracatu’s

estimated mine life of 2032

Barra dos Coquieros

Cacu

Page 56: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

56

www.kinross.com

56

APPENDIX

LA COIPA RESTART PROJECT: PFS RESULTS

Life of Mine Estimates (100% basis)(i)

Life of Mine 5.5 years

Total ounces recovered 1.03 million gold equivalent ounces

Average annual production 207,000 gold equivalent ounces per year

Average cost of sales $674 per gold equivalent ounce

Average all-in sustaining cost(ii) $767 per gold equivalent ounce

Initial capital $94 million

Pre-Stripping $105 million

IRR (after-tax) 20%

NPV(iii) $120 million

• PFS based on using existing infrastructure to blend and process higher grade material from the

recently delineated Phase 7 deposit with oxide/transition material from the existing Puren deposit

Project expected to generate a 20% IRR at an assumed gold price of $1,200 per ounce

(i) Summary results are shown on a 100% basis, however, Kinross has a 65% interest in Puren and currently holds a 50% interest in the Phase 7 deposit but has entered into an

agreement whereby it has agreed to purchase the other 50% that it does not currently own.

(ii) All-in sustaining cost includes operating costs, sustaining capital, and post start-up capitalized stripping and does not include estimated initial capital expenditures of $94 million and

estimated pre-stripping of $105 million, and any exploration, income taxes and non-cash items related to reclamation or allocation of regional or corporate overhead costs. This differs

from the World Gold Council definition of all-in sustaining cost.

(iii) After tax, 5% discount rate.

Page 57: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

57

www.kinross.com

57

Life of Mine Estimates

Mill throughput capacity 13,000 tonnes per day

Average mining rate 80,000 tonnes per day

Average gold grade 1.69 g/t

Average silver grade 61.5 g/t

Average gold recovery 76%

Average silver recovery 59%

Strip ratio (waste:ore) 5.0

• The pre-feasibility study estimates a 5.5 year mine life, following receipt of permits and

commencement of stripping

Processing expected to commence 1.5 years after pre-stripping has been initiated and continue

for 4 years

Assumptions

Gold price $1,200 per oz.

Silver price $17 per oz.

Oil price $65 per barrel

Chilean Peso 600 to the US dollar

Discount rate 5%

KEY ASSUMPTIONSADDITIONAL OPERATING METRICS

$1,100 $1,200 $1,300

IRR 15% 20% 26%

GOLD PRICE SENSITIVITY

APPENDIX

LA COIPA RESTART PROJECT: PFS RESULTS

Page 58: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

58

www.kinross.com

58

• High-grade, low-cost underground mines

• Estimated mine life: 2022

RUSSIA

KUPOL-DVOINOYE (100%)

2016 2017

Production (Au. Eq. oz.) 734,143 580,451

Production cost of sales ($/oz.) $441 $521

OPERATING RESULTS(4)

Our Russian operations are a model for successfully operating in a remote location

(1) Refer to endnote #1.

(4) Refer to endnote #4.

TONNES

(thousands)

GRADE

(g/t)

OUNCES

(thousands)

2P Reserves 8,161 7.7 2,011

M&I Resources 929 10.8 323

Inferred Resources 503 9.4 151

2017 GOLD RESERVE AND RESOURCE ESTIMATES(1)

Page 59: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

59

www.kinross.com

59

• Chirano is an underground operation located in

southwestern Ghana

• Estimated mine life: 2020

WEST AFRICA

CHIRANO, GHANA (90%)

Cost reductions achieved at Chirano by transitioning to self-perform mining

(1) Refer to endnote #1.

(3) Refer to endnote #3.

(4) Refer to endnote #4.

TONNES

(thousands)

GRADE

(g/t)

OUNCES

(thousands)

2P Reserves 8,301 2.1 567

M&I Resources 10,975 2.1 746

Inferred Resources 1,590 3.0 152

2016 2017

Production (Au. Eq. oz.) 190,759 221,424

Production cost of sales ($/oz.) $921 $797

OPERATING RESULTS(3,4)

2017 GOLD RESERVE AND RESOURCE ESTIMATES(1)

Page 60: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

60

www.kinross.com

60

• Phase Two of mill expansion expected to transform

Tasiast into a world-class operation; forecast to reach

commercial production in Q3 2020

• Estimated mine life: 2029

WEST AFRICA

TASIAST, MAURITANIA (100%)

Operating mine with a large gold resource located in a prospective district

TONNES

(thousands)

GRADE

(g/t)

OUNCES

(thousands)

2P Reserves 124,789 2.0 7,861

M&I Resources 74,591 1.2 2,959

Inferred Resources 41,771 0.9 1,237

2016 2017

Production (Au. Eq. oz.) 175,176 243,240

Production cost of sales ($/oz.) $1,061 $754

OPERATING RESULTS(4)

2017 GOLD RESERVE AND RESOURCE ESTIMATES(1)

(1) Refer to endnote #1.

(4) Refer to endnote #4.

Page 61: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

61

www.kinross.com

61

Timeline Operational Metric Estimate

2020-2024

(First 5 years

of Phase Two

operation)

Total tonnes mined 438 million

Strip ratio 6.4

Average CIL grade processed 2.5 grams per tonne

Average annual production 812,000 ounces

Average mining cost $2.05 per tonne

Average processing cost $14.50 per tonne

Production cost of sales $440 per ounce

All-in sustaining cost $655 per ounce

2025-2029

(Remaining life

of mine)

Total tonnes mined 141 million tonnes

Strip ratio 4.8

Average CIL grade processed 1.5 grams per tonne

Average annual production 457,000 ounces

Average mining and re-handle cost $2.75 per tonne

Average processing cost $14.30 per tonne

Production cost of sales $680 per ounce

All-in sustaining cost $835 per ounce

2020-2029

(Life of project)

Total tonnes mined 579 million tonnes

Strip ratio 5.9

Average CIL grade processed 2.0 grams per tonne

Average recovery 93%

Average annual production 634,000 ounces

Average mining cost $2.25 per tonne

Average processing cost $14.40 per tonne

Production cost of sales $530 per ounce

All-in sustaining cost $720 per ounce

TASIAST EXPANSION PROJECT

SUMMARY OF FEASIBILITY STUDY RESULTS

Estimated Initial Capital Cost

Operating Estimates (Phase One & Two combined)

Estimate ($ millions)

Processing plant 137

Power supply 76

Water supply 50

Mining fleet 49

EPCM 27

Indirect, owner’s cost and taxes 120

Contingency 79

Miscellaneous 52

Total $590

Standalone Phase Two Estimates

Estimate

Initial capital $590 million

Internal rate of return 24%

Page 62: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

62

www.kinross.com

62

ENDNOTES

1) Mineral reserves and mineral resources are estimates. For more information regarding Kinross’ 2017 mineral

reserve and mineral resource estimates, please refer to our Annual Mineral Reserve and Mineral Resource

Statement as at December 31, 2017 contained in our news release dated February 14, 2018, which is available on

our website at www.kinross.com. Kinross’ Annual Mineral Reserve and Mineral Resource Statements for previous

years (2008 – 2017) are also available on our website at www.kinross.com.

2) For more information regarding Kinross’ production, cost, overhead expense and capital expenditures outlook for

2018, please refer to the news release dated February 14, 2018 which is available on our website at

www.kinross.com. Kinross’ outlook for 2018 represents forward-looking information and users are cautioned that

actual results may vary. Please refer to the Cautionary Statement on Forward-Looking Information on slide 2 of this

presentation and in our news release dated February 14, 2018, available on our website at www.kinross.com.

3) Unless otherwise noted, gold equivalent production, gold equivalent ounces sold and production cost of sales

figures in this presentation are based on Kinross’ 90% share of Chirano production and sales.

4) Attributable production cost of sales per gold equivalent ounce sold and per gold ounce sold on a by-product basis,

all-in sustaining cost per gold equivalent ounce sold and per gold ounce sold on a by-product basis, adjusted net

earnings attributable to common shareholders, and adjusted operating cash flow numbers are non-GAAP financial

measures. For more information and reconciliations of these non-GAAP measures for the three months and twelve

months ended December 31, 2017, please refer to the news release dated February 14, 2018, under the heading

“Reconciliation of non-GAAP financial measures,” available on our website at www.kinross.com.

Page 63: CAUTIONARY STATEMENT ON FORWARD-LOOKINGs2.q4cdn.com/496390694/files/doc_presentations/2018/030418-PDA… · 2 2 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements,

63

www.kinross.com

63

KINROSS GOLD CORPORATION

25 York Street, 17th Floor │Toronto, ON │ M5J 2V5

www.kinross.com


Recommended